2
Thermography Inspection at Sinclairs Date: 12.03.2015 Photo and Identification Location Kugler 3 Equipment Panel 4 Type Nom load Actual load Fault Recommendatio n Repair Thermogram 25/02/2015 Sp1 Temperature 79.4 °C Analysis & Recommended action: Q1 overload seems excessively hot ,suggest replacing as soon as possible 0.1- 0.16 Siemens Inspected by : Darren Maloney Signature:….………..………… date: 12.-3.2015 Repaired by: ………………………………………… ...........date: document.docx 1 (2) 2015-03-30 FLIR Reporter 9.1 Sp1 27.8 76.5 °C 40 60

Upload: darren-maloney

Post on 27-Sep-2015

222 views

Category:

Documents


2 download

DESCRIPTION

Factory Electrical Repairs

TRANSCRIPT

IR Photo no formulas

Thermography Inspection atSinclairsDate: 12.03.2015

Photo and Identification

Location Kugler 3

Equipment Panel 4

Type

Nom load

Actual load

Fault

Recommendation Repair

Thermogram 25/02/2015

Sp1 Temperature 79.4 C

Analysis & Recommended action:

Q1 overload seems excessively hot ,suggest replacing as soon as possible 0.1-0.16 Siemens

Inspected by : Darren Maloney Signature:...date: 12.-3.2015

Repaired by: date:

Comment:..

Document11 (1)2015-03-30FLIR Reporter 9.1