    A STUDY ON THE EFFECTIVENESS OF MATERIAL

    REQUIREMENT PLANNING IN PURCHASE

    DEPARTTMENT IN SIMPSON & CO LTD.

    By

    KISHORE.P

    (Reg.No.31709631047)

    A PROJECT REPORT

    Submitted to the

    FACULTY OF MANAGEMENT STUDIES

    In partial fulfillment of the requirements

    For the award of the degree

    Of

    MASTER OF BUSINESS ADMINISTRATION

    IN

    FINANCE AND SYSTEMS

    St. JOSEPHS COLLEGE OF ENGINEERING, CHENNAI

    ANNA UNIVERSITY

    CHENNAI 600 025

    AUGUST 2010

  • 8/7/2019 Kishore Summer Project

    2/49

    ST.JOSEPHS COLLEGE OF ENGINEERING

    (Affiliated to Anna University)

    JEPPIAAR EDUCATIONAL TRUST

    JEPPIAAR NAGAR, RAJIV GANDHI ROAD, CHENNAI-119

    BONAFIDE CERTIFICATE

    Certified that this project report titled A STUDY ON THE EFFECTIVENESS OF

    MATERIAL REQUIREMENT PLANNING IN PURCHASE DEPARTMENT IN

    SIMPSON & CO LTD is the bonafide work of KISHORE.P Reg.no.31709631047

    who carried out the project work under my supervision. Certified further, that to the best

    of my knowledge the work reported herein does not from part of any other project or

    dissertation on the basis of which a degree or award was conferred on an earlier occasion

    on this or any other candidate.

    DR. S.SUDHA DR. JAYASREE KRISHNAN

    M.B.A., PhD. B.Sc., M.B.A., PhD.,

    INTERNAL GUIDE HEAD OF THE DEPARTMENT

    Department of Management Studies Department of Management Studies

    St.Josephs College of Engineering St.Josephs College of Engineering

    Chennai-600 119. Chennai-600 119.

  • 8/7/2019 Kishore Summer Project

    3/49

    ACKNOWLEDGMENT

    First and foremost, I thankAlmighty God for the strength and blessings showered,

    for successfully completing the project. I would like to express my gratitude and extentmy best wishes to all people who guided, inspired and motivated me during this project.

    I express my sincere gratitude to the management ofST.JOSEPHS COLLEGE

    OF ENGINEERING for having provided me an opportunity to do my master degree in

    their esteemed college.

    My sincere thanks and profound sense of gratitude goes to our respected

    Chairman Thiru. Jeppiaar, M.A., B.L., for his sincere endeavor in educating us in his

    premier institution andI also take this opportunity to thankDr. BabuManohar M.A.,

    M.B.A., Ph.D., honorable director of the esteemed institution.

    My heartfelt thanks to our Principal Jolly Abraham M.E., Ph.D., I am

    exceedingly grateful to the Head Of the Department Dr. Jayasree Krishnan B.Sc,

    M.B.A., PhD., for providing me necessary facilitates to complete this project work, and

    for guiding me throughout this project without her valuable help & support, this project

    work would have never been possible.

    I take this opportunity to acknowledge the help, guidance and co-operation

    received from the company DIEMENSIONAL SECRUTIES PVT LTD, Chennai for

    providing me an opportunity to do this project in their organization.

  • 8/7/2019 Kishore Summer Project

    4/49

    S.NO TITLE PAGE .NO

    CHAPTER 1

    INTRODUCTION

    1.1 Industry Profile 1

    1.2 Company Profile 3

    1.3 Need for the Study 4

    1.4 Scope for the Study 5

    1.5 Objectives for the study 6

    1.6 Limitation of the study 7

    1.7 What is MRP? 8

    1.8 Material requirement planning system 12

    1.9 Various Processes 13

    CHAPTER 2

    LITERATURE REVIEW

    2.1 Review ofLiterature 32

    CHAPTER 3

    RESEARCH METHODOLOGY

    3.1 Type of research 33

    3.2 Research instrutment 33

    3.3 Questionnaire design 33

    3.4 Sampling design 34

    3.5 Data collection 34

    3.6 Period of study 34

    CHAPTER 4

    FINDINGS AND SUGGESTION

    4.1 Findings 34

    4.2 Suggestions 36

    4.3 Conclusion 38

    Bibliography 39

    Annexure 40

    TABLE OF CONTENTS

  • 8/7/2019 Kishore Summer Project

    5/49

    TABLE .NO LIST OF FIGURES PAGE. NO

    1.9.1 Diagram showing purchase module 12

    1.9.2 Diagram showing Purchasing general process 16

    1.9.3 Diagram showing RFQ and quotation process 17

    1.9.4 Diagram showing purchase requisition process 18

    1.9.5 Diagram showing blanket agreement process 21

    1.9.6 Diagram showing blanket release process 22

    1.9.7 Diagram showing amendment process for blanketpurchase and release

    23

    1.9.8 Diagram showing receipts 24

    1.9.9 Diagram showing GI rejection 26

    1.9.10 Diagram showing line rejection 271.9.11 Diagram showing outside processing 29

    1.9.12 Diagram showing internal requisition 30

  • 8/7/2019 Kishore Summer Project

    6/49

    ABSTRACT

    The study was undertaken to determine EFFECTIVENESS OF MATERIAL

    REQUIREMENT PLANNING (MRP) IN PURCHASEDEPARTMENT IN SIMPSON & CO Ltd., Chennai.

    Among the various systems which are available, the most sought after or probably the

    highly opted ones are the material requirements planning (MRP). This study explores the

    reasons why organizations chose to use these systems, the problems and benefits derived

    from the MRP/ERP systems, and the characteristics of the types of companies that have

    benefited from the use of MRP-type systems. It also figures out the factors which make

    the MRP effective so that its benefits are utilized to the maximum. The study reveals

    what factors will cause the effective functioning of the MRP during its usage. While most

    ompanies use MRP or ERP computer system in manufacturing functions this study will

    loosely refer to these computer systems as MRP- type or simply MRP systems.

    The study undertaken strikes to procure an insight about the effectiveness of the MRP in

    purchase department in simpson & co ltd. The population consisted of employees of the

    purchase department and size of population includes 20 employees. The questionnaire

    were provided to 20 employees of the purchase department. Based on the feedback, the

    required study was carries out. A major finding of the study is that the employees were

    comfortable with the major part of the MRP system and just needed few additional

    features for better working.

  • 8/7/2019 Kishore Summer Project

    7/49

    1.1. INDUSTRY PROFILE

    The automotive industry designs, develops, manufactures, markets, and sells the

    world's motor vehicles. The automotive industry is one of the most important economic

    sectors by revenue.

    The Automobile industry in India is the seventh largest in the world with an annual

    production of over 2.6 million units in 2009.In 2009, India emerged asAsia's fourth

    largest exporter of automobiles, behind Japan, South Korea and Thailand. By 2050, the

    country is expected to top the world in car volumes with approximately 611 million

    vehicles on the nation's roads.

    Following economic liberalization in India in 1991, the Indian automotive industry has

    demonstrated sustained growth as a result of increased competitiveness and relaxed

    restrictions. Several Indian automobile manufacturers such as Tata Motors, Maruti

    Suzuki and Mahindra and Mahindra, expanded their domestic and international

    operations. India's robust economic growth led to the further expansion of its domestic

    automobile market which attracted significant India-specific investment by

    multinational automobile manufacturers. In February 2009, monthly sales of passenger

    cars in India exceeded 100,000 units.

    India has emerged as one of the world's largest manufacturers of small cars. According

    to New York Times, India's strong engineering base and expertise in the manufacturing

    of low-cost, fuel-efficient cars has resulted in the expansion of manufacturing facilities of

    several automobile companies like hyundai

    Motors, Nissan, Toyota, Volkswagen and Suzuki.

    In 2008, Hyundai Motors alone exported 240,000 cars made in India. Nissan

    Motors plans to export 250,000 vehicles manufactured in its India plant by

    2011.[8] Similarly, General Motors announced its plans to export about 50,000 cars

    manufactured in India by 2011.

    1

  • 8/7/2019 Kishore Summer Project

    8/49

    In September 2009, Ford Motors announced its plans to setup a plant in India with an

    annual capacity of 250,000 cars for US$500 million. The cars will be manufactured both

    for the Indian market and for export. The company said that the plant was a part of its

    plan to make India the hub for its global production business.[11] Fiat also announced

    that it would source more than US$1 billion worth auto components from India.

    The automotive industry is no stranger to change. Many of the changes occurring in the

    global marketplace today - tightened credit markets in a capital-intensive industry,

    declining consumer confidence, increased government involvement - are the most recent

    manifestations of this reality.

    The combination of these new realities with familiar industry challenges such as volatile

    raw materials costs and fuel prices, tighter regulations, capacity and sourcing challenges

    and the need to satisfy consumer demand for cleaner, greener cars, have combined to

    create a business environment that has had a profound effect on the global automotive

    industry.

    2

  • 8/7/2019 Kishore Summer Project

    9/49

    1.2. Company profile

    In 1840, Mr. Simpson, a Scotsman, foresaw potential in developing India as a major

    centre for building coaches and carriages. With a little spirit he nudged his dream and

    Simpson & Co was born. Simpson became a pioneer in railway coaches, motor cars,

    steam passenger buses, public service vehicles... India's Road Transport Industry was

    ushered into a new era.

    Simpsons became the first to recognise the potential of diesel as a fuel, and self started

    the diesel era in the country in 1951. And in 1955, Simpsons became the first Indian

    Company to indigenously manufacture diesel engines for surface transport vechicles.

    Simpsons is the first Indian Company to indigenously manufacture diesel engines for

    surface transport vechicles.

    SIMPSONS WORK POLICY:

    It is our policy to attain and maintain leadership in the market. We serve by providing

    products and services which meet and exceed customer satisfaction ,expectation and

    statutory and regulatory requirements with emphasis on continual improvement in all our

    procees and with total commottment and involvement of all employees

    PRODUCTS AND SERVICES:

    Agriculture Application Engines

    Gensets Application Engines

    Industrial Application Engines

    Marine Application Engines

    VehicularApplication Engines

    3

  • 8/7/2019 Kishore Summer Project

    10/49

    1.3. Need for the study

    The need for the study is to find out the effectiveness and usefulness of the materials

    requirement planning which is used in Simpson & co ltd. It brings out an overall idea of

    how effective is the materials requirement planning for production activity. With other

    automotive companies coming out with new options to attract customers with main

    concern on time and quality, the challenge of retaining the existing customers and

    satisfying the same has become a top reference.

    The main need for carrying out this study is to find out how much useful is the materials

    requirement planning for employees working in Simpson & co ltd. How the materials

    requirement planning helps them to carry out the work effectively without any hitchesand error. What can be done in order to make the materials requirement planning more

    effective so that the raw materials come on time, the manufacturing process goes on

    smoothly and the engines are delivered on time to the customer.

    .

    4

  • 8/7/2019 Kishore Summer Project

    11/49

    1.4. SCOPE OF THE STUDY

    The study reveals the employees preference, their needs, that is what they need in order

    to make the material resource planning effective, how the material resource planning can

    be effectively used in other departments of the company also. The number of respondents

    includes only employees of purchase department. The study also covers the employees

    awareness about materials resource planning and how to use them, factors influencing

    them to use material resource planning and their most preferred options in material

    resource planning. To maintain uniform levels in all levels of purchase department and

    also to communicate effectively to vendor.

    5

  • 8/7/2019 Kishore Summer Project

    12/49

    1.5. OBJECTIVES

    Primary Objective:

    To understand how material resource planning process is implemented in the

    company and to find out how effectively it is used.

    Secondary Objective:

    To bring out the features of materials resource planning.

    To find out how effectively purchase can be done.

    To find out what enhancements are required to improve the material resource

    planning.

    To find out the whether the information available in the MRP system is relevant

    for making decisions.

    To find out whether MRP software is reliable.

    6

  • 8/7/2019 Kishore Summer Project

    13/49

    1.7. LIMITATIONS OF THE STUDY

    This study focuses only on the employee base of Simpson & co ltd. in Anna salaiplant Chennai and it is about the effectiveness of the material requirementplanning used in the plant.

    The study does not provide a reliable source for judging the employee suggestionas it covers only 20 employees from the over all population.

    7

  • 8/7/2019 Kishore Summer Project

    14/49

    1.6. MATERIAL REQUIREMENT PLANNING

    Materials requirements planning (MRP) is the logic (software system) for

    determining the number of parts, components, and materials needed to produce a

    product.

    MRP provides time scheduling information specifying when each of the

    materials, parts, and components should be ordered or produced. Based on

    imputed FIXED LTs

    Dependent demand drives MRP.

    Example of MRP Logic and Product Structure Tree:

    Given the product structure tree for A and the lead time and demand

    information below, provide a materials requirements plan that defines

    the number of units of each component and when they will be needed.

    Product Structure Tree for Assembly A

    8

    E 1D 2 F 2D 3

  • 8/7/2019 Kishore Summer Project

    15/49

    First, the number of units of A are scheduled backwards to allow for their lead time.

    So, in the materials requirement plan below, we have to place an order for 50 units of

    A in the 9th day to receive them in the 10th day.

    L

    LT = 1 DAY

    Next, we need to start scheduling the components that make up A. In the case of

    component B we need 4 Bs for each A. Since we need 50 As, that means 4x50 Bs.

    Back the schedule up for the necessary 2 days of lead time.

    9

    Lead TimesB 2 daysC 1 dayD 3 days

    E 4 daysF 1 day

    DemandDay 10 50 ADay 8 20 B (Spares)Day 6 15 D (Spares)

    Day: 1 2 3 4 5 6 7 8 9 10

    A Required 50

    Order Placement 50

  • 8/7/2019 Kishore Summer Project

    16/49

    Finally, repeating the process for all components, we have the final materialsrequirements plan

    10

    Day: 1 2 3 4 5 6 7 8 9 10

    A Required

    Order Placement 50

    B Required 20 200

    Order Placement 20 200

    SparesLT = 2

    B(4)

    E(1)D(2)

    C(2)

    F(2)D(3)

    A

    Day: 1 2 3 4 5 6 7 8 9 10 A Required

    LT=1 Order Placement 50

    B Required 20 200

    LT=2 Order Placement 20 200

    C Required 100

    LT=1 Order Placement 100

    D Required 55 400 300

    LT=3 Order Placement 55 400 300

    E Required 20 200

    LT=4 Order Placement 20 200

    F Required 200

    LT=1 Order Placement 200

  • 8/7/2019 Kishore Summer Project

    17/49

    Types of Time Fences

    Frozen

    No schedule changes allowed within this window.

    Moderately Firm

    Specific changes allowed within product groups as long as parts are

    available.

    Flexible

    Significant variation allowed as long as overall capacity requirements

    remain at the same levels.

    11

    1 2 13Weeks

    FrozenModerately

    FirmFlexible

    Firm Customer Orders

    Forecast and available

    capacity

    Capacity

  • 8/7/2019 Kishore Summer Project

    18/49

    1.7. Material Requirements Planning System

    Based on forecasts & customer orders a Material Requirements Planning

    system: Creates schedules identifying the specific parts and materials required to

    produce end items.

    Determines exact unit numbers needed.

    Determines the dates when orders for those materials should be released,

    based on lead times.

    Purchase Module

    12

  • 8/7/2019 Kishore Summer Project

    19/49

    1.8. VARIOUS PROCESSES

    Introduction:

    Purchasing in Simpson can be classified as OE components, Tools and Machine Spares,

    Consumables, PMD Components , Branch local items , Engine job work (Cummins) and

    Capital Items.

    Purchasing includes all activities starting from Raising Indents, Approved SupplierList,

    Sourcing rules, RFQ, Quotation, Creating, Amending and canceling Purchase

    Orders(Standard, Blanket agreements and Blanket release), managing the Suppliers and

    conducting analysis of purchase activities.

    Purchasing activities are done atA

    nnasalai ,Sembiam, Pmd, Cummins(CUB),Bangalore,Hyderabad,Trichy,Ooty organizations.

    Depending on the type of Purchase items the Purchase Orders may be classified into

    Standard Purchase order for OE components, Tools & M/C spares consumables,Capital

    Items.

    Blanket Purchase order for OE Components

    Standard Purchase Order for Imported items.(Volvo, Tools & M/C spares and others)

    Purchase Order for Outside Processing

    The Detailed procedures followed in various Purchase departments are given below:

    1.OE Components :

    The Requirement is derived from Engg Department (New Components, Marketing

    Department (Sales Plan) and consolidated through MRP to arrive at the actual Purchase

    requirement. For New development components the engineering drawing is sent to

    vendor development department with ECO to develop new vendors. They in turn get the

    quotation from multiple suppliers and based on selection criteria vendors are short Listed.

    For the New Vendors quotation is created and attached to ASL.The Standard Purchase

    Order is created for getting sample items. The sample item is inspected assembled and

    tested by production and quality departments. Once it is fully approved, the STA

    department approves and implement the ECO. From that point onwards regular

    procurement and production is started. For regular item the component price is amended

  • 8/7/2019 Kishore Summer Project

    20/49

    after price negotiation with retrospective effect. For SSI suppliers the ED rates are also

    amended in quotation based on the supplier turn over.

    Quotation are maintained at organization level which means a vendor will have three

    quotation for supplying the same item to three different locations.

    2.Tools,M/C spares and Consumables:

    Purchase requirements is received from various MFG departments through

    Purchase indents(Manual).Tools are procured for old line, New Line and SJ3 line in the

    shop floor.The production plan determines the tool requirement and planning is based on

    tool life(For New line,SJ3) or min Max (Old Line). M/C spares and consumables are

    procured on need basis as and when required by the shop floor. Both tools and M/C

    spares can be either stocked or directly consumed.

    Quotations are created for all the items based on market price and price amendments are

    carried out as required.

    3.P.M.D Purchase:

    The part sale during the previous year forms the basis of requirement in P.M.D

    department. The vendor base for O.E. components and P.M.D purchases are one and the

    same, but the quotation price for parts department will be higher than OE rate. Price

    amendments are similar to O.E.Components

    4.Kits / Labour only engines Purchases: .

    Engine components are received as KIT assemblies from Cummins B5.9 and

    assembled in Simpsons. The kits are received thru 57F4 excise form and returned as

    finished engines. Labour invoice is prepared for the same.

    5.Capital Purchases:

    Capital item purchase for plant and machinery and special projects are controlled

    by Projects department. The process for imports is similar to Volvo Purchase. The Asset

    purchases are not integrated to F.A. Module in E.R.P currently.

    14

  • 8/7/2019 Kishore Summer Project

    21/49

    PURCHASE SETUP ORGANIZATION WISE

    Activity ASP SMP PMD Branch KMP

    Types Of Purchase

    OE 3 3 3 3 2Tools/Spare/Consumables

    3 3 2 2Only

    Consumables

    OSP 3 3 2 2 2

    Imports 3 3 3 2 2

    Types of Purchase Documents

    Blanket PO, Releasethru MRP

    3 3 3 2 2

    Standard PO 3 3 3 3 3

    Inter Plant Transfers

    STV 3 3 3 3 2

    Purchasing Hierachy

    Hierarchy 3 3 3 3 2

    Supplier Master Maintenance

    ItemCatalog

    3 3 3 3 2

    ASL 3 3 3 2 2

    SourcingRule

    3 3 3 2 2

    Tax - ItemCategory

    3 3 3 3 3

    Note :Tax Category is defined at IMO organization level.

    15

  • 8/7/2019 Kishore Summer Project

    22/49

    Purchasing General Process:

    Manage

    e

    isi

    ionManage

    e

    isi

    ion

    Vendor

    Manage Qo

    a

    ionsManage Q

    o

    a

    ions

    Manage Domes

    i

    ro

    remen

    Manage Domes

    i

    ro

    remen

    Manage Impor

    sManage Impor

    s

    Manage

    e

    eip

    sManage

    e

    eip

    sManage

    e

    rnsManage

    e

    rns

    Finan

    ias

    Ex

    ernaEn

    i

    y

    Ex

    erna

    ro

    ess

    Non-Apps

    The purchasing activity is decentralized and managed at ASP, SMP and PMD locations

    independently. The vendor base may be common or different across the different

    locations.

    There is a separate approval hierarchy for each organization with approval limits clearly

    defined.

    The components purchased will be of the following types:1.OE Components

    2.Tools

    3.Machinery Spares

    4.Consumables

    5.Capital Items 16

  • 8/7/2019 Kishore Summer Project

    23/49

    PMD parts

    Imported items

    The buyers are allocated for each vendor/item at the Organization/Item master level and

    the approval rules for Blanket order, Blanket Release, Standard PO and Purchase

    requisition is configured.

    The quotations forASP/SMP plant are managed at ASP material control department

    while PMD quotations are managed by themselves. There is no approval hierarchy for

    Quotations.

    RFQ and Quotation Process (OE-New component Development)

    RFQ Process for OE - For New ComponentDevelopment

    Crea

    e I

    em in

    Mas

    er and Assign

    o re

    evan

    Inven

    ory

    rgn.

    Crea

    e New

    S

    pp

    ier Code

    New Componen

    Deve

    oped by

    & D

    based on

    s

    omer

    re

    iremen

    Vendor

    EC

    rea

    ed by

    & D

    Forward

    he EC

    o

    STA Dep

    . wi

    h Drawing

    & send no

    ifi

    a

    ion

    o

    rod

    ion Dep

    .

    STA dep

    .

    o ana

    yze

    and se

    e

    he Vendor

    Che

    k if Vendor is

    exis

    ing or New Vendor

    re

    ired

    Exis

    ing

    New

    Crea

    e

    FQ for Se

    e

    ed

    Vendors

    rin

    FQ Do

    men

    forse

    e

    ion

    ri

    eria

    Ge

    Q

    o

    a

    ion from

    Vendor, Nego

    ia

    e

    ri

    e

    and

    e

    es

    o provide

    a Samp

    e

    Ge

    Samp

    e

    I

    ems(wi

    ho

    re

    eip

    ),

    Inspe

    ed,

    es

    ed and

    assemb

    ed by Q

    a

    i

    y

    Dep

    .

    Samp

    e

    omponen

    a

    ep

    ed - In

    ima

    ion

    o

    he s

    pp

    ier for reg

    ar

    prod

    ion

    Crea

    e a

    o

    a

    ion

    Crea

    e en

    ry in

    ASL wi

    h s

    a

    s

    New

    Crea

    e a s

    andard

    for

    he samp

    e

    prod

    (No

    for a

    S

    pp

    iers)

    Crea

    e

    e

    eip

    for

    aymen

    17

  • 8/7/2019 Kishore Summer Project

    24/49

    Description:

    The Current RFQ process is used only for Newly developed components. The

    development of the vendor/item is outside the system and the quotation is finalized based

    on the vendor quality and terms and conditions.

    For existing items the Quotation is maintained organization level for all the vendors. It is

    updated during price revision or tax changes and is used in MRP process to raise blanket

    agreement and also in Standard PO thru Catalog.

    Purchase Requisition process (Tools and M/c Spares)

    18

    PO Dep

    .

    Exis!

    ing

    B " yer# onso $ ida

    es a$ $

    re % " isi

    ion % " an

    i

    y

    o

    #rea

    e a sing$e order

    Ana$yze Vendor and

    he

    I

    em

    Man"a

    $Inden

    #rea

    ed by

    #on

    #erned Depar

    men

    Che#k for Exis

    ing / New

    I

    em

    o be Pur# hased

    New

    Crea

    e a New I

    em

    (May be Inven

    ory I

    em

    / DIre#

    Debi

    )

    &e

    %uiremen

    sen

    o

    Prospe#

    ive Vendors

    Quo

    a

    ion re # eived

    from Vendor

    Ana$yze

    he Quo

    a

    ion

    and fina$yze vendor

    Crea

    e S

    andard PO

    Crea

    e Quo

    a

    ion

    Ex'

    erna(

    En'

    i'

    y

    Ex'

    erna(

    Pro)

    ess

    Non-Apps

    Do)

    umen'

  • 8/7/2019 Kishore Summer Project

    25/49

    Description:

    Two types of materials are purchased under Tools and Machinery spares. One is

    stockable and another one is direct debits ( issued to works as a expense).

    Purchase Requisition of Oracle is not currently used. The Manual Purchase requisition is

    collected and pooled into a single Standard Purchase order.This is done for Machine

    Spares/Tools/Consumables,Asset and Capital Items and Contractual Purchase.

    The possibility of using Purchase requisition in Oracle Apps has to be explored. A new

    approval hierarchy would be required in that case.

    1. BLANKET AGREEMENT :

    A blanket agreement is released every 6 months from ASP/SMP/PMD plants to all the

    vendors for components purchase. This is based on the sales/production plan from the

    marketing department. The total value of purchase is approved thru the Finance

    committee and a Purchase Order is printed and sent to all suppliers.

    The actual process is done in MRP module and is explained in detail in the process flow

    chart attached above.

    The sourcing rule is used extensively in the process and the latest quotation is picked up

    for each vendor and updated in the Sourcing rule which is picked up by the MRP process.

    The machine shop at ASP and SMP plants cater to the assembly line of both the plants.

    The production requirement of the other plant is fed into MRP and Internal sales orders

    are generated for transfer of material.

    19

  • 8/7/2019 Kishore Summer Project

    26/49

    2. BLANKET RELEASE :

    Blanket release is done every month, based on the firm sales plan from marketing

    department This forms the daily delivery schedule for the supplier and a daily

    requirement statement is sent to all the suppliers with reference to the blanket agreement.

    For blanket release process, the blanket agreement number is updated in the Sourcing rule

    thru a concurrent program and MRP is run to generate releases.

    20

  • 8/7/2019 Kishore Summer Project

    27/49

    Updati0 1

    0

    f2

    34

    5

    ith

    Quotation6

    rocess

    7

    or2 3 6

    /3

    M6

    Marketing6 8

    an

    Process forthe9

    Months(

    4

    is5

    iseandPeriod5

    ise)

    In M@

    P Module

    Loadingthe7

    orecastPlan.

    InputthePlan Manuallyusing

    theA

    ucket TypePeriod

    STB

    C

    emand forotherD

    rgs likeSMP/PMC

    /2

    SP

    (C

    emand7

    or M7

    E

    Item)

    F

    opythe

    7

    orecastPlanas aDemandandalsocopy

    D

    therD

    rganizationDemand

    LaunchM@

    P

    ForPMDD

    rgnthe9

    Months@

    equirement is arriG

    edH

    yaveragingtheprevious yearactual

    sale (@

    eportProcess)

    LoadingForecastPlan

    Via InterfaceProcess

    F

    opytheForecastPlan

    As aDemand(WithoutI

    P

    plosion)

    LaunchM@

    P

    CreatePurchase@

    equisition

    (@

    equisition ImportProcess)

    CreationD

    fA

    lanketPOProcess In

    Purchasing Module

    PurchasingDocumentOpen

    InterfaceProgram

    PurchaseOrderE

    eneratedA

    ySystem

    WithApprovedStatus Condition

    Populating Tax InformationForA

    lanketPOcreated

    PO Tax InterfaceProcess

    E

    enerateFCStatement

    For5

    ardtoI

    DF for

    Approval

    PrintA

    lanketPO

    SendPurchaseAgreement

    ToVendor

    SummaryofFCcreatedH

    y

    CostOffice

    ToVice-Chairman

    Bla Q kR

    tS

    grR R

    T

    R

    Q t U rV W R X X

    FV

    rY

    atS

    S U /S a U / U a b Y

    rga Q izatiV

    Q

    ( U rV W R X X

    iX

    dV

    Q

    R

    atY

    rga Q izatiV

    Q cR

    dR

    l)

    21

  • 8/7/2019 Kishore Summer Project

    28/49

    Blanket Release

    Updation of ASL with

    Quotation Process

    For ASP/SMP Actual Sales Plan

    given by Marketing on 20th of

    every month forthe first fifteen

    days of nextMonth

    Loading the ForecastPlan.

    Inputthe Plan Manually using

    the Bucket Type -Daily

    STV Demand for other

    Orgs SMP/PMD/ASP

    Copy the ForecastPlan as a

    Demand and also copy Other

    Organization STV Demand

    Launch MRPProcess

    ForPMD Pending Sale Order

    Quantity is derived for 6 months

    then arrive average Qty/Month

    (Customized Report)

    Loading ForecastPlan

    Via Interface Process

    Launch MRP

    Create BlanketPurchase Release

    Create Release Process

    System Generates Concurrent Blanket

    Release For each Item Vendorwise

    Create Release Order Document

    Create Vendor Schedule Statement

    Send Purchase Agreement

    To Vendor

    Bl n et Rele se Process For OE t A P/ MP/PMD Or niz tion(Process is one t Or niz tion Level)

    22

  • 8/7/2019 Kishore Summer Project

    29/49

    Amendment Process for Blanket Agreement and Release

    Quae

    tityf

    g h

    ed

    g h

    et

    ir

    p

    q

    h

    r rf

    p

    rBlae

    kh

    t

    fgr

    h h g h

    et & Bla

    ek

    h

    t rh

    lh

    ar

    h

    Checks

    lanketOrderor

    t

    eleaseOrder

    PriceAmendmentinQuotation

    TaxStructureChanges

    Includingu

    ew Items /u

    on

    Processed ItemthroughMt

    P(

    t

    equisitioncreatgedv

    ut

    BlanketPOnotgenerated)

    Increase inOrderValue

    Processed

    BlanketPO

    (Open)

    ForwardtoApproval

    Hierarchy

    PriceamendmentinQuotation

    TaxChangeQuantity

    Amendment

    Processed

    ReleaseOrder

    (Open)

    Createnew

    ReleaseOrder fo

    rtheItem intheOpenBlanketPO

    Approvedv

    yDGM(Materials)

    ReleaseOrder

    Blanket

    Forwardtonext

    Hierarchy

    ForwardtoFCB

    forApproval

    ApprovedOrder

    1. Rate Amendments:

    When there is a price revision , Quotation Price is amended with price break(for keeping

    history) at each organization level for a vendor/item.

    For Blanket order the price is applied from catalog manually and taxes are re-applied.The

    P.O is sent for approval when the rate is increased.

    For Blanket releases the existing releases cannot be corrected. A new release is done

    throughA

    uto create from Blanket P.O.For standard P.O catlog is re-applied and sent for approval.

    2.Quantity Amendments:

    Quantity amendments are done in the blanket releases and standard P.O .No approval is

    required when the release value is within the blanket order value.

    23

  • 8/7/2019 Kishore Summer Project

    30/49

    Quantity amendments are done whenever the supply schedules are not following the

    agreed schedules due to various reasons like line changes, insufficient supplier capacity,

    short supply and rejections.

    Receipts

    Receiw

    tx

    ry

    cess fy

    r

    components,ools,

    /

    Spares &

    nsumables -

    Sx, S

    x,

    x

    ReceiveMaterialat

    Gate

    No

    Check TaxStructureand

    Matchwiththe

    Supplier Invoice

    Vendor

    CreateReceiptG1Document (using

    parameters supplierand

    Item, notconsideringOrders)

    Check allopenoredrs

    (Blanket release

    Orders / StandardPOs)

    SelectPO (Match

    Orderquantitywith

    supply)

    SembiumMaterial IfSupplyQuantity is