What is LEED?
Leadership in Energy andEnvironmental Design, is a greenbuilding certification system. It wasdeveloped by the U.S. Green BuildingCouncil (USGBC) in March 2000.
LEED certification providesindependent, third-partyverification that a building orcommunity was designed and builtusing strategies aimed at achievinghigh performance in five key areas of
human and environmental health:sustainable site development, watersavings, energy efficiency, materialsselection and indoor environmentalquality.
LEED Rating Systems
-
7/31/2019 LEED Consulting and Commissioning
3/10
-
7/31/2019 LEED Consulting and Commissioning
4/10
LEEDSERVICESProject Evaluation for attainable credits assesment (preliminary Scorecarddevelopment)
Fill and submit project registration at LEED Online
Assume LEED administrator role in LEED Online
Submit team members invitation to project profile
ProjectRegistration
Develop LEED Online credit assignments for team members
Support and guide project team in appropriate LEED credit documentationrequirements
Scorecard development and revisions
Support for LEED implementation strategies and specification development
LEED CreditDocumentation
Compile and review LEED Online documentation requirements from teammembers
Upload remaining documentation to LEED Online project profile
Submit for application for review
ApplicationSubmission
-
7/31/2019 LEED Consulting and Commissioning
5/10
LEEDSERVICESReview received application decision
Guide decision discussion between project team members
in order to decide upon acceptance or appeal
ApplicationDecision
Support compilation and development of additional
documentation for appealed credits
Submit required documentation via LEED Online for review
AppealDecision
Accept credit rulings and move into the certification /denial phase, where the final decision is made.
Accept FinalRevision
-
7/31/2019 LEED Consulting and Commissioning
6/10
How is LEED related to Commissioning?
LEED requires commissioning to verify that the projects
energy-related systems are installed, calibrated and perform
according to the owners project requirements (OPR), basis
of design (BoD) and construction documents (Cx Spec).
HEATING,VENTILATING,
AIRCONDITIONING
ANDREFRIGERATION
SYSTEMS
LIGHTING ANDDAYLIGHTING
CONTROLS
DOMESTIC HOTWATER SYSTEMS
RENEWABLEENERGYSYSTEMS
Commissioned
System
s
-
7/31/2019 LEED Consulting and Commissioning
7/10
LEED CommissioningSERVICES Commissioning Authority (CxA) designation OPR and BoD documentation
Cx Spec development
Establish a Commissioning Plan
Verify installation and performance of building systems
Commissioning Summary Report completion
EA Pre-Req 1:Fundamental
BuildingCommissioning
CxA designation prior to the construction documents phase
Commissioning design reviews
Contractor submittal review
Develop O&M Manual (contractor, with support from CxA)
Verify operator training (contractor, with support from CxA)
Post-occupancy operations review
EA Credit 3:Enhanced
Commissioning
-
7/31/2019 LEED Consulting and Commissioning
8/10
CommissioningPROJECT TIMELINE
Designate CxARFP
Document Owners Project Requirements
Develop Basis of Design
ConceptDevelopment
Review OPR and BoDSchematic Design
Develop and implement Commissioning PlanDesign
Development Incorporate Cx requirements in construction docs
Conduct a commissioning design review
ConstructionDocuments
Pre-D
esign&DesignPhase
-
7/31/2019 LEED Consulting and Commissioning
9/10
Review contractor submittals for commissionedsystems
Equipment:Procurement & Installation
Verify installation and performance ofcommissioned systems
Functional Testing
Develop systems manuals for commissionedsystems
Operations andMaintenance
Verify that requirements for training arecompleted
O&M Training
Complete a commissioning summary reportSubstantialCompletion
Co
nstructionPhase
CommissioningPROJECT TIMELINE
-
7/31/2019 LEED Consulting and Commissioning
10/10
Review building operation within 10months after substantial completion
SystemsMonitoring
Occupancy
CommissioningPROJECT TIMELINE