Page 1: LINE EFFICIENCY

11

PROJECT ON LEAN

Page 2: LINE EFFICIENCY

22

TEAM STRUCTURE

MR. KV KALRA

MANPREET SINGH

SHIVIT BANSAL

PRABHJOT SINGH

MUKESH KUMAR

ANKUR PRATAP SINGH

KIRANVIR SINGH

Our team consisted of 6 members.This project was done under guidance of Mr. KV Kalra (HOD, Paint Shop)

Page 3: LINE EFFICIENCY

33

Page 4: LINE EFFICIENCY

4

LINE EFFICIENCY (DISMOUNTING LINE)

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 6735 = 59.39% 270*42

• Low line efficiency in terms of manpower deployed in dismounting line (59.39%).

• Non-uniform work load distribution.

Problem/Present Status

Page 5: LINE EFFICIENCY

5

DISMOUNTING ASSY

CURRENT STATUS TARGET(5.26%

IMPROVEMENT)

LINE EFFICIENCY 59.39% 64.65%

TOTAL MANPOWER 73 NO. TO REDUCE 6.5NO. MANPOWER

LEAD TIME 85 MINUTES(13TRCTR/HR)

15 TRCTRS/ HR(105 TRCTRS/SHIFT)

DISMOUNTING ASSEMBLY

CURRENT STATE OF DISMOUNTING ASSEMBLY LINE

NO. OF LHS STATION 16

NO.OF RHS STATION 15

NO. OF SUB ASSY STATION 4

TOTAL 35

Page 6: LINE EFFICIENCY

6

STATION CYCLE TIME

NVA TIME NVA% MANPOWER REQUIRED

MANPOWER DEPLOYED

EFFICIENCY

TRACTOR GREASING

350 120 34.28% 1.5 2 64%

INSTRUMENT PLATE SUB ASSY

315 115 36.5% 1.5 2 58.3%

DASHBOARD PLATE SUB ASSY

280 100 35.7% 1.5 2 51.8%

7 PIN SOCKET 200 20 10% 1 1 74%

REAR FRAME 150 30 20% 1 1 55.5%

SHEET METAL LHS 300 115 38.33% 2 3 37%

SHEET METAL RHS 300 120 40% 2 3 37%

FRONT SHEET METAL

130 40 30% 1 1 48.14%

TAKT TIME PER TRACTOR 270 SECONDS

TARGETED STATION FOR INCREASING EFFICIENCY

Page 7: LINE EFFICIENCY

7

TR

AIL

ER H

OO

K

CLU

TCH

TIE

RO

D

RIG

HT

FEN

DER

TR

ACT

OR

GR

EASI

NG

RIG

HT

REA

R W

HEE

L

FEN

DER

SEA

T

OIL

DR

AIN

7-PI

N S

OCK

ET S

/A A

ND

FI

TM

ENT

FUEL

TA

NK

ST

RA

P

DA

SHB

OA

RD

PLA

TE

S/A

INST

RU

MEN

T P

LAT

E S/

A

ELEC

TR

ICA

L CO

NN

ECT

ION

S

DA

TA

PLA

TE

LHS

SHEE

T M

ETA

L

FRO

NT

GR

ILL

SILE

NCE

R

0

50

100

150

200

250

300

350

400

230 225

100

150

180200

350

200

230 230

120100

70

150

200180

120

350

280

180

315

240230

200 200

335

300 300

170

220

150

230

YAMAZUMI CHARTC

YCL

E T

IME

( in

s)

STAGES UNDER CONSIDERATION

TAKT TIME = 270s

Page 8: LINE EFFICIENCY

8

OPERATION TIMEREAR FRAME S/A

35

PICKING PF MATERIAL AND MOVING TOWARDS LINE 25

BOLT TIOGHTENING OF FRONT FRAME 30

DRIVE CABLE FITMENT40

TAKING REAR FRAME TO LINE 10

REAR FRAME FITMENT10

TOTAL TIME 1507 PIN SOCKET FITMENT

30

REFLECTOR PLATE FITMENT 30

TOTAL TIME 210

BASIS90 TPS

KAIZEN 1

Present Proposal

BALANCING OF OPERATIONS OF REAR FRAME AND 7 PIN SOCKET FITMENT

OPERATION TIMEREAR FRAME S/A

35

PICKING PF MATERIAL AND MOVING TOWARDS LINE 25

BOLT TIOGHTENING OF FRONT FRAME 30

DRIVE CABLE FITMENT40

TAKING REAR FRAME TO LINE10

REAR FRAME FITMENT10

Page 9: LINE EFFICIENCY

9

TR

AIL

ER H

OO

K

DR

IVER

SEA

T

CLU

TCH

TIE

RO

D

HO

RN

, FA

N B

ELT

RIG

HT

FEN

DER

LEFT

FEN

DER

TR

ACT

OR

GR

EASI

NG

FRO

NT

WH

EELS

RIG

HT

REA

R W

HEE

L

LEFT

REA

R W

HEE

L

FEN

DER

SEA

T

WA

TER

SEP

AR

AT

OR

OIL

DR

AIN

REA

R F

RA

ME

AN

D 7

-PIN

SO

CKET

FIT

MEN

T

7-PI

N S

OCK

ET S

/A

FUEL

TA

NK

FUEL

TA

NK

ST

RA

P

RA

DIA

TO

R

DA

SHB

OA

RD

PLA

TE

S/A

DA

SHB

OA

RD

FIT

MEN

T

INST

RU

MEN

T P

LAT

E S/

A

INST

RU

MEN

T P

LAT

E FI

TM

ENT

ELEC

TR

ICA

L CO

NN

ECT

ION

S

STEE

RIN

G W

HEE

L

DA

TA

PLA

TE

BA

TT

ERY

LHS

SHEE

T M

ETA

L

RH

S SH

EET

MET

AL

FRO

NT

GR

ILL

AIR

CLE

AN

ER, M

IRR

OR

SILE

NCE

R

DIE

SEL,

DIF

FER

ENT

IAL

OIL

CO

OLA

NT

0

50

100

150

200

250

300

350

400

230 225

100

150180

200

350

200230 230

120100

70

210

140

180

120

350

280

180

315

240 230200 200

335300 300

170

220

150

230

YAMAZUMI CHART(AFTER KAIZEN 1)

CY

CLE

TIM

E (

in s

)STAGES UNDER KAIZEN

BETTER WORK DISTRIBUTION

TAKT TIME = 270s

Page 10: LINE EFFICIENCY

10

EFFECT OF KAIZEN 1 ON LINE EFFICIENCY :-

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 6595 = 59.39% 270*41

PRESENT AFTER KAIZEN 1

55

56

57

58

59

60

61

59.39 59.57

LIN

E EF

FICI

ENCY

(%

)

K1

BETTER

Page 11: LINE EFFICIENCY

11

KAIZEN 2

OPERATION TIME( seconds)

MANPOWER DEPLOYED

STICKER PASTING 40

7 NO. MANPOWER

BATTERY COVER FITMENT

30

BONNET LOCK S/A

40

PANEL LOCK FITMENT

45

RHS SHEET METAL FITMENT

180

BONNET FITMENT

55

LHS SHEET METAL FITMENT

235

FRONT GRILL FITMENT

130

TOTAL TIME 755

OPERATION TIME (s) MANPOWER DEPLOYED

STICKER PASTING 40 735FE & 843OSM panel sticker given to Contractor

BATTERY COVER FITMENT

30 Fitted at Paint shop

OPERATION TIME(s) MANPOWER DEPLOYED

FRONT GRILL, NO. PLATE FITMENT & BATTERY COVER TIGHTENING

160 1

RHS SHEET METAL FITMENT 180 1

BONNET AND HEADLIGHT FITMENT

105 1

LHS SHEET METAL FITMENT 185 1

TOTAL TIME AND TOTAL MANPOWER

610 4

LINE BALANCING AT SHEET METAL FITMENT

Present Proposal

BONNET LOCK S/A 40 1No. Contractor Manpower

PANEL LOCK FITMENT 45

Already implemented

Proposed actions

MANPOWER REQUIRED AFTER ABOVE IMPLEMENTATIONS

Page 12: LINE EFFICIENCY

12

TR

AIL

ER H

OO

K

DR

IVER

SEA

T

CLU

TCH

TIE

RO

D

HO

RN

, FA

N B

ELT

RIG

HT

FEN

DER

LEFT

FEN

DER

TR

ACT

OR

GR

EASI

NG

FRO

NT

WH

EELS

RIG

HT

REA

R W

HEE

L

LEFT

REA

R W

HEE

L

FEN

DER

SEA

T

WA

TER

SEP

AR

AT

OR

OIL

DR

AIN

REA

R F

RA

ME

AN

D 7

-PIN

SO

CKET

FIT

MEN

T

7-PI

N S

OCK

ET S

/A

FUEL

TA

NK

FUEL

TA

NK

ST

RA

P

RA

DIA

TO

R

DA

SHB

OA

RD

PLA

TE

S/A

DA

SHB

OA

RD

FIT

MEN

T

INST

RU

MEN

T P

LAT

E S/

A

INST

RU

MEN

T P

LAT

E FI

TM

ENT

ELEC

TR

ICA

L CO

NN

ECT

ION

S

STEE

RIN

G W

HEE

L

DA

TA

PLA

TE

BA

TT

ERY

LHS

SHEE

T M

ETA

L

RH

S SH

EET

MET

AL

FRO

NT

GR

ILL

HEA

DLI

GH

T C

OV

ER A

ND

BO

NN

ET

AIR

CLE

AN

ER, M

IRR

OR

SILE

NCE

R

DIE

SEL,

DIF

FER

ENT

IAL

OIL

CO

OLA

NT

0

50

100

150

200

250

300

350

400

230 225

100

150180

200 205 200230 230

120100

70

210

140

180

120

350

280

180

315

240 230200 200

335

185 180160

105

220

150

230

YAMAZUMI CHART(AFTER KAIZEN 2)

CYCL

E T

IME

( in

s)

STAGES UNDER KAIZEN

3 NO. MAN-POWER RE-

DUCED

TAKT TIME = 270s

Page 13: LINE EFFICIENCY

13

EFFECT OF KAIZEN 2 ON LINE EFFICIENCY :-

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 6590 = 62.58% 270* 39

AFTER KAIZEN 1

AFTER KAIZEN 2

55

56

57

58

59

60

61

62

63

59.39

62.58

LIN

E EF

FICI

ENCY

(%

)

K2

BETTER

Page 14: LINE EFFICIENCY

14

KAIZEN 3

OPERATION TIME( seconds)

MANPOWER DEPLOYED

REMOVING OF OLD CAPS 60

2 NO. MANPOWER

PICK GUN MOVE TO TRACTOR 5

GREASING ALL 19 POINTS 125

CLEANING EXTRA GREASE 40

PLACING THE GUN BACK 5

MOVE TO PICK NEW CAPS 5

PLACING CAP ON GRESE POINTS 105

MOVE BACK TO STAGE 5

TOTAL 350

OPERATION TIME SAVING (s)

METHOD REQUIRED

GREASING OF TIE RODS, LEVELLING ROD, TOP LINK (TOTAL 7 POINTS)

45 To be offloaded

IMPLEMENTATION OF FLIP TYPE CAP REMOVAL & GREASING IN ONE GO

60

NO. OF REDUCED GREASE POINT CAP(7 NO.)

40

TOTAL 145

OPERATION TIME(s) MANPOWER DEPLOYED

PICK GUN MOVE TO TRACTOR 5

1 NO. MANPOWER

GREASING 12 POINTS 80

CLEANING EXTRA GREASE 40

PLACING THE GUN BACK 5PLACING CAP ON GREASE

POINTS 70MOVE BACK TO STAGE 5

TOTAL 205

LINE BALANCING AT TRACTOR GREASING STATION

Present Proposal

MANPOWER REQUIRED AFTER ABOVE IMPLEMENTATIONS

Page 15: LINE EFFICIENCY

15

TR

AIL

ER H

OO

K

DR

IVER

SEA

T

CLU

TCH

TIE

RO

D

HO

RN

, FA

N B

ELT

RIG

HT

FEN

DER

LEFT

FEN

DER

TR

ACT

OR

GR

EASI

NG

FRO

NT

WH

EELS

RIG

HT

REA

R W

HEE

L

LEFT

REA

R W

HEE

L

FEN

DER

SEA

T

WA

TER

SEP

AR

AT

OR

OIL

DR

AIN

REA

R F

RA

ME

AN

D 7

-PIN

SO

CKET

FIT

MEN

T

7-PI

N S

OCK

ET S

/A

FUEL

TA

NK

FUEL

TA

NK

ST

RA

P

RA

DIA

TO

R

DA

SHB

OA

RD

PLA

TE

S/A

DA

SHB

OA

RD

FIT

MEN

T

INST

RU

MEN

T P

LAT

E S/

A

INST

RU

MEN

T P

LAT

E FI

TM

ENT

ELEC

TR

ICA

L CO

NN

ECT

ION

S

STEE

RIN

G W

HEE

L

DA

TA

PLA

TE

BA

TT

ERY

LHS

SHEE

T M

ETA

L

RH

S SH

EET

MET

AL

FRO

NT

GR

ILL

HEA

DLI

GH

T C

OV

ER A

ND

BO

NN

ET

AIR

CLE

AN

ER, M

IRR

OR

SILE

NCE

R

DIE

SEL,

DIF

FER

ENT

IAL

OIL

CO

OLA

NT

0

50

100

150

200

250

300

350

400

230 225

100

150180

200 205 200230 230

120100

70

210

140

180

120

350

280

180

315

240 230200 200

335

185 180160

105

220

150

230

YAMAZUMI CHART(AFTER KAIZEN 3)

CY

CLE

TIM

E (

in s

)STAGES UNDER KAIZEN

1NO. MAN-POWER RE-

DUCED

TAKT TIME = 270s

Page 16: LINE EFFICIENCY

16

EFFECT OF KAIZEN 3 ON LINE EFFICIENCY :-

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 6445 = 62.82% 270* 38

BETTER

AFTER KAIZEN 2

AFTER KAIZEN 3

55

60

65

70

62.58 62.82

LIN

E E

FFIC

IEN

CY

( %

)

K3

Page 17: LINE EFFICIENCY

17

OPERATION TIME (S) MANPOWER DEPLOYED

TOTAL CYCLE TIME FOR WATER SEPARATOR FITMENT

100

1FENDER STICKER PASTING 40

TOTAL 140

KAIZEN 4LINE BALANCING AT FENDER SEAT & WATER SEPARATOR FITMENT

OPERATION TIME (S)MANPOWER DEPLOYED

TOTAL CYCLE TIME FOR FENDER SEAT FITMENT

125 1

TOTAL CYCLE TIME FOR WATER SEPARATOR FITMENT

100 1

TOTAL 225 2

Present Proposal

OPERATION TIME (S) MANPOWER DEPLOYED

TOTAL CYCLE TIME FOR FENDER SEAT FITMENT

125

1CHASIS STICKER PASTING 20

TOTAL 145

BASIS90 TPS

Page 18: LINE EFFICIENCY

18

TR

AIL

ER H

OO

K

DR

IVER

SEA

T

CLU

TCH

TIE

RO

D

HO

RN

, FA

N B

ELT

RIG

HT

FEN

DER

LEFT

FEN

DER

TR

ACT

OR

GR

EASI

NG

FRO

NT

WH

EELS

RIG

HT

REA

R W

HEE

L

LEFT

REA

R W

HEE

L

FEN

DER

SEA

T

WA

TER

SEP

AR

AT

OR

OIL

DR

AIN

REA

R F

RA

ME

AN

D 7

-PIN

SO

CKET

FIT

MEN

T

7-PI

N S

OCK

ET S

/A

FUEL

TA

NK

FUEL

TA

NK

ST

RA

P

RA

DIA

TO

R

DA

SHB

OA

RD

PLA

TE

S/A

DA

SHB

OA

RD

FIT

MEN

T

INST

RU

MEN

T P

LAT

E S/

A

INST

RU

MEN

T P

LAT

E FI

TM

ENT

ELEC

TR

ICA

L CO

NN

ECT

ION

S

STEE

RIN

G W

HEE

L

DA

TA

PLA

TE

BA

TT

ERY

LHS

SHEE

T M

ETA

L

RH

S SH

EET

MET

AL

FRO

NT

GR

ILL

HEA

DLI

GH

T C

OV

ER A

ND

BO

NN

ET

AIR

CLE

AN

ER, M

IRR

OR

SILE

NCE

R

DIE

SEL,

DIF

FER

ENT

IAL

OIL

CO

OLA

NT

0

50

100

150

200

250

300

350

400

230 225

100

150180

200 205 200230 230

145 140

70

210

140

180

120

350

280

180

315

240 230200 200

335

185 180160

105

220

150

230

YAMAZUMI CHART(AFTER KAIZEN 4)

CY

CLE

TIM

E (

in s

)STAGES UNDER KAIZEN

BETTER WORK DISTRIBUTION

TAKT TIME = 270s

Page 19: LINE EFFICIENCY

19

EFFECT OF KAIZEN 4 ON LINE EFFICIENCY :-

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 6505 = 63.40% 270* 38

BETTER

AFTER KAIZEN 3

AFTER KAIZEN 4

55

60

65

70

62.82 63.4

LIN

E E

FFIC

IEN

CY

( %

)

K4

Page 20: LINE EFFICIENCY

20

KAIZEN 5

OPERATIONTIME (sec)

MANPOWER DEPLOYED /SHIFT

EFFECTIVENESS

INSTRUMNET PLATE S/A

315 2UNDERUTILIZATION

OF 0.5 NO. MANPOWER

COVER PLATE S/A

280 2

UNDERUTILIZATION OF 0.7 NO.

MANPOWER

7 PIN SOCKET S/A

150 1

UNDERUTILIZATION OF 0.30 NO. MANPOWER

TOTAL 745 5 1.5 NO. MANPOWER UNDERUTILIZED

OPERATIONTIME(s) MANPOWER

REQUIRED

INSTRUMNET PLATE S/A

630 3

COVER PLATE S/A 5604

7 PIN SOCKET S/A 300

TOTAL 1490 7

LINE BALANCING AT INSTRUMENT PLATE , COVER PLATE , 7 PIN SOCKET S/A

Present Proposal

Proposed actions:IF WE PERFORM ALL THESE OPERATIONS IN ONE SINGLE SHIFT (GENERAL SHIFT) FOR BOTH THE SHIFTS WE CAN SAVE 3 NO. MANPOWER

MANPOWER REQUIRED AFTER ABOVE IMPLEMENTATIONS

•MANPOWER REQUIRED IN ONE SHIFT = 5•THEREFORE MANPOWER REQUIRED IN BOTH THE SHIFTS = 5X2 = 10

TOTAL REDUCTION IN MANPOWER = 3 NO.

Page 21: LINE EFFICIENCY

21

TR

AIL

ER H

OO

K

DR

IVER

SEA

T

CLU

TCH

TIE

RO

D

HO

RN

, FA

N B

ELT

RIG

HT

FEN

DER

LEFT

FEN

DER

TR

ACT

OR

GR

EASI

NG

FRO

NT

WH

EELS

RIG

HT

REA

R W

HEE

L

LEFT

REA

R W

HEE

L

FEN

DER

SEA

T

WA

TER

SEP

AR

AT

OR

OIL

DR

AIN

REA

R F

RA

ME

AN

D 7

-PIN

SO

CKET

FIT

MEN

T

7-PI

N S

OCK

ET S

/A

FUEL

TA

NK

FUEL

TA

NK

ST

RA

P

RA

DIA

TO

R

DA

SHB

OA

RD

PLA

TE

S/A

DA

SHB

OA

RD

FIT

MEN

T

INST

RU

MEN

T P

LAT

E S/

A

INST

RU

MEN

T P

LAT

E FI

TM

ENT

ELEC

TR

ICA

L CO

NN

ECT

ION

S

STEE

RIN

G W

HEE

L

DA

TA

PLA

TE

BA

TT

ERY

LHS

SHEE

T M

ETA

L

RH

S SH

EET

MET

AL

FRO

NT

GR

ILL

HEA

DLI

GH

T C

OV

ER A

ND

BO

NN

ET

AIR

CLE

AN

ER, M

IRR

OR

SILE

NCE

R

DIE

SEL,

DIF

FER

ENT

IAL

OIL

CO

OLA

NT

0

50

100

150

200

250

300

350

400

230 225

100

150

180200 205 200

230 230

145 140

70

210

0

180

120

350

0

180

0

240 230

200 200

335

185 180160

105

220

150

230

YAMAZUMI CHART(AFTER KAIZEN 5)

CY

CLE

TIM

E (

in s

)

SUB ASSEMBLIES ELIMI-NATED FROM MAIN LINE & SEPARATE CELL IS SETUP

TAKT TIME = 270s

Page 22: LINE EFFICIENCY

22

EFFECT OF KAIZEN 5 ON LINE EFFICIENCY :-

LINE EFFICIENCY: = Sum of all stations CYCLE TIME Takt Time* NO. OF MANPOWER

= 5760 = 64.65% 270* 33

BETTER

AFTER KAIZEN 4

AFTER KAIZEN 5

55

60

65

70

63.4 64.65

LIN

E E

FFIC

IEN

CY

( %

)

K5

Page 23: LINE EFFICIENCY

2323

Sheet metal Rear frame Water seperator/fender

seat

Greasing Electricals Total line efficiency improvement

0

10

20

30

40

50

60

70

80

90

40

55.5

41.6

64

5559.3956.5

77.7

52.7

7578

64.65

INCREASE IN EFFICIENCIES AFTER THE IMPLEMENTATION

Before After

5.26%

increase in

line efficiency

Page 24: LINE EFFICIENCY

24

TO IMPLEMENT THESE PROPOSAL WE NEED SYNERGY OF FOLLOWING DEPARTMENT

STAGE DEPARTMENT NATURE OF WORK

SHEET METAL

HR WITHDRAWL OF 3 NO. MANPOWER/SHIFT

TECHNOLOGYDEFINING AREA FOR PANEL AND BONNET LOCK SUB ASSY AT ONE POINTALLOCATING WORK TO CONTRACTOR

STORE CHANGING FEEDING LOCATION OF MATERIALS

MANUFACTURING PROPER IMPLEMENTATION IN BOTH SHIFT

STAGE DEPARTMENT NATURE OF WORK

TRACTOR GREASING

TECHNOLOGY

WITHDRAWL OF 1 NO. MANPOWER/SHIFT

STORE CHANGING FEEDING LOCATION OF MATERIALS

MANUFACTURING PROPER IMPLEMENTATION IN BOTH SHIFT

Page 25: LINE EFFICIENCY

25

STAGE DEPARTMENT NATURE OF WORK

WATER SEPARATOR / REAR FRAME

TECHNOLOGY ALLOCATING STICKER PASTING TO CONTRACTOR

STORE CHANGING LOCATION OF STICKER PASTING

MANUFACTURINGPROPER IMPLEMENTATION IN BOTH SHIFT

STAGE DEPARTMENT NATURE OF WORK

REAR FRAME

TECHNOLOGYPROVIDING A NEW SOP FOR WORK AT REAR

FRAME STATION

STORE CHANGING FEEDING LOCATION OF MATERIALS

MANUFACTURING PROPER IMPLEMENTATION IN BOTH SHIFT

STAGE DEPARTMENT NATURE OF WORK

ELECTRICALS

TECHNOLOGY

WITHDRAWL OF 1.5 NO. MANPOWER/SHIFT

PPC PROVIDE PRODUCTION DETAIL IN ADVANCE

STORE CHANGING FEEDING LOCATION OF MATERIALS

MANUFACTURINGPROPER IMPLEMENTATION IN BOTH SHIFT