Insert Heading Lessons learned from the Dar es Salaam Municipal Development Project Improvement of Solid Waste Management Daniel Cramer, SMEC Africa September 2013

Upload: others

Post on 18-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Insert Heading

Lessons learned from the

Dar es Salaam Municipal Development Project

Improvement of Solid Waste Management

Daniel Cramer, SMEC Africa

September 2013

SMEC Background

The Organisation and Regions

• Independent professional consultancy

firm

• over 5,000 over 80 offices around the

world.

• Consistently in the Engineering News

Record - one of the “Top 200

International Consultancy Firms”

• Ranked No. 9 for Water projects

South Africa

Africa

• First SMEC operations in 1970

• Over 30 offices across the continent

• 1,200 staff

Technical Functions

• Transport

• Civil Infrastructure

• Water & Environment

• Urban Development

• Industrial & Power

• Local Government

• Social Development

SMEC BACKGROUND

Industry Sectors

• National and Local Government

• Oil & Gas

• Mining

• Power Generation & Distribution

• Water Supply & Sanitation

• Land Developers

• Manufacturing Industries

• Agricultural Industry

• Waste Management

• Construction

� Dar es Salaam Metropolitan Development Project (DMDP)

� For Municipalities:

• strengthen the institutional and urban management systems of the

Dar es Salaam Local Authorities (DLAs) in order to improve service

delivery over time;

• provide studies/designs for actual improvements through sub-

projects, eg. Solid Waste

� Project Objectives:

• prepare the investments for a comprehensive SWM system for Dar

es Salaam

• Prepare feasibility studies, designs, drawings, cost estimates and

tender packages for sub-projects;

• Conduct ESIA for the sub-projects including new sites;

• Provide input to the separate consultants for both Institutional

Review and Strengthening and the PPP initiatives

Background

Project

Background

Project

Environment

Sub Projects

Quantities

Collection

TFS/MRF

Transport

Pugu Upgrade

W2E

Law/Regs

Education

Development

Proposal

Waste

Minimisation

� Significant percentages of the waste generated in Dar es Salaam

are not collected, especially waste from unplanned areas;

� Current conditions of the waste collection and transport systems

may pose risks to human health and the environment;

� Limited funding for operations;

� Aging equipment

Key Issues

Sub-Project: Waste Quantities & Composition

Year 2010 2015 2020 2025

Population Size 4,000,000 4,900,000 5,900,000 7,100,000

0 1,000 2,000 3,000 4,000 5,000

Hasconing & M-Konsult 1988

Master Plan SWM 1989

Manus Coffey 1992

Master Zanz-DSM [for 1994]

DCC 1995

JICA 1997

ERC 2004

DCC 2011

tonnes per day

Historic Waste Generation & Sources

HH

Commercial/Industrial

Institutional

Markets

Street Sweeping

Other

Total

Sub-Project: Waste Quantities & Composition

0% 20% 40% 60% 80% 100%

Dar es Salaam, Tanzania

Dhaka, Bangladesh

Lusaka, Zambia

Ghorari, Nepal

Bamako, Mali

Mosji, Tanzania

Nairobi, Kenya

Canete, Peru

Managua, Nicaragua

Sousee, Tunesia

Solid Waste Collection Rate/Coverage %

� Handcart collection where

other access is not possible

� Manual Handling

� Waste is on the ground

Solid Waste Collection

Solid Waste Collection

Material Recovery

� Community & stakeholder consultation

� Studies, feasibility assessments

� Community & stakeholder supported upgrade packages

� Engineering systems design

� Revenue collection and by-laws

� Services delivery system

Key Project Aspects

Key Aspect: Wide Range of Conditions

Wide Range of Conditions: Solutions

� Consultation with community & stakeholders

� Community and area specific solutions

� “One size does not fit all”

� High degree of flexibility

Key Aspects: Community & Stakeholder

� Community can make or break a waste management system

� Administrators need to support and have the appropriate capacity and funds

� Stakeholders need to actively participate

� Consultation: repeated consultation in different forums

� Training: Targeted training for different groups

� Incentives: Award schemes, fee reductions, tax exemptions

� Conflicting legislation & By-Laws:

• unify regulations and by-laws within the service delivery region

• adjust regulations/by-laws to service delivery mode

• model revisions on existing successful frameworks, if transferable

� Insufficient enforcement:

• Identify, be aware of, overcome cultural hurdles

• awareness campaign in parallel with stepping up enforcement

• positive reinforcement, eg. award systems

� Revenue - affordability, collection rate:

• increase fee collection rates from system users eg. electronic fund

transmission, by co-charging with other services

• increase transparency of collection to ensure collected fees are reaching

the intended destination

• subsidise collection in low income areas by revenue from high income

areas

Key Aspects: Legislation, Revenue

� Local Government Departments are often understaffed, underfunded and

bogged down in procedures and protocols:

• deliver part services through CBOs/Contractors [mini-PPP]: eg. providing

collection truck with driver;

• combine services into larger service packages [PPP]: eg. design,

construction, operation of Waste Transfer Station;

• award concessions [PPP] for wide ranging services based on performance

criteria;

� contract durations must be sufficiently long to allow service providers to make

sensible investments;

� service providers [CBOs/Contractors] need sufficient experience contract

management and financial planning: select capable providers and provide

training;

� all participants in a PPP must understand what the key prerequisites are for

PPP arrangements: provide targeted training

Key Aspects: Delivery Mode