Manual Cartage Calculation PWD Uttrakhand All Amount in Rs. Sr No Km Type A Type B Factor Cost Factor Cost 0.050 1 7.670 1,725.750 9.200 2,070.000 0.100 2 9.340 2,101.500 10.550 2,373.750 0.150 3 11.010 2,477.250 11.900 2,677.500 0.200 4 12.680 2,853.000 13.250 2,981.250 0.250 5 14.350 3,228.750 14.600 3,285.000 0.300 6 16.020 3,604.500 15.950 3,588.750 0.350 7 17.690 3,980.250 17.300 3,892.500 0.400 8 19.360 4,356.000 18.650 4,196.250 0.450 9 21.030 4,731.750 20.000 4,500.000 0.500 10 22.700 5,107.500 21.350 4,803.750 0.550 11 23.250 5,231.250 22.700 5,107.500 - The beldar cost is @225.00 Rs./day For Rate Card : For Date Effective : Block 16 Ukhimath (RUDRAPRAYAG) 20/03/2015 20/03/2015 08:11 PM Page 1 of 1

Upload: krishbist

Post on 28-Jan-2016

212 views

Category:

Documents


0 download

DESCRIPTION

rate analysis

TRANSCRIPT

Manual Cartage Calculation

PWD Uttrakhand

All Amount in Rs.

Sr No Km Type A Type B

Factor Cost Factor Cost

0.0501 7.670 1,725.750 9.200 2,070.000

0.1002 9.340 2,101.500 10.550 2,373.750

0.1503 11.010 2,477.250 11.900 2,677.500

0.2004 12.680 2,853.000 13.250 2,981.250

0.2505 14.350 3,228.750 14.600 3,285.000

0.3006 16.020 3,604.500 15.950 3,588.750

0.3507 17.690 3,980.250 17.300 3,892.500

0.4008 19.360 4,356.000 18.650 4,196.250

0.4509 21.030 4,731.750 20.000 4,500.000

0.50010 22.700 5,107.500 21.350 4,803.750

0.55011 23.250 5,231.250 22.700 5,107.500

- The beldar cost is @225.00 Rs./day

For Rate Card : For Date Effective :Block 16 Ukhimath (RUDRAPRAYAG) 20/03/2015