Carbonyatra presents highlights in the carbon market NOV 2010 updateTRANSCRIPT
CDM STATUS (Source: UNEP RISO)
CDM news:
In October 98 new CDM projects entered the CDM Pipeline.
The issuance of CERs in October was 10.2 MCERs.
UNEP projection for the number of CERs issued until the end of 2012 decreased from 976 MCERs to 954 MCERs. Of the 114 MCERs on the issuance waiting list the 77 MCERs are from projects with issuance requests under various stages of completeness check by the UNFCCC Secretariat.
The amount of CERs issued is now 450 Million CERs. The average issuance success is 96.2%. Only 802 out of the 2463 registered CDM projects have had issuance of CERs.
The share of projects that have requested registration that is registered automatically is increasing, meaning that the time delay from the review cycle is decreasing.
The CDM Pipeline now contains 5619 CDM projects after subtracting the 762 CDM projects where the DOEs terminated validation, the 162 where the DOEs gave a negative validation, the 173 projects rejected by the EB, and the 51 withdrawn projects. 207 are in the registration process.
One new PoA was submitted in October, increasing the number of PoAs to 59: “Sichuan Rural Poor-Household Biogas Development Programme” in China The data shows that the average approval time is 296 days for a full scale methodology, 188 days for a small-scale methodology, and 367 days for an A/R methodology.
Status of CDM projects Number At validation 2949 Request for registration 95 Request for review 60 Correction requested 28 Under review 24 Total in the process of registration 207 Withdrawn 51 Rejected by EB 173 Validation negative by DOE 162 Validation terminated by DOE 762 Registered, no issuance of CERs 1661 Registered. CER issued 802 Total registered 2463 Total number of projects (incl. rejected & withdrawn) 6767
Types of CDM projects by status At validation Request registration
Type (rejected projects excluded) Number kCERs 2012
kCERs Number kCERs 2012
kCERs Afforestation 8 400 1839 0 0 0 Agriculture 1 10 18 0 0 0
Biomass energy 399 27214 85364 12 973 2815 Cement 18 3635 10732 1 240 818
CO2 usage 1 5 17 0 0 0 Coal bed/mine methane 30 19028 58938 14 6386 18087
Energy distribution 19 5147 13265 1 230 633 EE households 44 1465 3784 7 155 375
EE industry 83 3958 10388 2 17 135 EE own generation 289 28695 91416 16 4284 12375
EE service 20 249 699 0 0 0 EE supply side 62 27794 50014 3 3475 600
Fossil fuel switch 71 19342 54333 6 3473 8771 Fugitive 23 7180 19094 2 1525 4026
Geothermal 4 320 1122 2 1198 3529 HFCs 1 18 68 0 0 0 Hydro 738 94255 204859 65 8163 20018
Landfill gas 140 15641 42360 9 1273 3390 Methane avoidance 270 16104 53195 9 349 854
N2O 10 2311 6353 0 0 0 PFCs and SF6 8 1747 3882 1 155 350 Reforestation 34 3960 9128 0 0 0
Solar 45 1552 2890 1 23 57 Tidal 0 0 0 0 0 0
Transport 28 3006 7178 1 218 491 Wind 603 49477 119146 55 6145 16451
Total 2949 332516 850084 207 38282 93775
Number of CDM projects in Asia by country
China50%
India33%
Malaysia3%
Vietnam3%
Thailand3%
Indonesia2%
South Korea
2%
Philippines2%
Pakistan1% Sri Lanka
0.5%
Others1%
Volume of CERs until 2012 in Asia by country
China67%
India20%
Malaysia2%
Vietnam1%
Thailand1%
Indonesia2%
South Korea5%
Philippines0.6%
Pakistan1%
Sri Lanka0%
Others0%
Top 20 CDM buyers Projects EcoSecurities 295 Tricorona Carbon Asset Management Sweden 175 EDF Trading 136 Vitol 124 Mitsubishi 105 RWE 99 Carbon Resource Management 99 AgCert 96 CAMCO 84 Danish Ministry of Climate & Energy 72 Noble Carbon 70 Trading Emissions 67 Bunge Emissions Group 65 MGM Carbon Portfolio 64 Cargill International 62 ENEL 61 KfW 58 Agrinergy 58 Kommunalkredit 57 Marubeni 56
Top 20 PDD consultants EcoSecurities
Beijing Tianqing Power International CDM Consulting
AgCert PricewaterhouseCoopers
CasperVanderTak
WB-CF CAMCO
Carbon Resource Management
CWEME Ecoinvest Agrinergy
Mitsubishi UFJ Securities Tsinghua University
Zenith Energy Services Easy Carbon
AGET
Econergy Hunan CDM Project Service Center
Senergy Global MGM
Time used for Completeness Check
0
20
40
60
80
100
120
140
160
180
Jun/
05A
ug/0
5O
ct/0
5D
ec/0
5Fe
b/06
Apr
/06
Jun/
06A
ug/0
6O
ct/0
6D
ec/0
6Fe
b/07
Apr
/07
Jun/
07A
ug/0
7O
ct/0
7D
ec/0
7Fe
b/08
Apr
/08
Jun/
08A
ug/0
8O
ct/0
8D
ec/0
8Fe
b/09
Apr
/09
Jun/
09A
ug/0
9O
ct/0
9D
ec/0
9Fe
b/10
Apr
/10
Day
s
The average time to get a new methodology approved or rejected
0
50
100
150
200
250
300
350
400
Large-scale Small-scale A/R
Day
s
Rejected
Approved
RETIRED VOLUNTARY CARBON CREDITS (VCS) FROM INDIA
From Vintage To Vintage
VCU Quantity
Project ID Project Name
Issuing Registry
April-09 September-09 100 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
April-09 September-09 150 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
January-09 October-09 33000 404
Bundled Wind Power project in Tamil Nadu managed by Enercon India Limited – II APX
June-08 November-08 148 51 29.70 MW Wind Power project in Karnataka India APX
June-08 November-08 11 51 29.70 MW Wind Power project in Karnataka India APX
April-08 June-08 10 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
April-08 June-08 9 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
April-08 June-08 2 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
April-08 June-08 1150 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
January-08 May-08 352 109 8.25 MW Bundled Wind Power Project APX
January-08 December-08 3427 404
Bundled Wind Power project in Tamil Nadu managed by Enercon India Limited – II APX
January-08 October-08 30037 145
Enercon Bundled Wind power projects (2004 Policy) in Rajasthan APX
January-08 March-08 20264 127
Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) APX
January-08 March-08 2 127
Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) APX
January-08 December-08 1019 429 Grouped Wind Power Project in India TZ1 Limited
January-08 June-08 20769 37 ISLWASTE HEAT RECOVERY PROJECT APX
January-08 June-08 4492 37 ISLWASTE HEAT RECOVERY PROJECT APX
January-08 June-08 2597 37 ISLWASTE HEAT RECOVERY PROJECT APX
January-08 May-08 7226 346 Wind power project by GFL in Gudhepanchgani TZ1 Limited
September-07 June-09 4268 292
150 MW grid connected Wind Power based electricity generation project in Gujarat, India. APX
May-07 May-08 10508 285
Rice husk based Co generation project at Dujana unit of KRBL Limited
Caisse des Depots
May-07 December-07 11754 37 ISLWASTE HEAT RECOVERY PROJECT APX
April-07 December-07 15445 136 Tungabhadra Wind Power Project. APX
April-07 April-09 25453 306
8.5 MW Wind Energy Project by KS Oils Limited, India APX
April-07 March-08 9123 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
February-07 December-07 29649 346
Wind power project by GFL in Gudhepanchgani TZ1 Limited
January-07 October-07 100 1
7.25 MW wind energy project of Aruppukottai Sri Jayavilas Ltd APX
January-07 December-07 4239 109 8.25 MW Bundled Wind Power Project APX
January-07 March-07 1625 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
January-07 March-07 3035 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
January-07 March-07 5340 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
January-07 December-07 31616 145
Enercon Bundled Wind power projects (2004 Policy) in Rajasthan APX
January-07 April-07 4744 43
Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan TZ1 Limited
January-07 December-07 79734 127
Fuel switchover from higher carbon intensive fuels to Natural Gas (NG) at Indian Farmers Fertiliser Cooperative Ltd (IFFCO) in Phulpur Village, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd (IFFCO) APX
January-07 December-07 725 2 LITL's Wind Power Project at Tamilnadu TZ1 Limited
January-07 December-07 12015 2 LITL's Wind Power Project at Tamilnadu TZ1 Limited
October-06 December-06 2902 145 Enercon Bundled Wind power projects (2004 APX
Policy) in Rajasthan September-
06 December-06 1260 2 LITL's Wind Power Project at Tamilnadu TZ1 Limited
July-06 September-08 19964 132 9 MW Neria Hyrdroelectric project, Karnataka, India APX
April-06 December-09 550 423
2.225 MW wind power project in Tamil Nadu, India. APX
April-06 November-08 30171 170
22.5 MW grid connected wind farm project by RSMMLin Jaisalmer,India APX
April-06 November-08 31041 170
22.5 MW grid connected wind farm project by RSMMLin Jaisalmer,India APX
April-06 December-08 5322 134
3.9 MW Bundled renewable energy project in Tamil Nadu, India APX
April-06 December-08 926 134
3.9 MW Bundled renewable energy project in Tamil Nadu, India APX
April-06 December-08 866 134
3.9 MW Bundled renewable energy project in Tamil Nadu, India APX
April-06 December-08 207 134
3.9 MW Bundled renewable energy project in Tamil Nadu, India APX
April-06 December-08 448 134
3.9 MW Bundled renewable energy project in Tamil Nadu, India APX
April-06 December-06 1 147
9.75 MW WIND POWER PROJECT AT CHITRADURGA, KARNATAKA, INDIA BY ESWARI GROUP. APX
April-06 March-07 21222 101
Bagasse based Co-generation Power Project at Khatauli APX
April-06 December-07 14281 429 Grouped Wind Power Project in India TZ1 Limited
March-06 June-08 1 297
Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra
Caisse des Depots
March-06 June-08 7466 297
Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra
Caisse des Depots
March-06 June-08 80 297
Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra
Caisse des Depots
March-06 June-08 88 297
Generation of Electricity from 3.2 MW Capacity Wind Mills by
Caisse des Depots
Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra
March-06 June-08 30 297
Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, Maharashtra
Caisse des Depots
March-06 June-08 11219 431 6.2 MW Bundled Wind Power Project in India TZ1 Limited
March-06 December-06 1020 43
Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan TZ1 Limited
March-06 December-06 12574 43
Fuel Switch from fossil fuel to renewable biomass for thermal energy applications in Rajasthan TZ1 Limited
January-06 December-06 2561 109 8.25 MW Bundled Wind Power Project APX
January-06 December-06 2910 128
Promotion of Low cost Irrigation Device in Eastern States of India APX
October-05 March-06 12220 101
Bagasse based Co-generation Power Project at Khatauli APX
August-05 December-05 1495 68
119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited TZ1 Limited
August-05 December-05 722 68
119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited TZ1 Limited
August-05 December-05 5 68
119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited TZ1 Limited
August-05 December-05 1000 68
119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited TZ1 Limited
August-05 December-05 695 68
119.8 MW Natural Gas based Combined Cycle Power Plant, at Tanjavur, Tamilnadu by M/s Aban Power Company Limited TZ1 Limited
May-05 July-07 16500 387
Electricity generation by utilization of waste heat from calcined petroleum APX
coke production process
January-05 December-05 1404 364 Bundled 15 MW Wind Power Project in India TZ1 Limited
January-05 December-05 1054 128
Promotion of Low cost Irrigation Device in Eastern States of India APX
January-04 December-06 15000 469
Installation of Low Green House Gases (GHG) Emitting Rolling stock cars in Metro System APX
January-02 December-02 4000 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
July-01 December-01 35 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
July-01 December-01 80 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
July-01 December-01 5 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
July-01 December-01 22000 93 86 MW Hydro Project in Himachal Pradesh
Caisse des Depots
CHICAGO CLIMATE
EXCHANGE Qty Price
Trade Date Vintage (contracts) (per metric ton) Type of
Transaction CFI
Delivered
10/01/10 2010 4 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 19 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 1 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 3 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 12 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 5 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 16 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2010 5 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2009 15 $5.00 Non-Platform
USA Agricultural Methane
10/01/10 2005 35 $0.10 Non-Platform Allowance
10/08/10 2009 3 $2.75 Non-Platform
USA Agricultural Methane
10/15/10 2009 14 $2.75 Non-Platform
USA Agricultural Methane
TOTAL 132