L. Greiner 1IPHC-LBNL Phone Conference 05/2012
STAR
IPHC-LBNL Phone Conference
News and updated ladder testing
L. Greiner 2IPHC-LBNL Phone Conference 05/2012
STARTopics
• Two power bus cable design and status• Power regulator testing cable design and
status• Ladder testing results post IPHC visit (MS)• General project progress.• Discussion
L. Greiner 3IPHC-LBNL Phone Conference 05/2012
STARTwo power bus cable design
• Design and layout are complete.• Gerbers have been sent to Rui at CERN
PBC shop.• LBNL PO has been placed.• Waiting on delivery date.
L. Greiner 4IPHC-LBNL Phone Conference 05/2012
STARTwo power bus cable design (cont)
Outer and Inner driver board design and layout complete. Outer driver board has been sent for fabrication (10 pieces) to CERN PCB shop.
L. Greiner 5IPHC-LBNL Phone Conference 05/2012
STARPower Regulator Test Cable
• Power regulator cable test schematic is complete.
• Power regulator cable layout is underway.• We will be producing these PCBs locally,
not in the CERN PCB shop.
L. Greiner 6IPHC-LBNL Phone Conference 05/2012
STARPXL Project News
• Preparation for DOE yearly review at BNL in July• Primarily a project progress review with significant technical content.• A set of documentation for the PXL detector CD-2/3 is available at
http://rnc.lbl.gov/hft/hardware/docs/sensor_review/summary_v2.doc • Additional documentation for this review will be posted soon.
• New Virtex-6 based RDO motherboards.• Design is complete and testing has finished• 3 PCB architecture, new connectors, cables, 9U VME physical format.• Full complement of 10 assembled boards have been ordered for the
prototype run RDO. Expected delivery in 3 weeks.
• Significant Progress in mechanical structures.• See pictures next slide
L. Greiner 7IPHC-LBNL Phone Conference 05/2012
STARHardware progress
L. Greiner 8IPHC-LBNL Phone Conference 05/2012
STARDiscussion Topics
• Ladder testing results. • Implications of instability in thresholds and noise.• Any other suggested testing?• Are these effects understandable through the
analysis of the sensor design?• Ultimate 2 submission schedule.• Monthly phone conferences – propose a
schedule. (2nd Tuesday of every month?) Please check your recurring meetings)