Page 1: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Community Meeting #2

February 11, 2016

King Street Complete Streets Project

Page 2: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Project Overview

• King Street resurfacing this summer • Complete Streets policy • Community Meeting #1 in November 2015 • Tonight: Present options and get feedback

• Provide facilities for people who walk, bike, ride transit or drive cars

• Improve the safety and convenience for all street users

• Implement City Council adopted plans and policies 3

Project Goals

Page 3: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Project Limits: Radford St. to Janney’s Ln.

4

Page 4: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Summary - What we heard

5

What We Heard

Difficult to cross King Street

Pedestrian safety concerns near school

Vehicle speeds along King Street are high

Street crossings are long

Not enough time to cross at lights

Unsafe for people who bike

Difficult to access bus stops

Improvements needed at intersections

Need to change character of the roadway

Page 5: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Proposed Options

1. Complete Street Maintenance

2. Pedestrian and Accessibility Intersection Enhancements

3. Complete Street Corridor Improvements

*Tradeoffs and Balances!!!

6

Page 6: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

King Street Existing Conditions

7

Page 7: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 1: Complete Street Maintenance

• Improve curb ramps

• Install crosswalks along side streets

• Provide ADA compliant bus stops

8

Page 8: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 1: Considerations

• No major change to roadway

• Minimal pedestrian improvements

• No bicycle or vehicular improvements

9

Page 9: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 2: Pedestrian & Accessibility Intersection Enhancements

• Remove westbound travel lane and install left turn lanes

• Provide pedestrian & streetscape improvements at intersections

• Improve pedestrian crossings at bus stops

10

Page 10: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 2: Considerations

• Westbound travel time along corridor increases by 13s in AM peak (11s in PM peak)

• Change character of roadway at intersections

• No improvements for people who bike

11

Page 11: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 2 Corridor Concept

12

Existing Option 2

Page 12: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Typical Intersection – Option 2

13

Page 13: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

14

Option 3: Complete Street Corridor Improvements – Radford Street to

Chinquapin Drive (Section 1)

• Remove westbound travel lane

• Provide westbound bike lane (to Kenwood Avenue) and east bound shared lane in front of school

• Provide left turn lane into school at Kenwood Avenue

• Provide left and right turn lane at Chinquapin Drive

Page 14: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Project Limits: Radford St. to Janney’s Ln.

15

Section 1

Section 2

Page 15: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 3: Complete Street Corridor Improvements – Chinquapin Drive to

Janneys Lane (Section 2)

• Remove one travel lane in each direction and provide left turn lanes

• Provide pedestrian & streetscape improvements at intersections

• Improve pedestrian crossings at bus stops

• Install buffered bike lanes

16

Page 16: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

17

Option 3: Considerations • Eastbound travel time increases by 7s in the AM peak (3s in PM peak)

• Westbound travel time increases by 13s in AM peak (11s in PM peak)

• Provides separation between vehicles and sidewalk

• Provides designated space on street for all users for most of corridor

• Changes character of the corridor

• Provides major pedestrian improvements at Kenwood Avenue for increased safety at school

Page 17: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 3 Corridor Concept: Section 2

18

Existing Complete Street Option

Page 18: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Typical Section 2 Intersection – Option 3

19

Page 19: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 3 Corridor Concept: Section 1

20

Page 20: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 3 Corridor Concept: Section 1

21

Page 21: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Typical Intersection improvements • With option 2 & 3, “typical”

improvements can be made to the following intersection:

• Albany, Quincy and Tuckahoe

• Improvements Include

22

• Planted pedestrian refuge island

• High visibility crosswalk

• Left turn lane

Stevenson Avenue, Alexandria

Page 22: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Lane Reduction Options 2 & 3

• Potential improvements with options 2 & 3

• Change to overall character of roadway

• Pedestrian refuge islands and new crosswalks at intersections with bus stops (6)

• Major pedestrian improvements at:

• Kenwood Avenue

• Scroggins Road

• Melrose Street

• Left turn bays/ center turn lane

• Reduced speeds with speed indicator signs 23

Page 23: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

24

What could it look like?

BEFORE AFTER

SAMPLE

Page 24: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Major Intersection Improvements

• Kenwood Avenue

• Scroggins Road

• Melrose Street

25 *No bicycle or pedestrian crashes reported

Page 25: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Kenwood Avenue Concept

26

• Remove left turn from King to Kenwood

• Provide pedestrian refuge islands on King and Kenwood

• Change lane designation on Kenwood

• Provide LPI for pedestrians at intersection

• Relocate bus stop to far side of intersection

Page 26: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

27

• Provide pedestrian refuge island on King

• Provide RFP (Rapid Flashing Beacon) for crossing of King

• Relocate bus stop to far side of intersection

• Provide ADA curb ramps and bus stops

• Provide left turn lanes

Melrose Street Concept

Page 27: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Scroggins Road Concept

28

• Provide pedestrian refuge island on King Street

• Provide SB left turn lane • Extend curb on Scroggins Rd.

to normalize intersection • Provide temporary materials

to realign right turn onto Scroggins Rd. and remove slip lane

Page 28: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option Matrix

What We Heard

Complete Street Maintenance

Pedestrian & Accessibility Intersection Enhancements

Complete Street Corridor Improvements

Difficult to cross King Street

Pedestrian safety concerns near school

Vehicle speeds along King Street are high

Street crossings are long

Not enough time to cross at lights

Unsafe for people who bike

Difficult to access bus stops

Improvements needed at intersections

Need to change character of the roadway

29

Page 29: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

How old are you at heart? (choose 1)

1. Under 18

2. 18-24

3. 25-34

4. 35-64

5. 65 and over

Under 18

18-24

25-34

35-64

65 and o

ver

5% 5%

25%

40%

25%

Polling Question - Sample

Page 30: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

1. Do you live on King Street or an adjacent side street? (choose one)

1. Yes

2. No

YesNo

45%

55%

Polling Question

Page 31: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

2. Other than your place of residence, what is your main destination on King Street?

(choose 1)

1. School/Daycare

2. Place of Worship

3. Recreation Center/Park

4. Work

5. Social

6. No destinations (I use King Street to travel elsewhere)

1. 2. 3. 4. 5. 6.

11% 11%

68%

5%

0%

5%

Polling Question

Page 32: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

3. What are your top priorities for a Complete King Street? (choose 3)

1. Improve pedestrian safety near TC Williams

2. Reduce vehicular speeding

3. Provide safer crossings for pedestrians

4. Provide more accessible transit stops

5. Provide a safe and accessible bicycle facility

6. Provide greater separation between vehicles and pedestrian

7. Maintain comparable travel times for drivers

1. 2. 3. 4. 5. 6. 7.

13% 13%

27%

6%

21%

13%

6%

Polling Question

Page 33: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

4. What intersection safety improvements are most important to you?

(choose all that apply)

1. Safer & shorter street crossings

2. Planted pedestrian islands

3. Left turn only lanes

4. Slower speeds of turning vehicles

5. None—not in favor of any improvements

1. 2. 3. 4. 5.

40%

19%

2%

17%

21%

Polling Question

Page 34: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

5. What intersections are in need of the most improvement?

(choose 3) 1. Janney’s Lane

2. Melrose Street

3. Albany Avenue

4. Tuckahoe Lane

5. Scroggins Road

6. Quincy Street

7. Chinquapin Drive

8. Kenwood Avenue

9. Radford Street 1. 2. 3. 4. 5. 6. 7. 8. 9.

12%

14%

0%

6%

2%

24%

16%

0%

27%

Polling Question

Page 35: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

Option 1 Complete Street

Maintenance

Option 2 Pedestrian & Accessibility Intersection

Enhancements

Option 3 Complete Street

Corridor Improvements

Page 36: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

6. What option do you prefer? (choose 1)

1. Option 1: Complete Street Maintenance

2. Option 2: Pedestrian Accessibility Intersection Enhancements

3. Option 3: Complete Streets Corridor Improvements

4. Other: (I will submit a comment form) 1. 2. 3. 4.

10%5%

70%

15%

Polling Question

Page 37: King Street Complete Streets Project · •Tonight: Present options and get feedback •Provide facilities for people who walk, bike, ride transit or drive cars •Improve the safety

[email protected] 40

Next Steps

• Alex Engage – Community Feedback on options

• Public Meeting #3 – Proposed Design

• Traffic and Parking Board – Public Hearing