MAPS 3 Trail ImprovementsPhase 3, Project 1
Lake Stanley Draper TrailProject Number: M3‐T003
November 2017
FINAL PLANS
SE 104th St.
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
N. Stanley Draper Dr.
Lake Stanley Draper
SE 74th St.
SE 89th St.
SE 104th St.
SE 119th St. SE 119th St.
SE 134th St.
SE 149th St.
SE 134th St.
I‐240
Westm
inster
Post Rd.
Doug
las B
lvd.
Post Rd.
Westm
inster
Doug
las B
lvd.
Midwest B
lvd. LAKE STANLEY DRAPER
TRAIL OVERVIEW
• Phase 3 of MAPS 3 Trail Improvements Project, the 13.54 mile Lake Draper Trail
• Overall project is split into three (3) construction projects
• Each project’s construction budget was set at $3.4 million, with a total project cost of just over $10.2 million
• Trail alignment is based upon the City of Oklahoma City Trail Master Plan
Typical Trail Section
Standard 12’ multi‐use trail
Typical Street Crossing (non signalized)
SE 104th St.
PROJECT 1: M3‐T003 Trail Alignment
• The M3‐T003 trail’s final overall length is 26,159 feet or 4.95 miles
• Accessible to the Draper Marina and parking lot
• Trail has three (3) significant street intersections
• Trail crosses West Draper Drive near Cross Timbers recreational area parking lot
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
SE 104th St.
PROJECT 1: M3‐T003 Trail Design Details
• Connection at SE 89thStreet intersection (Pier # 1) with M3‐T003A Trail
• Trail generally follows existing West Stanley Draper Drive
Open views of the lake Crosses SE 104th Street
then follows roadway towards Lake Draper Marina area
• Quick access to Marina parking lot
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
PROJECT 1: M3‐T003 Trail Views & Vistas
SE 104th St.
PROJECT 1: M3‐T003 Trail Design Details
New alignment generally follows the existing water front roadway
• Several horizontal bends in the trail alignment and the vertical profile has more frequent crests and sags
Alignment gets as close as 25’ to waters edge
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
PROJECT 1: M3‐T003 Trail Views & Vistas
SE 104th St.
PROJECT 1: M3‐T003 Trail Alignment
Trail connects to Baxter Airfield (RC air strip) along the east side
• Alignment works its way back to West Stanley Draper Drive
Trail switches to the west side of West Stanley Draper Drive at the Cross Timbers Riding Area
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
PROJECT 1: M3‐T003 Trail Views & Vistas
SE 104th St.
PROJECT 1: M3‐T003 Trail Alignment
• Trail alignment stays on the west side of West Stanley Draper Drive
This segment has the most critical utility conflicts
Trail crosses Water Plant Road and will construct new concrete driveways
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
PROJECT 1: M3‐T003 Trail Views & Vistas
SE 104th St.
PROJECT 1: M3‐T003 Trail Alignment
• Trail alignment stays on the west side of West Stanley Draper Drive
This segment has the most critical utility conflicts
Trail crosses Water Plant Road and will construct new concrete driveways
Trail alignment generally follows the toe of the dam to connection with M3‐T003A Trail
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
PROJECT 1: M3‐T003 Trail Views & Vistas
SE 104th St.
PROJECT 1: M3‐T003 100% Complete
Design Cost Estimate
• Construction budget of $3,415,000
• Preliminary trail concept construction estimate was $3,059,552
• 60% complete trail concept construction estimate was $3,491,046
• 100% complete trail design estimated at $3,385,897 with a 3.5% contingency included
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL
SE 104th St.
PROJECT 1: M3‐T003 Anticipated Schedule
• November 7, 2017: Approval by MAPS and City Council
• November 8, 2017: Project Advertisement
• November 29, 2017: Project Bid
• December 20, 2017: Recommendation to Subcommittee
• December 21, 2017: Recommendation to Citizens Advisory Board
• January 2, 2018: Award of Construction Contract by City Council
• January 3, 2018: Notice to Proceed for Construction
• August 2018: Construction Complete
PROJECT 1: M3‐T003 Questions and Comments
MAPS 3 TRAIL IMPROVEMENTS, PHASE 3, LAKE STANLEY DRAPER TRAIL