10/14/2009 1 LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas 8 October 2009 Outline of Presentation • Background Assessment Categories • Scoring Certification Level • Criteria

Upload: vutuyen

Post on 17-Feb-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

1

LEED,

Green Mark,

Green Building Index

By: Regina Ng, IEN Consultants

Presentation for Veritas8 October 2009

Outline of Presentation

• Background• Assessment Categories• Scoring• Certification Level• Criteria

Page 2: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

2

The Big Picture:Energy Impact per Person

Please guessPlease guess the top

energy consumptions?

Source: “Sustainable Buildings – without the hot air” by David MacKay, Cambridge University, 2009

Benefits of Labelling Buildings

• Provides an objective framework to assess buildings on the same platform

• Differentiate one building from another in the market

• Inform the tenants and public on the environmental benefits of the building

• Discloses the additional effort and investment made by the• Discloses the additional effort and investment made by the developer to achieve a green and high performance building

• Reduce risk of green-washing

Page 3: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

3

Background

LEED Green Mark GBI

• Launched by US Green Building Council in 1998

• Private driven

• Voluntary rating system but in some states, they have rating of public 

• Launched by Building Construction Authority (BCA) in 2005

• Public driven with industry support

• Mandatory rating system

• Launched by PAM and ACEM in 2009

• Private driven 

• Voluntary rating system

buildings compulsory

Suite of SchemesBuilding Life Cycle

DESIGN CONSTRUCTION OPERATIONS

LEEDHomesNeighbourhood Development (in pilot)Neighbourhood Development (in pilot)Commercial InteriorsCore and ShellNew ConstructionSchools, Healthcare and Retail

Existing BuildingsOperations & Maintenance

Green MarkResidential Non residentialOffice InteriorLanded Houses Existing BuildingsLanded HousesInfrastructure

Existing Buildings

Green Building IndexResidential Non residential

Page 4: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

4

Assessment CategoriesLEED Green Mark GBI

Sustainable SitesSustainable Site 

Management & Planning

Water Efficiency Water Efficiency Water Efficiency

Energy & AtmosphereEnergy Efficiency + Renewable Energy

Energy Efficiency

Materials & Resources Environmental Protection Materials & Resources

Indoor Environmental Indoor Environmental Indoor EnvironmentalIndoor Environmental Quality

Indoor Environmental Quality

Indoor Environmental Quality

Innovation in Design Other Green Features Innovation

Points AllocationCategory LEED Green Mark GBI

Sustainable Sites 26 0 16

Water Efficiency 10 14 10

Energy & Atmosphere

35 99 35

Materials & Resources

14 11

Indoor Environmental Quality

15 8 21

E i lEnvironmental Protection

32

Innovation in Design

6 7 7

Page 5: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

5

7

20140

160

180

Bonus of 20 pts

Total of 120 pts

Scoring Methodology

7910 10

14

2616

14

11

32

1521

8

67

7

40

60

80

100

120

Bonus: Renewable Energy 

Innovation 

Indoor Environmental Quality 

Environmental Protection 

Materials & Resources 

Totalof 100 pts

Total of 106 pts

Min 30 pts/ Max 50 Pts

Min 20 pts/ Max 50 Pts

35 35

0

20

LEED GBI Green Mark

Sustainable Sites

Water Efficiency 

Energy Efficiency 

Certification Level

LEED Green Mark GBI

Certified 40-49 50 to <75 50 to 65

Silver

(Green Mark 50-59 75 to <85 66 to 75(Green Mark Gold)

50 59 75 to 85 66 to 75

Gold

(Green Mark Goldplus)

60-79 85 to <90 76 to 85

Platinum 80 & above 90 and above 86 and above

Levels of

Certification

Page 6: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

6

site

sLEED

Construction Activity Pollution PreventionWater Use ReductionFundamental Commissioning of Building Energy SystemsMinimum Energy Performance Fundamental Refrigerant ManagementStorage & Collection of RecyclablesMinimum IAQ Performance

re-r

equi

s Environmental Tobacco Smoke Control

Green MarkETTV RTTVU value of roof Air-conditioning system

Air-tightness and Leakage Artificial Lighting

Ventilation Electrical Sub-metering

Pr Illuminance Level

Green Building IndexNo pre-requisites spelt out explicitly

Criteria- SiteSustainable Sites (LEED)

Sustainable Site Planning & Management (GBI)

Environmental Protection (Green Mark)

• For all 3 systems, there is emphasis on public transport access and provision of greenery/landscaping to improve micro-climate comfort.

• For LEED and GBI, emphasis on site selection to minimise automobile emissions

• For LEED and GBI, most criteria overlap except for Workers’ Site Amenities for GBI

Page 7: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

7

Criteria- WaterWater Efficiency (LEED)

Water Efficiency(GBI)

Water Efficiency (Green Mark)

• For LEED and GBI, more performance based approach towards total volume of potable water reduced

• For Green Mark, more feature based.

• More emphasis on water conservation in Green Mark, also including non-process water (cooling tower)g p ( g )

• But in Green Mark and GBI, emphasis on monitoring for leakage but not in LEED.

Criteria- EnergyEnergy & Atmosphere (LEED)

Energy & Efficiency(GBI)

Energy Efficiency (Green Mark)0%

10%20%30%40%50%60%70%80%90%

100%

0 50 100 150 200 250 300 350 400 450Energy Efficiency Index (kWh/m2/year)

Cum

ulat

ive

perc

entil

e

Malaysia(41 officebuildings)

Singapore(95 officebuildings)

• For LEED and GBI, looks at overall energy reduction as a indicator and award points for it

• Green Mark focuses more on reducing energy consumption for the various systems

• In Green Mark, there are pre-requisites of achieving certain energy reduction to obtain the higher rating

• GBI places more emphasis on commissioning and maintenance

• All 3 systems now require measurement & verification of energy performance after occupancy

Page 8: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

8

Criteria- Materials & ResourcesMaterials & resources (LEED)

Materials & Resources(GBI)

Environmental Protection (Green Mark)

• All 3 systems look into reducing waste during construction and reducing waste after occupancy

• GBI and Green Mark looks into sustainable construction methods explicitly but not LEED.

• LEED and GBI have most of the criteria overlapping each other

• There is focus on certified wood and regional materials for LEED and GBI

Criteria- Indoor Environmental QualityIEQ(LEED)

IEQ(GBI)

IEQ (Green Mark)

• All 3 systems look into reducing indoor air pollutants at source

• Greater emphasis on IEQ both during construction and after occupancy by LEED and GBI

• LEED and GBI also recognizes the value of individual controllability daylight and views to outsidecontrollability, daylight and views to outside

• Only LEED does not cover internal noise level

Page 9: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

9

ers

each

te

m?

LEEDLEED Accredited Professional (AP) guide design team on requirements and facilitate the design and construction submittals

Green Building Certification Institute (GBCI) provides 3rd party evaluation and certification of the project

adm

inis

teat

ing

syst Green Mark

Green Mark Manager/Green Mark Professional guide the design team on the requirements and facilitate design and construction submittals

Building Construction Authority (BCA) provides the 3rd party evaluation and certification of the project

Green Building Index

Who

r a GBI Facilitator guides design team and facilitates the design and construction submittals

GBI Certifier will evaluate the project submittals and GSB will issue the final certification

Certification Process

LEED Green Mark GBI

Schematic Design: Pre-certification Assessment (only for Core & Shell)

Schematic Design: Pre-assessment to establish feasibility

Design Phase: First Assessment with Issuance of Provisional Certificate

D i Ph Fi t A tDesign Phase: First Assessment

ith i f P i i l

Completion and Verification Assessment: Final Assessment

Design Phase: First Assessment with issuance of Provisional Certificate

(can extend up to 12 months or not < 50% occupancy)

Completion: Final Assessment Completion: Final Assessment

Need to conduct measurements to verify all the performance criteria are met before issuance of certification

Provide on going performanceFor Goldplus and Platinum projects need to demonstrateProvide on-going performance

data to maintain certification (for at least 5 years)

projects, need to demonstrate actual energy savings after occupancy to obtain final certificate

Triennial Certification

Triennial Certification

Page 10: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

10

Cost of Assessment (New Buildings-Commercial)

Floor Area (sq ft) LEED Green Mark GBI

Registration Fee 2052 RM No No

Pre-certification Fees (only for Core and Shell)

11,970 RM No No

<50,000 sq ft 7,695 RM 24,438 RM 10,000 RM

50,000-500,000 sq ft

(500,000 sq ft)

0.15RM/ sq ft

75,000RM40,000 RM 32,000 RM

>500,000 sq ft 76,950 RM 53,000RM 45,000RM

MEGA Projects

(>1,000,000 sq ft)No Project basis Project basis

Thank you

ANY QUESTIONS?

Page 11: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

11

Appendix

Comparison of Criteria Assessment Criteria LEED Green Mark GBI

SiteConstruction Activity Pollution Prevention • •Site Selection • •Development Density & Community Connectivity • •B fi ld R d l tBrownfield Redevelopment • •Public Transport Access • • •Provision of bicycle racks & shower rooms • • •Limit Parking Capacity • •Preferred parking for low‐emitting fuel efficient cars • •Protection & Restoration of Habitat • •Maximize Open Space • •Storm‐water Quantity Control • •Storm‐water Quality Control • •Heat Island Non roof • •H I l d R fHeat Island Roof • •Light Pollution Reduction •Greenery Provisions •Restoration & Preservation of Trees •Workers' Site Amenities •Building User Guide (LEED only for Core and Shell) • • •

Page 12: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

12

Comparison of Criteria

Water Efficiency LEED Green Mark GBI

Water Efficient Landscaping • • •

Innovative Wastewater technologies • •

Water Use Reduction •

Water Efficient Fittings • • •

Water Usage & Leak Detection • •

f lWater Consumption of Cooling Tower •

Rainwater Harvesting •

Water Recycling •

Comparison of Criteria

Energy & Atmosphere LEED Green Mark GBI

Fundamental Commissioning of Building Energy Systems •

Minimum Energy Performance • • •Minimum Energy Performance • • •

Fundamental Refrigerant Management • • •

Optimize Energy Performance • • •

On‐site renewable energy • • •

Enhanced Commissioning • •

Enhanced Refrigerant Management • • •

Measurement & Verification • • •

Green Power •

OTTV/ETTV • •OTTV/ETTV

Electrical & Tenant Sub‐metering • •

Post‐Occupancy Commissioning •

Lighting Zoning •

Sustainable Maintenance •

Page 13: LEED, Green Mark, Green Building Index - ien.dk LEED Green Mark and GBI revised 01.pdf · LEED, Green Mark, Green Building Index By: Regina Ng, IEN Consultants Presentation for Veritas

10/14/2009

13

Comparison of Criteria

Materials & Resources LEED Green Mark GBI

Storage & Collection of Recyclables • • •

Building Re‐use • •

Construction Waste Management • • •

Materials Re‐use • •

Recycled Content • • •

Regional Materials • •

Rapidly renewable materials •

Certified Wood • •

Energy & Water Reduction During Construction •

Sustainable Construction •

Compost from recycled horticulture waste • • •

CONQUAS/QLASSIC • •

ISO 14000 Certified firms •

Comparison of Criteria Indoor Environmental Quality LEED Green Mark GBI

Minimum IAQ Performance • • •Environmental Tobacco Smoke Control • • •Outdoor Air Delivery Monitoring • • •Increased Ventilation • •Construction IAQ Management Plan During Construction • •Construction IAQ Management Plan Before Occupancy • •Low Emitting Adhesives & Sealants • • •Low Emitting Paints & Coatings • • •Low Emitting Flooring Systems • • •Low Emitting Composite Wood and Agrifibre Products • • •Indoor Chemical & Pollutant Source Control • •Controllability of Lighting • •Controllability of Thermal Comfort • •Thermal Comfort Design • • •Thermal Comfort Verification • •Daylight Level • •Views • •

l i l lInternal noise level • •High Frequency Ballasts • •Mold Prevention •Air change effectiveness •Daylight Glare •Electric Lighting Level •Post Occupancy Comfort Survey •