30/08/2006 Ron Settles MPI-Munich/D ESY 8th W P phonemeeting 30 August 2006 1 LCTPC/LPWP-8th phonemeeting Date 30 August 2006 Time 7:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan To join, Phone +494089981390 code 52872#

Upload: jillian-orr

Post on 02-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

LCTPC/LPWP-8th phonemeeting. Date 30 August 2006 Time 7:00 west coast 10:00 east coast 16:00 central Europe 23:00 Japan To join, Phone +494089981390 code 52872#. Agenda for 8th WP phonemeeting (in future the meetings will be managed via http://ilcagenda.cern.ch/). AGENDA - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

1

LCTPC/LPWP-8th phonemeeting

– Date 30 August 2006 – Time

• 7:00 west coast• 10:00 east coast• 16:00 central Europe • 23:00 Japan

– To join, Phone +494089981390 code 52872#

Page 2: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

2

Agenda for 8th WP phonemeeting(in future the meetings will be managed via http://ilcagenda.cern.ch/)

AGENDA -1.News

Formation of the LCTPC/LP CollaborationWWS-R&D-panel tracking review at BeijingPIRE (Dan)

-2.WP meetingGem gating (RS)Gem endplate for the LP (Akira)Fieldcage (Ties)LP endplate/electronics discussion (Leif, Dan)

-3.Future meetings -Paris endcap meeting 12-15 September -Eudetmeeting at MPI 18-20 October -Valencia European WS 6-10 November -Beijing Asian WS February 3-7 February

-4.AOB

Page 3: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

3

AGENDA -1a.Formation of the LCTPC/LP collaboration

On the next foil are the groups who have replied with the name of their CB representative up to now: marked by

The non-checked groups have now been contacted directly. Status and lists of names are on the following foils…

Page 4: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

4

LCTPC/LP Groups (27 August 06)

AmericasCarleton Montreal VictoriaCornellIndianaLBNLMIT

PurdueYale

EuropeEuropeLAL OrsayLAL Orsay IPN OrsayIPN Orsay CEA SaclayCEA Saclay

AachenAachenBonnBonnDESYDESY

UHamburgUHamburgFreiburgFreiburgKarlsruheKarlsruhe

MPI-MunichMPI-MunichRostockRostockSiegenSiegenNIKHEFNIKHEF

UMM KrakowUMM KrakowBucharestBucharest

NovosibirskNovosibirskPNPI PNPI

StPetersburgStPetersburg LundLundCERNCERN

AsiaAsiaTsinghuaTsinghua

CDC:CDC:HiroshimaHiroshima

KEKKEKKinki UKinki USagaSaga

KogakuinKogakuinTokyo UA&TTokyo UA&T

U TokyoU TokyoU TsukubaU Tsukuba

Minadano SU-IITMinadano SU-IIT

…Other groups interested?

Page 5: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

5

Formation of the LCTPC/LP collaborationThe proposal is to have:1)Three coordinators, one chosen by each region. These spokespersons (SP)coordinate the work of the following two boards:

2)The collaboration board (CB), consisting of one representative from eachgroup or set of groups (the group leader, principle investigator or otherchosen member). Each CB member looks after the resources for its group(s)(money and people).

3)The technical board (TB), consisting of the existing workpackage (WP)conveners. The TB will ensure the technical integrity of their WP andcompatibility with other WPs while maintaining close contact with thecollaboration.

This structure now exists. 1) We are three interim coordinators and areto be replaced by chosen ones in the course of this formation phase.2) The CB is (almost) complete. 3) The workpackages and WP convenerswere identified during the first half of this year. The names of CB andTB members are listed in the next slide.

Page 6: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

6

The CB members are:==================--Americas-Carleton: Madhu DixitMontreal: Jean-Pierre MartinVictoria: Dean KarlenCornell: Dan PetersonIndiana: Rick Van KootenLBNL: Mike Ronan

--Asia-Tsinghua: Yuanning Gao

For the following CDC groups: Akira SugiyamaHiroshima

KEKKinkiSaga

KogakuinTokyo U A&T

U TokyoTsukuba

Mindanao

Page 7: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

7

--Europe-Eudet contact: Joachim MnichLAL Orsay/IPN Orsay: Vincent LepeltierAachen: Stefan RothBonn: Klaus DeschDesy/UHamburg: Ties BehnkeEudet: Joachim MnichFreiburg: Andreas BambergerMPI-Munich: Ariane FreyRostock: Henning SchroederSiegen: Ivor FleckNikhef: Jan TimmermansNovosibirsk: Alexei BuzulutskovSt.Peterburg: Anatoliy KrivchitchLund: Leif JonssonCERN: Michael Hauschild (deputy: Lucie Linsen)

--Groups with Observer status-TU Munich: Bernhard Ketzer

Purdue: Ian Shipsey

--Replies still missing from:MITYale

MindanaoCEA SaclayKarlsruheKrakow

Bucharest

Page 8: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

8

The TB members are:==================1) Workpackage Mechanics Ron Settles a) LP design (incl. endplate structure) Dan Peterson b) Fieldcage, laser Ties Behnke c) GEM panels for endplate Akira Sugiyama d) Micromegas panels for endplate Paul Colas e) Pixel panels for endplate Jan Timmermans f) Resistive foil for endplate Madhu Dixit2) Workpackage Electronics Leif Jonsson a)"Standard" RO/DAQ sytem for LP Leif Jonsson+Postdoc b) CMOS RO electronics Harry van der Graaf c) Electronics for LCTPC Luciano Musa3) Workpackage Software Peter Wienemann a) LP SW, simul./reconstr.framework Peter Wienemann b) TPC simulation, backgrounds Stefan Roth c) Full detector simulation Keisuke Fujii4) Workpackage Calibration Dean Karlen a) Field map Lucie Linssen b) Alignment Takeshi Matsuda c) Distortion correction Dean Karlen d) Radiation hardness of materials Anatoliy Krivchitch e) LP Gas/HV Eudet Postdoc

Page 9: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

9

We shall be sending an email this week on the next steps for the formation of the LCTPC/LP collaboration…

AGENDA -1a.Formation of the LCTPC/LP collaboration

Page 10: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

10

AGENDA -1b.Tracking review at Beijing:

As announced at the VLSW06, the WWS-R&D Panel is starting regular reviews of the different R&D projects for the LC detector. Chris Damerell has sent the email that they want to start with tracking (Si and TPC) at the Asian LC meeting in Beijing (3-7 February 2007). The modus operandi is still being discussed…

Page 11: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

11

AGENDA -1c.PIRE

As announced by Dan, this is the “Partnerships for International Research and Education” program at Cornell. More details from Dan…

Page 12: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

12

AGENDA -2a.Next iteration on the goals for LCTPC/LP.

For your info: we (Fabio Sauli, Madhu Dixit, Martin Killenberg, Akira Sugiyama, RS, a.o.) have started on thinking about ways to test Gem gating with (a) small prototype(s). Martin thinks we might have a scheme that works, but it has to be tried out. If you are interested or have suggestions, let us know…

Page 13: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

13

AGENDA -2b. Gem endplate (a.o.) for the LP

Akira (WP convener for the LP Gem endplate) sent a mail asking which groups want to participate in the work of making/testing the Gem endplate(s) for the LP. The division of work among groups will be a part of the general organization of the LCTPC/LP collaboration which has to be done within the next few weeks. For the Gem-endplate question, more from Akira…

Page 14: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

14

AGENDA -2c. Fieldcage for the LP

Page 15: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

15

Page 16: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

16

AGENDA -2c.LP endplate discussion Reminder: most urgent point for LP is to design layout

of endplate and finalize ~12/2006

One picture from the note Leif described at the last meeting, seehttp://mppmu.mpg.de/~settles/tpc/lp/wpmtg/lpconnectorarr.pdf

and two pictures of Dan’s iteration of the last meeting

http://w4.lns.cornell.edu/~dpp/linear_collider/LargePrototype.html

follow in the next three foils…

Page 17: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

17

Page 18: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

18

Page 19: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

19

Page 20: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

20

AGENDA

-3.Future meetingsThere are (in addition to bi-weekly phonemeetings):-Paris Endcap meeting organized by Paul/Akira (12-15

September 2006): announcements already sent to the LCTPC groups, see

http://www-dapnia.cea.fr/Spp/Meetings/EndPlate/-Eudet annual meeting MPI-Munich (18-20 October 2006) withwebsite:

http://www.eudet.org/AnnualMeeting2006/AnnualMeeting2006.html-European LC workshop Valencia (6-10 November 2006), see

http://ific.uv.es/~ilc/ECFA-GDE2006/-Asian LC workshop Beijing (4-7 February 2007)

Website:http://bilcw07.ihep.ac.cn/

Page 21: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

21

AGENDA -4.AOB

Page 22: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

22

Back up slides,

for reference

Back up slides,

for reference

Page 23: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

23

Akira Sugiyama – GLD DOD

Page 24: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

24

Page 25: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

25

RS study - LDC DOD - together with

Joel PouthasPhilippe Rosier

(IPN Orsay)

Page 26: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

26

Page 27: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

27

Page 28: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

28

Page 29: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

29

Page 30: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

30

Aleph Endplate

Page 31: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

31

Page 32: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

32

Page 33: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

33

Page 34: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

34

Page 35: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

35

Some features• Zigzag structure prevented loss of tracks > θ~22°• Sectors mounted from inside using a “handling tool” to minimize the dead space between sectors. This straight-forward operation which was performed at least 30 times during the lifetime of Aleph. • Alu sandwich structure stiff, lightweight to

- contain 7mb overpressure- provide forced-air thermal insulation between electronics and TPC volume

• Water cooling of 1kW electronics/side in addition- 22K channels per side

• Combination water/air cooling blocked all heat to TPC• Overall thickness ~ 25%Xo (average) w/o cables• Bending of endplate

- 20 micrometers due to 7mb overpressure- 5 micrometers due to wire tension

Page 36: LCTPC/LPWP-8th phonemeeting

30/08/2006 Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August 2006

36

R&D Planning• 1) Demonstration phase

– Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle.

• 2) Consolidation phase– Build and operate the LP, large prototype, (Ø ≥ 75cm, drift

≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years.

• 3) Design phase– After phase 2, the decision as to which endplate

technology to use for the LC TPC would be taken and final design started.