leadership forum on water supply and sanitation - vsang presentation
TRANSCRIPT
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 1/26
11
SAIGON WATER CORPORATIONAIGON WATER CORPORATION
(SAWACO)
TTỔỔNG CÔNG TYNG CÔNG TYCCẤẤP NƯP NƯỚỚC SC SÀÀI GÒNI GÒNThe views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies ofthe Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee theaccuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used maynot necessarily be consistent with ADB official terms.
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 2/26
22
SAIGON WATER CORPORATION ORGANIZATION CHARTSAIGON WATER CORPORATION ORGANIZATION CHART
GENERAL DIRECTORGENERAL DIRECTOR
VICE GENERAL DIRECTORVICE GENERAL DIRECTORBUSINESSBUSINESS--COOPERATIONCOOPERATION
VICE GENERAL DIRECTORVICE GENERAL DIRECTORENGINEERINGENGINEERING
WATERBUSINESS
DEVELOPMENTCOOPERATION
DEPT.
WATERTRANSMISSIO
NENTERPRISE
ADB LOAN1273/VIE-SF
PMU
SAIGONRIVERWATER
SYSTEMPHASE 01
PMU
ENGINEERINGTECHNOLOGY
DEPT.
HUMANRESOURCESPERSONEL
DEPT.
PLANNINGINVESTMENT
DEPT.
BEN THANHWATERSUPPLYJOINTSTOCK
COMPANY
CHO LONWATERSUPPLYJOINTSTOCK
COMPANY
GIA DINHWATERSUPPLYJOINTSTOCK
COMPANY
PHU HOA TANWATER
SUPPLYJOINTSTOCK
COMPANY
NHA BEWATERSUPPLYJOINT
STOCKCOMPANY
THU DUCWATERSUPPLY
JOINTSTOCK
COMPANY
TAN HOAWATERSUPPLYBRANCHOFFICE
THU DUCWATER
TREATMENTPLANT
TAN HIEPWATER
TREATMENTPLANT
SAIGONGROUND WATERCOMPANY LTD.
TRUNG ANWATERSUPPLY
ENTERPRISE
TRAFFIC &PUBLICWORKS
CONSTRUCTIONCOMPANY
WATERMECHANICAL
CONSTRUCTIONJOINTSTOCK
COMPANY
WATERDESIGN
&CONSULTANCY
JOINTSTOCK
COMPANY
TRAFFIC& PUCLIC
WORKSCONSULTANT
COMPANY
VICE GENERAL DIRECTORVICE GENERAL DIRECTORACCOUNTINGACCOUNTING – – ADMIN.ADMIN.
VICE GENERAL DIRECTORVICE GENERAL DIRECTORCAPITAL CONSTRUCTIONCAPITAL CONSTRUCTION
ACCOUNTINGAnd
FINANCIALDEPT.
CORPORATIONOFFICE
NONREVENUEWATER
REDUCTIONPMU
WAREHOUSE PROJECTSMANAGEMENT
UNITPMU
MANAGEMENT BOARDMANAGEMENT BOARD
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 3/26
33
SÔSÔ ÑÑOOÀÀ TOTOÅÅ CHCHÖÙÖÙC TOC TOÅÅNG COÂNG TY CANG COÂNG TY CAÁÁP NP NÖÖÔÔÙÙC SAC SAØØIGOIGOØØNN
TTỔỔNG GING GIÁÁM ĐM ĐỐỐCC
PHPHÓÓ TTỔỔNG GING GIÁÁM ĐM ĐỐỐCCHHỢỢP TP TÁÁC KINH DOANHC KINH DOANH
PHPHÓÓ TTỔỔNG GING GIÁÁM ĐM ĐỐỐCCKK Ỹ Ỹ THUTHUẬẬTT
PHÒNGHỢP TÁC
PHÁT
TRIỂNKINHDOANH
XÍ NGHIỆPTRUYỀN
DẪN
NƯ ỚCSẠCH
BANQUẢN LÝDỰ ÁN
VAY ADB1273/VIE-SFPMU
BANQUẢN LÝ
DỰ ÁN
NƯ ỚC SÔNGSÀI GÒN-GĐ 1
PHÒNGK Ỹ THUẬT
CÔNGNGHỆ
PHÒNGTỔCHỨCNHÂN SỰ
PHÒNGKẾ HOẠCH
ĐẦU TƯ
CÔNG TYCỔPHẦN
CẤP NƯ ỚCBẾN THÀNH
CÔNG TYCỔPHẦN
CẤP NƯ ỚCCHỢ LỚN
CÔNG TYCỔPHẦN
CẤP NƯ ỚCGIA ĐỊNH
CÔNG TYCỔPHẦN
CẤP NƯ ỚCPHÚ
HÒA TÂN
CÔNG TYCỔPHẦN
CẤP NƯ ỚCNHÀ BÈ
CÔNG TYCỔPHẦN
CẤP NƯ ỚCTHỦ ĐỨC
CHI NHÁNHCÂP NƯ ỚCTÂN HÒA
NHÀMÁYNƯ ỚC
THỦ ĐỨC
NHÀMÁYNƯ ỚC
TÂN HIỆP
CÔNG TY TNHHMỘT THÀNH
VIÊNNƯ ỚC NGẦM
SÀI GÒN
XÍ NGHIỆPCẤP NƯ ỚCTTRUNG
AN
CÔNG TYCÔNG TRÌNHGIAO THÔNGCÔNG CHÁNH
CÔNG TY CPCƠ KHÍ
XÂY DỰNGCÔNG TRÌNH
CÔNG TYTƯ VẤN
XÂY DỰNGCẤP NƯ ỚC
CÔNG TYTƯ VẤN
XÂY DỰNGCÔNG TRÌNHGIAO THÔNGCÔNG CHÁNH
PHPHÓÓ TTỔỔNG GING GIÁÁM ĐM ĐỐỐCCKKẾẾ TOTOÁÁN QUN QUẢẢN TRN TRỊỊ
PHPHÓÓ TTỔỔNG GING GIÁÁM ĐM ĐỐỐCCXÂY DXÂY DỰỰNG CƠ BNG CƠ BẢẢNN
PHÒNGKẾ TOÁN
TÀI CHÍNH
VĂN PHÒNGTỔNG
CÔNG TY
BAN QUẢNLÝ
DỰ ÁN
GIẢMTHẤTTHOÁTNƯ ỚC
TỔNG KHOVẬT TƯ
BANQUẢN LÝDỰ ÁN
CẤP NƯ ỚC
HHỘỘI ĐI ĐỒỒNG QUNG QUẢẢN TRN TRỊỊ
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 4/26
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 5/26
5 TỔNG CÔNG TY CẤP NƯỚC SÀI GÒN - SAWACO
– In 1966: Thu Duc Water Treatment Plant was put into operation with aninitial capacity of 450,000 m3/day, exploiting water from Dong Nai River.N ăm 1966: Nhà máy n ướ c Th ủ Đứ c b ắt đầu đ i vào ho ạt động v ớ i công su ất ban đầu 450.000 m3/ngày, khai thác n ướ c sông Đồng Nai
– In 1975: Saigon Metropolitan Water Office changed to Hochiminh City WaterSupply Company, maintaining the capacity of 450,000 – 480,000 m3/day.N ăm 1975: Sài Gòn Th ủ y C ụ c đổi tên thành Công ty C ấp n ướ c và v ẫn duy trì m ứ c công su ất 450.000 – 480.000 m3/ngày
– In 2005: Hochiminh City Water Supply Company changed to Saigon WaterCoporation (SAWACO) and by now the actual capacity is 1,236,000 m3/day.N ăm 2005: Công ty C ấp n ướ c TP.HCM đổi tên thành T ổng Công ty C ấp n ướ c Sài Gòn (SAWACO) và đến nay công su ất th ự c t ế là 1.236.000 m3/ngày.
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 6/26
6 TỔNG CÔNG TY CẤP NƯỚC SÀI GÒN - SAWACO
HOCHIMINH CITY: Area: 2,985 Km2; Population: 6,117,251THÀNH PH Ố H Ồ CHÍ MINH: Di ện tích: 2.985 Km2; Dân s ố: 6.117.251
TOTAL CAPACITY OF WATER PUMPED INTO NETWORK : 1,236,000 m³/dayT ỔNG CÔNG SU ẤT PHÁT N ƯỚ C RA M ẠNG
HOUSEHOLD SERVICE RATIO : 86.71%T Ỷ LỆ H Ộ DÂN ĐƯỢ C C ẤP N ƯỚ C
TOTAL WATER METERS ON THE NETWORK : 593,857T ỔNG S Ố ĐỒNG H Ồ TRÊN M ẠNG
TOTAL PIPELINE LENGTH : 3,132 kmT ỔNG CHI Ề U DÀI ĐƯỜ NG Ống
NON-REVENUE WATER RATE : > 40 %T Ỷ LỆ TH ẤT THOÁT N ƯỚ C
TOTAL STAFF : 3,509 personsT ỔNG S Ố NHÂN VIÊN
ANNUAL REVENUE : 1,078.611 billion VND/yearDOANH THU HÀNG N ĂM
DATAATA (2007)2007)SSỐỐ LILIỆỆU (2007)U (2007)
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 7/26
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 8/26
88
HO CHI MINH CITYHO CHI MINH CITY
NONNON --REVENUE WATERREVENUE WATERMANAGEMENT PROJECTMANAGEMENT PROJECT
D D Ự Ự ÁÁN GI N GI Ả ẢM TH M TH Ấ ẤT THO T THO ÁÁT N Ư T N Ư Ớ Ớ C C TH TH ÀÀNH PH NH PH Ố Ố H H Ồ Ồ CH CH Í Í MINH MINH
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 9/26
99
PROJECT SUMMARYPROJECT SUMMARY
T T Ó Ó M T M T Ắ ẮT D T D Ự Ự ÁÁN N Ho ChiHo ChiMinhMinhCity NonCity Non--Revenue Water Management Project is a subRevenue Water Management Project is a sub --projectprojectunder Vietnam Urban Water Supply Development Projectunder Vietnam Urban Water Supply Development Project – – World Bank CreditWorld Bank CreditNo.4028No.4028--VN.VN.D D ự ự á á n n Gi Gi ảảm m Th Th ấ ấ t t tho tho á á t t n ư n ư ớ ớ c c Th Th à à nh nh ph ph ốố H H ồồ Ch Ch í í Minh Minh l l à à m m ộột t d d ự ự á á n n th th à à nh nh ph ph ầần n
thu thu ộộc c D D ự ự á á n n Ph Ph á á t t tri tri ểển n C C ấ ấ p p n ư n ư ớ ớ c c Đô Đô th th ị ị Vi Vi ệệt t Nam,Nam, v v ốốn n vay vay Ngân Ngân h h à à ng ng Th Th ế ế gi gi ớ ớ i i ..Strategic objective of investment in water loss reduction:Strategic objective of investment in water loss reduction:M M ụục c tiêu tiêu đ đ ầầu u t ư t ư gi gi ảảm m th th ấ ấ t t tho tho á á t t n ư n ư ớ ớ c c : :
to use the funds from the World Bank in the most efficient manneto use the funds from the World Bank in the most efficient manne r to reduce leakager to reduce leakagein the areas with highest potential leakage of the City;in the areas with highest potential leakage of the City;S S ử ử d d ụụng ng hi hi ệệu u qu qu ảả ngu ngu ồồn n v v ốốn n vay vay c c ủủa a Ngân Ngân h h à à ng ng Th Th ế ế gi gi ớ ớ i i đ đ ểể Gi Gi ảảm m Th Th ấ ấ t t tho tho á á t t n ư n ư ớ ớ c c trong trong nh nh ữ ữ ng ng v v ù ù ng ng c c ó ó ti ti ềềm m n ăng n ăng gi gi ảảm m rò rò r r ỉ ỉ c c ủủa a Th Th à à nh nh ph ph ốố; ;
to create initial conditions for water loss reduction in the remto create initial conditions for water loss reduction in the rem ained areas in theained areas in thecontrolled manner;controlled manner;T T ạạo o ti ti ềền n đ đ ềề cho cho công công vi vi ệệc c gi gi ảảm m th th ấ ấ t t tho tho á á t t n ư n ư ớ ớ c c ở ở v v ù ù ng ng còn còn l l ạại i theo theo ph ươ ng ph ươ ng th th ứ ứ c c c c ó ó ki ki ểểm m so so á á t t ; ;
to train and improve the management capacity of the staff operatto train and improve the management capacity of the staff operat ing the watering the watersupply network;supply network;ĐĐồồng ng th th ờ ờ i i đ đ à à o o t t ạạo o ,, t ăng t ăng c ư c ư ờ ờ ng ng n ăng n ăng l l ự ự c c qu qu ảản n lý lý c c ủủa a đ đ ộội i ng ng ũũ công công nhân nhân viên viên v v ậận n h h à à nh nh h h ệệ th th ốống ng c c ấ ấ p p n ư n ư ớ ớ c c ..
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 10/26
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 11/26
1111
Project ProposalsProject Proposals
1.1. Network zoningNetwork zoningPhân Phân v v ù ù ng ng m m ạạng ng l ư l ư ớ ớ i i
2.2. EstablishEstablish DMAsDMAsThi Thi ế ế t t l l ậập p DMADMA
3.3. Selective Infrastructure Replacement & ExpansionSelective Infrastructure Replacement & ExpansionThay Thay th th ế ế c ơ c ơ s s ở ở h h ạạ t t ầầng ng c c ó ó l l ự ự a a ch ch ọọn n v v à à m m ở ở r r ộộng ng m m ạạng ng l ư l ư ớ ớ i i
4.4. Real Water Loss Reduction (leakages) in Zone 1 and Zone 2Real Water Loss Reduction (leakages) in Zone 1 and Zone 2Gi Gi ảảm m th th ấ ấ t t tho tho á á t t h h ữ ữ u u h h ì ì nh nh ( ( rò rò r r ỉ ỉ ) ) c c ủủa a V V ù ù ng ng 11 v v à à V V ù ù ng ng 2 2
5.5. Partial Outsourcing of Real Water Loss ReductionPartial Outsourcing of Real Water Loss ReductionS S ử ử d d ụụng ng m m ộột t ph ph ầần n ngu ngu ồồn n l l ự ự c c bên bên ngo ngo à à i i đ đ ểể gi gi ảảm m th th ấ ấ t t tho tho á á t t h h ữ ữ u u h h ì ì nh nh
6.6. Apparent Water Loss ReductionApparent Water Loss Reduction
Gi Gi ảảm m th th ấ ấ t t tho tho á á t t vô vô h h ì ì nh nh 7.7. NRW Management Capacity BuildingNRW Management Capacity Building
Xây Xây d d ự ự ng ng n ăng n ăng l l ự ự c c qu qu ảản n lý lý n ư n ư ớ ớ c c không không doanh doanh thu thu
8.8. Project Management SupportProject Management SupportH H ỗỗ tr tr ợ ợ qu qu ảản n lý lý d d ự ự á á n n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 12/26
1212
: :
N et w o rk Z o ne se t w o rk Z on esD D Ự Ự ÁÁN GI N GI Ả ẢM TH M TH Ấ ẤT THO T THO ÁÁT N Ư T N Ư Ớ Ớ C C
ZONE 4ZONE 4
ZONE 1ZONE 1
ZONE 5ZONE 5ZONE 6ZONE 6
ZONE 2ZONE 2
ZONE 3ZONE 3
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 13/26
1313
K e y c o nt r ac t o f t h e Pr oj ec te y c o nt r ac t o f t h e Pr oj ec t
H H ợ ợ p p đ đ ồồng ng ch ch í í nh nh c c ủủa a D D ự ự á á n n
PERFORMANCEERFORMANCE -BASEDASED
LEAK AGE REDUCTI ON A NDEAK AGE REDUCTI ON ANDMANAGEMENT CONTRACTANAGEMENT CONTRACT
H H ợ ợ p p đ đ ồồng ng Qu Qu ảản n lý lý v v à à Gi Gi ảảm m rò rò r r ỉ ỉ d d ự ự a a trên trên Hi Hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 14/26
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 15/26
1515
1) Contractor is responsible to carry out leak detection surveys
Nhà th ầu ch ị u trách nhi ệm th ự c hi ện kh ảo sát phát hi ện rò r ỉ
2) Contractor is paid for example per length of pipeline surveyed or(even worse) per staff dayNhà th ầu đượ c thanh toán theo chi ều dài đườ ng ống đ ã đượ c kh ảo sát ho ặc (th ậm chí t ệ h ơ n) theo ngày công
3) While this modality often brings improvement over the "donothing" scenario, the results are in many cases still less-than-optimalPh ươ ng th ứ c này th ườ ng t ốt h ơ n k ị ch b ản “không làm gì”, trong nhi ều tr ườ ng h ợ p k ế t qu ả v ẫ n ch ư a t ối ư u
TRADITI ONAL LEAK AGE REDUCTION CONTRACTS
H ợ p đồng Gi ảm Rò r ỉ Truy ền th ống
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 16/26
1616
TRADITI ONAL LEAK AGE REDUCTION CONTRACTS
H ợ p đồng Gi ảm Rò r ỉ Truy ền th ống
4) Contractor has the wrong (or no) incentive and no obligationwhatsoever to achieve maximum savingsNhà th ầu có động c ơ sai (ho ặc không có động c ơ ) và không có ngh ĩ a v ụ ph ải làm b ấ t c ứ đ i ều gì để đạt đượ c l ượ ng n ướ c ti ế t ki ệm t ối đ a
5) Repairs are traditionally carried out by a third party; the leakagereduction Contractor is not accountable for anything and theresults are sometimes not satisfactory.Vi ệc s ử a ch ữ a đượ c th ự c hi ện b ở i bên th ứ ba theo truy ền th ống,Nhà th ầu gi ảm rò r ỉ không có trách nhi ệm đối v ớ i b ấ t c ứ vi ệc gì và k ế t qu ả đ ôi khi không th ỏa đ áng.
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 17/26
1717
1)1) This is a new conceptThis is a new concept
Đây Đây l l à à m m ộột t kh kh á á i i ni ni ệệm m m m ớ ớ i i 2)2) Contract is designed to increase the efficiency andContract is designed to increase the efficiency and
effectiveness of water distribution networks and relatedeffectiveness of water distribution networks and relatedoperationsoperationsĐư Đư ợ ợ c c thi thi ế ế t t k k ế ế nh nh ằằm m t ăng t ăng t t í í nh nh hi hi ệệu u qu qu ảả c c ủủa a m m ạạng ng l ư l ư ớ ớ i i phân phân ph ph ốối i n ư n ư ớ ớ c c v v à à c c á á c c ho ho ạạt t đ đ ộộng ng liên liên quan quan
3)3) Ensures that the leakage will be significantly reducedEnsures that the leakage will be significantly reducedand the reduced leakage levels will be maintained overand the reduced leakage levels will be maintained overseveral yearsseveral yearsĐĐểể đ đ ảảm m b b ảảo o r r ằằng ng n ư n ư ớ ớ c c rò rò r r ỉ ỉ s s ẽẽ đư đư ợ ợ c c gi gi ảảm m đ ang đ ang k k ểể v v à à m m ứ ứ c c rò rò r r ỉ ỉ gi gi ảảm m đư đư ợ ợ c c s s ẽẽ đư đư ợ ợ c c duy duy tr tr ì ì trong trong to to à à n n b b ộộ th th ờ ờ i i gian gian d d ự ự á á n n ,, thông thông th ư th ư ờ ờ ng ng l l à à v v à à i i n ăm n ăm
CONCEPTONCEPT OF PERFORMANCEF PERFORMANCE -BASED CONT RACTASED CONT RACTKh Kh á á i i ni ni ệệm m v v ềề H H ợ ợ p p đ đ ồồng ng D D ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 18/26
1818
4)4) Contract significantly expands the role of the private sector, fContract significantly expands the role of the private sector, f romrom
the simple execution of works to the management andthe simple execution of works to the management andconservation of water distribution networksconservation of water distribution networksNh Nh ằằm m m m ở ở r r ộộng ng vai vai trò trò c c ủủa a l l ĩ ĩ nh nh v v ự ự c c t ư t ư nhân nhân ,, t t ừ ừ vi vi ệệc c th th ự ự c c hi hi ệện n đơ n đơ n thu thu ầần n c c á á c c công công tr tr ì ì nh nh cho cho đ đ ế ế n n qu qu ảản n lý lý v v à à b b ảảo o to to à à n n m m ạạng ng l ư l ư ớ ớ i i phân phân ph ph ốối i n ư n ư ớ ớ c c
5)5) Performance Based Contract tries to address the issue ofPerformance Based Contract tries to address the issue ofinadequate incentivesinadequate incentives
H H ợ ợ p p đ đ ồồng ng Qu Qu ảản n lý lý v v à à Gi Gi ảảm m Rò Rò r r ỉ ỉ c c ốố g g ắ ắ ng ng ch ch ỉ ỉ ra ra ch ch ỉ ỉ ra ra v v ấ ấ n n đ đ ềềkhuy khuy ế ế n n kh kh í í ch ch không không tho tho ảả đ đ á á ng ng
6)6) Contractors are not paid directly forContractors are not paid directly for ““inputsinputs ”” or physical works,or physical works,but for thebut for the ““outputoutput””: volume of leakage reduced: volume of leakage reduced
Nh Nh à à th th ầầu u không không đư đư ợ ợ c c thanh thanh to to á á n n tr tr ự ự c c ti ti ế ế p p theo theo “ “ đ đ ầầu u v v à à o o ” ” hay hay c c á á c c công công vi vi ệệc c v v ậật t ch ch ấ ấ t t ( ( m m à à h h ọọ đư ơ ng đươ ng nhiên nhiên ph ph ảải i th th ự ự c c hi hi ệện n ), ), m m à à đư đư ợ ợ c c
thanh thanh to to á á n n theo theo “ “ đ đ ầầu u ra ra ” ” : : l ư l ư ợ ợ ng ng n ư n ư ớ ớ c c r r ỏỏ r r ỉ ỉ gi gi ảảm m đư đư ợ ợ c c ..
CONCEPTONCEPT OF PERFORMANCEF PERFORMANCE -BASED CONT RACTASED CONT RACTKh Kh á á i i ni ni ệệm m v v ềề H H ợ ợ p p đ đ ồồng ng D D ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 19/26
1919
7)7) Contractor is responsible for designing and carrying out the actContractor is responsible for designing and carrying out the act ionsionshe believes are necessary in order to comply with the contract.he believes are necessary in order to comply with the contract.M M ộột t n n é é t t đ đ ặặc c tr ư ng tr ư ng c ơ c ơ b b ảản n c c ủủa a h h ợ ợ p p đ đ ồồng ng d d ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n l l à à Nh Nh à à th th ầầu u ch ch ị ị u u tr tr á á ch ch nhi nhi ệệm m thi thi ế ế t t k k ế ế v v à à th th ự ự c c hi hi ệện n c c á á c c ho ho ạạt t đ đ ộộng ng m m à à Nh Nh à à th th ầầu u cho cho l l à à c c ầần n thi thi ế ế t t đ đ ểể tuân tuân th th ủủ H H ợ ợ p p đ đ ồồng ng ..
8)8) Under the performanceUnder the performance --based contract, the Contractor has a strongbased contract, the Contractor has a strong
financial incentive to be efficientfinancial incentive to be efficient..Theo Theo h h ợ ợ p p đ đ ồồng ng d d ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n ,, Nh Nh à à th th ầầu u đư đư ợ ợ c c kh kh í í ch ch l l ệệt t à à i i ch ch í í nh nh m m ạạnh nh m m ẽẽ đ đ ểể mang mang l l ạại i hi hi ệệu u qu qu ảả..
9)9) To maximize profits, the Contractor must reduce his activitiesTo maximize profits, the Contractor must reduce his activities
to the least possible volume of intelligently designedto the least possible volume of intelligently designedinterventions but also that preinterventions but also that pre --defined outputs are achieveddefined outputs are achievedand maintained over time.and maintained over time.ĐĐểể t t ốối i đ a đ a h h ó ó a a l l ợ ợ i i nhu nhu ậận n ,, Nh Nh à à th th ầầu u ph ph ảải i gi gi ảảm m đ đ ế ế n n m m ứ ứ c c t t ốối i thi thi ểểu u c c ó ó th th ểể nh nh ữ ữ ng ng ph ph á á t t sinh sinh trong trong thi thi ế ế t t k k ế ế tuy tuy nhiên nhiên v v ẫ ẫ n n đ đ ảảm m b b ảảo o đ đ ạạt t đư đư ợ ợ c c v v à à duy duy tr tr ì ì lâu lâu d d à à i i c c á á c c k k ế ế t t qu qu ảả đư đư ợ ợ c c x x á á c c đ đ ị ị nh nh tr ư tr ư ớ ớ c c ..
CONCEPTONCEPT OF PERFORMANCEF PERFORMANCE -BASED CONT RACTASED CONT RACTKh Kh á á i i ni ni ệệm m v v ềề H H ợ ợ p p đ đ ồồng ng D D ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 20/26
2020
10)10) Necessary for the Contactor to have a good managementNecessary for the Contactor to have a good management
capacity having the means to define, optimize and carry outcapacity having the means to define, optimize and carry outin a timely basis the physical interventions which are neededin a timely basis the physical interventions which are neededin the short, medium and long term, to guarantee efficiencyin the short, medium and long term, to guarantee efficiency
Lo Lo ạại i h h ợ ợ p p đ đ ồồng ng n n à à y y yêu yêu c c ầầu u Nh Nh à à th th ầầu u ph ph ảải i c c ó ó kh kh ảả n ăng n ăng qu qu ảản n
lý lý t t ốốt t .. Ở Ở đ ây đ ây ,, “ “ qu qu ảản n lý lý ” ” ngh ngh ĩ ĩ a a l l à à kh kh ảả n ăng n ăng ho ho ạạch ch đ đ ị ị nh nh ,, đ đ á á nh nh gi gi á á v v à à th th ự ự c c hi hi ệện n trong trong s s ự ự can can thi thi ệệp p đ đ ú ú ng ng l l ú ú c c ,, ng ng ắ ắ n n h h ạạn n ,, trung trung v v à à d d à à i i h h ạạn n ,, đ đ ểể đ đ ảảm m b b ảảo o th th ự ự c c hi hi ệện n gi gi ảảm m rò rò r r ỉ ỉ hi hi ệệu u qu qu ảả nh nh ấ ấ t t
11)11) The role of the Employer is to enforce the contract by verifyingThe role of the Employer is to enforce the contract by verifyingachieved leakage reduction, as well as all other legislation andachieved leakage reduction, as well as all other legislation andregulations the Contractor must comply with.regulations the Contractor must comply with.
Vai Vai trò trò c c ủủa a Ch Ch ủủ đ đ ầầu u t ư t ư l l à à th th ú ú c c đ đ ẩẩy y h h ợ ợ p p đ đ ồồng ng b b ằằng ng c c á á ch ch ki ki ểểm m tra tra m m ứ ứ c c gi gi ảảm m rò rò r r ỉ ỉ đ ã đ ã đ đ ạạt t đư đư ợ ợ c c c c ũũng ng nh ư nh ư c c á á c c v v ấ ấ n n đ đ ềề ph ph á á p p lý lý v v à à c c á á c c quy quy đ đ ị ị nh nh m m à à Nh Nh à à th th ầầu u ph ph ảải i tuân tuân th th ủủ..
CONCEPTONCEPT OF PERFORMANCEF PERFORMANCE -BASED CONT RACTASED CONT RACTKh Kh á á i i ni ni ệệm m v v ềề H H ợ ợ p p đ đ ồồng ng D D ự ự a a trên trên hi hi ệệu u qu qu ảả th th ự ự c c hi hi ệện n
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 21/26
2121
BIDDING PROCESSIDDING PROCESSQu Qu á á tr tr ì ì nh nh đ đ ấ ấ u u th th ầầu u
1) Prequalification(28/9/2006 – 23/3/2007) 177 days
Invitation for PrequalificationThông báo M ờ i s ơ tuy ển
Issuing Prequalification DocumentsPhát hành H ồ s ơ M ờ i s ơ tuy ển
Receiving ApplicationsNh ận H ồ s ơ D ự s ơ tuy ển
Six eligible applications received
Đã nh ận 6 h ồ s ơ h ợ p l ệ
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 22/26
2222
Evaluation of Applications
Đánh giá H ồ s ơ D ự s ơ tuy ển
Prequalification of ApplicantsS ơ tuy ển Nhà th ầu
There are five prequalified ApplicantsCó 5 nhà th ầu đạt yêu c ầu s ơ tuy ển
Notification of PrequalificationThông báo Nhà th ầu đạt s ơ tuy ển
BIDDING PROCESSIDDING PROCESSQu Qu á á tr tr ì ì nh nh đ đ ấ ấ u u th th ầầu u
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 23/26
2323
BIDDING PROCESSIDDING PROCESSQu Qu á á tr tr ì ì nh nh đ đ ấ ấ u u th th ầầu u
2)Bidding and
Contract award(24/8/2007 – 18/04/2008)
238 days Invitation for Bids
(To prequalified Applicants)M ờ i n ộp H ồ s ơ D ự th ầu
Issuing Bidding DocumentsPhát hành H ồ s ơ M ờ i th ầu
Receiving BidsNh ận H ồ s ơ D ự th ầu
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 24/26
2424
BIDDING PROCESSIDDING PROCESSQu Qu á á tr tr ì ì nh nh đ đ ấ ấ u u th th ầầu u
Bid Opening and EvaluationM ở và Đánh giá H ồ s ơ D ự th ầu
Bid Opening and EvaluationM ở và Đánh giá H ồ s ơ D ự th ầu
Evaluation ofTechnical Proposals
Đánh giá Đềxu ấ t K ỹ thu ật
Evaluation ofFinancial Proposals
Đánh giá Đềxu ấ t Tài chính
Substantially Responsive BidsH ồ s ơ D ự th ầu Đáp ứ ng C ơ b ản
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 25/26
2525
BIDDING PROCESSIDDING PROCESS
Qu Qu á á tr tr ì ì nh nh đ đ ấ ấ u u th th ầầu u Comparison of
Substantially Responsive BidsSo sánh H ồ s ơ D ự th ầu
Bid Award-Substantially Responsive
-Lowest Evaluated Bid Price: small fixed fee and asubstantial performance fee based onvolume of water saved
(Manila Water Company, Inc. Philippines)Trao H ợ p đồng cho HSDT
Đáp ứ ng C ơ b ản và có Giá Đánh giá th ấ p nh ấ t
Contract SigningKý H ợ p đồng
8/6/2019 Leadership Forum on Water Supply and Sanitation - VSang Presentation
http://slidepdf.com/reader/full/leadership-forum-on-water-supply-and-sanitation-vsang-presentation 26/26
2626
SAIGON WATER CORPORATIONSAIGON WATER CORPORATION
T T Ổ Ổ NG CÔNG TY C NG CÔNG TY C Ấ ẤP N Ư P N Ư Ớ Ớ C S C S ÀÀI GÒN I GÒN ------------oOooOo------------
THANK YOU FOR YOUR ATTENTION !