key issues & challenging implementation of ibs in …

62
KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN MALAYSIA IR. DR. ZUHAIRI ABD. HAMID, FASc Senior General Manager Technology Development Sector Construction Industry Development Board (CIDB) WISMA REHDA 27 th October 2020

Upload: others

Post on 23-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

KEY ISSUES &

CHALLENGING

IMPLEMENTATION OF IBS

IN MALAYSIA

IR. DR. ZUHAIRI ABD. HAMID, FASc

Senior General Manager

Technology Development Sector

Construction Industry Development Board (CIDB)

WISMA REHDA

27th October 2020

Page 2: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CONTENTS

1

2

3

ABOUT IBS

IBS ECOSYSTEM4

KEY ISSUE & CHALLENGING IN IBS

IBS SCORE

5 KEY ACHIEVEMENT CITP2016-2020

6 RECOMMENDATION AND CONCLUSION

Page 3: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Standard design and

quality affordable housing

for low income and middle

income groups

Construction 4.0

Quality design for

affordable housing

(CIS 7:2014 QLASSIC)

Productivity measuring

tools (PMT)

Agenda: Initiatives by CIDB

Page 4: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CIDB Aspiration

Quality Home

Meet requirement for affordable housing standard (CIS 26 : 2019)

Promote Emerging Technology

Use of IBS, BIM and other technology in construction

Improve productivity

Enhance construction time, cost and quality

Sustainable affordable housing design

Development of DeLIGHT Homes take consideration on Computational Fluid Dynamic (CFD)

Page 5: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Affordable Housing –Issues and challengers

Page 6: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 7: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CHALLENGES AFFORDABLE HOUSING

RESIDENTS

Poor natural

ventilation & lighting

Page 8: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 9: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 10: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 11: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 12: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 13: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 14: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 15: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 16: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 17: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

IBS

Conventional

Legend

RM/sqft (Estimate)

Z

X

Y

TIME

Building cost

of IBS

Building cost of

conventional=

▪ Productivity

▪ Efficiency

▪ Labour cost

Meeting point

BUILDING COST

Page 18: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

• Malaysian IBS Open System

• Flexibility of design where user choose the best IBS system according budget and preference

MyIOS

• Design for Low-Income Group Housing Through Technology

• Flexible home design to meet the needs of different demographic groups, family units and challengers

DeLIGHTHomes

• Divergent Dwelling Design

• Inspired by traditional “Kampung” house design (rumah ibu, halaman)

D3

• MySERENE (under development)

• New design focused on humanizing, sustainability for tropical

MySERENE(New

Design)

Page 19: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

DeLIGHT Homes: Design for Low Income Group Through Technology

Page 20: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

AIMS

To improve and

humanise homes

through of building for

quality affordable

housing.

To humanise low-

income housing using

technology and

innovation

Through design and efficient methods

Page 21: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

DeLIGHT Homes Concept

Page 22: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Apartment

Terrace House

Single house

Townhouse

DeLIGHT Homes Category

Page 23: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS: Malaysian IBS Open System

Page 24: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS or Malaysian IBS Open

System that allows greater flexibility of

design where a potential user would

be able to choose the best IBS design

and product according to their

preferences.

Overview

Page 25: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS Home Category

MyIOS Apartment

• 4 types of design named P01 – P04

MyIOS Terrace House

• 6 types of design named P05 – P10

MyIOS Single House

• 6 types of design named P11 – P16

Page 26: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS Apartment

Page 27: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS Terrace

House

1st Floor

Layout

Ground floor

layout

Page 28: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MyIOS Single

House1st Floor

Layout

Ground floor

layout

Page 29: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

MySERENE: Affordable housing new design

Page 30: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Terrace House (1-storey)

Page 31: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Terrace house

Page 32: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Townhouse

Lower unit Upper unit

Page 33: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Townhouse

Page 34: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Apartment

Page 35: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Apartment - Units

Design option 1 Design Option 2

Page 36: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Apartment – IBS Component

Page 37: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

D3: Divergent Dwelling

Design

Page 38: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …
Page 39: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

D3 apartment 3D View

(Artist impression)

Housing Concept

Page 40: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Unit Plan Layout for

D3 Apartment

Page 41: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

QLASSIC

Page 42: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

QLASSIC

Quality Assessment

System In Construction

“A Malaysian Independent quality assessment tools to measure quality of workmanship for

buildings projects”

42

1. Introduction

Page 43: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

DEFECT P ICTURES Internal finishes: Internal Wall Defect Group: Alignment & Evenness

Walls not meet at right

angle ≥4mm/300mmUnevenness of wall

surface ≥3mm/1.2m

43

Page 44: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

DEFECT PICTURES Internal finishes: Floor Defect Group: Alignment & Evenness

Unevenness of

floor finishing

more than

3mm/1.2m

Lippage between two tiles more than 1mm

Floor tiles jointing

not align with wall

tiles

Staircase, the

variance in lengths

of treads and risers

exceed 5mm

44

Page 45: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

DEFECT PICTURES Internal finishes: Door Defect Group: Joints & gaps

Gap between door leaf and floor

finishing more than 5mm

Gap between door leaf and

frame more than 5mm

45

Page 46: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Productivity measuring tool (PMT)

Page 47: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

▪ Labour Productivity measures any types

of construction methods as its parameters

only consider GFA and man day.

▪ The more gross floor area a manpower can

construct in a short period of time, the more

productive the construction project is.

OVERALL PRODUCTIVITY

Labour Productivity

Productivity Rate = Gross Floor Area (GFA)

Man-day

*GFA includes the total property square footage including

finished areas inside the property such as common areas,

lobbies, stairwells and etc.

*1 man-day = 1 manpower working for 1 day

Man-day = (no of workers/day) x (construction period)

GRADE PRODUCTIVITY RATE

(sq ft/man-day)

A 7.5 ≤ x < 10

B 5.0 ≤ x < 7.5

C 2.5 ≤ x < 5.0

D 0 ≤ x < 2.5

Page 48: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CONVENTIONAL

2.3sq ft/man-day

PRECAST CONCRETE

SYSTEM

5.0 – 8.0sq ft/man-day

AUTOMATED

AND ROBOTIC

> 8.0sq ft/man-day

AVERAGE RANGE

PRODUCTIVITY RATE*6.6

sq ft/man-day

* Source : CREAM, 2020

CURRENT IBS PRODUCTIVITY IN MALAYSIA

IBS Automated and robotic has productivity score more than 8.0 sq ft / man-day. Hence, robotics is important in driving the construction industry towards greater productivity.

Productivity rate in Malaysia:Conventional = 2.3 sq ft/man-day

Precast concrete system = 5.0 – 8.0 sq ft/man-day

Automated and robotic = > 8.0 sq ft/man-day

Page 49: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

TRADE

PRODUCTIVITY

Productivity Rate = Total units of output

Man-hour

*1 man-hour = 1 manpower working for 1 hour

Man-hour = (total manpower) x (total time)

Page 50: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CONSTRUCTION 4.0

Page 51: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Future Construction Industry (Construction 4.0)

Page 52: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Sources: Construction 4.0 Strategic Plan (2021-2025), CIDB 2020

Government-Industry

perception on

technology needs

Page 53: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

CONSTRUCTION 4.0 EMERGING TECHNOLOGIES

Short Term Implementation(< 1 year)

Prefabrication and Modular Construction

AutonomousConstruction

Cloud and Realtime

collaboration

Building Information Modelling

Augmented Reality &

Virtualisation

3D Scanning & Photogrammetry

Big Data & Predictive Analytics

Internet of Things

Medium Term Implementation(< 3 years)

Long Term Implementation(< 5 years)

Advanced Construction

Materials

Blockchain Artificial Intelligence

3D Printing & Additive

Manufacturing

IMPLEMENTATION PHASE

Sources: Construction 4.0 Strategic Plan (2021-2025), CIDB 2020

Page 54: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

WAY FORWARD (Government – Industry – Academia - Society)

ROLES & RESPONSIBILITIES QUADRUPLE HELIX

ACADEMIA

GOVERNMENT

SOCIETY

INDUSTRY

Interactive Roles and Responsibilities of Construction Industry Stakeholders

The success of implementing Construction 4.0strategic plan, shall be dynamic and holistic inits approach. The interactive quadruple helixactions will ensure SMART measurable anddeliverables.

Key performance Indicators (KPI) and stepwisestrategies shall be highlighted in theImplementation of Strategic Plan documentwhich will be published later.

Education

Spin off

Performance

Venturing

Technology Financial

Leadership

Individual & Structural Perspective

Legitimating LinkResearch

Incubator

Collaboration

Competency

Rules & Regulations

Innovation

Industrial leadership

Page 55: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Conventional

Reusable Formwork

System

Precast System

Automated & Robotics

PPVC / Modular

3D Printing

Industrialised Building System (IBS) Advanced IBS

REVOLUTION OF CONSTRUCTION TECHNOLOGY IN MALAYSIA

Page 56: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

GOVERNMENT

SECTOR

-Surat Pekeliling

Perbendaharaan

Bil. 7 tahun 2008

Projek kerajaan yang

bernilai RM10 Juta

dan ke atas wajib

mencapai minimum

70 IBS Skor sejak

dari 2008

PRIVATE

SECTOR

Pekeliling KSU

Kementerian KPKT

Bil. 1 Tahun 2017

-Bertarikh 10

Januari 2018

56

ABOUT IBS - IBS POLICYX

Projek swasta yang

bernilai RM50 Juta

dan ke atas wajib

mencapai minimum

50 IBS Skor

Page 57: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

OLIGOPOLY

✓ Market Share by small no. of

players and control market

✓ Low delivery of the targeted

affordable housing

DELIVERY

QUALITY

✓ Quality in manufacturing and

installation process of IBS

components

R&D

✓ Poor commercialization for local

R&D Products

SME

✓ No real development from new IBS SME company

IBS ISSUES ON THE GROUND

TECHNOLOGY

✓ Low usage of new technology

and innovation in the IBS

CONVENTIONAL

METHOD

✓ High dependency on conventional

method

10

Page 58: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

IBS ECOSYSTEM

3

CAPACITY

• Professionals (5,888)

• IBS Manufacturer/Distributor (317)

• IBS Contractors (12,620)

• Skill workers - Installer (9,076)

5

INCENTIVE• IBS Tax Holiday Incentive

• Levy Exemption

1

POLICY

• Modular Coordination through UBBL

• Public Projects >RM10mil

to have 70 IBS score

• Private Projects >RM50mil to

have 50 IBS score

2

Quality

Control

Open

System

Rujukan

INITIATIVE

• IBS Library

• IBS Training

• One Stop Centre

• IBS Showhouses

• IBS Component Gallery

Design Development

• MyIOS, D3 &

DeLIGHT Homes

• Digital

Component (BIM

Library)

• Advisory• IBS Score Manual (CIS18)

• IBS Catalogue

• JKR PAPs

Product Registration

• IMPACT

4

PROMOTION

• Media Engagement

• MIIE (2018)

• Seminars/Roadshows

2019 (6)

2020 (7)

Page 59: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Focus on Technology In CITP 2016-2020 – Key AchievementsOutcome: Double construction industry productivity from 2011

IBS adoption rate (%)

14% 40%

2015 Q2 2020

Private projects

1 Kompleks Kediaman Kakitangan Awam, Bangsar 93.5

2 IKEA Batu Kawan, P.Pinang 92.5

3 Velodrom Nasional Malaysia, Nilai 89.3

4 PP1AM Apartment Selasih, Putrajaya 85.7

5 MACC Headquarters, Putrajaya 80.6

1 Johor 4 N. Sembilan 7 Perak 10 Selangor

2Kuala

Lumpur5 Pahang 8 Terengganu

3 Kedah 6 Melaka 9 Perlis

24% 87%

2015 Q2 2020

Public projects

Top IBS High Score

10 States Adopted IBS Policy in Private

*Note: Data shown is on completed projects worth RM10 million and above that achieved 70 IBS score and above

356

2,069

4,053

5,888 6,363

- 1,000 2,000 3,000 4,000 5,000 6,000 7,000

2016 2017 2018 2019 Q2 2020

STATISTIK OF IBS PROFESSIONAL TRAINED CUMULATIVELY

8,170 8,695 9,097

12,620 13,900

- 2,000 4,000 6,000 8,000

10,000 12,000 14,000 16,000

2016 2017 2018 2019 Q2 2020

STATISTIC OF IBS CONTRACTOR REGISTERED CUMULATIVELY

7,814 8,572 9,076 9,705 9,855

- 2,000 4,000 6,000 8,000

10,000 12,000

2016 2017 2018 2019 Q2 2020

STATISTIC OF IBS INSTALLER REGISTERED CUMULATIVELY

227 263

300 310 317

- 50

100 150 200 250 300 350 400

2016 2017 2018 2019 Q2 2020

STATISTIC OF REGISTERED IBS MANUFACTURER CUMULATIVELY

3

7

4 4

1

-

2

4

6

8

10

2016 2017 2018 2019 Q2 2020

TOTAL OF IBS MANUFACTURER ENJOYED IN 'TAX HOLIDAY’ INCENTIVE BY YEAR

FROM MIDA

Page 60: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

Recommendations

To encourage use of standard design (DeLIGHT, MyIOS, MySERENE, D3) for affordable housing projects.

Mandatory to obtain QLASSIC certification for affordable housing.

To achieve Productivity rating at least 6.0

To embark Construction 4.0:• Prefabrication and modular construction• Advanced building materials• Building information modelling

01

02

03

04

Page 61: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …

▪ Currently, the industry is at medium level of

prefabrication adoption but is heading into a more

rapid implementation of IBS in future.

▪ Advanced technology and modern methods of

construction using prefabrication and offsite

construction are needed to cope with current

global construction industry.

▪ CIDB and industry must work hand in hand to

implementing IBS in the ground level to delivering

efficient, sustainable and productive construction

environment by resolving the issues and

challenging for implementation of IBS.

CONCLUSION

Page 62: KEY ISSUES & CHALLENGING IMPLEMENTATION OF IBS IN …