legend abbreviations smith mechanicalliquidated damages for hvac outages during occupied hours will...

8
THERMOSTAT MOUNTED AT 48" AFF. ('1' INDICATES AHU CONTROLLED) ('N' INDICATES NIGHT SETBACK) SMOKE DETECTOR (PROVIDED BY ELECTRICAL CONTRACTOR, INSTALLED BY MECHANICAL CONTRACTOR AND WIRED BY ELECTRICAL CONTRACTOR). T S 1-1 P/T PIPING B B CHILLED WATER SUPPLY PIPING CHILLED WATER RETURN PIPING CONDENSER WATER SUPPLY PIPING CONDENSER WATER RETURN PIPING HEATING WATER SUPPLY PIPING HEATING WATER RETURN PIPING NEW UNDERGROUND PIPING CONDENSATE DRAIN PIPING GATE VALVE BALL VALVE BUTTERFLY VALVE SWING CHECK VALVE SPRING CHECK VALVE PRESSURE REDUCING VALVE PRESSURE RELIEF VALVE. PIPE FULL SIZE DISCHARGE TO FLOOR DRAIN. 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE COMBINATION VENTURI AND BALL VALVE WITH MEMORY STOP FOR FLOW BALANCING AND SHUT OFF SERVICE MULTI-TURN BALANCING VALVE UNION GLOBE VALVE THERMAL EXPANSION VALVE TRIPLE DUTY VALVE ANGLE VALVE SOLENOID VALVE BACKPRESSURE RELIEF OR SAFETY VALVE BACKPRESSURE REGULATOR (SELF-CONTAINED) BACKPRESSURE REGULATOR (EXTERNAL PRESSURE) FLEXIBLE PIPE CONNECTOR COMBINATION PRESSURE AND TEMPERATURE TEST PLUG WITH EXTENDED NECK AND CAP STRAINER WITH BLOW DOWN GATE VALVE FULL SIZE OF STRAINER AND 3/4" HOSE END CONNECTION WITH CAP MANUAL AIR VENT WITH 1/2" BALL VALVE. ROUTE 1/2" SOFT COPPER TUBING FROM DISCHARGE TO FLOOR DRAIN UNLESS OTHERWISE NOTED. ELBOW TURN UP ELBOW TURN DOWN CONNECTION, BOTTOM CONNECTION, TOP POINT OF CONNECTION TO EXISTING LEGEND ABBREVIATIONS POSITIVE PRESSURE SUPPLY DUCT TURNING UP NEGATIVE PRESSURE RETURN OR EXHAUST DUCT TURNING UP POSITIVE PRESSURE SUPPLY DUCT TURNING DOWN NEGATIVE PRESSURE RETURN OR EXHAUST DUCT TURNING DOWN RECTANGULAR DUCT SIZE. FIRST SIZE LISTED IS SIDE SHOWN IN PLANS. EXTERNALLY INSULATED DUCTWORK EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO BE DEMOLISHED EXTERNALLY INSULATED ROUND FLEXIBLE DUCTWORK DUCT ELBOW WITH TURNING VANES RADIUSED DUCT ELBOW FLEXIBLE DUCT CONNECTION MANUAL VOLUME BALANCING DAMPER TRANSITION FLEX DUCT TAKE OFF WITH MVD BRANCH DUCT TAKEOFF WITH MVD RETURN OR SUPPLY DEVICE WITH MVD DIRECTLY BELOW MAIN TRUNK DUCT TEE WITH TURNING VANES MOTORIZED DAMPER FIRE DAMPER @ AAV ACD ACC AD AFF AFMS AHU AS ASPA BT BD CD CF CWP CWS CWR CFM CONT. CP DD DDC DPS DWGS. EA EAL EER EF EG EL EMCS ENT ESP ET EH FD FPM GI GPM GR GSHP HP HHW HW HWB HWP HWR HWS KH LFD LPS LV LVG MAU MAX. MIN. MVD NFPA OA OAL OAU O.C. PM PRV P/T RA RAG SA SD SEER SF SMACNA SPT SW TAG T'STAT TSP TYP. W/ W.G. AT AUTOMATIC AIR VENT AUTOMATIC CONTROL DAMPER AIR COOLED CHILLER ACCESS DOOR ABOVE FINISHED FLOOR AIRFLOW MEASURING STATION AIR HANDLING UNIT AIR SEPARATOR ALABAMA STATE PORT AUTHORITY BALLAST TANK (CHILLED WATER) BELT DRIVE CEILING DIFFUSER CHEMICAL FEEDER CHILLED WATER PUMP CHILLED WATER RETURN CHILLED WATER SUPPLY CUBIC FEET PER MINUTE CONTINUOUS CONTROL PANEL DIRECT DRIVE DIRECT DIGITAL CONTROL DIFFERENTIAL PRESSURE SENSOR DRAWINGS EXHAUST AIR EXHAUST AIR LOUVER ENERGY EFFICIENCY RATIO EXHAUST FAN EXHAUST GRILLE ELEVATION ENERGY MANAGEMENT AND CONTROL SYSTEM ENTERING EXTERNAL STATIC PRESSURE EXPANSION TANK ELECTRIC HEATER FIRE DAMPER FEET PER MINUTE GRAVITY INTAKE GALLONS PER MINUTE GRAVITY RELIEF GROUND SOURCE HEAT PUMP HORSEPOWER HEATING HOT WATER HOT WATER HOT WATERBOILER HOT WATER PUMP HOT WATER RETURN HOT WATER SUPPLY KITCHEN HOOD LOUVERED FACE DIFFUSER LITERS PER SECOND LINE VOLTAGE LEAVING METERS MAKE-UP AIR UNIT MAXIMUM MINIMUM MANUAL VOLUME DAMPER NATIONAL FIRE PROTECTION ASSOCIATION OUTSIDE AIR OUTSIDE AIR LOUVER OUTSIDE AIR UNIT ON CENTER ASPA PROJECT MANAGER PRESSURE REDUCING VALVE PRESSURE/TEMPERATURE RETURN AIR RETURN AIR GRILLE SUPPLY AIR SMOKE DETECTOR SEASONAL ENERGY EFFICIENCY RATIO SUPPLY FAN SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION STATIC PRESSURE TRANSMITTER SWITCH TRANSFER AIR GRILLE THERMOSTAT TOTAL STATIC PRESSURE TYPICAL WITH WATER GAUGE 1. THE MECHANICAL CONTRACTOR IS REQUIRED TO HAVE A GENERAL CONTRACTORS LICENSE AND SHALL COORDINATE WITH ASPA PROJECT MANAGER AND OTHER TRADES AS NECESSARY FOR REQUIRED OPENINGS IN WALLS, FOUNDATIONS, FLOORS, AND ROOFS. 2. THE MECHANICAL CONTRACTOR TO VERIFY MECHANICAL EQUIPMENT LOCATIONS AND BE RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE ADEQUATE MAINTENANCE CLEARANCE AROUND EACH PIECE OF EQUIPMENT PER THE MANUFACTURER'S RECOMMENDATIONS. PROVIDE CLEARANCE IN FRONT OF ELECTRICAL PANELS AND OTHER ELECTRICAL EQUIPMENT PER THE NATIONAL ELECTRICAL CODE REQUIREMENTS. COORDINATE WITH THE CONTROLS CONTRACTOR AND ELECTRICAL CONTRACTORS IN THE FIELD. 3. PROVIDE WATER PROOF SEALING OF PIPE AND DUCT PENETRATIONS OF EXTERIOR WALLS, FLOORS, AND/OR ROOF. 4. THE PIPING SYSTEM IS TO BE FLUSHED UNTIL CLEAN BEFORE EQUIPMENT CONNECTION. 5. PIPING SHOWN IN THESE DRAWINGS ARE DIAGRAMMATIC. ARRANGE IN A NEAT AND ORDERLY MANNER. 6. PENETRATIONS THROUGH FIRE RATED FLOORS AND WALLS ARE TO BE FIRE SEALED SO AS TO MAINTAIN FLOOR OR WALL INTEGRITY IN THE EVENT OF A FIRE. 7. VERIFY COLLAR SIZES ON ALL EQUIPMENT INLETS AND OUTLETS. TRANSITION DUCTWORK AS NECESSARY. EXTERNALLY INSULATE ALL TRANSITIONS AT EQUIPMENT CONNECTIONS. 8. INSTALL EQUIPMENT AND DUCTWORK TO MANUFACTURERS RECOMMENDED CLEARANCES. 9. PENETRATIONS OF FIREWALLS, CEILINGS, FLOORS, ETC. FOR PIPING TO BE UL LISTED FIRESTOPS AND SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATION. CONTRACTOR TO OBTAIN MANUFACTURER SHOP DRAWINGS AT JOBSITE FOR PENETRATIONS. 10. PROVIDE FLEXIBLE DUCT, PIPE CONNECTIONS, AND VIBRATION ISOLATORS FOR INTERNALLY ISOLATED UNITS. 11. DO NOT MOUNT DISCONNECT SWITCHES ON HVAC EQUIPMENT. 12. ALL ROUND FLEXIBLE DUCT TO BE FACTORY PRE-INSULATED. MAXIMUM LENGTH OF ANY FLEXIBLE DUCT RUNOUT TO BE 6 FT. WHERE LENGTH REQUIRED EXCEEDS 6 FT, INSTALL EXTERNALLY INSULATED ROUND SNAPLOCK DUCT FOR BALANCE OF DISTANCE TO SPIN-IN TAP AT MAIN DUCT TRUNK. 13. SUPPLY AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2" THICK R-8 FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. 14. RETURN AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. PROVIDE 2" THICK R-8 EXTERNAL FIBERGLASS DUCT WRAP. 15. OUTSIDE AIR INTAKE DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2" THICK R-8 FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. 16. EXHAUST AIR DUCTWORK TO BE LOW PRESSURE SINGLE WALL RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. PROVIDE 2" THICK R-8 EXTERNAL FIBERGLASS DUCT WRAP. 17. AVOID ROUTING DUCTWORK OVER LIGHTS WHEREVER POSSIBLE. MAINTAIN MINIMUM 6" CLEARANCE BETWEEN DUCT INSULATION TO TOP OF LIGHTS. 18. WORK SHALL COMPLY WITH THE FOLLOWING AGENCIES -2013 INTERNATIONAL BUILDING CODE -2013 INTERNATIONAL MECHANICAL CODE -2015 INTERNATIONAL ENERGY CONSERVATION CODE -NATIONAL FIRE PROTECTION AGENCY (NFPA) -AMERICAN SOCIETY OF HEATING AND REFRIGERATION ENGINEERS (ASHRAE) -NATIONAL ELECTRIC CODE 19. TRANSFER DUCTS TO BE INTERNALLY INSULATED WITH 25mm (1") THICK ACOUSTICAL DUCT LINER. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. 20. ALL CONDENSATE PIPING FROM EVAPORATOR COILS WILL BE INSULATED TYPE L COPPER. ROUTE CONDENSATE DRAIN TO FLOOR DRAIN. 21. ALL WORK AND EQUIPMENT SHALL BE PROVIDED WITH A TWO YEAR WARRANTY STARTING FROM THE TIME OF SUBSTANTIAL COMPLETION OF THE PROJECT AS DETERMINED BY THE ASPA PROJECT MANAGER. REFER TO BID TABULATION FORM FOR ADDITIONAL "EXTENDED WARRANTY" PRICING REQUIREMENTS. 22. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. GENERAL NOTES M F CONTRACTOR SHALL BE ADVISED, THE WORK REQUIRED FOR THIS OCCUPIED BUILDING MUST BE PERFORMED IN A MANNER THAT IS MINIMALLY DISRUPTIVE TO THE DAILY OPERAT OF THE OCCUPANTS. IT IS EXPECTED THE WORK AT THE PENTHOUSE LEVEL BE PERFORMED MONDAY THROUGH FRIDAY FROM 7:00AM TO 5:00PM. CHILLED WATER IS TO BE PROV BY A CONTRACTOR PROVIDED TEMPORARY CHILLER DURING THE DEMOLITION AND INSTALLATION OF THE NEW CHILLED WATER SYSTEM. WORK ASSOCIATED WITH THE REPLACEMENT OF THE DUAL DUCT VAV BOXES ON FLOORS 1, 2, AND 3, SHALL BE COORDINATED WITH THE ASPA PM A MINIMUM OF 10 DAYS PRIOR T WORK TAKING PLACE. THIS TIMEFRAME IS REQUIRED TO ALLOW FOR THE COORDINATION WITH THE OCCUPANTS AS NECESSARY. BASE BID 1. THE REPLACEMENT OF THE CHILLER, CHILLED WATER PUMPS, CHILLED WATER PIPING SYSTEM, AHU-1 CHILLED WATER CONTROL VALVE, AND ASSOCIATED CHILLED WATER APPURTENANCES AT THE MECHANICAL PENTHOUSE LEVEL. 2. THE REPLACEMENT OF THE NATURAL GAS FIRED BOILER, HOT WATER PUMPS, HOT WATER PIPING SYSTEM, AHU-1 HOT WATER CONTROL VALVE, AND ASSOCIATED HEATING WATER APPURTENANCES AT THE PENTHOUSE LEVEL. 3. REPLACEMENT OF THE CHILLED WATER CONTROL VALVE AT THE FIRST FLOOR AIR HANDLING UNIT (AHU-3) SERVING THE KILLIAN ROOM. 4. REPLACEMENT OF THE EXISTING PNEUMATIC CONTROL SYSTEM WITH A NEW DDC CONTROL SYSTEM. DDC CONTROL SYSTEM INSTALLED UNDER THE BASE BID SHALL INCLU ALL NECESSARY COMPONENTS TO ALLOW FOR THE ADDITION OF THE 36 DUAL DUCT VAV BOXES INCLUDED IN ADDITIVE ALTERNATE #1, AND THE 7 HOT WATER CONTROL VA IN ADDITIVE ALTERNATE #2. 5. SEE INSULATION NOTES ON DRAWING M4.1 FOR ADDITIONAL INFORMATION. a. CONTRACTOR SHALL PROVIDE AND INSTALL INSULATION ON THE RETURN AIR DUCT FOR AIR HANDLING UNIT (AHU-1) AT THE MECHANICAL PENTHOUSE LEVEL ONLY. b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°F TO 65°F) DURING OCCUPIED TIMES DUE TO LACK OF HVAC. THE AIR HANDLING UNIT AHU-1 HAS THE CAPABILITY TO OPERATE IN ECONOMIZER MODE IF A PARTITION IS INSTALLED INSIDE THE PLENUM SPACE BEHIND THE AIR HANDLING UNIT. CONTRACTOR WILL BE RESPONSIBLE MAKING UNIT FUNCTION IN THIS MANNER. LIQUIDATED DAMAGES Smith Mechanical Consulting & Design 19-053 1-7-20 FOR THE HVAC RENOVATIONS MOBILE, ALABAMA 36602 NORTH WATER STREET A L A B A M A S T A T E P O R T A U T H O R I T Y INTERNATIONAL TRADE CENTER M1.0 HVAC LEGEND AND NOTES

Upload: others

Post on 20-Jan-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

  • THERMOSTAT MOUNTED AT 48" AFF.

    ('1' INDICATES AHU CONTROLLED)

    ('N' INDICATES NIGHT SETBACK)

    SMOKE DETECTOR

    (PROVIDED BY ELECTRICAL CONTRACTOR,

    INSTALLED BY MECHANICAL CONTRACTOR

    AND WIRED BY ELECTRICAL CONTRACTOR).

    T

    S

    1-1

    P/T

    PIPING

    B

    B

    CHILLED WATER SUPPLY PIPING

    CHILLED WATER RETURN PIPING

    CONDENSER WATER SUPPLY PIPING

    CONDENSER WATER RETURN PIPING

    HEATING WATER SUPPLY PIPING

    HEATING WATER RETURN PIPING

    NEW UNDERGROUND PIPING

    CONDENSATE DRAIN PIPING

    GATE VALVE

    BALL VALVE

    BUTTERFLY VALVE

    SWING CHECK VALVE

    SPRING CHECK VALVE

    PRESSURE REDUCING VALVE

    PRESSURE RELIEF VALVE. PIPE

    FULL SIZE DISCHARGE TO FLOOR DRAIN.

    2-WAY CONTROL VALVE

    3-WAY CONTROL VALVE

    COMBINATION VENTURI AND BALL VALVE WITH

    MEMORY STOP FOR FLOW BALANCING AND

    SHUT OFF SERVICE

    MULTI-TURN BALANCING VALVE

    UNION

    GLOBE VALVE

    THERMAL EXPANSION VALVE

    TRIPLE DUTY VALVE

    ANGLE VALVE

    SOLENOID VALVE

    BACKPRESSURE RELIEF OR SAFETY VALVE

    BACKPRESSURE REGULATOR (SELF-CONTAINED)

    BACKPRESSURE REGULATOR (EXTERNAL PRESSURE)

    FLEXIBLE PIPE CONNECTOR

    COMBINATION PRESSURE AND TEMPERATURE TEST PLUG

    WITH EXTENDED NECK AND CAP

    STRAINER WITH BLOW DOWN GATE VALVE FULL SIZE OF

    STRAINER AND 3/4" HOSE END CONNECTION WITH CAP

    MANUAL AIR VENT WITH 1/2" BALL VALVE. ROUTE 1/2"

    SOFT COPPER TUBING FROM DISCHARGE TO FLOOR

    DRAIN UNLESS OTHERWISE NOTED.

    ELBOW TURN UP

    ELBOW TURN DOWN

    CONNECTION, BOTTOM

    CONNECTION, TOP

    POINT OF CONNECTION TO EXISTING

    LEGEND ABBREVIATIONS

    POSITIVE PRESSURE SUPPLY DUCT TURNING UP

    NEGATIVE PRESSURE RETURN OR EXHAUST DUCT

    TURNING UP

    POSITIVE PRESSURE SUPPLY DUCT TURNING DOWN

    NEGATIVE PRESSURE RETURN OR EXHAUST DUCT

    TURNING DOWN

    RECTANGULAR DUCT SIZE. FIRST SIZE LISTED IS SIDE

    SHOWN IN PLANS.

    EXTERNALLY INSULATED DUCTWORK

    EXISTING DUCTWORK TO REMAIN

    EXISTING DUCTWORK TO BE DEMOLISHED

    EXTERNALLY INSULATED ROUND FLEXIBLE DUCTWORK

    DUCT ELBOW WITH TURNING VANES

    RADIUSED DUCT ELBOW

    FLEXIBLE DUCT CONNECTION

    MANUAL VOLUME BALANCING DAMPER

    TRANSITION

    FLEX DUCT TAKE OFF WITH MVD

    BRANCH DUCT TAKEOFF WITH MVD

    RETURN OR SUPPLY DEVICE WITH MVD DIRECTLY BELOW

    MAIN TRUNK DUCT

    TEE WITH TURNING VANES

    MOTORIZED DAMPER

    FIRE DAMPER

    @

    AAV

    ACD

    ACC

    AD

    AFF

    AFMS

    AHU

    AS

    ASPA

    BT

    BD

    CD

    CF

    CWP

    CWS

    CWR

    CFM

    CONT.

    CP

    DD

    DDC

    DPS

    DWGS.

    EA

    EAL

    EER

    EF

    EG

    EL

    EMCS

    ENT

    ESP

    ET

    EH

    FD

    FPM

    GI

    GPM

    GR

    GSHP

    HP

    HHW

    HW

    HWB

    HWP

    HWR

    HWS

    KH

    LFD

    LPS

    LV

    LVG

    MAU

    MAX.

    MIN.

    MVD

    NFPA

    OA

    OAL

    OAU

    O.C.

    PM

    PRV

    P/T

    RA

    RAG

    SA

    SD

    SEER

    SF

    SMACNA

    SPT

    SW

    TAG

    T'STAT

    TSP

    TYP.

    W/

    W.G.

    AT

    AUTOMATIC AIR VENT

    AUTOMATIC CONTROL DAMPER

    AIR COOLED CHILLER

    ACCESS DOOR

    ABOVE FINISHED FLOOR

    AIRFLOW MEASURING STATION

    AIR HANDLING UNIT

    AIR SEPARATOR

    ALABAMA STATE PORT AUTHORITY

    BALLAST TANK (CHILLED WATER)

    BELT DRIVE

    CEILING DIFFUSER

    CHEMICAL FEEDER

    CHILLED WATER PUMP

    CHILLED WATER RETURN

    CHILLED WATER SUPPLY

    CUBIC FEET PER MINUTE

    CONTINUOUS

    CONTROL PANEL

    DIRECT DRIVE

    DIRECT DIGITAL CONTROL

    DIFFERENTIAL PRESSURE SENSOR

    DRAWINGS

    EXHAUST AIR

    EXHAUST AIR LOUVER

    ENERGY EFFICIENCY RATIO

    EXHAUST FAN

    EXHAUST GRILLE

    ELEVATION

    ENERGY MANAGEMENT AND CONTROL SYSTEM

    ENTERING

    EXTERNAL STATIC PRESSURE

    EXPANSION TANK

    ELECTRIC HEATER

    FIRE DAMPER

    FEET PER MINUTE

    GRAVITY INTAKE

    GALLONS PER MINUTE

    GRAVITY RELIEF

    GROUND SOURCE HEAT PUMP

    HORSEPOWER

    HEATING HOT WATER

    HOT WATER

    HOT WATERBOILER

    HOT WATER PUMP

    HOT WATER RETURN

    HOT WATER SUPPLY

    KITCHEN HOOD

    LOUVERED FACE DIFFUSER

    LITERS PER SECOND

    LINE VOLTAGE

    LEAVING METERS

    MAKE-UP AIR UNIT

    MAXIMUM

    MINIMUM

    MANUAL VOLUME DAMPER

    NATIONAL FIRE PROTECTION ASSOCIATION

    OUTSIDE AIR

    OUTSIDE AIR LOUVER

    OUTSIDE AIR UNIT

    ON CENTER

    ASPA PROJECT MANAGER

    PRESSURE REDUCING VALVE

    PRESSURE/TEMPERATURE

    RETURN AIR

    RETURN AIR GRILLE

    SUPPLY AIR

    SMOKE DETECTOR

    SEASONAL ENERGY EFFICIENCY RATIO

    SUPPLY FAN

    SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL

    ASSOCIATION

    STATIC PRESSURE TRANSMITTER

    SWITCH

    TRANSFER AIR GRILLE

    THERMOSTAT

    TOTAL STATIC PRESSURE

    TYPICAL

    WITH

    WATER GAUGE

    1. THE MECHANICAL CONTRACTOR IS REQUIRED TO HAVE A GENERAL CONTRACTORS LICENSE AND SHALL COORDINATE WITH ASPA PROJECT MANAGER AND OTHER TRADES AS NECESSARY

    FOR REQUIRED OPENINGS IN WALLS, FOUNDATIONS, FLOORS, AND ROOFS.

    2. THE MECHANICAL CONTRACTOR TO VERIFY MECHANICAL EQUIPMENT LOCATIONS AND BE RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE ADEQUATE MAINTENANCE

    CLEARANCE AROUND EACH PIECE OF EQUIPMENT PER THE MANUFACTURER'S RECOMMENDATIONS. PROVIDE CLEARANCE IN FRONT OF ELECTRICAL PANELS AND OTHER ELECTRICAL

    EQUIPMENT PER THE NATIONAL ELECTRICAL CODE REQUIREMENTS. COORDINATE WITH THE CONTROLS CONTRACTOR AND ELECTRICAL CONTRACTORS IN THE FIELD.

    3. PROVIDE WATER PROOF SEALING OF PIPE AND DUCT PENETRATIONS OF EXTERIOR WALLS, FLOORS, AND/OR ROOF.

    4. THE PIPING SYSTEM IS TO BE FLUSHED UNTIL CLEAN BEFORE EQUIPMENT CONNECTION.

    5. PIPING SHOWN IN THESE DRAWINGS ARE DIAGRAMMATIC. ARRANGE IN A NEAT AND ORDERLY MANNER.

    6. PENETRATIONS THROUGH FIRE RATED FLOORS AND WALLS ARE TO BE FIRE SEALED SO AS TO MAINTAIN FLOOR OR WALL INTEGRITY IN THE EVENT OF A FIRE.

    7. VERIFY COLLAR SIZES ON ALL EQUIPMENT INLETS AND OUTLETS. TRANSITION DUCTWORK AS NECESSARY. EXTERNALLY INSULATE ALL TRANSITIONS AT EQUIPMENT CONNECTIONS.

    8. INSTALL EQUIPMENT AND DUCTWORK TO MANUFACTURERS RECOMMENDED CLEARANCES.

    9. PENETRATIONS OF FIREWALLS, CEILINGS, FLOORS, ETC. FOR PIPING TO BE UL LISTED FIRESTOPS AND SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATION. CONTRACTOR

    TO OBTAIN MANUFACTURER SHOP DRAWINGS AT JOBSITE FOR PENETRATIONS.

    10. PROVIDE FLEXIBLE DUCT, PIPE CONNECTIONS, AND VIBRATION ISOLATORS FOR INTERNALLY ISOLATED UNITS.

    11. DO NOT MOUNT DISCONNECT SWITCHES ON HVAC EQUIPMENT.

    12. ALL ROUND FLEXIBLE DUCT TO BE FACTORY PRE-INSULATED. MAXIMUM LENGTH OF ANY FLEXIBLE DUCT RUNOUT TO BE 6 FT. WHERE LENGTH REQUIRED EXCEEDS 6 FT, INSTALL

    EXTERNALLY INSULATED ROUND SNAPLOCK DUCT FOR BALANCE OF DISTANCE TO SPIN-IN TAP AT MAIN DUCT TRUNK.

    13. SUPPLY AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2" THICK R-8

    FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.

    14. RETURN AIR DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. DUCT SIZES INDICATED ARE INSIDE

    CLEAR DIMENSIONS. PROVIDE 2" THICK R-8 EXTERNAL FIBERGLASS DUCT WRAP.

    15. OUTSIDE AIR INTAKE DUCTWORK TO BE SINGLE WALL LOW PRESSURE RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A, EXTERNALLY INSULATED WITH 2"

    THICK R-8 FIBERGLASS DUCT WRAP. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.

    16. EXHAUST AIR DUCTWORK TO BE LOW PRESSURE SINGLE WALL RECTANGULAR, SMACNA STATIC PRESSURE CLASS 250 Pa (1" W.G.), SEAL CLASS A. PROVIDE 2" THICK R-8 EXTERNAL

    FIBERGLASS DUCT WRAP.

    17. AVOID ROUTING DUCTWORK OVER LIGHTS WHEREVER POSSIBLE. MAINTAIN MINIMUM 6" CLEARANCE BETWEEN DUCT INSULATION TO TOP OF LIGHTS.

    18. WORK SHALL COMPLY WITH THE FOLLOWING AGENCIES

    -2013 INTERNATIONAL BUILDING CODE

    -2013 INTERNATIONAL MECHANICAL CODE

    -2015 INTERNATIONAL ENERGY CONSERVATION CODE

    -NATIONAL FIRE PROTECTION AGENCY (NFPA)

    -AMERICAN SOCIETY OF HEATING AND REFRIGERATION ENGINEERS (ASHRAE)

    -NATIONAL ELECTRIC CODE

    19. TRANSFER DUCTS TO BE INTERNALLY INSULATED WITH 25mm (1") THICK ACOUSTICAL DUCT LINER. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.

    20. ALL CONDENSATE PIPING FROM EVAPORATOR COILS WILL BE INSULATED TYPE L COPPER. ROUTE CONDENSATE DRAIN TO FLOOR DRAIN.

    21. ALL WORK AND EQUIPMENT SHALL BE PROVIDED WITH A TWO YEAR WARRANTY STARTING FROM THE TIME OF SUBSTANTIAL COMPLETION OF THE PROJECT AS DETERMINED BY THE ASPA

    PROJECT MANAGER. REFER TO BID TABULATION FORM FOR ADDITIONAL "EXTENDED WARRANTY" PRICING REQUIREMENTS.

    22. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

    GENERAL NOTES

    M

    F

    CONTRACTOR SHALL BE ADVISED, THE WORK REQUIRED FOR THIS OCCUPIED BUILDING MUST BE PERFORMED IN A MANNER THAT IS MINIMALLY DISRUPTIVE TO THE DAILY OPERATIONS

    OF THE OCCUPANTS. IT IS EXPECTED THE WORK AT THE PENTHOUSE LEVEL BE PERFORMED MONDAY THROUGH FRIDAY FROM 7:00AM TO 5:00PM. CHILLED WATER IS TO BE PROVIDED

    BY A CONTRACTOR PROVIDED TEMPORARY CHILLER DURING THE DEMOLITION AND INSTALLATION OF THE NEW CHILLED WATER SYSTEM.

    WORK ASSOCIATED WITH THE REPLACEMENT OF THE DUAL DUCT VAV BOXES ON FLOORS 1, 2, AND 3, SHALL BE COORDINATED WITH THE ASPA PM A MINIMUM OF 10 DAYS PRIOR TO

    WORK TAKING PLACE. THIS TIMEFRAME IS REQUIRED TO ALLOW FOR THE COORDINATION WITH THE OCCUPANTS AS NECESSARY.

    BASE BID

    1. THE REPLACEMENT OF THE CHILLER, CHILLED WATER PUMPS, CHILLED WATER PIPING SYSTEM, AHU-1 CHILLED WATER CONTROL VALVE, AND ASSOCIATED CHILLED WATER

    APPURTENANCES AT THE MECHANICAL PENTHOUSE LEVEL.

    2. THE REPLACEMENT OF THE NATURAL GAS FIRED BOILER, HOT WATER PUMPS, HOT WATER PIPING SYSTEM, AHU-1 HOT WATER CONTROL VALVE, AND ASSOCIATED HEATING HOT

    WATER APPURTENANCES AT THE PENTHOUSE LEVEL.

    3. REPLACEMENT OF THE CHILLED WATER CONTROL VALVE AT THE FIRST FLOOR AIR HANDLING UNIT (AHU-3) SERVING THE KILLIAN ROOM.

    4. REPLACEMENT OF THE EXISTING PNEUMATIC CONTROL SYSTEM WITH A NEW DDC CONTROL SYSTEM. DDC CONTROL SYSTEM INSTALLED UNDER THE BASE BID SHALL INCLUDE

    ALL NECESSARY COMPONENTS TO ALLOW FOR THE ADDITION OF THE 36 DUAL DUCT VAV BOXES INCLUDED IN ADDITIVE ALTERNATE #1, AND THE 7 HOT WATER CONTROL VALVES

    IN ADDITIVE ALTERNATE #2.

    5. SEE INSULATION NOTES ON DRAWING M4.1 FOR ADDITIONAL INFORMATION.

    a. CONTRACTOR SHALL PROVIDE AND INSTALL INSULATION ON THE RETURN AIR DUCT FOR AIR HANDLING UNIT (AHU-1) AT THE MECHANICAL PENTHOUSE LEVEL ONLY.

    b. CONTRACTOR SHALL PROVIDE AND INSTALL INSULATION ON THE SUPPLY AND RETURN AIR DUCT FOR AIR HANDLING UNIT (AHU-2) AT THE MECHANICAL PENTHOUSE LEVEL

    ONLY.

    6. ALL WORK INDICATED AND SPECIFIED THAT IS NOT INCLUDED IN ADD ALTERNATES 1 AND 2.

    ADDITIVE ALTERNATE #1

    1. REPLACE DUAL DUCT VAV BOXES ON FLOORS 1, 2, AND 3. REPLACEMENT OF PNEUMATIC CONTROLS WITH DDC CONTROLS FOR EACH OF THE DUAL DUCT VAV BOXES.

    INDIVIDUAL DUAL DUCT VAV BOX ACTUATORS AND ASSOCIATED THERMOSTATS SHALL BE CONNECTED TO THE BUILDING DDC SYSTEM INSTALLED IN THE BASE BID.

    ADDITIVE ALTERNATE #2

    1. REPLACE FIVE PNEUMATIC HOT WATER COIL CONTROL VALVES AND TWO PNEUMATIC HOT WATER UNIT HEATER CONTROL VALVES WITH NEW DDC CONTROL VALVES. THIS

    WORK IS ALL LOCATED ON THE 4TH FLOOR. THIS WORK INCLUDES THE REPLACEMENT OF THE PNEUMATIC THERMOSTATS WITH DDC THERMOSTATS. THE CONTROL VALVES AND

    ASSOCIATED THERMOSTATS SHALL BE CONNECTED TO THE DDC SYSTEM INSTALLED IN THE BASE BID.

    GENERAL SCOPE OF WORK

    1. A FULL TIME SUPERVISOR IS REQUIRED TO BE ONSITE WHEN WORK IS TAKING PLACE.

    2. TWIC CREDENTIALS ARE REQUIRED FOR ALL WORKERS ONSITE.

    3. A DRUG FREE WORKPLACE WITH WRITTEN SAFETY MANUALS ARE REQUIRED TO BE ONSITE.

    4. CONTRACTOR MUST HAVE A PHYSICAL BUILDING LOCATED WITHIN 25 MILES OF THE PROJECT SITE.

    5. CONTRACTOR MUST HAVE A SERVICE DEPARTMENT THAT IS AVAILABLE FOR AFTER HOURS AND WEEKEND CALL OUTS.

    6. CONTRACTOR MUST HAVE A MINIMUM OF 5 FULL TIME EMPLOYEES ON STAFF WITH EXPERIENCE SERVICING NEW EQUIPMENT INCLUDED IN THE SCOPE OF WORK.

    7. REFER TO SPECIFICATION FRONT END DOCUMENTS FOR ADDITIONAL REQUIREMENTS FOR THIS PROJECT.

    8. CONTRACTOR ON THIS PROJECT SHALL HOLD AN ALABAMA GENERAL CONTRACTOR'S LICENSE.

    9. CONTRACTOR SHALL PROVIDE ADDRESSING THESE QUALIFICATIONS WITH THE BID PACKAGE.

    CONTRACTOR QUALIFICATIONS

    LIQUIDATED DAMAGES FOR HVAC OUTAGES DURING OCCUPIED HOURS WILL BE $2,000.00 PER DAY WHCH WILL BE IMPOSED IF THE HVAC WORK IS NOT COMPLETED AS SCHEDULED

    AND AGREED UPON WITH ASPA PM. INCLUDE DETAILED SCHEDULE IN BID PACKAGE. SCHEDULE START DATE TO BE ADJUSTED BASE UPON NOTICE TO PROCEED ISSUED AND TO

    ALLOW WORK TO BE DONE DURING DAYS WITH MILD TEMPERATURES (50°F TO 65°F) DURING OCCUPIED TIMES DUE TO LACK OF HVAC. THE AIR HANDLING UNIT AHU-1 HAS THE

    CAPABILITY TO OPERATE IN ECONOMIZER MODE IF A PARTITION IS INSTALLED INSIDE THE PLENUM SPACE BEHIND THE AIR HANDLING UNIT. CONTRACTOR WILL BE RESPONSIBLE FOR

    MAKING UNIT FUNCTION IN THIS MANNER.

    LIQUIDATED DAMAGES

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M1.0

    HVAC LEGEND AND

    NOTES

    AutoCAD SHX Text24x12

    AutoCAD SHX TextCHWS

    AutoCAD SHX TextHWR

    AutoCAD SHX TextHWS

    AutoCAD SHX TextCHWR

    AutoCAD SHX TextD

    AutoCAD SHX TextPRV

    AutoCAD SHX TextCWS

    AutoCAD SHX TextCHR

    AutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • A. BUTTERFLY VALVES SHALL BE RATED AT A MINIMUM OF 150 PSIG WOG AND SHALL PROVIDE BUBBLETIGHT SHUTOFF. VALVES SHALL HAVE LUG

    STYLE CAST IRON BODY, ALUMINUM BRONZE DISC, 416 STAINLESS STEEL STEM, EPDM SLEEVES, SEATS AND O-RINGS, AND LEVER OPERATOR.

    VALVES SHALL BE SUITABLE FOR DEAD END SERVICE AND SHALL BE MILWAUKEE 'M' SERIES, OR EQUAL BY KITZ OR HAMMOND.

    B. ALL BALL VALVES, INCLUDING THOSE USED FOR DRAIN/BLOWDOWN VALVES, GAGE, AIR VENT, COLD WATER MAKE-UP, CHEMICAL TREATMENT

    AND EXPANSION TANK SERVICE SHALL BE BRONZE BODY, THREADED ENDS, ALL STAINLESS STEEL TRIM AND STAINLESS STEEL LATCH-LOCK

    HANDLE, MILWAUKEE 20BSOR-02-LL, OR EQUAL BY KITZ OR HAMMOND.

    C. ALL TAPS FOR P/T PORTS, GAGES, DIFFERENTIAL PRESSURE SWITCHES, DRAIN VALVES ETC. SHALL BE MAKE WITH FORGED STEEL

    THREDOLETS OR WELDED REDUCING TEE IN PIPING SIZE 2 1/2" AND LARGER, GALVANIZED MALLEABLE IRON SCREWED REDUCING TEE IN STEEL

    PIPING SIZE 2" AND SMALLER, AND SOLDERED TEES IN COPPER PIPING. MOUNT P/T PORTS IN VERTICAL POSITION.

    D. ALL GAGE (INTERIOR), AIR VENT, DRAIN VALVE, STRAINER BLOWDOWN AND DIFFERENTIAL PRESSURE CONNECTION PIPING SHALL BE SCREWED

    BRASS PIPE. AIR VENT DISCHARGE PIPING MAY BE HEAVY WALL SOFT COPPER TUBING IF RUN STRAIGHT AND PERPENDICULAR TO BUILDING

    LINES AND PROPERLY SUPPORTED AT REGULAR INTERVALS.

    E. PRESSURE/TEMPERATURE TEST PORTS SHALL BE BRASS BODY 1/4" MPT WITH DUAL NORDEL SEALS AND BRASS CAP W/RETAINER STRAP, FLOW

    DESIGN INC. SUPERSEAL. PROVIDE 2-3/4" LENGTH FOR INSULATED PIPING AND 1-1/4" LENGTH FOR NON-INSULATED PIPING. MOUNT P/T PORTS

    IN VERTICAL POSITION ACCESSIBLE FOR EASY INSERTION OF TEMPERATURE AND PRESSURE MEASURING DEVICES.

    F. THE USE OF BUSHINGS AND CLOSE NIPPLES FOR THREADED CONNECTIONS OF ANY KIND IS NOT ALLOWABLE.

    G. PROVIDE AUTOMATIC AIR VENTS AT ALL HIGH POINTS IN PIPING AND ELSEWHERE AS INDICATED, SEE TYPICAL DETAILS.

    H. SUPPORT PIPING FROM GROUND WITH GALVANIZED STEEL SCHEDULE 40 PIPE STANDS PRIOR TO FINAL CONNECTION TO PUMPS SUCH THAT NO

    PIPING WEIGHT IS CARRIED BY PUMP CONNECTIONS.

    I. ALL IRREGULAR SHAPED CHILLED WATER SYSTEM ACCESSORIES SUCH AS AIR SEPARATOR, EXPANSION TANK, CHILLED WATER PUMPS, ETC.

    SHALL BE INSULATED WITH TWO LAYERS OF ONE INCH THICK ARMAFLEX AND SHALL BE PAINTED WITH TWO COATS OF ELASTOMERIC PAINT.

    J. MECHANICAL CONTRACTOR SHALL INSTALL THRED-O-LETS FOR DDC TEMPERATURE WELLS WHERE REQUIRED BY ENGINEER AND/OR TRANE

    DDC CONTRACTOR.

    K. ALL NEW HOT WATER PIPING SHALL BE INSULATED WITH 1-1/2" THICK SECTIONAL FIBERGLASS WITH AN ASJ JACKET. ALL FITTINGS AND VALVES

    TO BE PROVIDED WITH PREMOLDED INSULATION SECTIONS.

    L. ALL NEW HYDRONIC PIPING SHALL MATCH EXISTING PIPING MATERIALS.

    M. CONTRACTOR SHALL DRAIN AND REFILL EXISTING HOT WATER SYSTEM AND PROVIDE NEW CHEMICAL TREATMENT FOR REFILL.

    N. CONTRACTOR SHALL REBALANCE ALL EXISTING HOT WATER COILS. OBTAIN THE ORIGINAL BUILDING DRAWINGS FOR LOCATION AND

    DESCRIPTION OF DEVICES AS WELL AS FLOW INFORMATION.

    O. THE MECHANICAL CONTRACTOR PERFORMING WORK ON THIS PROJECT WILL BE RESPONSIBLE FOR ALL ASSOCIATED ELECTRICAL AND

    CONTROLS WORK REQUIRED TO SUPPORT THE INSTALLATION OF THE NEW BOILER, CHILLERS, AND ASSOCIATED PUMPS AS DESCRIBED IN

    THESE DOCUMENTS.

    GENERAL PIPING NOTES

    AIR COOLED CHILLER SCHEDULE (BASE BID)

    MARK MIN. EER IPLV

    EVAPORATOR DATA CONDENSER DATA COMPRESSER DATA ELECTRICAL DATA

    GPM

    ENT. WATER

    TEMP.

    LVG. WATER

    TEMP.

    MAX. WATER

    PRESS.

    DROP (FT.

    W.C.)

    FOULING

    FACTOR

    AMBIENT

    TEMP. (DB)

    DEG. F

    LOW

    AMBIENT

    TEMP. (DB)

    DEG. F

    CONDENSER FANS

    MIN.

    QUANT.

    CAPACITY

    REDUCTION

    VOLTS PHASE Hz

    QUANT. FLA

    APPROX. %

    RANGE

    ACC-1 75.0 HFC-410A WATER 10.1115.58

    185.7 54.0 44.0 10.0 0.00010 95.0 26.0 4 4.0 4 25-100 181 460 3 60

    EER - ENERGY EFFICIENCY RATIO. POWER INPUTS SHALL INCLUDE ALL COMPRESSORS, CONDENSER FANS, AND CONTROL POWER AT FULL LOAD CONDITIONS.

    IPLV - INTEGRATED PART LOAD VALUE OF EER'S AT ARI CONDITIONS.

    SCROLL TYPE CHILLER WITH LOW AMBIENT CONTROLS AND FLANGE KIT.

    PROVIDE FACTORY MOUNTED DISCONNECT SWITCH, POWER SUPPLY MONITOR, AND SINGLE POINT POWER CONNECTION. AND SOFT START STARTER.

    PROVIDE FACTORY WEATHERPROOF CONTROL PANEL WITH MICROPROCESSOR BASED OPERATING AND SAFETY CONTROLS, STARTERS AND CONTROL VOLTAGE TRANSFORMER.

    PROVIDE CORROSION RESISTANT COATING ON THE CONDENSER COILS. PROVIDE COILS WITH HAIL GUARDS.

    PROVIDE VANDAL-PROTECTIVE LOUVERED GUARDS AROUND BOTTOM OF CHILLER PERIMETER OPENING TO PROTECT PIPING, INSULATION, ETC.

    PROVIDE WITH SINGLE POINT POWER CONNECTION WITH 120 VOLT RECEPTACLE CONVENIENCE OUTLET.

    PROVIDE WITH MINIMUM SOUND ATTENUATION PACKAGE.

    PROVIDE EVAPORATOR WITH FREEZE PROTECTION. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR TO PROVIDE A POWER CIRCUIT AS NECESSARY.

    BASIS OF DESIGN YORK YLAA STANDARD EFFICIENCY. PROVIDE WITH TWO YEAR PARTS AND LABOR WARRANTY INCLUDING REFRIGERANT, ADDITIONALLY PROVIDE WITH 10 YEAR COMPRESSOR WARRANTY. REFER TO BID

    TABULATION SHEET FOR ADDITIONAL WARRANTY REQUIREMENTS.

    TOTAL

    UNIT

    MCA

    LIQUID TYPE

    REFRIG.

    TYPE

    MIN.

    CAPACITY

    (TONS)

    3

    REMARKS

    COMP.

    RLA

    4@48

    BASE-MOUNTED.

    ES

    SEE SEQUENCE OF OPERATION ON SHEETS M6.1

    AND M6.4

    TOTAL HEAD

    (FT H O)

    PERFORMANCE DATA

    PUMP SCHEDULE (BASE BID)

    SERVICE

    CHWCHWP-1

    ES=END SUCTION

    IL=INLINE

    MARK

    CAPACITY

    (GPM)

    VARIABLE SPEED

    300

    2

    60

    TYPE

    ELECTRICAL DATA

    MAXIMUM

    SPEED (RPM)

    MOTOR HP

    MINIMUM

    EFFICIENCY

    176072% 7.5

    HERTZPHASEVOLTS

    60460 3

    REMARKS

    ONCE PUMP IS INSTALLED, THE PUMP AND

    MOTOR SHAFT SHALL BE REALIGNED PER THE

    PUMP MANUFACTURERS RECOMMENDATIONS.

    HOT WATER HEATING BOILER SCHEDULE (BASE BID)

    ELECTRICAL DATA

    MINIMUM MINIMUM MINIMUM FUEL FLOW PRESSURE

    MARK INPUT OUTPUT EFFICIENCY RATE DROP MAXIMUM EWT LWT BASIS OF NOTES

    HWB-

    (MBTUH) (MBTUH) (%) (GPM) (FT of HEAD) (°F) (°F)

    DESIGN VOLTS Hz PHASE

    13,000 2,550

    85 NATURAL GAS 210 12.0 160 180 RAYPAK MVB TYPE H 120 60 11, 2, 3, 4, 5, 6, 7, 8, 9

    NOTES

    1 COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR. COORDINATE ALL CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR.

    2

    INSTALL BOILER IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

    3BOILER SHALL HAVE FULL ELECTRONIC MODULATION, CONSTANT RATIO UP TO 7:1 TURNDOWN.

    4

    MINIMUM WATER INLET TEMPERATURE IS 120°F.

    5

    PROVIDE BOILER WITH FACTORY START-UP.

    6

    BOILER SHALL BE INSTALLED PER THE REQUIREMENTS OF THE STATE OF ALABAMA BOILER AND PRESSURE VESSEL SAFETY DIVISION. CONTRACTOR SHALL CONTACT THE INSPECTOR TO ARRANGE AN INSPECTION OF THE COMPLETED INSTALLATION.

    THE CONTRACTOR SHALL PROVIDE A WRITTEN INSPECTION REPORT TO THE ARCHITECT/OWNER OF THE FINDINGS. THE CONTRACTOR SHALL CORRECT ANY DEFFICIENCIES NOTED IN THE REPORT.

    7

    MECHANICAL CONTRACTOR SHALL REGISTER THE BOILER TO THE ALABAMA PORT AUTHORITY STATE AND PAY ALL REQUIRED FEES FOR REGISTRATION AND INSPECTION. THE BOILER INSTALLATION SHALL MEET ALL STATE OF ALABAMA

    REQUIRMENTS. BOILER PERMIT SHALL BE OBTAINED FROM THE ALABAMA DEPARTMENT OF LABOR. ALL BOILER REGISTRATION AND INSPECTION DOCUMENTATION SHALL BE TURNED OVER WITH THE CONSTRUCTION CLOSEOUT DOCUMENTS.

    FLUE SIZE

    (IN)

    12

    200

    TOTAL

    UNIT

    MOCP

    ACC-2 75.0 HFC-410A WATER 10.1115.58

    185.7 54.0 44.0 10.0 0.00010 95.0 26.0 4 4.0 4 25-100 181 460 3 60

    4@48

    200

    ESHHWHWP-2 225 60 176072% 5 60460 3

    ESHHWHWP-3 225 60 176072% 5 60460 3

    ESCHWCHWP-2 300 60 176072% 7.5 60460 3

    REDUNDANT PUMPS. CONTROLS TO BE

    SEQUENCED TO SWITCH PUMPS EVERY OTHER

    DAY TO BE PRIMARY.

    ILHHWHWP-1 175 18 116078% 1.5 60460 3

    PUMP IS MOUNTED ON THE BOILER.

    8

    COORDINATE BOILER CONTROL REQUIREMENTS WITH THE CONTROLS CONTRACTOR. PROVIDE INTERFACE MODULE AS NECESSARY THAT IS COMPATIBLE WITH THE CONTROLS SYSTEM BEING INSTALLED ON THIS PROJECT.

    9

    PROVIDE BOILER WITH 25 YEAR THERMAL SHOCK WARRANTY AND 10 YEAR HEAT EXCHANGER WARRANTY.

    COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR AND CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR.

    PUMP IS TO BE INSTALLED AT THE BUILDING EXTERIOR.

    PUMP AND MOTOR SHALL BE RATED FOR EXTERIOR

    USE. ELECTRICAL ENCLOSURES SHALL BE NEMA 3R.

    CONDUIT SHALL BE RIGID WITH ARMORED WATER

    TIGHT FLEX WHIP ADJACENT TO MOTOR CONNECTION.

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M1.1

    HVAC SCHEDULES

    AutoCAD SHX Text%%UCHILLER NOTES

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text7

    AutoCAD SHX Text8

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text11

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text7

    AutoCAD SHX Text8

    AutoCAD SHX Text11

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text%%UPUMP NOTES

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text1

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text5

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text7

    AutoCAD SHX Text9

    AutoCAD SHX Text10

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text2

    AutoCAD SHX Text3

    AutoCAD SHX Text4

    AutoCAD SHX Text5

    AutoCAD SHX Text6

    AutoCAD SHX Text3

    AutoCAD SHX Text7

    AutoCAD SHX Text7

    AutoCAD SHX Text11

    AutoCAD SHX Text11

    AutoCAD SHX Text6

    AutoCAD SHX Text6

    AutoCAD SHX Text6

    AutoCAD SHX Text6

    AutoCAD SHX Text12

    AutoCAD SHX Text12

    AutoCAD SHX Text12

    AutoCAD SHX Text8

    AutoCAD SHX Text8

    AutoCAD SHX Text8

    AutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • 1. INSTALL ALL WORK IN COMPLIANCE WITH THE LOCAL AUTHORITY HAVING JURISDICTION, THE 2012

    INTERNATIONAL MECHANICAL CODE, AND THE 2015 INTERNATIONAL ENERGY CONSERVATION CODE.

    2. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR PRIOR TO BEGINNING

    ANY WORK.

    3. DUCT CONSTRUCTION SHALL BE PER THE LATEST REQUIREMENTS OF NFPA 90A AND 90B, SMACNA AND

    ASHRAE AND SHALL MEET OR EXCEED THEIR REQUIREMENTS FOR SUPPORT AND REINFORCEMENT.

    4. BRANCH SUPPLY AND RETURN DUCT RUNOUTS SHALL BE GALVANIZED SNAP-LOCK WITH ALL JOINTS AND

    SEAMS SEALED WITH MASTIC. TRAVERSE JOINTS SHALL BE CONNECTED WITH SHEET METAL SCREWS MINIMUM

    6" ON CENTER. ALL GALVANIZED DUCT SHALL BE INSULATED WITH 2" THICK, R-8 WRAP INSULATION.

    INSULATION TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS.

    5. R-8 FLEXIBLE DUCT TO SUPPLY GRILLES SHALL NOT EXCEED 8'-0". ROUTE EXTERNALLY INSULATED RIGID SNAP

    LOCK DUCT TO WITHIN 8'-0" OF GRILLE.

    6. EQUIPMENT PROVIDED AND INSTALLED ON THIS PROJECT SHALL MEET OR EXCEED THE MINIMUM EFFICIENCY

    REQUIREMENTS INDICATED IN THE SCHEDULE.

    7. DUCT CONSTRUCTION SHALL BE G-90 GALVANIZED SHEET METAL. DUCT SEALING SHALL BE CLASS "A", ALL

    JOINTS, SEAMS, AND PENETRATIONS SHALL BE BRUSHED WITH 2 COATS OF WATER BASED MASTIC. THE DUCT

    SEAL SHALL MEET OR EXCEED PRESSURE CLASS 2".

    8. ALL SHEET METAL DUCT SHALL BE EXTERNALLY INSULATED WITH 2" THICK, MINIMUM R-8.0 DUCT WRAP WITH AN

    FSK JACKET. JOINTS AND SEAMS SHALL OVERLAP 2" AND SHALL BE STAPLED AT 6" ON CENTER. ALL

    INSULATION JACKET JOINTS AND SEAMS SHALL BE SEALED WITH PRESSURE SENSITIVE TAPE. INSULATION

    APPLIED TO DUCT DIMENSIONS GREATER THAN 24" SHALL BE SECURED ON THE BOTTOM OF THE DUCT WITH

    MECHANICAL FASTENERS AT 18" ON CENTER.

    9. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND OTHER TRADES

    ALL REQUIRED OPENINGS IN WALLS, FOUNDATIONS, FLOORS, AND ROOFS.

    10. THE MECHANICAL CONTRACTOR SHALL VERIFY ALL MECHANICAL EQUIPMENT LOCATIONS AND BE

    RESPONSIBLE FOR ALL RELATED CLEARANCES IN THE FIELD. PROVIDE CLEARANCE IN FRONT OF ALL

    ELECTRICAL PANELS PER NATIONAL ELECTRIC CODE REQUIREMENTS. DUCT SHALL NOT ROUTE OVER

    ELECTRICAL PANELS.

    15. DUCT SHALL BE FIELD MEASURED PRIOR TO INSTALLATION TO ENSURE PROPER FIT WITHIN STRUCTURAL

    MEMBERS. DUCT SHALL BE OFFSET, OR TRANSITIONED AS NECESSARY TO ACCOMMODATE STRUCTURAL

    MEMBERS. DUCT SHALL NOT BE PURCHASED PREFABRICATED FROM THESE DRAWINGS. ANY DUCT

    PURCHASED PREFABRICATED FROM A DUCT VENDOR SHALL BE DONE FROM CONTRACTOR PROVIDED, FIELD

    MEASURED SHOP DRAWINGS THAT HAVE BEEN SUBMITTED TO THE ENGINEER FOR PRIOR APPROVAL. NO

    EXCEPTIONS.

    16. OFFSET AND TRANSITION DUCT AS NECESSARY TO AVOID STRUCTURAL MEMBERS OR EQUIPMENT

    CONNECTION SIZES. PROVIDE FLEXIBLE DUCT CONNECTORS ON ALL DUCT CONNECTION TO MOTORIZED

    EQUIPMENT.

    17. THE MECHANICAL CONTRACTOR PERFORMING WORK ON THIS PROJECT WILL BE RESPONSIBLE FOR ALL

    ASSOCIATED ELECTRICAL AND CONTROLS WORK REQUIRED TO SUPPORT THE INSTALLATION OF THE NEW

    BOILER, CHILLERS, AND ASSOCIATED PUMPS AS DESCRIBED IN THESE DOCUMENTS. ADDITIONAL

    COORDINATION OF ELECTRICAL AND CONTROLS WORK ASSOCIATED WITH THE REPLACEMENT OF THE DUAL

    DUCT VAV BOXES AND REPLACEMENT OF CONTROL POINTS ON EXISTING TO REMAIN AIR HANDLING UNITS AND

    MEDIUM PRESSURE DUCT SYSTEM.

    DUAL DUCT VAV BOX SCHEDULE (ADDITIVE ALTERNATE #1)

    MARK REMARKS

    DDB 1-1

    12-1/2" x 28-1/8"

    1, 2, 3

    1. COORDINATE ALL ELECTRICAL REQUIREMENTS WITH THE ELECTRICAL CONTRACTOR AND CONTROLS REQUIREMENTS WITH THE CONTROLS CONTRACTOR. 24 VOLT CONTROL

    ACTUATORS SHALL BE PROVIDED WITH A TRANSFORMER TO STEP DOWN FROM 120/1Ø.

    COLD

    09"

    2. BASIS OF DESIGN TITUS DEDV-N. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE EXISTING HOT AND COLD INLETS SIDES AND PROVIDING THE NEW BOX TO MATCH

    THE EXISTING DUCT CONNECTION CONFIGURATION. DUCT CONNECTIONS SHOWN ON THE PLANS WERE DEVELOPED FROM THE ORIGINAL PLANS.

    3. CONTRACTOR SHALL FIELD MOUNT DAMPER ACTUATORS. FIELD VERIFY ALL REQUIREMENTS AND COORDINATE INSTALLATION WITH THE CONTROLS CONTRACTOR.

    NOTES:

    MANUFACTURER

    MODEL

    NUMBER

    TITUS DEDV

    SIZE

    HOT

    09"

    INLET

    OUTLET

    COLD CFM

    MAX.

    930

    MIN.

    512

    HOT CFM

    MAX.

    930

    MIN.

    512

    STATIC

    INLET

    1

    DOWN

    0.25

    MIN.

    0.05

    MAX NC

    LEVELS

    RAD

    23

    DIS

    20

    DDB 1-2

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1240 682 1240 682 1 0.25 0.01 26 22

    DDB 1-3

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1095 1 0.25 0.01 24 20

    DDB 1-4

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV795 1 0.25 0.01 18 17

    DDB 1-5

    10" x 24-1/8"

    1, 2, 3

    TITUS DEDV510 1 0.25 0.09 20 18

    DDB 1-6

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1050 1 0.25 0.01 23 19

    DDB 1-7

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV960 1 0.25 0.06 23 22

    DDB 1-8

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV810 1 0.25 0.04 22 19

    DDB 1-9

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1240 1 0.25 0.01 26 22

    DDB 1-10

    10" X 24-1/8"

    1, 2, 3

    TITUS DEDV405 1 0.25 0.06 19 15

    DDB 1-11

    10" X 24-1/8"

    1, 2, 3

    TITUS DEDV405 1 0.25 0.06 19 15

    DDB 1-12

    8 X 24-1/8"

    1, 2, 3

    TITUS DEDV200 1 0.25 0.02 16 15

    DDB 2-1

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV810 1 0.25 0.04 22 19

    DDB 2-2

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV960 1 0.25 0.06 23 22

    DDB 2-3

    12-1/2" x 28-1/8"

    1, 2, 3

    10" TITUS DEDV1080 1 0.25 0.01 24 20

    DDB 2-4

    10" X 24-1/8"

    1, 2, 3

    08" TITUS DEDV710 1 0.25 0.02 17 18

    DDB 2-5

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV800 1 0.25 0.04

    DDB 2-6

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV820 1 0.25 0.04

    DDB 2-7

    12-1/2" x 28-1/8"

    1, 2, 3

    10" TITUS DEDV1080 1 0.25 0.01 24 20

    DDB 2-8

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV810 1 0.25 0.04

    DDB 2-9

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV820 1 0.25 0.04

    DDB 2-10

    12-1/2" x 28-1/8"

    1, 2, 3

    09" TITUS DEDV800 1 0.25 0.04

    DDB 2-11

    10" X 24-1/8"

    1, 2, 3

    08" TITUS DEDV710 1 0.25 0.02 17 18

    DDB 2-12

    8" X 24-1/8"

    1, 2, 3

    06" TITUS DEDV350 1 0.25 0.1 17 14

    DDB 3-1

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04 22 19

    DDB 3-2

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.06 23 22

    DDB 3-3

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.01 24 20

    DDB 3-4

    10" X 24-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.02 17 18

    DDB 3-5

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04

    DDB 3-6

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04

    DDB 3-7

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.01 24 20

    DDB 3-8

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04

    DDB 3-9

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04

    DDB 3-10

    12-1/2" x 28-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.04 22 19

    DDB 3-11

    10" X 24-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.02 17 18

    DDB 3-12

    8" X 24-1/8"

    1, 2, 3

    TITUS DEDV1 0.25 0.1 17 14

    10"

    10"

    10"

    07"

    10"

    09"

    09"

    10"

    07"

    07"

    05"

    10"

    10"

    10"

    07"

    10"

    09"

    09"

    10"

    07"

    07"

    05"

    09"

    09"

    10"

    08"

    09"

    09"

    10"

    09"

    09"

    09"

    08"

    06"

    09"

    09"

    10"

    08"

    09"

    09"

    10"

    09"

    09"

    09"

    08"

    06"

    09"

    09"

    10"

    08"

    09"

    09"

    10"

    09"

    09"

    09"

    08"

    06"

    810

    960

    1080

    710

    800

    820

    1080

    810

    820

    800

    710

    350

    602 1095 602

    437

    280

    578

    528

    446

    682

    223

    223

    110

    446

    528

    594

    390

    440

    451

    594

    446

    451

    440

    390

    528

    594

    390

    440

    451

    594

    446

    451

    440

    390

    192

    446

    192

    795

    510

    1050

    960

    810

    1240

    405

    405

    200

    810

    960

    1080

    710

    800

    820

    1080

    810

    820

    800

    710

    350

    810

    960

    1080

    710

    800

    820

    1080

    810

    820

    800

    710

    350

    437

    280

    578

    528

    446

    682

    223

    223

    110

    446

    528

    594

    390

    440

    451

    594

    446

    451

    440

    390

    528

    594

    390

    440

    451

    594

    446

    451

    440

    390

    192

    446

    192

    22 19

    22 19

    22 19

    22 19

    22 19

    22 19

    22 19

    22 19

    22 19

    GENERAL HVAC NOTES

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M1.2

    HVAC SCHEDULES

    AutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • FIRST FLOOR HVAC DEMO PLAN

    1

    N

    KEYNOTES

    EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED

    ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING

    ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED

    THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE

    INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL

    REQUIREMENTS.

    CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO

    ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE

    NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL

    REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH

    IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL

    PAINTED FINISH ONCE THE WORK IS COMPLETE.

    CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR

    TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS

    REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    EXISTING CHILLED WATER WATER AIR HANDLING UNIT (AHU-3) TO REMAIN. EXISTING PNEUMATIC

    CHILLED WATER CONTROL VALVE TO BE REMOVED AND REPLACED NEW WITH DDC CONTROLLED

    VALVE. REFERENCE NEW WORK PLAN FOR ADDITIONAL INFORMATION. CHILLED WATER PIPING

    SHALL REMAIN. MODIFY PIPING AS NECESSARY TO ACCOMMODATE NEW CONTROL VALVE. THIS

    WORK IS PART OF THE BASE BID.

    1

    1-2

    30"Ø

    25"Ø

    1-3

    1-4

    1-6 1-7 1-8

    1-11

    1-1

    20Ø

    14

    Ø

    14

    Ø

    20

    x1

    2

    26

    x1

    2

    26

    x1

    2

    24x12

    20Ø

    20

    x6

    16x616x6

    10x10 10x10

    18x12

    14

    x1

    2

    10

    x1

    0

    10x10

    12

    x6

    16

    x1

    0

    12

    x1

    0

    26x12

    10

    x6

    1-5

    20x10

    15

    x1

    0

    10

    x1

    0

    10x10

    10x10

    10x10

    10x10

    10x10

    14x4 12x12

    14x4

    10x10

    16

    x1

    21

    8x1

    22

    0x1

    2

    26x12

    14x4

    14

    x4

    10

    x1

    0

    18Ø

    18Ø

    16Ø

    16Ø

    14x4

    20

    x1

    2

    8x8 8x8

    14x4

    8x6

    14x10

    8x8

    26

    x1

    2

    12x12

    12x12

    16x12

    14

    x4

    14

    x4

    8x6

    8x6

    8x6

    14

    x4

    12

    x1

    2

    14

    x4

    8x8

    12x12

    20x12

    16x12

    12x12

    10

    x1

    0

    12

    x8

    8x6

    24

    x1

    2

    15Ø

    15Ø

    8x6

    8x6

    8x6

    8x6

    12x12

    18x12

    14

    x4

    14

    x4

    1-9

    26x12

    20

    x1

    2

    12x12 14x4

    8x6

    14x4

    14

    x4

    14

    x4

    14x10

    8x6

    8x6

    14x10

    8x6

    1-10

    12

    Ø

    12

    Ø

    16x10

    16x10

    8x6

    8x6

    14

    x1

    0

    14x4

    8x6

    14x10

    14x10

    14

    x1

    0

    14x48x6

    34

    x1

    8

    26x18

    14

    x4

    12

    x7

    12

    x7

    12

    x7

    26x15

    14

    x4

    12

    x7

    12

    x7

    12

    x7

    14

    x4

    12

    x8

    15x13

    12

    x8

    12

    x7

    26x1334x18

    12

    x7

    1-12

    15Ø

    8x6

    10x8

    16x10

    8x6

    T

    1-8

    T

    1-6

    T

    1-7

    T

    1-5

    T

    1-4

    T

    1-3

    8x6

    T1-12

    T

    1-9

    T

    1-10

    T

    1-11

    T

    1-2

    T

    1-1

    T

    AHU-1

    AHU-3

    NOTE:

    EXISTING DUCT, VAV BOX, AND THERMOSTAT

    LOCATIONS AND SIZES WERE OBTAINED FROM

    THE ORIGINAL BUILDING PLANS FROM 1966 PLUS

    SEVERAL SUBSEQUENT RENOVATIONS. THE

    CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

    LOCATIONS AND SIZES PRIOR TO BID AND

    BEGINNING ANY WORK. EQUIPMENT LOCATIONS

    SHOWN ON THE PLANS ARE APPROXIMATE. FIELD

    VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT

    DECK AND COLD DECK INLETS ON THE DUAL

    DUCT BOXES. BOXES SHALL BE ORDERED TO

    MATCH EXISTING CONNECTION

    CONFIGURATIONS. TRANSITION EXISTING DUCT

    AS NECESSARY FOR CONNECTIONS TO NEW VAV

    BOX INLETS AND OUTLETS.

    COORDINATION OF WORK IN EACH AREA SHALL

    BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF

    WORK OCCURRING WITH THE ASPA PM.

    DEMOLITION AND INSTALLATION OF NEW VAV BOX

    SHALL OCCUR CONSECUTIVELY. REMOVAL OF

    EXISTING BOX SHALL ONLY OCCUR WHEN NEW

    BOX IS AVAILABLE AND READY FOR

    INSTALLATION. AREAS OF WORK SHALL BE KEPT

    TO A MINIMUM TO PREVENT EXCESSIVE

    DISRUPTION TO ONGOING BUSINESS

    OPERATIONS AT THE FACILITY. WORK AREAS

    SHALL BE CLEANED DAILY BEFORE THE NEXT

    BUSINESS DAY.

    2

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 21 2

    1 2

    1 2

    1 2

    1 2

    4

    4

    1-1/2" CR / CS

    WORK ON THIS DRAWING IS INCLUDED IN

    ADDITIVE ALTERNATE #1 EXCEPT FOR THE WORK

    ASSOCIATED WITH AHU-3. WORK ASSOCIATED

    WITH AHU-3 IS INCLUDED IN THE BASE BID.

    TYPICAL DUAL DUCT VAV BOX AND

    ASSOCIATED WALL THERMOSTAT.

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M2.1

    FIRST FLOOR HVAC

    DEMO PLAN

    AutoCAD SHX Text0'

    AutoCAD SHX TextSCALE: 3/16"=1'-0"

    AutoCAD SHX Text5'

    AutoCAD SHX Text5'

    AutoCAD SHX Text10'

    http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • SECOND FLOOR HVAC DEMO PLAN

    1

    N

    2-9

    30"Ø25"Ø

    2-10

    2-11

    2-1 2-2 2-3

    2-4

    2-5

    2-6

    2-72-8

    20

    Ø

    15Ø 15Ø

    18

    Ø

    1

    5

    Ø

    15

    Ø1

    15Ø15Ø

    15

    Ø

    14Ø

    16

    Ø

    14Ø

    14

    Ø

    14Ø

    14

    Ø

    14

    Ø

    20

    x1

    02

    2x1

    2

    20x10

    14x10

    8x6

    8x6

    8x6

    8x6

    9x69x6

    12x8 12x10 12x12

    15x12 15x12

    26

    x1

    2

    20

    x1

    2

    10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    10x12 10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    20x12

    10x12

    12

    x7

    12x12

    8x6

    8x6

    8x6

    6x8

    12x10 12x8

    8x6

    8x6

    8x6

    26

    x1

    2

    8x6

    12

    x7

    12

    x8

    14x10

    20x10

    20

    x1

    02

    2x1

    0

    12x6

    14x10

    20x10

    20

    x1

    02

    2x1

    0

    12x6

    22

    x1

    2

    12

    x7

    12

    x8

    22x12

    16

    x1

    2

    10

    x1

    2

    10x12

    8x6

    10

    x6

    10x10

    10x12 10x10

    8x6

    10

    x6

    8x12

    8x6

    12x6

    22

    x1

    2

    22x12

    20

    x1

    0

    20x10

    12

    x7

    12

    x8

    14x10

    12

    x7

    12

    x7

    12

    x7

    12

    x7

    10x12

    15x1215x12

    10x12

    26

    x1

    2

    10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    10x12

    20

    x1

    2

    16

    x1

    2

    10x1210x10

    8x6

    10

    x6

    12x6

    10x1210x10

    8x6

    10

    x6

    22x12

    2-12

    14Ø

    15Ø

    12

    x6

    12

    x6

    14x6

    20

    x1

    2

    12x10

    8x10

    T

    2-2

    T

    2-9

    T

    2-8

    T

    2-6

    T

    2-11

    T

    2-1

    T

    2-3

    T

    2-4

    T

    2-5

    T

    2-10

    T

    2-7

    T

    2-12

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    1 2

    1 2

    1 2

    1 2 1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    WORK ON THIS DRAWING IS INCLUDED IN

    ADDITIVE ALTERNATE #1.

    TYPICAL DUAL DUCT VAV BOX AND

    ASSOCIATED WALL THERMOSTAT.

    KEYNOTES

    EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED

    ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING

    ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED

    THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE

    INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL

    REQUIREMENTS.

    CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO

    ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE

    NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL

    REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH

    IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL

    PAINTED FINISH ONCE THE WORK IS COMPLETE.

    CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR

    TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS

    REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    1

    2

    3

    NOTE:

    EXISTING DUCT, VAV BOX, AND THERMOSTAT

    LOCATIONS AND SIZES WERE OBTAINED FROM

    THE ORIGINAL BUILDING PLANS FROM 1966 PLUS

    SEVERAL SUBSEQUENT RENOVATIONS. THE

    CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

    LOCATIONS AND SIZES PRIOR TO BID AND

    BEGINNING ANY WORK. EQUIPMENT LOCATIONS

    SHOWN ON THE PLANS ARE APPROXIMATE. FIELD

    VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT

    DECK AND COLD DECK INLETS ON THE DUAL

    DUCT BOXES. BOXES SHALL BE ORDERED TO

    MATCH EXISTING CONNECTION

    CONFIGURATIONS. TRANSITION EXISTING DUCT

    AS NECESSARY FOR CONNECTIONS TO NEW VAV

    BOX INLETS AND OUTLETS.

    COORDINATION OF WORK IN EACH AREA SHALL

    BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF

    WORK OCCURRING WITH THE ASPA PM.

    DEMOLITION AND INSTALLATION OF NEW VAV BOX

    SHALL OCCUR CONSECUTIVELY. REMOVAL OF

    EXISTING BOX SHALL ONLY OCCUR WHEN NEW

    BOX IS AVAILABLE AND READY FOR

    INSTALLATION. AREAS OF WORK SHALL BE KEPT

    TO A MINIMUM TO PREVENT EXCESSIVE

    DISRUPTION TO ONGOING BUSINESS

    OPERATIONS AT THE FACILITY. WORK AREAS

    SHALL BE CLEANED DAILY BEFORE THE NEXT

    BUSINESS DAY.

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M2.2

    SECOND FLOOR HVAC

    DEMO PLAN

    AutoCAD SHX Text0'

    AutoCAD SHX TextSCALE: 3/16"=1'-0"

    AutoCAD SHX Text5'

    AutoCAD SHX Text5'

    AutoCAD SHX Text10'

    http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • THIRD FLOOR HVAC DEMO PLAN

    1

    N

    3-9

    30"Ø25"Ø

    3-10

    3-11

    3-1 3-2 3-3

    3-4

    3-5

    3-6

    3-73-8

    20

    Ø

    15Ø 15Ø

    18

    Ø

    1

    5

    Ø

    15

    Ø1

    15Ø15Ø

    15

    Ø

    14Ø

    16

    Ø

    14Ø

    14

    Ø

    14Ø

    14

    Ø

    14

    Ø

    20

    x1

    02

    2x1

    2

    20x10

    14x10

    8x6

    8x6

    8x6

    8x6

    9x69x6

    12x8 12x10 12x12

    15x12 15x12

    26

    x1

    2

    20

    x1

    2

    10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    10x12 10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    20x12

    10x12

    12

    x7

    12x12

    8x6

    8x6

    8x6

    6x8

    12x10 12x8

    8x6

    8x6

    8x6

    26

    x1

    2

    8x6

    12

    x7

    12

    x8

    14x10

    20x10

    20

    x1

    02

    2x1

    0

    12x6

    14x10

    20x10

    20

    x1

    02

    2x1

    0

    12x6

    22

    x1

    2

    12

    x7

    12

    x8

    22x12

    16

    x1

    2

    10

    x1

    2

    10x12

    8x6

    10

    x6

    10x10

    10x12 10x10

    8x6

    10

    x6

    8x12

    8x6

    12x6

    22

    x1

    2

    22x12

    20

    x1

    0

    20x10

    12

    x7

    12

    x8

    14x10

    12

    x7

    12

    x7

    12

    x7

    12

    x7

    10x12

    15x1215x12

    10x12

    26

    x1

    2

    10x12

    12

    x7

    15x12

    12

    x7

    12

    x7

    10x12

    20

    x1

    2

    16

    x1

    2

    10x1210x10

    8x6

    10

    x6

    12x6

    10x1210x10

    8x6

    10

    x6

    22x12

    3-12

    14Ø

    15Ø

    12

    x6

    12

    x6

    14x6

    20

    x1

    2

    12x10

    8x10

    T

    3-11

    T

    3-2

    T

    3-7

    T

    3-5

    T

    3-9

    T

    3-10

    T

    3-8

    T3-12

    T3-4

    T3-1

    T3-3

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    1 2

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    3

    T

    3-6

    3

    T

    3-12

    3

    TYPICAL DUAL DUCT VAV BOX AND

    ASSOCIATED WALL THERMOSTAT.

    KEYNOTES

    EXISTING DUAL DUCT VAV BOX AND ASSOCIATED PNEUMATIC CONTROL TUBING TO BE REMOVED

    ENTIRELY. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF BOX PRIOR TO BEGINNING

    ANY WORK. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING ASSOCIATED

    THERMOSTAT AND REMOVE ENTIRELY. PREPARE DUCT AS NECESSARY TO ACCEPT THE

    INSTALLATION OF THE NEW DUAL DUCT VAV BOX. SEE NEW WORK PLAN FOR ADDITIONAL

    REQUIREMENTS.

    CONTRACTOR SHALL REMOVE CEILING TILES AND GRID OR GYPSUM CEILING AS NECESSARY TO

    ALLOW FOR THE REMOVAL OF THE EXISTING DUAL DUCT VAV BOX AND THE INSTALLATION OF THE

    NEW DUAL DUCT VAV BOX. ONCE NEW BOX HAS BEEN INSTALLED, THE CONTRACTOR SHALL

    REINSTALL THE CEILING GRID AND TILES, OR MAKE REPAIRS TO THE GYPSUM CEILING TO MATCH

    IMMEDIATE SURROUNDING. IT IS EXPECTED FOR THE CEILING TO HAVE THE SAME ORIGINAL

    PAINTED FINISH ONCE THE WORK IS COMPLETE.

    CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF THE EXISTING THERMOSTAT PRIOR

    TO BEGINNING ANY WORK. THERMOSTAT SHALL BE REMOVED ENTIRELY WHEN VAV BOX IS

    REMOVED. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    1

    2

    3

    WORK ON THIS DRAWING IS INCLUDED IN

    ADDITIVE ALTERNATE #1.

    NOTE:

    EXISTING DUCT, VAV BOX, AND THERMOSTAT

    LOCATIONS AND SIZES WERE OBTAINED FROM

    THE ORIGINAL BUILDING PLANS FROM 1966 PLUS

    SEVERAL SUBSEQUENT RENOVATIONS. THE

    CONTRACTOR SHALL FIELD VERIFY ALL EXISTING

    LOCATIONS AND SIZES PRIOR TO BID AND

    BEGINNING ANY WORK. EQUIPMENT LOCATIONS

    SHOWN ON THE PLANS ARE APPROXIMATE. FIELD

    VERIFY ALL DUCT SIZES AND LOCATIONS OF HOT

    DECK AND COLD DECK INLETS ON THE DUAL

    DUCT BOXES. BOXES SHALL BE ORDERED TO

    MATCH EXISTING CONNECTION

    CONFIGURATIONS. TRANSITION EXISTING DUCT

    AS NECESSARY FOR CONNECTIONS TO NEW VAV

    BOX INLETS AND OUTLETS.

    COORDINATION OF WORK IN EACH AREA SHALL

    BE MADE A MINIMUM OF 10 DAYS IN ADVANCE OF

    WORK OCCURRING WITH THE ASPA PM.

    DEMOLITION AND INSTALLATION OF NEW VAV BOX

    SHALL OCCUR CONSECUTIVELY. REMOVAL OF

    EXISTING BOX SHALL ONLY OCCUR WHEN NEW

    BOX IS AVAILABLE AND READY FOR

    INSTALLATION. AREAS OF WORK SHALL BE KEPT

    TO A MINIMUM TO PREVENT EXCESSIVE

    DISRUPTION TO ONGOING BUSINESS

    OPERATIONS AT THE FACILITY. WORK AREAS

    SHALL BE CLEANED DAILY BEFORE THE NEXT

    BUSINESS DAY.

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M2.3

    THIRD FLOOR HVAC

    DEMO PLAN

    AutoCAD SHX Text0'

    AutoCAD SHX TextSCALE: 3/16"=1'-0"

    AutoCAD SHX Text5'

    AutoCAD SHX Text5'

    AutoCAD SHX Text10'

    http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • FOURTH FLOOR HVAC DEMO PLAN

    1

    N

    72

    x3

    6

    72x36

    64x42

    24x20 24x20

    36

    x2

    0

    KEYNOTES

    EXISTING DUCT MOUNTED HOT WATER COIL TO REMAIN. CONTRACTOR SHALL REMOVE THE

    EXISTING PNEUMATIC HOT WATER CONTROL VALVE AND PREPARE THE EXISTING PIPING FOR

    RECONNECTION TO A NEW DDC HOT WATER CONTROL VALVE. CONTRACTOR SHALL MODIFY THE

    EXISTING PIPING AS NECESSARY FOR RECONNECTION TO EXISTING COIL. CONTRACTOR SHALL

    FIELD VERIFY PIPING SIZES PRIOR TO BEGINNING ANY WORK.

    EXISTING PNEUMATIC ZONE REHEAT THERMOSTAT TO BE REMOVED ENTIRELY. REMOVED

    ASSOCIATED PNEUMATIC CONTROL TUBING ENTIRELY. SEE NEW WORK PLAN FOR ADDITIONAL

    REQUIREMENTS.

    EXISTING HOT WATER UNIT HEATER TO REMAIN. CONTRACTOR SHALL REMOVE THE EXISTING

    PNEUMATIC HOT WATER CONTROL VALVE AND PREPARE THE EXISTING PIPING FOR

    RECONNECTION TO A NEW DDC HOT WATER CONTROL VALVE. CONTRACTOR SHALL MODIFY THE

    EXISTING PIPING AS NECESSARY FOR RECONNECTION TO EXISTING COIL. CONTRACTOR SHALL

    FIELD VERIFY PIPING SIZES PRIOR TO BEGINNING ANY WORK.

    1

    2

    3

    #1

    #2

    #3

    #4

    #5

    T

    #3

    T

    #4

    T

    #5

    T

    UH-2

    UH-2

    T

    UH-1

    UH-1

    1" HWS/HWR

    1" HWS/HWR

    1-1

    /4

    " H

    WS

    /H

    WR

    3/4" HWS/HWR

    1-1/4" HWS/HWR

    1-1

    /2

    " H

    WS

    /H

    WR

    2" H

    WS

    /H

    WR

    1-1/4" HWS/HWR

    1" HWS/HWR

    1" HWS/HWR

    T

    #1

    T

    #2

    WORK ON THIS DRAWING IS INCLUDED IN

    ADDITIVE ALTERNATE #2.

    1

    1

    1

    1

    1

    3

    3

    2

    2

    2

    2

    2

    2

    2

    ALL SUPPLY AND RETURN DUCT ON THIS SHEET IS

    EXISTING TO REMAIN. NO WORK REQUIRED.

    NOTE:

    WORK ON THIS FLOOR INCLUDES THE REMOVAL

    AND REPLACEMENT OF THE HOT WATER

    CONTROL VALVES AT THE DUCT REHEAT COILS

    AND THE HOT WATER UNIT HEATERS LOCATED IN

    THE KITCHEN AREA. AREAS OF WORK SHALL BE

    KEPT TO A MINIMUM TO PREVENT EXCESSIVE

    DISRUPTION TO ONGOING BUSINESS

    OPERATIONS AT THE FACILITY. WORK AREAS

    SHALL BE CLEANED DAILY BEFORE THE NEXT

    BUSINESS DAY.

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M2.4

    FOURTH FLOOR HVAC

    DEMO PLAN

    AutoCAD SHX Text0'

    AutoCAD SHX TextSCALE: 3/16"=1'-0"

    AutoCAD SHX Text5'

    AutoCAD SHX Text5'

    AutoCAD SHX Text10'

    http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextSTAIRS

    AutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

  • KEYNOTES

    EXISTING CONDENSING UNIT, COMPRESSORS, AND PIPING TO BE REMOVED ENTIRELY. THE

    EXISTING SHED STRUCTURE AND HOIST RAILS WITH ASSOCIATED SUPPORT POSTS TO BE

    REMOVED ENTIRELY. IT IS EXPECTED ALL EQUIPMENT AND STRUCTURAL MEMBERS ABOVE THE

    EQUIPMENT PEDESTALS AND HORIZONTAL SUPPORT BEAMS BE REMOVED ENTIRELY. ALL OF THE

    EXISTING HORIZONTAL SUPPORT BEAMS ARE TO BE REMOVED ENTIRELY. PEDESTALS ARE TO BE

    PREPARED TO ACCEPT NEW HOT DIPPED GALVANIZED STEEL SUPPORT BEAMS TO SUPPORT NEW

    CHILLED WATER PUMPS AND CHILLERS. CONTRACTOR SHALL FIELD VERIFY EXISTING

    STRUCTURAL BEAMS AS W12x30 OR W14x30 AND PROVIDE NEW BEAMS AS THE SAME SIZE.

    PROVIDE ADDITIONAL SUPPORT BEAMS AT THE NEW CHILLED WATER PUMPS AS NECESSARY.

    SEE NEW WORK PLAN FOR MORE INFORMATION. PRIOR TO REMOVAL OF THE EXISTING CHILLED

    WATER SYSTEM, THE TEMPORARY CHILLER IS TO BE PLACED IN OPERATION TO SUPPORT THE

    BUILDING.

    EXISTING CHILLED WATER PUMP, EXPANSION TANK, AND OLD UNUSED CHILLER COMPONENTS

    AND RACK TO BE REMOVED ENTIRELY. ALL CHILLED WATER SUPPLY AND RETURN PIPING

    LOCATED AT THE PENTHOUSE MECHANICAL ROOM LEVEL TO BE REMOVED ENTIRELY. THE

    CHILLED WATER BRANCH PIPING TURNING DOWN INSIDE THE DUCT CHASE TO THE FIRST FLOOR

    TO REMAIN. THE EXISTING VIBRATION ISOLATION CURB/SUPPORT TO BE REMOVED ENTIRELY. IT

    IS EXPECTED THIS AREA OF THE MECHANICAL ROOM BE CLEARED FOR THE INSTALLATION OF THE

    NEW SYSTEM COMPONENTS. SEE NEW WORK PLAN FOR ADDITIONAL INFORMATION. PARTIAL

    REMOVAL OF THIS EQUIPMENT MAY BE REQUIRED TO ACCOMMODATE CHANGEOVER SCHEDULE.

    EXISTING PNEUMATIC CHILLED WATER CONTROL VALVE AND ASSOCIATED PNEUMATIC CONTROLS

    ASSOCIATED WITH THE DUAL DECK AIR HANDLING UNIT TO BE REMOVED ENTIRELY. PREPARE

    CHILLED WATER PIPING CONNECTIONS TO THE UNIT FOR NEW CHILLED WATER PIPING AND

    CONTROLS. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    CHILLED WATER PIPING TURNING DOWN INSIDE DUCT CHASE TO REMAIN. SEE NEW WORK PLAN

    FOR ADDITIONAL INFORMATION.

    EXISTING NATURAL GAS FIRED BOILER AND ASSOCIATED FLUE TO BE REMOVED ENTIRELY.

    PREPARE EXISTING FLUE CONNECTION THROUGH ROOF FOR REUSE. SEE NEW WORK PLAN FOR

    ADDITIONAL INFORMATION.

    REMOVE NATURAL GAS PIPING BACK TO A POINT TO ALLOW FOR THE REMOVAL OF THE EXISTING

    BOILER AND INSTALLATION OF THE NEW BOILER. CONTRACTOR SHALL RECONNECT THE EXISTING

    NATURAL GAS PIPING TO THE NEW BOILER FULL SIZE OF THE EXISTING PIPING. PROVIDE WITH

    NEW REGULATOR VENTED TO THE BUILDING EXTERIOR.

    EXISTING HOT WATER EXPANSION TANK, PUMP, AND HOT WATER SUPPLY/RETURN PIPING AT

    PENTHOUSE LEVEL TO BE REMOVED ENTIRELY.

    HOT WATER SUPPLY AND RETURN PIPING TURNING DOWN IN DUCT CHASE TO 4TH FLOOR REHEAT

    COILS TO REMAIN. SEE NEW WORK PLAN FOR ADDITIONAL INFORMATION.

    EXISTING HOT DECK AND COLD DECK SUPPLY DUCT TO REMAIN ENTIRELY.

    EXISTING PNEUMATIC CONTROL PANEL AND ASSOCIATED AIR COMPRESSOR TO BE REMOVED

    ENTIRELY. SEE NEW WORK PLAN FOR NEW DDC CONTROLS REQUIREMENT.

    EXISTING 7' WIDE x 9' TALL OUTSIDE AIR INTAKE LOUVER TO REMAIN. CONTRACTOR SHALL

    REMOVE THE ASSOCIATED MOTORIZED DAMPER BEHIND THE LOUVER ENTIRELY. THE LOUVER

    SHALL BE THOROUGHLY CLEANED AND PREPARED FOR REUSE. SEE NEW WORK PLAN FOR

    ADDITIONAL REQUIREMENTS.

    BLANK OFF EXISTING APPROXIMATE 30x24 OUTSIDE AIR INTAKE OPENING ON THE SIDE OF THE

    RETURN AIR DUCT. SEE NEW WORK PLAN FOR NEW OUTSIDE AIR INTAKE DUCTING

    REQUIREMENTS. SEAL WITH MASTIC AND INSULATE TO MATCH SURROUNDINGS.

    EXISTING OUTSIDE INTAKE LOUVER TO REMAIN. CLEAN LOUVER AND REPLACE BIRD SCREEN

    NEW. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    EXISTING PNEUMATIC CONTROLS ON AIR HANDLING UNIT TO BE REMOVED ENTIRELY.

    ASPA PERSONNEL WILL EVACUATE THE R-22 REFRIGERANT FROM THE EXISTING CHILLER SYSTEM

    PRIOR TO THE MECHANICAL CONTRACTOR DEMOLISHING THE SYSTEMS. COORDINATE THIS

    WORK WITH THE ASPA PM.

    HOT AND COLD DECK DUCT INSULATION LOCATED WITHIN THE PENTHOUSE MECHANICAL ROOM IS

    TO BE REMOVED BY THE ACM ABATEMENT CONTRACTOR. SEE NEW WORK PLAN FOR

    REQUIREMENTS ASSOCIATED WITH REINSULATING THIS DUCT. THE SOUND ABSORBERS ARE TO

    BE REINSULATED. THE REISULATING WORK IS PART OF THE BASE BID.

    BOILER INSULATION TO BE REMOVED BY THE ABATEMENT CONTRACTOR UNDER THE BASE BID.

    EXISTING BOILER FLUE AND ROOF CAP TO BE REMOVED ENTIRELY. PREPARE ROOF

    PENETRATION FOR REUSE. SEE NEW WORK PLAN FOR ADDITIONAL REQUIREMENTS.

    1

    PENTHOUSE MECHANICAL FLOOR HVAC DEMO PLAN

    1

    N

    34Ø

    32Ø32Ø

    RA

    DOWN

    RETURN

    AIR FAN

    SUPPLY

    FAN

    AHU-1

    AHU-2

    CHILLER COMPRESSORS

    CONDENSING UNIT

    AIR COOLED CONDENSING UNIT

    BOILER

    EXP.

    TANK

    PUMP

    PUMP

    4" CR

    4" CR

    1-1/2" CR / CS

    4" CS

    EXP.

    TANK

    4" CR / CS

    3" HR / HS

    3-1/2" HR / HS

    2" HR / HS

    3-1/2" HS

    CP

    MAIN PNEUMATIC

    CONTROL PANEL

    3" GAS

    SOUND

    ABSORBER

    SOUND

    ABSORBER

    CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT THE

    ROOF FROM DAMAGE DURING THE RENOVATION. ALL DAMAGE TO THE

    ROOF SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE USING

    THE OWNERS ROOFING CONTRACTOR THAT HOLDS THE ROOF WARRANTY.

    EXISTING EQUIPMENT TO

    REMAIN. NO WORK REQUIRED.

    1

    EXISTING EQUIPMENT TO

    REMAIN. NO WORK REQUIRED.

    EXISTING EQUIPMENT TO

    REMAIN. NO WORK REQUIRED.

    2

    3

    3

    2

    4

    5

    6

    7

    8

    5

    6

    7

    8

    4

    9

    9

    10

    10

    10

    11

    11

    11

    PNEUMATIC

    CONTROL AIR

    COMPRESSOR

    WORK ON THIS DRAWING IS INCLUDED IN THE

    BASE BID.

    12

    12

    EXISTING COMBUSTION INTAKE

    LOUVER TO REMAIN. CLEAN

    LOUVER AND REPLACE BIRD

    SCREEN NEW.

    EXISTING HVAC

    EQUIPMENT TO

    REMAIN. NO WORK

    REQUIRED.

    13

    13

    14

    14

    14

    15

    15

    ROOF

    ROOF

    ROOF

    ROOF

    COMPUTER ROOM CONDENSING UNIT

    16

    16

    16

    16

    16

    17

    17

    MECHANICAL

    PENTHOUSE

    18

    18

    Sm

    ith M

    echanical

    Co

    nsu

    ltin

    g &

    D

    esig

    n

    19-053

    1-7-20

    FO

    R T

    HE

    HV

    AC

    R

    EN

    OV

    AT

    IO

    NS

    MO

    BIL

    E, A

    LA

    BA

    MA

    3

    66

    02

    NO

    RT

    H W

    AT

    ER

    S

    TR

    EE

    T

    ALA

    BAMA

    ST

    ATE

    POR

    TAUTHOR

    ITY

    IN

    TE

    RN

    AT

    IO

    NA

    L T

    RA

    DE

    C

    EN

    TE

    R

    M2.5

    PENTHOUSE

    MECHANICAL FLOOR

    DEMO HVAC PLAN

    AutoCAD SHX Text0'

    AutoCAD SHX TextSCALE: 3/16"=1'-0"

    AutoCAD SHX Text5'

    AutoCAD SHX Text5'

    AutoCAD SHX Text10'

    http://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwghttp://wygcad.wyg.com/details/lib/General/Drafting/North/North_WYG.dwgAutoCAD SHX TextSTAIRS

    AutoCAD SHX TextDUCT CHASE

    AutoCAD SHX TextELEVATORS

    AutoCAD SHX TextISSUE DATE:

    AutoCAD SHX TextPROJECT NO:

    AutoCAD SHX TextREVISIONS:

    AutoCAD SHX TextTHIS DRAWING REPRESENTS DESIGNS PREPARED BY SMITH MECHANICAL CONSULTING AND DESIGN FOR SPECIFIC USE ON THIS PROJECT AND IS NOT TO BE COPIED, REPRODUCED, OR ALTERED WITHOUT THE EXPRESS WRITTEN CONSENT OF THE SMITH MECHANICAL CONSULTING AND DESIGN REPRESENTATIVE AUTHORIZED TO APPROVE THIS USE. UNAUTHORIZED USE IS SUBJECT TO LEGAL ACTION UNDER STATE AND FEDERAL LAW.

    AutoCAD SHX TextSHEET TITLE:

    AutoCAD SHX TextSHEET NUMBER:

    AutoCAD SHX TextNOT VALID UNLESS SIGNED

    AutoCAD SHX TextALABAMA CERTIFICATE OF AUTHORIZATION: CA-3717 E

    AutoCAD SHX Text7150 CHARLANDA CT.

    AutoCAD SHX TextMOBILE, AL 36695

    AutoCAD SHX Text(251) 402-1364

    AutoCAD SHX TextROGER J. SMITH, PE 24744

    AutoCAD SHX Textwww.smithmechanicalconsulting.com

    AutoCAD SHX TextG

    AutoCAD SHX TextM

    AutoCAD SHX TextE

    AutoCAD SHX TextS

    AutoCAD SHX TextR

    AutoCAD SHX TextJ

    AutoCAD SHX Text.

    AutoCAD SHX TextNo. 24744

    AutoCAD SHX TextD

    AutoCAD SHX TextE

    AutoCAD SHX TextM

    AutoCAD SHX TextR

    AutoCAD SHX TextE

    AutoCAD SHX TextPROFESSIONAL

    AutoCAD SHX TextA

    AutoCAD SHX TextO

    AutoCAD SHX TextR

    AutoCAD SHX TextG

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextI

    AutoCAD SHX TextN

    AutoCAD SHX TextE

    AutoCAD SHX TextC

    AutoCAD SHX TextL

    AutoCAD SHX TextI

    AutoCAD SHX TextE

    AutoCAD SHX TextN

    AutoCAD SHX TextS

    AutoCAD SHX TextA

    AutoCAD SHX TextL

    AutoCAD SHX TextB

    AutoCAD SHX TextA

    AutoCAD SHX TextA

    AutoCAD SHX TextH

    AutoCAD SHX TextT

    AutoCAD SHX TextI

    AutoCAD SHX Text1/7/2020

    Sheets and ViewsMechanical-M1.0Mechanical-M1.1Mechanical-M1.2Mechanical-M2.1Mechanical-M2.2Mechanical-M2.3Mechanical-M2.4Mechanical-M2.5