lance processing at the amsr-e sips

19
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint AMSR-E Science Team Meeting June 2-3, 2010 Huntsville, AL [email protected] www.itsc.uah.edu http://ghrc.msfc.nasa.gov 256.961.7791

Upload: benecia-urban

Post on 02-Jan-2016

30 views

Category:

Documents


4 download

DESCRIPTION

LANCE Processing at the AMSR-E SIPS. Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint AMSR-E Science Team Meeting June 2-3, 2010 Huntsville, AL - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LANCE Processing  at the AMSR-E  SIPS

LANCE Processing at the AMSR-E SIPS

Presented by Kathryn RegnerInformation Technology and Systems Center

at the University of Alabama in Huntsville

Joint AMSR-E Science Team MeetingJune 2-3, 2010Huntsville, AL

[email protected] www.itsc.uah.edu http://ghrc.msfc.nasa.gov 256.961.7791

Page 2: LANCE Processing  at the AMSR-E  SIPS

2

Outline• Overview • System Configuration

–Hardware –Software Architecture

• System Status and Accomplishments• Planned Work• Schedule

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 3: LANCE Processing  at the AMSR-E  SIPS

3 AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

UAHuntsville ITSC (Staff shared with GHRC DAAC): Management: Dr. Sara Graves, Director, ITSC

Development: Helen Conover, Lead Bruce Beaumont Lamar Hawkins Mary Nair Matt SmithEngineering: Kathryn Regner Sandra Harper Data Management: Steve Jones User Services: Sherry Harrison Systems Administration: Will Ellett, Lead Michele Garrett

AMSR-E LANCE Personnel

Page 4: LANCE Processing  at the AMSR-E  SIPS

4

LANCE AMSR-E Overview

• Co-located with the AMSR-E SIPS, TLSCF, and GHRC; well established relationships with the AMSR-E Science Team. The AMSR-E SIPS currently produces the L2 & L3 standard products.

• Two fully redundant processing and distribution strings, at separate locations, on separate networks

• Seven day rolling archive• Ingest of L0 data directly from EDOS • Products generated within 20 min from

acquisition at SIPS, in support of three hour latency requirement

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 5: LANCE Processing  at the AMSR-E  SIPS

5

LANCE AMSR-E Data Flow

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 6: LANCE Processing  at the AMSR-E  SIPS

6 AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

LANCE AMSR-E First Processing StringNational Space Science and Technology

Center

Page 7: LANCE Processing  at the AMSR-E  SIPS

7

LANCE AMSR-E Second Processing StringOlin B. King Technology Hall

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 8: LANCE Processing  at the AMSR-E  SIPS

8

Software Architecture

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 9: LANCE Processing  at the AMSR-E  SIPS

9

System Status

• Hardware (four servers total for two strings of equipment) has been specified and is in the UAHuntsville procurement process.

• Network Interfaces for both strings of equipment have been identified.

• A list of firewall exceptions to request from NASA MSFC was submitted on Friday, 4/23.– Firewall exceptions are in place for BBFTP and

LDAP. BBFTP is installed on the LANCE AMSR-E interim ingest and processing server, GWEN. 

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 10: LANCE Processing  at the AMSR-E  SIPS

10

Network Interfaces

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 11: LANCE Processing  at the AMSR-E  SIPS

11

Network Interfaces (2)

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 12: LANCE Processing  at the AMSR-E  SIPS

12

Development Status

• LANCE MODIS software downloaded and installed on temporary platform (existing AMSR-E SIPS reprocessing server). 

• We are now able to generate all AMSR-E LANCE products.  – L1A and L1B, using the same code that JAXA

delivered to NSIDC for use by NOAA.  – Level-2A, using RSS code obtained from NSIDC and

adapted by NOAA.– Level-2B and Level-3 daily processing, using the

same standard product algorithms currently in production at the SIPS.  

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 13: LANCE Processing  at the AMSR-E  SIPS

13

Development Status (2)

• Beginning routine LANCE processing in an extended test mode to evaluate error handling, metrics collection processes, etc.– ingesting and processing IERB data, utcpole.dat,

leapsec.dat, orbital events, and other external files via cron as needed

• Ready to begin external interface testing to verify connectivity and procedures– Interface testing with EDOS for real-time receipt of

RBD and GBAD data and with the ESDIS LDAP server for user registration/authentication.

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 14: LANCE Processing  at the AMSR-E  SIPS

14

Development Status (3)

• Initial validation has been performed using a few sample L2A files.– L2A files generated at LANCE-MODAPS and LANCE

AMSR-E are virtually identical, with very small differences attributed to the differences in compilers and operating systems (64-bit versus 32-bit).

– Differences between L2A files generated at LANCE AMSR-E and at the AMSR-E SIPS are more significant, but appear to be due to the fact that different versions of the L2A algorithm are used; LANCE is using V9 and SIPS is using the more current V10. We are working with the AMSR-E TLSCF to evaluate these differences.

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 15: LANCE Processing  at the AMSR-E  SIPS

15

Development Status (4)

• File naming convention– To distinguish standard products from near real

time products, we will use the existing “product maturity code” within the file name, e.g., AMSR_E_L2_Rain_R10_200905281123_A.hdf

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 16: LANCE Processing  at the AMSR-E  SIPS

16

Near Term Tasks

• End-to-end processing and validation• Implement data distribution to users • Move all processing to production• Prepare DIF entries for the ASMR-E

LANCE products to submit to NASA’s Global Change Master Directory (GCMD)

• Define and implement metrics process 

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 17: LANCE Processing  at the AMSR-E  SIPS

17

Schedule

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Phase1 (April 1 – June 30): • Implement initial AMSR-E NRT capability

equivalent to NOAA & MODAPS on processing hardware borrowed from the SIPS and distribution via the GHRC web ftp server.

• Includes preliminary validation, initial user registration/authentication, and metrics

Phase 2 (July 1 – August 30): • Implement initial AMSR-E NRT capability on

target hardware at both locations

Page 18: LANCE Processing  at the AMSR-E  SIPS

18

Schedule (2)

Phase 3 (September 1 – January 30) • Implement latest AMSR-E standard products

algorithms • Implement L2A near real time algorithm from

RSS. • Provide subscription service, web-based

monitoring, ESDIS User registration.

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010

Page 19: LANCE Processing  at the AMSR-E  SIPS

19

Summary

• LANCE AMSR-E processing system is on schedule to become operational in early 2010.– procuring two strings of hardware – leveraging existing SIPS personnel,

processes and procedures and software algorithms from the NSIDC DAAC.

AMSR-E Joint Science Team Meeting Huntsville June 2-3,

2010