lake creek ifim appendix k habitat duration time series ...€¦ · table 4. january lake creek...
TRANSCRIPT
Lake Creek IFIM Appendix K
Habitat Duration Time Series
Contents • Habitat Time Series by All Reaches and Study Sites 1, 2, 3 and 4 • Habitat Time Series by Month • Habitat Time Series for:
Reference Period Existing Project Proposed Project with Enhancement
Table 1. January Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,147 5,903 5,906 1,780 2,160 2,194 44 287 1,181 28 18 54 2,879 3,966 4,055
10% 5,443 5,310 5,248 1,893 3,369 3,379 48 330 1,625 32 29 99 2,987 5,684 5,72315% 5,691 4,960 4,935 1,914 3,505 3,511 89 244 1,612 31 31 116 3,394 5,861 5,89920% 5,704 4,809 4,809 1,915 3,576 3,576 165 193 1,646 30 31 138 3,749 5,965 6,00325% 5,721 4,848 4,846 1,968 3,552 3,555 268 190 1,729 33 29 190 4,040 6,077 6,13630% 5,693 4,909 4,909 2,143 3,522 3,524 340 190 1,788 30 27 241 4,167 6,220 6,23135% 5,705 4,971 4,963 2,425 3,475 3,483 374 192 1,823 28 24 280 4,350 6,304 6,28640% 5,641 5,036 5,028 2,779 3,427 3,435 373 196 1,849 28 22 318 4,640 6,416 6,43745% 5,472 5,070 5,063 2,966 3,407 3,413 335 198 1,853 28 19 339 4,948 6,550 6,51150% 5,298 5,085 5,094 3,127 3,405 3,401 293 199 1,850 28 17 356 5,267 6,630 6,62355% 5,148 5,083 5,084 3,283 3,424 3,424 249 201 1,837 29 17 371 5,569 6,727 6,70660% 5,068 5,064 5,080 3,364 3,461 3,454 219 202 1,821 29 17 394 5,705 6,825 6,76965% 4,952 5,025 5,035 3,432 3,531 3,522 187 206 1,787 29 17 424 5,759 6,938 6,91270% 4,916 4,986 5,008 3,475 3,589 3,572 182 208 1,761 29 18 445 5,754 7,069 7,03875% 4,889 4,916 4,918 3,500 3,673 3,668 176 209 1,719 29 19 472 5,704 7,199 7,13980% 4,880 4,790 4,817 3,518 3,813 3,796 173 212 1,661 28 20 512 5,666 7,374 7,33185% 4,920 4,502 4,549 3,521 4,106 4,068 172 200 1,523 26 20 563 5,646 7,710 7,61490% 4,979 4,308 4,363 3,468 4,267 4,245 175 187 1,418 24 28 576 5,626 7,942 7,81695% 5,028 3,949 4,038 3,425 4,409 4,379 187 165 1,267 24 44 622 5,614 8,268 8,130
Winter RearingChinook Rearing Coho Rearing Coho Spawning Cutthroat Spawning
Page 1
Table 2. January Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,856 5,750 5,736 2,026 2,032 2,037 15 350 1,658 0 6 59 2,577 4,006 4,013
10% 5,997 4,961 4,884 2,090 2,989 2,992 33 389 2,288 0 22 124 2,867 5,694 5,73615% 6,087 4,586 4,562 2,080 3,071 3,069 101 255 2,263 0 23 148 3,139 6,082 6,07920% 5,909 4,436 4,437 2,040 3,097 3,098 209 169 2,298 0 21 177 3,683 6,002 5,98025% 5,750 4,516 4,516 2,032 3,055 3,055 350 147 2,404 6 17 254 4,006 5,845 5,84530% 5,581 4,622 4,622 2,216 2,999 2,999 444 139 2,483 12 13 328 4,409 5,786 5,78635% 5,509 4,703 4,692 2,539 2,933 2,945 482 136 2,530 17 10 385 4,762 5,791 5,80140% 5,322 4,776 4,766 2,828 2,873 2,885 471 138 2,564 21 9 443 5,173 5,943 5,93945% 5,032 4,822 4,812 2,952 2,842 2,852 409 139 2,567 22 8 478 5,560 6,106 6,09350% 4,785 4,853 4,853 3,018 2,831 2,831 342 142 2,562 22 7 505 5,879 6,259 6,25955% 4,618 4,865 4,865 3,059 2,854 2,854 273 144 2,545 23 7 527 6,052 6,382 6,38260% 4,526 4,865 4,875 3,082 2,899 2,893 228 148 2,522 23 7 559 6,108 6,574 6,53865% 4,424 4,827 4,836 3,093 2,988 2,982 180 156 2,473 22 7 604 6,064 6,814 6,77870% 4,436 4,783 4,811 3,097 3,068 3,042 169 162 2,440 21 8 634 6,002 6,973 6,93875% 4,455 4,694 4,694 3,087 3,178 3,178 157 169 2,382 20 9 674 5,927 7,160 7,16080% 4,491 4,564 4,564 3,065 3,354 3,354 150 179 2,302 18 10 732 5,862 7,431 7,43185% 4,592 4,302 4,320 3,024 3,703 3,673 140 177 2,115 14 19 814 5,797 7,820 7,78190% 4,690 4,148 4,148 2,941 3,881 3,881 136 169 1,970 11 35 838 5,776 8,116 8,11695% 4,791 3,784 3,832 2,862 4,027 4,014 140 146 1,757 9 59 907 6,000 8,546 8,495
Winter RearingChinook Rearing Coho Rearing Coho Spawning Cutthroat Spawning
Page 2
Table 3. January Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 50 86 86 17 34 35 1 2 2 1 1 1 1,865 3,685 3,833
10% 59 84 83 20 58 58 1 3 3 1 1 1 2,023 6,079 6,07715% 67 79 79 21 61 62 1 3 3 1 1 1 2,306 6,130 6,13820% 73 77 77 23 63 63 1 3 3 1 1 1 2,635 6,257 6,26925% 78 77 77 25 64 64 1 4 4 1 1 1 2,930 6,351 6,36930% 82 76 76 27 64 64 2 4 4 1 1 1 3,049 6,451 6,47235% 84 77 76 30 64 64 2 4 4 1 1 1 3,308 6,583 6,57640% 87 77 77 37 64 64 2 4 4 1 1 1 4,052 6,760 6,75545% 88 77 77 41 64 64 2 4 4 1 1 1 4,540 6,903 6,85950% 88 77 77 46 64 64 3 4 4 1 1 1 5,088 7,018 6,95855% 87 77 77 52 64 64 3 4 4 1 1 1 5,650 7,098 7,08860% 86 76 76 55 64 64 3 4 4 1 1 1 5,909 7,238 7,16865% 84 75 75 57 65 65 3 4 4 1 1 1 6,060 7,397 7,30870% 82 75 75 59 65 65 3 4 4 1 1 1 6,104 7,537 7,51175% 80 74 74 60 65 65 3 4 4 1 1 1 6,118 7,739 7,65180% 79 73 74 62 66 65 3 4 4 1 1 1 6,151 8,009 7,87985% 78 68 69 63 69 68 3 3 4 1 0 0 6,226 8,489 8,33790% 77 64 67 63 70 69 4 3 3 1 0 0 6,286 8,862 8,64295% 76 59 62 64 72 71 4 3 3 1 0 0 6,379 9,303 9,082
Cutthroat Spawning Winter RearingChinook Rearing Coho Rearing Coho Spawning
Page 3
Table 4. January Lake Creek Habitat Duration Analysis Table 5. January Lake Creek Habitat DuratioStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,038 2,949 3,050 5% 5,705 8,267 8,108
10% 3,789 3,936 4,130 10% 6,266 8,267 8,10815% 4,383 4,323 4,513 15% 7,027 8,267 8,10820% 4,704 4,513 4,703 20% 7,363 8,267 8,10825% 4,841 4,893 5,083 25% 8,010 8,108 8,10830% 4,765 5,272 5,272 30% 8,353 8,108 8,10835% 4,685 5,425 5,272 35% 8,601 7,845 8,10840% 4,047 5,425 5,425 40% 8,777 7,845 8,10845% 3,977 5,576 5,425 45% 9,019 7,845 8,10850% 3,959 5,576 5,576 50% 8,998 7,845 8,10855% 3,945 5,728 5,576 55% 8,901 7,845 8,10860% 3,958 5,728 5,576 60% 8,810 7,845 8,10865% 3,948 5,728 5,728 65% 8,637 7,845 8,10870% 3,895 5,875 5,728 70% 8,567 7,845 8,10875% 3,736 5,875 5,728 75% 8,500 7,845 8,10880% 3,572 5,875 5,875 80% 8,460 7,845 8,10885% 3,395 6,017 5,875 85% 8,400 7,845 8,10890% 3,229 6,017 5,875 90% 8,344 7,845 8,10895% 2,931 6,174 6,017 95% 8,222 7,845 8,108
Winter Rearing Winter Rearing
Page 4
Table 6. February Lake Creek Habitat Duration Analysis. All Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,646 4,914 4,883 1,929 3,524 3,536 64 233 1,609 31 31 119 3,201 5,826 5,914
10% 5,695 4,825 4,828 1,915 3,560 3,559 175 191 1,709 30 30 176 3,743 6,038 6,12515% 5,711 4,881 4,890 1,962 3,541 3,538 267 189 1,772 34 28 225 4,039 6,114 6,16020% 5,684 4,950 4,963 2,153 3,492 3,483 343 192 1,823 31 25 280 4,152 6,228 6,28625% 5,696 5,006 5,019 2,466 3,453 3,443 376 196 1,847 29 24 313 4,355 6,341 6,40630% 5,580 5,045 5,047 2,838 3,419 3,420 361 197 1,854 28 22 328 4,735 6,444 6,47135% 5,353 5,077 5,071 3,097 3,403 3,410 309 198 1,852 28 19 346 5,205 6,556 6,57940% 5,224 5,088 5,084 3,225 3,412 3,416 272 201 1,844 28 17 364 5,461 6,643 6,65945% 5,126 5,082 5,085 3,312 3,443 3,443 237 202 1,827 29 17 386 5,616 6,779 6,72450% 5,068 5,062 5,080 3,364 3,478 3,454 219 207 1,821 29 17 394 5,705 6,830 6,76955% 4,982 5,035 5,045 3,414 3,522 3,503 196 210 1,797 29 18 414 5,775 6,887 6,89660% 4,937 5,008 5,020 3,450 3,572 3,546 185 211 1,774 29 18 435 5,758 7,013 6,98165% 4,917 4,938 4,974 3,475 3,650 3,608 180 212 1,742 29 19 458 5,750 7,148 7,06370% 4,896 4,870 4,907 3,493 3,730 3,688 177 215 1,704 29 20 485 5,721 7,232 7,14775% 4,890 4,640 4,690 3,520 3,978 3,935 172 207 1,582 27 21 544 5,670 7,531 7,43680% 4,928 4,514 4,555 3,516 4,108 4,066 172 202 1,524 26 25 564 5,637 7,639 7,60285% 4,963 4,445 4,486 3,484 4,167 4,125 176 197 1,489 25 27 568 5,612 7,731 7,69490% 4,997 4,285 4,375 3,458 4,287 4,225 183 186 1,420 24 32 577 5,599 7,950 7,81195% 5,047 3,770 3,904 3,418 4,452 4,415 193 151 1,222 23 53 639 5,640 8,404 8,259
6,912
Coho SpawningCoho RearingChinook Rearing Winter RearingCutthroat Spawning
Page 5
Table 7. February Lake Creek Habitat Duration Analysis. Study Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 6,122 4,541 4,505 2,112 3,072 3,078 63 237 2,256 0 23 152 3,004 6,088 6,098
10% 5,889 4,470 4,481 2,037 3,072 3,068 224 153 2,378 0 19 232 3,754 5,903 5,88915% 5,750 4,577 4,592 2,032 3,030 3,024 350 142 2,462 6 15 304 4,006 5,807 5,79720% 5,575 4,679 4,692 2,234 2,953 2,945 449 138 2,530 12 11 385 4,448 5,785 5,80125% 5,496 4,742 4,754 2,598 2,908 2,897 486 140 2,561 17 9 435 4,827 5,878 5,90930% 5,218 4,789 4,791 2,872 2,861 2,862 451 138 2,570 21 9 459 5,305 5,973 6,00035% 4,870 4,832 4,823 3,005 2,836 2,846 367 140 2,566 22 8 487 5,794 6,152 6,14040% 4,707 4,859 4,851 3,046 2,842 2,847 309 143 2,555 23 7 517 6,001 6,320 6,29445% 4,586 4,877 4,869 3,071 2,877 2,882 255 147 2,530 23 7 549 6,082 6,504 6,47750% 4,526 4,862 4,875 3,082 2,923 2,893 228 154 2,522 23 7 559 6,108 6,618 6,53855% 4,442 4,836 4,849 3,088 2,982 2,953 193 160 2,489 23 7 589 6,095 6,778 6,69860% 4,428 4,811 4,824 3,096 3,042 3,012 175 165 2,456 22 8 619 6,036 6,938 6,85865% 4,439 4,722 4,766 3,096 3,152 3,097 167 171 2,413 21 9 654 5,992 7,125 7,03170% 4,450 4,632 4,677 3,088 3,262 3,207 159 178 2,359 20 10 693 5,950 7,312 7,21975% 4,516 4,403 4,427 3,055 3,568 3,531 147 178 2,191 17 16 781 5,845 7,657 7,63180% 4,607 4,268 4,320 3,012 3,733 3,673 140 176 2,115 14 25 814 5,792 7,880 7,78185% 4,666 4,217 4,268 2,962 3,792 3,733 137 173 2,068 12 30 822 5,770 7,979 7,88090% 4,729 4,114 4,166 2,920 3,911 3,851 139 167 1,973 10 40 839 5,848 8,177 8,07895% 4,823 3,602 3,717 2,846 4,058 4,036 143 130 1,697 8 73 932 6,140 8,714 8,604
Chinook Rearing Coho Rearing Coho Spawning Cutthroat Spawning Winter Rearing
Page 6
Table 8. February Lake Creek Habitat Duration Analysis. Study Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 64 79 78 21 62 62 1 3 3 1 1 1 2,184 6,158 6,163
10% 73 77 77 23 64 64 1 4 4 1 1 1 2,647 6,328 6,33715% 78 76 76 25 64 64 1 4 4 1 1 1 2,913 6,403 6,42720% 82 76 76 27 64 64 2 4 4 1 1 1 3,042 6,533 6,57625% 84 77 77 30 64 64 2 4 4 1 1 1 3,308 6,661 6,70330% 88 77 77 38 64 64 2 4 4 1 1 1 4,196 6,760 6,80435% 88 77 77 45 64 64 3 4 4 1 1 1 4,990 6,903 6,90340% 87 77 77 50 64 64 3 4 4 1 1 1 5,443 7,028 7,01845% 87 76 77 53 64 64 3 4 4 1 1 1 5,740 7,168 7,09850% 86 76 76 55 64 64 3 4 4 1 1 1 5,909 7,238 7,16855% 85 75 75 57 65 65 3 4 4 1 1 1 6,050 7,308 7,29860% 83 75 75 58 65 65 3 4 4 1 1 1 6,077 7,511 7,42365% 82 74 75 59 65 65 3 4 4 1 1 1 6,099 7,651 7,53770% 81 74 74 60 65 65 3 4 4 1 1 1 6,114 7,765 7,65175% 78 71 72 62 67 66 3 4 4 1 0 1 6,163 8,184 8,03180% 77 69 70 63 68 68 3 4 4 1 0 0 6,244 8,337 8,31485% 77 68 68 63 69 68 4 3 3 1 0 0 6,292 8,489 8,46790% 77 64 67 64 70 69 4 3 3 1 0 0 6,337 8,862 8,64295% 76 57 59 64 73 72 4 3 3 1 0 0 6,451 9,523 9,303
Chinook Rearing Coho Rearing Cutthroat SpawningCoho Spawning Winter Rearing
Page 7
Table 9. February Lake Creek Habitat Duration Analysis. Table 10. February Lake Creek Habitat Duration Analysis. Study Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,079 4,130 4,513 5% 6,676 8,267 8,108
10% 4,654 4,703 5,083 10% 7,270 8,267 8,10815% 4,923 4,893 5,083 15% 7,860 8,267 8,10820% 4,754 5,083 5,272 20% 8,213 8,267 8,10825% 4,691 5,272 5,425 25% 8,556 8,108 8,10830% 4,028 5,425 5,425 30% 8,859 8,108 8,10835% 3,959 5,576 5,576 35% 8,998 7,845 8,10840% 3,954 5,576 5,576 40% 8,950 7,845 8,10845% 3,941 5,728 5,576 45% 8,877 7,845 8,10850% 3,958 5,728 5,576 50% 8,810 7,845 8,10855% 3,983 5,728 5,728 55% 8,723 7,845 8,10860% 3,930 5,728 5,728 60% 8,614 7,845 8,10865% 3,895 5,875 5,728 65% 8,567 7,845 8,10870% 3,789 5,875 5,728 70% 8,521 7,845 8,10875% 3,572 6,017 5,875 75% 8,460 7,845 8,10880% 3,336 6,017 5,875 80% 8,382 7,845 8,10885% 3,176 6,017 5,875 85% 8,325 7,845 8,10890% 3,023 6,017 5,875 90% 8,248 7,845 8,10895% 2,839 6,174 6,017 95% 8,157 7,845 8,108
Winter RearingWinter Rearing
Page 8
Table 11. March Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,716 4,809 4,806 1,915 3,570 3,574 145 137 870 30 32 131 3,742 5,958 5,997
10% 5,695 4,870 4,879 1,997 3,543 3,541 150 148 856 32 28 213 4,057 6,101 6,14615% 5,699 4,985 4,998 2,320 3,469 3,461 153 152 763 29 24 302 4,237 6,327 6,37620% 5,636 5,061 5,063 2,755 3,410 3,413 138 160 684 28 20 339 4,633 6,481 6,51125% 5,379 5,081 5,081 3,044 3,435 3,435 127 137 594 28 17 379 5,090 6,692 6,71630% 5,237 5,062 5,080 3,196 3,478 3,454 119 124 565 28 17 394 5,402 6,830 6,76935% 5,121 5,035 5,045 3,308 3,522 3,503 115 114 530 29 18 414 5,614 6,887 6,89640% 5,014 5,011 5,020 3,397 3,567 3,546 113 104 496 29 18 435 5,766 6,967 6,98145% 4,961 4,974 5,008 3,424 3,608 3,572 113 98 479 29 19 445 5,780 7,077 7,03850% 4,931 4,938 4,974 3,459 3,650 3,608 114 91 464 29 19 458 5,758 7,148 7,06355% 4,912 4,870 4,907 3,483 3,730 3,688 116 80 431 29 20 485 5,751 7,232 7,14760% 4,891 4,834 4,851 3,497 3,771 3,747 130 73 412 28 21 499 5,718 7,303 7,22365% 4,873 4,797 4,834 3,514 3,820 3,771 141 69 396 28 22 513 5,682 7,313 7,32770% 4,882 4,662 4,726 3,529 3,951 3,886 148 57 361 28 22 533 5,660 7,479 7,42675% 4,912 4,549 4,619 3,524 4,068 4,002 164 46 326 27 22 554 5,640 7,626 7,52580% 4,944 4,467 4,536 3,498 4,147 4,088 173 40 305 25 23 562 5,622 7,723 7,61985% 4,978 4,405 4,467 3,468 4,203 4,147 176 35 285 25 27 566 5,600 7,804 7,71190% 4,997 4,285 4,375 3,458 4,287 4,225 175 27 248 24 32 577 5,599 7,950 7,81195% 5,034 3,992 4,126 3,424 4,399 4,363 185 16 192 24 44 605 5,614 8,239 8,094
Chinook Rearing Coho Rearing Steelhead Spawning Cutthroat Spawning Winter Rearing
Page 9
Table 12. March Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,934 4,428 4,428 2,042 3,092 3,096 123 129 2,163 0 22 168 3,625 6,047 6,036
10% 5,681 4,559 4,574 2,058 3,036 3,030 125 181 2,154 8 15 287 4,074 5,800 5,79115% 5,532 4,717 4,729 2,439 2,928 2,920 145 243 1,946 15 10 419 4,660 5,832 5,84820% 5,322 4,811 4,812 2,828 2,847 2,852 160 294 1,756 21 8 478 5,173 6,060 6,09325% 4,896 4,863 4,863 2,997 2,870 2,870 162 270 1,539 22 7 538 5,755 6,416 6,41630% 4,707 4,862 4,875 3,046 2,923 2,893 154 250 1,465 23 7 559 6,001 6,618 6,53835% 4,586 4,836 4,849 3,071 2,982 2,953 146 230 1,381 23 7 589 6,082 6,778 6,69840% 4,463 4,811 4,824 3,086 3,042 3,012 137 210 1,298 23 8 619 6,098 6,938 6,85845% 4,423 4,766 4,811 3,091 3,097 3,042 132 198 1,257 22 8 634 6,078 7,031 6,93850% 4,432 4,722 4,766 3,097 3,152 3,097 123 187 1,215 22 9 654 6,012 7,125 7,03155% 4,445 4,632 4,677 3,095 3,262 3,207 118 163 1,133 21 10 693 5,972 7,312 7,21960% 4,457 4,588 4,604 3,083 3,317 3,288 130 152 1,086 19 10 713 5,916 7,406 7,34765% 4,470 4,534 4,588 3,072 3,388 3,317 144 141 1,050 19 12 732 5,903 7,481 7,40670% 4,516 4,427 4,481 3,055 3,531 3,460 162 120 960 17 16 765 5,845 7,631 7,55675% 4,577 4,320 4,373 3,030 3,673 3,602 203 99 870 15 20 797 5,807 7,781 7,70680% 4,634 4,250 4,302 2,986 3,763 3,703 222 89 819 13 24 813 5,766 7,919 7,82085% 4,690 4,199 4,250 2,941 3,822 3,763 237 80 768 11 29 821 5,776 8,018 7,91990% 4,729 4,114 4,166 2,920 3,911 3,851 245 62 674 10 40 839 5,848 8,177 8,07895% 4,801 3,832 3,948 2,857 4,014 3,992 295 39 525 9 59 881 6,047 8,495 8,385
Chinook Rearing Winter RearingCutthroat SpawningCoho Rearing Steelhead Rearing
Page 10
Table 13. March Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 72 78 77 23 63 63 23 21 21 1 1 1 2,622 6,231 6,244
10% 79 76 76 26 64 64 24 19 18 1 1 1 2,955 6,379 6,40315% 84 77 77 28 64 64 23 15 14 1 1 1 3,129 6,618 6,66120% 87 77 77 36 64 64 18 12 12 1 1 1 3,931 6,810 6,85925% 88 77 77 43 64 64 16 9 9 1 1 1 4,765 7,098 7,09830% 88 76 76 49 64 64 15 8 9 1 1 1 5,318 7,238 7,16835% 86 75 75 53 65 65 14 7 7 1 1 1 5,719 7,308 7,29840% 85 75 75 56 65 65 14 7 7 1 1 1 6,021 7,423 7,42345% 84 75 75 57 65 65 15 6 6 1 1 1 6,060 7,537 7,51150% 83 74 75 58 65 65 16 5 6 1 1 1 6,084 7,651 7,53755% 82 74 74 59 65 65 17 5 5 1 1 1 6,107 7,765 7,65160% 80 74 74 60 65 65 19 4 5 1 1 1 6,118 7,879 7,76565% 79 74 74 62 65 65 20 4 4 1 1 1 6,138 7,879 7,87970% 78 71 72 63 67 66 21 3 4 1 1 1 6,176 8,162 8,03175% 78 69 71 63 68 67 21 2 3 1 0 0 6,214 8,337 8,18480% 77 68 69 63 69 68 21 2 2 1 0 0 6,252 8,489 8,33785% 77 67 68 63 69 69 21 1 2 1 0 0 6,298 8,620 8,48990% 77 64 67 64 70 69 20 1 1 1 0 0 6,337 8,862 8,64295% 76 60 62 64 72 71 18 1 1 1 0 0 6,424 9,261 9,040
Chinook Rearing Coho Rearing Winter RearingSteelhead Spawning Cutthroat Spawning
Page 11
Table 14. March Lake Creek Habitat Duration Analysis Table 15. March Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,721 4,513 4,703 5% 7,386 8,267 8,108
10% 4,804 4,893 5,083 10% 8,059 8,267 8,10815% 4,712 5,272 5,425 15% 8,458 8,267 8,10820% 4,324 5,425 5,425 20% 8,607 8,108 8,10825% 3,977 5,576 5,576 25% 9,020 7,845 8,10830% 3,959 5,728 5,576 30% 8,998 7,845 8,10835% 3,950 5,728 5,728 35% 8,950 7,845 8,10840% 3,958 5,728 5,728 40% 8,853 7,845 8,10845% 3,975 5,875 5,728 45% 8,766 7,845 8,10850% 3,930 5,875 5,728 50% 8,614 7,845 8,10855% 3,895 5,875 5,728 55% 8,567 7,845 8,10860% 3,789 5,875 5,728 60% 8,521 7,845 8,10865% 3,630 5,875 5,875 65% 8,480 7,845 8,10870% 3,513 5,875 5,875 70% 8,440 7,845 8,10875% 3,395 6,017 5,875 75% 8,400 7,845 8,10880% 3,283 6,017 5,875 80% 8,363 7,845 8,10885% 3,123 6,017 5,875 85% 8,299 7,845 8,10890% 3,023 6,017 5,875 90% 8,248 7,845 8,10895% 2,839 6,174 6,017 95% 8,157 7,845 8,108
Winter RearingWinter Rearing
Page 12
Table 16. April Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing 5% 5,672 4,880 4,889 1,897 3,540 3,538 7,079 4,490 4,467 139 150 851 4,169 3,938 3,939 4,856 2,941 2,902
10% 5,678 4,972 4,985 1,914 3,478 3,469 7,133 4,295 4,257 145 154 774 4,234 3,949 3,949 4,821 2,898 2,85715% 5,690 5,019 5,028 1,959 3,443 3,435 7,141 4,173 4,137 149 156 732 4,310 3,932 3,920 4,795 2,866 2,80420% 5,658 5,055 5,063 2,078 3,416 3,413 7,083 4,073 4,032 152 160 684 4,380 3,887 3,869 4,734 2,795 2,78825% 5,671 5,087 5,088 2,239 3,404 3,404 7,036 3,942 3,938 154 149 640 4,430 3,824 3,823 4,692 2,738 2,73730% 5,680 5,081 5,087 2,385 3,435 3,423 6,988 3,825 3,873 155 137 611 4,406 3,772 3,791 4,661 2,696 2,72435% 5,655 5,065 5,080 2,658 3,462 3,454 6,813 3,727 3,760 145 129 565 4,355 3,728 3,741 4,561 2,637 2,70040% 5,542 5,035 5,053 2,795 3,522 3,498 6,636 3,639 3,690 140 114 532 4,293 3,669 3,695 4,461 2,621 2,65045% 5,464 5,020 5,035 2,912 3,546 3,522 6,458 3,567 3,639 135 108 514 4,274 3,640 3,669 4,280 2,595 2,63950% 5,304 4,974 5,008 3,093 3,608 3,572 6,047 3,472 3,503 125 98 479 4,223 3,582 3,611 4,023 2,530 2,59155% 5,188 4,907 4,941 3,218 3,688 3,651 5,764 3,374 3,405 118 86 447 4,178 3,516 3,545 3,899 2,501 2,56260% 5,065 4,834 4,870 3,335 3,771 3,730 5,499 3,224 3,299 113 73 414 4,138 3,440 3,478 3,793 2,448 2,52965% 4,971 4,662 4,726 3,418 3,951 3,886 5,271 3,003 3,094 111 57 361 4,105 3,258 3,326 3,702 2,377 2,42470% 4,930 4,619 4,690 3,466 4,002 3,935 5,087 2,965 3,066 114 52 345 4,073 3,212 3,284 3,613 2,329 2,42075% 4,899 4,549 4,619 3,487 4,068 4,002 4,973 2,864 2,965 129 46 326 4,049 3,141 3,212 3,540 2,292 2,38380% 4,889 4,480 4,549 3,514 4,126 4,068 4,846 2,759 2,864 146 40 308 4,019 3,061 3,141 3,455 2,253 2,34685% 4,922 4,285 4,375 3,520 4,287 4,225 4,726 2,496 2,622 168 27 248 4,011 2,823 2,929 3,391 2,151 2,26090% 4,965 4,116 4,250 3,482 4,364 4,327 4,625 2,335 2,464 177 20 211 4,012 2,662 2,771 3,344 2,042 2,16195% 5,004 3,904 4,038 3,454 4,415 4,379 4,510 2,170 2,299 178 14 175 3,996 2,497 2,607 3,304 1,975 2,094
Chinook Rearing Coho Rearing Steelhead Rearing Steelhead Spawning Cutthroat Rearing Rainbow Rearing
Page 13
Table 17. April Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 6,024 4,574 4,590 2,051 3,030 3,024 6,552 4,677 4,666 123 192 2,146 4,468 3,673 3,678 4,955 3,401 3,400
10% 5,858 4,704 4,717 2,032 2,937 2,928 6,474 4,505 4,480 123 241 1,970 4,438 3,707 3,708 4,815 3,361 3,35415% 5,739 4,754 4,766 2,037 2,897 2,885 6,392 4,401 4,374 123 266 1,874 4,424 3,687 3,676 4,650 3,333 3,32620% 5,597 4,801 4,812 2,160 2,857 2,852 6,342 4,283 4,246 132 295 1,756 4,451 3,635 3,616 4,576 3,301 3,29025% 5,549 4,845 4,845 2,356 2,836 2,836 6,323 4,135 4,135 141 284 1,651 4,473 3,561 3,561 4,563 3,257 3,25730% 5,509 4,863 4,857 2,539 2,870 2,859 6,290 3,992 4,040 149 270 1,576 4,395 3,504 3,523 4,583 3,207 3,22435% 5,395 4,865 4,875 2,801 2,899 2,893 6,206 3,874 3,897 159 260 1,465 4,213 3,455 3,466 4,566 3,168 3,17440% 5,184 4,836 4,849 2,888 2,982 2,953 6,023 3,732 3,787 165 230 1,381 4,041 3,377 3,407 4,414 3,113 3,13445% 5,032 4,824 4,836 2,952 3,012 2,982 5,844 3,677 3,732 166 220 1,340 3,937 3,348 3,377 4,264 3,093 3,11350% 4,797 4,766 4,811 3,024 3,097 3,042 5,502 3,558 3,622 158 198 1,257 3,782 3,276 3,318 3,969 3,047 3,07355% 4,646 4,677 4,722 3,060 3,207 3,152 5,261 3,430 3,494 150 175 1,174 3,697 3,193 3,235 3,742 2,996 3,02260% 4,505 4,588 4,632 3,083 3,317 3,262 5,038 3,302 3,366 141 152 1,091 3,641 3,109 3,151 3,513 2,945 2,97165% 4,426 4,427 4,481 3,094 3,531 3,460 4,872 3,066 3,145 128 120 960 3,629 2,921 2,984 3,375 2,833 2,87070% 4,445 4,373 4,427 3,095 3,602 3,531 4,785 2,988 3,066 118 109 915 3,639 2,858 2,921 3,369 2,796 2,83375% 4,455 4,320 4,373 3,080 3,673 3,602 4,752 2,909 2,988 135 99 870 3,645 2,795 2,858 3,377 2,759 2,79680% 4,504 4,268 4,320 3,059 3,733 3,673 4,721 2,820 2,909 157 90 825 3,654 2,719 2,795 3,394 2,701 2,75985% 4,592 4,114 4,166 3,024 3,911 3,851 4,659 2,551 2,641 213 62 674 3,680 2,491 2,567 3,396 2,528 2,58590% 4,666 3,948 4,063 2,962 3,992 3,970 4,582 2,362 2,462 237 46 573 3,705 2,333 2,415 3,381 2,397 2,47095% 4,729 3,717 3,832 2,920 4,036 4,014 4,454 2,163 2,263 245 32 477 3,709 2,171 2,252 3,347 2,251 2,324
Chinook Rearing Steelhead Spawning Cutthroat RearingSteelhead RearingCoho Rearing Rainbow Rearing
Page 14
Table 18. April Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 68 76 76 22 64 64 1,079 642 637 22 19 18 49 62 62 5,001 3,678 3,672
10% 73 76 77 23 64 64 1,098 611 605 23 15 15 52 62 62 5,124 3,637 3,63015% 77 77 77 25 64 64 1,106 592 586 24 14 13 56 61 61 5,236 3,615 3,60420% 80 77 77 26 64 64 1,097 579 572 24 12 12 58 61 61 5,263 3,593 3,58325% 82 77 77 27 64 64 1,088 561 560 24 11 11 60 61 60 5,271 3,565 3,56430% 83 77 77 28 64 64 1,080 546 553 23 9 10 61 60 60 5,273 3,530 3,54735% 86 76 76 32 64 64 1,047 533 539 20 8 9 64 59 60 5,188 3,498 3,51440% 87 75 76 36 65 64 1,021 525 532 18 7 8 67 59 59 5,106 3,480 3,49745% 88 75 75 39 65 65 995 513 525 17 7 7 69 59 59 5,019 3,436 3,48050% 88 75 75 45 65 65 930 501 503 16 6 6 71 58 58 4,754 3,392 3,39955% 88 74 75 49 65 65 885 489 491 15 5 6 72 58 58 4,590 3,348 3,35560% 86 74 74 53 65 65 842 465 477 14 4 5 72 57 58 4,459 3,260 3,30465% 85 71 72 57 67 66 804 434 449 15 3 4 71 55 56 4,327 3,150 3,19970% 82 71 72 59 67 66 769 432 449 16 3 4 69 55 56 4,182 3,137 3,19975% 81 69 71 60 68 67 746 415 432 18 2 3 68 54 55 4,075 3,076 3,13780% 79 68 69 62 69 68 719 399 415 21 2 2 66 52 54 3,942 3,015 3,07685% 78 64 67 63 70 69 697 361 382 21 1 1 65 49 51 3,837 2,861 2,95490% 77 62 64 63 71 70 680 339 361 21 1 1 64 46 49 3,777 2,768 2,86195% 77 59 62 63 72 71 665 318 339 21 1 1 64 44 46 3,729 2,675 2,768
Coho Rearing Steelhead Spawning Rainbow RearingCutthroat RearingSteelhead RearingChinook Rearing
Page 15
Table 19. April Lake Creek Habitat Duration Analysis Table 20. April Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,206 1,859 1,793 5% 5,665 1,171 968
10% 3,971 1,793 1,727 10% 5,458 1,171 96815% 3,802 1,727 1,586 15% 5,248 1,171 96820% 3,626 1,586 1,586 20% 5,037 968 96825% 3,509 1,445 1,445 25% 4,882 968 96830% 3,428 1,445 1,445 30% 4,736 776 96835% 3,301 1,304 1,445 35% 4,520 776 96840% 3,202 1,304 1,304 40% 4,379 776 96845% 2,813 1,304 1,304 45% 4,222 776 96850% 2,566 1,163 1,304 50% 4,036 776 96855% 2,563 1,163 1,304 55% 3,941 776 96860% 2,572 1,163 1,304 60% 3,832 776 96865% 2,585 1,163 1,163 65% 3,746 776 96870% 2,585 1,023 1,163 70% 3,599 776 96875% 2,542 1,023 1,163 75% 3,527 776 96880% 2,498 1,023 1,163 80% 3,453 776 96885% 2,469 1,023 1,163 85% 3,421 776 96890% 2,428 855 1,023 90% 3,386 776 96895% 2,402 855 1,023 95% 3,346 776 968
Rainbow Rearing Rainbow Rearing
Page 16
Table 21. May Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,237 4,864 4,984 1,814 3,514 3,467 6,696 4,963 4,261 131 131 782 3,897 4,029 3,951 4,746 3,441 2,858 148 260 288
10% 5,447 5,026 5,038 1,892 3,434 3,427 6,870 4,167 4,123 127 156 723 4,041 3,929 3,911 4,890 2,866 2,802 153 103 29415% 5,529 5,063 5,071 1,910 3,413 3,410 6,938 4,037 3,996 127 157 669 4,062 3,871 3,854 4,926 2,844 2,746 155 104 29320% 5,596 5,087 5,084 1,911 3,404 3,416 7,003 3,942 3,896 128 149 625 4,096 3,824 3,804 4,939 2,793 2,727 155 101 29425% 5,630 5,082 5,077 1,896 3,436 3,447 7,037 3,831 3,783 132 138 579 4,132 3,773 3,754 4,942 2,769 2,703 155 100 29130% 5,621 5,023 5,028 1,892 3,547 3,526 7,066 3,575 3,631 139 109 512 4,155 3,641 3,662 4,919 2,599 2,638 155 88 27935% 5,629 4,918 4,941 1,899 3,668 3,651 7,096 3,388 3,405 142 90 447 4,187 3,534 3,545 4,903 2,503 2,562 155 79 26240% 5,647 4,837 4,870 1,906 3,772 3,730 7,119 3,232 3,299 145 74 414 4,220 3,441 3,478 4,874 2,452 2,529 157 76 25045% 5,661 4,797 4,834 1,919 3,820 3,771 7,125 3,195 3,224 146 69 396 4,254 3,398 3,440 4,851 2,443 2,466 158 74 24150% 5,640 4,726 4,797 1,955 3,886 3,820 7,125 3,094 3,195 149 63 380 4,282 3,326 3,398 4,839 2,407 2,461 160 72 23755% 5,617 4,710 4,733 1,995 3,912 3,885 7,124 3,082 3,104 152 62 362 4,310 3,306 3,330 4,836 2,404 2,431 161 71 23260% 5,626 4,656 4,726 2,105 3,953 3,886 7,101 2,993 3,094 154 56 361 4,382 3,255 3,326 4,817 2,370 2,424 165 70 23165% 5,625 4,549 4,603 2,241 4,068 4,027 7,056 2,864 2,953 155 46 324 4,389 3,141 3,192 4,782 2,292 2,381 168 64 22170% 5,645 4,445 4,514 2,364 4,167 4,108 7,024 2,727 2,832 157 37 289 4,377 3,009 3,089 4,760 2,245 2,339 172 61 21275% 5,654 4,375 4,445 2,525 4,225 4,167 6,980 2,622 2,727 158 31 269 4,337 2,929 3,009 4,732 2,206 2,300 177 58 20680% 5,520 4,250 4,340 2,674 4,327 4,265 6,802 2,464 2,589 150 23 230 4,233 2,771 2,877 4,645 2,143 2,253 184 56 19785% 5,328 4,116 4,217 2,949 4,364 4,336 6,365 2,335 2,448 133 20 208 4,188 2,662 2,743 4,413 2,042 2,157 191 50 18990% 5,143 3,904 4,038 3,199 4,415 4,379 5,789 2,170 2,299 117 14 175 4,155 2,497 2,607 3,938 1,975 2,094 186 48 17995% 4,984 3,770 3,904 3,412 4,452 4,415 5,283 2,041 2,170 108 10 157 4,114 2,388 2,497 3,725 1,917 2,036 186 46 173
Chinook Rearing Coho RearingSteelhead Rearing
Steelhead Spawning Cutthroat Rearing Rainbow Rearing Rainbow Spawning
Page 17
Table 22. May Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,896 4,431 4,715 2,051 3,095 2,925 6,984 4,857 4,491 125 125 1,992 4,391 3,635 3,712 4,960 3,371 3,362 0 17 1,452
10% 6,048 4,764 4,778 2,102 2,884 2,874 6,756 4,385 4,347 123 265 1,850 4,514 3,684 3,665 4,999 3,334 3,319 0 40 1,54115% 6,096 4,812 4,823 2,109 2,852 2,846 6,675 4,246 4,209 123 292 1,721 4,495 3,616 3,598 4,981 3,290 3,279 0 70 1,58920% 6,105 4,845 4,851 2,094 2,836 2,847 6,607 4,135 4,087 123 284 1,613 4,480 3,561 3,542 4,971 3,257 3,241 0 93 1,61325% 6,070 4,863 4,869 2,062 2,870 2,882 6,575 3,992 3,945 123 270 1,502 4,480 3,504 3,485 4,977 3,207 3,191 0 108 1,62130% 5,957 4,824 4,827 2,044 3,012 2,988 6,526 3,677 3,709 123 220 1,335 4,452 3,348 3,367 4,917 3,093 3,108 0 137 1,58835% 5,884 4,694 4,722 2,036 3,178 3,152 6,496 3,469 3,494 123 186 1,174 4,441 3,219 3,235 4,865 3,011 3,022 1 146 1,51340% 5,831 4,588 4,632 2,027 3,317 3,262 6,452 3,302 3,366 122 152 1,091 4,434 3,109 3,151 4,765 2,945 2,971 3 153 1,45945% 5,792 4,534 4,588 2,021 3,388 3,317 6,420 3,223 3,302 121 141 1,050 4,430 3,047 3,109 4,689 2,908 2,945 4 149 1,43350% 5,707 4,481 4,534 2,050 3,460 3,388 6,377 3,145 3,223 125 130 1,005 4,421 2,984 3,047 4,634 2,870 2,908 7 145 1,40055% 5,619 4,457 4,481 2,084 3,496 3,460 6,338 3,110 3,145 129 130 960 4,412 2,954 2,984 4,589 2,851 2,870 10 145 1,36760% 5,581 4,427 4,481 2,216 3,531 3,460 6,342 3,066 3,145 135 120 960 4,477 2,921 2,984 4,565 2,833 2,870 12 142 1,36765% 5,526 4,320 4,350 2,385 3,673 3,639 6,305 2,909 2,953 142 99 864 4,447 2,795 2,828 4,559 2,759 2,777 15 134 1,29870% 5,509 4,217 4,268 2,539 3,792 3,733 6,290 2,730 2,820 149 80 775 4,395 2,643 2,719 4,583 2,643 2,701 17 119 1,23875% 5,472 4,166 4,217 2,744 3,851 3,792 6,269 2,641 2,730 156 71 724 4,294 2,567 2,643 4,608 2,585 2,643 19 111 1,20880% 5,218 4,063 4,114 2,872 3,970 3,911 6,054 2,462 2,551 164 53 624 4,066 2,415 2,491 4,441 2,470 2,528 21 96 1,14785% 4,831 3,948 4,014 3,006 3,992 3,983 5,587 2,362 2,416 160 46 566 3,811 2,333 2,373 4,036 2,397 2,443 22 87 1,11490% 4,566 3,717 3,832 3,075 4,036 4,014 5,133 2,163 2,263 145 32 477 3,662 2,171 2,252 3,611 2,251 2,324 22 69 1,03695% 4,432 3,602 3,717 3,097 4,058 4,036 4,834 2,063 2,163 123 25 429 3,633 2,090 2,171 3,369 2,178 2,251 16 61 995
Chinook Rearing Steelhead Spawning Cutthroat RearingSteelhead RearingCoho Rearing Rainbow SpawningRainbow Rearing
Page 18
Table 23. May Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 53 80 77 18 61 64 956 735 605 20 20 15 39 67 62 4,297 4,018 3,630 126 120 102
10% 57 77 77 20 64 64 1,015 592 585 19 14 13 42 61 61 4,635 3,615 3,603 137 97 9515% 60 77 77 20 64 64 1,037 573 567 19 12 11 43 61 61 4,746 3,584 3,575 141 90 8720% 62 77 77 21 64 64 1,057 561 554 19 11 10 45 61 60 4,842 3,565 3,548 143 85 8225% 65 77 76 21 64 64 1,068 547 540 20 9 9 47 60 60 4,914 3,532 3,515 142 78 7430% 68 75 75 22 65 65 1,078 515 525 22 7 7 49 59 59 4,996 3,443 3,480 141 62 6435% 70 74 75 22 65 65 1,088 489 491 22 5 6 50 58 58 5,055 3,348 3,355 139 48 5140% 72 74 74 23 65 65 1,096 467 477 23 4 5 52 57 58 5,108 3,267 3,304 137 40 4245% 74 74 74 23 65 65 1,101 465 465 23 4 4 53 57 57 5,158 3,260 3,260 136 37 3750% 76 72 74 24 66 65 1,104 449 465 24 4 4 55 56 57 5,203 3,199 3,260 136 34 3755% 77 72 73 25 66 66 1,107 449 451 24 4 4 56 56 56 5,247 3,199 3,211 135 34 3460% 79 71 72 26 67 66 1,102 432 449 24 3 4 58 55 56 5,259 3,137 3,199 140 31 3465% 81 69 71 27 68 67 1,094 415 432 24 2 3 59 54 55 5,266 3,076 3,137 145 28 3170% 82 68 69 27 69 68 1,088 399 415 24 2 2 60 52 54 5,271 3,015 3,076 149 25 2875% 83 67 68 28 69 69 1,080 382 399 23 1 2 61 51 52 5,273 2,954 3,015 154 22 2580% 85 64 67 31 70 69 1,057 361 382 21 1 1 63 49 51 5,214 2,861 2,954 161 21 2285% 88 62 64 39 71 70 995 339 361 17 1 1 69 46 49 5,019 2,768 2,861 160 20 2190% 88 59 62 48 72 71 901 318 339 15 1 1 72 44 46 4,652 2,675 2,768 143 19 2095% 85 57 59 56 73 72 810 297 318 15 0 1 71 42 44 4,351 2,582 2,675 124 18 19
Coho Rearing Steelhead Spawning Rainbow RearingSteelhead RearingChinook Rearing Rainbow SpawningCutthroat Rearing
Page 19
Table 24. May Lake Creek Habitat Duration Analysis Table 25. May Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed Reference Existing Proposed %Exceed Reference Existing Proposed Reference Existing Proposed5% 4,873 2,374 1,727 220 604 144 5% 6,551 3,246 968 273 421 104
10% 4,797 1,727 1,586 219 144 133 10% 6,368 1,171 968 273 115 10415% 4,762 1,727 1,445 219 144 123 15% 6,260 1,171 968 270 115 10420% 4,682 1,586 1,445 218 133 123 20% 6,103 1,171 968 266 115 10425% 4,584 1,586 1,445 217 133 123 25% 5,999 1,171 968 272 115 10430% 4,400 1,304 1,304 216 112 112 30% 5,879 776 968 281 93 10435% 4,282 1,163 1,304 217 102 112 35% 5,781 776 968 289 93 10440% 4,155 1,163 1,304 222 102 112 40% 5,665 776 968 300 93 10445% 4,041 1,163 1,163 226 102 102 45% 5,572 776 968 308 93 10450% 3,963 1,163 1,163 229 102 102 50% 5,489 776 968 316 93 10455% 3,907 1,163 1,163 231 102 102 55% 5,417 776 968 322 93 10460% 3,852 1,163 1,163 233 102 102 60% 5,344 776 968 328 93 10465% 3,739 1,023 1,163 232 92 102 65% 5,248 776 968 332 93 10470% 3,669 1,023 1,163 236 92 102 70% 5,140 776 968 334 93 10475% 3,582 1,023 1,163 244 92 102 75% 5,037 776 968 337 93 10480% 3,496 1,023 1,163 254 92 102 80% 4,905 776 968 342 93 10485% 3,301 855 1,023 286 77 92 85% 4,613 776 968 338 93 10490% 2,566 855 1,023 310 77 92 90% 4,185 776 968 312 93 10495% 2,568 855 1,023 357 77 92 95% 3,916 776 968 295 93 104
Rainbow Rearing Rainbow RearingRainbow Spawning Rainbow Spawning
Page 20
Table 26. June Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,117 5,682 4,998 1,773 1,988 3,461 6,535 7,124 4,220 131 151 763 3,825 4,330 3,948 4,626 4,757 2,816 145 164 288
10% 5,117 4,964 5,088 1,773 3,428 3,404 6,535 5,246 3,938 131 115 640 3,825 4,092 3,823 4,626 3,639 2,737 145 189 29515% 5,150 4,967 5,077 1,780 3,474 3,447 6,599 4,430 3,783 132 166 579 3,839 3,963 3,754 4,672 3,199 2,703 146 215 29120% 5,242 5,071 5,045 1,816 3,474 3,503 6,672 3,740 3,665 132 127 530 3,904 3,721 3,689 4,752 2,753 2,642 147 99 28125% 5,360 5,020 4,989 1,865 3,546 3,589 6,770 3,611 3,494 129 110 477 3,983 3,642 3,601 4,841 2,691 2,590 151 94 27130% 5,456 4,944 4,907 1,893 3,646 3,688 6,852 3,449 3,374 127 93 431 4,036 3,554 3,516 4,896 2,636 2,555 153 89 25735% 5,540 4,851 4,817 1,911 3,747 3,796 6,925 3,290 3,211 127 79 394 4,054 3,468 3,420 4,942 2,546 2,463 155 81 24140% 5,586 4,726 4,726 1,902 3,886 3,886 6,998 3,094 3,094 128 63 361 4,096 3,326 3,326 4,960 2,407 2,424 155 72 23145% 5,612 4,662 4,726 1,891 3,951 3,886 7,026 3,003 3,094 132 57 361 4,123 3,258 3,326 4,966 2,377 2,424 155 70 23150% 5,610 4,592 4,619 1,890 4,018 4,002 7,055 2,902 2,965 137 51 326 4,147 3,187 3,212 4,952 2,340 2,383 155 68 22155% 5,611 4,486 4,549 1,895 4,125 4,068 7,082 2,768 2,864 141 41 308 4,171 3,064 3,141 4,933 2,260 2,346 155 62 21560% 5,628 4,445 4,486 1,900 4,167 4,125 7,101 2,727 2,768 143 37 288 4,198 3,009 3,064 4,911 2,245 2,314 155 61 21065% 5,643 4,340 4,375 1,908 4,265 4,225 7,118 2,589 2,622 145 28 248 4,229 2,877 2,929 4,885 2,199 2,260 156 57 20170% 5,620 4,116 4,250 1,959 4,364 4,327 7,119 2,335 2,464 149 20 211 4,276 2,662 2,771 4,855 2,085 2,161 159 54 19075% 5,608 4,038 4,116 2,064 4,379 4,364 7,124 2,299 2,335 154 17 192 4,351 2,607 2,662 4,847 2,076 2,103 161 53 18480% 5,615 3,904 4,038 2,174 4,415 4,379 7,093 2,170 2,299 155 14 175 4,393 2,497 2,607 4,830 1,975 2,094 165 48 17985% 5,634 3,904 4,038 2,358 4,415 4,379 7,033 2,170 2,299 157 14 175 4,369 2,497 2,607 4,790 1,975 2,094 170 48 17990% 5,505 3,691 3,825 2,642 4,467 4,430 6,846 2,005 2,134 154 8 139 4,212 2,333 2,442 4,684 1,907 2,026 181 45 16895% 5,264 3,504 3,691 3,026 4,522 4,467 6,174 1,870 2,005 128 5 121 4,172 2,210 2,333 4,327 1,846 1,969 191 43 162
Chinook Rearing Coho Rearing Steelhead Rearing Steelhead Spawning Cutthroat Rearing Rainbow Rearing Rainbow Spawning
Page 21
Table 27. June Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,856 5,685 4,729 2,026 2,058 2,920 7,063 6,367 4,454 126 126 1,946 4,346 4,419 3,709 4,929 4,623 3,347 0 8 1,479
10% 5,856 4,442 4,845 2,026 3,088 2,836 7,063 4,943 4,135 126 136 1,651 4,346 3,629 3,561 4,929 3,417 3,257 0 20 1,61015% 5,856 4,703 4,869 2,026 2,933 2,882 7,063 4,517 3,945 126 239 1,502 4,346 3,711 3,485 4,929 3,368 3,191 0 22 1,62120% 5,912 4,862 4,849 2,058 2,923 2,953 6,959 3,842 3,787 124 250 1,381 4,406 3,436 3,407 4,974 3,154 3,134 0 123 1,60125% 5,997 4,814 4,783 2,090 3,017 3,068 6,820 3,654 3,597 123 219 1,251 4,479 3,337 3,303 4,996 3,088 3,063 0 137 1,56430% 6,067 4,722 4,677 2,105 3,152 3,207 6,725 3,494 3,430 123 187 1,133 4,510 3,235 3,193 4,993 3,022 2,996 0 146 1,48635% 6,113 4,604 4,564 2,111 3,288 3,354 6,638 3,341 3,267 123 163 1,044 4,484 3,136 3,079 4,969 2,960 2,926 0 150 1,43040% 6,090 4,481 4,481 2,080 3,460 3,460 6,593 3,145 3,145 123 130 960 4,480 2,984 2,984 4,974 2,870 2,870 0 145 1,36745% 6,065 4,427 4,481 2,057 3,531 3,460 6,570 3,066 3,145 123 120 960 4,480 2,921 2,984 4,977 2,833 2,870 0 142 1,36750% 5,968 4,373 4,373 2,045 3,602 3,602 6,532 2,988 2,988 123 109 870 4,458 2,858 2,858 4,924 2,796 2,796 0 138 1,30155% 5,893 4,268 4,320 2,037 3,733 3,673 6,503 2,820 2,909 123 90 825 4,442 2,719 2,795 4,882 2,701 2,759 0 127 1,26860% 5,853 4,217 4,268 2,031 3,792 3,733 6,470 2,730 2,820 122 80 775 4,437 2,643 2,719 4,807 2,643 2,701 2 119 1,23865% 5,805 4,114 4,166 2,023 3,911 3,851 6,430 2,551 2,641 121 62 674 4,431 2,491 2,567 4,714 2,528 2,585 4 103 1,17870% 5,685 3,948 4,063 2,058 3,992 3,970 6,367 2,362 2,462 126 46 573 4,419 2,333 2,415 4,623 2,397 2,470 8 87 1,11775% 5,592 3,832 3,948 2,179 4,014 3,992 6,343 2,263 2,362 133 39 525 4,460 2,252 2,333 4,572 2,324 2,397 11 78 1,07780% 5,556 3,717 3,832 2,314 4,036 4,014 6,332 2,163 2,263 139 32 477 4,488 2,171 2,252 4,559 2,251 2,324 13 69 1,03685% 5,509 3,717 3,832 2,539 4,036 4,014 6,290 2,163 2,263 149 32 477 4,395 2,171 2,252 4,583 2,251 2,324 17 69 1,03690% 5,218 3,487 3,602 2,872 4,080 4,058 6,054 1,964 2,063 164 18 381 4,066 2,009 2,090 4,441 2,105 2,178 21 52 95495% 4,727 3,293 3,487 3,041 4,130 4,080 5,393 1,847 1,964 156 15 333 3,739 1,908 2,009 3,870 2,003 2,105 23 44 913
Steelhead Rearing Steelhead SpawningChinook Rearing Rainbow SpawningRainbow RearingCutthroat RearingCoho Rearing
Page 22
Table 28. June Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 49 78 77 17 25 64 913 1,105 598 20 24 14 37 57 62 4,005 5,255 3,622 121 136 99
10% 49 84 77 17 57 64 913 793 560 20 15 11 37 70 60 4,005 4,280 3,564 121 122 8615% 50 76 76 17 64 64 927 641 540 20 18 9 38 62 60 4,106 3,675 3,515 123 117 7420% 53 76 75 18 64 65 953 539 526 20 9 7 39 60 59 4,276 3,514 3,482 125 73 6525% 55 75 75 19 65 65 986 525 503 19 7 6 40 59 58 4,485 3,480 3,399 132 64 5630% 57 75 74 20 65 65 1,013 501 489 19 6 5 42 58 58 4,626 3,392 3,348 137 53 4835% 59 74 74 20 65 65 1,037 477 465 19 5 4 43 58 57 4,746 3,304 3,260 141 42 3740% 62 72 72 21 66 66 1,057 449 449 19 4 4 45 56 56 4,842 3,199 3,199 142 34 3445% 64 71 72 21 67 66 1,065 434 449 20 3 4 46 55 56 4,897 3,150 3,199 142 31 3450% 67 70 71 21 68 67 1,075 417 432 21 3 3 48 54 55 4,975 3,089 3,137 142 29 3155% 69 68 69 22 68 68 1,084 401 415 22 2 2 50 52 54 5,030 3,028 3,076 140 26 2860% 71 68 68 22 69 68 1,091 399 401 23 2 2 51 52 52 5,074 3,015 3,028 138 25 2665% 73 67 67 23 69 69 1,098 382 382 23 1 1 52 51 51 5,124 2,954 2,954 137 22 2270% 76 62 64 24 71 70 1,104 339 361 24 1 1 55 46 49 5,197 2,768 2,861 136 20 2175% 78 62 62 25 71 71 1,107 339 339 24 1 1 57 46 46 5,254 2,768 2,768 136 20 2080% 79 59 62 26 72 71 1,100 318 339 24 1 1 58 44 46 5,260 2,675 2,768 140 19 2085% 81 59 62 27 72 71 1,090 318 339 24 1 1 60 44 46 5,269 2,675 2,768 147 19 2090% 84 57 59 30 73 72 1,067 297 318 22 0 1 62 42 44 5,241 2,582 2,675 160 18 1995% 88 55 57 41 74 73 968 275 297 16 0 0 70 39 42 4,911 2,489 2,582 156 18 18
Coho RearingChinook Rearing Steelhead Spawning Rainbow RearingSteelhead Rearing Rainbow SpawningCutthroat Rearing
Page 23
Table 29. June Lake Creek Habitat Duration Analysis Table 30. June Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed Reference Existing Proposed %Exceed Reference Existing Proposed Reference Existing Proposed5% 4,938 3,683 1,586 221 235 133 5% 6,756 5,101 968 268 335 104
10% 4,938 2,518 1,445 221 357 123 10% 6,756 3,453 968 268 325 10415% 4,930 2,256 1,445 220 427 123 15% 6,710 2,894 968 269 443 10420% 4,902 1,586 1,304 220 133 112 20% 6,629 1,171 968 271 115 10425% 4,852 1,445 1,304 220 123 112 25% 6,529 1,171 968 273 115 10430% 4,814 1,445 1,304 220 123 112 30% 6,444 1,171 968 274 115 10435% 4,791 1,304 1,163 219 112 102 35% 6,362 1,171 968 273 115 10440% 4,725 1,163 1,163 218 102 102 40% 6,208 776 968 269 93 10445% 4,672 1,163 1,163 218 102 102 45% 6,103 776 968 266 93 10450% 4,532 1,163 1,163 217 102 102 50% 5,980 776 968 273 93 10455% 4,400 1,023 1,163 216 92 102 55% 5,888 776 968 280 93 10460% 4,295 1,023 1,163 216 92 102 60% 5,805 776 968 287 93 10465% 4,181 1,023 1,163 221 92 102 65% 5,700 776 968 297 93 10470% 4,015 1,023 1,023 227 92 92 70% 5,561 776 968 309 93 10475% 3,931 1,023 1,023 230 92 92 75% 5,458 776 968 318 93 10480% 3,883 855 1,023 232 77 92 80% 5,396 776 968 324 93 10485% 3,739 855 1,023 232 77 92 85% 5,276 776 968 332 93 10490% 3,552 855 1,023 247 77 92 90% 5,015 776 968 338 93 10495% 3,279 855 1,023 291 77 92 95% 4,582 776 968 336 93 104
Rainbow Rearing Rainbow RearingRainbow Spawning Rainbow Spawning
Page 24
Table 31. July Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,150 5,074 4,938 1,780 3,404 3,650 6,599 4,087 3,397 3,839 3,857 3,544 4,676 3,130 2,558 146 184 260
10% 5,436 4,925 4,870 1,887 3,664 3,730 6,830 3,440 3,299 4,032 3,543 3,478 4,883 2,635 2,529 153 89 25015% 5,561 4,761 4,656 1,913 3,869 3,953 6,941 3,167 2,993 4,063 3,355 3,255 4,952 2,512 2,388 155 78 22620% 5,606 4,583 4,514 1,889 4,050 4,108 7,033 2,937 2,832 4,129 3,170 3,089 4,971 2,433 2,339 155 73 21225% 5,606 4,514 4,445 1,892 4,108 4,167 7,071 2,832 2,727 4,161 3,089 3,009 4,945 2,394 2,300 155 71 20630% 5,625 4,445 4,375 1,900 4,167 4,225 7,100 2,727 2,622 4,198 3,009 2,929 4,914 2,355 2,260 155 68 20135% 5,640 4,328 4,250 1,907 4,286 4,327 7,117 2,575 2,464 4,229 2,848 2,771 4,885 2,250 2,161 156 61 19040% 5,623 4,083 4,116 1,954 4,373 4,364 7,119 2,319 2,335 4,273 2,633 2,662 4,862 2,082 2,103 159 54 18445% 5,600 4,038 4,038 2,002 4,379 4,379 7,120 2,299 2,299 4,304 2,607 2,607 4,852 2,076 2,094 160 53 17950% 5,607 3,904 4,038 2,108 4,415 4,379 7,115 2,170 2,299 4,376 2,497 2,607 4,840 2,018 2,094 162 51 17955% 5,624 3,770 3,904 2,244 4,452 4,415 7,069 2,041 2,170 4,388 2,388 2,497 4,824 1,917 2,036 167 46 17360% 5,634 3,691 3,779 2,358 4,467 4,451 7,033 2,005 2,052 4,369 2,333 2,395 4,804 1,907 1,987 169 45 16765% 5,622 3,577 3,691 2,551 4,506 4,467 6,977 1,891 2,005 4,300 2,244 2,333 4,760 1,854 1,969 175 44 16270% 5,440 3,504 3,513 2,740 4,522 4,521 6,703 1,870 1,882 4,188 2,210 2,217 4,624 1,846 1,916 183 43 15475% 5,330 3,290 3,504 2,938 4,567 4,522 6,384 1,728 1,870 4,177 2,063 2,210 4,462 1,759 1,907 187 43 15480% 5,178 3,290 3,504 3,145 4,567 4,522 5,910 1,728 1,870 4,161 2,063 2,210 4,170 1,759 1,907 192 43 15485% 5,063 3,158 3,371 3,257 4,601 4,556 5,635 1,686 1,828 4,138 1,994 2,142 3,877 1,746 1,894 184 42 14790% 4,986 3,070 3,290 3,412 4,607 4,567 5,278 1,582 1,728 4,115 1,910 2,063 3,731 1,662 1,820 182 42 14895% 4,936 2,938 3,158 3,464 4,641 4,601 5,016 1,540 1,686 4,068 1,842 1,994 3,607 1,602 1,763 185 37 137
Chinook Rearing Coho Rearing Steelhead Rearing Rainbow Rearing Rainbow SpawningCutthroat Rearing
Page 25
Table 32. July Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,856 4,834 4,722 2,026 2,841 3,152 7,063 4,172 3,494 4,346 3,579 3,235 4,929 3,268 3,022 0 85 1,513
10% 6,056 4,694 4,632 2,104 3,178 3,262 6,745 3,469 3,366 4,515 3,219 3,151 4,998 3,011 2,971 0 146 1,45915% 6,123 4,481 4,427 2,110 3,460 3,531 6,623 3,145 3,066 4,481 2,984 2,921 4,969 2,870 2,833 0 145 1,33420% 6,029 4,320 4,268 2,051 3,673 3,733 6,555 2,909 2,820 4,472 2,795 2,719 4,959 2,759 2,701 0 134 1,23825% 5,913 4,268 4,217 2,040 3,733 3,792 6,511 2,820 2,730 4,446 2,719 2,643 4,893 2,701 2,643 0 127 1,20830% 5,849 4,217 4,166 2,030 3,792 3,851 6,467 2,730 2,641 4,436 2,643 2,567 4,798 2,643 2,585 2 119 1,17835% 5,801 4,096 4,063 2,022 3,941 3,970 6,427 2,512 2,462 4,431 2,448 2,415 4,706 2,502 2,470 4 103 1,11740% 5,696 3,899 3,948 2,054 4,005 3,992 6,372 2,317 2,362 4,420 2,292 2,333 4,628 2,370 2,397 7 87 1,07745% 5,614 3,832 3,832 2,103 4,014 4,014 6,339 2,263 2,263 4,422 2,252 2,252 4,586 2,324 2,324 10 78 1,03650% 5,575 3,717 3,832 2,234 4,036 4,014 6,342 2,163 2,263 4,486 2,171 2,252 4,562 2,251 2,324 12 69 1,03655% 5,540 3,602 3,717 2,398 4,058 4,036 6,314 2,063 2,163 4,457 2,090 2,171 4,568 2,178 2,251 15 61 99560% 5,509 3,487 3,602 2,539 4,080 4,058 6,290 1,964 2,063 4,395 2,009 2,090 4,583 2,105 2,178 17 52 95465% 5,431 3,400 3,487 2,787 4,106 4,080 6,236 1,907 1,964 4,247 1,958 2,009 4,589 2,063 2,105 20 52 91370% 5,088 3,293 3,293 2,930 4,130 4,130 5,922 1,847 1,847 3,974 1,908 1,908 4,327 2,003 2,003 21 44 86075% 4,843 3,099 3,293 3,012 4,179 4,130 5,575 1,731 1,847 3,810 1,808 1,908 4,034 1,901 2,003 22 37 86080% 4,606 3,099 3,293 3,068 4,179 4,130 5,196 1,731 1,847 3,679 1,808 1,908 3,677 1,901 2,003 23 37 86085% 4,463 2,905 3,099 3,086 4,229 4,179 4,975 1,615 1,731 3,633 1,707 1,808 3,449 1,800 1,901 20 30 80790% 4,436 2,905 3,099 3,097 4,229 4,179 4,822 1,615 1,731 3,634 1,707 1,808 3,369 1,800 1,901 15 30 80795% 4,481 2,711 2,905 3,068 4,278 4,229 4,732 1,499 1,615 3,650 1,607 1,707 3,386 1,698 1,800 10 22 754
Chinook Rearing Rainbow SpawningCutthroat Rearing Rainbow RearingSteelhead RearingCoho Rearing
Page 26
Table 33. July Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 50 77 74 17 64 65 927 591 489 38 61 58 4,105 3,613 3,348 122 98 48
10% 57 75 74 20 65 65 1,006 501 477 41 58 58 4,591 3,392 3,304 136 53 4215% 60 74 71 21 65 67 1,042 465 432 44 57 55 4,769 3,260 3,137 141 37 3120% 65 71 69 21 67 68 1,068 432 415 47 55 54 4,919 3,137 3,076 142 31 2825% 68 69 68 22 68 69 1,081 415 399 49 54 52 5,011 3,076 3,015 141 28 2530% 71 68 67 22 69 69 1,091 399 382 51 52 51 5,074 3,015 2,954 138 25 2235% 73 67 64 23 69 70 1,098 382 361 52 51 49 5,124 2,954 2,861 137 22 2140% 75 62 62 24 71 71 1,103 339 339 55 46 46 5,191 2,768 2,768 136 20 2045% 77 62 62 25 71 71 1,106 339 339 56 46 46 5,231 2,768 2,768 135 20 2050% 78 59 62 25 72 71 1,105 318 339 57 44 46 5,256 2,675 2,768 137 19 2055% 80 57 59 26 73 72 1,096 297 318 58 42 44 5,264 2,582 2,675 143 18 1960% 81 57 57 27 73 73 1,090 297 299 60 42 42 5,269 2,582 2,600 146 18 1965% 83 55 57 28 74 73 1,082 275 297 61 39 42 5,277 2,489 2,582 153 18 1870% 85 55 55 32 74 74 1,045 275 278 64 39 40 5,177 2,489 2,507 161 18 1875% 88 51 55 38 74 74 1,001 253 275 68 36 39 5,036 2,347 2,489 161 18 1880% 88 51 55 46 74 74 923 253 275 72 36 39 4,733 2,347 2,489 148 18 1885% 88 51 55 50 74 74 879 253 275 72 36 39 4,575 2,347 2,489 138 18 1890% 85 47 51 56 75 74 810 229 253 71 32 36 4,351 2,186 2,347 124 19 1895% 82 47 51 59 75 74 757 229 253 68 32 36 4,132 2,186 2,347 117 19 18
Steelhead RearingCoho RearingChinook Rearing Cutthroat Rearing Rainbow Rearing Rainbow Spawning
Page 27
Table 34. July Lake Creek Habitat Duration Analysis Table 35. July Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed Reference Existing Proposed %Exceed Reference Existing Proposed Reference Existing Proposed5% 4,936 2,230 1,304 221 331 112 5% 6,736 2,714 968 268 389 104
10% 4,822 1,445 1,304 220 123 112 10% 6,473 1,171 968 274 115 10415% 4,788 1,304 1,163 219 112 102 15% 6,350 1,171 968 273 115 10420% 4,661 1,304 1,163 217 112 102 20% 6,082 1,171 968 265 115 10425% 4,466 1,304 1,163 216 112 102 25% 5,934 1,171 968 277 115 10430% 4,308 1,304 1,163 216 112 102 30% 5,816 1,171 968 286 115 10435% 4,181 1,163 1,023 221 102 92 35% 5,712 968 968 295 104 10440% 4,041 1,023 1,023 226 92 92 40% 5,584 776 968 307 93 10445% 3,971 1,023 1,023 229 92 92 45% 5,509 776 968 314 93 10450% 3,915 1,023 1,023 231 92 92 50% 5,437 776 968 320 93 10455% 3,860 855 1,023 233 77 92 55% 5,365 776 968 327 93 10460% 3,781 855 1,023 232 77 92 60% 5,314 776 968 331 93 10465% 3,655 855 1,023 238 77 92 65% 5,140 776 968 334 93 10470% 3,522 855 1,023 251 77 92 70% 4,971 776 968 339 93 10475% 3,400 855 1,023 265 77 92 75% 4,767 776 968 348 93 10480% 3,183 855 1,023 315 77 92 80% 4,419 776 968 327 93 10485% 2,566 855 1,023 310 77 92 85% 4,185 776 968 312 93 10490% 2,563 855 1,023 342 77 92 90% 3,989 776 968 294 93 10495% 2,585 674 855 364 58 77 95% 3,791 776 968 303 93 104
Rainbow Rearing Rainbow Spawning Rainbow SpawningRainbow Rearing
Page 28
Table 36. August Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Propsed5% 5,605 4,397 4,479 270 107 798 2,019 4,228 4,149 7,124 2,680 2,799 4,319 2,928 3,037 4,848 2,344 2,457
10% 5,639 4,305 4,410 271 81 747 2,338 4,306 4,207 7,034 2,557 2,694 4,379 2,825 2,957 4,789 2,301 2,41815% 5,481 4,171 4,305 250 68 645 2,711 4,342 4,306 6,758 2,428 2,557 4,211 2,716 2,825 4,639 2,207 2,37120% 5,306 4,038 4,227 225 55 589 2,974 4,379 4,321 6,304 2,299 2,521 4,176 2,607 2,770 4,399 2,149 2,36225% 5,217 3,904 4,138 209 42 579 3,080 4,415 4,351 6,047 2,170 2,412 4,169 2,497 2,687 4,246 2,091 2,31030% 5,146 3,825 4,093 194 30 533 3,183 4,430 4,357 5,822 2,134 2,392 4,153 2,442 2,660 4,026 2,082 2,30435% 5,058 3,792 4,093 177 29 533 3,273 4,440 4,357 5,603 2,118 2,392 4,137 2,414 2,660 3,857 2,059 2,30440% 5,006 3,504 3,959 161 14 476 3,358 4,522 4,394 5,410 1,870 2,263 4,126 2,210 2,551 3,782 1,907 2,24645% 4,995 3,290 3,880 155 11 421 3,404 4,567 4,409 5,304 1,728 2,227 4,122 2,063 2,496 3,743 1,759 2,23750% 4,960 3,158 3,825 158 9 420 3,439 4,601 4,430 5,161 1,686 2,134 4,093 1,994 2,442 3,675 1,746 2,18855% 4,939 3,158 3,746 169 9 364 3,453 4,601 4,445 5,072 1,686 2,098 4,078 1,994 2,387 3,633 1,746 2,17960% 4,934 2,938 3,746 179 7 364 3,468 4,641 4,445 4,989 1,540 2,098 4,061 1,842 2,387 3,591 1,649 2,14265% 4,942 2,938 3,614 195 7 323 3,480 4,641 4,479 4,873 1,540 2,057 4,043 1,842 2,318 3,528 1,649 2,12970% 4,942 2,879 3,559 203 6 323 3,499 4,659 4,501 4,803 1,519 1,963 4,031 1,807 2,264 3,478 1,643 2,08175% 4,963 2,716 3,559 236 4 323 3,486 4,684 4,501 4,703 1,405 1,963 4,024 1,688 2,264 3,412 1,551 2,08180% 4,991 2,700 3,559 268 4 323 3,465 4,682 4,501 4,598 1,393 1,963 4,014 1,681 2,264 3,360 1,537 2,08185% 5,006 2,700 3,559 283 4 323 3,453 4,682 4,501 4,545 1,393 1,963 4,005 1,681 2,264 3,339 1,490 2,08190% 5,039 2,548 3,427 306 4 282 3,419 4,678 4,535 4,429 1,348 1,922 3,945 1,585 2,196 3,298 1,473 2,06895% 5,056 2,244 3,239 307 3 240 3,412 4,682 4,590 4,306 1,197 1,787 3,873 1,389 2,073 3,263 1,346 2,006
Chinook Rearing Coho Rearing Rainbow RearingChinook Spawning Cutthroat RearingSteelhead Rearing
Page 29
Table 37. August Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,608 4,148 4,217 254 142 1,154 2,122 3,881 3,792 6,340 2,602 2,730 4,432 2,524 2,643 4,582 2,560 2,643
10% 5,516 4,063 4,166 245 105 1,080 2,510 3,970 3,851 6,293 2,462 2,641 4,409 2,415 2,567 4,579 2,470 2,58515% 5,150 3,948 4,063 217 86 932 2,903 3,992 3,970 5,992 2,362 2,462 4,017 2,333 2,415 4,386 2,397 2,47020% 4,797 3,832 3,948 197 68 850 3,024 4,014 3,992 5,502 2,263 2,362 3,782 2,252 2,333 3,969 2,324 2,39725% 4,658 3,717 3,899 181 50 836 3,050 4,036 4,005 5,307 2,163 2,317 3,709 2,171 2,292 3,776 2,251 2,37030% 4,566 3,602 3,832 163 32 769 3,075 4,058 4,014 5,133 2,063 2,263 3,662 2,090 2,252 3,611 2,178 2,32435% 4,463 3,553 3,832 142 32 769 3,086 4,071 4,014 4,975 2,018 2,263 3,633 2,048 2,252 3,449 2,151 2,32440% 4,426 3,293 3,717 125 12 687 3,094 4,130 4,036 4,872 1,847 2,163 3,629 1,908 2,171 3,375 2,003 2,25145% 4,436 3,099 3,602 119 9 605 3,097 4,179 4,058 4,822 1,731 2,063 3,634 1,808 2,090 3,369 1,901 2,17850% 4,448 2,905 3,602 122 7 605 3,092 4,229 4,058 4,777 1,615 2,063 3,640 1,707 2,090 3,371 1,800 2,17855% 4,458 2,905 3,487 135 7 523 3,077 4,229 4,080 4,744 1,615 1,964 3,647 1,707 2,009 3,378 1,800 2,10560% 4,493 2,711 3,487 146 4 523 3,064 4,278 4,080 4,727 1,499 1,964 3,652 1,607 2,009 3,390 1,698 2,10565% 4,561 2,711 3,293 164 4 463 3,036 4,278 4,130 4,682 1,499 1,847 3,670 1,607 1,908 3,397 1,698 2,00370% 4,592 2,624 3,293 172 4 463 3,024 4,305 4,130 4,659 1,442 1,847 3,680 1,556 1,908 3,396 1,657 2,00375% 4,652 2,517 3,293 216 1 463 2,974 4,328 4,130 4,598 1,383 1,847 3,700 1,506 1,908 3,384 1,597 2,00380% 4,704 2,517 3,293 257 1 463 2,937 4,328 4,130 4,505 1,383 1,847 3,707 1,506 1,908 3,361 1,597 2,00385% 4,729 2,517 3,293 277 1 463 2,920 4,328 4,130 4,454 1,383 1,847 3,709 1,506 1,908 3,347 1,597 2,00390% 4,791 2,293 3,099 311 0 403 2,862 4,321 4,179 4,320 1,258 1,731 3,653 1,365 1,808 3,312 1,469 1,90195% 4,834 2,057 2,905 320 0 343 2,841 4,283 4,229 4,172 1,126 1,615 3,579 1,217 1,707 3,268 1,328 1,800
Chinook Rearing Steelhead RearingCoho RearingChinook Spawning Cutthroat Rearing Rainbow Rearing
Page 30
Table 38. August Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 77 68 69 4 0 0 25 69 68 1,107 399 415 56 52 54 5,242 3,015 3,076
10% 81 67 68 5 0 0 27 69 69 1,090 382 399 60 51 52 5,269 2,954 3,01515% 85 64 67 4 0 0 32 70 69 1,052 361 382 64 49 51 5,201 2,861 2,95420% 88 62 67 4 0 0 40 71 69 988 339 382 69 46 51 4,992 2,768 2,95425% 88 59 64 4 0 0 43 72 70 946 318 361 71 44 49 4,824 2,675 2,86130% 88 59 64 4 0 0 47 72 70 908 318 361 72 44 49 4,679 2,675 2,86135% 87 59 64 3 0 0 51 72 70 871 318 361 72 44 49 4,551 2,675 2,86140% 86 55 62 3 0 0 54 74 71 836 275 339 72 39 46 4,438 2,489 2,76845% 85 51 62 3 0 0 56 74 71 816 253 339 71 36 46 4,374 2,347 2,76850% 84 51 59 3 0 0 58 74 72 787 253 318 70 36 44 4,257 2,347 2,67555% 82 51 59 3 0 0 59 74 72 769 253 318 69 36 44 4,182 2,347 2,67560% 81 47 59 3 0 0 60 75 72 752 229 318 68 32 44 4,103 2,186 2,67565% 79 47 59 4 0 0 61 75 72 729 229 318 67 32 44 3,990 2,186 2,67570% 78 47 57 4 0 0 62 75 73 715 229 297 66 32 42 3,918 2,186 2,58275% 78 43 57 4 0 0 63 75 73 697 207 297 65 29 42 3,837 2,024 2,58280% 77 43 57 4 0 0 63 75 73 680 205 297 64 28 42 3,777 1,996 2,58285% 77 43 57 4 0 0 63 75 73 672 205 297 64 28 42 3,753 1,996 2,58290% 77 43 57 4 0 0 64 75 73 657 205 297 63 28 42 3,710 1,996 2,58295% 76 36 55 4 0 0 64 76 74 641 181 275 62 24 39 3,675 1,786 2,489
Chinook Spawning Coho RearingChinook Rearing Rainbow RearingCutthroat RearingSteelhead Rearing
Page 31
Table 39. August Lake Creek Habitat Duration Analysis Table 40. August Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 3,947 1,304 1,445 5% 5,478 1,171 1,534
10% 3,739 1,304 1,445 10% 5,276 1,171 1,53415% 3,509 1,163 1,445 15% 4,949 1,171 1,53420% 3,322 1,163 1,445 20% 4,644 1,171 1,53425% 3,221 1,163 1,445 25% 4,489 1,171 1,53430% 2,813 1,163 1,445 30% 4,300 1,171 1,53435% 2,566 1,163 1,445 35% 4,109 968 1,53440% 2,565 1,023 1,445 40% 4,036 968 1,53445% 2,563 855 1,445 45% 3,989 776 1,53450% 2,570 855 1,445 50% 3,892 776 1,53455% 2,577 855 1,445 55% 3,832 776 1,53460% 2,588 855 1,304 60% 3,769 776 1,53465% 2,600 855 1,304 65% 3,679 776 1,53470% 2,571 855 1,304 70% 3,626 776 1,53475% 2,518 855 1,304 75% 3,527 776 1,53480% 2,479 855 1,304 80% 3,453 776 1,53485% 2,459 674 1,304 85% 3,432 776 1,53490% 2,420 674 1,304 90% 3,386 776 1,53495% 2,393 674 1,304 95% 3,346 776 1,534
Rainbow RearingRainbow Rearing
Page 32
Table 41. September Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,405 4,410 4,479 239 108 798 2,869 4,207 4,149 6,521 2,694 2,799 4,206 2,957 3,037 4,505 2,347 2,457
10% 5,111 3,959 4,171 187 43 588 3,237 4,394 4,342 5,702 2,263 2,428 4,147 2,551 2,716 3,901 2,139 2,31315% 5,006 3,825 4,093 161 30 533 3,358 4,430 4,357 5,410 2,134 2,392 4,126 2,442 2,660 3,780 2,082 2,30420% 4,952 3,792 3,959 161 29 476 3,444 4,440 4,394 5,132 2,118 2,263 4,088 2,414 2,551 3,660 2,078 2,24625% 4,928 3,691 3,959 173 17 476 3,467 4,467 4,394 5,018 2,005 2,263 4,067 2,333 2,551 3,604 2,024 2,24630% 4,921 3,559 3,959 186 15 476 3,485 4,501 4,394 4,910 1,963 2,263 4,040 2,264 2,551 3,542 1,956 2,24635% 4,938 3,371 3,880 199 12 421 3,494 4,556 4,409 4,828 1,828 2,227 4,034 2,142 2,496 3,488 1,894 2,23740% 4,945 3,158 3,825 220 9 420 3,501 4,601 4,430 4,733 1,686 2,134 4,021 1,994 2,442 3,423 1,746 2,18845% 4,977 3,158 3,746 253 9 364 3,474 4,601 4,445 4,652 1,686 2,098 4,021 1,994 2,387 3,381 1,746 2,14250% 4,984 2,938 3,746 261 7 364 3,470 4,641 4,445 4,624 1,540 2,098 4,018 1,842 2,387 3,367 1,649 2,14255% 5,006 2,938 3,746 283 7 364 3,453 4,641 4,445 4,545 1,540 2,098 4,005 1,842 2,387 3,335 1,649 2,14260% 5,025 2,806 3,559 297 5 323 3,432 4,675 4,501 4,465 1,498 1,963 3,967 1,773 2,264 3,308 1,636 2,08165% 5,035 2,806 3,559 304 5 323 3,421 4,675 4,501 4,412 1,498 1,963 3,939 1,773 2,264 3,289 1,636 2,08170% 5,039 2,700 3,559 305 4 323 3,419 4,682 4,501 4,382 1,393 1,963 3,920 1,681 2,264 3,279 1,537 2,08175% 5,056 2,635 3,427 307 4 282 3,412 4,682 4,535 4,306 1,371 1,922 3,873 1,623 2,196 3,260 1,530 2,06880% 5,056 2,548 3,427 307 4 282 3,412 4,678 4,535 4,306 1,348 1,922 3,873 1,585 2,196 3,260 1,473 2,06885% 5,068 2,548 3,381 298 4 281 3,430 4,678 4,555 4,183 1,348 1,840 3,825 1,585 2,149 3,231 1,473 2,02990% 5,088 2,244 3,239 285 3 240 3,448 4,682 4,590 4,072 1,197 1,787 3,784 1,389 2,073 3,208 1,346 2,00695% 5,080 2,244 3,239 275 3 240 3,483 4,682 4,590 3,976 1,197 1,787 3,741 1,389 2,073 3,187 1,346 2,006
Chinook Rearing Coho Rearing Rainbow RearingChinook Spawning Cutthroat RearingSteelhead Rearing
Page 33
Table 42. September Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 4,975 4,166 4,217 210 143 1,154 2,975 3,851 3,792 5,766 2,641 2,730 3,900 2,567 2,643 4,202 2,585 2,643
10% 4,526 3,717 3,948 155 50 850 3,082 4,036 3,992 5,070 2,163 2,362 3,646 2,171 2,333 3,545 2,251 2,39715% 4,426 3,602 3,832 125 32 769 3,094 4,058 4,014 4,872 2,063 2,263 3,629 2,090 2,252 3,375 2,178 2,32420% 4,450 3,553 3,717 125 32 687 3,088 4,071 4,036 4,769 2,018 2,163 3,642 2,048 2,171 3,373 2,151 2,25125% 4,470 3,487 3,717 139 14 687 3,072 4,080 4,036 4,738 1,964 2,163 3,649 2,009 2,171 3,382 2,105 2,25130% 4,516 3,293 3,717 153 12 687 3,055 4,130 4,036 4,715 1,847 2,163 3,655 1,908 2,171 3,398 2,003 2,25135% 4,577 3,099 3,602 168 9 605 3,030 4,179 4,058 4,670 1,731 2,063 3,675 1,808 2,090 3,397 1,901 2,17840% 4,622 2,905 3,602 194 7 605 2,999 4,229 4,058 4,628 1,615 2,063 3,690 1,707 2,090 3,390 1,800 2,17845% 4,679 2,905 3,487 237 7 523 2,953 4,229 4,080 4,557 1,615 1,964 3,706 1,707 2,009 3,374 1,800 2,10550% 4,692 2,711 3,487 247 4 523 2,945 4,278 4,080 4,531 1,499 1,964 3,706 1,607 2,009 3,367 1,698 2,10555% 4,729 2,711 3,487 277 4 523 2,920 4,278 4,080 4,454 1,499 1,964 3,709 1,607 2,009 3,347 1,698 2,10560% 4,766 2,517 3,293 297 1 463 2,885 4,328 4,130 4,374 1,383 1,847 3,676 1,506 1,908 3,326 1,597 2,00365% 4,791 2,517 3,293 311 1 463 2,862 4,328 4,130 4,320 1,383 1,847 3,653 1,506 1,908 3,312 1,597 2,00370% 4,801 2,517 3,293 313 1 463 2,857 4,328 4,130 4,283 1,383 1,847 3,635 1,506 1,908 3,301 1,597 2,00375% 4,834 2,421 3,099 320 1 403 2,841 4,327 4,179 4,172 1,321 1,731 3,579 1,421 1,808 3,268 1,543 1,90180% 4,834 2,293 3,099 320 0 403 2,841 4,321 4,179 4,172 1,258 1,731 3,579 1,365 1,808 3,268 1,469 1,90185% 4,857 2,293 3,099 314 0 403 2,859 4,321 4,179 4,040 1,258 1,731 3,523 1,365 1,808 3,224 1,469 1,90190% 4,875 2,057 2,905 302 0 343 2,893 4,283 4,229 3,897 1,126 1,615 3,466 1,217 1,707 3,174 1,328 1,80095% 4,849 2,057 2,905 295 0 343 2,953 4,283 4,229 3,787 1,126 1,615 3,407 1,217 1,707 3,134 1,328 1,800
Chinook Rearing Steelhead RearingCoho Rearing Rainbow RearingChinook Spawning Cutthroat Rearing
Page 34
Table 43. September Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 87 68 69 4 0 0 36 69 68 1,016 399 415 67 52 54 5,089 3,015 3,076
10% 88 62 64 4 0 0 49 71 70 886 339 361 72 46 49 4,599 2,768 2,86115% 86 59 64 3 0 0 54 72 70 836 318 361 72 44 49 4,438 2,675 2,86120% 83 59 62 3 0 0 58 72 71 781 318 339 70 44 46 4,232 2,675 2,76825% 82 57 62 3 0 0 59 73 71 757 297 339 68 42 46 4,132 2,582 2,76830% 80 57 62 4 0 0 61 73 71 734 297 339 67 42 46 4,019 2,582 2,76835% 79 55 62 4 0 0 62 74 71 719 275 339 66 39 46 3,942 2,489 2,76840% 78 51 59 4 0 0 63 74 72 701 253 318 65 36 44 3,853 2,347 2,67545% 77 51 59 4 0 0 63 74 72 688 253 318 65 36 44 3,805 2,347 2,67550% 77 47 59 4 0 0 63 75 72 684 229 318 65 32 44 3,789 2,186 2,67555% 77 47 59 4 0 0 63 75 72 672 229 318 64 32 44 3,753 2,186 2,67560% 77 47 57 4 0 0 63 75 73 661 229 297 63 32 42 3,720 2,186 2,58265% 77 47 57 4 0 0 64 75 73 653 229 297 63 32 42 3,701 2,186 2,58270% 77 43 57 4 0 0 64 75 73 649 205 297 62 28 42 3,691 1,996 2,58275% 76 43 57 4 0 0 64 75 73 641 205 297 62 28 42 3,675 1,996 2,58280% 76 43 57 4 0 0 64 75 73 641 205 297 62 28 42 3,675 1,996 2,58285% 76 43 55 4 0 0 64 75 74 624 205 278 62 28 40 3,653 1,996 2,50790% 77 36 55 3 0 0 64 76 74 610 181 275 62 24 39 3,635 1,786 2,48995% 77 36 55 3 0 0 64 76 74 597 181 275 61 24 39 3,620 1,786 2,489
Coho RearingChinook Rearing Rainbow RearingCutthroat RearingChinook Spawning Steelhead Rearing
Page 35
Table 44. September Lake Creek Habitat Duration Analysis Table 45. September Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 3,386 1,304 1,445 5% 4,736 1,171 1,534
10% 2,566 1,163 1,445 10% 4,185 1,171 1,53415% 2,564 1,163 1,445 15% 4,025 1,171 1,53420% 2,575 1,163 1,445 20% 3,852 1,171 1,53425% 2,585 1,163 1,445 25% 3,769 1,171 1,53430% 2,597 1,023 1,445 30% 3,679 968 1,53435% 2,571 1,023 1,445 35% 3,599 968 1,53440% 2,528 855 1,445 40% 3,527 776 1,53445% 2,488 855 1,304 45% 3,471 776 1,53450% 2,479 855 1,304 50% 3,453 776 1,53455% 2,449 855 1,304 55% 3,421 776 1,53460% 2,428 855 1,304 60% 3,400 776 1,53465% 2,411 855 1,304 65% 3,373 776 1,53470% 2,402 855 1,304 70% 3,359 776 1,53475% 2,384 855 1,304 75% 3,332 776 1,53480% 2,384 674 1,304 80% 3,332 776 1,53485% 2,354 674 1,304 85% 3,297 776 1,53490% 2,333 674 1,304 90% 3,274 776 1,53495% 2,314 674 1,304 95% 3,246 776 1,534
Rainbow RearingRainbow Rearing
Page 36
Table 46. October Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,659 5,050 4,974 1,915 3,417 3,608 233 197 1,742 7,125 4,170 3,472 4,242 3,885 3,582 4,850 3,148 2,584
10% 5,576 4,674 4,514 2,612 3,960 4,108 365 210 1,491 6,879 3,054 2,832 4,267 3,263 3,089 4,669 2,526 2,33915% 5,251 4,171 4,038 3,060 4,342 4,379 268 178 1,267 6,099 2,428 2,299 4,178 2,716 2,607 4,262 2,243 2,09420% 5,014 3,913 3,770 3,324 4,414 4,452 188 161 1,178 5,482 2,181 2,041 4,129 2,504 2,388 3,806 2,100 1,97825% 4,967 3,736 3,691 3,434 4,461 4,467 175 150 1,136 5,189 2,025 2,005 4,098 2,360 2,333 3,686 1,975 1,96930% 4,930 3,504 3,691 3,461 4,522 4,467 172 133 1,136 5,046 1,870 2,005 4,072 2,210 2,333 3,616 1,889 1,96935% 4,928 3,298 3,504 3,498 4,572 4,522 168 123 1,074 4,832 1,740 1,870 4,030 2,071 2,210 3,488 1,771 1,90740% 4,945 3,158 3,298 3,504 4,601 4,572 169 114 1,014 4,734 1,686 1,740 4,023 1,994 2,071 3,423 1,746 1,83245% 4,969 3,158 3,290 3,480 4,601 4,567 171 114 1,013 4,661 1,686 1,728 4,020 1,994 2,063 3,384 1,746 1,82050% 4,999 2,938 3,158 3,459 4,641 4,601 176 103 955 4,571 1,540 1,686 4,009 1,842 1,994 3,346 1,649 1,76355% 5,029 2,938 3,026 3,430 4,641 4,635 181 103 896 4,481 1,540 1,644 3,973 1,842 1,926 3,313 1,649 1,75060% 5,039 2,716 2,938 3,419 4,684 4,641 187 91 894 4,382 1,405 1,540 3,920 1,688 1,842 3,279 1,551 1,66765% 5,049 2,700 2,938 3,415 4,682 4,641 190 91 894 4,319 1,393 1,540 3,885 1,681 1,842 3,261 1,537 1,66770% 5,065 2,548 2,806 3,419 4,678 4,675 195 84 835 4,236 1,348 1,498 3,842 1,585 1,773 3,242 1,520 1,65375% 5,076 2,548 2,700 3,435 4,678 4,682 200 84 832 4,135 1,348 1,393 3,811 1,585 1,681 3,220 1,473 1,55580% 5,084 2,244 2,548 3,465 4,682 4,678 205 75 765 4,024 1,197 1,348 3,762 1,389 1,585 3,198 1,346 1,53885% 5,080 2,244 2,548 3,483 4,682 4,678 208 75 765 3,976 1,197 1,348 3,741 1,389 1,585 3,187 1,346 1,53890% 5,061 2,244 2,548 3,542 4,682 4,678 215 75 765 3,835 1,197 1,348 3,671 1,389 1,585 3,154 1,346 1,53895% 4,934 2,244 3,698 4,682 224 692 3,630 1,197 3,538 1,389 3,106 1,411
Coho SpawningChinook Rearing Coho Rearing Rainbow RearingSteelhead Rearing Cutthroat Rearing
Page 37
Table 47. October Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,809 4,812 4,766 2,024 2,852 3,097 308 142 2,413 6,434 4,246 3,558 4,432 3,616 3,276 4,723 3,290 3,047
10% 5,322 4,403 4,268 2,828 3,568 3,733 471 178 2,068 6,146 3,031 2,820 4,147 2,891 2,719 4,520 2,814 2,70115% 4,707 3,948 3,832 3,046 3,992 4,014 309 156 1,757 5,360 2,362 2,263 3,729 2,333 2,252 3,838 2,397 2,32420% 4,421 3,717 3,602 3,089 4,036 4,058 184 138 1,636 4,911 2,163 2,063 3,625 2,171 2,090 3,385 2,251 2,17825% 4,445 3,553 3,487 3,095 4,071 4,080 163 128 1,575 4,785 2,018 1,964 3,639 2,048 2,009 3,369 2,151 2,10530% 4,458 3,293 3,487 3,077 4,130 4,080 155 108 1,575 4,744 1,847 1,964 3,647 1,908 2,009 3,378 2,003 2,10535% 4,561 3,099 3,293 3,036 4,179 4,130 143 96 1,489 4,682 1,731 1,847 3,670 1,808 1,908 3,397 1,901 2,00340% 4,622 2,905 3,099 2,999 4,229 4,179 139 83 1,403 4,628 1,615 1,731 3,690 1,707 1,808 3,390 1,800 1,90145% 4,666 2,905 3,099 2,962 4,229 4,179 137 83 1,403 4,582 1,615 1,731 3,705 1,707 1,808 3,381 1,800 1,90150% 4,717 2,711 2,905 2,928 4,278 4,229 139 70 1,317 4,480 1,499 1,615 3,708 1,607 1,707 3,354 1,698 1,80055% 4,766 2,711 2,711 2,885 4,278 4,278 140 70 1,231 4,374 1,499 1,499 3,676 1,607 1,607 3,326 1,698 1,69860% 4,801 2,517 2,711 2,857 4,328 4,278 141 57 1,231 4,283 1,383 1,499 3,635 1,506 1,607 3,301 1,597 1,69865% 4,823 2,517 2,711 2,846 4,328 4,278 143 57 1,231 4,209 1,383 1,499 3,598 1,506 1,607 3,279 1,597 1,69870% 4,851 2,293 2,517 2,847 4,321 4,328 146 47 1,145 4,087 1,258 1,383 3,542 1,365 1,506 3,241 1,469 1,59775% 4,863 2,293 2,517 2,870 4,321 4,328 149 47 1,145 3,992 1,258 1,383 3,504 1,365 1,506 3,207 1,469 1,59780% 4,862 2,057 2,293 2,923 4,283 4,321 154 38 1,046 3,842 1,126 1,258 3,436 1,217 1,365 3,154 1,328 1,46985% 4,849 2,057 2,293 2,953 4,283 4,321 157 38 1,046 3,787 1,126 1,258 3,407 1,217 1,365 3,134 1,328 1,46990% 4,811 2,057 2,293 3,042 4,283 4,321 165 38 1,046 3,622 1,126 1,258 3,318 1,217 1,365 3,073 1,328 1,46995% 4,632 2,057 3,262 4,283 178 943 3,366 1,126 3,151 1,217 2,971 1,328
Steelhead RearingCoho RearingChinook Rearing Coho Spawning Rainbow RearingCutthroat Rearing
Page 38
Table 48. October Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 74 77 75 23 64 65 1 4 4 1,099 604 501 53 62 58 5,141 3,628 3,392
10% 84 72 69 30 66 68 2 4 4 1,067 449 415 62 56 54 5,241 3,199 3,07615% 88 64 62 43 70 71 2 3 3 953 361 339 71 49 46 4,854 2,861 2,76820% 87 60 57 53 72 73 3 3 3 849 321 297 72 44 42 4,480 2,693 2,58225% 84 57 57 57 73 73 3 3 3 793 297 297 70 42 42 4,280 2,582 2,58230% 82 55 57 59 74 73 3 3 3 763 275 297 69 39 42 4,157 2,489 2,58235% 79 51 55 62 75 74 3 2 3 719 255 275 66 36 39 3,942 2,370 2,48940% 78 51 51 63 74 75 3 2 2 701 253 255 65 36 36 3,852 2,347 2,37045% 77 51 51 63 74 74 3 2 2 688 253 253 65 36 36 3,805 2,347 2,34750% 77 47 51 63 75 74 4 2 2 676 229 253 64 32 36 3,765 2,186 2,34755% 77 47 51 63 75 74 4 2 2 665 229 253 64 32 36 3,729 2,186 2,34760% 77 43 47 64 75 75 4 2 2 649 207 229 62 29 32 3,691 2,024 2,18665% 76 43 47 64 75 75 4 2 2 641 205 229 62 28 32 3,675 1,996 2,18670% 76 43 47 64 75 75 4 2 2 632 205 229 62 28 32 3,663 1,996 2,18675% 76 43 43 64 75 75 4 2 2 617 205 205 62 28 28 3,643 1,996 1,99680% 77 36 43 64 76 75 4 2 2 604 181 205 62 24 28 3,628 1,786 1,99685% 77 36 43 64 76 75 4 2 2 597 181 205 61 24 28 3,620 1,786 1,99690% 77 36 43 64 76 75 4 2 2 579 181 205 61 24 28 3,593 1,786 1,99695% 77 36 64 76 4 2 553 181 60 24 3,547 1,786
Coho SpawningCoho Rearing Rainbow RearingCutthroat RearingSteelhead Rearing
Chinook Rearing
Page 39
Table 49. October Lake Creek Habitat Duration Analysis Table 50. October Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,053 2,236 1,304 5% 5,572 2,774 968
10% 3,496 1,445 1,163 10% 4,905 1,353 96815% 3,202 1,304 1,023 15% 4,458 1,171 96820% 2,565 1,163 1,023 20% 4,048 1,171 96825% 2,572 1,023 1,023 25% 3,872 968 96830% 2,585 1,023 1,023 30% 3,769 776 96835% 2,571 855 1,023 35% 3,599 776 96840% 2,528 855 1,023 40% 3,527 776 96845% 2,498 855 1,023 45% 3,471 776 96850% 2,459 855 855 50% 3,432 776 96855% 2,428 855 855 55% 3,400 776 96860% 2,402 855 855 60% 3,359 776 96865% 2,384 855 855 65% 3,332 776 96870% 2,364 855 855 70% 3,309 776 96875% 2,343 674 855 75% 3,285 776 96880% 2,324 674 855 80% 3,260 776 96885% 2,314 674 855 85% 3,246 776 96890% 2,286 674 855 90% 3,204 776 96895% 2,271 855 95% 3,128 968
Rainbow RearingRainbow Rearing
Page 40
Table 51. November Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,321 5,058 4,949 1,854 3,412 3,489 49 232 1,812 32 29 266 2,869 5,602 6,259
10% 5,649 5,053 5,063 1,901 3,413 3,413 161 196 1,853 31 21 339 3,463 6,448 6,51115% 5,677 5,089 5,082 1,940 3,413 3,436 262 200 1,832 34 16 379 3,843 6,638 6,71120% 5,660 5,053 5,035 2,264 3,498 3,522 358 209 1,787 32 17 424 4,168 6,841 6,91225% 5,563 4,944 4,907 2,712 3,646 3,688 360 214 1,704 29 19 485 4,571 7,036 7,14730% 5,341 4,690 4,690 2,993 3,935 3,935 301 211 1,582 28 23 544 5,060 7,436 7,43635% 5,154 4,480 4,514 3,213 4,126 4,108 235 199 1,491 29 24 569 5,401 7,718 7,62740% 5,022 4,340 4,375 3,338 4,265 4,225 194 189 1,420 29 32 577 5,663 7,836 7,81145% 4,975 4,250 4,250 3,420 4,327 4,327 181 184 1,353 28 35 588 5,778 7,963 7,98750% 4,962 4,116 4,250 3,434 4,364 4,327 178 175 1,353 28 40 588 5,782 8,092 7,98755% 4,911 4,038 4,116 3,477 4,379 4,364 173 169 1,308 28 44 605 5,793 8,106 8,11660% 4,918 3,770 3,904 3,503 4,452 4,415 169 151 1,222 27 53 639 5,766 8,404 8,25965% 4,943 3,691 3,770 3,503 4,467 4,452 170 145 1,178 25 58 656 5,739 8,418 8,38770% 4,990 3,636 3,691 3,465 4,489 4,467 176 142 1,136 24 57 673 5,692 8,532 8,40275% 5,017 3,504 3,691 3,440 4,522 4,467 182 133 1,136 24 62 673 5,664 8,551 8,40280% 5,049 3,158 3,371 3,415 4,601 4,556 190 114 1,016 23 69 669 5,674 8,700 8,55385% 5,067 3,011 3,158 3,430 4,625 4,601 198 110 955 22 69 667 5,708 8,843 8,68490% 5,085 2,938 3,158 3,480 4,641 4,601 209 103 955 22 73 667 5,803 8,853 8,72595% 4,894 2,548 2,806 3,739 4,678 4,675 226 84 835 19 69 663 6,129 9,020 8,896
Winter RearingCutthroat SpawningCoho SpawningChinook Rearing Coho Rearing
Page 41
Table 52. November Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,949 4,566 4,678 2,078 3,075 2,950 27 246 2,515 0 23 365 2,805 6,090 5,760
10% 5,920 4,800 4,812 2,040 2,852 2,852 206 138 2,567 0 8 478 3,665 6,013 6,09315% 5,761 4,859 4,863 2,028 2,842 2,870 345 143 2,538 5 7 538 3,994 6,320 6,41620% 5,540 4,849 4,836 2,398 2,953 2,982 471 157 2,473 15 7 604 4,623 6,698 6,77825% 5,252 4,722 4,677 2,857 3,152 3,207 458 171 2,359 21 9 693 5,257 7,125 7,21930% 4,843 4,427 4,427 3,012 3,531 3,531 359 180 2,191 22 16 781 5,834 7,631 7,63135% 4,586 4,268 4,268 3,071 3,733 3,733 255 176 2,068 23 25 822 6,082 7,880 7,88040% 4,442 4,114 4,166 3,088 3,911 3,851 193 167 1,973 23 40 839 6,095 8,177 8,07845% 4,432 4,063 4,063 3,097 3,970 3,970 171 164 1,879 22 45 856 6,012 8,275 8,27550% 4,439 3,948 4,063 3,096 3,992 3,970 167 156 1,879 21 52 856 5,992 8,385 8,27555% 4,458 3,832 3,948 3,077 4,014 3,992 155 147 1,818 19 59 881 5,918 8,495 8,38560% 4,546 3,602 3,717 3,043 4,058 4,036 144 130 1,697 16 73 932 5,826 8,714 8,60465% 4,622 3,487 3,602 2,999 4,080 4,058 139 121 1,636 13 81 958 5,786 8,823 8,71470% 4,704 3,487 3,487 2,937 4,080 4,080 139 121 1,575 10 81 983 5,817 8,823 8,82375% 4,754 3,293 3,487 2,897 4,130 4,080 140 108 1,575 9 87 983 5,909 8,967 8,82380% 4,823 2,905 3,099 2,846 4,229 4,179 143 83 1,403 8 99 978 6,140 9,254 9,11085% 4,857 2,818 2,905 2,859 4,255 4,229 147 81 1,317 7 99 975 6,355 9,317 9,25490% 4,849 2,711 2,905 2,953 4,278 4,229 157 70 1,317 7 105 975 6,698 9,397 9,25495% 4,588 2,293 2,517 3,317 4,321 4,328 181 47 1,145 10 100 970 7,406 9,649 9,540
Cutthroat SpawningCoho RearingChinook Rearing Coho Spawning Winter Rearing
Page 42
Table 53. November Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 55 84 76 19 57 64 1 3 4 1 1 1 1,887 6,050 6,533
10% 70 77 77 22 64 64 1 4 4 1 1 1 2,477 6,804 6,85915% 76 77 77 24 64 64 1 4 4 1 1 1 2,813 7,018 7,08820% 82 76 75 27 64 65 2 4 4 1 1 1 3,039 7,238 7,30825% 86 75 74 33 65 65 2 4 4 1 1 1 3,635 7,537 7,65130% 88 72 72 41 66 66 2 4 4 1 1 1 4,478 8,031 8,03135% 88 68 69 49 69 68 3 3 4 1 0 0 5,318 8,489 8,33740% 86 67 67 53 69 69 3 3 3 1 0 0 5,796 8,642 8,64245% 85 64 64 57 70 70 3 3 3 1 0 0 6,040 8,862 8,86250% 84 62 64 57 71 70 3 3 3 1 0 0 6,060 9,082 8,86255% 81 62 62 60 71 71 3 3 3 1 0 0 6,110 9,082 9,08260% 79 57 59 62 73 72 3 3 3 1 0 0 6,151 9,523 9,30365% 78 57 57 63 73 73 3 3 3 1 0 0 6,214 9,523 9,52370% 77 55 57 63 74 73 4 3 3 1 0 0 6,275 9,743 9,52375% 77 55 57 63 74 73 4 3 3 1 0 0 6,323 9,743 9,52380% 76 51 55 64 74 74 4 2 3 1 0 0 6,403 9,959 9,74385% 76 47 51 64 75 74 4 2 2 1 0 0 6,499 10,217 9,95990% 77 47 51 64 75 74 4 2 2 1 0 0 6,711 10,217 9,95995% 77 43 47 64 75 75 4 2 2 1 0 0 7,098 10,490 10,217
Cutthroat SpawningCoho Spawning Winter RearingCoho RearingChinook Rearing
Page 43
Table 54. November Lake Creek Habitat Duration Analysis Table 55. November Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 4,027 3,454 5,272 5% 5,186 8,344 8,108
10% 4,168 5,272 5,425 10% 6,676 8,267 8,10815% 4,620 5,425 5,576 15% 7,176 8,267 8,10820% 4,859 5,576 5,728 20% 7,860 8,267 8,10825% 4,752 5,576 5,728 25% 8,283 8,108 8,10830% 4,565 5,875 5,875 30% 8,556 8,108 8,10835% 3,992 6,017 5,875 35% 8,777 7,845 8,10840% 3,954 6,017 5,875 40% 9,019 7,845 8,10845% 3,958 6,017 6,017 45% 8,998 7,845 8,10850% 3,950 6,017 6,017 50% 8,982 7,845 8,10855% 3,975 6,017 6,017 55% 8,853 7,845 8,10860% 3,913 6,174 6,017 60% 8,637 7,845 8,10865% 3,736 6,174 6,017 65% 8,544 7,845 8,10870% 3,454 6,174 6,017 70% 8,440 7,845 8,10875% 3,229 6,174 6,017 75% 8,363 7,845 8,10880% 3,023 6,174 6,017 80% 8,273 7,845 8,10885% 2,885 6,174 6,017 85% 8,196 7,845 8,10890% 2,722 6,174 6,174 90% 7,999 7,845 8,10895% 2,949 6,144 6,174 95% 7,728 7,845 8,108
Winter RearingWinter Rearing
Page 44
Table 56. December Lake Creek Habitat Duration AnalysisAll Study Sites
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,117 5,770 5,221 1,773 2,062 3,392 45 309 1,626 26 26 100 2,659 3,970 5,732
10% 5,587 4,819 4,817 1,920 3,567 3,565 61 190 1,688 31 31 161 3,031 6,020 6,07015% 5,674 4,890 4,898 1,903 3,536 3,530 145 188 1,774 31 27 227 3,492 6,111 6,21720% 5,697 4,971 4,984 1,937 3,475 3,467 246 191 1,830 33 25 289 3,882 6,251 6,30925% 5,669 5,045 5,047 2,144 3,419 3,420 342 197 1,855 32 22 327 4,134 6,405 6,47330% 5,683 5,086 5,088 2,459 3,400 3,404 376 200 1,850 29 18 357 4,287 6,551 6,62035% 5,556 5,077 5,087 2,775 3,447 3,431 358 204 1,832 28 17 378 4,737 6,731 6,72040% 5,397 5,037 5,053 2,991 3,505 3,498 316 206 1,798 28 17 414 4,951 6,882 6,86545% 5,292 5,020 5,035 3,119 3,546 3,522 287 210 1,787 28 18 424 5,238 6,957 6,91250% 5,174 4,938 4,974 3,242 3,650 3,608 248 212 1,742 29 19 458 5,487 7,148 7,06355% 5,065 4,834 4,870 3,335 3,771 3,730 212 215 1,683 29 21 499 5,664 7,303 7,21860% 4,979 4,726 4,797 3,409 3,886 3,820 186 211 1,637 29 21 524 5,769 7,402 7,33765% 4,942 4,619 4,656 3,451 4,002 3,953 181 207 1,579 29 22 542 5,785 7,537 7,51570% 4,907 4,480 4,549 3,482 4,126 4,068 175 199 1,523 28 24 563 5,773 7,718 7,61475% 4,896 4,375 4,445 3,505 4,225 4,167 171 191 1,456 28 29 573 5,739 7,823 7,71980% 4,933 4,126 4,250 3,511 4,363 4,327 170 176 1,353 26 40 588 5,692 8,070 7,98785% 5,004 3,825 3,904 3,454 4,445 4,415 181 157 1,222 24 48 639 5,649 8,374 8,25990% 5,047 3,636 3,770 3,418 4,489 4,452 193 142 1,178 23 57 656 5,655 8,532 8,38795% 5,078 3,445 3,632 3,424 4,540 4,485 197 132 1,128 22 62 672 5,699 8,559 8,410
Cutthroat Spawning Winter RearingChinook Rearing Coho SpawningCoho Rearing
Page 45
Table 57. December Lake Creek Habitat Duration AnalysisStudy Site 1
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 5,856 5,648 4,858 2,026 2,071 2,999 15 394 2,289 0 9 126 2,577 4,110 5,776
10% 6,108 4,455 4,455 2,110 3,087 3,080 57 157 2,352 0 20 211 2,986 5,927 5,92915% 5,963 4,590 4,604 2,045 3,024 3,011 181 139 2,464 0 14 307 3,523 5,781 5,77720% 5,791 4,703 4,715 2,023 2,933 2,925 322 136 2,539 4 10 398 3,940 5,791 5,80725% 5,575 4,789 4,791 2,234 2,861 2,862 449 138 2,570 12 9 459 4,448 5,973 6,00030% 5,489 4,843 4,845 2,628 2,831 2,836 488 141 2,563 18 7 506 4,860 6,199 6,23235% 5,206 4,869 4,871 2,858 2,882 2,865 451 150 2,537 21 7 537 5,270 6,477 6,44340% 4,923 4,840 4,849 2,990 2,958 2,953 381 153 2,489 22 7 589 5,715 6,734 6,69845% 4,774 4,824 4,836 3,030 3,012 2,982 334 162 2,473 22 8 604 5,925 6,858 6,77850% 4,626 4,722 4,766 3,064 3,152 3,097 273 171 2,413 23 9 654 6,064 7,125 7,03155% 4,505 4,588 4,632 3,083 3,317 3,262 219 181 2,332 23 10 713 6,105 7,406 7,31260% 4,424 4,481 4,534 3,093 3,460 3,388 180 180 2,267 22 14 748 6,064 7,556 7,48165% 4,436 4,373 4,427 3,097 3,602 3,531 169 179 2,191 21 18 781 6,002 7,706 7,63170% 4,453 4,268 4,320 3,084 3,733 3,673 158 176 2,115 20 25 814 5,939 7,880 7,78175% 4,504 4,166 4,217 3,059 3,851 3,792 149 170 2,020 18 35 830 5,860 8,078 7,97980% 4,607 3,948 4,063 3,012 3,992 3,970 140 156 1,879 14 52 856 5,792 8,385 8,27585% 4,729 3,668 3,717 2,920 4,049 4,036 139 137 1,697 10 66 932 5,848 8,656 8,60490% 4,823 3,487 3,602 2,846 4,080 4,058 143 121 1,636 8 81 958 6,140 8,823 8,71495% 4,865 3,206 3,400 2,854 4,156 4,106 144 107 1,563 7 87 982 6,382 9,030 8,887
Cutthroat SpawningChinook Rearing Coho SpawningCoho Rearing Winter Rearing
Page 46
Table 58. December Lake Creek Habitat Duration AnalysisStudy Site 2
%Exceed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed Reference Existing Proposed5% 49 83 83 17 28 58 2 2 3 1 1 1 1,860 3,091 6,084
10% 62 77 77 21 63 63 1 4 4 1 1 1 2,103 6,286 6,31515% 70 76 76 22 64 64 1 4 4 1 1 1 2,463 6,403 6,44820% 76 76 77 24 64 64 1 4 4 1 1 1 2,813 6,576 6,61825% 81 77 77 27 64 64 2 4 4 1 1 1 3,018 6,760 6,81030% 84 77 77 29 64 64 2 4 4 1 1 1 3,182 6,909 6,95835% 87 76 77 36 64 64 2 4 4 1 1 1 3,931 7,158 7,09840% 88 75 76 41 65 64 2 4 4 1 1 1 4,540 7,308 7,23845% 88 75 75 46 65 65 3 4 4 1 1 1 5,011 7,423 7,30850% 88 74 75 50 65 65 3 4 4 1 1 1 5,464 7,651 7,53755% 86 74 74 53 65 65 3 4 4 1 1 1 5,796 7,879 7,76560% 85 72 74 56 66 65 3 4 4 1 1 1 6,031 8,031 7,87965% 83 71 71 58 67 67 3 4 4 1 0 0 6,077 8,184 8,18470% 81 68 69 60 69 68 3 3 4 1 0 0 6,110 8,489 8,33775% 79 67 68 62 69 69 3 3 3 1 0 0 6,138 8,642 8,48980% 78 62 64 63 71 70 3 3 3 1 0 0 6,214 9,040 8,86285% 77 57 59 63 73 72 4 3 3 1 0 0 6,309 9,481 9,30390% 76 55 57 64 74 73 4 3 3 1 0 0 6,451 9,743 9,52395% 76 55 57 64 74 73 4 3 3 1 0 0 6,541 9,743 9,523
Cutthroat SpawningCoho SpawningChinook Rearing Winter RearingCoho Rearing
Page 47
Table 59. December Lake Creek Habitat Duration Analysis Table 60. December Lake Creek Habitat Duration AnalysisStudy Site 3 Study Site 4
%Exceed Reference Existing Proposed %Exceed Reference Existing Proposed5% 3,527 3,954 4,130 5% 4,784 8,680 8,108
10% 3,776 4,703 4,893 10% 6,165 8,267 8,10815% 4,311 4,893 5,272 15% 6,874 8,267 8,10820% 4,737 5,083 5,272 20% 7,344 8,267 8,10825% 4,804 5,272 5,425 25% 8,010 8,108 8,10830% 4,739 5,425 5,576 30% 8,353 8,108 8,10835% 4,685 5,576 5,576 35% 8,577 7,845 8,10840% 4,028 5,728 5,728 40% 8,695 7,845 8,10845% 3,969 5,728 5,728 45% 9,020 7,845 8,10850% 3,957 5,875 5,728 50% 9,013 7,845 8,10855% 3,962 5,875 5,728 55% 8,990 7,845 8,10860% 3,941 5,875 5,875 60% 8,926 7,845 8,10865% 3,966 6,017 5,875 65% 8,853 7,845 8,10870% 3,948 6,017 5,875 70% 8,680 7,845 8,10875% 3,842 6,017 5,875 75% 8,567 7,845 8,10880% 3,572 6,017 6,017 80% 8,480 7,845 8,10885% 3,229 6,174 6,017 85% 8,363 7,845 8,10890% 2,885 6,174 6,017 90% 8,196 7,845 8,10895% 2,792 6,174 6,017 95% 8,078 7,845 8,108
Winter Rearing Winter Rearing
Page 48
Figure 1
Lake Creek IFIM: SS1-4 January Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per
1000
Ft.
of S
trea
m)
050100150200250300350400
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 2
Lake Creek IFIM: SS1-4 January Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50100
150
200
250300
350W
UA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 49
Figure 3
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 January Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t pe
r 10
00 F
t. of
Str
eam
)
0
500
1,000
1,500
2,000
WUA
(Sq.
Ft.
of H
abita
t pe
r 10
00 F
t. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 4
Lake Creek IFIM: SS1 January Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
100
200
300
400
500
600
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 50
Figure 5
Lake Creek IFIM: SS1 January Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
050100150200250300350400450
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 6
Lake Creek IFIM (40 % Enhancement): SS1 January Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of
Stre
am)
0
500
1,000
1,500
2,000
2,500
3,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 51
Figure 7
Lake Creek IFIM: SS2 January Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.00.51.01.52.02.53.03.54.04.5
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 8
Lake Creek IFIM: SS2 January Fish Habitat (WUA) vs. Flow Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.00.51.01.52.02.53.03.54.04.55.0
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 52
Figure 9
Lake Creek IFIM SS2 January Fish Habitat (WUA) vs. FlowProposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
H
abita
t per
100
0 Ft
. of
Str
eam
)
0.00.51.01.52.02.53.03.54.04.55.0
WU
A (S
q. F
t. of
H
abita
t per
100
0 Ft
. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingCoho Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 10
Lake Creek IFIM: SS3 January Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Page 53
Figure 11
Lake Creek IFIM: SS3 January Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%Flow ExceedenceW
UA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
trea
m)
Rainbow Winter Rearing
Figure 12
Lake Creek IFIM SS3 January Fish Habitat (WUA) vs. FlowProposed Project Flow - 4cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 54
Figure 13
Lake Creek IFIM: SS4 January Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Figure 14
Lake Creek IFIM: SS4 January Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
7,800
7,900
8,000
8,100
8,200
8,300
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Winter Rearing
Page 55
Figure 15
Lake Creek IFIM SS4 January Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 16
Lake Creek IFIM: SS1-4 February Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
300
350
400
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 56
Figure 17
Lake Creek IFIM: SS1-4 February Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 18
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 February Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
500
1,000
1,500
2,000
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 57
Figure 19
Lake Creek IFIM: SS1 February Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
100
200
300
400
500
600
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 20
Lake Creek IFIM: SS1 February Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 58
Figure 21
Lake Creek IFIM (40% Enhancement): SS1 February Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
500
1,000
1,500
2,000
2,500
3,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 22
Lake Creek IFIM: February SS2 Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0.00.51.01.52.02.53.03.54.04.5
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 59
Figure 23
Lake Creek IFIM: February SS2 Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.00.51.01.52.02.53.03.54.04.55.0
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 24
Lake Creek IFIM February SS2 Fish Habitat (WUA) vs. FlowProposed Project Flow-4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0.00.51.01.52.02.53.03.54.04.55.0
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 60
Figure 25
Lake Creek IFIM: February SS3 Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
tream
)
Rainbow Winter Rearing
Figure 26
Lake Creek IFIM: February SS3 Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 61
Figure 27
Lake Creek IFIM February SS3 Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 28
Lake Creek IFIM: February SS4 Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Rainbow Winter Rearing
Page 62
Figure 29
Lake Creek IFIM: February SS4 Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
7,8007,8507,9007,9508,0008,0508,1008,1508,2008,2508,300
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Winter Rearing
Figure 30
Lake Creek IFIM February SS4 Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,0003,000
4,000
5,000
6,0007,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 63
Figure 31
Lake Creek IFIM: SS1-4 March Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
2,000
4,000
6,000
8,000
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho Rearing
Steelhead Rearing Rainbow Winter Rearing
Steelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 32
Lake Creek IFIM: SS1-4 March Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
20
40
60
80
100
120
140
160
180
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 64
Figure 33
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 March Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
01002003004005006007008009001,000
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 34
Lake Creek IFIM: SS1 March Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
trea
m)
0
50
100
150
200
250
300
350
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 65
Figure 35
Lake Creek IFIM: SS1 March Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
0
50
100
150
200
250
300
350
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 36
Lake Creek IFIM (40% Enhancement): SS1 March Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f St
ream
)
0
500
1,000
1,500
2,000
2,500
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f St
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 66
Figure 37
Lake Creek IFIM: SS2 March Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Sq.
Ft. o
f Str
eam
)
0
5
10
15
20
25
30
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 38
Lake Creek IFIM: SS2 March Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,0002,000
3,0004,000
5,000
6,0007,000
8,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Sq.
Ft. o
f Str
eam
)
0
5
10
15
20
25
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Page 67
Figure 39
Lake Creek IFIM SS2 March Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Sq.
Ft. o
f Str
eam
)
0
5
10
15
20
25
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow Winter RearingSteelhead Spawning (Rt Scale) Cutthroat Spawning (Rt Scale)
Figure 40
Lake Creek IFIM: SS3 March Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of
Str
eam
)
Rainbow Winter Rearing
Page 68
Figure 41
Lake Creek IFIM: SS3 March Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 42
Lake Creek IFIM SS3 March Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 69
Figure 43
Lake Creek IFIM: SS4 March Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
WUA
(Sq.
Ft o
f Hab
itat p
er 1
000
ft. o
f Stre
am)
Figure 44
Lake Creek IFIM: SS4 March Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f St
ream
)
Rainbow Winter Rearing
Page 70
Figure 45
Lake Creek IFIM SS4 March Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 46
Lake Creek IFIM: SS1-4 April Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,0004,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
020406080100120140160180200
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingCutthroat Rearing Steelhead Spawning (Rt Scale)
Page 71
Figure 47
Lake Creek IFIM: SS1-4 April Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
020406080100120140160180
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingCutthroat Rearing Steelhead Spawning (Rt Scale)
Figure 48
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 April Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0100200300400500600700800900
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingCutthroat Rearing Steelhead Spawning (Rt Scale)
Page 72
Figure 49
Lake Creek IFIM: SS1 April Fish Habitat (WUA) vs. Flow Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
300
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)
Figure 50
Lake Creek IFIM: SS1 April Fish Habitat (WUA) vs. Flow Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f St
ream
)
0
50
100
150
200
250
300
350
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f St
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)
Page 73
Figure 51
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 April Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0100200300400500600700800900
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingCutthroat Rearing Steelhead Spawning (Rt Scale)
Figure 52
Lake Creek IFIM: SS2 April Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
tream
)
0
5
10
15
20
25
30
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
tream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)
Page 74
Figure 53
Lake Creek IFIM: SS2 April Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
02468101214161820
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)
Figure 54
Lake Creek IFIM SS2 April Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
02468101214161820
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)
Page 75
Figure 55
Lake Creek IFIM: SS3 April Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 56
Lake Creek IFIM: SS3 April Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0200400600800
1,0001,2001,4001,6001,8002,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Page 76
Figure 57
Lake Creek IFIM SS3 April Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0200400600800
1,0001,2001,4001,6001,8002,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 58
Lake Creek IFIM: SS4 April Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Page 77
Figure 59
Lake Creek IFIM: SS4 April Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 60
Lake Creek IFIM SS4 April Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of
Stre
am)
Rainbow Rearing
Page 78
Figure 61
Lake Creek IFIM: SS1-4 May Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
05001,0001,5002,0002,5003,0003,5004,0004,5005,000
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Figure 62
Lake Creek IFIM: SS1-4 May Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
05001,0001,5002,0002,5003,0003,5004,0004,500
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Page 79
Figure 63
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 May Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
05001,0001,5002,0002,5003,0003,5004,0004,500
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Figure 64
Lake Creek IFIM: SS1 May Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
05001,0001,5002,0002,5003,0003,5004,0004,5005,000
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Page 80
Figure 65
Lake Creek IFIM: SS1 May Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
05001,0001,5002,0002,5003,0003,5004,000
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Figure 66
Lake Creek IFIM (40% Enhancement): SS1 May Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
05001,0001,5002,0002,5003,0003,5004,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Page 81
Figure 67
Lake Creek IFIM: SS2 May Fish Habitat (WUA) vs. Flow Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
020406080100120140160180
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Figure 68
Lake Creek IFIM: SS2 May Fish Habitat (WUA) vs. Flow Existing Conditions Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,0004,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
20
40
60
80
100
120
140
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Page 82
Figure 69
Lake Creek IFIM SS2 May Fish Habitat (WUA) vs. Flow Proposed Project Flow- 4 cfs
0500
1,0001,5002,0002,5003,0003,5004,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
20
40
60
80
100
120
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Rainbow RearingSteelhead Spawning (Rt Scale) Rainbow Spawning (Rt Scale)Cutthroat Rearing
Figure 70
Lake Creek IFIM: SS3 May Fish Habitat (WUA) vs. Flow Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
300
350
400
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 83
Figure 71
Lake Creek IFIM: SS3 May Fish Habitat (WUA) vs. Flow Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
100
200
300
400
500
600
700
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 72
Lake Creek IFIM SS3 May Fish Habitat (WUA) vs. Flow Proposed Project Flow- 4 cfs
0200
400600800
1,000
1,2001,4001,600
1,8002,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
20
40
60
80
100
120
140
160
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 84
Figure 73
Lake Creek IFIM: SS4 May Fish Habitat (WUA) vs. Flow Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Duration
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
300
350
400
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 74
Lake Creek IFIM: SS4 May Fish Habitat (WUA) vs. Flow Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Duration
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
300
350
400
450
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 85
Figure 75
Lake Creek IFIM SS4 May Fish Habitat (WUA) vs. Flow Proposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Duration
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
0
20
40
60
80
100
120
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 76
Lake Creek IFIM: SS1-4 June Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
0
50
100
150
200
250
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Page 86
Figure 77
Lake Creek IFIM: SS1-4 June Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
0
50
100
150
200
250
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Figure 78
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 June Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0100200300400500600700800900
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Page 87
Figure 79
Lake Creek IFIM: SS1 June Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
020406080100120140160180
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Figure 80
Lake Creek IFIM: SS1 June Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
0
50
100
150
200
250
300
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Page 88
Figure 81
Lake Creek IFIM (40% Enhancement): SS1 June Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
H
abita
t per
100
0 Ft
. of S
trea
m)
0
500
1,000
1,500
2,000
2,500
WU
A (S
q. F
t. of
H
abita
t per
100
0 Ft
. of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Steelhead Spawning (Rt Scale)Rainbow Spawning (Rt Scale)
Figure 82
Lake Creek IFIM: SS2 June Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per
1000
Ft.
of S
tream
)
020406080100120140160180
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Rearing Steelhead SpawningRainbow Spawning
Page 89
Figure 83
Lake Creek IFIM: SS2 June Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
20
40
60
80
100
120
140
160
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Rearing Steelhead SpawningRainbow Spawning
Figure 84
Lake Creek IFIM SS2 June Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
20
40
60
80
100
120
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Rearing Steelhead SpawningRainbow Spawning
Page 90
Figure 85
Lake Creek IFIM: SS3 June Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t pe
r 10
00 F
t. of
Stre
am)
0
50
100
150
200
250
300
350
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 86
Lake Creek IFIM: SS3 June Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
300
350
400
450
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 91
Figure 87
Lake Creek IFIM SS3 June Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
0
20
40
60
80
100
120
140
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 88
Lake Creek IFIM: SS4 June Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
300
350
400
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 92
Figure 89
Lake Creek IFIM: SS4 June Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
050
100150200250
300350400
450500
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Figure 90
Lake Creek IFIM SS4 June Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
0
20
40
60
80
100
120
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing Rainbow Spawning (Rt Scale)
Page 93
Figure 91
Lake Creek IFIM: SS1-4 July Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Figure 92
Lake Creek IFIM: SS1-4 July Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Page 94
Figure 93
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 July Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho Rearing Steelhead Rearing Cutthroat Rearing Rainbow Rearing
Figure 94
Lake Creek IFIM: SS1 July Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Page 95
Figure 95
Lake Creek IFIM: SS1 July Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Figure 96
Lake Creek IFIM (40% Enhancement): SS1 July Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Rearing
Page 96
Figure 97
Lake Creek IFIM: SS2 July Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Figure 98
Lake Creek IFIM: SS2 July Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing
Page 97
Figure 99
Lake Creek IFIM SS2 July Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Rearing
Figure 100
Lake Creek IFIM: SS3 July Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Rainbow Rearing
Page 98
Figure 101
Lake Creek IFIM: SS3 July Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Rainbow Rearing
Figure 102
Lake Creek IFIM SS3 July Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Str
eam
)
Rainbow Rearing
Page 99
Figure 103
Lake Creek IFIM: SS4 July Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,000
3,0004,0005,0006,000
7,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Figure 104
Lake Creek IFIM: SS4 July Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing
Page 100
Figure 105
Lake Creek IFIM SS4 July Fish Habitat (WUA) vs. Flow Proposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Rainbow Rearing
Figure 106
Lake Creek IFIM: SS1-4 August Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,0004,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
300
350
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 101
Figure 107
Lake Creek IFIM: SS1-4 August Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
20
40
60
80
100
120
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 108
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 August Fish Habitat (WUA) vs. Flow Proposed Project Flow - 7 cfs
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0100200300400
500600700800900
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 102
Figure 109
Lake Creek IFIM: SS1 August Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
050100150200250300350
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 110
Lake Creek IFIM: SS1 August Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
20
40
6080
100
120
140
160
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 103
Figure 111
Lake Creek IFIM (40% Enhancement): SS1 August Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 7 cfs
0500
1,0001,5002,0002,5003,0003,5004,0004,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
200
400
600
800
1,000
1,200
1,400
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 112
Lake Creek IFIM: SS2 August Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 104
Figure 113
Lake Creek IFIM: SS2 August Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0.00.10.10.20.20.30.30.40.40.50.5
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 114
Lake Creek IFIM SS2 August Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 105
Figure 115
Lake Creek IFIM: SS3 August Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,0004,500
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing
Figure 116
Lake Creek IFIM: SS3 August Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Page 106
Figure 117
Lake Creek IFIM SS3 August Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
1,280
1,300
1,320
1,340
1,360
1,380
1,400
1,420
1,440
1,460
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 118
Lake Creek IFIM: SS4 August Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing
Page 107
Figure 119
Lake Creek IFIM: SS4 August Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 120
Lake Creek IFIM SS4 August Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Page 108
Figure 121
Lake Creek IFIM: SS1-4 September Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Fow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
0
50
100
150
200
250
300
350
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 122
Lake Creek IFIM: SS1-4 September Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Fow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
10
00 F
t. of
Stre
am)
0
20
40
60
80
100
120W
UA (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
tream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 109
Figure 123
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 September Fish Habitat (WUA) vs. Flow Proposed Project Flow - 7 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Fow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
0
100
200
300
400
500
600
700
800
900
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 124
Lake Creek IFIM: SS1 September Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
0
50
100
150
200
250
300
350
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 110
Figure 125
Lake Creek IFIM: SS1 September Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
tream
)
-20
0
20
40
60
80
100
120
140
160
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
tream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 126
Lake Creek IFIM (40% Enhancement): SS1 September Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 7 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0
200
400
600
800
1,000
1,200
1,400
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 111
Figure 127
Lake Creek IFIM: SS2 September Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 128
Lake Creek IFIM: SS2 September Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0.0
0.1
0.1
0.2
0.2
0.3
0.3
0.4
0.4
0.5
0.5
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Page 112
Figure 129
Lake Creek IFIM SS2 September Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Chinook Spawning (Rt Scale)
Figure 130
Lake Creek IFIM: SS3 September Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Page 113
Figure 131
Lake Creek IFIM: SS3 September Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of
Stre
am)
Rainbow Rearing
Figure 132
Lake Creek IFIM SS3 September Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
1,280
1,300
1,320
1,340
1,360
1,380
1,400
1,420
1,440
1,460
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing
Page 114
Figure 133
Lake Creek IFIM: SS4 September Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 134
Lake Creek IFIM: SS4 September Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Page 115
Figure 135
Lake Creek IFIM SS4 September Fish Habitat (WUA) vs. FlowProposed Project Flow- 7 cfs
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Rainbow Rearing
Figure 136
Lake Creek IFIM: SS1-4 October Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
050100150200250300350400
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Page 116
Figure 137
Lake Creek IFIM: SS1-4 October Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
250
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Figure 138
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 October Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
02004006008001,0001,2001,4001,6001,8002,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Page 117
Figure 139
Lake Creek IFIM: SS1 October Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
050100150200250300350400450500
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Figure 140
Lake Creek IFIM: SS1 October Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 20% 40% 60% 80% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0
50
100
150
200
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Page 118
Figure 141
Lake Creek IFIM (40% Enhancement): SS1 October Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0
500
1,000
1,500
2,000
2,500
3,000
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Figure 142
Lake Creek IFIM: SS2 October Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
01122334455
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Page 119
Figure 143
Lake Creek IFIM: SS2 October Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Figure 144
Lake Creek IFIM SS2 October Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
5001,000
1,5002,000
2,500
3,0003,500
4,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.00.51.01.52.02.53.03.54.04.5
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Rearing Coho Spawning (Rt Scale)
Page 120
Figure 145
Lake Creek IFIM: SS3 October Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0500
1,0001,5002,0002,5003,0003,5004,0004,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Figure 146
Lake Creek IFIM: SS3 October Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Page 121
Figure 147
Lake Creek IFIM SS3 October Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
1,400
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Rearing
Figure 148
Lake Creek IFIM: SS4 October Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Page 122
Figure 149
Lake Creek IFIM: SS4 October Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
500
1,000
1,500
2,000
2,500
3,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Rearing
Figure 150
Lake Creek IFIM SS4 October Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
200
400
600
800
1,000
1,200
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WUA
(Sq.
Ft.
of H
abita
t per
100
0 Ft
. of S
trea
m)
Rainbow Rearing
Page 123
Figure 151
Lake Creek IFIM: SS1-4 November Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
050100150200250300350400
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 152
Lake Creek IFIM: SS1-4 November Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 124
Figure 153
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 November Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
500
1,000
1,500
2,000
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 154
Lake Creek IFIM: SS1 November Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
100
200
300
400
500
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 125
Figure 155
Lake Creek IFIM: SS1 November Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
12,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
50
100
150
200
250
300
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 156
Lake Creek IFIM (40% Enhancement): SS1 November Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
2,000
4,000
6,000
8,000
10,000
12,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
500
1,000
1,500
2,000
2,500
3,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 126
Figure 157
Lake Creek IFIM: SS2 November Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
2,000
4,000
6,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0
1
2
3
4
5
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 158
Lake Creek IFIM: SS2 November Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
12,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 127
Figure 159
Lake Creek IFIM SS2 November Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
2,000
4,000
6,000
8,000
10,000
12,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0.00.51.01.52.02.53.03.54.04.55.0
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 160
Lake Creek IFIM: SS3 November Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Page 128
Figure 161
Lake Creek IFIM: SS3 November Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 162
Lake Creek IFIM SS3 November Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
5,2005,3005,4005,5005,6005,7005,8005,9006,0006,1006,2006,300
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 129
Figure 163
Lake Creek IFIM: SS4 November Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 164
Lake Creek IFIM: SS4 November Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 130
Figure 165
Lake Creek IFIM SS4 November Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Figure 166
Lake Creek IFIM: SS1-4 December Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
050100150200250300350400
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 131
Figure 167
Lake Creek IFIM: SS1-4 December Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
050100150200250300350
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 168
Lake Creek IFIM (40% Enhancement at SS1) Combined with SS 2-4 December Fish Habitat (WUA) vs. Flow Proposed Project Flow - 4 cfs
01,0002,0003,0004,0005,0006,0007,0008,0009,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
500
1,000
1,500
2,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 132
Figure 169
Lake Creek IFIM: SS1 December Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
0
1,000
2,000
3,0004,000
5,000
6,000
7,000
8,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
0
100
200
300
400
500
600
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 170
Lake Creek IFIM: SS1 December Fish Habitat (WUA) vs. FlowExisting Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat
per
1000
Ft.
of S
trea
m)
050100150200250300350400450
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 133
Figure 171
Lake Creek IFIM (40% Enhancement): SS1 December Fish Habitat (WUA) vs. Flow
Proposed Project Flow- 4 cfs
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0
500
1,000
1,500
2,000
2,500
3,000
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho Rearing Steelhead RearingCutthroat Rearing Rainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 172
Lake Creek IFIM: SS2 December Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 134
Figure 173
Lake Creek IFIM: SS2 December Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
2,000
4,000
6,000
8,000
10,000
12,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat
per 1
000
Ft. o
f Str
eam
)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Figure 174
Lake Creek IFIM SS2 December Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
2,000
4,000
6,000
8,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow ExceedenceWU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
0.0
1.0
2.0
3.0
4.0
5.0
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
trea
m)
Chinook Rearing Coho RearingSteelhead Rearing Cutthroat RearingRainbow Winter Rearing Coho Spawning (Rt Scale)Cutthroat Spawning (Rt Scale)
Page 135
Figure 175
Lake Creek IFIM: SS3 December Fish Habitat (WUA) vs. Flow
Pre-Project Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er
1000
Ft.
of S
tream
)
Rainbow Winter Rearing
Figure 176
Lake Creek IFIM: SS3 December Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Page 136
Figure 177
Lake Creek SS3 December Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Figure 178
Lake Creek IFIM: SS4 December Fish Habitat (WUA) vs. FlowPre-Project Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
tream
)
Rainbow Winter Rearing
Page 137
Figure 179
Lake Creek IFIM: SS4 December Fish Habitat (WUA) vs. Flow
Existing Conditions Flow Duration
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft.
of S
trea
m)
Rainbow Winter Rearing
Figure 180
Lake Creek IFIM SS4 December Fish Habitat (WUA) vs. FlowProposed Project Flow- 4 cfs
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Flow Exceedence
WU
A (S
q. F
t. of
Hab
itat p
er 1
000
Ft. o
fSt
ream
)
Rainbow Winter Rearing
Page 138