    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r

    A case study in Raigarh, Chhattisgarh

    December 13

    Land Acquisition and Transfers

    for Private Industry

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    2/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2

    This study was undertaken by the Centre for Equity Studies in partnership with

    Jan Chetna in Raigarh, who continue to work tirelessly for the rights of the

    disadvantaged all over the district, often at a great personal cost. Without the

    assistance of Rajesh Tripathi, Savita Rath, Ramesh Agrawal, and others in the

    organization, this study would not have been possible.

    The paper was written by Amod Shah, Saba Sharma, and Shikha Sethia,

    researchers at the S. R. Sankaran Unit for Hunger and Social Exclusion. Other

    researchers who worked on interviews, surveys and analysis in this study

    include Kanchan Gandhi, Radhikha Nair and Shankhmala Sen. We are always

    grateful for the guidance and input of Harsh Mander, director at CES.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    3/35

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    4/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 4

    affected persons (PAPs), about 40 per cent of who were tribals. 2 Only about a

    quarter of all such displaced persons had been rehabilitated.3 An updated

    estimate, for the period from 1947 to 2000, puts the total number of DPs and

    PAPs at more than 60 million.4 While there are no recent estimates on the

    number of development-displaced and project affected persons, the rapid pace ofresource exploration and industrialisation in recent years would suggest a sharp

    increase in these numbers.

    A second notable feature of recent economic growth in India is the increasing

    withdrawal of the States participation in the processes of development and

    industrialisation. This is particularly apparent in the case of public purpose

    projects, for instance mining projects, dams, power plants, highways, ports and

    other vital infrastructure and industries, which serve the broader interests of

    society, rather than solely private aims. While in the past, government owned

    companies were directly responsible for setting up and running large-scale

    projects in the public interest, the State has increasingly found itself unable to

    meet the rapidly growing demand in these sectors in the post-liberalization

    period. In addition, the belief that the private sector can deliver these public

    goods and services faster and more efficiently than the government has come to

    be widely accepted. As a result, the government has actively supported the

    growing influence of private companies in the implementation of public purpose

    projects, with the government functioning primarily as a facilitator of such

    private sector participation. For instance, over the period from 2006 to 2010, the

    private sectors share of the total installed capacity ofthe power sector in India

    rose from 11.6 percent to 20 percent, and private companies are expected to

    contribute around 60 percent of the new power capacity added over the 12th

    Five Year Plan period, from 2012 to 2017.5 Similarly, 74 out of the 131 coal

    blocks allocated by the government between 2006 and 2011 went to private

    companies.6

    The States changing role in the context of public purpose projects raises critical

    questions about its ability to balance its responsibility of protecting the rights of

    those affected by the project and compensating affected persons for any costs

    that they are forced to bear in the name of development, with the pressing need

    2Fernandes, Walter (1998), Development-Induced Displacement in Eastern India, in S.C. Dube

    (ed.), Antiquity to Modernity in Tribal India, Vol 1: Continuity and Change among the Tribals,

    New Delhi: Inter-India Publications, pp. 217-301.3Ibid4Fernandes, Walter (2007), Singur and the Displacement Scenario, Economic and Political

    Weekly, 42 (no. 3, 2026 January), pp. 203-6.5India's installed power capacity up 37% in last five years - Economic Times6Minutes of the meeting held on 11.01.2012 & 12.01.2012 chaired by Additional Secretary (Coal)

    to review the progress of allocated coal/lignite blocks and associated end use projects, Ministry

    of Coal, Government of India,2 March 2012

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    5/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 5

    to create a favourable policy framework for rapid growth in sectors that promote

    the public good. These issues are of critical importance, since public purpose

    projects, despite their broader social and developmental objectives, have severe

    negative impacts on the environment and the lives of people affected by such

    projects. As the pace of growth and industrialisation has significantlyaccelerated, so too has the scale of such destruction and damage. While the role

    of private companies is being increasingly regarded by many as the most

    efficient way to achieve faster growth, there is great concern that private

    companies are motivated primarily by profit and in the pursuit of profit, the

    public benefit is often compromised. The State, by encouraging and actively

    assisting private companies implementing public purpose projects for instance,

    by appropriating land for their use or relaxing environmental standards for such

    projects- is ultimately utilising its sovereign power to further private profit. It is

    the States duty, in all such transactions, to ensure that the viability of the project

    is also evaluated on the basis of how far the benefits to the public outweigh the

    costs to the public, rather than project-level profitability, and the extent to which

    both due legal process and justice have been ensured for all persons affected by

    the transactions.

    The present study seeks to analyse the abovementioned debates specifically in

    relation to the procurement of land by private companies implementing public

    purpose projects. In the past few years, the highly contentious nature of such

    land transfers, often with the active support of the government, has been widely

    publicised due to agitations in Singur and Nandigram in West Bengal, and in

    Jagatsingpur and Niyamgiri in Orissa, among others. However, these are hardly

    isolated incidents; by one estimate, land related conflicts affect 130 of Indias

    602 districts, across all states of the country, with most such incidents taking

    place in 2011 and 2012.7In this study, we explore in greater detail the various

    mechanisms by which such transfers have occurred, as well at the States role in

    this process. The rest of the paper is structured as follows: Section 2 summarizes

    key laws and procedures related to land procurement by private companies.

    Section 3 details the objectives and methodology of the study, while a detailed

    analysis of the study findings is presented in Section 4. Lastly, section 5 discusses

    these findings in the context of Indias recently passed land acquisition law.

    7Press Release: New Research Predicts Rising Trend in Indias Violent Land Conflicts; Map Shows

    Massive Resource Takeover Spurs Conflict in 130 Districts, 17 December 2012, Rights and

    Resources Initiative, Society for Promotion of Wastelands Development, New Delhi. Available at

    http://www.rightsandresources.org/documents/files/doc_5644.pdf

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    6/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 6

    2. Laws and procedures for land procurement by private companiesPrivate companies undertaking public purpose projects can rely on two avenues

    for the procurement of land required for such projects - direct purchase from

    landowners or compulsory acquisition by the government. In theory, companies

    and landowners are free to engage in free market transactions, resulting in the

    purchase of land by the company at a mutually agreed rate of compensation.

    However, as we highlight in the findings of our study, there generally exists a

    significant asymmetry of power between land (and livelihood) losers and

    companies, resulting in deals being concluded on terms that are unfavourable orunjust to land losers.

    The process of coal allocation to private companies

    As per the Coal Mines (Nationalisation) Act, 1973, only the public sector was

    allowed access to the countrys coal reserves. However, soon public

    enterprises found themselves unable to cope with the increasing demand for

    coal to feed the countrys growing demand for coal for power, steel andcement consumption. In 1993 and 1996, amendments to the Coal Mines

    (Nationalisation) Act allowed for coal mining for captive consumption by

    private companies for power generation and cement, respectively, with other

    uses to be notified by the government. A previous amendment in 1976 had

    permitted captive mining by private companies in the iron and steel sector.

    The governments record in allocating blocks through a fair and transparent

    process has been far from satisfactory and, rather than maintaining a neutral

    role in the process, is accused to have been hand in glove with privateindustry. A draft performance audit by the CAG of allocations made by Coal

    India Limited reveal that, between 2004 and 2009, the government had

    allocated coal mines with a capacity of producing over 14 billion tonnes to

    private companies, at preferential rates and without following a transparent

    bidding process. While the scale of the allocations in this period is

    unprecedented, it is alleged that even allocations done between 1993 and

    2004 were rife with malpractices. Allocations in both periods are currently

    the subject of an enquiry by the Central Board of Investigation.

    While captive mining was encouraged in order to help meet short and

    medium term coal production requirements of the country, many of the

    captive coal blocks allocated failed to meet production targets and some failed

    even to start production.

    Source: "Draft Performance Audit, Allocation of Coal Blocks and Augmentation of Coal

    Production by Coal India Limited" Report of the Comptroller and Auditor General of India

    (Union Government (Commercial)), and various news articles

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    7/35

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    8/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 8

    Similarly, in an attempt to address its extremely poor record of rehabilitation

    and resettlement of persons affected by public purpose projects, the government

    introduced a National Policy on Resettlement and Rehabilitation for Projected

    Affected Families (NPRR) in 2003, and subsequently revised this in 2007. The

    stated aim of the policy is to minimise large scale displacement, and where such

    displacement is inevitable, to ensure the proper rehabilitation and resettlement

    of all project affected families, including for landless persons whose livelihoods

    and are negatively impacted by such projects. Unlike the LAA 1894, which only

    dealt with cash compensation for land losers, the NPRR adopts a more holistic

    view of rehabilitation and resettlement, laying out guidelines on additional

    assistance aimed at the restoration of livelihoods of affected persons, and where

    possible, the provision of land for land. The NPRR attempts to lay down basic

    norms for the rehabilitation and resettlement policies adopted by various States

    and Central government departments. For instance, the Chhattisgarh Ideal

    Rehabilitation Policy 2007 lays out guidelines for amount of land to be provided

    to resettled families, the provision of jobs and other assistance. It also specifies

    norms around compensation for acquired land, and for trees, houses and other

    improvements on the acquired land. One major concern with the NPRR is that it

    applies only to projects that displace 500 families or more en masse in the plains

    and 250 families or en masse in hilly, desert or Scheduled Areas. This has

    resulted in instances where land acquisition for the same project has been split

    into smaller bits, each displacing fewer than 500 families, so that the provisions

    of this policy can be sidestepped.11In order to give the NPRR statutory backing,

    many of its provisions have been incorporated into the RFCTLARR 2013, which

    11Walter Fernandes, Rehabilitation Policy for the Displaced, Economic and Political Weekly, Vol

    XXXIX No 12, 20 March 2004

    How is land acquisition legislation misused to favour private companies?

    A recent CAG report on land acquisition by the Odisha government for private

    companies between 2002 and 2011 highlights that in 176 out of 208 cases

    (involving 3,434 hectares of private land), land was acquired based on their

    incorrect declaration as public purpose projects. Additionally, in 85 of thesecases (involving 2,010 hectares of private land), the urgency clause was

    invoked to speed up the land acquisition process, even though none of these

    cases satisfied the conditions required for invoking this provision. The CAG

    report also found that the government had failed to adequately assess land

    requirements for industries, resulting in large amounts of acquired land being

    unutilised and hoarded by private companies.

    Source: T N Vijaylakshmi (2012), CAG blows lid off land grab in Odisha, Down to Earth, 30

    March 2012

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    9/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 9

    now stands as a comprehensive law regulating land acquisition, as well as

    rehabilitation and resettlement.

    In tribal areas covered under Schedule V of the Indian constitution 12, the

    Panchayats (Extension to the Scheduled Areas) (PESA) Act 1996 provides foradditional safeguards to prevent tribal land alienation and unfair acquisition of

    tribal land. These include a requirement that land acquisition for development

    projects, and rehabilitation and resettlement of affected persons, be undertaken

    only after consultation with the Gram Sabha or the Panchayats at the appropriate

    level. As of March 2013, only three out of the nine states with Schedule V areas

    had framed state-level rules for implementation of the PESA Act. Whereas

    Chhattisgarh is yet to frame state-level PESA rules, the states Land Revenue

    Code and Land Acquisition Act have been amended to require approval of

    village-level Gram Sabhas in the event of land acquisition or diversion of land for

    industrial purposes. By requiring consent at the village level, rather than just

    consultation at the appropriate level, the Chattisgarh amendments appear to

    provide for stronger protection against unfair land acquisition than the PESA Act.

    3. Overview of the studya. Study Objectives

    This study aims to provide a detailed examination of the processes by which land

    is procured by private companies undertaking public purpose projects, as well as

    the role of the State in these transfers. It looks at both legal and illegal

    mechanisms of land transfers, while acknowledging that even transactions that

    appear to be legitimate on paper may not be truly legal; and also there is a

    distinction between formal and substantive legality, and between legality and

    justice. Similarly, rules and regulations governing the transfer of land are often

    subjectively interpreted and implemented by the State and its officials, resulting

    in transactions that, though legal, may be severely unjust to certain stakeholders.

    With these objectives in mind, the study essentially aims to ask the following key

    questions:

    1. In the studied area, what is the extent to which companies purchasingland directly from local residents follow procedures laid down by law, in

    both letter and spirit? If the law is subverted, how is this done? Is

    illegality merely an anomaly, or part of the system in the way that it is

    operationalised at the ground level?

    2. What, ultimately, is the role of the state when it comes to issues ofprocurement of land by private companies? Is it merely a facilitator, and

    to what extent should it take responsibility for ensuring fair practices?

    12Raigarh district in Chhattisgarh, where this study is focused, is a Schedule V area

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    10/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 0

    How does the States role in this instance fit into the broader debate about

    the nature of development, and the role of industrialization?

    3. In the context of compulsory land acquisition by the government, to whatextent are practices laid down in the new land acquisition law just or

    unjust? How does it address the issues highlighted in the study area?

    b. Description of the study areaThe study focuses on Tamnar block in the district of Raigarh, Chhattisgarh.

    Raigarh has experienced rapid industrialisation since the early 1990s, when the

    first sponge iron plant of the steel and mining giant, Jindal Steel and Power

    Limited, was established there. Since then, the entire state of Chhattisgarh has

    seen industry grow at an unprecedented rate, and Raigarh, given its dense

    concentration of coal, perhaps more so than other districts. Tamnar block in

    Raigarh is host to a variety of industrial projects, including coal mines, thermal

    power plants, sponge iron plants, cement plants and a large industrial park. A

    number of private companies currently run projects here, with the major ones

    being Jindal Steel and Power Limited, Jindal Power Limited, Monnet Ispat and

    Energy Limited, and Jayswal Neco Industries Limited.

    The environmental impact on such industrialisation has been enormous,

    resulting in massive deforestation, water and air pollution, and the consequent

    impact on the health of those who inhabit these places. But by far the greatest

    conflict is on the issue of land, and the way that land is sold and acquired in these

    places. Of the 533 Gram Panchayats in Raigarh, about 300 are likely to be

    affected by mining and industrial projects. In Tamnar block, only 6 out of 57

    Gram Panchayats have not experienced land acquisition for coal mines or other

    industries. In about 8 of the affected villages, all of the land has been transferred

    for such projects, resulting in the displacement of the local population. Since the

    process of land procurement is far from over, such displacement is bound to

    increase.13

    c. Study methodologyThe study involved visits to the study area by CES researchers, in June and

    October 2012, and a household survey in three villages, conducted over a two-

    week period in February 2013. In two of the surveyed villages, Sarasmal and

    Kosampalli, large amounts of land have been procured for the Gare-Pelma IV/2

    and IV/3 opencast coal mines, owned by Jindal Power Limited. The third village,

    Tamnar, is the largest village in Tamnar block and lies in the vicinity of a 1000

    MW power plant, also built by Jindal Power Limited. In Tamnar village, the 1000

    MW power plant was set up in 2004, and is used for commercial power

    production. The plant is now further expanding to add the capacity of another

    13Interview with Jayant Paridhar, reporter at the Raigarh daily Patrika

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    11/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 1

    2400 MW, which has run into some controversy previously, first for starting

    construction before obtaining environmental clearances from the Ministry of

    Environment and Forests, and then for proposing construction on land that had

    already been acquired by the Chhattisgarh Mineral Development Corporation.

    The small size of Sarasmal and Kosampalli14 enabled a fairly comprehensive

    door-to-door survey by our team of four researchers, covering a total of 83

    households. In Tamnar, a large village of 3,974 people organized into 10

    neighbourhoods or paras based on community, we aimed to cover each

    neighbourhood and randomly select houses within a given neighbourhood,

    sueveying a total of 117 households.

    The survey covered questions about the amount of land purchased, acquired or

    illegally occupied by the company, the manner in which such transactions were

    conducted, the current landholding status of the household, and the

    compensation received (both monetary and non-monetary). In addition, the

    survey enquired about the perceived health and environmental impacts of the

    project, welfare work undertaken by the company under its corporate social

    responsibility programs, and awareness of procedures related to land

    acquisition.

    The survey results are supplemented by interviews with individuals and families

    in several villages across Tamnar block, conducted during earlier visits, and

    alongside the survey in February 2013. All of these villages are located in the

    immediate proximity of coal mines and other industries. Information from these

    interviews has been used to illustrate and elaborate on some of the mechanisms

    of land procurement highlighted in the survey data, as well as crucial issues

    around health, environment, and livelihood, which form an imperative part of

    the larger narrative of land acquisition. The report also refers to documents

    obtained through the Right to Information Act and from government offices in

    Raigarh.

    4. Findings of the studyWidely perceived through the analysis of the survey, as well as through

    interviews and meetings in affected villages, was a sense of mistrust in the

    companys willingness to behave fairly, and in the governments promise to

    protect against these injustices. In both private sales and land acquisition, there

    were a variety of mechanisms where the process of law had been subverted to

    varying degrees. In some cases, even where formal legal procedure was followed,

    in practice, it was not done so substantively with adherence to the spirit in which

    14In 2011, the population of Sarasmal and Kosampalli villages was 508 and 279 respectively

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    12/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 2

    the law was framed. During private sales, for instance, the power imbalance

    between the company and the landholder puts the landholder at a considerable

    disadvantage, often resulting in transactions that barely compensate for the

    market value of the land, let alone the loss of livelihood. Companies are able to

    do this by intimidating through force and, and, as we heard repeatedly,threatening people with forced acquisition at even lower levels of compensation.

    Companies are successful in purchasing the land in this manner because it is

    widely assumed that regardless of whether it is through private sale or

    compulsory acquisition, they will eventually be in possession of the land. And

    finally, even when the law is formally or even substantively complied with, it

    often leads to unjust outcomes for vulnerable communities like tribal people, and

    raises questions of sustainability.

    Landholders felt that the government was willing to use its authority to act in the

    interests of the company. In cases where they resisted selling their land to the

    company, it was compulsorily acquired by the government. While the affected

    persons should be better protected when the government acquires the land

    parcels, this was not the case. The government appeared to have completely

    disregarded its duty to adequately protect the interests of landholders. For

    instance, appeals filed against land acquisition were not taken into consideration

    by the local authorities. Notifying Gram Sabhas as well as individuals of the

    impending acquisition and the process of appeal is an important duty of the

    government but we discovered that rarely were the affected persons fully

    informed about the procedures and most people were unaware of the time-

    frame within which to file an appeal. Similarly, instances of land acquisition in

    scheduled areas like Raigarh district require a No Objection Certificate (NOC)

    from the Gram Sabha, but false NOCs were issued, signed only by gram

    panchayat members, and accepted by the state as an adequate proof of consent.

    Perhaps most crucially, none of these procedural violations take into account the

    larger question, of whether the government should be indiscriminately acquiring

    tribal land for industrial purposes in the first place. It can be argued that the

    spirit of the law barring the sale of tribal land to non-tribals should override the

    governments right to indiscriminately exercise its powers of eminent domain,

    and should particularly apply to instances where the State functions as an

    intermediary in the process of such land transfers.

    Direct negotiation between the company and the affected person (whether

    coercive or not) and acquisition by the government on behalf of private

    companies are not the only two ways through which companies acquire land for

    development projects. As evidenced in Raigarh, another practice is the illegal

    occupation of land by companies. As before, at a disadvantage because of their

    lack of agency, affected persons are often unable to regain possession of theirland. In most instances, directives from the district collectors office, as well as

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    13/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 3

    orders from the high court to return the land to the owner were ignored by the

    company, and neither had government officials followed up on the

    implementation of these orders, despite the repeated requests of the

    landholders. There is also no official record of land being illegally occupied by

    the company, i.e. cases where it may still be in the name of the originallandholder, but is effectively being used by the company.

    In tribal areas, where sale of tribal land to non-tribals is illegal, companies have

    developed the practice of purchasing the land parcel in the name of a tribal

    employee, for their own use. Even though this is formally recognised as a legal

    transaction between two tribals, it represent a clearly illegal subversion of laws

    aimed at preventing alienation of tribal land. This was a recurring practice in

    Raigarh, and many tribal landowners claim to have sold their land, either directly

    to the company or to an employee or broker of the company, and these sales had

    either been registered with full knowledge of the local authorities, or transferred

    without due procedure. It is practically impossible to determine how much tribal

    land has been procured by the company in this fashion, without the intervention

    of the government. and particularly local officials like the patwari, who is

    supposed to keep an annual record of changes in land use at the village level.

    However, it is widely acknowledged that these records are not regularly

    updated, if at all.

    In many cases, people were unable to clearly differentiate between the two main

    forms of land procurement, namely private sale to the company and compulsory

    land acquisition by the government. While this may appear to be a

    methodological issue, it actually speaks of a much deeper problem. It is reflective

    of a larger trend in which affected persons are unable to tell the company and

    the State apart, given that the latter tends to act almost uniformly in favour of the

    former. This lack of information is not just a symptom of poor awareness among

    the landholders but of willful neglect of the due process of acquisition on the part

    of companies and the State alike. A number of people reported that the

    compensation for both land acquisition and private sale was received as one

    lump sum, and were therefore unable to tell whether the rates of compensation

    for these transactions were different for the two. Moreover, some of the

    landholders covered in the survey were unable to specify whether their land had

    been transferred to the company through a private sale, or land acquisition, or a

    combination of both.

    Irrespective of the nature of the transaction - whether through direct sale,

    compulsory acquisition, or illegal occupation - ignorance about proper

    procedures was a key reason for affected persons going undercompensated or

    being unable to effectively appeal at the appropriate level. Adding to this was thecommonly shared perception that the government had accepted a bribe from the

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    14/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 4

    company and will thus act in its favour, which left landholders with little choice

    but to take what was offered quietly, without protesting. The absence of the State

    in checking the subversion of laws and procedures by the company was not

    restricted to just private land transfers, but extended to other issues, such as the

    illegal occupation of forest and common land by the company and a completedisregard for a projects impact on the health, environment, livelihoods and

    social conditions of the local population.

    The findings of the study are divided into five sections the first is an enquiry

    into the procedure of land transfer, in which we identify how much land was

    procured through various mechanisms, and how many people were rendered

    landless as a result. The second area of enquiry is compensation and

    rehabilitation, in which we examine the differing rates of compensation and also

    issues such as the provision of jobs and other rehabilitation measures, which are

    meant to compensate for the loss of livelihoods and security. The third section is

    about awareness and consent, where we assess how well informed people were

    about the process of land acquisition and sale, and whether companies and

    governments are following the correct procedures when land is acquired or sold.

    More than anything, this section aims to highlight the importance of information

    and awareness of law in the land acquisition process.15 We then address the

    effect of the development project on livelihoods, on health and environment as

    well as the social impact. Finally, we look at what CSR initiatives have been

    undertaken by the company in the vicinity of the project.

    i. ProcedureBased on the survey, of a total of 682.07 acres of land that is in possession of the

    company in Sarasmal and Kosampalli, 47 percent was sold to the company

    directly, 38 percent was procured through government acquisition and about 1

    percent was illegally occupied by the company, without the consent of the

    landholder and in most cases, without paying them any compensation. In

    Tamnar, of a total of 390.43 acres in the companys possession, 61 percent of the

    land was sold directly to the company, 29 percent was acquired by the

    government, while another 7 percent was illegally occupied by the company. In

    Sarasmal and Kosampalli, owners of the remaining 14 per cent of land (the

    majority of which belonged to tribals) were unable to clearly identify whether

    their land was acquired by the government or sold directly to the company. In

    Tamnar this figure was 2 percent acres, somewhat lower. In some cases we were

    15A methodological clarification many households in Sarasmal and Kosampalli, while being

    distinct in themselves, have joint land holdings such as between two or three brothers, or

    between a father and his sons. When we speak of households in the survey, we speak of the

    family representing the same land holding, even where this concerns two or three families.

    Where, however, the family members have already split the titles among themselves, we speak of

    them separately. This is to avoid repeating entries in the data.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    15/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 5

    able to resolve the confusion by looking at acquisition or registration documents,

    but in others this proved to be not possible. We have excluded these respondents

    from the following data analysis, so as not to misrepresent the results.

    Since Tamnar block in Raigharh district has a significant tribal population, and

    transfer of tribal land is a particularly contentious issue, it is important to

    highlight here that of all the households surveyed in Sarasmal and Kosampalli,

    68 percent of land belonged to tribals. In Tamnar, which has a much more

    diverse population, 20 percent of surveyed land belonged to tribals, 36 percentto OBCs, and 44 percent to the General category. A breakdown for the groups is

    shown in the following table, as are the types of transactions through which the

    land transfer took place.

    Table 4.1 Details of surveyed households

    Sarasmal & Kosampalli Tamnar

    NumberLand

    (in acres)

    Land (%

    of total)Number

    Land

    (in acres)

    Land (%

    of total)

    Landholdinghouseholds

    75 682 100% 111 390 100%

    of which SC 1 4 1% 1 1 0%

    ST 59 467 68% 26 77 20%

    OBC 14 202 30% 58 142 36%

    General 1 9 1% 26 170 44%

    Landless

    households8 - - 6 - -

    While the transfer of land occurred through private sale, government acquisition

    or illegal occupation, even within these categories there is a spectrum, withvarying degrees of compliance with due process.

    47%

    38%

    1%

    14%

    61%

    29%

    7%2%

    Land sold directly

    to the company

    Land acquired by

    the government

    on behalf of the

    company

    Land illegally

    occupied by the

    company

    Nature of land

    transaction

    unclear

    Chart 4.1 Breakdown of land in possession of thecompany (percentage of total)

    Sarasmal & Kosampalli

    Tamnar

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    16/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 6

    In some instances, transactions were conducted willingly between companies

    and landowners, with minimum infringement of the law, at least on paper. In the

    surveyed villages of Sarasmal and Kosampalli, sale of non-tribal land conducted

    willingly accounted for 15 percent of the total land sold, acquired or illegally

    occupied by the company, and in Tamnar, it accounted for 34 percent. However,

    even here, there are discrepancies between the compensation received. In all of

    the surveyed villages, companies typically first approach the biggest landholders

    in a village with offers to buy their land. They often also went on to become

    intimidators and agents of the company in helping the company to purchase land

    from other residents of the village. These landholders tended to be upper-caste

    and wealthy and, given their status as keys to purchasing land in the rest of thevillage, were able to negotiate better prices and compensation deals for

    themselves.

    With tribal land, even less can willing sales be accepted at face value. Provisions

    aimed at preventing tribal land alienation in Schedule V areas of the country

    prohibit the direct sale of tribal land to non-tribals or companies. However, a

    fairly common practice revealed during our surveys involved selling land to

    tribal employees at the company, or a tribal broker, thus making the actual sale

    legal (since it is still a transaction between two tribals). The use of this land bythe company, nonetheless, remains illegal, and obtaining this land via its

    employees is a clear violation of these rules. This is rarely ever investigated,

    since tribal employees and brokers do not file complaints against the company,

    and there is no other way to say how the land is being used. Of the total land

    sold, acquired or illegally occupied by the company, 14 percent in Sarasmal and

    Kosampalli, and 9 percent in Tamnar was tribal land that was reportedly sold

    willingly to the company.

    15%

    44%

    10%14% 16%

    2%

    34%30%

    17%

    9%

    2%7%

    Non-tribal

    land sold

    freely to the

    company

    Land acquired

    by the

    government

    Non-tribal

    land sold

    through

    intimidation

    Tribal land

    sold freely to

    the company

    Tribal land

    sold through

    intimidation

    Land illegally

    occupied by

    the company

    Chart 4.2 Nature of land transactions (percentage of total)

    Sarasmal & Kosampalli

    Tamnar

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    17/35

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    18/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 8

    In Sarasmal and Kosampalli, we found that 26 percent of the total land sold,

    acquired or illegally occupied by the company involved such forms of

    intimidation, and in Tamnar this was 19 percent of the total land. Whereas in

    Sarasmal and Kosampalli, the primary form of intimidation was threats by the

    company and its agents, in Tamnar, most households who were intimidatedreported that their land was dug up, earth and building materials were dumped

    on it, or that access to their fields was severely restricted due to the companys

    activities. Many who claimed not to have been intimidated nonetheless wished

    they had not sold their land, and worried about future livelihood security, or of

    feeling cheated because of inadequate compensation.

    Often when companies are unable to acquire land themselves from villagers or

    are not allowed to purchase land directly from tribals, they approach the block

    or district administration with a request for the acquisition of the required land.

    Land acquisition of tribal and non-tribal land through the government usually

    happens over several rounds, depending on the requirements of the company at

    various stages of the project. In Sarasmal and Kosampalli, 44 percent of the total

    land transferred to the company was acquired through the government, and in

    Tamnar this figure accounted for 30 percent of total land. While acquisition is

    considered to be the states prerogative,16 people report that they feel the

    acquisition was unjustified, or that their consent was not properly sought before

    the process began. Many came to know of their lands being acquired very late

    into the process, and there is some evidence that the government did not make

    enough of an effort in informing people well in advance, as they are required to.

    There are also cases of illegal occupation of private land by the company, where

    little or no compensation is paid. In a few cases, landholders were forced to sell

    after companies had already occupied the land and begun work on it. As land

    ownership had been transferred to the company, this appears legal on paper,

    although our interviews suggested otherwise. Such illegal occupation of land by

    the company accounts for 2 percent of all land procured by the company in

    Sarasmal and Kosampalli, and 7 percent in Tamnar.

    16This is no longer the case, since the recently passed land acquisition act requires a minimum

    level of consent if land is being acquired for private companies

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    19/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 1 9

    Occupation of forestland and government land

    In addition to private land, companies also utilize common lands and forests in

    and around villages, sometimes illegally. In Sarasmal and Kosampali, discussions

    revealed that the company had occupied at least 13.5 hectares (33.7 acres) of

    village common land, without approval from the Gram Sabha, and mining has

    continued on this land despite Gram Sabha resolutions calling for it to be ceased.

    In the case of forestland, documents obtained through the RTI indicate that nodiversion of forestland for mining and industrial purposes had occurred in

    Sarasmal and Kosampalli. This is at odds with information obtained through the

    survey, during which villagers reported that forestland surrounding the village

    was also being used by the company. Additionally, at least 10 villagers who were

    given title or pattas to forestland under the Forest Rights Act 2006 have had

    their land forcibly occupied, without any compensation, by the company. In some

    of these cases, the company claimed that this land had been allocated to them by

    the government.

    Illegal occupation of land

    Krishna Sao, a resident of Tamnar, found that 2 acres of land had been illegally

    occupied by JPL in 2002, and digging began on it without his consent. He was

    offered 2 lakh rupees per acre (at the time, legal transactions were usually

    settled at 50,000 rupees per acre), but he refused, and took his case first to theSub District Magistrate (SDM) court, and then to the High Court in Bilaspur. In

    2006 the court ordered that his land be returned, but he was unable to get this

    order implemented. In 2007, he approached JPL to provide him compensation

    for the crops that he lost, which was refused. In addition to facing harassment

    by the company when he filed a case, he was also harassed and pressured at

    his workplace, forcing him to resign the police service. Krishna Sao is an

    exception, and most others, even if they do file a case, do not pursue it after

    they are intimidated, either by the company or others in the village.

    In the case of Haripriya Bai Patel, 6 acres of her land was illegally occupied by

    Jindal Power Limited, and without any money or documents changing hands,

    construction of a residential complex for its employees began on the land.

    Haripriya Bai went to the district collector with this complaint, who ordered

    that the land be immediately returned to her, in its original form. When this

    did not happen, she took her case to the high court in Bilaspur, who ordered

    the same thing, most recently in November 2013, when it gave the company

    15 days in which to return the land. As with Krishna Sao, however, this order

    has not been implemented, and cannot be done without the proactiveinvolvement of the district administration, in particular the collector.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    20/35

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    21/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 1

    acquisition typically happens after the company has bought up whatever land it

    can beforehand, this is of little use. In any case, the government has set the bar

    too low to adequately account for the loss of livelihoods associated with land;

    until very recently, when compensation amounts were raised substantially,

    persons losing land due to government acquisition were paid less than Rs. 1 lakhper acre.

    In addition to setting the rates in a discriminatory fashion, companies will

    sometimes refuse to pay or delay payment as punishment for filing a case against

    them or resisting the acquisition and sale. Even the government is not entirely

    neutral in this process. In a letter from the residents of villages Sarasmal,

    Kosampalli, Kondkel, Dongamahua and Libra (all in the Gram Panchayat of

    Sarasmal) to the District Collector, the residents allege that 17 landholders from

    these villages (all of which have been affected by the JPL IV/2 and IV/3 coal

    mines) have not received any compensation for their lands, which were all

    transferred through government acquisition.18 The letter further lists each

    applicants name, land holding, and whether they have cases pending in a district

    or high court on the matter. Out of 17, only two have cases in the high court,

    while one is in the SDMs court. There are also those among the surveyed

    households who have not collected compensation for land acquisition in protest,

    opposing either the acquisition itself, or the extremely low values of

    compensation.

    As part of the rehabilitation process, the company is obliged to offer at least one

    job to each family whose land is acquired for industrial or mining-related

    projects. In Sarasmal and Kosampalli, 63 percent of the landowning households

    were offered a job by the company19but strikingly, only 25 percent of the total

    landowning families have received jobs for a family member. Tamnar does not

    fare much better, although the gap is slightly narrower 55 percent of

    landowning households were offered jobs, and 32 percent received them. The

    outcome is similar, with less than a third of landowning families actually

    receiving jobs as part of compensation. People also complained that the jobs

    offered were mostly for low-paying contractual work, which usually paid

    between 4,000 rupees to 5,000 rupees per month. These jobs provide neither

    sustainability nor significant compensation for loss of livelihood.

    Several of those who received jobs, and others who wanted to but did not,

    reported that it often takes several trips and repeated requests to the company

    before even a contractual job is provided, let alone a permanent one. Others

    18A copy of the letter is available at the Sarasmal Gram Panchayat. It is undated.19This includes both cases of land acquisition, and instances where jobs were promised to

    landholders, as an incentive to sell their land to the company.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    22/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 2

    claimed that jobs were promised to each shareholder of a commonpatta (such as

    family-owned land, where three or four brothers jointly hold the title of the

    land), but ultimately provided only to one shareholder. Some respondents also

    reported that during the sale or acquisition, the company offered to sponsor the

    education of the children of the landholders, a promise that they have failed tofulfill across the board.

    iii. Awareness and ConsentOne of the most remarkable and, we believe, important findings of the study is

    the awareness of procedures related to sale and acquisition of land. Many people

    were unaware of the requirements from the government and company, and

    others pointed out that both had deliberately flouted these procedures.

    During instances of land acquisition, the government is obliged to provide a

    public notification of the acquisition, with the option for affected landholders to

    appeal against the decision within 30 days. In Sarasmal and Kosampalli, we

    found that only 12 percent of total landholders whose land was acquired were

    informed about it well in time, either through newspapers or through a

    notification at the Panchayat office. Another 46 percent found out after the

    notification period, but before the process of land acquisition had been

    completed.

    Similarly, in Tamnar, only 22 percent claim to have been informed in time about

    the land acquisition process, and 46 percent found out after the notification

    period. Results also show that 19 percent in Sarasmal and Kosampalli, and 22

    percent in Tamnar found out about the acquisition not only after the stipulated

    period, but indeed after work had already begun on the land. In several cases,

    people reported that the first they heard of the acquisition was when they were

    asked to pick up their cheques at the Sub-District Magistrates office.

    12%

    46%

    19%24%22%

    46%

    22%

    10%

    Before the end of

    the notification

    period

    After notification

    period but before

    completion

    After procedure

    was completed

    No response

    Chart 4.3 Notification about compulsory land

    acquisition by government

    Sarasmal & Kosampalli Tamnar

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    23/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 3

    The low levels of awareness about notification and appeal explain why despite a

    lot of opposition, only 3 households in Sarasmal and Kosampalli, and in Tamnar,

    whose land was acquired by the government reported filing an official appeal

    against this land acquisition with the relevant authorities. Many reported being

    unaware that appeal was possible, while others were reluctant because ofintimidation by company agents or after seeing the fruitlessness of others

    efforts. All those that have appealed have reported a lack of response and no

    positive outcomes for their case.

    Perhaps the biggest fraud perpetuated by companies has been in obtaining false

    No Objection Certificates (NOCs). Under the provisions of the PESA Act, land

    acquisition in Schedule V areas is only possible with the consent of the Gram

    Sabha,20 but in Sarasmal and Kosampalli, as well as Tamnar, NOCs have been

    taken from the Gram Panchayatinstead(who are sometimes beneficiaries of the

    ensuing process, one dissenting gram panchayat member in Tamnar informed

    us), which is illegal.21 In Sarasmal and Kosampalli, only 31 percent of the

    respondents were aware that NOC procedures had not been followed or that afalse NOC had been issued, while another 59 percent said that they were

    unaware about NOC procedures, or did not attend the Gram Sabha regularly and

    were thus not aware. In Tamnar, these numbers were 46 percent and 34 percent

    20As discussed earlier, private land sales from tribals to non-tribals are illegal in all instances,

    irrespective of the consent of the Gram SabhaG21Residents of Sarasmal filed an objection stating that on the date on which the false NOC is

    issued, there was no meeting of the Gram Sabha in the village. As a result, there are now two

    official documents, one that claims to have granted the NOC, and another which declares that

    there was no such meeting on this date, the latter filed in response to the former. See also

    Debarshi Dasgupta, Where the Ore Sinks the Earth, Outlook, 24 September 2012.

    Misinformation and Land Transfers

    It is not uncommon to hear of people discovering after the fact that their land

    had either been sold or acquired without their knowledge. In what might

    sound like the plot of an especially absurd film, Bharat Raj Sidar, from Milu

    Para, found that not only was his 1.8 Hectares of land sold without his

    knowledge and consent to a person whom he had never met nor seen, but

    also that it had been sold on his behalf by a woman impersonating his wife.

    The situation took another bizarre twist when upon filing a case in the high

    court, the revenue department claimed to have lost all documentation

    pertaining to his case. This case, filed in 2001, continues to be fought in the

    high court, and in the last 12 years Bharat has received several lucrative

    offers from Monet Ispat Limited (the company in question) in exchange for

    dropping the case, all of which he has refused. The former General Manager of

    the company has already been jailed for forging the signature of the buyer.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    24/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 4

    respectively. In both cases, only 1 percent thought that the procedures had been

    carried out legally. In at least four other villages22 in Tamnar block, false NOCs

    had been taken from Gram Panchayats for projects being implemented in their

    vicinity. Despite this, there has been no attempt by the local authorities to

    investigate the issue and take appropriate action.

    iv. Impact of the projectImpact on Livelihood Security

    The question of livelihoods is a crucial one in the debate on land acquisition.

    Most of the respondents were concerned that without land, their traditional

    occupation of agriculture and related activities like livestock rearing andcollection of forest produce were under threat. Thus, an important learning from

    the survey has been the proportion of people that have been rendered

    completely landless by the acquisition, and how many remain with land on

    which to farm. 64 percent of the total landholding households surveyed in

    Sarasmal and Kosampalli, and 44 percent of those in Tamnar had become

    completely landless as a direct result of the project i.e. all of their existing land

    holdings were bought by the company and its intermediaries, or compulsorily

    acquired by the government.23A few of these people have bought land elsewhere

    with the compensation money received. 9 percent of landholding households inSarasmal and Kosampalli, and 15 percent of those in Tamnar had less than 2

    acres of land remaining, meaning they are engaged in some form of subsistence

    farming. Food security was a particularly important concern, with most people

    having previously grown and consumed their own food, and sold the surplus for

    additional expenditures. As a result of becoming landless, people were

    concerned that their expenditures would increase because of having to now buy

    food from the market, or from the Public Distribution System, and that this was

    22Gare, Kharsiya, Saraitola and Jhikabahal23This is separate from the number of people that were already landless at the beginning of the

    survey

    59%

    31%

    1%

    8%

    34%

    46%

    1%

    19%

    Unaware/do not

    attend Gram

    Sabha

    No NOC/false NOC

    issued

    Legal NOC

    issued/procedures

    were followed

    No response

    Chart 4.4 Knowledge about Gram Sabha NOC

    Sarasmal & Kosampalli Tamnar

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    25/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 5

    not properly offset in the rehabilitation and compensation offered to them by the

    company.

    Eight of the respondents that were surveyed in Sarasmal and Kosampalli, and 6

    respondents in Tamnar, were initially landless, and thus not eligible for anycompensation or rehabilitation. However, the presence of the mines has

    negatively impacted their livelihoods, as they worked as agricultural labourers

    on other peoples lands. Additionally, any earnings that they made from common

    lands or minor forest product are also compromised. However, this section of

    affected people has not been addressed by the company or the government, and

    they continue to struggle to make ends meet without any external help.

    Impact on Health and Environment

    In general, regulations on environment are clearer than those on land

    acquisition, with clear guidelines in place for each step. The company must apply

    for an environmental clearance from the Ministry of Environment and Forests

    (MoEF) at the central level, as well as seek approval from the State Pollution

    Control Board at the state level, after which it is obliged to submit an

    Environmental Impact Assessment (EIA) report from an independent agency.

    The submission of the EIAs must be followed by a public hearing or jan sunvahi,

    to be announced in at least 2 local newspapers, and must include all affected

    persons within a 10 kms radius. After the jan sunvahi, the company is expected

    to submit a report of its compliance with various local environmental issues, and

    once the MoEF has satisfactorily reviewed thejan sunvahiproceedings and other

    submissions, the company is granted a clearance.

    Local activists in Raigarh have argued that companies writing the EIAs are not as

    independent as they may appear, and are paid by companies to write favourable

    reports. A second complaint, by activists and villagers alike, is that these 400-

    64%

    9%

    27%

    44%

    15%

    41%

    Landless Subsistence farming (

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    26/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 6

    page reports, as well as their 20-page executive summaries are almost always in

    English, and are hardly ever circulated widely, thus making affected persons

    unable to comment effectively on their contents. While the jan sunvahi is

    supposed to be about environmental issues, it often becomes a forum for

    discussion about social and land-related impacts as well, since there is no otherplatform to voice these concerns publicly. Reports of misconduct atjan sunvahis

    are not common, and one in Gare in 2008, a hearing of the IV/6 coal mine

    allocated to Jindal Steel and Power Limited, was lathi-charged.24 Activists also

    report thatjan sunvahis are usually held in remote and difficult to access villages,

    in order to limit local participation, and that company supporters from other

    areas are brought in to speak on behalf of the company.

    Despite such violations, the flouting of environmental norms is increasingly

    being more carefully monitored. The National Green Tribunal (NGT), for

    instance, invalidated the January 2008 public hearing at Gare, and directed the

    company to hold another. On other issues relating to the expansion of the

    2400MW plant, the NGT had also ordered expansion to be stopped until

    environmental clearances are properly obtained. It is easier to successfully

    appeal the stay or reversal of an industrial project on environmental grounds,

    particularly with the establishment of independent agencies like the NGT at the

    centre, than it is on grounds of unfairness in the land acquisition process.

    However, closer monitoring of environmental standards has nonetheless not

    eased the negative effects on the environment at the village level. In essence,

    once the applications are cleared and work has begun, there is no follow-up or

    monitoring of the extent to which environmental standards with regards to

    pollution and health impacts are being met.

    In Sarasmal and Kosampalli, which are both now situated on the edge of the JPL

    coal mine, the primary source of concern is coal dust, which settles on everything

    in and around the village from trees, crops, clothes, etc. Coal dust, dirty water

    and other waste from the mines seeps into the nearby rivers and ponds, making

    this water unfit to drink. Some people also reported getting skin infections from

    bathing or washing their clothes in the water. The presence of the coal mine also

    means a significant increase in the air pollution, and noise pollution. Twice a day,

    there are blasts to dig deeper for coal, and this results in violent shaking. In some

    instances, rocks and debris from the mines fly out due to the blast, and land on

    the roofs and houses of the inhabitants, often causing serious damage to the

    structures. In addition, the vast amount of deforestation has meant a significant

    24An alternative jan sunvahi was conducted in September 2013. See Alok Gupta, 'Public Hearing

    for Jindal coal projects held amid protests', Down to Earth, 27 September 2013. Available at

    http://www.downtoearth.org.in/content/public-hearing-jindal-coal-project-raigarh-held-amid-

    protests

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    27/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 7

    reduction in access to forest produce, and the takeover of common land by the

    company has meant reduced availability of fodder for livestock.

    In Tamnar, living right next to the power plant means constant exposure to

    smoke from the plant, as well as increased air pollution due to this and thepresence of coal dust in the air. Villagers reported a noticeable increase in

    respiratory diseases, and sickness among children. Pollution is affecting the

    health not only of humans, but also livestock. As with Sarasmal and Kosampalli,

    water pollution is a major issue, particularly with regard to industrial effluents.

    Water is unfit for drinking or bathing in, and locals say the availability of fish in

    the water bodies is decreasing.

    Social Impacts

    In addition to affecting the physical environment, the presence of the company

    also has adverse effects on the socio-cultural life of the community. In all three

    villages, the presence of industry meant that many labourers were brought in

    from outside. This created a sense of resentment among the residents, which

    often manifested itself in claims about those outsiders making the area more

    unsafe for women, or being the cause of increased instances of crime. Others

    pointed out that there was increase in the number of road accidents because of

    the number of dumper trucks carrying coal to the plant, reportedly driving at

    reckless speeds.

    The biggest change for the affected families was the changing nature of

    livelihood, and of learning to cope with a new way of life that did not have

    agriculture at its core. Many families were accustomed to producing their own

    grains, fruits and vegetables. Others felt that the company was not compensating

    adequately for the loss of livelihood. The effect on employment overall however

    was ambiguous, many felt that the company had generated more employment by

    being established there in particular, people of lower castes in Tamnar village

    felt their social standing had improved, and their being landless no longer meant

    that they were at the mercy of the upper caste landowners of the village. Others

    also felt that the level of education had improved, more people were sending

    their children to private school than before. Even some of those who were not

    properly compensated said that if they had been, perhaps life would have

    improved, as it appeared to have for those who had been properly compensated.

    However, most felt that losing land meant losing their livelihood, which had not

    been replaced with a steady source of income from the company. It was pointed

    out that those who received the most generous compensation packages were

    those that were already powerful in the village the large landowners, who

    ultimately became facilitators for the company.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    28/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 8

    v. Corporate Social ResponsibilityUnder Corporate Social Responsibility, companies are expected to provide

    certain services and undertake work to fulfill the developmental needs of the

    villages. In the case of Tamnar, this includes the building of boundary walls for

    schools, building water tanks, public taps and digging bore wells to providedrinking water, building roads, setting up community halls, and sometimes

    putting up a medical camp and providing free medicines. Additionally, some

    people also reported individually receiving financial assistance, or donations for

    festivals. Many people responded to questions about CSR with an irritable what

    have they done here, even where the company had undertaken CSR efforts in the

    village. CSR mainly is a fraction of R&R responsibilities, but done as a kind of

    charity, rather than the right of affected persons. The general sense, with few

    exceptions, was that digging wells or putting taps in place was not adequate for

    the loss of land and livelihood that most people have had to suffer. Most people

    said they would have preferred getting a permanent job with the company

    instead, and some even complained that the water in the taps was not fit for

    drinking, which rendered their provision somewhat ineffective. Many believed

    that the CSR activities were tokenistic, and not necessarily in the best interests of

    the village.

    As an answer to a question in the Vidhan Sabha in 2011, Jindal Power Limited

    (which owns both the coal mines in Sarasmal and Kosampalli, as well as the

    power plant in Tamnar) reported that from 2006 to 2011, in the district of

    Raigarh, it had spent only Rs. 46 crores on corporate social responsibility and

    other activities, having promised, at the start of 2006, to spend at least Rs. 150

    crores over three years.25According to its own admission, however, it has failed

    to spend even a third of this amount over five years.26Moreover, in each year,

    among its largest expenditures on CSR is on the development of and student

    welfare in the O.P. Jindal school in Raigarh.27This, however, is a private school in

    the city of Raigarh, not benefitting the children of any affected people in the

    villages of the district (a fact that has not gone by unnoticed in the rural areas

    affected by industry and mining).

    25Information submitted in response to Vidhan Sabha question no. 767 (b), asked by MLA

    Mohammed Akbar in the Monsoon session of 2011. The document contains information on

    previous conditions fulfilled by industries in the state of Chhattisgarh. This document was

    obtained under the RTI act in Raigarh.26The figure for the first three years is even lower, just under Rs. 40 crores.27Expenditures on the O.P. Jindal School in each year are as follows: 1.4 crores in 2006-07

    (biggest expenditure that year); 3.18 crores in 2007-08 (biggest expenditure that year); 2.16

    crores in 2008-09 (third largest expenditure); 10.5 crores in 2009-10 (third largest); 38.9 lakhs

    in 2010-11.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    29/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 2 9

    The District Collector of Raigarhs note on proposing a new CSR policy also notes

    that present CSR spending is arbitrary and ad-hoc in nature, that there is

    inadequate monitoring, and that people are generally skeptical of companies

    efforts, which the document acknowledges are often ingenuine.28In an effort to

    streamline CSR with the development agenda of the district, Raigarh has set up acommon fund at the DCs office, which will collect CSR money directly from

    companies, and set up a monitoring cell to ensure that it is used productively and

    for genuine development efforts.

    5. Role of the State in the context of the new land acquisition lawAs we saw in Raigarh, although land transfer implemented by the State was

    accomplished through means that formally appear legal, they often involved

    practices that were not substantively legal and threatened the rights of the very

    people that the law was meant to protect. Affected families had difficulty in

    telling the State and the private industry apart in the land acquistion process,

    which suggests either that the two acted in tandem or the outcomes of the direct

    land transfer and compulsory acquisition by the State were not vastly different.

    Even if private companies alone were responsible for the disregard for law such

    as that observed in Raigarh, the State is complicit in the act by its very absence

    and inability to prevent such practices.

    28Approach Note for CSR Policy in Chhattisgarh, 31 March 2012, District Collectorate, Raigarh.

    Alternative mechanisms: The role of community mining

    As an alternative to big companies mining land, residents of Gare in Tamnar

    have launched a campaign for what they call community mining, where

    landholders themselves will be in charge and will directly reap the profits of

    coal mining. On 2 October 2012, villagers symbolically broke what they called

    the koyla kanoon, saying that if coal mining is essential for the development of

    the nation, then they can do this themselves, by setting up a company in which

    the villagers are shareholders, so that they have an equal stake in what

    becomes of their land.1 In return for this, they are willing to pay the

    government ten times the royalty that mining companies pay. In the case of

    Gare, which falls within the disputed IV/6 Gare-Pelma coal block, the mining

    rights for this coal block have already been allotted to JSPL in 2006. The

    company had until 2012 to acquire land, get environmental clearances and so

    forth. The only way in which the community can ask for this allotment to be

    revoked is if the corporation does not adhere to the timeline and the

    community asks for the rights instead. So far the government is silent on the

    issue, with matters being complicated by the fact that the JSPL has failed to

    acquire the requisite land and environment clearances in the stipulated time.

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    30/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 3 0

    However, with the State unable to execute public purpose at the speed and with

    the efficiency necessary to meet its development goals, there appears to be no

    viable alternative at present to the idea of private involvement in executing

    public purpose. Some alternatives have emerged to the development process

    being managed by local communities, without the involvement of the State orprivate companies (see box on community mining in Gare), but these are largely

    isolated incidents and have received little support from the State.

    There is little consensus at present on how the role of the State should change, to

    respond to the new challenges that emerge as a result of the withdrawal of the

    State from taking a lead role in this process. In such a situation, the land

    acquisition law in the country becomes an extremely important tool for setting

    clear guidelines for the State, as well as codifying a minimum standard for large-

    scale private land transfers. Currently, there are at least 4 prevailing views about

    what the role of the State should be in land transfers between private companies

    and landowners, for public purposes:

    i. Hands-off Policy: One important view is that the state should havenothing to do with compulsory land acquisition for private companies. If

    private companies need land, they should negotiate with the landowners

    and pay them what they demand, if they choose to sell their land. If they

    do not, then they should not be forced to do so by the state.

    The willing buyer-willing seller model is said to be an efficient mechanism

    that allows for the two parties involved to directly negotiate a price

    acceptable to both and accounts for subjective preferences that could be

    higher than the objective rate of compensation decided by the State.

    However, the Raigarh experience shows us that this is far from the case.

    Between the acquirer and the affected person, the balance of negotiating

    powers is tilted in favour of the acquirer who has more resources, access

    to more information, more agency and is better organised than the land-

    and livelihood-losers. Thus, the probability that coercive tactics and

    intimidation will be used to persuade unwilling sellers to become

    willing sellers at a price acceptable to the acquirers is quite high. In the

    case of Raigarh, common tactics used to intimidate landowners were the

    dumping of earth and other materials on the fields and blocking access to

    the fields.

    Another problem with this approach is that the receiving company is not

    obliged to undertake R&R, or offer adequate compensation. What goes in

    the name of CSR is no substitute whatsoever to a rights-based legally

    binding entitlement of R&R (which we shall see the new legislation, nowin force, does address).

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    31/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 3 1

    ii. The 75:25 Approach: A second approach is that the private companyshould be required to first purchase a certain proportion of the land

    themselves, say 75% or 80%, through the willing buyer-willing seller

    model. It should then be their right to approach the state to compulsorily

    acquire the remaining land for them.

    This option is often touted to be optimal for growth in terms of

    discouraging the holdout problem that often delays projects that provide

    a clear public benefit. When the option exists for people to claim

    compensation by the government by holding out, they can in theory

    refuse any offer that is lower. It would appear that this option leaves the

    affected persons best off, by encouraging private companies to provide

    higher compensation, but this is not so. This method also discounts the

    imbalance of powers between the two negotiating parties and those

    without agency again are vulnerable to exploitative sales. In the case of

    Raigarh, we saw that powerful landowners were the first to sell, and on

    average received better compensation than the smaller landowners, who

    were from the SC and ST communities. In addition, the threat of forced

    acquisition by the government was used to force landowners to sell their

    land to the company.

    This approach in fact benefits private parties the most as, in effect, there

    is no real cost to the company from the holdout, with the government

    guaranteeing that land will be acquired from the recalcitrant landholders.

    There is therefore no incentive for the company to offer compensation

    packages higher than that offered by the State. Furthermore, this leaves

    no choice with the affected person about whether their land should be

    acquired or not (unlike the hands off approach) and can be especially

    harmful when the public benefit is hard to establish, when the State sides

    with the private company and/or when the legal provisions for

    compensation and rehabilitation are insufficient.

    iii. Compulsory Acquisition Only by the State: A third view is that all landacquisition for public purpose should be done by the State, and not by

    private companies. This hopes to address the inequality in bargaining

    power between the company and the landowners, which often leads to

    coercive sales, putting landowners at a disadvantage. This method is

    meant to ensure that the acquisition is legally implemented and adheres

    to minimum standards for compensation, rehabilitation and resettlement,

    as mandated by the law.

    Our findings in Raigarh show that this is not necessarily true, and that thestate is also susceptible to powerful influence and corruption. Grievance

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    32/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 3 2

    redressal was ineffective, since filing an appeal did not mean that the land

    was returned, neither did compensation increase. However, proponents

    of this view argue that it is the least unfair of all the methods. The

    presence of the State as the negotiator creates an accountability towards

    the people that private companies do not possess, whether in matters offairness of transaction, compensation, consent, or other pertinent issues.

    This view argues that the state, however flawed, nonetheless has more of

    an incentive to act in the public interest and that this is the most equitable

    (or least inequitable) approach to land acquisition.

    iv. Choice Between Direct Purchase and Compulsory Acquisition: Afourth view is that the choice should lie with the private company;

    whether it wants the government to acquire land or it wishes to approach

    landowners directly.

    More so than the 75:25 approach, this method provides some incentive

    for companies to provide higher compensation than mandated by the

    government, as there is no option to ask the government to acquire the

    remainder of the land area in cases of holdout. However, when the

    company chooses to acquire the land itself, this method suffers from the

    same drawbacks highlighted in the hands off approach. When the

    government acquires land on behalf of the company, this method has

    similar outcomes to the one in which compulsory acquisition is

    permissable only by the State.

    The Right to Fair Compensation and Transparency in Land Acquisition,

    Rehabilitation and Resettlement Act (hereafter referred to as the RFCTLARR Act,

    2013) was passed in September 2013, replacing the Land Acquisition Act, 1894,

    which, despite its colonial legacy, had continued to be in effect for more than a

    half-century after Indias freedom in 1947. The earlier law was a mixed bag of

    various approaches but adhered most closely to the 75:25 rule, even though no

    such limits to how much land the company was required to purchase were set in

    advance. This effectively amounted to a hands-off approach by the State, until the

    company failed to purchase the entire parcel of land that it required for the

    project. The company could in this situation request the government to step in

    and acquire the remaining portion of the land through compulsory acquisition.

    Indias new RFCTLARR Act, 2013 is a variation of the last approach, which allows

    private companies to choose whether the government will acquire the land

    through the procedures laid down in the RFCTLARR law or the company will

    acquire the land through direct negotiation (willing buyer-willing seller).

    However, in situations where the company chooses to approach the governmentto acquire land on their behalf, they are required to get the consent of 80 percent

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    33/35

    C e n t r e f o r E q u i t y S t u d i e s | W o r k i n g P a p e r P a g e 3 3

    of affected families (70 percent in the case of public-private partnerships). When

    the companies acquire the land themselves, they are also required by this law to

    provide compensation, rehabilitation and resettlement to affected families, in

    cases of large-scale acquisitions. Our dominant concern is that if the companies

    do choose to or are compelled to buy the land for themselves, as in Raigarh,strong-arming and intimidation tactics will continue. There is also little guidance

    on how compliance with the law will be monitored, for example in ensuring that

    affected persons were correctly identified, compensated and rehabilitated.

    All the methods mentioned above, except for the one in which only the State is

    authorised to acquire land for public purpose, require that the State be present

    as a neutral arbitrator and a guardian of rights for the affected person, to prevent

    the unjust land transfer practices observed in Raigarh. The absence of the State

    in this capacity has grave consequences for those affected, including, but not

    limited to, displacement without resettlement and rehabilitation, health

    problems and loss of livelihood. Only the State can hold private companies

    accountable for delivering large-scale public benefit without imposing a

    significantly larger public and environmental cost. At the same time, the law

    governing land acquisition by the State should also impose strict guidelines on

    the State for when compulsory acquisition can be exercised, what its

    responsibilities are and any such law should pay particular attention to

    recording and resolving public grievances. The RFCTLARR Act attempts to

    accomplish this in three ways:

    i. Defining Public Purpose: The Act gives us a list of public purposesfor which land can be acquired under provisions of the Act. These

    include, among others, strategic defence and national security,

    permitted infrastructure projects, housing and urban development,

    residential housing for the poor and landless, as well as land for

    persons displaced or affected as a result of natural calamities or

    schemes implemented by entities owned or controlled by the State. In

    Schedule 1 of Section 2 in the RFCTLARR Act, 2013 projects for

    industrial corridors or mining activities, national investment and

    manufacturing zones, as designated in the National Manufacturing

    Policy are considered within the scope of public purpose. The list

    clearly lists the purposes for which the law applies and is, therefore,

    less open to interpretation than its predecessor. The list has no open-

    ended clause for other purposes that are unforeseen at the time of the

    drafting of the law, as is common in some other countries. However,

    the list of permitted infrastructure projects allows for other projects

    to be included within in by tabling a notice in Parliament to that effect.

    It must be noted here, however, that there are no constitutionalprovisions or guidelines regarding compulsory land acquisition and

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    34/35

  • 8/13/2019 Land Acquisition and Transfers for Private Industry_211213

    35/35

    should ideally protect the interests of the affected persons, the Raigarh

    experience shows that malicious intent often leads to circumvention of the law

    and coercive practices to obtain consent, even if the language of the law dictates

    otherwise.

    The RFCTLARR Act, 2013 also inexplicably exempts some important laws from

    the acquisition, rehabilitation and resettlement procedures laid down in the Act

    for a year from the commencement of the Act. These laws include the Railways

    Act, the Coal Bearing Areas Act and the Land Acquisition for Mines Act, which are

    among those under which the largest amount of land acquisition takes place.

    While this schedule already includes thirteen such laws, the Centre can add to or

    subtract from this list by executive notification.

    Even though the new Act has generous entitlements for affected families (not

    just land losers), the States demonstrated bias towards supporting private

    industry at the expense of the affected persons means that private land-owners

    could continue to be pauperised, receiving rock-bottom rates for land, which

    either the state formally acquires from them, as it did for state implementation of

    public purpose projects in the past, or land which they voluntarily sell to

    private companies. Without sensitive institutions, participation of local bodies

    such as the Gram Sabhas and participation of the affected families themselves, it

    is unlikely that the experience of affected families under the RFCTLARR Act,

    2013 will be vastly different from those in Raigarh.