kek visit to fermilab --- week 2

4
KEK visit to Fermilab --- Week 2 e Interface Bread Board to allow KEK system to switch the clock phas ter resolving grounding issues, every thing works. ting of Demod output from KEK system From KEK Clocking System To (MAB), going to the phase switches protection: -0.6 volts min, 1.2 volts max, 1 nF to ground 1

Upload: osman

Post on 11-Feb-2016

33 views

Category:

Documents


0 download

DESCRIPTION

KEK visit to Fermilab --- Week 2. - Made Interface Bread Board to allow KEK system to switch the clock phase. After resolving grounding issues, every thing works. - Testing of Demod output from KEK system. From KEK Clocking System. To (MAB), going to the phase switches. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: KEK visit to  Fermilab  --- Week 2

1

KEK visit to Fermilab --- Week 2

- Made Interface Bread Board to allow KEK system to switch the clock phase. After resolving grounding issues, every thing works.

- Testing of Demod output from KEK system

From KEKClockingSystem

To (MAB), going tothe phase switches

protection: -0.6 volts min, 1.2 volts max, 1 nF to ground

Page 2: KEK visit to  Fermilab  --- Week 2

2

Testing the Demod Readout of KEK system

Magic-T50 ohm Module

eccosorb or Gunn Diode

LV biases from MMIC

Jig Board

KEK clockingsystem

(4Khz and 50 Hz)

KEK preamps(x100)

Q1KEK ADC

PS voltages

Mac Mini

Page 3: KEK visit to  Fermilab  --- Week 2

3

Start 4Khz clock End 4 Khz clock

no eccosorb

eccosorb

Hard to see changein Demodoutput

with andwithouteccosorb

Demodoutputhas smallglitches anddrifts

Page 4: KEK visit to  Fermilab  --- Week 2

4Gunn Diode ONGunn Diode

OFF

GunnDiodeswitchingON/OFFmakesclear change in DemodOutput