Lincoln-Lancaster Planning Department Memorandum TO: Planning Staff FROM: Stephen Henrichsen DATE: November 7, 2003 SUBJECT: Comp Plan Amendment - Southeast Upper Salt Creek Watershed Study COPIES: Enclosed are amended pages for the 2025 Lincoln/Lancaster County Comprehensive Plan with all amendments per the Southeast Upper Salt Creek watershed study as adopted by the Lincoln City Council and Lancaster County Board on September 9, 2003 and October 7, 2003, respectively. Please replace pages F 23 through F 26 with the enclosed. Please replace pages F 79 and F 80 with the enclosed. Please replace pages F 155 and F 156 with the enclosed. The amended pages are also available on the Internet at www.ci.lincoln.ne.us/city/plan/index.htm. I:\CPMR\ltr com plan amendments 11 03.wpd

Upload: others

Post on 22-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

Lincoln-Lancaster Planning DepartmentMemorandum

TO: Planning Staff

FROM: Stephen Henrichsen

DATE: November 7, 2003

SUBJECT: Comp Plan Amendment - Southeast Upper Salt Creek Watershed Study

COPIES:

Enclosed are amended pages for the 2025 Lincoln/Lancaster County Comprehensive Plan with allamendments per the Southeast Upper Salt Creek watershed study as adopted by the Lincoln CityCouncil and Lancaster County Board on September 9, 2003 and October 7, 2003, respectively.

Please replace pages F 23 through F 26 with the enclosed.Please replace pages F 79 and F 80 with the enclosed.Please replace pages F 155 and F 156 with the enclosed.

The amended pages are also available on the Internet at www.ci.lincoln.ne.us/city/plan/index.htm.

I:\CPMR\ltr com plan amendments 11 03.wpd

Page 2: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

Ashland Rd

Little Salt Rd

Agnew Rd

Rock Creek Rd

Davey Rd

Branched Oak Rd

Raymond Rd

Mill Rd

Waverly Rd

Bluff Rd

McKelvie Rd

Alvo Rd

Fletcher Ave

Havelock Ave

Adams St

Holdrege St

O St

A St

Van Dorn St

Old Cheney Rd

Pine Lake Rd

Yankee Hill Rd

Rokeby Rd

Saltillo Rd

Bennet Rd

Wittstruck Rd

Roca Rd

Martell Rd

Hickman Rd

Stagecoach Rd

Panama Rd

Olive Creek Rd

Princeton Rd

Firth Rd

Gage Rd

SW 1

42nd

St

SW 1

28th

St

SW 1

14th

St

SW 1

00th

St

SW 8

6th

St

SW 7

2nd

St

SW 5

8th

St

SW 4

2nd

St

SW 2

9th

St

SW 1

4th

St

SW 2

nd S

t

S 12

th S

t

S 25

th S

t

S 38

th S

t

S 54

th S

t

S 68

th S

t

S 82

nd S

t

S 96

th S

t

S 11

0th

St

S 12

0th

St

S 13

4th

St

S 14

8th

St

S 16

2nd

St

S 17

6th

St

S 19

0th

St

Pella Rd

Pioneers Blvd

(/plan/plots/amls/colandplansm.aml /plots/develop/rtl/colandplansm.rca)...Updated to October 21, 2003 29 Oct 03 13:21:16 Wednesday

Resid

entia

l, U

rban

Resid

entia

l, Lo

w D

ensit

y

Com

mer

cial

Indu

stria

l

Gre

en S

pace

Publ

ic an

d Se

mi-P

ublic

Lake

s & S

tream

s

Envi

ronm

enta

l Res

ourc

es

Agr

icul

tura

l

Agr

icul

tura

l Stre

am C

orrid

or

Futu

re S

ervi

ce L

imit

New

Pro

pose

d Co

mm

/ In

dus C

ente

rs

(Not

Site

Spe

cific

)

(Site

Spe

cific

)

The

loca

tion

of e

ach

land

use

des

igna

tion

is g

ener

aliz

ed.

The

app

ropr

iate

ness

of a

par

ticul

arzo

ning

dis

trict

for a

par

ticul

ar p

iece

of p

rope

rty w

ill d

epen

d on

a re

view

of a

ll th

e el

emen

tsof

the

Com

preh

ensi

ve P

lan.

Ple

ase

cons

ult o

ther

sou

rces

for e

xact

loca

tions

of e

nviro

nmen

tal

reso

urce

s su

ch a

s w

etla

nds,

nat

ive

prai

rie a

nd fl

oodp

lain

. N

ot a

ll of

thes

e re

sour

ces

are

disp

laye

d on

this

figu

re.

The

inco

rpor

ated

tow

n pl

ans

are

disp

laye

d on

this

figu

re.

In m

any

circ

umst

ance

s th

e la

nd u

seca

tego

ries

in th

e to

wn

plan

s w

ere

diff

eren

t fro

m th

e ca

tego

ries

used

in th

e L

inco

ln /

Lan

cast

erC

ount

y Pl

an, s

o so

me

adju

stm

ents

wer

e m

ade

for t

he p

urpo

ses

of th

is d

ispl

ay.

The

se c

omm

uniti

esan

d th

eir s

peci

fic a

dopt

ed p

lans

sho

uld

be c

onsu

lted

as th

e so

urce

for d

ecis

ions

with

in th

eir

zoni

ng ju

risdi

ctio

ns.

Page 3: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

F 24

Lincoln City - Lancaster County Comprehensive PlanLast Updated: May 28/29, 2002

Future Conditions - Community Form

This page left blank intentionally.

Page 4: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

(/plan/plots/amls/citylusm.aml) (/plots/develop/rtl/citylusm.rca) Updated to October 21, 2003

Residential, Urban

Residential, Low Density

Commercial

Industrial

Green Space

Public and Semi-Public

Lakes & Streams

Environmental Resources

Agricultural

Agricultural Stream CorridorFuture Service Limit

New Proposed Comm or Indus Centers(Not Site Specific)(Site Specific)

L E G E N D

W 7

2nd

SW 5

8th

W 4

2nd

SW 2

9th

SW 1

4th

SW 2

nd

S 12

th

S 25

th

S 38

th

S 54

th

S 68

th

S 82

nd

S 96

th

S 11

0th

S 12

0th

S 13

4th

Waverly Rd

Bluff Rd

McKelvie Rd

Alvo Rd

Fletcher Av

Havelock Av

Adams St

Holdrege St

O St

A St

Van Dorn St

Pioneers Blvd

Old Cheney Rd

Pine Lake Rd

Yankee Hill Rd

Rokeby Rd

Saltillo Rd

Bennet Rd

The location of each land use designation is generalized. The appropriatenessof a particular zoning district for a particular piece of property will dependon a review of all the elements of the Comprehensive Plan. Please consult othersources for exact locations of environmental resources such as wetlands, nativeprairie and floodplain. Not all of these resources are displayed on this figure.

The incorporated town plans are displayed on this figure. In many circumstancesthe land use categories in the town plans were different from the categories usedin the Lincoln / Lancaster County Plan, so some adjustments were made for thepurposes of this display. These communities and their specific adopted plansshould be consulted as the source for decisions within their zoning jurisdictions.

Page 5: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

F 26

Lincoln City - Lancaster County Comprehensive PlanLast Updated: May 28/29, 2002

Future Conditions - Community Form

This page left blank intentionally.

Page 6: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

Special consideration should also be given to the Salt Creek floodplain from Van Dorn Street to Superior Streetwhere the FEMA Flood Insurance Study recommends preserving flood storage so as not to increase flood heightsgreater than one foot.

GUIDING PRINCIPLES

Watershed planning will continue in order to be proactive and integrate stewardship princi-ples for land conservation, stream and wetland buffers, better site design, Best ManagementPractices (BMP), and erosion and sediment control. The natural drainage system can servemultiple benefits, including wildlife habitat and recreation.

The community should encourage site designs that are compatible with the natural charac-teristics of the site, clustering development, minimizing grading and impervious cover, andpreserving site hydrology to the maximum extent possible. Naturalized or bioengineeredsolutions to drainage issues should be used wherever possible.

Subject to the findings of the Mayor’s Floodplain Task Force and the assumptions used incrafting this Plan, future urban development will be outside of the floodplain and floodway.This helps new development avoid potential flood risks and preserves the important func-tions of the floodplain. Keeping development outside of the floodplain preserves flood stor-age and other natural and beneficial functions of floodplains. It also avoids the long-term,cumulative impact of development in the floodplain.

STRATEGIES

Create a stormwater utility, as a division of the Public Works and Utilities Department, to provide for a steady rev-enue source as well as an organizational structure to address the growing needs of the stormwater and watershedmanagement system.

Use public projects as an opportunity to set positive examples for the community relative tostormwater and floodplain management.

Develop project approaches which view stormwater as an asset, by working with the naturaltopography and using wetlands, floodplains, and natural drainage corridors as natural ways tomanage flood flows and stormwater run-off.

Designate areas for future urban development outside of floodplain and floodway areas toavoid introducing new development to flood risks and to preserve the important functions ofthe floodplain.

Opportunities should be sought for the reclamation of floodplain functions through the acqui-sition and relocation of structures and the re-establishment of natural or open space areas.

Utilize naturalized or bioengineered solutions to drainage issues wherever possible.

Develop a Watershed Management Master Plan for Lincoln and future growth areas. Integrateexisting neighborhoods and growth areas into watershed planning.

Utilize basin master plan recommendations and components as analysis tools to be referenced and compared withproposed development within the basin, and as a guide in the preparation of future capital improvement projects.

F 79

Lincoln City - Lancaster County Comprehensive PlanLast Updated: October 6/7, 2003

Future Conditions - Utilities

Best ManagementPractices (BMP) aredefined as measures thatremove or prevent pollu-tants from enteringstormwater. Examples ofBMP include stabilizing allareas disturbed during con-struction and preservingnatural drainageways. It isthe City’s policy to encour-age the use of BMP in newdevelopment and redevel-opment.

Page 7: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

F 80

Lincoln City - Lancaster County Comprehensive PlanLast Updated: October 6/7, 2003

Future Conditions - Utilities

Seek broad public participation in the location and design of specific watershed management projects. The relativebenefits of the projects to be evaluated should include impacts on the flood hazards, water quality, channel integrity,natural character, bridges, culverts, and existing public and private structures.

Future master planning efforts for largely undeveloped basins will rely more heavily on pro-active better manage-ment practice (BMP) measures and the conservation of existing natural drainage features to most effectively managestormwater and floodplains. Designs of human made features should seek to utilize bioengineering and other natural-ized techniques, incorporating trail systems and other linear park features where possible.

The following watershed studies have been adopted in order to provide guidance to watershed management activitieswithin the basin.

• Stevens Creek Watershed Study and Flood Management Plan, 1998 (for rural watershed).• Beal Slough Stormwater Master Plan, May 2000.• Southeast Upper Salt Creek Watershed Master Plan, 2003.

SOLID WASTE

SANITARY LANDFILL

The Bluff Road Sanitary Landfill is projected to be at capacity near the year 2025 based on current generation ratesand the projected population growth rate of 1.5 percent per year. Planning for expansion of the Bluff Road Landfillon City owned property just east of the existing site is anticipated. The City policy of public ownership, operationand financing of integrated solid waste management services is anticipated to continue during the planning period.This additional landfill area has not been permitted by the State of Nebraska Department of Environmental Quality.

The North 48th Street construction and demolition landfill estimated life is 17 years (Year 2019) based on currentgeneration rates and projected rates of growth. Thus, a new facility for handling construction and demolition debriswill need to be sited during the planning period, starting in 2014. During the planning period the North 48th Streetconstruction and demolition landfill and the old solid waste landfill closure shall be completed and may be returnedto public use. The N. 48th Street transfer station and recycling areas are scheduled to remain.

RECYCLING

Additional multi-material recycling sites will be required in each new development area to provide for convenientuse by residents in growth areas. The growth of population in the County will also require additional recycling sitesin villages in the County. Southwest Lancaster County would have the higher priority for new sites.

Other methods for the collection of recyclables, such as expansion of a curbside pick-up program to a city and coun-ty-wide basis may become economically feasible during the planning period and will continue to be evaluated on aperiodic basis throughout the planning period.

GUIDING PRINCIPLES

No out of county waste is accepted for landfill disposal. This policy reserves landfill capacity for city and countyresidents and allows administration of programs under existing authorities.Create a county-wide integrated, efficient, environmentally safe and conservation-oriented recycling and waste man-agement system. Promote and support markets for waste materials and recycled products.

Page 8: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

sewer), and may include specific or general plans for the private financing of improvements to the infra-structure supporting or contributing to the land uses in the annexed area.

The character of existing residentialareas should be respected as much aspossible during the annexationprocess. However, any annexationof existing residential areas willinclude some costs which must bethe responsibility of property own-ers.

Annexation to facilitate the installa-tion of improvements and/or possi-ble assessment districts is appropri-ate if it is consistent with the annex-ation policies of the Plan listedabove.

Plans for the provision of serviceswithin the areas considered forannexation shall be carefully coordi-nated with the Capital ImprovementsProgram of the City and the County.

Each town in Lancaster County will have their own procedures for annexation.

ON-GOING COMPREHENSIVE PLAN ACTIVITIES

While the Comprehensive Plan may have received formal approval, certain long-range planning tasks remain to becompleted or continued as part of the Plan’s implementation. These include:

Interagency Cooperation and Coordination – Broad involvement of numerous public agencies anddepartments were used in the Plan’s formulation. The cooperation and coordination of efforts with thesegroups needs to remain in place during the Plan’s implementation.

Joint Planning Commission and Planning Department – The City and County created a joint City-County Planning Commission and a single City-County Planning Department more than fifty years ago.This structure has served the community well over this period. It is intended that this structure remain inplace as a means for furthering the implementation of the Plan.

City-County Common – The City Council, County Board, and Lincoln Mayor hold a joint meeting eachmonth to discuss issues of common concern to them. This group is known as the City-County Common.The Common provides a regular opportunity for the elected officials to discuss planning issues of jointinterest to them.

MPO Officials Committee and Technical Committee – Through the Metropolitan Planning Organizationstructure, the Officials and the Technical Committees lend additional policy and technical oversight to theprocess. These standing groups meet on an ad hoc basis to review, discuss, and approve matters relating to

F 155

Lincoln City - Lancaster County Comprehensive PlanLast Updated: May 28/29, 2002

Future Conditions - Plan Realization

Page 9: Lincoln-Lancaster Planning Department€¦ · The appropriateness of a particular zoning district for a particular piece of property will depend on a review of all the elements of

F 156

Lincoln City - Lancaster County Comprehensive PlanLast Updated: October 6/7, 2003

Future Conditions - Plan Realization

the area-wide transportation planning process. This includes the annual MPO Work Program,Transportation Improvement Program (TIP), Annual Certification, Long Range Transportation Plan (LRTP)and other related studies and programs.

Subarea Planning – The Comprehensive Plan provides broad guidance for achieving the community’s stat-ed Vision. Putting details to the Plan takes additional effort. One means of doing this is through the prepa-ration of subarea plans. Subarea plans offer greater details about the intended future of an area of the com-munity — including land uses, infrastructure requirements, and development policies and standards. Manyof these subarea plans are prepared by the City-County Planning Department, while some are prepared byother agencies and departments. Subarea plans from the previous (1994) Comprehensive Plan carried overas part of this Comprehensive Plan include:

• North 27th Street Corridor Plan, RDG Crose Gardner Shukert, April 1997.• Antelope Valley Major Investment Study: Amended Draft Single Package, City of Lincoln; May

1998, Updated November 1998.• Investment Strategy for a Competitive Downtown, Leland Consulting Group; 1999.• Wilderness Park Subarea Plan; February, 2000• Stonebridge Creek Development Area at 14th to 27th, north of the Interstate; March 27, 2000.• Greater Arnold Heights Area Neighborhood Plan; September, 2000.• Southeast Lincoln/Highway 2 Subarea Plan; March 26, 2001.• City-County Solid Waste Management Plan, Public Works and Utilities Department and Lincoln-

Lancaster County Health Department; September, 1994.• Ground Water Management Plan, Lower Platte South Natural Resources District; April, 1995.• Consolidated Plan for HUD Entitlement Programs; FY 2000 Urban Development;• Lincoln Water System Facilities Master Plan, Public Works and Utilities Department; April

2003.• Lincoln Wastewater Facilities Plan, Public Works and Utilities Department; March 2003.• Stevens Creek Watershed Study and Flood Management Plan, Lower Platte South Natural

Resources District; March 1998.• Beal Slough Stormwater Master Plan, Olsson Associates & Wright Water Engineers; May 2000.• Southeast Upper Salt Creek Watershed Master Plan, 2003.

As part of the Annual Plan Status Report process, the Planning Director should complete a yearly review ofall subarea plans that become five years of age and older. This review would be for the purpose of deter-mining the continued viability and relevance of those subareas plans to the Comprehensive Plan and thelong range planning process.

As part of the first Annual Review Status Report of this Plan, some of the older studies that are not includedas part of this Plan but for which updating consideration might be given include: 1989 Lincoln Area TrailsMaster Plan (w/1992 Supplement entitled State of the Trails Report); 1992 Mo-Pac East Recreational TrailMaster Plan; 1987 University Place Neighborhood Plan; 1987 Woods Park Neighborhood Plan; 1990Downtown Housing Plan with 1994 Update; and, 1996 Downtown 2001: Heart of the City Plan.

Human Services Planning - Explore points of common concern and emphasis between the long range landuse Comprehensive Plan and the community’s long range health and human services Community ServicesImplementation Plan (CSIP). Enhancing the coordination of these two endeavors should be initiated andcompleted within two years from the adoption of the Comprehensive Plan.