kings plaza shopping centerassets.macerichepicenter.com/filemanager/property...tenant design...

17
Tenant Design Criteria 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section gi General Information Criteria Updated: September 2017

Upload: others

Post on 07-Aug-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteria

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

Page 2: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi2

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017 Addendum Log

December, 2012 Updated to current layout

January, 2013 Inserted front cover photo

February, 2013 Updated Building Type & Code Information (gi13)

April, 2013 Union requirement language updated per VP request (gi13)

May, 2013 Updated Contact Directory (gi10) Updated Mall Required Contractors (gi11)

December, 2014 TC contact info updated

March, 2015 Mall required electric meter contractor info added (gi11)

July, 2015 For Data Services information contact (gi10)

September, 2015 Updated Working Environment to change language to current local building trades union. (gi13)

October, 2015 Updated Mall Required Fire Alarm Contractor and Fire Alarm Designer and Expeditor (gi13)

Updated Contractor and Engineer contact information (gi11)

February, 2016 Data Service contractor Granite Grid contact info updated (gi11) Permit Expediting information updated (gi11)

ADDENDUM LOG June, 2016 Updated Fire Alarm Contractor (gi11)

August, 2016 Updated Mall Required Contractors (gi11)

February, 2017 Added Additional Expediter (gi11)

March, 2017 Updated Mall Required Contractors (gi11)

April, 2017 Previous Telephone contact information removed (gi10) Communications Services information note added (gi11) Added Low Voltage contact information (gi11)

May, 2017 Updated TC contact information (gi10)

June, 2017 Removed one Fire Sprinkler, added two new Sprinkler contractor names (gi11)

September, 2017 Updated TC contact information (gi10)

Page 3: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi3

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

GENERAL MALL INFORMATION

Mission Statement gi4 Vicinity Map, Site Plan, Design Key Plan gi5-gi8

Center Views gi9 Contact Directory, Mall Contractors gi10-gi11

Submission Requirements gi12

Building Type & Code Information gi13 Glossary gi14-gi15 Condition of Premises, Field Conditions gi16 Tenant’sWorkDefined,Landlord’sWork Defined gi17

Table of Contents

TABLE OF CONTENTS

PLEASE VISIT WWW.MACERICH.COM TO VIEWPLAN SUBMITTAL & APPROVAL PROCEDURES and

CONTRACTOR’S RULES & REGULATIONS

Page 4: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi4General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

Theretailenvironmentisprimarilyinfluencedbytwofactors:1)Overallsetting(Mallcommonareas);and2)Individualcomponents(Tenantstorefronts).BothaffecttheperceptionofKings Plaza Shopping Center as a primeretailestablishment.

Generally,storefrontdesignstylesaretheprovenanceoftheTenant.TheLandlord provides input towards the full development of the design concept, promotes compatibility with adjacent Tenants and common areas andinsurescompliancewithdesigncriteria.

CriteriaapplicabletospecificareasintheMallspecifycertainrequirementssuch as the extent of vertical and horizontal projections, the use of three-dimensionalformandpropermaterialuse.Thesecriteriaareintendedto provide a basis for all storefronts to present merchandise in an exciting, promotionalfashion.

All areas exposed to public view are subject to a thorough design review andapprovalprocessbytheLandlord.Tenantsmustaddressstorefrontandinteriordesign,materials,colors,signageandlighting.Additionally,specificarchitecturalcriteria,applicabletovariouslocationsintheMall,mustbemet.

These criteria act as a guide for the design of all work by Tenants in conjunctionwiththeprovisionsoftheTenant’sleasewiththeLandlord.Furthermore, these criteria are subject to revision by the Landlord and the Landlord’sinterpretationofthesecriteriaisfinalandgoverning.AllTenantsshould refer to the Technical Criteria for electrical, mechanical, plumbing and lifesafetyinformation.

Tenants are encouraged to express their own unique design statement within theparametersofthedesigncriteriaasoutlinedinthismanual.Thedesigncriteria calls for a three-dimensional storefront that carries into the store salesareaandisexpressiveofthemerchandisesold.

National and regional “standard” storefront concepts are respected to the extentthattheymeetthedesigncriteria.However,TenantsshouldbeawarethatsomeconceptmodificationsmightbenecessarytocomplywiththeCentercriteria.Thesameistrueforproposeddesignsthatareoverlysimilar

MISSION STATEMENT toaneighboringTenant’sstorefrontdesign.WewishtomaketheMallasdiverse and interesting as possible and enable each Tenant to make a singularstatementwiththeirdesign.

Three-dimensional opportunities afforded by the following criteria to emphasizecreativeanddynamicformsanddesigns.Storefrontelementsshall de-emphasize linear or boxy forms by the use of recesses, angles, curves,gablesandmaterialchangesinbothverticalandhorizontalviews.

Page 5: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi5General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

5100 Kings PlazaBrooklyn, NY 11234(718)253-6844Phone

Mall HoursMonday-Friday:10:00AMto9:30PMSaturday:10:00AMto10:00PMSunday:11:00AMto8:00PMStore hours may differ from Mall hours.

VICINITY MAP

Map data ©2011 Google

Page 6: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi6General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

SITE PLAN

Page 7: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi7General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

CENTER PLAN - FIRST LEVEL

Page 8: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi8General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

CENTER PLAN - SECOND LEVEL

Page 9: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi9General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

INTERIOR CENTER VIEWS

Page 10: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi10General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

Landlord/Owner:The Macerich Company401WilshireBlvd.,Suite700Santa Monica, CA 90401(310)394-6000Phone

Tenant Coordinator:Melissa Woodruff, AVPTenant CoordinationMacerich1175Pittsford-VictorRoad,Bldg2Pittsford, NY 14534(585)[email protected]

CONTACT DIRECTORY Local Utility Agencies:ELECTRICKings Plaza(718)253-6844 Phone GASNational GridOne MetroTech CenterBrooklyn, NY 1120`(718)403-2000Phone

WATERLandlord master metered

REFUSEPleasecontactMallManagementOffice(718)253-6842 Phone

Health Department:Health&HospitalsCentralOffice2601 Ocean ParkwayBrooklyn, NY 11235(718)616-3000Phone(212)639-9675 Phone

Building and Safety:Department of Buildings210 Joralemon StreetBrooklyn, NY 11201(718)802-3675Phone

Fire Department:FireDepartmentHeadquarters250 Livingston StreetBrooklyn, NY 11201(718)694-2000Phone

NOTE: Thisisa“UnionOnly”property.Allcontractorsandsub-contractorsworkersarerequiredtobemembersoflocalunionhallsfromtheCityofNewYork.Noexceptions.

Page 11: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi11General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

ELECTRICIAN (FINAL CONNECTIONS)ForestElectricalCo.2 Penn PlazaNew York, NY 10001Contact:DaveSpoto(718)706-2551 PhoneFinal switch gear connections.

FIRE ALARM DESIGN & EXPEDITINGZS Engineering99 Tulip Avenue, Suite 102Floral Park, NY 11001Contact:ThomasAllocca(516)328-3200 [email protected]

FIRE ALARM CONTRACTOR, INSTALLATION AND PROGRAMMINGAll-NuElectricalContractingCorp.5018 Expressway Drive South, Suite 100Ronkonkoma,NY11779Contact:ChrisReilly(631)[email protected]

FIRE PROOFER(BuildingStructuralSteel)PalEnvironmentalSafetyCorp.11-02 Queens Plaza SouthLong Island City, NY 11101Contact:BengDangman(718)349-0900 Phone

FIRE SPRINKLERSPace Fire ProtectionContact:PeterMirz(212)282-1638 [email protected]

OR

Par Fire ProtectionContact: Mike Dooley60 North Prospect AvenueLynbrook, NY 11563(516) 394-2339 [email protected]

OR

United Fire Protection:Contact: Lou Chierchia5645 58 StreetMaspeth, NY 11378(718_) [email protected]

ROOFINGUS AllegroContact:YuriBogutskiy54-30 44th Street - Suite AMaspeth,NY11378(800)876-4935 [email protected]

VOICE / DATA SERVICERob NortonGranite Services(781) [email protected] refer to the Technical Manual, Page t4 for Communications Services information.

STRUCTURAL ENGINEERDesman AssociatesContact:[email protected]

MECHANICAL/ELECTRICAL ENGINEERDLB Associates265 Industrial Way WestEatontown, NJContact:[email protected] (732)927-5006Phone

PLUMBING ENGINEERDLB Associates265 Industrial Way WestEatontown, NJContact:[email protected] (732)927-5006Phone

ARCHITECT (BASE BUILDING)Gilligan & Bubnowski246 Industrial Way WestEatontown, NJContact:[email protected] (732)460-1970Phone

NOTE:Landlord reserves the right to require the Tenant to use certain contractors for specific types of construction. This list will be updated from time to time. Please verify your contractors with the Operations Manager during the pre-construction meeting.

MALL REQUIRED CONTRACTORSLOW VOLTAGERob NortonGranite Services(781)[email protected]

PERMIT EXPEDITERDOMANI ConsultingWagner Lopez68 Whitehall StreetLynbrook, NY 11563(516)256-0317 Phone(516)[email protected]

ORGreen Light Expediting LLC43-24 21st Street - STE 202Long Island City, NY 11101(718)514-7562PhoneMany Russell

INSTALLATION OF MALL REQUIRED ELECTRIC METERSource One7PennPlazaNew York, NY 10001(212)612-7606 [email protected]

ENGINEERS OF RECORD

Page 12: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi12General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

SUBMISSION REQUIREMENTSCompletion Requirements

Tenant shall commence Tenant work promptly after possession has been delivered, Lamdlord has approved the construction drawings and work has beenpermitted.UponcompletionoftheTenantwork,TenantshalldelivertoLandlordthefollowing:

• Tenant’sfinalnotarizedoriginalaffidavitthatTenant’sworkhasbeencompleted to Tenant’s satisfaction and in strict accordance with the approved construction drawings and Tenant’s and Landlord’s constructionrequirements.Anydeliberateornegligentmisstatementorfalse statement made by Tenant therein shall constitute breach of the lease.

• ThefinalnotarizedoriginalaffidavitandwaiveroflienbytheGeneralContractor performing Tenant’s work to the effect that Tenant work was completed in accordance with the Landlord approved Construction Drawings.Affidavitshallalsostatethatallsubcontractors,laborers,material suppliers engaged in furnishing materials or rendering services forTenantwork,havebeenpaidinfull.

• Complete operating, maintenance and spare parts manuals for all mechanical, electrical and similar equipment installed as part of Tenant work.

• CertificateofOccupancy-NYCLetterofCompletion,FDNYFireAlarmapprovaland/orothergovernmentalapprovals.

• As-built drawings and PDF formats (Full size set delivered to mall office).

• All Tenant open applications must be closed out with the local jurisdiction.

Default

If Tenant fails to adequately perform any of the following items, Landlord may, at any time thereafter, give Tenant notice that Tenant is in default of its lease:

• SubmittoLandlordpreliminaryplansandfinalworkingdrawingsandspecifications.

• SubmittoLandlordfinalapprovedsprinklershopandfirealarmdrawingsandspecifications.

• CauseTenant’sspacetobebuiltstrictlyinaccordancewiththefinalsetofLandlordapprovedconstructiondrawings.

Such notice will describe the nature of the Tenant’s default and will specify adateafterthegivingofsuchnoticebywhichsuchdefaultmustbecured.Unless prior to such date Tenant makes the required submissions, Tenant will be deemed incurably in default of this lease and Landlord will be entitled toallremediesspecifiedinthelease.

Page 13: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi13General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

ConstructionType:Type 2C Non-combustible

OccupancyType:Group“M”forallstores.Group“A3”forallrestau-rants.

BuildingArea:Approximately 916,404 square feet

The following is a general reference list of applicablecodes.Itisthesoleresponsibility of the Tenant’s Architect, Engineer(s)andContractor(s)tocomplywithallapplicable federal, state, local codes and ordinancesfortheiroccupancytype.

ApplicableCodes:CurrentlyadoptedNYCBuildingCode.

WORKING ENVIRONMENTTenant, at Tenants sole cost and expense must ensurethefollowing:

1. All tradespersons entering the job site must be current members of a local building trades union and must, at all times, carry on their person such evidence of proof of their membership as may be required by the Landlord.

2. All materials transported to and from the site must be done so by members of a current localbuildingtradesunion.

Note: Prior to the commencement of construction, building and other permits shall be obtained by Tenant and posted in a prominent place within the premises. All Tenant improvements must comply with governing building codes in effect at the time the application for the building permit is submitted. The Tenant is required to determine the jurisdiction and comply with all applicable code requirements. The Tenant shall secure their own building permits. All Tenants involved in food sales or service shall submit plans for review and approval by the local health department.

BUILDING TYPE BUILDING CODE INFORMATION

Page 14: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi14General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

COMMON AREAAnyandallareaswithintheMall,whicharenotleasabletoaTenantincludingpublicareas,servicecorridors,etc.

DEMISING WALLSCommonwallbetweenindividualTenantspaces.Thewallshallextendfromthefloorslabtotheundersideoftheroofdeck(Thisdoesnotapplyineverycase).Thedemisingwallsaretomaintainaone(1)ortwo(2)hourfireratingdependentupontheTenantuseandthegoverningcodes.

DESIGN CONTROL AREA “DCA”/DISPLAY AREATheDCA(DesignControlArea)isallareaswithintheneutralframeandleaselinesandareasdesignatedforTenant’sstorefrontandsignlocations.TheDCAismeasuredfromtheleaselineorpopout/projectedstorefront,toaspecificdistancebeyondtheinnermostpointofclosure“POC”ofthepremisesandextendsthefullwidthandheightoftheTenant’spremises.TheTenantisresponsibleforthedesign,constructionandallcostsforworkwithintheDCA.ThisareahasbeendefinedmoreexplicitlyintheArchitecturalDesignportionoftheTenantCriteria.

HAZARDOUS MATERIALSAnysubstancethatbyvirtueofitscompositionorcapabilities,islikelytobeharmful,injuriousorlethal.Forexample:asbestos,flammables,PCB’s,radioactivematerials,paints,cleaningsupplies,etc.

LEASE LINELineestablishingthelimitoftheleasablespace.ThePremiseswithalltheFloorArea(GLA)providedintheLease,includingthepopoutzone.DimensionsoftheTenantpremisesaredeterminedinthefollowingmanner:

A. BetweenTenants:centerlineofdemisingwall.

B. Atexteriorwall:tooutsidefaceofexteriorwall.

C. Atcorridor(s),stairwells,etc.:tocorridororstairwellsideofwall.

D. Atserviceorequipmentrooms:toserviceorequipmentroomsideofwall.

E. Neutralpier(s)areNOTsubtractedfromfloorarea.

F. NodeductiontotheGLAshallbemadeforanyducts,shafts,conduits,columnsorthelikewithintheleasespaceunlesssuchitemsexceedonepercent(1%)oftheGLAinwhichcasethepremisesshallbesubjecttoaremeasureattheTenant’ssolecost.

LEASE OUTLINE DIAGRAM “LOD”AttheLandlord’ssolediscretion,aLeaseOutlineDiagram(LOD)maybeprovided.TheLODshallshowthelegalextentoftheTenantpremisesasdefinedtheTenantLeaseandshallincludethe“Popout”Zoneareasnotedinthesecriteria.TheLandlordmakesnowarrantyastotheaccuracyofanythingshownorrepresentedontheLODandsuchinformationwhethershownornotistheresponsibilityoftheTenanttofieldverify.

GLOSSARY

Page 15: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi15General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

NEUTRAL PIERS/NEUTRAL STRIPAuniformframeseparatingtheTenant’sstorefront,whichmayormaynotbeprovidedbytheLandlord.

POINT OF CLOSURE “POC”ArealorimaginarydemarcationsuchasthecenterlineoftheGlassoranyEntryDoor(s)intheirfullyclosedposition.

RECESSED STOREFRONTAnyportionofthestorefrontlocatedbehindtheleaseline,theareabetweentheleaseline,thepointofclosure(POC)andthestorefrontshallbeconsideredpartofthedesigncontrolarea.

SERVICE CORRIDORSApartofthecommonareausedprimarilyfordeliveries,employeeentranceandfireexitsfortheTenantspaceandgenerallynotusedbythepublic.

GLOSSARY (cont’d.)

Page 16: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi16General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

Upon the Delivery Date, Tenant shall accept delivery of the premises in an “As Is” condition and “With All Faults” and Landlord shall have no obligation to improve, remodel, alter or otherwise modify or prepare the premises for Tenant’s occupancy except to the extent otherwise expressly stated in the LeaseDocuments.Tenantherebyrepresentseachofthefollowing:

1. Tenant or its authorized representative has inspected the premises and has made all inquiries, tests and studies that it deems necessary in connectionwithitsleasingofthepremises.

2. Tenant is relying solely on Tenant’s own inspection, inquiries, tests and studies conducted in connection with and Tenant’s own judgment with respectto,theconditionofthepremisesandTenant’sleasingthereof.

3. Tenant is leasing the premises without any representations or warranties, express, implied or statutory by Landlord, Landlord’s agents,brokers,finders,consultants,counsel,employees,officers,directors,shareholders,partners,trusteesorbeneficiaries.

4. The Work to be completed by Landlord, “Landlord’s Work” under the TenantLeaseshallbelimitedtothatdescribedintheforegoingsections.

5. All other items of work not provided for herein, to be completed by Landlord, shall be provided by the Tenant at Tenant’s expense and is hereinreferredtoas“Tenant’sWork”.

1. Tenantisrequiredtoinspect,verifyandcoordinateallfieldconditionspertaining to the premises from the time prior to the start of its store designworkandthecommencementofitsconstruction.Anyadjustmentstotheworkarisingfromfieldconditionsnotapparentondrawings and other building documents shall receive written approval of Landlordpriortostartofconstruction.

2. Immediately following the installation by Landlord of metal stud fram-ingdefiningthepremises,theTenantshallverifytheaccuracyofsaidinstallationandshallimmediatelyadviseLandlordofanydiscrepancies.Failure to so notify Landlord shall be deemed as acceptance by Tenant ofsaidinstallationandlayout.

3. Landlord shall have the right to locate, both vertically and horizontally, utilitylines,airducts,flues,drains,cleanouts,sprinklermainsandvalves, and such other equipment including access panels for same, withinthepremises.

4. Landlord’s right to locate equipment within the premises shall include theequipmentrequiredbyotherTenants.Landlordshallalsohavetheright to locate mechanical and other equipment on the roof over the premises.

CONDITION OF PREMISES FIELD CONDITIONS

Page 17: Kings Plaza Shopping Centerassets.macerichepicenter.com/FileManager/Property...Tenant Design Criteria i gi4 5100 Kings Plaza, Brooklyn, NY 11234 Kings Plaza Shopping Center Section

Tenant Design Criteriagi17General Mall Information

5100 Kings Plaza, Brooklyn, NY 11234

Kings Plaza Shopping Center

Section gi General Information CriteriaUpdated: September 2017

“Tenant’sWork”meansallworkofimprovementtobeundertakenuponthePremises(excludingLandlord’sWork,ifany),including,withoutlimitation,allrelateddocuments,permits,licenses,feesandcosts,allofwhichshallbeatthesolecostandexpenseofTenant.Tenant’sWorkshallinclude,withoutlimitation,thepurchase,installationandperformanceofthefollowing:

Engagingtheservicesofalicensedarchitect(“Tenant’sArchitect”)topreparethePreliminaryDocuments,ConstructionDocumentsandtheAs-BuiltDocuments.

A. PreparationoforiginalsandcopiesofthePreliminaryDocuments,ConstructionDocumentsandAs-BuiltDocuments.

B. FeesforplanreviewbyLandlordandlocalgovernmentalauthorities.

C. SuchotherimprovementsasLandlordshallrequirepertheLeasetobringthePremisesintofirst-classconditionbaseduponLandlord’sreasonablestandardsofappearance,materials,specifications,designcriteriaandLandlordApprovedFinalPlansfortheCenter,aswellasthatpartoftheCenterinwhichthePremisesarelocated.

LANDLORD’S WORK DEFINED

GeneralLandlord’sWorkDefined.“Landlord’sWork”meansthework,ifany,whichLandlordisexpresslyobligatedtoundertakeinaccordancewiththeLease.Landlordshallhavenoobligationtoimprove,remodel,alterorotherwisemodifyorpreparethePremisesforTenant’soccupancy.

CenterLandlord or its predecessor-in-interest has constructed the Center, and the Building and other improvements upon the Center (exclusive of improvements constructedbyoronbehalfofeachpresentandpriorOccupantoftheCenter).TenanthasinspectedtheCenter,theBuilding,theutilities,thetypes,quantitiesandqualitiesoftheUtilitiesandtheothersystemsandTenanthasfoundthesametobesuitable,sufficientandinacceptableconditionforthepurposeofTenantconductingthePermittedUseuponthePremises.LandlordshallhavenoobligationtoundertakeanyworkorfurnishanyadditionalmaterialsuponanypartoftheCenterorprovideanyadditionalutilitiesorothersystemsforthebenefitofthePremises.

For the purpose of all Tenant Criteria Manuals, all references to Preliminary/Construction “Plans” are considered the same as Preliminary/Construction “Documents”.

TENANT’S WORK DEFINED