Boru Douthwaite's presentations during the LBDC Inception Workshop covering reflecting on 'stripped' outcome logic models, an overview of the CPWF M&E system, development of outcome targets, indicator and baseline plans, BDC-level M&E system and mapping future partnershipsTRANSCRIPT
Boru Douthwaite
Reflection; M&E; future linkages
Agenda Day 2Reflection on Inception Period
Plenary report back (12nn)
LunchIntroduction to CPWF M&E systemOutcome targets, indicators and baseline plansCoffeeBDC-level M&E system
2
Reflection on Inception PeriodInputs: original project documents, stripped OLMs and experience to dateIn project teams, reflect on: What are the project’s main outcome pathways (refining stripped
OLMs)? Who, specifically, does the project expect to influence (get more
specific about the actors in the OLM)? What are the key entry points / tactics that the project will use to
achieve the influence? What is the main research contribution that the project will make? Taking into account the four answers above, what are the main
changes from original expectations?
Present back reworked stripped OLM in plenary and answers to the 5 questions
3
Example of L1 stripped OLM
4
Portion of L5 OLM
5
Why strip OLMs?Version of project theory of change that communicatesHelp identify the core of the projectBuilding block for BDC-level OLMBDC-level OLM basis for BDC-level M&E Starting point for M&E is a good model of what you think
will happen
6
M&E: introduction; developing a BDC level system
7
CPWF’s M&E system: In summaryReporting every six months linked to tranche paymentsM&E designed to support adaptive managementTraffic light systemBL plays pivotal roleAnnual reporting more ‘formal’Our M&E system itself an innovation
8
http://www.waterandfood.org/page/MandE-Guide
9
CPWF M&E Guide (monitoring.cpwf.info)
10
11
12
13
14
15
16
17
18
19
In summaryReporting every six months linked to tranche paymentsM&E designed to support adaptive management “You can change what you can negotiate”
Traffic light systemBL plays pivotal roleAnnual reporting more ‘formal’M&E system itself an innovation
http://monitoring.cpwf.info
20
21
22
Filling out the OTIBTake 20 mins to start filling outUse stripped OLM and answers to morning discussion as in putPlenary discussion of issues arising
23
BDC level monitoring systemL5 responsibility to coordinate, pull together monitoring information and ensure use in reflection, communicate how BDC is doingEach project equally responsible for implementingStarting point for M&E is a good model of what you think will happenBDC level OLM and OTIB plans are the inputs into a negotiationNext steps Draft BDC-level OLM and agree Submit project OTIB Plans Develop BDC-level monitoring plan
24
25
Linkages needed for impact
26
InstructionsReview by table the LBDC OLM and provide feedback Do you see yourself? Does this capture the Limpopo BDC? Missing? Suggestions
Identify actors who you need to engage with to achieve changes shown in LBDC OLM
Table to fill in to identify actors to engage in the futureActor need to engage Reason Tactics