Page 1: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 1

Sensor and infrastructure testing at LBL. Capabilities and Plan

Page 2: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 2

Talk Structure

• Existing capabilities and current status. (More from MS)

• Testing boards including tests on individual sensors and infrastructure.

• Schedule

Page 3: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 3

Existing RDO and Test System• 8 x 50 MHz ADC inputs (6

implemented)• FPGA processing for

CDS, etc.• Full Frame readout• Fiber optic readout to

linux PC or readout via ethernet and NIOS on Stratix FPGA.

• All JTAG, clock, signal and other I/O are implemented over an RJ-45 connector interface.

• Fully tested on the bench and in beam conditions at the ALS and at RHIC.

MIMOSTAR

2

MIMOSTAR

2

MIMOSTAR

2

Motherboard

Analog signalsClock & controlJTAGLU prot. Power

Analog signalsClock & controlCluster FIFOHot Pixel MapMemory Access(for full frame)Trigger infoPower

Stratix

Daughtercard

Trigger, Clockfrom MWPC

Powerfrom MWPC

JTAGx3 for MIMOSTARx1 for daughtercard

Latch upmonitor and reset

powerDDL to Linux PC

serial / ip connection

JTAG

Trigger, ClockCluster FIFOBusy to trigger

PC(WIN)

control conectionto PC in DAQ room

TestBoards

We have two complete systems of the type seen above.

Page 4: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 4

Testing Boards

• Mimostar-3 individual test card (FR4)• Mimostar-2 individual test card (FR4)- optional• Mimosa-22E individual test card (FR4)• Mimostar-3 infrastructure test board (FR4 with

optional flex)• Phase-1 individual test card (FR4)• Phase-1 test cable (FR4 and flex)

PCBs needed for the next year of testing

All in addition to the new motherboard and RDO system

Page 5: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 5

Mimostar-3 individual test board

• Individual Mimostar-3 sensor.• Interfaces with existing RDO

system.• Almost identical circuit to IPHC

test board

Status: Layout complete – board is being fabricated.

Full thickness and thinned 50 micron Mimostar-3 sensors will be tested.

We will test:

Sensor operation, noise, pixel response.

Page 6: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 6

Mimostar-2 test boards

Mimostar-2 telescope• Used in ALS and STAR tests• High noise due to un-terminated DAC

outputs • only one test assembly

Mimostar-2 individual mezzanine test card• Equivalent noise to IPHC design, (DACs

can be terminated)• Previous generation design, needs adapter

to fit existing RDO system• Additional PCBs will require a new

fabrication.

If circumstances require, we can make a new Mimostar-2 test board based on the Mimostar-3 layout. We believe that we are finished with testing on Mimostar-2.

Page 7: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 7

Mimosa-22E individual test board

• Interface to the existing test system.• This will be the first digital output sensor to

which we have access.• This will be used to tune our RDO system for

interfacing to the sensor as well as evaluating sensor performance.

• We expect that IPHC will perform extensive testing on this sensor, we would perform functional and speed tests and other testing as needed .

Page 8: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 8

Mimostar-3 Infrastructure test board

Early prototype cable with 40 differential pair output, clock and control routed under sensorarea. Mimosa-5 thinned to 50 um.

10 sensor PCB with (removable) full capacitive bypassing and filtering.Fabrication in FR-4.

• Test thinned 50 um sensors• Validate 10 sensor infrastructure.• Test LVDS multi-drop clock, JTAG, markers, crosstalk, sensor interaction,

power dissipation, bandwidth limits (useful as a check of conductor geometry and impedance for later generation Phase-1 160 MHz LVDS outputs)

• We intend to cool this board for testing to give improved noise performance.

Page 9: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 9

Phase-1 Individual test board

• Interface to new RDO system.

• Test thinned 50 um and full thickness dies.

• Small scale infrastructure tests (bypassing, etc.) before design of 10 sensor infrastructure test board.

Page 10: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 10

Phase-1 Cable (FR-4 and flex)

• 10 sensor PCB optimized for detector function and low mass.

• Two stage development – test with FR-4 version and build final copper conductor flex kapton cable (Al conductor to follow).

• Test and characterize all individual and system functionality with the new RDO system.

Page 11: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 11

Phase-1 Probe testing system

• This is not yet well defined. We would like to verify that the capabilities of our existing RDO system are sufficient for this task since we intend to use this as the basis of the probe test system. This will require further consultation.

Page 12: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 12

Summary• Testing will be a large component of the effort

needed for the STAR HFT for the next year (or two).

• Similar testing capability is needed at both LBNL and IPHC.

• Question – Can we combine efforts on the testing boards needed and make common hardware where practical? (i.e. Mimosa-22e, Phase-1 and Probe test card)

• Detailed testing program needs to be developed in collaboration with IPHC.

Page 13: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 13

Schedule

Missing dependencyMoves start of this task to August

Page 14: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 14

Detailed System Structure – RDO Board(s)

New motherboard

Two board System – Virtex-5 Development board mated to a new HFT motherboard

Xilinx Virtex-5 Development Board

•Digital I/O LVDS Drivers•4 X >80 MHz ADCs•PMC connectors for SIU•Cypress USB chipset•SODIMM Memory slot•Serial interface•Trigger / Control input

•FF1760 Package•800 – 1200 I/O pins•4.6 – 10.4 Mb block RAM•550 MHz internal clock

Note – This board is designed for development and testing.Not all features will be loadedfor production.

Page 15: Leo Greiner IPHC testing 2007-101 Sensor and infrastructure testing at LBL. Capabilities and Plan

Leo Greiner IPHC testing 2007-10 15

fin