let us close the environment circle!
DESCRIPTION
Let Us Close The Environment Circle!. O. Biogas. Biogas is a Multitalent !. Input. Process. Output. Organic Waste Regrowing Mat. from Agricalture from Food Industie from Householdwaste from Ethanol/Starch/CPO Combinations. Biogas Electrical Power Heat- / Cooling Energy - PowerPoint PPT PresentationTRANSCRIPT
Let Us Close The Environment Circle!
OBiogas
• Organic Waste
• Regrowing Mat. • from Agricalture
• from Food Industie
• from Householdwaste
• from Ethanol/Starch/CPO
• Combinations
Input Output
AnerobicFermentation
•Biogas
•Electrical Power
•Heat- / Cooling Energy
•Natural Gas…Gasoline?
•Organic Fertilizer
•Reduce CO2 Emission• Examples
Process
Biogas is a Multitalent !
• Example:
Manure Cow/Pig
• Obstacles
• Flowchart
INPUT
Manure Exampel
= 15 m3 Manure / Cattle p.a. (in Europe 20 m³)
= COD load 50 -100 000 ppm = 450 m3 Biogas p.a. = approx. 900 kWhel p.a.
= 70% COD Reduction
Biogas From one Cattel/Pig…
One pig produces energy equivalent to 23 l/year of diesel oil.
Substrate Dry Matter m³/t Biogas CH4 (%)
Cattle Manure 5-10 % 15-30 57
Pig Manure 6 % 20 59
Hen Manure 20-60% 70 - 200 60
Mais Silage 34% 210 53
!! Fast degration (aerobic) => Fresh Collection !!
Process
Nature as an ExampleFlow Chart
Obstacles & Solutions Examples
1. Fermenter 2. Co-Fermenter 3. Residue Storrage
Fermenter Tank = Big Cow Stomach
Let us take the nature as a good example!
Flow Chart of a Biogas Plant
Process
Some Typical Obstacles and our solution to that.
Mobile Messing
For Impotant Error
Error Management and Monitoring, Operation Look Book, Reporting in Diagramms, incl. CHP Data
Obstacle 1 – Low Operation Know How – Solution …
…Automated Operation System
12 Years Data Base, 300 Plants
…Regular Analysis of Substrate
Biogas
Obstacle 2 – Instable Gasyield – Solution… BSS
Technical ONLINE Support Monitoring
Biogas Inhibitors in Manure:
- Antibiotcs (prevention, treatment of deasese) - Disinfectant (e.x. desinfection of the cot)- Solvents (e.x. cleaning-, paint works on the cot)- Herbicide, Insecticide oder Bactericide (e.x. intake from feedstock)
Obstacle 3 – Operation in Winter – Solution…
Proper Heating Coil System
Tank Insulation according to Climate
Obstacle 4 – To High H²S – Solution…
Hidrogen Sulfide Content!
Some Case: + …Iron Chloride or
+ External Deslufurisation
Internal biolog. Desulfurisation System
Horizontal Adjustable
.
..
.
Obstacle 5 – Layer Scrum + high DM – Solution…
…Flexible
Submersile Mixer
- Drymatter 5% to 25%
-Low Maintenance
Vertical
TurnableVertical Liftable
Gear protection system
Over+ Under pressure safeguard
View Holes
Feeding Level protection
Obstacle 6 – High Maintenance Level – Solution…
10 Min. Opening of Fermenter during operation
Sandproblem in Manure? Solution by tank size extention and simple sedimentation. Empty after 2-8 years with Skid Loader
Gas Storage Level Indocator
Air Support
Fan
Weather Protection Foil
Gas Collection Foil
Central Operation Plattform
….12 years optimized own operation + security parts
Examples
Biogas Plants1. Manure2. Gaspurification3. Large Size
Biogas PlantMilchcenter Dorfheimat
Post-DigesterResidue storage tank
Digester
CHP container
Technical Data
Start of operation: 2007
Capacity: 500 kWel
Input material: 109 m3 liquid manure
(~ 1,600 dairy cows), approx. 5.5 t solid
Manure and approx. 3 t corn silage
Biogas Plant BiRo GmbH
Technical data
Start of operation: First quarter 2008
Capacity: 300 m³/h Purification from Biogas to Bio Methane (fed into the Natural Gas Grid) (this corresponds to 600 m³ biogas und 1,2 MWel)
Input: Corn silage
More information: www.bbfm.de
Biogas Plant in Bad Oldesloe
Technical data
Start of operation: 2007
Capacity: 2.1 MWel. Micro gas distribution system with four CHPs :- One CHP at the biogas plant- Three decenralized CHPs in 1,6 km distance
Input: Corn silage
Thermal use: Supply of Farm und two external industrial factories
MT-Energie in facts Solid knowlege, with 12 years building experience in biogas
plants
In total 60 MW of installed electrical capacity by 2007
Onlinedata from 300 different biogas plants were we provide continious biological consulting
Until now we built 140 biogas plants, ALL in operation with an average running hour per year of 94%
International Business in Italy, France, Spain, Czeschia, Hungary, Kroatia, Thailand, China.
Thank you for your kind attention!
Headoffice: Markus Dicke, Director Asia [email protected]+49 172 64 97 110Germany
China Office Beijing:+86 10 6296 7662Mrs. Wang Zhen, (Executive Adviser)[email protected]
Mr. Zengbin Qi, (Ing. Biotechnology)[email protected] & Germany
…Mmm Every Drop collected