lhc bi 2015 summary: bsrl m. palm (be-bi-pm) 2015-11-12 1

9
LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

Upload: madeleine-lamb

Post on 06-Jan-2018

221 views

Category:

Documents


1 download

DESCRIPTION

APD: Performance Distorted bunch profile “Phantom” bunches “Phantom” bunch signal typically decreases during the fill Mechanism not fully understood… Possible cause: bias voltage ripple (>GHz) leading to sensitivity fluctuations and avalanche onset.

TRANSCRIPT

Page 1: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

1

LHC BI 2015 Summary: BSRLM. Palm (BE-BI-PM)

2015-11-12

Page 2: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

2

Changes since Run 1Optical line• BSRL and BSRA on

extension table

Hybrid detectors installed• Both beams since TS2

TS3• Hybrid shutter control

installed• Additional layer of protection

against saturation

2015-11-12

APD

• IRF widens at shorter wavelengths

•Filter Better signal at high energies

Color filter (APD)

Synchrotron light

•Fiber-coupled sub-ns pulsed laser installed in gallery

•SPAD afterpulse calibration

•System functionality verification

Pulsed laser

• Reduce impact (signal variation) of extraction mirror movement

Diffuser (APD)

•Replacing filter wheels

•5 filters (Attenuation up to ~107)

Neutral density filters

BSRA

•Block reflections

Screens

Hybrid

Page 3: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

APD: Performance

2015-11-12 3

Distorted bunch profile

“Phantom” bunches

“Phantom” bunch signal typically decreases

during the fill

Mechanism not fully understood…•Possible cause: bias voltage ripple (>GHz) leading to sensitivity fluctuations and avalanche onset.

Page 4: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

Hybrid: Intended use (1)

2015-11-12 4

Doublets

Satellites

Doublet train, B1 (Fill 4164)

Satellite fraction (

Ghost fraction (

vdM-scan: Ghost & Satellite fraction

Hybrid significantly

better than APD

Flattop

Page 5: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

5

Hybrid: Intended use (2)

2015-11-12

B1 Satellite & Ghost map (vdM scan, Aug 25)

=Filled/masked bucketAbort Gap

Page 6: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

6

Hybrid: Bonus

2015-11-12

Abort gap population Synchronous phase shift, Bunch by bunch

Page 7: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

7

(No baseline subtraction)

RawBeam loss correction

Hybrid: Unexpected

• Most likely beam losses(?)

• Bunched signal from wrong beam corrupts measurement

• …can be corrected• Long term damage?

Profile of opposite beam is detected

2015-11-12

B1 structure seen by B2 hybrid

Page 8: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

8

Outlook

• Install BSRL equipment on removable breadboard

YETS

• Investigate BSRL installation in UA• Less exposed to radiation• Two complementary systems in RA

and UA• Issues:

• Broad-band light signal through 75 m fibre => Severe dispersion

• 2’’ light cone into ~10s m fibre• Scintillation?

2016

2015-11-12

Current location

New location?

Fibre

Page 9: LHC BI 2015 Summary: BSRL M. Palm (BE-BI-PM) 2015-11-12 1

9

Backup

2015-11-12

Hybrid abort gap estimate and measured beam loss