KE 168 March 2013 GASTEC QA Approval Requirements 168 Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs

Upload: nguyenanh

Post on 20-Mar-2018

230 views

Category:

Documents


2 download

TRANSCRIPT

KE 168 March 2013

GASTEC QA

Approval Requirements 168

Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 2 - March 2013

Kiwa Nederland BV

Wilmersdorf 50

7327 AC Apeldoorn

Postbus 137

7300 AC Apeldoorn

The Netherlands

Tel. +31 55 539 33 93 Fax +31 55 539 34 94 www.kiwa.nl

© 2011 Kiwa N.V. All rights reserved. No part of this book may be reproduced, stored in a database or retrieval system, or published, in any form or in any way, electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher. The use of this evaluation guideline by third parties, for any purpose whatsoever, is only allowed after a written agreement is made with Kiwa to this end.

Foreword

These GASTEC QA Approval Requirements have been accepted by the Board of Experts of the GASTEC QA Quality mark, wherein all the relevant parties in the field of gas related products are represented. This Board of Experts also supervises the certification activities and where necessary require the GASTEC QA Approval requirement to be revised. All references to Board of Experts in this GASTEC QA Approval requirement pertain to the above mentioned Board of Experts. This GASTEC QA Approval requirement will be used by Kiwa Nederland BV in conjunction with the “KIWA regulations for carrying the GASTEC QA Quality mark”. This regulation details the method employed by Kiwa Nederland BV for conducting the necessary investigations prior to issuing the (technical approval-with) product certificate and the method of external control. The inspection frequency is determined by the above mentioned Board of Experts. Approved by Board of Experts : April 2

nd 2013

Accepted by Kiwa Nederland BV : March 2

nd 2013

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 3 - March 2013

Contents

1 Introduction 6

1.1 General 6

1.2 Scope 6

1.3 Acceptance of test reports provided by the supplier 6

2 Product Requirements 7

2.1 General 7 2.1.1 Assembly 7 2.1.2 Reliability and suitability 7 2.1.3 Provision for pressure test 7 2.1.4 Use of self-closing gas valves in combination with top pieces of tapping saddles 7 2.1.5 Use of top pieces in combination with tapping saddles 7

2.2 Materials 7 2.2.1 Plastic components 7 2.2.2 Elastomeric components 7

2.3 Construction 7 2.3.1 Pressure accommodation during use 7 2.3.2 Pressure accommodation during pressure testing 7

2.4 Marking and documentation 8 2.4.1 Marking 8 2.4.2 Instructions 8

3 Testing methods 9

3.1 General 9

3.2 Testing of top pieces of tapping saddles for self-closing gas valves for the placement of inflatable pipe plugs 9

3.3 Leak tightness test after tapping 9

3.4 Leak tightness test at 200 mbar 9

3.5 Leak tightness test after repeated use 9

3.6 Testing for pressure difference over the self-closing gas valve during pressurizing of the service line 9

3.7 Leak tightness test after pressure test 9

4 Quality system requirements 10

4.1 General 10

4.2 Manager of the quality system 10

4.3 Internal quality control/quality plan 10

4.4 Procedures and work instructions 10

4.5 Other Quality system requirements 10

5 Summary of tests and inspections 11

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 4 - March 2013

5.1 Test matrix self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs 11

5.2 Evaluation of the quality system 12

6 Agreements on the performance of certification 13

6.1 General 13

6.2 Certification staff 13

6.3 Qualification requirements for executive staff of CI that fulfil the requirements of EN 45011 13

6.4 Qualification requirements for executive staff of a CI that are in addition set up by the Board of Experts for the subject of this evaluation guideline 13

6.5 Qualification 14

7 List of mentioned documents 15

7.1 Standards/ normative documents 15

7.2 Replacement(s) of standard/ normative documents 15

Appendix A: Model IQC-scheme or frame-IQC-scheme Appendix B: Model Certificate

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 5 - March 2013

Summary of changes

Paragraph Change

1.1 A general introduction is included, replacing the 1996 foreword.

1.2 Scope: Requirements for the tapping valves have been added. Requirements for the gas installations have been added. The scope of application of self-closing valves has been added.

1.3 A clause regarding the acceptance of test reports provided by the supplier is included

2 Numbering of paragraphs has been changed.

2.1 A general introduction to the product requirements is included

2.1.4 2.1.5

(formerly 2.6 and 2.7): Date of GASTEC QA Approval Requirements 58 has been changed from 1 November 1993 to April 2011. NEN 7232 has been added.

2.2 Ch.3 has become par.2.2

2.4.1 (formerly 3.1): Requirements for the high-impact PVC has been added.

2.2.2 (formerly 3.2): NEN 7212 has been replaced by: NEN-EN 682 standard, types GAL or GBL.

2.2.2 Ch.4 has become par.2.2.2

2.4 Ch.5 has become par.2.4

2.4.1 (formerly 5.1) „Manufacturer‟ has been replaced by „manufacturer or supplier‟. „trademark‟ has been replaced by „registered trademark‟.

2.4.2 (formerly 5.2) Added: The manufacturer shall also supply assembly instructions in Dutch.

3 Ch.6 has become ch.3.

3.2 (formerly 6.2): Date of GASTEC QA Approval Requirements 58 has been changed from 1 November 1993 to April 2011. NEN 7232 has been added.

3.7 (new): A leak tightness test after pressure test has been added

4 New chapter „quality system requirements‟ included

5 Summary of tests and inspections included

6 Agreemenst on the performance of certification included

7 List of referenced documents included

Appendix A

Model of IQC-scheme included

Appendix B

Model Certificate included

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 6 - March 2013

1 Introduction

1.1 General These GASTEC QA Approval Requirements replace the GASTEC QA Approval Requirements 168, Self-closing gas valves for hot tapping and installing of inflatable pipe plugs , dated March 1996. During the execution of the certification work, Kiwa is bound to the requirements as laid down in the chapter “Agreements on the performance of certification”.

1.2 Scope These Approval Requirements apply to self-closing gas valves to be mounted in high-impact polyvinylchloride (PVC-HI) tapping saddles for hot tapping high-impact polyvinylchloride (PVC-HI) distribution lines and hot installing of inflatable pipe plugs. The maximum operating pressure is 200 mbar. The self-closing gas valve may only be used in combination with GASTEC QA approved tapping saddles. The tapping saddles shall meet the GASTEC QA Approval requirements 58 for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI) of April 2011 and NEN 7232. The self-closing gas valves are for use in gas installations for 2

nd and 3

rd family gases according to NEN-EN 437 for

gas pressures up to and including 200 mbar. The specific functional recommendations for application of these self-closing valves in gas systems are described in NEN 7244 and national and international standards and/or regulations.

1.3 Acceptance of test reports provided by the supplier The rules for acceptance of test reports provided by the supplier are laid down in the “KIWA regulations for carrying the GASTEC QA Quality mark”.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 7 - March 2013

2 Product Requirements

2.1 General In this chapter the functional and performance requirements imposed on Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs are included, as well as the determination methods in order to be able to determine whether the requirements are fulfilled.

2.1.1 Assembly The assembly, dimensions and tolerances of the components shall comply with the construction drawings approved and certified by Kiwa Nederland.

2.1.2 Reliability and suitability The self-closing gas valve shall be reliable and well-suited for the intended purpose. It shall be possible to drill safe and reliable taps under practical conditions and to set inflatable plugs with virtually no gas being released.

2.1.3 Provision for pressure test The manufacturer shall provide a plug for the pressure test equipment, or provide another provision that makes it possible for the service line to be pressure tested at 1 bar without creating a pressure difference over the self-closing gas valve.

2.1.4 Use of self-closing gas valves in combination with top pieces of tapping saddles The self-closing gas valve may only be used in combination with GASTEC QA approved top pieces (Dutch: opzetstukken) for tapping saddles. The top pieces shall meet the GASTEC QA Approval Requirements 58 for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI) and NEN 7232 “Plastics piping systems for gas supply – Saddles with clamp connection of modified poly(vinylchloride) (modified PVC) - Requirements and test methods”.

2.1.5 Use of top pieces in combination with tapping saddles The above mentioned top pieces with built-in self-closing gas valve may only be used in combination with GASTEC QA approved tapping saddles. The tapping saddles shall meet the GASTEC QA Approval requirements 58 for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI) and NEN 7232 “Plastics piping systems for gas supply – Saddles with clamp connection of modified poly(vinylchloride) (modified PVC) - Requirements and test methods”.

2.2 Materials

2.2.1 Plastic components Plastic components of the construction that make contact with gas shall be made of high-impact PVC, in accordance with the GASTEC-QA Approval Requirements 58 for saddles with clamp connection of polyvinylchloride (PVC-HI). The material shall be free of contamination and resistant against the action of gas and its components.

2.2.2 Elastomeric components Elastomeric sealing components shall conform to the requirements of NEN-EN 682, Type GAL or GBL.

2.3 Construction

2.3.1 Pressure accommodation during use The construction shall be made in such a way that no pressure difference is created over the self-closing gas valve under operational conditions.

2.3.2 Pressure accommodation during pressure testing The construction shall be made in such a way that when the service line is pressurized to 1 bar from the gas meter side, no pressure difference is created over the self-closing gas valve. When pressurizing to 1 bar from the side of the top piece, this can be achieved with a provision in the connector of the pressurizing device on the top piece.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 8 - March 2013

2.4 Marking and documentation

2.4.1 Marking The following information shall be permanently applied to the construction:

1. Name of the manufacturer or supplier and/or the registered trademark

2. The GASTEC QA word mark or logo mark;

2.4.2 Instructions The manufacturer shall also supply assembly instructions in Dutch. The documentation shall provide clear instructions for tapping, pressurizing and placement of inflatable pipe plugs. The following shall be indicated in the documentation:

The types of top pieces and tapping saddles for which the constructions are suitable;

What cutters and devices for the placement of inflatable pipe plugs may be used;

The type of fitting and connector to be used for the pressure testing equipment

The maximum allowable pressure for pressurizing and placing inflatable pipe plugs.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 9 - March 2013

3 Testing methods

3.1 General All measurements shall be performed at 23 ± 2 °C. Pressures shall be measured using a precision manometer as specified by NEN 927, class 1. Leakage losses shall be measured with an accuracy to ± 5 cm

3/h.

Tests shall be done in triplicate.

3.2 Testing of top pieces of tapping saddles for self-closing gas valves for the placement of inflatable pipe plugs The top pieces, including the corresponding caps, shall fulfil the relevant parts of the GASTEC-QA Approval Requirements 58 for the GASTEC QA product certificate for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI) and NEN 7232 “Plastics piping systems for gas supply – Saddles with clamp connection of modified poly(vinylchloride) (modified PVC) - Requirements and test methods”.

3.3 Leak tightness test after tapping The high-impact polyvinylchloride (PVC-HI) main line should be tapped at an operating pressure of 25 +5/-0 mbar using through the self-closing gas valve with the drill provided for this. The seal of the valve shall be checked for leak tightness. The leakage loss may not exceed 1000 cm

3/h.

3.4 Leak tightness test at 200 mbar After being subjected to the leak tightness test mentioned in paragraph 3.3, without installation of the screw cap, the construction shall be able to withstand an internal pressure of 200 +10/-0 mbar for a period of 24 hours under the self-closing gas valve. The construction shall remain intact. The test is performed by measuring the leakage loss over the self-closing gas valve from the start of the test to the end of the test. The leakage loss from the start to the end of the test period may not exceed 1000 cm

3/h.

3.5 Leak tightness test after repeated use After being subjected to leak tightness test mentioned in paragraph 3.4, the construction shall be tested after repeated use. Tapping shall be done 10 times at an operational pressure of 200 +10/-0 mbar through the self-closing gas valve with the drill provided for this. The self-closing gas valve may not show any damage after completion of the tappings. The test is performed by measuring the leakage loss over the self-closing gas valve. The leakage loss may not exceed 1000 cm

3/h.

3.6 Testing for pressure difference over the self-closing gas valve during pressurizing of the service line The construction is brought to 1 bar with an even pressure build-up from the service line connection. The duration of this pressure build-up is 15 seconds. No pressure difference may arise across the self-closing gas valve during this process.

3.7 Leak tightness test after pressure test Directly after being subjected to the pressure test mentioned in paragraph 3.6, the leak tightness of the self-closing valve shall be tested. The seal of the valve shall be checked for leak tightness during 1 hour at 200 +10/-0 mbar and 1 hour at 25 +5/-0 mbar. The leakage loss may not exceed 1000 cm

3/h. The self-closing gas valve may not show any

damage or malfunction after completion of the test. This shall be checked by way of a visual test.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 10 - March 2013

4 Quality system requirements

4.1 General This chapter contains the requirements that have to be fulfilled by the manufacturer‟s quality system.

4.2 Manager of the quality system Within the manufacturer‟s organisational structure an employee shall be appointed who is in charge of managing the quality system.

4.3 Internal quality control/quality plan As part of the quality system the manufacturer shall implement an internal quality control schedule (IQC-scheme). In this IQC-scheme the following shall be demonstrably recorded:

which aspects are inspected by the manufacturer;

according to which methods these inspections are carried out;

how often these inspections are carried out;

how the inspection results are registered and stored. This IQC-schedule shall be in the format as shown in the annex. The schedule shall be detailed in such a way that it provides Kiwa sufficient confidence that requirements will be continuously fulfilled.

4.4 Procedures and work instructions The manufacturer shall be able to submit:

Procedures for: - the handling of non-conforming products;

- corrective actions in case non-conformities are found;

- the handling of complaints regarding the products and / or services supplied;

the work instructions and inspection sheets in use

instructions for packaging and closing off of products during storage and transport.

4.5 Other Quality system requirements The quality system of the production location shall be ISO 9001 certified. Part of the ISO 9001 certified quality system can be combined with the IQC scheme.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 11 - March 2013

5 Summary of tests and inspections

This chapter contains a summary of tests and inspections to be carried out during: Initial evaluation: the investigation necessary in order to determine whether all requirements of the evaluation

guideline are fulfilled, Inspection visit: the surveillance inspections carried out after issuing the certificate in order to determine whether

the certified products continuously fulfil the requirements of this evaluation guideline. The inspections are carried out according to the frequency indicated. Inspection of the quality system: inspection with regard to the correct implementation of the IQC-schedule and

procedures.

5.1 Test matrix self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs

Description of requirement Clause guideline or standard

Test within the scope of

Initial evaluation tests

Surveillance by CI after issue of the certificate

1)

Inspection2)

Frequency

Requirements to be met by self-closing

valve as received

GASTEC QA 168 :

2.1

Assembly GASTEC QA 168 :

2.1.1

X X every two

years

Reliability and suitability GASTEC QA 168 :

2.1.2

X

Provision for pressure test GASTEC QA 168 :

2.1.3

X X every two

years

Use of self-closing gas valves in

combination with top pieces of tapping

saddles

GASTEC QA 168 :

2.1.4

X X once a year

Use of top pieces in combination with

tapping saddles

GASTEC QA 168 :

2.1.5

X X once a year

Materials GASTEC QA 168 :

2.2

Plastic components GASTEC QA 168 :

2.2.1

X X once a year

Rubber components GASTEC QA 168 :

2.2.2

X X once a year

Construction GASTEC QA 168 :

2.2.2

Pressure accommodation during use GASTEC QA 168 :

2.3.1

X

Pressure accommodation during pressure

testing

GASTEC QA 168 :

2.3.2

X

Marking and documentation GASTEC QA 168 :

2.4

Marking GASTEC QA 168 :

2.4.1

X X once a year

Instructions GASTEC QA 168 :

2.4.2

X X once a year

Testing GASTEC QA 168 : 3

Top pieces GASTEC QA 168 :

3.2

X X once a year

Leak tightness after tapping GASTEC QA 168 :

3.3

X

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 12 - March 2013

Leak tightness at 200 mbar GASTEC QA 168 :

3.4

X

Leak tightness after repeated use GASTEC QA 168 :

3.5

X X once a year

Pressure difference over the self-closing

gas valve during pressurizing of the

service line

GASTEC QA 168 :

3.6

X X once a year

Leak tightness after pressure test GASTEC QA 168 :

3.7

X X once a year

1) In case the product or production process changes significantly, the performance requirements shall be determined again with respect to paragraph 13 of the “Kiwa regulations for product certification”.

2) All product properties that can be determined within the visiting time (maximum 1 day) are determined by the inspector or by the supplier in the presence of the inspector. In case this is not possible, an agreement will be made between the certification body and the supplier about how the inspection will take place.

5.2 Evaluation of the quality system During each inspection visit the quality system of the supplier shall be examined and evaluated.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 13 - March 2013

6 Agreements on the performance of certification

6.1 General This chapter contains the by the Board of Experts elaborated agreements on the performance of certification by Kiwa.

6.2 Certification staff The staff involved in the certification process is sub-divided into:

Certification engineers: in charge of carrying out the pre-certification tests and assessing the reports of the inspectors;

Inspectors: in charge of carrying out external inspections at the supplier‟s works;

Decision-makers: in charge of taking decisions in connection with the pre-certification tests performed, continuing the certification in connection with the inspections performed and taking decisions with regard to corrective actions.

6.3 Qualification requirements for executive staff of CI that fulfil the requirements of EN 45011 The qualification of the executive staff of a CI shall fulfil the requirements of EN 45011. The way qualification of the staff is performed shall be described in the quality manual of the CI.

EN45011

Auditor (A) pre-certification tests and inspections of companies

Inspector (B) factory, field & project visits and follow-up inspections

Decision maker (C) person deciding on granting of certificate

1 Education, general

Relevant tech. thinking and working level comparing to Bachelor Internal training in certification and Kiwa policies Training in audit skills

Tech. thinking and working level at vocational education (intermediate level) Internal training in certification and Kiwa policies Training in audit skills

Thinking and working at Bachelor level Internal training in certification and Kiwa policies Training in audit skills

2 Education, specific

Training geared towards this guideline Specific courses and training (knowledge and skills)

Training geared towards this guideline Specific courses and training (knowledge and skills)

not applicable

3 Experience, general

1 year of relevant working experience with a minimum of 4 tests of which: 1 complete pre-certification test independently, under supervision

1 year of relevant working experience with a minimum of 4 tests, 1 of which independently, under supervision

4 years of working experience, with a minimum of 1 year of experience with certification

4 Experience, specific

Detailed knowledge of certification and 4 tests relating to this specific guideline or to guidelines which are related to each other.

Detailed knowledge of certification and 4 tests relating to the specific guideline or to guidelines which are related to each other

Basic knowledge of the specific certification

6.4 Qualification requirements for executive staff of a CI that are in addition set up by the Board of Experts for the subject of this evaluation guideline

No additional requirements are set up by the Board of Experts.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 14 - March 2013

6.5 Qualification Certification staff shall be demonstrably qualified by evaluation of education and experience of the above-mentioned requirements. In case qualification takes place on the basis of other criteria, then this has to be recorded in writing. The authority for qualification rests with:

Decision-makers: qualification of the certification experts and inspectors;

Management of the certification body: qualification of the decision-makers.

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 15 - March 2013

7 List of mentioned documents

7.1 Standards/ normative documents Unless stated otherwise, the latest edition of all standards referenced shall be used. Sorted by number: NEN-EN 437:2003+A1:2009

Test gases - Test pressures - Appliance categories

NEN-EN 682:2002 Elastomeric seals - Materials requirements for seals used in pipes and fittings carrying gas and hydrocarbon fluids

NEN 927:1963 Pressure gauges - Testing and gauging NEN 7232:2011 Plastics piping systems for gas supply - Saddles with clamp connection of

modified poly(vinyl chloride) (modified PVC) - Requirements and test methods

NEN 7244 series Dutch edition on base of NEN-EN 12007 series: Gas supply systems - Pipelines for maximum operating pressure up to and including 16 bar

Gastec QA Approval Requirements 58

Approval Requirements for the GASTEC QA product certificate for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI)

7.2 Replacement(s) of standard/ normative documents Sorted by number: Old Document Replaced by Replacement‟s title NEN 7212:1987 Rubber seals in distribution systems for natural gas

NEN-EN 682:2002 Elastomeric seals - Materials requirements for seals used in pipes and fittings carrying gas and hydrocarbon fluids

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 16 - March 2013

I Appendix A: Model IQC-scheme or frame-IQC-

scheme

Subject Aspect Method Frequency Registration

Incoming control supplied materials

Compound Rubber parts

Material data sheets, preferably according to EN 10204, type 3.1 Material Certificates Certificate according to EN 682 Shore hardness test

Production process

Procedures Work instructions Used apparatus

Manufacture Applied inspection methods Inspection frequency Registration and Recording inspection results.

Finished product inspection

Procedures Work instructions Used apparatus

Applied inspection methods Inspection frequency Registration and Recording inspection results. Appearance Marking Contamination

Status of measuring and test equipment Measure equipment

List of used test equipment Calibration and maintenance reports

Logistics Internal transport Storage Packaging Preservation Identification Marking

Procedure non conforming

Registration and Recording Settlement

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 17 - March 2013

Subject Aspect Method Frequency Registration

Complaints procedure

Registration and Recording Settlement

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 18 - March 2013

Number Replaces -- Issued Scope KE 168 Report number Page Contract number

Product Certificate

Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs

Based on pre-certification tests as well as periodic inspections by Kiwa Nederland B.V., the products referred to in this certificate and marked with the GASTEC QA mark, supplied by

Manufacturer may, on delivery, be relied upon to comply with the GASTEC QA Approval Requirements 168, Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs. Bouke Meekma Kiwa This certificate is issued by Kiwa Nederland BV in conjunction with the “KIWA regulations for carrying the GASTEC QA Quality mark”. This certificate consists of .. pages. Publication of the certificate is allowed.

Company

……….. …………….. ………………. P.O. Box …………… www………….. T F

Kiwa Nederland B.V.

Wilmersdorf 50

P.O. Box 137

7300 AC APELDOORN

The Netherlands

Tel.+31- 55 539 33 55 Fax +31- 55 539 36 76

www.kiwa.nl

Gastec QA Approval Requirements KE 168

© Kiwa Nederland BV - 19 - March 2013

Self-closing gas valves for hot tapping and hot installing of inflatable pipe plugs

PRODUCT SPECIFICATION

APPLICATION AND USE

8 The self-closing gas valves are to be mounted in high-impact polyvinylchloride (PVC-HI) tapping saddles for hot tapping high-impact

polyvinylchloride (PVC-HI) distribution lines and hot installing of inflatable pipe plugs.

9 The self-closing gas valve may only be used in combination with GASTEC QA approved tapping saddles. The tapping saddles shall meet the

GASTEC QA Approval requirements 58 for saddles with clamp connection of high-impact polyvinylchloride (PVC-HI) and NEN 7232.

10

11 Maximum application pressure: 200 mbar

12

MARKING

The Valves shall be marked with the following information:

Manufacturer‟s name or trademark

Batch number or identification number

GASTEC QA word mark or logo mark.

Place of the mark:

On the product.

Method of marking:

Permanent marking.

RECOMMENDATIONS FOR CUSTOMERS:

1. Check at the time of delivery whether:

1.1 the manufacturer or supplier has delivered in accordance with

the agreement;

1.2 the mark and the marking method are correct;

1.3 the products show no visible defects as a result of transport

etc.

2. If you should reject a product on the basis of the above, please

contact:

2.1 Manufacturer

and, if necessary,

2.2 Kiwa Nederland B.V.

3. Consult the producer's processing guidelines for the proper storage

and transport methods.

4. Check whether this certificate is still valid by consulting Kiwa

Nederland or the Kiwa website.