KC-30A Asset Information Management SystemSQNLDR Tanya Evans

Systems Engineering Airworthiness Manager, HALSPO

Page 2: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Scope

• Intro to HALSPO

• KC-30A Capability

• KC-30A Enterprise

• Levels of Service

• Critical Assets

• Types of data

• Data Mapping

• Decision Making Framework

• Asset Information Management

• Where to from here

Page 3: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Heavy Airlift Systems Program Office

Mission

We deliver heavy airlift capability for defence in partnership with industry and global partners

Vision

HALSPO works as a team to deliver:

Heavy airlift capability to meet global operational requirements

Ongoing agile and responsive support to Air Mobility Group

Cost-effective through-life support leveraging a strong industry base

Objectives

1. Deliver the required sustainment outcomes and manage the introduction of new capability

2. Continue to improve our business

3. Build on external and internal relationships and be trusted to deliver

4. Provide heavy Airlift sustainment services using a diverse, motivated and skilled workforce

of optimal size and structure

Page 4: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

KC-30A Capability

• 5 x KC-30A

• A/C 006 due Sep 2017

• A/C 007 due mid 2019

Missions:

• AAR

– Aerial refuelling

Boom System

– Hose and Drogue

• ALS

– Personnel

– Stores

– VIP Transport

Page 5: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

KC-30A Enterprise

Page 6: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Current Levels of Service

• Life of type

• Available Aircraft

• Mission Capability

• Rate of Effort

• Aircraft Serviceability

• Mission System serviceability

– Pods

– Boom

– UARRSI

Page 7: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

How do we know?

• Aircraft availability

• Serviceability rates

• Maintenance hours

• Mean time between failure

• Number of serviceable engines

• Pod hours

• Boom hours

• Boom cycles

• Engine Hours

• Engine Cycles

• Airframe Hours

• Landing Cycles

• Qualified aircrew

• Number of maintainers

• Engineering vacancies

• Mean time to repair

• Number of serviceable spares

• Cost to repair

• Number of Publication Amendment Requests

• Tech Information registration time

• Number of tasks engineering tasks open

• Days in maintenance

• Maintenance Interval Extension Requests

• Carried Forward Unserviceability

• Publication Interim Amendments

• Aviation Safety Occurrence reports

• Corrective Action Requests

• Mission Completion rates

• Facilities maintenance requests

• Number of Special Technical Instructions

• Rate of effort achievement

• Flying Hours

• Flight Cycles

• Courses completed

• Course length

• Fuel consumption

• Oil consumption

• EGT Margins

• Downtime due to spares

• Downtime due to facilities

• UARRSI serviceability

• Downtime due labour

• Structural condition data

• Number of defects

• Tyre wear

• Missions cancelled

• ……….and many more……….

Page 8: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Critical Assets

• Engines

• ARBS

• Pods

• Maintenance manuals

• Simulators

• Maintainers

• Facilities

Page 9: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Types of Data

• Performance

– Ability of an asset to fulfil its requirements or objectives

• Lifing/Usage

– Details the consumed and remaining life of the asset

• Condition

– Describes the health of an asset (deterioration, wear etc)

• Reliability

– Probability that an asset will perform as required for a given time under

set conditions

• Supportability

– Considers obsolescence, technology, spares and life cycle cost

Page 10: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Data Mapping

Data Type Airframe Engine Boom Hangar Simulators Maint

Manuals

Performance -Availability

-Serviceability

-ROE

achievement

-Availability

-Serviceabilty

-Mission

Capable

-Downtime

due facilities

-Qualified

aircrew

Lifing -Airframe

Hours

-Airframe

cycles

-Engine hours

-Engine

Cycles

-Boom hours

-Boom cycles

-Time since

construction

-Operating

hours

Condition -Condition

assessments

-EGT Margins

-Oil

consumption

-Inspection

results

-No. PIRRs

Reliability -Defects

-Materiel

ASORs

-Defects -MIERs

-Defects

-Maintenance

Requests

-No. interim

amendments

Supportability -MTTR

-Downtime

due spares

-Cost to

replace

-No. spares

available

-PIRR

turnaround

time

?

?

?

?

?

?

?

Page 11: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Decision Making Framework

Integrated

Product Teams 6 weekly

Enterprise

Management GroupMonthly

Weapon System

Steering GroupQuarterly

Weapon System Strategic

Management BoardAnnually

Individual asset

Systems Integration

Capability focus

Strategic planning

Page 12: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Turning Data into Information

Engine Availability

Engine Serviceability

Engine cycles / engine

Engine hours / engine

EGT Margins

Component spares availability

No defects per engine

CFUs per engine

Component reliability data

Engine fleet availability

Engine fleet serviceability

Fleet usage vs expectancy

Key risks

Key engine risks

Impacts to service levels

Opportunities

Risks to levels of

service

Opportunities

Risk retention

Changes to strategic plan

Changes to service levels

Restrictions imposed

Resource prioritisation

Engines Example

Page 13: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Where to from here?

• Finalise and Approve HALSPO Asset Information Management Plan

• Establish and review against existing reporting framework

– Levels of Service

– Critical Assets

• Develop detailed data map

• Identify shortfalls and remove unnecessary monitoring activity

Page 14: KC-30A Asset Information Management System · KC-30A Asset Information Management System SQNLDR Tanya Evans Systems Engineering Airworthiness Manager, HALSPO. Scope • Intro to HALSPO

Questions?