lightship „gannet 1954“ basel€¦ · feuerschiff gannet 1954 basel_en.indd created date:...

1
EMIL EGGER AG [email protected] ete.ch T +41 71 282 52 20 Service Line +41 848 800 110 Heavy goods logistics reference ETE Services Project Mobile cranes and crawler cranes Special cargo transports Industry relocation Lifting and moving technology Sector End client Holzpark Klybeck BACH Projects AG, 4057 Basel Client (contact info on request) Dates July - August 2019 Project description A retired lightship is receiving a new lease of life as a cultural attraction, restaurant and radio station. The LR11000 was used to lift the lightvessel, weighing a total of 550 t and measuring 42.00 m by 8.00 m, out of the water, move her approxi- mately 20 m under load and set her down in a specially-prepared bed. Equipment Crawler crane LR11000 with V-frame, 2 x 400 t Modulift spreader beams Specialities / Expertise - Extremely cramped conditions - Special lifting equipment - Designed and built the anchor points (bollards) on the ship’s hull - Challenging site conditions (bearing capacity of existing Rhine dam) Lightship „Gannet 1954“ Basel CONSTRUCTION ENERGY CHEMISTRY/ FOOD PRODUCTS MECHANICAL AND PLANT ENGINEERING

Upload: others

Post on 19-Jun-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lightship „Gannet 1954“ Basel€¦ · Feuerschiff Gannet 1954 Basel_EN.indd Created Date: 10/21/2019 9:28:52 AM

EMIL EGGER AG [email protected] ete.ch T +41 71 282 52 20 Service Line +41 848 800 110

Heavy goods logistics reference

ETE Services

Project

Mobile cranes and crawler cranes

Special cargo transports Industry relocation Lifting and moving technology

Sector

End clientHolzpark KlybeckBACH Projects AG, 4057 Basel

Client (contact info on request)

DatesJuly - August 2019

Project descriptionA retired lightship is receiving a new lease of life as a cultural attraction, restaurant and radio station.

The LR11000 was used to lift the lightvessel, weighing a total of 550 t and measuring 42.00 m by 8.00 m, out of the water, move her approxi-mately 20 m under load and set her down in a specially-prepared bed.

EquipmentCrawler crane LR11000 with V-frame,2 x 400 t Modulift spreader beams

Specialities / Expertise- Extremely cramped conditions- Special lifting equipment- Designed and built the anchor points (bollards) on the ship’s hull- Challenging site conditions (bearing capacity of existing Rhine dam)

Lightship „Gannet 1954“ Basel