![Page 1: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/1.jpg)
PRE PARED BY
DOCUMENT NUMBER VOY-CO-FR 28 JULY 1967
VOLUME 5 DATA MANAGEMENT STUDY
APPENDIX E
CONTRACTOR DATA PACKAGE
QUALITY ASSURANCE (QA)
T.F. SMYTH
J.R. GOTTSHALL
QUALITY ASSURANCE MANAGEMENT
VOYAGER SPACECRAFT SYSTEM PROJECT
APPROVED BY
A. FRANK, COGNIZANT ENGINEER
DATA MANAGEMENT A N D CONTROL TASK
VOYAGER SPACECRAFT SYSTEM PROJECT
PREPARED FOR
JET PROPULSION LABORATORY
CALIFORNIA INSTITUTE OF TECHNOLOGY
4800 OAK GROVE DRIVE
PASADENA, CALIFORNIA
U NDER JPL CONTRACT No. 951 1 12
G E N E R A L @ E L E C T RI C M I S S I L E A N D S P A C E DIVISION
V a l l e y Forge Space T e c h n o l o g y C e n t e r P.O. Box 8555 Philadelphia, Penna. 19101
https://ntrs.nasa.gov/search.jsp?R=19670031087 2020-03-08T06:07:07+00:00Z
![Page 2: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/2.jpg)
TABLE OF CONTENTS
Section Page
1 INTRODUCTION. . .1-1
2 DATA ITEM LIST/USER MATRIX. . . . . . . . . . . . . 2-1 3 USER FLOWDIAGRAMS . . . . . . . . . . . . 3-1
4 DATAREQUIREMENT DESCRIPTIONS (DRD'S) - . 4-1 5 DOCUMENTATIONRELATIONSHIPTREES * 5-1
#
iii/iv
![Page 3: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/3.jpg)
INTRODUCTION
This appendix presents the Contractor Data Package (Data Item Matrix, Data Requirement
Descriptions, User Flow Diagram, Document Relationship Tree, and Frequency and Phasing
Charts) for Quality Assurance (QA).
These data include control and review procedures to ensure that component, subsystem,
and system design, manufacture, assembly, and testing will produce items that meet the
established specifications. This category also includes manufacturing verification tests to obtain quality assurance. #
The complete list of Contractor Data Package appendixes is-as follows:
Appendix A - Technical Description and System Engineering (SE)
Appendix B - Planetary Quarantine (PQ)
Appendix C - Manufacturing (MG)
Appendix D - Configuration Management (CM)
Appendix E ,- Quality Assurance (QA)
Appendix F - Test (TE) and Mission Operations (MP)
Appendix G - Reliability Assurance (RA)
Appendix H - Logistics and Support (LS)
Appendix I - Overall Management (MA) ,Scheduling (SC),Manning and Financial (MF)
Appendix J - Procurement and Contracting (PC)
Appendix K - Data Management (DM)
Appendix L* - Facilities (FA)
Appendix M* - Safety (SA)
Appendix N* - Site Activation for Launch (AL)
* Appendixes L through Q prepared under Contract NAS 7-584
1 1-1
![Page 4: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/4.jpg)
Appendix 0" - Science (SI)
Appendix P* - Related Project Interfaces (RP)
Appendix Q* - Advanced Missions (AM)
* Appendixes L through Q prepared under Contract NAS 7-584 c
1-2
![Page 5: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/5.jpg)
NUMBER 1__
01 0
QA- 011
*
QA- 003
QA- 004
&A- 0 05
&A- 006
&A- 007
QA- 008
&A- 009
QA-
1 o f 4
DATA ITEM
QUALITY ASSURANCE
MANUALS
Manual, Instrument Calibration and Maintenance
\
Manual, Quality Assurance f
Operating Procedures
Manual, Special Test Equipment, Component
Manual, Workmanship Standards
MINUTES
Minutes, Material Review Board
PLANS
Plan, Inspection
Plan, Quality Assurance Program
Plan, Sampling
Plan, Test and Operating, for Special Test Equipment (STE), Component
DESCRIPTION
An approved set of procedures for calibration cycle instruments so that reliable data and confidence can ting procedure.
Formalizes the specific requirements of the Quality established operations procedures.
Cdntrols a6d maintains the equipment current, nece fo rmance requirements . Provides visual aids and standards jointly selected 1 for use during the program.
~~
Minutes of formal meetings of the Material Review f
Documents the specific parameters of inspection and the required quality levels in fabrication, assembly,
The system contractorfs total quality plan which me( tractual requirements.
Documents and controls the sample size necessary t quality levels.
A detailed checkout and operating procedure fo r test grity and confidence in the test results. In process checkout equipment. -
* KEY INFORMAL DATA
1 2-1
![Page 6: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/6.jpg)
.DATA ITEM LIST/USER MATRIX
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
and maintenance cycles for )e maintained in the opera-
issurance Plan into
~
sitated by design and per-
r contractor and customer
oard (MRB). -
F the tolerances to maintain and configuration.
ts all the customer con-
I maintain acceptance
equipment to maintain inte- est of hardware using bend
U - USE R - REVIEW AUTHORITY A - APPROVAL AUTHORITY PM - PROJECT MANAGER APPROVAL
1 2-2-1
![Page 7: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/7.jpg)
PAGE N0 .1 of 4
.APPL I CAB1 L I TY TO PROJECT BOARDS :ABILITY AT SUBCONTRAC- /ENDOR/SUPPLIER LEVELS
A _.
- PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENDOR/SUPPLIER [ ) - OPTIONAL APPLICATION
1
2-2-aB-
NA - NOT APPLICABLE
![Page 8: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/8.jpg)
NUMBER
~
&A- 014
&A- 016
&A- 017
&A-
&A-
018
019
&A-
&A- 002
001
2 of 4
DATA ITEM
QUALITY ASSURANCE
PROCEDURES
Procedure, Process Control
#
Procedure, Test/Inspection
Procedure, Rework
Procedure, Area Control
RECORDS ~
Record, Calibration
Record, Shelf Life
Record, Tool and Gauge Usage
Record, Test {Materials, Parts, Sub-Assemblies)
Logbook, Component
Logbook, Vehicle
* KEY INFORMAL DATA
1
DESCRIPTION
Essential process controls needed to supplement thc procedure.
Specific test and inspection procedures to be perfor contractor.
A chronological and historical record used in review status, solving of anomalies and verifying acceptanc commment reauirements,
To verify to the customer the chronological and histc for the vehicle presented for buy-off.
![Page 9: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/9.jpg)
D A T A I T E M L I S T / U S E R M A T R I X
I
SE
-
SA
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
I - es t and inspection
ed by the system
l -
ng component criteria for the
rical acceptance I u U - USE
J
R - REVIEW AUTHORITY A - APPROVAL AUTHORITY PM - PROJECT MANAGER APPROVAL
2-49
![Page 10: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/10.jpg)
PAGE NO. 2 of4
- - -
- - -
- u -
APPLl CAB1 LI TY TO PROJECT BOARDS
- - -
- u -
- u -
- R -
- PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENOOR/SUPPLIER ( ) - OPTIONAL APPLICATION NA - NOT APPLICABLE
![Page 11: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/11.jpg)
DATA ITEM
NUMBER
QA- 020
QA- 021
QA- 022
QA- 023
QA- 024
QA- 025
&A- 026
&A- 027
QA- 028
QA- 029
QA- 03 0
DATA ITEM
QUALITY ASSURANCE
REPORTS
*Report, Failure Analysis
*Report, Nonconforming *
Material (NCMR)
*Report, Process Trends
*Report, Quality Audit
*Report, Quality Status
Report, Special Measurement and Test Equipment Evaluation (Com- poneno
Report, Quality Assurance Audit Summary ~~ ~
Report, Quality Assurance Trend Summary
Report, Break of Inspection
*Report, Failure Categorization
-~ ~
Report, Qualification Status
DESCRl PTl ON
Documentation of the investigatory analysis of noncl problem cause, and prevention.
A document to report nonconformance in fabrication assembly, and inspection and the cause, corrective and disposition.
Identifies shifts in quality levels during processes s corrective action can be taken.
--
Measures the level of compliance in all areas of fab assembly and test to the governing quality document,
~~ ~~ ~
A report of the system contractor's quality perform; submitted to the customer.
A special capability study of test equipment to verifj and confidence in test and inspection results
Summary of the audits verifying compliance in fabric testing, inspection, to specific control documents.
Summarization of QA trend reports to determine any quality levels and to emphasize corrective action.
Identifies the break of inspection event which causes processing to be stopped and verifies that all materi; a component is maintained as prime.
An analysis report categorizing failures and assignin for failures to design, component, fabrication, or te
Reports the status of the type approval (TA) progr customer.
* KEY INFORMAL DATA
-s-
![Page 12: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/12.jpg)
D A T A I T E M L I S T / U S E R M A T R I X
SE
u u
- -
u -
u -
u -
u u
u u
u -
- u
- -
u -
U -
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
PQ
*
USE
PA
R U
A U
A -
A U
A U
A R
A -
A R
TE
A U
A U
A R
formance,
test, ction,
that
cation,
me
integrity
ttion,
shifts in
iardware 1 within
; responsibility t.
to the
R - REVIEW AUTHORITY A - APPROVAL AUTHORITY PM - PROJECT MANAGER APPROVAL
![Page 13: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/13.jpg)
PAGE NO. 3 of 4 APPLICABILITY AT SUBCONTRAC- TOR/VENDOR/SUPPLIER LEVELS
u - -
- - -
- s s
- s s
- (S) NA
I
APPLl CAB1 LI TY TO PROJECT BOARDS
. PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENDOR/SUPPLIER ( 1 - OPTIONAL APPLICATION
1
NA - NOT APPLICABLE
![Page 14: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/14.jpg)
DATA ITEM
NUMBER DATA ITEM
QUALITY ASSURANCE
&A- 031
DESCRl PTI ON
SP ECIFICA TIONS
I
Specification, Special Test Equipment (STE), . Component
* KEY INFORMAL DATA
J
2- -7
![Page 15: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/15.jpg)
: P A T A I T E M L I S T / U S E R M A T R I X
MF
APPLICABILITY TO FUNCTIONAL USERS
MP DM
- _ -
AT CONTRACTOR LEVEL
L
I u
U - USE
1
R - REVIEW AUTHORITY A - APPROVAL AUTHORITY PM - PROJECT MANAGER APPROVAL
![Page 16: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/16.jpg)
PAGE NO. 4 O f 4
T SUBCON' PPLIER LE -
v)
u o T Z C W O >
a w n
NA -
TO PROJECT
- PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTI)R/VENDOR/SUPPLIER [ 1 - OPTIONAL APPLICATION
1
NA - NOT APPLICABLE
2- 7/8
![Page 17: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/17.jpg)
USER FLOW DIAGRAMS
The Quality Assurance Data U s e r Flow Diagrams were developed to show the quality
activities and required data items on Voyager to meet customer requirements
(NPC 200-2, 3, 4) and the needs of a long-life space system quality program. Interfaces
with the systems office, the contractor Voyager project, and procurement sources have
been indicated from contract award through launch. The quality assurance data items
shown in the diagrams agree with Voyager data item lists.
Early attention is devoted to the quality assur&ce program plan, conducting special quality
system studies, and obtaining rapid integration of major subcontractor quality programs
into the prime contractor quality assurance system; Contincous from the systems design
phase through launch, key quality activities are:
SDR through PDR
PDR through HDR
MDR through CDR
e
e
e
0
e
e
e
e
e
e
0
0
0
0
e
e
e
Develop parts qualification plan
Review specifications and drawings
Initiate training program
Monitor breadboard activities
Establish procurement source (supplier) evaluation system
Begin parts and process qualifications
Finalize Quality Assurance Operating Procedures Manual
Initiate component special test equipment design
Calibrate tools and gages
Continue certification of personnel
Establish QA engineer residents at major subcontractors
Monitor model fabrication and tests
Continue test plan development
Conduct failure analyses
Inspect engineering model procurement, fabrication and tests
Conduct audits
Review purchase requisitions for TA and PTM hardware
J 3-1
![Page 18: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/18.jpg)
CDR through FACI 0 Update procedures and processes
0 Update component STE
0 Continue STE, tool and gage calibrations
0 Inspect TA and PTM fabrication and tests
0 Review process trends and conduct failure analyses
0 Compile documentation, including deviation data for FACI
FACI through MAR 0 Prepare launch operations QA plan
0 Implement defect preventive measures evolving from FACI
0 Perform FA and OSE h p r o c e s s inspection test and certification
0 Conduct failure analyses
0 Compile Mission Acceptance Review documentation
0 Review status of each vehicle
MAR through Launch 0 Inspect shipments of FA, OSE and STE
0 Receipt inspection at launch site
0 Monitor pre-launch tests
0 Provide QA data for problem solving areas
3-2
J
![Page 19: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/19.jpg)
Figure Number
E-1
E-2
E-3
E-4
Quality Assurance User Flow Diagrams
Title - Quality Assurance User Flow Diagram - Summary
Quality Assurance User Flow Diagram - Contract Award Through Preliminary Design Review
Quality A_ssurance User Flow Diagram - Preliminary Design Review Through Critical Design Review
Quality Assurance User,Flow Diagram - Critical Design Review Through Launch (2 sheets)
3-3/4
![Page 20: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/20.jpg)
SYSTEM OFFICE
-_I
CONTRACTOR
CONTRACT WORK STATEMENT SPECIFIClTIONS NPC zoo-2. zoo-a
QA DETAILED FUNCTIONS & RESPONGD3ILlTlES
ESTABLLSH QA SPECIFICATION AND DRAWING REVIEW
CONDUCT QA SPECIAL SYSTEM STUDIES I
QUALlTY - I n
ASSURANCE PROGRAM PLAN REYIEW
REYIEW QA OPERATING PROCEDURES
TRAlNING AND INDOCTRINATION REQUIREMENTS
PREPARE QA PROGRAM RQMTS FOR LSSUE TO MAJOR SUBCONTRACTORS
![Page 21: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/21.jpg)
PRELIMINARY
REVIEW r --t - DESIGN SYSTEM
DESIGN REVLEW
SPECIFICATIONS H AND R E ~ W DRAWINGS
-
3CTION & QA NEERING MOM-
,-----_)-----_.-------------..--
k PROCEDURES FOR
CLEANLINESS. TRACEABILITY. QA PROGRAM CONTROL O F QUARANTINE.
?EW QA #GRAM PLAN LEMENTATION
A
PLANUPDATE , ,.-~ ~ I , , MAGNETIC CLEANLINESS. & L I F E SENSJTIVE PARTS
REVIEW QA PROGRAM
#
PREPARE PARTS ---C QUALIFICATION
PLAN c
DEVELOP
MANUALS - CALIBRATION c
INITIATE
PROGRAMS ---c TRAINING c
1 SURVEY MAJOR ESTABLISH SUBCONTRACTORS PRELIMINARY -
QUALIFICATION PROGRAM
INTERFACE TOOLS, JIGS. AND FIXTURE
- ANDSELECTED - VENDORS
t BEGIN SPECIAL PROCESS QUALIFICATION
SUPPLIER EVALUATION SYSTEM -
FINALIZE QAOP MANUAL
t PREPARE BREAD- BOARD & MODEL INSPECTION PROCEDURES
SPECJAL TEST EQUIPMENT DESIGN
m t CALIBRATE TOOLS 4 ANDGAGES
ESTABLISH QA ENGINEERING RESDENCY AT
SUBCONTRACTORS
3-6-1
![Page 22: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/22.jpg)
~~t DESIGN
REVIEW QA PROGRAM
I
BREADBOARDAND MODEL FABRICA- TION & T E S T S
I
CONTINUE T E S T PLAN D E V E W P M E N T
FAILURE
I
ATTEND DESIGN
MEETINGS 4 REVIEW
t INSPECT ENGINEERING MODEL FABRICATION H & T E S T
DEVELOP DETAILED PROCEDURES
4
CONDUCT
AUDITS .-) QUALITY
PROCbRE COMPONENT SPECIAL T E S T EQUIPMENT
COMPILE TOOL & GAGE USAGE RECORDS
CERTIFICATIONS -I I d I I
R E C E I P T INSPECT
EVALUATION SYSTEM
REVIEW PURCHASE REQUISITTONS FOR ENGINEERING HARDWARE
__C & U P D A T E S U P P L E R - -
FINALIZE 4 Z N S
REVISED SPECIFICATIONS &DRAWINGS
UPDATE PROCEDURES &PROCESSES
7 CONDUCT 4 AUDITS
I UPDATE COMPONENT 1 S T E
CONTINUE STE TOOL AND GAGE CALIBRATIONS
PERSONNEL QUALIFICATIONS
CONFIRM GE SUBCONTRACTOR STE C O M P A T l B I L n
REVIEW PURCHAS REVISION AND R E C E I P T INSPEC? TA & P T M HDWE
![Page 23: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/23.jpg)
CONFIGURATION INSPECTION
4
COMPILE DEVIATION 1'. DATA FACI FOR I
MISSION
REVIEW ACCEPTANCE +
TRENDB AND
FABRICATION AND TEST OF
PREPARE LAUNCH OPERATIONS_
COMPILE
WCUMENTATION
T
IMPLEMENT DEFECT PERFORM FLIGHT PREVENTIVE MEASURES EVOLVING T PROCESS INSPEC-
ARTICLE IN-
COMPILE I SUBCONTRACTOR DOCUMENTS
--
---I -I i
LEGEND:
ACTIVITY. V U
![Page 24: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/24.jpg)
VEHICLE
PROVIDE Q-4 DATA FOR
PROBLEM AREAS
INSPECT RECEIPT INSPECT SHIPMENTS AT LAUNCH SITE OF FA. OSE AND STE
I I MONITOR PRELAUNCH TESTS
I MAJOR ~uBcoNTHACTOR QA SUPPORT
ITH DESCRIPTION INSIDE
Figure E-1. Quality Assurance User Flow Diagram - Summary
![Page 25: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/25.jpg)
STATEMENT SPECS NPC 200-2,200.-3 iYSTEbl OFFICE
>ONTRACTOR
PLANS AND MANAGEMENT PLAN
QUALITY ASSURANCE SYSTEM SPECIALSTUDIES __
QUA-LETY ASSURANCE PROCEDURE DEVEIAPEMENT
SPECIAL MEASUREMENT INSTRUMENT AND TEST EQUIPMENT CALIBRATION
FUNCTIONS RESPONSE31 PLANS
ORGANIZATION MTERFACES
I I
81 DRAWINGS 83-025, 059
SPECIFICATION REVIEW CHECK SHEETS
ESTABLISH QUALITY QA SPEC AND ASSURANCE DRAWING REVIEW SPECIFICATION 6 PLAN DRAWING PLAN
PRELIMINARY APPROVED PARTS LIST 83-029
CLEANLINESS MODEL GUIDELINES PROCESS &SPECS PQ-001. 002, 004, 006
ASSURANCE
QUARATINE &CLEANLINESS MODEL .(__>- pB-001 002
FOR LIFE SENSlTNE
REQUIRINO MAGNETIC
TRACEABILITY MODEL VI CM-013
SUECONTR RFLATIONSRP . -- DOCUMENT
EVALUATE THAINING INDOCTRINATION &INDOCTRINATION REQUIREMENTS
PROCEDl
-----
MAJOR SUBCONTR PREPARE QUA LIT^ ASSURANCE PROGRAM REQUIREMENTS REQUIREMENTS FOR ISSUANCE TO MAJOR SUBCONTWCTORS
5-7
PREPARE QUA LIT^ ASSURANCE PROGRAM REQUIREMENTS FOR ISSUANCE TO MAJOR SUBCONTWCTORS
5-7
![Page 26: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/26.jpg)
REVIEW REPORTS
PRELIMINARY QA OPERATING PROCEDURES MANUAL QA-004
.----- PROCEDUREFOR BREADBOARD ITEMS QA-021
------------ TEST EQUIPMENT & INSTRUMENTATION EVALUATION REPORT
INlTL4m SUBCONTR VOYAGER ORlENTATION
CGNTR, MAJOR
PROGRAMPLAN REVIEW &APPROVAL SUBCONTRQA OF MAJOR SUBCONTR QA PROGRAM PLAN INTEGRATION
'
r- I I I I 1 1 1 I
A
![Page 27: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/27.jpg)
PROGRAM PLAN
PREPARE SPECIAL SPECIALQA QA PROCESS PROCESS
PLAN & PROCESS CONTROLPROCEDURE
DEVELQPMENT PLAN
b DEVELOPMENT
SURVEY MAJOR SUBCONTRACTORS * & SELECTED VENDORS FOR LQNG LEAD ITEMS
PROCEDLWES D
- PRELIMINARY ESTABLBR
PRELIMINARY
SPECIFICATION Q DRAWING REVIEW REPORTS PROCESSES
SUPPLIER
PROCEDURESFOR b CONTROLOF
QUARANTINE I CLEANLINESS, TRACE
+ SUPPIER EVALUATION SYSTEM
I ESTABLISH I
EVALUATION REPORT PC-023
1
~ DOCUMENTCONTROL & QA RECORDS I CONTROL 1 -
BREADBOARD RECENING INSPECTION PROCEDURE QA-013
PREPAREBBEADBOARD RECEMNG INSPECTION PROCEDURE
L
I RECEIPT INSPECT BREADBOARD
4 I T E M S 1 UPDATED BA OPERATING PROCEDURE MANUAL QA-004
1
CENTER (QADCC)
INSPECTION REPORTS DATA L QA-021
PRELIMINARY DEVEIOP
CALIBRATION CALIBRATTON 61 M A ~ E N A N ~ E &MAINTENANCE L
--- MANUAL
![Page 28: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/28.jpg)
QA STATU8 OGUAM PLAN REPORTS PLEMENTATION PA-024
LEGEND: -
ACTIVITY, WITH DESCRIPTION W I D E n DATA ITEM(S),WITH TITLEV) INSIDE 0
Figure E-2. Quality Assurance User Flow Diagram - Contract Award Through
Preliminary Design Review
![Page 29: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/29.jpg)
rmmoR PLANS k STATUS
- - -
----
, - _ - - - _ _ _ - _ _ _ _ . - - - - - - - u -- PRELUCLNARY STE COMPONENT MANUAL
r
INITIATE COMPONENT SPECIAL TEST
[STEI DESIGN
EQUIF'MENT SPECIFICATION * EQUIF'MENT
SPECIFICATION AND DRAWING REYIEW
C
QUALITY ASSURANCE PROCEDURE DEVELOPMENT
EQUIPMENT
UPDATE INSTRUMENT CALIBRATION & MAINTENANCE MANUAL
QA AUDIT PLAN XA QA-009
ESTABLISH TRAINING CLASSES
TRAINING B nmoCTRINATION UPDATE
WORKMANSHIP STANDARDS klANUAL
PREPARE DETAILED PROGRAM PLAN QA PLANS
MANUAL WA-006
BEGIN QUALIFYWG
PROCESSES * SPECIAL
UPDATED QAOP
MANUAL QA ENGIG NOTEBOOKS SE-065 MONITOR BREAD-
BOARD. THERMAL, STRUCTURAL, OSE, a TESTS WSPECTTON
PREPAREBREAD- BOARD. THERMAL (r
5TRUCTWAL MODEL AHSE. FABRICATTON (r INSPECTION PROCEDURE REPORTS PN
PROCESS)
.
- - -
PREPARE QUALITY QUALTCY ASSURANCE ASSURANCE DOCUMENT CONTROL
CENTER PROCEDURES * DOCUMENT CONTROL CENTERPROCEDURE
-- --_---__------------
SPECIAL
& TEST MEASUREMENT
EQWMENT
![Page 30: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/30.jpg)
I
CENTER
-t--
REVIEW LONG
MATERIAL REQUISITIONS
QA STATUS REPORT QA-024
QUALITY ASSURANCE
------- CONTINUE PARTS QUALrPlCATION TESTREPORTS STATUS REPORT
PROCEDURE 0 SAMPLINO
UPDATEDAREA CONTROLPROCEDURES QA-015
MANUAL &A-004, 006
BOARDPROCEDURE
UPDATED REWORK PROCEDURE Bp-014
81 LIFE SENSITIVE PART
AUDIT PROCEDURES QA-009 -----
PROCURE INSPECT 0 COMPONENT CHECK OUT STE
. COMPONENT STE
SPECIFICATION QA-OS1
------- CONTINUE PERSONNEL CERTIFICATION
CERTmCATION
4 F E N S , t-( ) STD MANUAL 8TD RA-008
WNTIMIE SURVEILWiCE
AUMT OF SUPPLIERS NASADCAS
REVIEW PURCHASE REQUISITIONS FOR ENGRG MODEL PARTS AND ASSEMBLY
![Page 31: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/31.jpg)
PLAN QA-009
DESIGN REVIEW SUMMARY
PROCEDURE
T IN-PROCESS
I
I ENGINEERING SPACECRAFT 5 OSE MODEL FABRICATION INSPECTION 5 TESr
INSPECTION REPORTS
CATEGORIZATION
RECORDS QA-019
COMPONENT TEST RECORDS QA-OlS
QUALITY ASSUBANCE
COMPONENT 5 VEHICLE LOGBOOK9QA-OO1, 002
I
RECORDS QA-016
BEGIN MONITORING SUBCONTRACTOR SUR-TIER SUPPLlRS
UPDATE SUPPLIER EVALUATION SYSTEM
MRB
QA-007 ACTION REPORTS REPORTS-@N MMUTES
![Page 32: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/32.jpg)
-
----
CRITICAL DESIGN REYIEW
I
---------.
1
--
PROCESS TRENm REPORT Q4-022
REVIEW QUALITY
PROGRAM ZAssURANCE STATUS REPORT
J
i
Figure E-3. Quality Assurance User Flow Diagram - Preliminary Design Review
Through Critical Design Review
![Page 33: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/33.jpg)
SYSTEM OFFICE
COWINUE AUDITS
QUALITY ASSURANCE PLANS AND STATUS
1
SPECIFICATION AND DRAWING R E W E S
PROCEDURE DEYEWPMENT
CALIBRATION AND TEST EQUIPMENT
---- TRAINING
FINALIZE TEST PLANS
I 1
W L E M E N T DEFECT PREVENTIVE
IDENTIFIED DURING CDR
REVISED INSPECTION PROCEDURES
REVISED PROCESS CONTROL PROCEDURES QA-015
REVISED INSPECTION PROCEDURES QA-013
QUALIFIED PARTS LISTS SE-029
QUALIFIED
PROCEDURES Q4-013
I I / . CALIBRATION AND USAGE RECORDS QA-016. 018
CONTINUE TOOL AND
P A T 7 r I r n A r n M 9 4 GAGE
REVIEW RECEIPT PURCHASE INSPECT
FOR TA P T M ITEME AND PTM
C REQUISITION w TAANU
f 4 1 P T M ITEME
SOURCE INSPECT AND WITNESS KEY
AND TESTS O F TA AND PTM
CONFIRM GE SUBCONTRACTOR
COMPATIBILITY * PROCESSES -i STE
![Page 34: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/34.jpg)
ITEM TEST PLANS
*
h UCT NASA/
ESS AUDITS IN/
COMPILE DEVIATION DATAFOR SUBCONTRACTOR ITEMS
TEST ARTICLE AND PROOF TEST MODEL FABRICATION INSPECTION k TEST OF SPACECRAFT k OSE
U
.TREND SUMMARY QA-021 FAILURE CATEGORIZATION QA-021
.INSPECTIONREPORTS (INPROCESS1
.NONCONFORMING MATERIAL QA-021 CONDUCT .BREAK OF INSPECTION QA-028 AUDIT FAILURE *MRB MlWUTES QA-OW ANALYSIS FAILURE ANALYSIS QA-020 QA-023
SUMMARY REPORT
.AUDIT QA-023. 026
.PROCESS TRENDS QA-022
.QUALIFICATION STATUS REPORT QA-030
.TEST QA-019
D SUWNARIZE DEVIATIONS, SHORTAGES, EXPECTED DEPARTURES FROM SPECS FOR FACI
'I, CLEANLINESS - QAE NOTEKIOKSSE-055 . COMPONENT MGBOOKE QA-001
UPDATE PLANS, MANUALS QA-004, 1 010. 011
AND STE QA-OCQ. 005
I I
UPDATED WORKMANSHIP STDS MANUAL QA-OW
PERSONNEL CERTIFICATION LLST
UPDATED WORKMANSHIP STDS MANUAL QA-OW
PERSONNEL CERTIFICATION LLST
MRR AND FAILURE ANALYSIS REPORT
![Page 35: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/35.jpg)
CONFIGURATION IMEPECTION
QA STATUS REWRT QA-024
REMEW I
f
LEGEND:
0 ACTIVITY. WITH DESCRIPTION INSIDE
DATA ITEM(S). WITH TITLE(S) msmE Figure E-4. Quality Assurance User Flow Diagram - Critical Design Review
Through Launch (Sheet 1 of 2)
![Page 36: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/36.jpg)
n YSTEM OFFICE
FIRST ARTICLE CONFIGURATION INSPECTION
QA STATUS REPORT QA-024
WNTRACTOR
QUALITY ASSURANCE PLANS AND STATUS
SPECIFICATION AND DRAWING REVUES
PROCEDURE DEVEIL~PMENT
%ALIBRATION AND TEST EQUIPMLTlT
SUBCONTRACTOR
LAUNCH OPERATIONS QA P w v QA-om
DEVELOP LAUNCH OPERATIONS a4 PLANS
PARTICIPATE IN
CONFICURATION CONFIGURATION CHANGE BOARD CHANGES REPORT
CONDUCT
ANALYS* 4 FALURE 1 PARTS LIFE TEST REPORTS VI TE-16s I
CONDUCT PARTS LIFE TEST
IMPLEMENT P E R F O R M W DEFECT PROCESS PREVENTION
EVOLT?NG FROM FACI
INSPECTION CATEGORIZATION QA RPTS,
FOR FLIGHT ARTICLES
c RECOMMENDATIONS - AND TESTS RECORDS, NOTEBOOKS, LOGB
I .I
AUPIT SUMMARY REPORT QA-026 CONDUCT AUDITS
I TEST
EQUIPMENT RECORDS QA-016
GAGE * TOOLAND
~ CALIBRATION
AND COMPILE ALL SUBCONTR
. "As DESIGNED" CONFIGURATION L@T CM-009 e -& BUILT" CoNFIGIIRATION LIST CM-012
'?-
DOCUMENTATION REQUIRED FOR MISWNACCEPTANCE QAE RESIDENT REPORT8 I O F FLIGHT H
![Page 37: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/37.jpg)
TRENDS REPORT
4 ACCEPTANCE z:
REVIEW QUALITY ASSURANCE REPORTS QA-024 PROGRAM
QA STATUS +
------- TRENDS, TXEND SUMMARY B R M OF INSPECTION, FAILURE
CONDUCT AUDITS +II--+
QUALIFICATION STATUS REPORTS
+( :::GAGE USAGERECORDS
CONTINUE TOOL AND 4 GAGE CALIBRATIONS t-c
------e
1 CONTINUE I LAUNCH OPERATIONS 7 TRAINING 1-
![Page 38: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/38.jpg)
AUDIT REPORTS W-028, 026
----- MANUAL? QA-002. 004
CALIBRATION RECORDS
-_I-_..
I
JOINT FLIGHT ACCEPTANCE COMFKBITE TEST (J FACT)
REVIEW QUALITY QA STATUS ASSURANCE REPORTS QA-024
, PROGRAM
I
LAUNCH OSE AND STE SITE
--------- PERFORM SUBCONTR QA SUPPORT ECR LAUNCR OPERATIONS
![Page 39: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/39.jpg)
LAUNCH
f
--_.----------
LEGEND:
ACTMTY, WITH DESCRIPTDN INSIDE
DATA ITEM(SJ,WiTH TPPLE(S) INSIDE
I
Figure E-4. Quality Assurance User Flow Diagram - Critical Design Review
Through Launch (Sheet 2 of 2)
3 -,4-3
![Page 40: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/40.jpg)
Quality Assurance Data Requirement Descriptions
DRD Number
QA-001
QA- 002
QA-003
QA- 004
QA- 005
QA- 006
QA-007
QA- 0 08
QA- 009
QA-010
QA- 011
QA- 012
QA- 013
QA- 014
QA- 015
QA- 016
QA-017
QA- 018
QA- 019
QA-020
QA- 021
QA- 022
QA-023
QA- 024
QA- 025
Title
Logbook, Component
Logbook, 'Vehicle
Manual,
Manual,
Manual,
Manual,
Instrument Calibration and Maintenance
Quality Assurance Operating Procedures
Special Test Equipment, Component
Workmanship Standards
#
Minutes, Material Review Board
Plan, Inspection
Plan, Quality Assurance Program
Plan, Sampling
Plan, Test and Operating, for Special Test Equipment (STE), Component
Procedure, Process Control
Procedure, Tes t/Inspec tion
Procedure, Rework
Procedure, Area Control
Record, Calibration
Record, Shelf Life
Record, Tool and Gauge Usage
Record, Test (Materials, Parts, Sub-Assemblies)
*Report, Failure Analysis
*Report Nonconforming Material (NCIVIR)
*Report, Process Trends
*Report, Quality Audit
*Report, Quality Status
Report, Special Measurement and Test Equipment Evaluation (Component)
*Key Informal Data
3 4-1
![Page 41: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/41.jpg)
DRD Number
&A- 026
&A-027
&A- 028
&A- 029
&A-030
&A-031
Title
Report, Quality Assurance Audit Summary
Report, 'Quality Trend Summary
Report, Break of Inspection
*Report, Failure Categorization *
Report, Qualification Status
Specification, Special Test Equipment (STE), Component r
*Key Informal Data
4-2
a
![Page 42: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/42.jpg)
GE EXHIBIT DRD QA-001
VOYAGER DATA REQUIREMENT DESCRIPTION DRD APPROVED BY
I
3RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE REOUIREMENT QA T. Smyth 7/28/6' rlTLE OF DOCUMENT.
LOGBOOK, COMPONENT
To record chronological historical data and pertinent information used in reviewing component staffis, tracing and solving anomalies and to determine suitability in meeting requirement and acceptance crite ria.
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
CM-003, Change Notice QA-009, Plan, Quality Assurance Program QA-021, *Report, Nonconforming Material (NCMR) TE-027, *Logbook, Test TE-061, *Logbook Cumulative Test Time
0 GROUP I :LASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: 1 KIND OF DATA.
B PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG ISI LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR Disc) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
3RGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION.
Quality Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR COCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION.
ESTIMATED COST ($1 FOR SINGLE PREPARATION
FREOUENCY OF ISSUE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 €31-WEEKLY 0 WEEKLY 0 DAILY (B OTHERWISE,AS SPECIFIED
1) for each comp. REFERENCE DOCUMENTS'
CONTRACT NO.
~
DRL NO.. LEVEL NC
DDL NO. F I L E NO f NO OF COPIES
1 INFORMATION CUTOF
DATE OR MILESTONE
DATE DATA DUE TO USER.
PUBLICATION DATE
HDR - UPDATE (FREQUENCY
OR MILESTONE)
Daily thru MA1 ESTIMATED
EXPIRATION DATE
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT
~~
DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
Manager, Qudlity Assurance
PL 256% XCT 6 *Key Informal Data PAGE I O F 2
![Page 43: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/43.jpg)
GE EXHIBIT DRD QA-001
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
- DRD NO.:
QA-00 SPEC I AL INSTRUCTIONS:
A DRD at the subcontractor/vendor level similar in content to this DRD is required.
SPECIAL OISTRIBUTION' ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING,DOL WRITE IN DISTRIBUTION BELOW)
~~
OUTLINE OF CONTENTS:
1.
2.
3.
Component Logbook is a chronological, historical record of component activity starting with the first functional test. Each Component Logbook is serialized and is assigned to a specific piece of hardware identified by a lot number o r serial number. The cognizant engineer identifies the various parameters to be recorded in the logbook. a. b. c. d.
Number of mate and demating of connectors. Number of hours power was applied to the component. Number of operating test cycles of the component. Number of out-of-specification readings (failures) troubleshooting procedure , assignable for the out-of-specification reading and how the correction was accomplished. This is in addition to MRB documentation. Any abnormal occurrence, no matter how insignificant, is recorded. e.
References break of inspection record and nonconforming material record. References the failures and failure analysis reports.
4. 5. 6. Identifies component configuration.
1 (CONTINUE ON THIRD SHEET, IF NECESSARY, AN0 AFFIX TO THIS ORD)
-2- JPL 2568-1 CCT 65
![Page 44: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/44.jpg)
GE EXHIBIT DRD QA-002
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: 1 DATE' REQUIREMENT.
&A T. SI
TITLE OF DOCUMENT:
LOGBOOK, VEHICLE
TYPE OF m U M E N T : CONTROL OACTION OREFERENCE Q INFORMATION
USE OF DOCUMENT:
To verify by a documented logbook to the customer the historical and chronological acceptance events #of the vehicle presented for buy off.
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS: CM-005, Index, Contract End Item Approved Configuratior CM-010, List, Hardware Incorporated Changes ?A-001, Logbook, Component ?A-009, Plan, Quality Assurance Program ?A-021, *Report, Nonconforming Material (NCMR) RA-006, Log, Problem/Failure Summarv CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET $) UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
'ORM OF DATA: KIND OF DATA.
13 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG XI LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
o MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
4h 17/28/67 I
DRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
2uality Assurance ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTIOF
ORGAN IZ ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR MCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
ESTIMATED COST ($1 FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY 0 DAILY gl OTHERWIS€,AS SPECIFIED
A s required
CATEGOR'I
NO.:
DRL NO.: LEVEL NO t NO OF COPIES:
10 INFORMATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE:
HDR - UPDATE (FREQUENCY
OR MILESTO E) Ls required' ' hru launch
ESTIMATED EXPIRATION DATE:
REFERENCE DOCUMENTS:
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY BY
BY BY SUBMIT FOR APPROVAL TO -
Manager Quality Assurance
*Key Informal Data PAGE I O F 2 JPL 2568 XCT 6
![Page 45: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/45.jpg)
GE EXHIBIT DRD QA-002
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.
A-00: SPECIAL INSTRUCTIONS'
Logbooks may be any number of volumes dependent upon events (number of BOT'S etc.) occuring during vehicle processing. Since the books are a completion of numerous types of data items, they will be in notebook form with appropriate covers.
SPECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN _DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1.
2. 3.
4. 5. 6.
7 . 8.
Lists all components by serial number, drawing and revision number, and verifies acceptance buy off. Verifies inspection buy off during assembly. List of all nonconforming material reports written during assembly and test and verifies acceptance buy off. Lists all MRB actions and dispositions. Lists all tests and results and verifies acceptance. Records power on time, cycle times, mating and demating of connectors, etc. A l l pertinent actions as performed on the vehicle during assembly and test. Records all break of inspection events. Record of compliance to the latest configuration.
-2-
![Page 46: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/46.jpg)
GE EXHIBIT DRD QA-003
VOYAGER DATA REQUIREMENT DESCRIPTION
I I I I
‘ITLE OF DOCUMENT’
MANUAL INSTRT-JMENT CALIBRATION AND MAINTENANCE
rYPE OF DOCUMENT: o CONTROL OACTION BREFERENCE o INFORMATION
USE OF DOCUMENT: Provide a standardized, approved set of procedures for performing the scheduled calibration and maintenance of test and measurement instrumentk These controlled procedures maintain the accuracy standards €or reliability and confidence in the inspection and test lata. NTERRELATIONSH IP WITH OTHER DATA REQUIREMENTS:
&A-009, Plan, Quality Assurance Program
:LASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET BUNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
J P L 2568 X T 65 PAGE I O F 2
ORM OF DATA: KIND OF DATA:
[x PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 ORAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 CPMPUTER CARD ORDER Is[ PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
IRGANI Z ATlON RESWNSI BLE ‘OR DOCUMENT PREPARATION:
FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS INFORMATION CUTOFF FOR SINGLE PREPARATION DATE OR MILESTONE
DATE DATA DUE ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION. TO USER
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY
MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY
REFERENCE DOCUMENTS:
MIL-C-45662 - Calibration System Requirements
PPPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO:
BY
BY SUBMIT FOR APPROVAL TO
. 1 - r a n c c r
PREPUBLICATION PROOF DATE
BY
BY
![Page 47: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/47.jpg)
GE EXHIBIT DRD QA-003
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
&A-00: SPECIAL INSTRUCTIONS'
Calibration and maintenance procedures for equipment used in tests are published by the equipment engineer. Calibration cycles are based on manufacturer's recommendations and from established historical records on the equipment. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING ODL WRITE IN_DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. 2. 3. 4.
5.
6.
Type of Equipment, by Manufacturer. A brief description of the equipment. Equipment accuracy limits and ranges. Maintenance procedure a s recommended by the manufacturers and supplemented by the equipment engineer. Calibration procedure for the technician utilizing secondary standards traceable to the Bureau of Standards. Description of the method of documenting the calibration and maintenance performed.
(CONTINJE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 E T 65
![Page 48: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/48.jpg)
GE EXHIBIT DRD &A-004
VOYAGER DATA REQUIREMENT DESCRIPTION I DRD APPROVED BY:
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE' REQUIREMENT. I QAl I IT. Smyth b /2 8/67 I
I I 1 I
TITLE OF DOCUMENT:
MANUAL, QUALITY ASSURANCE OPERATING PROCEDURES
TYPE OF DOCUMENT: o CONTROL OACTION ~ E F E R E N C E o INFORMATION
USE OF DOCUMENT.
To meet the historical and specific customer requirements with established Voyager Management Quality Assurance Procedures
~
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
QA-009, Plan, Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR)
CLASSIFICATION: 0 SECRET I ' 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET
0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET I llIUNCLASSlFlED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
IX PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
I 0 COMPUTER CARD ORDER 8 PROCEDURE
I
3RGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION:
2uality Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTION
ORGAN IZ ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION.
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MAN HOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY
MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY 0 WEEKLY ~~ ~
0 DAILY OTHERWISE,AS SPECIFIED
Maintain current REFERENCE DOCUMENTS:
I
DATE
- CONTRACT
NO.:
TASK OR SUBTASK
- DRL NO..
DDL NO.:
- NO OF
30
DATA CATEGOR'
DRD NO.'
2A-00~ D R h ITE
NO.
LEVEL NC
F I L E NO
- OPIES
INFORMATION CUTOF DATE OR MILESTONE
GATE DATA DUE TO USER:
PUBLICATION DATE:
SDR - UPDATE (FREQUENCI
M%li$i€% launch EST I MATED
EXPIRATION DATE
Military Specifications Configuration Management (JF L) NPC 200-2 NPC 200-3
APPLICABLE STANDARDS.
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR w/o CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO:
'B Y BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Qualiky Assurance
PAGE I O F 2 JT'L 256e X T c
![Page 49: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/49.jpg)
GE EXHIBIT DRD QA-004
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
I ~ A - 0 0 SPEC I A L INSTRUCTIONS:
Procedures incorporate specific customer, and established quality requirements a s governed by NASA and Military documents.
f
SPECIAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING ODL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. 2. 3. 4. 5.
Defines the purpose and scope of the operating procedure. Assigns specific responsibilities for implementation and control of the procedure. Defines method of implementation by manufacturing. Defines method of measurement and audit requirements. Defines the documentation required to meet the procedure/requirements.
Example: Processing of Nonconformance Material Report through the Material Review Board.
(CONTINI~E ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 CCT 65 -2-
![Page 50: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/50.jpg)
GE EXHIBIT DRD QA-005
VOYAGER DATA REQUIREMENT DESCRIPTION I DRO APPROVED BY:
MANUAL, SPECIAL TEST EQUIPMENT, COMPONENT
To control the configuration of the special test equipment consistent with changes necessitated by design &nd per- formance requirements and represents an operation manual for special test equipment.
CM-003, Change Notice QA-009, Plan, Quality Assurance Program TE-030, Procedure, Test Operating
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
Pp PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MDTION) 0 CONTRACT B MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLDSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN 0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR WIO CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
ING CHANGE PROPOSAL 0 REWRT
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
Yth 1'7/28/6i
Quality Assurance
3RGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOb
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE:
0 ANNUALLY
0 QUARTERLY 0 El-MONTHLY 5 MONTHLY 0 SEMI-MONTHLY 0 Bl-WEEKLY 0 WEEKLY 0 DAILY a OTHERWISE,AS SPECIFIED
SEMI-ANNUALLY
Maintain current REFERENCE DOCUMENTS:
DDL NO.: F I L E NO.. I NO. OF COPIES:
10
INFORMATION CUTOFI DATE OR MILESTONE
DATE DATA DUE TO USER:
PU 8 LI CAT I ON DATE:
PDR UPDATE (FREQUENCY
OR MILESTONE): Monthp thru
ESTIMATED EXPIRATION DATE:
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER DF SUBMITTAL)
DRAFT DATE PREPUBLI CAT10 N PROOF DATE
SUBMIT FOR REVIEW TO:
EY , B Y
BY BY SUBMIT FOR APPROVAL TO
Manager. Qialitv Asgurance
PAGE I O F 2 JPL 2568 W T c
![Page 51: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/51.jpg)
GE EXHIBIT DRD &A-005
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.: SPECIAL INSTRUCTIONS:
Quality Assurance Engineer is responsible for maintaining the manual current with the design and performance requirements and changes.
SPECIAL DISTRIBUTION ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING ,DDL WRITE IN_DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1.
2. 3.
4.
5. 6. 7. 8. 9.
Manual describes the test equipment by drawing number and alteration notice and covers its test capabilities as related to a specific piece of hardware. A complete set of print control drawings are a part of the manual. Each modification to test equipment is authorized by a print control drawing and the manual is updated. Changes in operating procedures are made at each revision, and manual is maintained current. Special precautions for operation are detailed in manual. Equipment troubleshooting procedures are detailed. Checkoff lists are detailed for operating equipment. Defines the limitation of the equipment. Calibration and maintenance cycles.
-2- JPL 2568-1 OCT 65
![Page 52: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/52.jpg)
GE EXHIBIT DRD QA-006 a
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE REOUIREMENT T. Sm i 7/28/6: TITLE OF DOCUMENT:
MANUAL, WORKMANSHIP STANDARDS
TYPE OF DOCUMENT: CONTROL OACTION XIREFERENCE o INFDRMATION
USE OF DOCUMENT:
To provide visual aids for operators and inspectors as acceptance criteria for applicable processes.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
QA-009, Plan, Quality Assurance Program
1
IRGANI Z ATlON RESWNSI BLE 'OR DOCUMENT PREPARATION:
Quality Assurance 3RGANIZATIDN RESPONSIBLE OR DOCUMENT REPRODUCTION
DRGAN I2 ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION.
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION'
EST1 MATED COST ( $ ) FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY B MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
Maintain current
A -OO(
DDL NO.: F I L E NO r - NO OF COPIES:
10 INFORMATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER:
PU BLlCAT I ON DATE:
UPDATE (FREOUENCY OR I E S ONE). Montxf thru
Fk!C I EST1 MATED
EXPIRATION DATE:
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET Bf UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
R P R I N T E D DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT d MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECOROING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR wio CARD) ING CHANGE PROPOSAL 0 REWRT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN DROER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
REFERENCE DOCUMENTS:
NPC - 200-4
APPLICABLE STANDARDS.
1 SUBMIT FOR REVIEW TO'
BY BY
I I SUBMIT FOR 0" m v
" I " I
APPROVAL TO
Manager, Mahufacturing
PAGE I O F 2 JPL 2566 X T 6
![Page 53: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/53.jpg)
GE EXHIBIT DRD QA-006
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
&A -001 SPECIAL INSTRUCTIONS
I Samples of workmanship are closely coordinated and compatible with the operator/ inspector training school for certification. selected with the customer. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
Photographs or work samples must be jointly
SPECIAL DISTRIBUTION ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN_DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1.
2. 3. 4.
The manual defines the categories of acceptance and rejection with samples of work or photographs defining, accept, minimum acceptable, and reject. Defines the limitations on rework (e.8. number of splices). Recommends approved inspection procedure (e. g. magnification power). Establishes the most significant criteria of inspection.
JPL 2568-1 OCT 6: -2-
![Page 54: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/54.jpg)
GE EXHIBIT DRD QA-007
VOYAGER DATA REQUIREMENT DESCRIPTION DRD APPROVED BY
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE' REQUIREMENT QA T. F. Smyth 7/28/6'
I I I I
TITLE OF DOCUMENT:
MINUTES, MATERIAL REVIEW BOARD
TYPE OF DOCUMENT: CONTROL OACTION IJREFERENCE m INFORMATION
USE OF DOCUMENT.
To report the status of hardware which is noncon6orming.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS: CM-016, List, Deviations and Waivers QA-009, Plan, Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR) RA-007, *Minutes, Failure Analysis Review Board (FARB)
I SE-057, Drawings (Category B) for Interface Control 0 GROUP I CLASSIFICATION:
0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET f UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KINO OF DATA:
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL E3 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
Quality Assurance ORGANIZATION RESPONSIBLE FOR DOCUMENT REPROOUCTlOh
ORGAN IZ ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION'
ESTIMATED COST ($1 FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY a WEEKLY
DAILY- 0 OTHERWISE,AS SPECIFIED
NO OF COPIES:
10
INFORMATION CUTDF DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE:
SDR - UPDATE (FR EOU ENCY
ESTIMATED EXPIRATION DATE
REFERENCE DOCUMENTS:
NASA Specifications
APPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY BY
I
BY BY SUBMIT FOR APPROVAL TO
Manager , Quality Assurance
*Key Informal Data PAGE I OF+ JPL 2568 X T 65
![Page 55: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/55.jpg)
GE EXHIBIT DRD QA-zOO7
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.: SPECIAL INSTRUCTIONS:
A DRD at the subcontractor/vendor level similar in content to this DRD is required.
Contenfs (see below) shall be coded for inclusion in data system facilitating com put oriz ing data.
SPECIAL OISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN_DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. 2. 3. 4. 5. Disposition of the hardware:
Description of hardware by drawing number and nomenclature. Identification of hardware by serial number and lot number. Description of nonconformance and the assignable cause. Corrective action assigned to specific individuals or functions.
a. Accept as is b. Return to vendor c. Repair d. Retest e. Scrap f. g. Submit to failure analysis
a. Quality Assurance Engineering b. Design engineering c. Customer representative
For Engineering use only "E1* starnp
6. Approvals
(CONTINCE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 OCT 65 -2-
![Page 56: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/56.jpg)
GE EXHIBIT DRD &A-008
I DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
PLAN, INSPECTION
I TYPE OF O°CUMENT: CONTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT.
To document the parameters to be controlled during the manufacture cycle to assure the highest level-of quality consistent with drawing requirements.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS: MG-004, Manufacturing Standing Instructions (MSIs) MG-012, *Request, Manufacturing Planning QA-009, Plan, Quality Assurance Program SE-059 Drawings (Category E) for Manufacture and
Procurement of Prime Equipment
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET 9 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KlND OF DATA.
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 9 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST F O R ENGINEER- 0 REGULATION
MICROFILM (WIOR wio CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX . 0 VOUCHER
Yth 17/28/6’
Quality Assurance
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
ORGANIZATION RESPONSIBLE O R DOCUMENT REPRODUCTIOI
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
E ST I MATED MAN HOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY B OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS:
NO OF COPIES
INFOR MATION CUTOFI DATE OR MILESTONE
DATE DATA DUE TO USER’
PUBLICATION DATE:
SDR UPDATE (FREQUENCY
OR MILESTONE).
rhrough HDR ESTIMATED
EXPIRATION DATE
Applicable NASA Spec.
APPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF OAT E
I SUBMIT FOR REVIEW TO:
BY .BY
I
BY BY SUBMIT FOR APPROVAL TO
Manager, Qwlity Assurance 1
PAGE I OF& J P L 256R CCT 6 *Key Informal Data
![Page 57: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/57.jpg)
GE EXHIBIT DRD QA-008 1
*
:
VOYAGER DATA REaUlREMENT DESCRIPTION - 2ND SHEET I DRD NO.:
&A-OOt SPECIAL INSTRUCTIONS:
For critical processes special inspection planning is issued. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
OUTLINE OF CONTENTS:
Inspection Planning contains control parameters that specify attributes to be inspected and lists any special inspection tooling required t o verify conformance t o the Quality Assurance Plan during the manufacturing cycle.
1. Hardware drawing number 2. Hardware nomenclature 3. Project 4. NHAnumber 5.
6. Operation number
Applicable specifications (manufacturing standing instructions, military standard, etc. )
1 (CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRDJ
L -2- JPL 2568-1 OCT 65
![Page 58: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/58.jpg)
GE EXHIBIT DRD QA-009
DRD APPROVED BY VOYAGER DATA REOUIREMENT DESCRIPTION
I I ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: REQUIREMENT T. Smyth QA TITLE OF DOCUMENT:
PLAN, QUALITY ASSURANCE PROGRAM
the customer.
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS:
MG-009, Plan, Manufacturing RA-015, Report, Failure Review SC-002, Schedule, Project Level (PERT) SC-004, Schedule, Task and Subtask Level (PERT) SE-006, Plan, Cleanliness Control
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET LSI UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA'
P PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
F~LM (STATIC OR MOTION) o CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR w/o CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION:
Quality Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION.
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
&TIMATED COST ( $ 1 FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY tX OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS:
CATECXXI 7- CONTRACT DRD NO.: B NO.: A- 00:
TASK OR DRL ITEl
DRL NO. LEVEL NO + NO OF COPIES
10 INFORMATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE:
SDR UPDATE (FREQUENCY
OR MILESTONE).
rhrough CDR ESTIMATED
EXPIRATION DATE'
NPC - 200-2, 200-3 and 200-4
APPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REOUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT I
DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
Pr oj e d Manager - PAGE I O F A J'PL 2568 W T 65
![Page 59: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/59.jpg)
GE EXHIBIT DRD QA-009
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEEl
SPEC1 AL INSTRUCTIONS'
None
DRD NO.:
SPECIAL DISTRIBUTION ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING ,DDL WRITE IN,DlSTRIBUTION BELOW) I
OUTLINE OF CONTENTS:
Delineates the implementation of the controls proposed by the system contractor necessary to meet the requirements of NPC 200-2 and the customer work statement. Contents are a s followc 1. Introduction 2. Approach/Problems
a. Traceability b. Customer/C ontractor Relationship c. Life-Sensitive Flight Hardware d. Cleanliness
3. Management a. GE b. Major Subcontractors c. Program Management
a. Design and development control b. Control of procured material c. d. Test controls e. f. QA audits g. Relationship with other management plans
4. Program Controls
Control of contractor's fabricated articles
Data reporting and corrective action
Inspection, measuring and test equipment 5.
-2- JPL 2560-1 CCT 6
![Page 60: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/60.jpg)
GE EXHIBlT DRD QA-010
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE REQUIREMENT 7/2 8/ 6 'i QA T. Smyth
I - I 1 I
TITLE OF DOCUMENT:
PLAN, SAMPLING
necessary to maintain an acceptable quality level for in- coming bulk material and/or other articles such as pyros fuses, etc. The plan applies to lot sizes compatible with the quality requirements of the program.
I INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
&A-009, Plan, Quality Assurance Program QA-019, Record, Test (Materials, Parts, Subassemblies
CLASS1 FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET E UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
E PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
I
ING CHANGE PROPOSAL 0 REWRT
PROPOSAL
0 HANDBOOK
0 INDEX
0 SPECIFICATION
0 STANDARD
0 VOUCHER
I
IRGANIZATIDN RESPONSIBLE W R DOCUMENT PREPARATION:
auality Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
ORGANIZATION RESPONSIBLE FOR WCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
One time
NO. : QA-01
DDL NO.: F I L E NO I NO OF COPIES:
5
INFORMATION CUTOFI DATE OR MILESTONE
DATE DATA'DUE TO USER:
PUBLICATION DATE.
SDR - UPDATE (FREOUENCY
OR MILESTONE):
Through FACI EST1 MATED
EXPIRATION DATE'
REFERENCE DOCUMENTS:
MIL- STD - 105 NPC 200-2
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT I
DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY
BY SUBMIT FOR APPROVAL TO'
Manager, QuaEty Assurance
BY
BY
I PAGE I D F ~ J'PL 2568 X T 6
![Page 61: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/61.jpg)
GE EXHIBIT DRD QA-010
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET 1 DRD NO.:
QA-01C SPECIAL INSTRUCTIONS'
Incoming inspection planning with the Quality Assurance Engineer determines the acceptable quality levels for incoming inspection of bulk material or special articles and specifies the sampling plan for the lot size. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
#
SPECIAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING, DDL WRITE IN_ DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. Hardware drawing number 2. Hardware nomenclature 3. Applicable specifications 4. Lot size 5. Sample size 6 . Acceptance criteria 7. Operating characteristic curve 8. Space for recording data 9. Signature of originator
10. Revision number of planning 11. Date
![Page 62: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/62.jpg)
GE EXHIBIT DRD &A-011
VOYAGER DATA REQUIREMENT DESCRIPTION DRD APPROVED BY
I
IRGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY. DATE IEQUIREMENT'
QA T. F. Smyth 7/28/67 ITLE OF DOCUMENT:
PLAN, TEST AND OPERATING, FOR SPECIAL TEST EQUIPMENT, (STE), COMPONENT
YPE OF DOCUMENT: PJI CONTROL OACTION OREFERENCE o INFORMATION
To document the detailed checkout procedure of the test equipment prior to utilizing with flight hardware.
JSE OF DOCUMENT:
VTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
TE-001, Plan, Integrated Test
.LASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET R UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
DRM OF DATA: , KIND OF DATA.
B PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE (3 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
)RGANIZATION RESPONSIBLE 'OR DOCUMENT PREPARATION:
Jualits Assurmce DRGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTION
ORGAN I2 ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION.
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION
ESTIMATED COST($) FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY W OTHERWISE,AS SPECIFIED A s required
DATE: DATA CATEGORY
DRL NO.. LEVEL NO + NO OF COPIES.
5
INFORMATION CUTOFF DATE OR MILESTONE.
DATE DATA DUE TO USER.
PUBLICATION DATE.
HDR UPDATE (FREQUENCY
OR MILESTONE):
I'hrough FACI ESTIMATED
EXPIRATION DATE
REFERENCE DOCUMENTS:
APPLICABLE STANDARDS.
?€VIEWS AND/OR APPROVALS REQUIRED: ;LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATIO N PROOF DATE
SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
urance
PAGE I O F 2 3 P L 2568 X T 6'
![Page 63: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/63.jpg)
GE EXHIBIT DRD QA-011
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO. SPECIAL INSTRUCTIONS'
Quality Assurance engineer witnesses the checkout and operation of the test equipment and verifies the adequacy of the performance to the test procedure.
SPECIAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN_DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. 2. 3. 4. 5. 6.
Description of the test equipment. Detail of the parameters to be tested for and checkout procedures for each parameter. Facilities and peripheral equipment needed to supplement the test equipment. Initial wiring checkout procedures. Operational checkout with a simulated test procedure and a sample data sheet. Special precautions to be taken by operator to assure confidence in the data and integrity of the test.
(CONTINLE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD)
- 2- JPL 2560-1 OCT 65
![Page 64: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/64.jpg)
GE EXHIBIT DRD QA-012
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE REQUIREMENT. QA T. Smyth 7/2 8/6' TITLE OF DOCUMENT:
PROCEDURE, PROCESS CONTROL
USE OF DOCUMENT:
To identify the step-by-step operating instruction for process-oriented inspections such as radiography and ultrasonic test. These procedures will supplement those contained in Manufacturing Standing Instructions.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
MG-004, Manufacturing Standing Instructions (MSIs) MG-009, Plan, Manufacturing QA-009, Plan, Quality Assurance Program
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET I iX UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
g PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
I 0 DRAWING 0 CATALOG LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN.
I 0 COMPUTER CARD O R D E R 1 PROCEDURE
I
FiGANIZATlON RESWNSIBLE :OR DOCUMENT PREPARATION
&ali ty Assurance IRGAN IZATION RESPONSIBLE OR DOCUMENT REPRODUCTIOI
3RGANIZATION RESPONSIBLE DOCUMENT DISTRIBUTION
ORGAN I Z AT1 ON RESPONSIBLE FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
E~TIMATED COST ( $ 1 FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
One time
NO.
DDL NO.: F I L E NO -I- - NO OF COPIES
10 INFORMATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER.
PUBLICATION DATE
SDR - UPDATE (FREQUENCY
OR MILESTONE)
Through CDR ESTIMATED
EXPIRATION DATE
REFERENCE DOCUMENTS:
NPC 200-2, 200-3, 200-4
APPLICABLE STANDARDS
0 COMPUTER TAPE 0 R E Q U E S T FOR E N G I N E E R- 0 REGULATION
MICROFILM (WIOR WIO CARD) I N G CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO'
BY B Y
BY BY SUBMIT FOR APPROVAL TO
Manager, Qual$& Assurance
PAGE I O F 2 JPL 256e X T 6
![Page 65: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/65.jpg)
GE EXHIBIT DRD QA-012 1
SPECIAL INSTRUCTIONS:
I VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEEl
DRD NO.:
QA- 01:
SPECIAL DISTRIBUTION. ( I F OlSTRlBUTlON IS NOT COVERED BY AN EXISTING .DDL WRITE lN,DlSTRlBUTlON BELOW)
OUTLINE OF CONTENTS:
1. 2. 3.
4. 5.
6.
Procedure defines the process to be controlled. Document the parameters to be controlled for the preparation of the material. Delineate all controls for the fabrication process by specific conditions to be maintained during the processing. Define the methods of verification and documentation of the process verification. Describe method of verification and the maintenance of special environments t o be maintained. References the workmanship standards to be followed.
J (CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2 - JPL 2568-1 OCT 65
![Page 66: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/66.jpg)
GE EXHIBIT DRD &A- 013
VOYAGER DATA REQUIREMENT DESCRIPTION DRD APPROVED BY
PROCEDURE, TESTmSPE CTION
rYPE OF IXCONTROL OACTION OREFERENCE o INFORMATION
Provides the necessary specific test/inspection procedures to be performed on the system/subsystem.
USE OF DOCUMENT
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
MG-004, Manufacturing Standing Instructions (MSIS) QA - 006, Manual, Wo rkmans h ip Standards QA-009, Plan, Quality Assurance Program RA-002, List, Critical and Limited Life Items RA-005, List, Parts Application Data
0 GROUP I :LASS IFICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET W UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
Quality Assurance ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTIOI
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR MCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION
FREQUENCY OF ISSUE
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY Kl OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS:
QA-01: TjT
DRL NO.. LEVEL NO
NO OF COPIES
10
INFORMATION CUTOFI DATE OR MILESTONE
DATE DATA DUE TO USER
PU B LI CAT I 0 N DATE
SDR - UPDATE [ FR EOU ENCY
OR MILESTONE)
rhrough CDR EST1 MATED
EXPIRATION DATE
APPLICABLE STANDARDS.
ORM OF DATA: , KIND OF DATA.
Kl PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE fl PLAN
0 COMPUTER CARD ORDER PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO' - BY BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Quality Assurance
PAGE I O F 2 J P L 2568 SCT 6
![Page 67: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/67.jpg)
GE EXHIBIT DRD QA-013
VOYAGER DATA REQUIREMENT DESCRIPTION - 2NO SHEET
SPECIAL INSTRUCTIONS: DRD NO.:
QA-01: Specific detailed procedures are written for each inspection and test operation. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
SPECIAL DISTRIBUTION ( IF OlSTRlBUTlON IS NOT COVERED BY AN EXISTING DDL WRITE IN, DISTRIBUTION BELOW)
*
OUTLINE OF CONTENTS:
1 .
2. 3. 4.
5.
6.
7.
8.
Identifies the article to be inspected o r tested by its specific drawing number, latest revision, serial and lot number. Defines the objectives of test/inspection. Specifies the equipment to be used including the range, accuracy required, and type. Details the test operator'sPnspector's operation to be performed, the exact method of measuring o r testing. Details the exact conditions to be maintained during test/inspection including environmental and precautions for the protection of article and instruments. Establishes the criteria for acceptance o r rejection of the article being tested o r inspected including workmanship standards. Identifies the test specifications and the test procedures to be followed (standing instructions). Reports the test cycle and schedule to be followed.
(CONTI~UE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 OCT 65
![Page 68: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/68.jpg)
GE EXHIBIT DRD QA-014
VOYAGER DATA REQUIREMENT DESCRIPTION *r- DRD APPROVED BY
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE. REQUIREMENT.
QA J. R. TITLE OF DOCUMENT:
PROCEDURE, REWORK
TYPE OF DOCUMENT: ICONTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT.
To outline the steps and approvals required to *
process any rework.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
MG-009, Plan, Manufacturing RA-009, Plan, Reliability RA-014, Standard, Rework
CLASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET I 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET I GUNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
ot ts hall I 7/2 8/6 7 )RGANIZATION RESPONSIBLE :OR DOCUMENT PREPARATION
halitv Assurance IRGANIZATION RESPONSIBLE OR DOCUMENT REPRODUCTIOI
3RGANIZATION RESPONSIBLE 'OR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR WCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION'
~ S T I M A T E D COST ( $ ) FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
One time
DOL NO.. F ILE NO I- - NO OF COPIES.
50
INFORMATlON CUTOFI DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE:
PDR - UPDATE (FREQUENCY
EXPIRATION DATE:
REFERENCE DOCUMENTS:
NPC 200-2
APPLICABLE STANDARDS
FORM OF DATA: KINO OF DATA.
W PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
pt PROCEDURE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLI CAT I O N PROOF DATE
I SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
Manager, Quallty Assurance 1
PAGE I O F 2 J P L 25@ X T 6
![Page 69: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/69.jpg)
GE EXHIBIT DRD $A-014
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
QA-01, SPEC I A L INSTRUCTIONS'
rhe procedure will implement and conform to the rework policies specified by the Eeliability Section.
SPECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING,ODL WRITE IN_ DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
Purpose Scope Definitions Responsibilities Procedures
![Page 70: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/70.jpg)
GE EXHIBIT DRD QA-015 L
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
PROCEDURE, AREA CONTROL
MPE OF OOCUMENT: &CONTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT:
To control the requirements of the Voyager centract for the cleanliness of fabrication and test areas and to maintain the required quality level in these areas.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
MG-009, Plan, Manufacturing QA-009, Plan, Quality Assurance Program SE - 021, General Engineering Specificat ion,
Magnetic Cleanliness SE-023, General Engineering Specification, Cleanliness
CLASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET 1'25 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: , KINO OF DATA.
x1 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
Yth 17/28/6 7 )RGANIZATION RESPONSIBLE :OR DOCUMENT PREPARATION:
Quality Assurance IRGAN IZATION RESPONSIBLE OR DOCUMENT REPRODUCTION
3RGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
ORGANIZATION RESPONSIBLE FOR MCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION'
ESTIMATED COST ($1 FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY E OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS.
CATEGORY I IQA-OU
NO OF COPIES
10 INFORMATION CUTOFF
DATE OR MILESTONE.
DATE DATA DUE TO USER
PUBLICATION DATE.
PDR - UPDATE (FREQUENCY
OR MI LE STONE)
Through CDR ESTIMATED
EXPIRATION DATE
APPLICABLE STANDARDS.
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- REGULATION
MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL 0 REWRT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF OAT€
I SUBMIT FOR REVIEW TO'
BY BY
I I
BY BY SUBMIT FOR APPROVAL TO
Project Mapager
PAGE I O F 2 J?L 2568 X T 6
![Page 71: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/71.jpg)
GE EXHIBIT DRD QA-015
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
ORD NO.:
QA-01 SPECIAL INSTRUCTIONS:
The Quality Appraisal function will define the criteria of the environments for the facilities where hardware will be built, tested, packaged and stored. This criteria will establish limits for cleanliness and handling as required by the customer's contract. A plan of controlling, auditing, and reporting will be incorporated into the area requirement specifications. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
f
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE LN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. Identify area of control. 2. Define the levels of control.
a. Temperature b. Humidity e . Particle count d. Audit period e. Storage and handling
3. Define method of controlling contamination. a. Material, floors, furniture, and tools. b. Clothing, shoes c. Protective clothing
4. Maintenance schedules and methods to be used. 5. Frequency of measurement of area contamination level. 6 . Maintain capability control charts in each area. 7. Training of personnel. Information manual.
(CONT~NUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD)
-2- JPL 2560-1 CCT 65
![Page 72: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/72.jpg)
GE EXH[BIT DRD QA-016 L
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY. DATE' REQUIREMENT
7 /28b7 QA T.F. Smyth TITLE OF DOCUMENT: DRGANIZATION RESPONSIBLE
FOR DOCUMENT PREPARATION
Quality Assurance RECORD, CALIBRATION
I
TYPE OF DOCUMENT: CONTROL OACTION OREFERENCE B INFORMATION
An established automatic computerized recall system for tools, gages and instruments to maintain the integrity and confidence in the inspection and test operations. A reference for establishing wear patterns and rnaintenancc
USE OF DOCUMENT:
cycles. INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
QA-009, Plan, Quality Assurance Program QA-018, Record, Tool and Gauge Usage TE-129, Procedure, Equipment Calibration and
Checkout
CLASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET B UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTIOI
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGAN1 Z ATTI ON RESPONSIBLE FOR WCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
A s required REFERENCE DOCUMENTS:
~ CATEGORY
~ DRL NO.. LEVEL NO
DDL NO.: F I L E NO .
~
NO OF COPIES'
5 INFORMATION CUTOFl
DATE OR MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE.
PDR
OR MILESTONE).
- UP DATE ( FR EQ U EN CY
Every Calibration
ESTIMATED EXPIRATION DATE
APPLICABLE STANDARDS.
FORM OF DATA: KIND OF DATA:
0 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG RI LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
@ OTHER 0 ENGINEERING CHANGE c] SCHEDULE
Historical File PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REOUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF
SUBMIT FOR REVIEW TO:
BY
I SUBMIT FOR P" c3,
APPROVAL TO
Manager, Quality Assurance
PAGE I O F 2
DATE
B Y
BY
J P L 256e X T 6
![Page 73: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/73.jpg)
GE EXHIBIT DRD QA-016
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
D R D NO.:
QA-01f SPECIAL INSTRUCTIONS:
Automatic data processing techniques are utilized by the Instrument Control Section to assure periodic recall of measurement and test equipment for calibration purposes. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
jPEClAL DISTRIBUTION, ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN .DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The record contains : 1. Inventory control number 2. Equipment name 3. Manufacturer's name 4. GE drawing number/model no. 5. Serial number 6. Range 7. Responsible operation 8. Responsible custodian 9. Last inventory date
10. 11. 12. 13. 14. 15. 16. 17. 18.
Condition code Cali brat ion cycle Calibration date (due) Present location Part number Purchase order of instrument Listing of repairs made at calibration Data points performed at each calibration Name of personnel performing the calibration
1 (CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD)
-2- JPL 2568-1 CCT 65
![Page 74: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/74.jpg)
GE EXHIBIT DRD QA-017 & . .
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I I ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: 1 DATE' REQUIREMENT
QA T. I TITLE OF DOCUMENT:
RECORD, SHELF LIFE
TYPE OF DOCUMENT: CONTROL OACTION OREFERENCE IIP INFORMATION
To control the use of materials which are subject to age deterioration and dispose of material whosCusefu1 life is expended.
USE OF DOCUMENT
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS: QA-009, Plan, Quality Assurance Program RA-009, Plan, Reliability Program SE-001, Plan, Engineering Development SE-016, Specification, Material SE-028, List, Approved Materials
0 GROUP I CLASSIFICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET p3 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
0 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PL4N
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REPUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
OTHER 0 ENGINEERING CHANGE c] SCHEDULE
Label PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
Smyth 17/28/67 ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
Quality Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCT101
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY 0 WEEKLY 0 DAILY €4 OTHERWISE,AS SPECIFIED
One time
I
DATE
- CONTRACT
NO.
TASK OR SUBTASK. - DRL NO.
DDL NO.:
- NO OF
- DATA
CATEGOA
DRD NO.
$A-01 IRL I T €
NO
€VEL N(
' ILE NO
- )PIES
1 0 INFORMATION CUTOF
DATE OR MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE.
HDR
Maintain cur- rent thru launc ESTIMI\TED
- UPDATE ( FR E 0 U ENC)
OR MILESTONE)
EXPIRATION DATE:
REFERENCE DOCUMENTS:
APPLICABLE STANDARDS
(LIST IN ORDER OF SUBMITTAL) DRAFT PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY BY
I BY BY
SUBMIT FOR APPROVAL TO
Manager, Quality Assurance
P L 256P X T 6 PAGE I O F 2
![Page 75: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/75.jpg)
GE EXHIBIT DRD QA-017
I VOYAGER DATA REQUIREMENT DESCRIPTION - 2NO SHEET
DRD NO. SPECIAL INSTRUCTIONS’
The control of limited lifetime material is by means of shelf life labels permanently attached to the material. Determination of shelf life is made by reference to the suppliers instruction manual o r special instructions supplied with the material o r indication of shelf life limitations marked on the material by the Materials and Process Laboratory. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
SPECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING, DOL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The shelf lifetime label indicates the following information:
1. Material part no. and/or nomenclature.
2. Purchase order number.
3. Date not to be used after
4. Temperature storage requirements.
5. Disposition routine for time date expired material.
6. A s each label is affixed to the container a permanent record is established for the material and contains this information:
Date, Type of Material, Released to, Expiration Date of Material, Disposition of Material, etc.
1 (CONTINUE ON THIRD SHEET, IF NECESSARY, AN0 AFFIX TO THIS DRD.)
JPL 2568-1 OCT 6: - 2-
![Page 76: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/76.jpg)
GE EXHIBIT DRD QA-018 DATE DATA
CATEGORY DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
DATE CONTRACT DAD NO.' ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED ey: NO.
QA T. Smq h 7/28/67 QA-Olt REQUIREMENT
TITLE OF DOCUMENT.
RECORD, TOOL AND GAGE USAGE
I
I USE OF DOCUMENT:
To assure, by documentation, that tools and gages whicl measure dimension, contours, o r locations affGcting quality characteristics are initially checked for accurac prior to use and periodically thereafter to ensure continued accuracv.
M G O O l , Drawings, Interface Tools, Jigs and Fixtures MG-002, *Drawings, Tools, Jigs and Fixtures &A-004, Manual, Quality Assurance Operating QA-009, Plan, Quality Assurance Program
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS:
CLASS1 FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET dUNCLASSlFt ED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE XI PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REPUEST FOR ENGINEER- 0 REGULATION
o MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION.
FOR SINGLE PREPARATION TO USER
HDR I.
FREQUENCY OF ISSUE: PUBLICATION DATE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY €3 MONTHLY OR MILESTONE)
UP D AT E (FREQUENCY
0 SEMI-MONTHLY Maintain cur- 0 81-WEEKLY rent thru launch 0 WEEKLY - ESTIMATED 0 DAILY Pp OTHERWISE,AS SPECIFIED DATE
REFERENCE DOCUMENTS:
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAF l DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY BY
1 I 1 SUBMIT FOR P" n v I 2 3 Y I
APPROVAL TO
Manager, Quality Assurance
*Key Informal Data PAGE I O F 2 JPL 256P K T 6
![Page 77: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/77.jpg)
3-
GE EXHIBIT DRD QA-018
VOYAGER DATA REQUIREMENT DESCRIPTION - 2N0 SHEET
SPEC I AL INSTRUCTIONS' DRD NO.:
QA-Olf I The control, identification, and recall of tools and gages are the responsibility of
the Quality Appraisal Instrument and Calibration Laboratory. A DRD at the subcontractor/vendor level similar in content to this DRD is required.
OUTLINE OF CONTENTS:
The control, identification and recall capability is by means of a computerized system. The computer cards within this system contain the pertinent information for control.
1.
2 .
3.
4.
5.
6.
7.
a.
I and C lab control number.
Supplier's identification number and nomenclature.
Purchase order number and cost.
Present location.
Tolerances.
Date of last calibration.
Frequency of calibration.
Date of next calibration.
(CO~TINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 CCT 65
![Page 78: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/78.jpg)
GE EXHIBIT DRD QA-019
VOYAGER DATA REQUIREMENT DESCRIPTION DRD APPROVED BY
I RGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY. DATE' IEQUIREMENT
ITLE OF DOCUMENT: ORGANIZATION RESWNSIBLE
QA J.R. C ttshall 7/28/6'
FOR DOCUMENT PREPARATION'
RECORD, TEST (MATE RIALS , PAR TS , SUB-ASSEM BLIES)
~
YPE OF DOCUMENT: CONTROL OACTION DREFERENCE PP INFORMATION
ISE OF DOCUMENT:
ro permanently record variable data of testing results D f flight hardware.
NTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
4A-009, Plan, Quality Assurance $A -013 , Procedure, Test/Inspection TE-001, Plan, Integrated Test TE-130, Plan, General Test
;LASS1 FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET
0 GROUP 4 0 J P L DISCREET 0 SECRET RESTRICTED DATA CONFIDENTIAL RESTRICTED DATA n PROPRIETARY 0 PROJECT DISCREET
XI UNCLASSIFIED a PUBLIC DOMAIN NOFORN
ORM OF DATA: KIND OF DATA:
8 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
D FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLYSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLDSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN 0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
ING CHANGE PROPOSAL B R E P o R T
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
Guality A s surance ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTIOh
ORGAN I Z AT1 ON RESPONS I BLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
ESTIMATED MANHOURS FOR SINGLE PREPARATION
ESTIMATED COST ($ ) FOR SINGLE PREPARATION
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY
0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY
18 OTHERWISE,AS SPECIFIED a DAILY
4 s required REFERENCE DOCUMENTS: .
A-Ol! ~ TASK OR DRL ITEI
DRL NO LEVEL NO t DDL NO.. F I L E NO
~
NO OF COPIES
10 INFORMATION CUTOF
DATE OR MILESTONE
DATE DATA DUE TO USER'
PUBLICATION DATE
HDR - UPDATE (FREPUENCI
OR MILESTONE). Not 2pplicable
ESTIMATED EXPIRATION DATE
. NPC 200-2
APPLICABLE STANDARDS:
SEVJEWS AND/OR APPROVALS REQUIRED: :LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO'
BY BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Quzllity Assurance
PAGE I O F 2 JPL 256P X T t
![Page 79: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/79.jpg)
GE EXHIBIT DRD QA-019
SPECIAL INSTRUCTIONS'
Computer cards will be used for parts data.
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO..
QA-011
Preprinted data sheets will be used t o record material and subassembly data.
f
SPECIAL DISTRIBUTION. (IF DlSTRlEUTlON IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW) r
OUTLINE OF CONTENTS:
1. Component name. 2. 3. Vendor serial number. 4. Vendor's name (not trademark). 5. Vendor's test procedures number and revision. 6. The name, make, model number, vendor's identification number and calibration due
date of the test equipment, gages o r tools used. 7 . Provisions for signatures of the vendor's and GE responsible representative(s). 8. A brief description of each test with a reference to the applicable paragraph in the vendor'
test procedure (e. gi 9. Units of measure (e. g . ohms, ma, etc.). 10. Tolerances - Given in limits, not percent (e. g. , 4750-5250 ohms) except where measure-
ment is in percent (e. g. , harmonic distortion). 11. Actual readings taken during tests. Do not record a s pass or fail unless otherwise
specified. 12. Date of tests. 13. Operating time matrix: includes hardware operating and nonoperating time in the testing
environments.
GE drawing number with most recent revision.
input power c cmtinuity, frequency response, etc. ).
14. Identification of environment associated with each set of test readings. 15. The number of any f&#y&q ~ ~ ~ ~ ~ % i ~ ~ 4 p ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ yJihDf& test.
-2- JPL 2568-1 CCT 6
![Page 80: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/80.jpg)
GE EXHIBIT DRD QA-020
r VOYAGER DATA REOUIREMENT DESCRIPTION DRD APPROVED BY
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE' CONTRACT WD NO,: REQUIREMENT NO. '
TITLE OF DOCUMENT' 3RGANIZATION RESPONSIBLE
RA T.F. Smyth 7 /2 8/67 &?A-02(
FOR DOCUMENT PREPARATION.
*REPORT, FAILURE ANALYSIS
TYPE OF mCUMENT. o CONTROL OACTION OREFERENCE €5 INFORMATION
USE OF DOCUMENT. To document the investigatory steps in the analysis of a nonconformance including what was the problem, what caused it, and what is being dongto preven r e cur rence . Users: Quality Appraisal (FARB) - Reliability - Design Engineering
QA-009, Plan, Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR) RA-007, *Minutes, Failure Analysis Review Board (FAR€ RA-009, Plan, Reliability Program
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
1 RA-015, Report, Failure Review CLASSIFICATION: 0 GROUP I
0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET B UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
8 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART I 0 DIAGRAM
0 BROCHURE
0 BULLETIN
0 LETTER
0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE E
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL gl REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
Quality Assurance I I 'OR DOCUMENT REPRODUCTION.
L
ORGANIZATION RESPONSIBLE DRL NO.' LEVEL NO 'OR DOCUMENT REPRODUCTION:
ORGANIZATION RESPONSIBLE DDL NO.: F I L E NO FOR DOCUMENT DlSTRlBUTl ON:
FOR WCUMENT STOWAGE
FOR SINGLE PREPARATION TO USER'
FREQUENCY OF ISSUE: { PUBLICATION DATE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 81-MONTHLY 6 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY Not applicable
5 OTHERWISE,AS SPECIFIED
a WEEKLY 0 OAlLY
is required I REFERENCE DOCUMENTS:
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO'
BY
BY SUBMIT FOR
Manager, Qdality Assurance
BY
BY
I PAGE I O F 2 *Key Informal Data
![Page 81: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/81.jpg)
GE EXHIBIT DRD &A-020
VOYAGER DATA REOUIREMENT OESCRIPTION - 2ND SHEET
DRD NO.:
QA-021 SPEC I A L INSTRUCTIONS.
I In Section 3 of the contents, X-rays, pictures, sketches o r other descriptive media should be used to completely describe the failure mechanism.
A DRD at the subcontrador/vendor level similar in content to this DRD is required.
The report will reference a number correlating it to a specific nonconforming material report.
I SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DOL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. Description of Failure Symptons - Includes what test the unit failed, under what conditions, the data (or measurement) and when.
2. What Failed - What part, wire, module, bracket, etc. , was the actual failure.
3. Analysis Steps - Description of the total steps taken to identify the failure and the effects of the failure on associated equipment.
4. Corrective Action -,What has been done to prevent reoccurrence of the problem including reference to the documentation that accomplishes this.
(CO~TINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD)
JPL 2568-1 CCT 65 -2-
![Page 82: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/82.jpg)
GE EXHfBIT DRD &A-021 DATE DATA
CATEGORL DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
I *REPORT, NONCONFORMING MATERIAL
TYPE OF o CONTROL OACTION OREFERENCE IX INFORMATION
USE OF DOCUMENT:
An established document to report nonconformance in the fabrication, assembly, inspection and test of hardware. It assigns responsibility for nonconformance, corrective action and disposition of the hardware to rework, MRB, failure analysis.
QA-007, Minutes, Material Review Board (MRB) QA-009, Plan, Quality Assurance Program QA-020, "Report, Failure Analysis SE-056, Drawings (Category A) for Design Evaluation SE-058, Drawings (Category C) for Test
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS:
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING I7 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
lx PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLDSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMRUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (WIOR w/o CARD) ING CHANGE PROPOSAL REPORT
0 OTHER ENGINEERING CHANGE n SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
'OR DOCUMENT REPRODUCTION:
FOR DOCUMENT DISTRIBUTION.
FOR DOCUMENT STOWAGE
FOR SINGLE PREPARATION TO USER
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY OR MILESTONE)
ESTIMATED Pit OTHERWISE,AS SPECIFIED
0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY
A s required REFERENCE DOCUMENTS.
Contract NASA Specifications
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF
I SUBMIT FOR REVIEW TO'
BY
I
BY SUBMIT FOR APPROVAL TO
Manager, Quality Assurance T
*Key Informal Data PAGE I OF&
DATE
BY
BY
![Page 83: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/83.jpg)
GE EXHIBIT DRD QA-021
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
ORD NO.:
QA-02 SPECIAL INSTRUCTIONS'
I
A DRD at the subcontractor/vendor level similar in content to this DRD is required. See sample format.
SPECIAL DISTRIBUTION: ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. 2. 3. 4. 5.
6 .
Serialized preprinted form. Description of the hardware by drawing number and nomenclature. Description of nonconformance and the assignable responsibility. Assigning of corrective action to individual and/or function for implementation. Disposition recommended: a. Failure analysis e. MRB b. Return to vendor f. Accept as is c. Rework g. Retest d. Scrap Approvals required: Manufacturing engineering Design engineering Quality assurance engineering
(CO~TINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRDJ
- 2- JPL 2560-1 CCT 65
![Page 84: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/84.jpg)
GE EXHIBIT DRD QA-021
4. DISCREPANCY (IN-PROCESS) (FUNCTIONAL)
* Failure Discovered During Reason for Report Repair o r Disposition Action Replacement
1. Bench Test 2. Inspection 3. Storage 4. Shipping 5 . Checkout 6. Maintenance 7. Mfr. Test 8. Operation 9. Qual
1. Failed Item 1. 2. T.O. Direct 2. 3. Time Expired -3. 4. Other 4.
5. 6. 7. 8.
Repaired in Place 1. Identical Part Rep Reinstalled 2. Substitute Pt. Adjustect 3. None Needed Eliminated 4. Not Available Condemned Held for Rep. Depot Rep. Failure Analysis
15. IN IT IAL DISPOSITION
16. DISPOSITION
If. CORRECTIVE ACTION (TO AVOID RECUREENCE)
6.CL 119. RECD INSP. REJ 120. PC CODE1 21. SHIP NOTICE I 22. VEND. SHOQ/LOCATION I 1
23. SHOP ORDER NO. 24. PROD. CONT DATE 25. PURCHASING DATE 26. RESPON 27. CAUSl
20. AS REOD. DATE A. DISP. AUTHORITY DATE 0. DATE 29. MRB # 30. FA NO. co.
I
31. AS REQD. DATE 8. DATE E. DATE 32.AR0 DATE
33.AS REOD. DATE C. DATE F. DATE S4.CONT.ON PG.
Nonforming Material Report
-3-
![Page 85: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/85.jpg)
GE EXHIBIT DRD QA-022 DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
REQUIREMENT
*REPORT, PROCESS TRENDS
To detect nonconformance trends at receiving/'mspection, fabrication, final assembly and test to identify sEfts in quality levels so that timely corrective action can be taken.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
MG -004, Manufacturing Standing Instructions (MSI's) QA-007, Minutes, Material Review Board (MRB) QA-009, Plan, Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR)
CLASSIFICATION: 0 GROUP 1 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET I UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
B PRINTED DOCUMENT 0 ABSTRACT
0 CHART 0 BROCHURE
0 DIAGRAM 0 BULLETIN
0 DRAWING 0 CATALOG
0 FILM (STATIC OR MOTION) 0 CONTRACT
0 ILLUSTRATION 0 DIRECTIVE
0 MODEL 0 DISCLOSURE
0 INSTRUCTION
0 LETTER
0 LIST
0 LOG
0 MANUAL
0 MEMORANDUM
0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 OLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
MICROFILM (W/OR wio CARD) ING CHANGE PROPOSAL W REPORT
0 OTHER O ENGINEERING CHANGE 0 SCHEDULE
I PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
)RGANIZATION RESPONSIBLE 'OR DOCUMENT PREPARATION:
Quality Assurance 3RGANIZATION RESPONSIBLE OR DOCUMENT REPRODUCTIOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGAN1 7. ATTI ON RESPONSIBLE FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION..
E~TIMATED COST ( $ ) FOR SINGLE PREPARATION'
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY
@ MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY
n 81-MONTHLY
WEEKLY 0 D n l i Y - 0 OTHERWISE,AS SPECIFIED
QA-02:
DRL NO.: LEVEL NO I DDL NO.: F I L E N O . I
NO OF COPIES
15
INFORMATION CUTOFF DATE OR MILESTONE
DATE DATA DUE TO USER'
PUBLICATION DATE:
HDR - UPDATE (FREQUENCY
OR MILESTONE).
ESTlMATED ~
EXPIRATION DATE
~
REFERENCE DOCUMENTS:
N P C 200-2
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REOUIRED: (LIST I N ORDER OF SUBMITTAL)
h
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO'
BY BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Quality Assurance
PAGE I O F 2 J P L 2568 X T 6 *Key Informal Data
![Page 86: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/86.jpg)
GE EXHIBIT DRD QA-022
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS: DRD NO.
]&A- 02 I The Process Control Engineer performs a daily review of all NCM reports and
interfaces with Engineering, Manufacturing Planning and Supervision, Quality Assurance to determine assignables for defects and corrective action. Trend charts are maintained weekly from these determinations.
E
SPECIAL DISTRIBUTION: ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1.
2.
3.
4.
5.
The Nonconforming Material Reports are developed into trend charts for each area of manufacturing, inspection, test and assembly.
Each area is broken down into the major elements of activity, and trend charts are plotted with established control limits (upper and lower).
Responsibility for corrective action on nonconformance is assigned to Manufacturing, Engineering and Quality Assurance and each function is measured by the trend charts.
Trend charts and records a re maintained on all operators and inspectors to measure performance and determine needs for additional training.
A summary of corrective action status is made each week to supplement the trend charts.
(CONJTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 OCT 61
![Page 87: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/87.jpg)
VOYAGER DATA REQUIREMENT DESCRIPTION
REQUIREMENT
.*REPORT, QUALITY AUDIT
TYPE OF o CONTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT:
To measure the level of compliance to the established Quality Assurance Operating Procedures and Manufactur ing Standing Instructions and to implement corrective action as necessary.
QA-009, Plan Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR)
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET XI UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
%PRINTED DOCUMENT 0 ABSTRACl I 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PL4N
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
FOR DOCUMENT PREPARATION: SUBTASK
ORGANIZATION RESPONSIBLE DRL NO. LEVEL NO 'OR H DOCUMENT REPRODUCTION:
Quality Assurance
I
ORGANIZATION RESPONSIBLE DDL NO.. F I L E NO FOR DOCUMENT OISTRIBUTION.
ORGANIZATION RESPONSIBLE NO OF COPIES' FOR WCUMENT STOWAGE.
10 ESTIMATED MANHOURS INFORMATION CUTOFI
FOR SINGLE PREPARATION: DATE OR MILESTONE
ESTIMATED COST ( $ 1 DATE DATA DUE FOR SINGLE PREPARATION' TO USER.
n FREQUENCY OF ISSUE. PUBLICATION DATF
0 ANNUALLY HDR 0 SEMI-ANNUALLY 0 QUARTERLY UPDATE (FREOUENCY 0 El-MONTHLY 0 MONTHLY OR MILESTONE)
0 SEMI-MONTHLY Through' O BI-WEEKLY a WEEKLY 0 DAILY
REFERENCE DOCUMENTS:
NPC 200-2
APPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REOUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT I
DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
NIanager, Quality Assurance
*Key Informal Data PAGE I O F 2 J P L 256e X T t
![Page 88: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/88.jpg)
GE EXHIBIT DRD QA-023
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS: DRD NO.:
QA-02:
SPECIAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. Name of area o r operation, date of audit, audited by 2. List the specific document for which the area was audited. (e. g. , QAOP). 3. Results of audit and recommendation for correction and/or improvement. 4. Assign responsibility for correction and/or improvement. 5. Establish completion dates for correction/improveme nt. 6. Reschedule audit period.
d
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 OCT 65
![Page 89: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/89.jpg)
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE: REQUIREMENT. QA T. F. Smyth 7/28/67
I I I I
TITLE OF DOCUMENT:
*REPORT ; QUALITY STATUS I
1 USE OF DOCUMENT:
To compile and submit to the customer for information the system contractor performance for meeting" the quality requirements as supported by the various control documents.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS: MA-019, Report, Quarterly Written PC-002, Report, Contract Status QA -004,
Procedures &A-009, Plan, Quality Assurance Program
Manual, Quality Assurance Operating
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET 1D UNCLASSIFIED 0 PUBLIC DOMAIN 0 NDFORN
FORM OF DATA: KIND OF DATA:
El PRINTED DOCUMENT 0 ABSTRACl I 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM D BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) D CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
o MICROFILM (WIOR WIO CARD) ING CHANGE PROPOSAL 1x[ REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
3RGANIZATIDN RESPONSIBLE FOR DOCUMENT PREPARATION:
GualitY Assurance ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION.
ORGANIZATION RESPONSIBLE FOR WCUMENT STOWAGE:
E S T I M ATE D MAN HOURS FOR SINGLE PREPARATION'
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY P MONTHLY
SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
REFERENCE DOCUMENTS:
NPC 200-2
1 c:;L?y DATE.
NO OF COPIES'
10
INFORMATION CUTOFF DATE OR MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE.
SDR - UPDATE (FREQUENCY
OR MILESTONE)
Through launch ESTIMATED
EXPIRATION DATE'
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO:
BY BY
BY BY SUBMIT FOR APPROVAL TO
I Manager, Quajitv Assurance
PAGE I O F 2 P L 256P X T 6 *Key Informal Data
![Page 90: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/90.jpg)
GE EXHIBIT DRD QA-024
SPECIAL INSTRUCTIONS:
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRO NO.:
&A-024
~ - _____ ~~
jPEClAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITEIN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. General narrative comment on the conformance of meeting the quality levels of the
2. Summarized pictorial illustrations, graphs of the various measurements of the quality Voyager Program.
performance such as: a. MRB activity b. NCMR activity c. Corrective actions d. Tests e. Audits With supplemental narrations on the progress in each area of activity.
3. Conclusions on the overall quality performance.
1 (CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 CCT 65 -2-
![Page 91: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/91.jpg)
DATE DATA CATEGORI
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRG PREPARED By: DATE CONTRACT REOUIREMENT NO.
QA T. F. TITLE OF DOCUMENT'
REPORT, SPECIAL MEASUREMENT AND TEST EQUIPMENT EVALUATION (COMPONENT)
to verify the integrity and confidence in the test results,
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
QA-009, Plan, Quality Assurance Program QA-031, Specification, Special Test Equipment
(STE) Component TE-001, Plan, Integrated Test TE-030, Procedure, Test Operating
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECdET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET I 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET - - ~ I €4 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
rORM OF DATA: KIND OF DATA:
IXPRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 P I 4 N
0 COMPUTER CARD O R D E R 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
o MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL XJ REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER I
3vth 17 /2 8 /671 bA-02! )RGANIZATION RESPONSIBLE I TASK OR IDRL ITEI
FOR DOCUMENT DISTRIBUTION.
I I ORGANIZATION RESPONSIBLE NO OF COPIES.
FOR WCUMENT STOWAGE
10 ESTIMATED MANHOURS INFORMATION CUTOF
FDR SINGLE PREPARATION DATE OR MILESTONE
ESTIMATED COST !$) DATE DATA DUE FOR SINGLE PREPARATION TO USER.
FREQUENCY OF ISSUE: PUBLICATION DATE
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY I 0 WEEKLY 0 DAILY
OTHERWISE,AS SPECIFIED
REFERENCE DOCUMENTS:
NPC 200-2
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO'
BY BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Qudlity Assurance
PAGE 1 O F 2 J P L 256P K T 1
![Page 92: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/92.jpg)
GE EXHIBIT DRD QA-025
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET I SPECIAL INSTRUCTIONS: I DRD NO.: I QA-02!
L -
Quality Assurance Engineer witnesses the special measurement and test equipment evaluation.
#
SPECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING ODL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1.
2 .
Procedure for the verification that the equipment is compatible with desired resolution of measurement parameters. Defines data requirements of the special test.
( C O ~ I N U E ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRDJ
- 2- JPL 2568-1 CCT 65
![Page 93: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/93.jpg)
- GE EXHIBIT DRD QA-026
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY. DATE’ REQUIREMENT
lQAl 1 1T.F. Smyth I I TITLE OF DOCUMENT:
REPORT, QUALITY ASSURANCE AUDIT SUMMARY
TYPE OF CONTROL OACTION OREFERENCE 33 INFORMATION
USE OF DOCUMENT
To summarize status of compliance to the contrd documents as imposed on the systems contractor in areas of fabrication, inspection and testing of prime hardware.
QA-009, Plan, Quality Assurance Program QA-023, Report, Quality Audit QA-027, Report, Quality Assurance Trend Summary
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
I
)RGANIZATION RESPONSIBLE :OR DOCUMENT PREPARATION
2uality Assurance IRGANIZATION RESPONSIBLE OR DOCUMENT REPRODUCTIOI
3RGAN IZ ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION:
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION:
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY a QUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
NO.: QA -021
DDL NO.: F I L E NO + I
NO OF COPIES
10 INFORMATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE:
HDR - UPDATE (FREQUENCY
fhru launch OR MILESTONE)
ESTIMATED EXPIRATION DATE:
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
KIND OF DATA. FORM OF DATA:
9 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
REFERENCE DOCUMENTS:
NPC 200-2
APPLICABLE STANDARDS.
SUBMIT FOR REVIEW TO:
BY BY
I
BY BY SUBMIT FOR APPROVAL TO
Manager, Qudlity Assurance
PAGE I O F 2 J?L 25hP K T C
![Page 94: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/94.jpg)
GE EXHIBIT DRD QA-026
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS:
tPECIAL DISTRIBUTION. ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DOL WRITE IN DISTRIBUTION BELOW)
Submitted quarterly to Spacecraft System Office.
OUTLINE OF CONTENTS:
1. 2. 3.
4. 5. Analysis, conclusions and recommendations.
Summary of biweekly audits listing. Name of area and/or operation (date of audits). Findings, corrective action, completion dates and open corrective actions with promise dates of completion. Overall rating for area audited and an indication of trends.
The summary extends to all areas of fabrication, assembly, inspection and test.
(CON~INUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.) I JPL 2568-1 OCT 65 - -
![Page 95: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/95.jpg)
d GE EXHIBIT DRD QA-027
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
c I ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DRo NO- REQUIREMENT
DATE' CONTRACT NO. '
QA T.F. Smyth 7 /2 8/67 2A-02'5 TITLE OF DOCUMENT: )RGANIZATION RESPONSIBLE
:OR DOCUMENT PREPARATION'
REPORT, QUALITY ASSURANCE TREND SUMMARY
TYPE OF o CONTROL OACTION OREFERENCE a INFORMATION
Summarize and analyze all trend reports to determine the status of the overall fabrication, assembly, inspfection and test performance and to determine need for emphasis on corrective action.
USE OF DOCUMENT:
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
QA-007 , Minutes, Material Review Board (MR B) QA-009, Plan, Quality Assurance Program QA-021, Report, Nonconforming Material (NCMR) QA-022, *Report, Process Trends
CLASSIFICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 23 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET n UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
FORM OF DATA: KIND OF DATA:
W PRINTED DOCUMENT 0 ABSTRACT
0 CHART 0 BROCHURE
0 DIAGRAM 0 BULLETIN
0 DRAWING 0 CATALOG
0 INSTRUCTION
0 LETTER
0 LIST
0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM . 0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 D U N
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
ING CHANGE PROPOSAL =REPORT
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I Quality Assurance I 3RGANIZATION RESPONSIBLE DRL NO LEVEL NO OR DOCUMENT REPRODUCTION.
FOR DOCUMENT DISTRIBUTION:
FOR DOCUMENT STOWAGE
DATE DATA DUE FOR SINGLE PREPARATION TO USER'
PUBLICATION DATE
HDR
UPDATE (FREQUENCY OR MILESTONE) t Thru launch
FREQUENCY OF ISSUE
0 ANNUALLY 0 SEMI-ANNUALLY B QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY
0 OTHERWISE,AS SPECIFIED
0 WEEKLY 0 DAILY
REFERENCE DOCUMENTS:
N P C 200-2
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO'
BY BY
BY BY SUBMIT FOR APPROVAL TO
Manager, Qualitv Assurance
![Page 96: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/96.jpg)
GE EXHIBIT DRD QA-027
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS: DRD NO.:
QA-027 4 The weekly quality trends are plotted on control charts; process averages are calculate and control limits established. Each specific area of performance, electronic shops, machine shops, sheet metal shop, assembly and test areas is plotted to indicate trends to control quality of the outgoing hardware. A summary analysis for each area is submitted to assign responsibility for control.
SPECIAL DISTRIBUTION ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DlSTRlEUTlON BELOW) r
OUTLINE OF CONTENTS:
1.
2 .
Report summarizes the process parameters within a given area that a re measured for performance trends. a. Mechanical machine shop b. Mechanical sheet metal shop. Typical control parameters in these areas are, dimensional surface finish, welding concentricity, procedure. Defects are assigned responsibility by shop planning, engineering, inspection planning. Electronic shops are controlled in the following areas: a. Module or printed circuits b. Black box assembly c. Test Typical control parameters in these areas are: accumulations, assembly and orientation, soldering, welding, procedural and handling and defects are assigned responsibility.
( C O N ~ N U E ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRDJ
JPL 2560-1 OCT 65 -2-
![Page 97: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/97.jpg)
GE EXHIBIT DRD &A-028 DATE DATA DRD APPROVED BY
CATEGORI VOYAGER DATA REQUIREMENT DESCRIPTION
, ORGANIZATION ORIGINATING CODE' OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE CONTRACT NO. REOUIREMENT NO.'
TITLE OF DOCUMENT: DRGANIZATION RESPONSIBLE I TASK OR DRL I=
CM T. F. Smyth 7/28/67 QA-02I
I REPORT, BREAK OF INSPECTION
TYPE OF CONTROL OACTION OREFERENCE 3.5 INFORMATION
To report status of the hardware affected by the "Break of Inspection" event delaying assembly- and test schedules of the overall program.
USE OF DOCUMENT
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS: CM-019,
CM-026, Plan, Configuration Management QA-009, Plan, Quality Assurance Program QA-028, Report, Break of Inspection
List, Break of Inspection per Contract End Item
CLASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UN CLASSI FI ED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
3 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN ZLIST DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLPN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
FOR D CUMENT PREPARATION' SUBTASK NO Qua fit y
Assurance DRGANIZATION RESPONSIBLE DRL NO LEVEL NO 'OR DOCUMENT REPRODUCTION.
FOR DOCUMENT DISTRIBUTION.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY TE (FREQUENCY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY
WEEKLY 0 DAILY
REFERENCE DOCUMENTS:
Configuration Management Manual CM 001BB001-1B
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REOUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO'
BY BY
I
BY BY SUBMIT FOR APPROVAL TO
urance
PAGE I OF& J P L 256P CXT 65
![Page 98: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/98.jpg)
GE EXHIBIT DRD QA-028
VOYAGER DATA REaUlREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS’ DRD NO.
QA-021
In-Process Inspection makes out a Break of Inspection card with a copy to Quality Assurance Data Collection Center.
A DRD at the subcontractor/vendor level similar in content to this DRD is required.
#
SPECIAL OISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
1. Summary of the Break of Inspection cards and their status.
2. Contains the action taken on specific hardware affected by the break of inspection.
3. Shows status of parts and substitutions by serial number of the affected parts.
4. Shows hardware status awaiting Break of Inspection action.
5. Lists hardware requiring Material Review Board action as direct result of the Break of Inspection event.
6. Identifies the reinspection required to progress hardware to next level of assembly or test.
See attached form.
(CON~INUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRDJ I
-2- JPL 2568-1 OCT 6
![Page 99: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/99.jpg)
GE EXHIBIT DRD &A-028
- 3 - 1
![Page 100: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/100.jpg)
GE EXHIBIT DRD QA-029
VOYAGER DATA REQUIREMENT DESCRIPTION I DRD APPROVED BY
I
ORGANIZATION ORIGINATING CODE. OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY. DATE REQUIREMENT
QA T. F. TITLE OF DOCUMENT'
I *REPORT, FAILURE CATEGORIZATION
USE OF DOCUMENT' Computerize and categorization of , and assigning respon- sibilities for failure with regard to: (1) class of equipment (2) environmental test during which failure occur;ed; (3) test levels at instant of failure; (4) description of failure: (5) transducers (if any) records at time of failure.
QA-009, Plan, Quality Assurance Program QA-020 *Report, Failure Analysis QA-02 1, RA-009, Plan, Reliability Program
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
Report, Nonconforming Material (NCMR)
CLASS I FIGEON: r 0 SECRET 0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 1 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
I UWNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
0 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PI AN
k COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
ING CHANGE PROPOSAL Zp REPORT
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
ayth 67/28/65
2ua1ityAssurance
IRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
ORGANIZATION RESPONSIBLE OR DOCUMENT REPRDDUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION
FOR SINGLE PREPARATION
FREQUENCY OF ISSUE'
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY
0 SEMI-MONTHLY 0 BI-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
=MONTHLY
CATEGORY
A-02:
DRL NO LEVEL NO I- DDL NO.: F I L E NO. I
NO OF COPIES.
10 INFORMATION CUTOFf
DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE.
HDR UPDATE (FREQUENCY
OR MILESTONE)
hr 'lauric h ~
ESTIMATED EXPIRATION DATE
REFERENCE DOCUMENTS:
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO'
BY BY
I BY BY SUBMIT FOR
APPROVAL TO
Manager, Quality Assurance
*Key Informal Data PAGE I O F 2 PL 256P KCT 6
![Page 101: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/101.jpg)
SPECIAL INSTRUCTIONS.
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN OlSTRlBUTlON BELOW) r
D R D NO.'
3A-02!
~
OUTLINE OF CONTENTS:
Computer cards bear information regarding: 1. Failure report number 2. Equipment identificationhame 3. Equipment categories
a. Subsystem b. Class of equipment Environmental test during which fi?&ilure occurred Test level at the instant of failure Category of failed element (electrical, mechanical, etc. ) Transducer records at instant of failure, etc.
4. 5. 6 . 7.
(CO~TINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 OCT 65
![Page 102: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/102.jpg)
GE EXHIBIT DRD BA-030 DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE REQUIREMENT. QA J. R. Gottshall 7/28/6' TITLE OF DOCUMENT'
REPORT, QUALIFICATION STATUS
TYPE OF DOCUMENT: CONTROL OACTION OREFERENCE o INFORMATION
USE OF DOCUMENT.
* To report to the customer the status of the Type Approval Program.
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS: PC-013, List, Bidder QA-004, Manual, Quality Assurance Operating
Procedures QA-009, Plan, Quality Assurance Program QA-024, *Report, Quality Status TE-165, Report, Test
CLASS I FICATION: n C R n l l D I I .,.. .,", . 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET B UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA.
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PI AN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 R E Q U E S T FOR ENGINEER- REGULATION
0 MICROFILM (W/OR W/O CARD)
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
ING CHANGE PROPOSAL W REPORT
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX n VOUCHER
. . ORGANIZATION RESPONSIBLE FOR PCUMENT PREPARATION
aUa'ltyAssurance ORGANIZATION RESPONSIBLE
FOR DOCUMENT REPRODUCTIOF
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANlZATl ON RESPONSIBLE FOR DOCUMENT STOWAGE.
ESTIMATED MANHOURS FOR SINGLE PREPARATION'
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY @ MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
REFERENCE DOCUMENTS:
NPC-200-2
TASK OR DRL ITEI
DRL NO. LEVEL NO -t DDL NO.: F I L E NO.:
I NO. OF COP1 ES:
10 INFOR MATION CUTOFI
DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE:
PDR
UPDATE (FREQUENCY OR MILESTONE).
3m.1 launch ESTIMATED
EXPIRATION DATE'
APPLICABLE STANDARDS
I
REVIEWS AND/OR APPROVALS REOUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO:
BY B Y
BY BY SUBMIT FOR APPROVAL TO
Manager. B- uranw- I JPL 256P K T 65
PAGE I O F L *Kev Informal Data
![Page 103: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/103.jpg)
GE EXHIBIT DRD QA-030 "*
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS:
OUTLINE OF CONTENTS:
1. Matrix consisting of: a. b. Dates for
End item list to be qualified
(1) Hardware availability (2) Test facilities availability (3) Test procedure availability (4) Environmental tests
2. Narrative of : a. Completed tests b. Significant events
(1) Milestones (2) Problems/solutions
c. Expenditures act/planned
(CO~TINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 CCT 65
![Page 104: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/104.jpg)
4 GE EXHIBIT DRD QA-031
BY BY SUBMIT FOR APPROVAL TO
rant- -
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
I ORGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY DATE REQUIREMENT
QA J. R. I TITLE OF DOCUMENT
SPECIFIC A TION, SPE C IA L TEST EQU IPME N T (STE), COMPONENT
TYPE OF BCDNTROL OACTION OREFERENCE o INFORMATION
To dcbfiiiitize the component special test
USE OF DOCUMENT
*
equipment design and test and verif ication r c y ui re me nts.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS' QA-009, Plan , Quality Assurance P r o g r a m TE-001, Plan , Integrated Test TE-123,
TE-130, Plan , General T e s t
P lan , Special Tes t Equipment (STE) Verif icat ion Tests
CLASS1 FlCATlON 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY 0 PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA KIND OF DATA
B PRINTED DOCUMENT 0 ABSTRACT
0 CHART 0 BROCHURE
0 DIAGRAM 0 BULLETIN
0 DRAWING 0 CATALOG
0 FILM (STATIC OR MOTION) 0 CONTRACT
0 ILLUSTRATION 0 DIRECTIVE
0 INSTRUCTION
0 LETTER
0 LIST
0 LOG
0 MANUAL
0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE DR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL j$ SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
q u a l i t y Assuraricc 3RGAN IZATION RESPONSIBLE OR DOCUMENT REPRODUCTlOh
ORGAN I2 ATION RESPONSIBLE FOR DOCUMENT DlSTRlBUTlON
ORGANIZATION RFSPONSIBLE FOR DOCUMENT STOWAGE
ESTIMATED MANHOURS FOR SINGLE PREPARATION
- ESTIMATED COST ( $ 1
FOR SINGLE PREPARATION
FREQUENCY OF ISSUE
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY o DAILY- = OTHERWISE,AS SPECIFIED
As required
DATL
- CONTRACT
NO
TASK OR SUBTASK
DRL NO
DDL NO
- NO OF
10
- DATA
CATEMRY
DRD NO.
2A-031
NO Gi r T E n
LEVEL NO
F I L E NO
- OPI ES
INlORMATlON CUTOFF DATE OR MILESTONE
DATE D A T A DUE TO IJSER
PUBLICATION DATE
PDR - UPDATE (FR E OU ENCY
OR MILESTO E) ~s re uirea t h r o u h FACI
ESTIMATED EXPIRATION DATE
REFERENCE DOCUMENTS
Jp L Configuration Management Manual
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (LIST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO'
B Y B Y
![Page 105: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/105.jpg)
GE EXHIBIT DRD QA-031
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
QA-03 SPECIAL INSTRUCTIONS:
Cognizant Quality Assurance engineers will prepare the requirements section of the STE Specification to initiate design.
SPECIAL DISTRIBUTION (IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW) r
OUTLl NE OF CONTENTS:
1.
2.
3.
4.
Scope - outline of specification applicability.
Applicable documents - component specification, workmanship standards, etc.
Requirements - measurement tolerances, safety, operability, etc.
Test and verification - test requirements for the equipment prior to use with flight hardware, measurement studies, etc.
Preparation for delivery - special handling requirements. 5.
6. Notes - as applicable.
(CON~INUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 OCT 65 - 2-
![Page 106: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/106.jpg)
DOCUMENTATION RELATIONSHIP TREES
A documentation relationship tree has been prepared to show the relationships of data items
within each functional category as well as their relationships across categories.
Relationships within each functional category are shown by constructing a tier pattern beginning
with the top-level (or governing) data item and relating in descending order all data items
within the category to this top-level data item. (The location of a data item at a given level
on the diagram does not necessarily indicate the importance of that specific item but iden-
tifies and defines its relation to all other data items in that category.)
*
Relationships between data items in one category and data items in other functional categories
are shown by (1) shaded arrows to indicate the direction of the relationship and (2) an
alphabetic code to indicate the nature of the interrelationship a6 follows:
a, Data items needed for preparation and/or support of the referenced item. (I)
b. Data items that are supported or needed by this data item. (S)
e. Data items that relate rrtorr and provide information of a general nature but are not required in an input or support role. (G)
Each data item appearing on the Data Item List (DIL) was examined and evaluated with
respect to its contribution to, o r dependence upon, data items appearing in other categories
and is included in the diagrams. Additionally, certain data elements indicated in the user
flow diagrams (but currently not identified as individual data items) have been shown within
a dashed rectangle to clarify relationships.
5 -1/2
![Page 107: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/107.jpg)
SPECIFICATION SPECIAL ' STUDIES. I QUALITY COMPONENT (QA- 0315 I SYSTEM
ASSURANCE TEST EQUIP (STE) 0 TE-UO(S) T E - O O ~ ( ~ TE-123(1)
REPORT, QUALITY ASSURANCE TREND SUMMARY (QA -027)
COMPONENT I (QA-011)
r I PROCEDURE,
I AUDIT
REPORT, , QUALITY
AUDIT
REPORT, QUALITY ASSURANCE AUDIT SUMMARY (QA-023) (&A-026)
QUALITY
I A L---,-.
SPECL4L TEST TE-030 (I) CM-003 0 0 I ~~~~~~~
REPORT, SPECIAI MEASUREMENT AND TEST EQUIPMENT EVAL [COMPONENT) (QA-025)
REPORT, BREAK OF INSPECTION (QA-028)
CM-019 (S) CM-026 (S)
Io TE-O( I RECORD. TEST T W - 3 ' 11 (S)
~ _- -JO(S) LOGWOK, VEHICLE I fQA-002)
(PARTS, MATERIALS SUB ASSEMBLIES) I
SE-056 0 53-05? m
V RA-006 (5) RA-007 $) RA-015 $)
CATEGORIZATION nr I 1 (QA-029) I" RA-015 (S) RA-006 (S) QA-020 (S) RA-OM (S) RA-002 (S)
c-3
![Page 108: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/108.jpg)
SC-006 (S) RA-006 (S) SC-004 (S) RA-007 (S) 0 SC-002 (S) 53-025 0 DM-008 (S)
PROGRAM MG-011 (S) ($A-009) M G 0 0 9 (S)
RA-015 (I) SE-006 0
RA-014 0 MG-005 0
RECORD, SE-003 (S) RA-002 (S) I I
RA-012 (S) I I
RA-003 (S) I pQ-006 p) 0 INSPECTION RA-005 ’) ~ ~ - 0 0 6 (s) I QUALIFIcATIoN I
PROCEDURE. 1 MG004 (I) 1 TEST/ SHELF
(QA-017) 1 LIFE
($A-013)
a TE-0300
0 TE-001 (8)
REPORT, QUALIFICATIO STATUS ($A-030)
MANUAL, QUALITY ASSURANCE OPERATIXG PROCEDURES (Q-4-004)
I -
REPORT, QUALTI’Y STATUS
JQA-OW
PC-002 (S) 0 MA-019 (S)
PROCEDURE, LOGBOOK PROCESS PROCEDURE, COMPONENT CONTROL REWORK ($A-001) (QA-012) (QA-014)
I
I I
I
I LIFE I I
PROCEDURE, I SHELF
I CONTROL
PLAN, SAMPLIXI @A-010)
I 53-057 (I) THRU
NPC 200-2 b i s (I) CM-023 (I) NPC 200-3 (I) TE-027 (G)
TE-161 (G) NPC 200-4 fi M G 0 0 4 (I)
b
SE-062 (I) SE-017 (I) M G 0 0 4 (I) M G 0 1 2 (I)
is M G 0 0 9 (S) RA-014 (S)
M G 0 0 9 (S) RA-009 @)
RA-009 (S) SE-001 (S)
I PLAN, I
I
I I I PARTS 1 QUALIFICATION I
_i -I--- L-- r--L-- 1 1
REPORT, PROCESS TRENDS (QA-022)
b MG-004 (I)
3
![Page 109: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/109.jpg)
-1 I
i I I I
-J
MANUAL, INSTRUMENT CALIBRATION AND MAINTENANCE (a-003)
CALIBRATION GAGE WAGE
4 TE-159 (l)
PC-OlS(S) 3 TE-l65(S)
MATERIAL I BOARD I
I I I REVIEW
L--T--J CM-816 (l) MINUTES,
MATERIAL REVIEW
SE-062 0 ($A-007)
1 I I I I REPORT.
I INSPECTION I @PROCESS) !
--l~ PROCEDURE SE-021 (l)
CONTROL (QA-015)
SE-023 (l) MG-009 (S)
LEGEND: (l) INDICATES DATA JTEMS NEEDED FOR PREPARATION OR SUPPORT
OF THE REFERENCED ITEM (TNPUT).
(S) INDICATES DATA ITEMS THAT ARE SUPPORTED OR NEEDED BY THIS ITEM.
(G) DATA JTEMS THAT RELATE TO AND PROVIDE INFORMATION O F A GENERAL NATURE BUT ARE NOT REQUIRED IN AN INPUT OR SUPPORT ROLE
INDICATES PRINCIPAL RELATIONSHIP (I, S, OR G) BETWEEN DATA JTEMS R? OTHER FUNCTIONAL CATEGORIES.
Figure E-5. Quality Assurance Documentation Relationship Tree (QA)
![Page 110: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/110.jpg)
DATA ITEM PHASING/FREQUENCY
Preparation requirements for Quality Assurance data items are shown in Quality Assurance
Data Item Phasing and Frequency Matrix, Figure E-6. With the exception of control and
administrative-type data items, Quality Assurance document needs have a direct relation-
ship with the scope and complexity of the hardware program and range from piece part to
system level.
The basis for compilation of these estimates are:
#
a. Comparisons with other spacecraft systems, the makeup of which can be accurately described in terms of the total number of piece parts used and the percentages of non-electronic piece parts used. In the case investigated (a total of 11,740 piece parts, excluding OSE), the percentages were approxi- mately 89 percent electronic and 11 percent non-electronic.
b. Assume that each Voyager Spacecraft will contain approximately 100,000 piece parts.
c. For each Voyager Spacecraft, assume it will be composed of:
28 Prime Equipment CEI's
36 Identification Item CEI's
85 Engineering Critical Components CEI's (Configuration Management) Plan, Phase IB) 149
Assume 11 Subassemblies for each Identification Item
Assume 34 Subassemblies for each Engineering Critical Component 34 x 85 2,040
11 x 36 396
Total Spacecraft Assemblies 2,585
d. Eight equivalent Spacecraft then would contain 8 x 2, 585 testable assemblies 20,680
e. For OSE, AHSE and MDE. assume:
36 Prime Equipment CEI's
135 Identification Items (CEI's)
18 Engineering Critical Components (CEI's) (from Configuration Management Plan, Phase IB) 189
6-1
![Page 111: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/111.jpg)
Assume:
11 Subassemblies for each Identification item
(CEI's) 11 x 135
Assume :
24 Subassemblies for each Engineering Critical
Components (CEI's) 24 x 18
Total OSE, AHSE and MDE Assemblies
Assume two sets OSE *
Total Spacecraft Assemblies
S/C, OSE, AHSE, MDE total assemblies
Assume:
Average of four tests per assembly (acceptance testing,
Eng. Dev. Testing, T/A Testing, PTM Testing, Flight
Accept. Testing and retesting requirements
1,485
432
2,106
4,212
20,680
24,892
568 tests
f. From Para. E. 2. a the number of piece part test records can be calculated.
$ equivalent S/C x 89,000 + 20 percent excess
assume an average of two test records for each
electronic piece part 1,452,440
726,220
8 equivalent S/C x 11,000 non-electronic piece parts.
Assume an average of one test record for each part. 88,000
1,540,440 Total S/C Piece Part Test Records
g. Using as a basis the ratio of estimated drawings for the Spacecraft versus the OSE:
OSE will contain approximately 70,000 piece parts
Assume two sets of OSE will be produced 140,000
Piece Part Test Record Total 1,680,440
The Quality Assurance Data Item Density Profile, Figure E-7, shows the distribution and
density of data item preparation requirements. Requirements are shown by monthly
6-2 J
![Page 112: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/112.jpg)
averages and reflect both formal and key informal data items. Of particular interest is
the impact caused by data item QA-019, Test Records (Materials, Parts, Subassemblies).
6-3/4
I
![Page 113: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/113.jpg)
0 SDR I
I PHASE C - SYSTEM DEFINITION -
QUALIlY ASSURANCE I (PA)
DATA I T E M I T I R B
I I I I i - (continued on page 2) I I I .!- I I
*Key Informal Data
A Annual S/A Semi-Annual WK Weekly MO Monthly B/W Bi-Weekly B/M Si-Monthly
O/T One Time A/R As Required
YU One Update
Q Quarterly
U update
DA m i l y
I Initial F Final N/R New and 1
System D SDR PDR Prelimin: HDR Hard Des
&-3-
![Page 114: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/114.jpg)
0 0 0 0 0 R HDR CDR PAC1 w JPACl
I I
PHASE D - ACQUISTION I I d-- 9 MO w&4 12 Mo wfl 17 no --A- 14 no 5 no
I 4- S / C and OSE DESIGN PBZIAUNCH h IAUh
I T/A HDWE PRW
FAE h EST-
rised gn Review ' Design Review I Review
CDR Critical Design Review FACI First Article Configuration Inspection MAR Mission Acceptance Review J FACT Joint Flight Acceptance
Composite Testing
![Page 115: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/115.jpg)
0 MUNCH
1
. ~ T Y 1 EREQUENCY(TOW. I NOTES AND ASSWFTIONS TOTALS I I I I I
wk 10 262 F a i l u r e a n a l y s i s computed a t a 10% r a t e w i t h a procurement
buy of 20% e x c e s s .
50
4
80
I I I
OSE p i e c e p a r t s ba sed on r a t i o o f f l i g h t h a r d v z e t o OSE
~~
000
500
150
,500
I I I I drawings . I 421 I
1,000 47,400
MO 1,000 31,000
1,000 68, 500 NO 6,250 1680,000 E s t . 8 SIC 1 0 0 , 0 0 0 q i e c e p a r t s e a c h 2 S e t s 0% 140,000 p i e c e p a r t s each
24,500
400
2,600
I I I
I I I I Totals in matrix are included in those shown on next page
Figure E-6. Quality Assurance Data Item Phasing and Frequency Matrix (Sheet 1 of 2)
![Page 116: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/116.jpg)
0
6 TOTALS
SDR
I
I 264
C PDI
QUALITY ASSUR~NCE(QA) (Can't)
DATA ITEM TITLE
3.5 MO. r- -t 3.5M0. 7
QA-028 Report, Break of Inspection QA-029 *Report, Failure Categorization QA-030 Report, Qualification Status
I I I I I I I SPECIFICATIONS
I QA-031 Specification, Special Test Equipment
(STE). Comonent
I I I I I I I I I I I I I
*Key Informal Data
A Annual S/A Semi-Annual WK Weekly MO Monthly
Bi-Weekly B/W B/M Bi-Monthly
O/T One Time I Initial A/R As Required F Final U update N/R New and Revise, VU One Update SDR System Design I
Preliminary De DA Daily PDR Q Quarterly HDR Hard Design Re
J
![Page 117: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/117.jpg)
0 HDR
0 CDR
0 FACI
0 MAR
- 9 M 0 . t 1 2 M O . ~ 17MO. t 1 4 M O . t 2.5 MO.
0 JFACT
I I I I I I 1 I I I I I I I 12,410' 317.63 849,015 675,013 66,208
riew ,n Review W
CDR Critical Design Review FACI F i r s t Article Configuration Inspxt ion MAR Mission Acceptance Review J FACT Joint Flight Acceptance
Composite Test ing
![Page 118: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/118.jpg)
0 LAUNCH
2.5 Ma.
Figure E-6. Quality Assurance Data Item Phasing and Frequency Matrix (Sheet 2 of 2)
![Page 119: L ELECTRIC - NASA · 2017-06-27 · p re pared b y d ocument n umber voy-co-fr 28 j uly 1967 volume 5 data management study appendix e contractor data package quality assurance (qa)](https://reader033.vdocument.in/reader033/viewer/2022041907/5e648d0eb083371ce16746b2/html5/thumbnails/119.jpg)