List of KALAHI-CIDSS Subprojects - BUB Region Province Municipality Barangay Phase / Cycle Sub-Project Name Validated SP Name (Actual Project Title) Project Type No. Of Bgys No. Of HH Physical Target Unit BUB Amount LCC Amount Total Amount Date Started Date of Completion Status ARMM Lanao Del Sur Lumbaca-Unayan 2015 Protective Services: Infrastructure Projects - Construction of Protective Services: Infrastructure Projects - Construction of DAY CARE CENTER 1 3,446,572.00 TBD ARMM Lanao Del Sur Lumbayanague 2015 Protective Services: Infrastructure Projects - Construction of Protective Services: Infrastructure Projects - Construction of DAY CARE CENTER 1 1,300,000.00 TBD ARMM Lanao Del Sur Maguing 2015 Protective Services: Infrastructure Projects - Construction of Protective Services: Infrastructure Projects - Construction of DAY CARE CENTER 1 3,000,000.00 TBD Lanao Del Sur 2015 1 500,000.00 TBD ARMM Lanao Del Sur Tamparan 2015 Protective Services: Infrastructure Projects - Construction of Group Handwashing Facility in Day Care Centers Protective Services: Infrastructure Projects - Construction of Group Handwashing Facility in Day Care Centers DAY CARE CENTER 1 5,028,000.00 TBD ARMM Lanao Del Sur Tugaya 2015 Protective Services: Infrastructure Projects - Construction of Protective Services: Infrastructure Projects - Construction of DAY CARE CENTER 1 1,000,000.00 TBD ARMM Lanao Del Sur Tugaya 2015 Protective Services: Infrastructure Projects - Cosntruction of Protective Services: Infrastructure Projects - Cosntruction of BUILDING FACILITY 1 1,000,000.00 TBD ARMM Maguindanao SULTAN KUDARAT (NULING) Dalumangcob (Pob.) 2013 Construction of Livelihood Training Center Construction of Livelihood Training Center BUILDING FACILITY 1 136.99 meter2 1,500,000.00 - 1,500,000.00 March 2015 completed ARMM Maguindanao SHARIFF AGUAK (MAGANOY) 2015 Protective Services: Infrastructure Projects - Construction of Protective Services: Infrastructure Projects - Construction of BUILDING FACILITY 1 3,000,000.00 TBD ARMM Maguindanao Upi 2015 Protective Services: Infrastructure Projects - Cosntruction of Protective Services: Infrastructure Projects - Cosntruction of BUILDING FACILITY 1 1,500,000.00 proposed ARMM Basilan Sumisip Bacung Baiwas Basak Benembengan Lower Benembengan Upper Bohe-languyan Buli-buli Cabcaban Cabengbeng Lower Cabengbeng Upper Ettub-ettub Guiong Kaum-Air Kaumpamatsakem Libug Limbocandis Lukketon Luuk-Bait Mahatalang Manaul Mangal (Pob.) Marang Mebak Sahaya Bohe Bato Sapah Bulak 2014 Sports Facilities Provision Sports Equipment to Youth Groups BUILDING FACILITY 29 2 250,000.00 250,000.00 pipelined ARMM 1 ARMM Sulu JOLO (Capital) 2015 Construction of Municipal Evacuation Center Construction of Municipal Evacuation Center BUILDING FACILITY 1 19,000,000.00 proposed ARMM Sulu PANGLIMA ESTINO (NEW 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 3,500,000.00 TBD ARMM SULU PATIKUL 2015 Skills Training Center with Materials Skills Training Center with Materials PSB 1 1,500,000.00 TBD 2015 1 ARMM SULU TALIPAO Kabatuhan, Bilaan 2014 Community Demand Driven Development through Construction of Barangay Health Station BUILDING FACILITY 2 7,500,000.00 7,500,000.00 pipelined ARMM SULU 2 ARMM SULU TALIPAO Lower Kamuntayan 2014 Contruction of Community Learning Center BUILDING FACILITY 1 pipelined ARMM SULU 1 ARMM SULU TALIPAO Bandang 2014 Construction of Elementary Stage SCHOOL FACILITY 1 pipelined ARMM SULU TALIPAO Bandang 2014 Rehabilitation of 3 CL Unit School Building SCHOOL BUILDING 1 pipelined ARMM SULU 1 ARMM SULU TALIPAO Tiis 2014 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined ARMM SULU TALIPAO Tiis 2014 Construction of Barangay Health Station HEALTH CENTER 1 pipelined ARMM SULU 1 ARMM SULU TALIPAO Dalih 2014 Contruction of Community Learning Center BUILDING FACILITY 1 pipelined ARMM SULU 2015 1 ARMM SULU TALIPAO 2015 Community Demand Driven Development through Community Development Assistance Community Demand Driven Development through Community Development Assistance PSB 1 7,625,000.00 TBD ARMM TAWI-TAWI BONGAO (Capital) languyan, languyan meron bogao, languyan wala 2014 (Non-Menu ) Capacity building for Csos, Pos and Basic Sectors on Organizational and Financial Management. Registration/ Accreditation to different agencies and LGU special Bodies. Capability Enhancement and values formation for Senior Citizens and mentoring of parents PSB 4 500,000.00 500,000.00 pipelined CAR ABRA BUCAY Bangbangcag 2014 Improvement of Day Care Center (Bangbangcag, Tabiog, Palaquio, Pagala, Dugong;105 children; 5 DCC) Improvement Of Day Care Center: Bangbangcag DAY CARE CENTER 1 237,500.00 237,500.00 ongoing Tabiog 1 Palaquio 1 CAR ABRA BUCAY Pagala 2014 Improvement Of Day Care Center at Pagala DAY CARE CENTER 1 - ongoing Dugong 1 CAR ABRA BUCAY 2015 Evacuation Facility Evacuation Facility EVACUATION CENTER 1 8,000,000.00 proposed CAR ABRA BUCLOC Longsad, Lingey 2014 Construction of 100meter footbridge (Longsad, Lingey) Construction of 100meter footbridge (Longsad, Lingey) FOOT BRIDGE 2 100 meter 1,000,000.00 1,000,000.00 pipelined CAR ABRA BUCLOC Guisang, Lingey 2014 Construction of 126meter footbridge (Guisang, Lingey) Construction of 126meter footbridge (Guisang, Lingey) FOOT BRIDGE 2 126 meter 1,200,000.00 1,200,000.00 pipelined CAR ABRA BUCLOC Ducligan 2014 Construction of 142meter footbridge (Ducligan) Construction of 142meter footbridge (Ducligan) FOOT BRIDGE 1 142 meter 1,000,000.00 1,000,000.00 pipelined CAR ABRA BUCLOC Solden, Lingey 2014 Construction of 75meter footbridge (Solden, Lingey) Construction of 75meter footbridge (Solden, Lingey) FOOT BRIDGE 2 75 meter 650,000.00 650,000.00 pipelined CAR ABRA BUCLOC Kablaan, Lamao 2014 Construction of 80meter footbridge (Kablaan, Lamao) Construction of 80meter footbridge (Kablaan, Lamao) FOOT BRIDGE 2 80 meter 1,500,000.00 1,500,000.00 pipelined CAR ABRA BUCLOC Lamao 2014 Construction of Day Care Center (Lamao; 1 unit) Construction of Day Care Center (Lamao; 1 unit) DAY CARE CENTER 1 500,000.00 500,000.00 pipelined CAR ABRA BUCLOC Palali 2015 Palali Footbridge Construction Palali Footbridge Construction FOOT BRIDGE 1 2,300,000.00 TBD CAR ABRA 2015 1 CAR ABRA BUCLOC 2015 Construction of Footbridge Construction of Footbridge FOOT BRIDGE 1 1,000,000.00 TBD CAR ABRA DOLORES 2015 Protective Services - Infrastructure project: Construction of Construction of Day Care Centers*** DAY CARE CENTER 1 3,500,000.00 proposed CAR ABRA Gangit 1 CAR ABRA 1 CAR ABRA LACUB Upper Poblacion 2015 Construction of Upper Poblacion Day Care Center Construction of Upper Poblacion Day Care Center DAY CARE CENTER 1 864,000.00 TBD CAR ABRA Talampac 1 CAR ABRA Lan-ag 1 CAR ABRA LAGANGILANG Poblacion 2014 Improvement of Day Care Centers (5 DCCs: Poblacion, Improvement Of Day Care Center at Poblacion DAY CARE CENTER 1 500,000.00 500,000.00 pipelined CAR ABRA LAGANGILANG Lagben 2014 Improvement Of Day Care Center at Lagben DAY CARE CENTER 1 - pipelined CAR ABRA Tagodtod 1 CAR ABRA LAGANGILANG Aguet 2014 Improvement Of Day Care Center at Aguet DAY CARE CENTER 1 - pipelined CAR ABRA LAGANGILANG Palpalitpit 2014 Improvement Of Day Care Center at Palpalitpit DAY CARE CENTER 1 - pipelined CAR ABRA 2015 1 CAR ABRA LAGANGILANG 2015 Construction of Senior Citizen's Building Construction of Senior Citizen's Building BUILDING FACILITY 1 1,000,000.00 TBD CAR ABRA LICUAN-BAAY (LICUAN) Lenneng 2014 Rehabilitation of two (2) Day Care Centers (Lenneng, Rehabilitation of Day Care Centers -Lenneng DAY CARE CENTER 1 500,000.00 500,000.00 pipelined CAR ABRA LICUAN-BAAY (LICUAN) Subagan 2014 Rehabilitation of Day Care Centers - Subagan DAY CARE CENTER 1 - pipelined CAR ABRA 1 CAR ABRA LUBA Dagsian 2014 Repair/improvement of Dagsian Footbridge Repair/improvement of Dagsian Footbridge FOOT BRIDGE 1 200,000.00 200,000.00 ongoing CAR ABRA MALIBCONG Pacgued 2014 Construction of Day Care Center (Pacgued;265 HHs; 1 unit) Construction of Day Care Center at Pacgued DAY CARE CENTER 1 1 735,000.00 735,000.00 pipelined CAR ABRA Duldulao 2015 1 CAR ABRA MALIBCONG Gacab 2015 Construction of Mabolo (Gacab) Foot Bridge Construction of Mabolo (Gacab) Foot Bridge FOOT BRIDGE 1 1,000,000.00 pipelined CAR ABRA PILAR Poblacion, Gapang 2014 Improvement of 1km road in Poblacion Gapang Improvement of 1km road in Poblacion Gapang ROAD 2 1 kilometer 1,800,000.00 1,800,000.00 pipelined CAR ABRA PILAR 2015 Construction of Day Care Centers Repair and Construction of Day Care Centers*** DAY CARE CENTER 1 5,000,000.00 pipelined CAR ABRA Naguilian 1 CAR ABRA SALLAPADAN Sacaang 2013 Construction of 1 unit daycare center at Sacaang DAY CARE CENTER 1 - completed CAR ABRA SALLAPADAN Subusob 2014 Rehabilitation of 1.04km road Rehabilitation of 1.04km road ROAD 1 1.04 kilometer 1,155,000.00 1,155,000.00 June 2015 completed CAR ABRA SALLAPADAN Sacaang 2014 Rehabilitation of 2.4km road Rehabilitation of 4km road ROAD 1 4 kilometer 1,960,000.00 1,960,000.00 ongoing CAR Abra Tubo Wayangan 2014 Construction of footbridge in Wayangan Construction of footbridge in Wayangan FOOT BRIDGE 1 1,806,455.45 1,806,455.45 ongoing 2015 1 CAR Abra Villaviciosa 2015 Construction of ALS Community Learning Center Construction of ALS Community Learning Center BUILDING FACILITY 1 800,000.00 pipelined CAR APAYAO CONNER Malama 2014 Construction of ASC Cubet-Main Campus, Malama road Construction of ASC Cubet-Main Campus, Malama road ROAD 1 450,000.00 450,000.00 completed CAR APAYAO CONNER Daga 2014 Construction of BLMNHS, Daga road Construction of BLMNHS, Daga road ROAD 1 270,000.00 270,000.00 ongoing CAR APAYAO Tataggat,Batumbong 2 CAR APAYAO CONNER Paddig Banayu- Pigo 2014 Construction of footbridge (Paddig Banayu- Pigo) Construction of footbridge at Paddig Banayu- Pigo FOOT BRIDGE 2 850,000.00 850,000.00 ongoing CAR APAYAO CONNER Guinaang-Buguit 2014 Improvement of Guinaang-Buguit road Improvement of Guinaang-Buguit road ROAD 2 450,000.00 450,000.00 ongoing CAR APAYAO CONNER Guinamgaman 2014 Improvement of Mabaguio-Purag, Guinamgaman road Improvement of Mabaguio-Purag, Guinamgaman road ROAD 1 450,000.00 450,000.00 ongoing CAR APAYAO Puguin-Bakbakot 2 CAR APAYAO CONNER Ripang (Old Pob.) 2014 Improvement of Ripang road Improvement of Ripang road ROAD 1 900,000.00 900,000.00 ongoing CAR APAYAO CONNER Bubog-Buneg, Nabuangan 2014 Phase 1 construction of footbridge (Bubog-Buneg, Phase 1 construction of footbridge (Bubog-Buneg, FOOT BRIDGE 2 1,200,000.00 1,200,000.00 ongoing CAR APAYAO CONNER Kelpat, Cupis 2014 Phase 1 construction of footbridge (Kelpat, Cupis) Phase 1 construction of footbridge (Kelpat, Cupis) FOOT BRIDGE 2 1,200,000.00 1,200,000.00 ongoing CAR APAYAO CONNER Karikitan-Tilang 2014 Phase II-Improvement of Gassud, Karikitan to Tilang road Phase II-Improvement of Gassud, Karikitan to Tilang road FOOT BRIDGE 2 653,000.00 653,000.00 ongoing CAR APAYAO 2015 1 CAR APAYAO CONNER Paddig Banayu- Pigo 2015 Construction of Paddig Banayu-Pigo Hanging Bridge Construction of Paddig Banayu-Pigo Hanging Bridge BRIDGE 2 1,000,000.00 proposed CAR APAYAO CONNER 2015 Construction of Footbridge Phase II Construction of Footbridge Phase II FOOT BRIDGE 1 1,000,000.00 proposed CAR APAYAO CONNER 2015 Construction of Catbridge Construction of Catbridge BRIDGE 1 600,000.00 proposed CAR APAYAO FLORA 2015 Construction of Evacuation Center Construction of Evacuation Center BUILDING FACILITY 1 4,000,000.00 pipelined CAR APAYAO KABUGAO (Capital) Laco-Kumao-Baliwanan 2014 Rehabilitation of Laco-kumao-Baliwanan Foot Trail Rehabilitation of Laco-kumao-Baliwanan Foot Trail FOOT BRIDGE 3 1,275,000.00 1,275,000.00 pipelined CAR APAYAO KABUGAO (Capital) Sta. Pukaw 2014 Rehabilitation of Poblacion DCC-2, Sta. Pukaw, Poblacion Rehabilitation of Poblacion DCC, Sta. Pukaw DAY CARE CENTER 1 255,000.00 255,000.00 pipelined CAR APAYAO Poblacion 1 CAR APAYAO KABUGAO (Capital) Poblacion-Guisic 2014 Rehabilitation of Poblacion-Guisic road Rehabilitation of Poblacion-Guisic road ROAD 2 1,220,000.00 1,220,000.00 pipelined CAR APAYAO 2015 1 CAR APAYAO PUDTOL 2015 Protective Services - Infrastructure Project Protective Services - Infrastructure Project PSB 1 1,025,000.00 pipelined CAR BENGUET BAGUIO CITY 2015 Rehabilitation/Expansion/Upgrading of an Existing Infrastructure - Evacuation Center for the City of Baguio Rehabilitation/Expansion/Upgrading of Evacuation Center BUILDING FACILITY 1 3,500,000.00 pipelined CAR BENGUET 2015 1 CAR BENGUET Cabutotan 2015 1 CAR BENGUET BOKOD Poblacion 2015 Construction of Poblacion Day Care Center Construction of Poblacion Day Care Center DAY CARE CENTER 1 1,000,000.00 pipelined CAR BENGUET BUGUIAS Buyacaoan 2014 Completion of Buyacaoan Day Care Center - 500 households Completion of Buyacaoan Day Care Center - 500 households DAY CARE CENTER 1 595,000.00 595,000.00 June 2015 completed CAR BENGUET BUGUIAS Natubleng 2014 Repair of Natubleng Day Care Center - 50 households Repair of Natubleng Day Care Center - 50 households DAY CARE CENTER 1 127,500.00 127,500.00 June 2015 completed CAR BENGUET BUGUIAS 2015 Construction of Social Protection Center Construction of Social Protection Center BUILDING FACILITY 1 2,350,000.00 pipelined CAR BENGUET Abatan 2015 1 CAR BENGUET BUGUIAS JNR-Sinipsip-Maalad-Nabalicong 2015 Improvement of JNR-Sinipsip-Maalad-Nabalicong Road (Nansabatan Section) Improvement of JNR-Sinipsip-Maalad-Nabalicong Road (Nansabatan Section) ROAD 4 500,000.00 pipelined CAR BENGUET BUGUIAS Kimpit 2015 Construction of Kimpit Day Care Center Construction of Kimpit Day Care Center DAY CARE CENTER 1 650,000.00 pipelined CAR BENGUET KABAYAN Pacso, Ballay Proper, Adaoay, Tenaleb Bally 2014 Day Care Center - Pacso, Balla Proper, Adaoay, Tenaleb Rehabilitation of Day Care Center - Pacso DAY CARE CENTER 4 1,900,000.00 1,900,000.00 ongoing CAR BENGUET KABAYAN Ballay Proper 2014 Rehabilitation of Day Care Center - Balla Proper DAY CARE CENTER 1 - completed CAR BENGUET Adaoay 1 CAR BENGUET Tenaleb 1 CAR BENGUET KABAYAN Abuyon 2014 Rehabilitation of Day Care Center - Abuyon DAY CARE CENTER 1 pipelined CAR BENGUET 2015 1 CAR BENGUET KIBUNGAN Tacadang 2015 Construction of a Sanitary Toilet for the Tacadang National Construction of a Sanitary Toilet for the Tacadang National SANITARY FACILITY 1 500,000.00 proposed CAR BENGUET LA TRINIDAD (Capital) 2015 Construction of Women Crisis Center (with designated room Construction of Women Crisis Center BUILDING FACILITY 1 2,500,000.00 proposed CAR BENGUET MANKAYAN Mogao 2014 Construction of Mogao Day care Center Construction of Mogao Day care Center DAY CARE CENTER 1 300,000.00 300,000.00 June 2015 completed CAR BENGUET Palatong 1 CAR BENGUET MANKAYAN Guinaoang 2014 Repair of Guinaoang Day Care Centers Repair of Guinaoang Day Care Centers DAY CARE CENTER 1 200,000.00 200,000.00 June 2015 completed CAR BENGUET MANKAYAN Poblacion 5 2014 Improvement of Day Care Centers Improvement of Day Care Centers DAY CARE CENTER 1 200,000.00 200,000.00 June 2015 completed CAR BENGUET Cabiten 1 CAR BENGUET MANKAYAN Lap-angan 2014 Lap-angan Day Care Center Improvement Lap-angan Day Care Center Improvement DAY CARE CENTER 1 300,000.00 300,000.00 June 2015 completed CAR BENGUET Colalo 1 CAR BENGUET MANKAYAN Agaki 2015 Agaki Water Source Protection Agaki Water Source Protection Phase I (Canal and Fencing) WATER SYSTEM 1 500,000.00 pipelined CAR BENGUET SABLAN 2015 Footbridge Footbridge FOOT BRIDGE 1 1,440,000.00 pipelined CAR BENGUET TUBLAY Belong-Sayatan 2014 Construction of Day Care Center at Sitio Belong-Sayatan Construction of Day Care Center at Sitio Belong-Sayatan DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed CAR BENGUET TUBLAY King Solomon, Ambassador 2014 Construction of Day Care Centers at Sitio King Solomon Construction of Day Care Centers at Sitio King Solomon DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed CAR BENGUET TUBLAY Mamuyod, Ambassador 2014 Construction of Day Care Centers at Sitio Mamuyod Construction of Day Care Centers at Sitio Mamuyod DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed CAR IFUGAO AGUINALDO 2015 Construction of CICL - Women Crisis Center Construction of CICL - Women Crisis Center BUILDING FACILITY 1 1,500,000.00 proposed CAR IFUGAO ASIPULO Siku-Luum 2014 Concreting of Siku-Luum Road Concreting of Siku-Luum Road ROAD 2 1,350,000.00 1,350,000.00 June 2015 completed CAR IFUGAO 2 CAR IFUGAO ASIPULO Mayubba-Panacligan 2014 Improvement of Mayubba-Panacligan road Improvement of Mayubba-Panacligan road ROAD 2 450,000.00 450,000.00 pipelined CAR IFUGAO ASIPULO Nunteg-Tuyong 2014 Improvement of Nunteg-Tuyong Road Improvement of Nunteg-Tuyong Road ROAD 2 360,000.00 360,000.00 June 2015 completed CAR IFUGAO ASIPULO Tinoc 2014 Improvement of Taaw mun . Nursery access road Improvement of Taaw mun . Nursery access road (haliap) ROAD 1 450,000.00 450,000.00 June 2015 completed CAR IFUGAO ASIPULO Uggew-Ungol 2014 Improvement of uggew-ungol Road Improvement of uggew-ungol Road ROAD 2 1,800,000.00 1,800,000.00 June 2015 completed CAR IFUGAO HINGYON Hulungan/Mompolia - Luhadan 2014 Opening of Umalbong - Hulungan/Mompolia - Luhadan road Opening of Umalbong - Hulungan/Mompolia - Luhadan road ROAD 3 500,000.00 500,000.00 ongoing CAR IFUGAO HUNGDUAN Hagonghong 2015 Hagonghong Junction to Hallagan Access Trail Improvement Hagonghong Junction to Hallagan Access Trail Improvement TRAIL WAY 1 500,000.00 proposed CAR IFUGAO HUNGDUAN Magalo-Balyagan 2015 Magalo-Balyagan Access Trail Improvement Magalo-Balyagan Access Trail Improvement TRAIL WAY 2 500,000.00 proposed

Upload: others

Post on 20-Oct-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of KALAHI-CIDSS Subprojects - BUB

List of KALAHI-CIDSS Subprojects - BUBas of September 2015

Region Province Municipality Barangay Phase / Cycle Sub-Project NameValidated SP Name

(Actual Project Title)Project Type No. Of Bgys No. Of HH Physical Target Unit BUB Amount LCC Amount Total Amount Date Started Date of Completion Status

ARMM Lanao Del Sur Lumbaca-Unayan 2015 Protective Services: Infrastructure Projects - Construction of

Day Care Center

Protective Services: Infrastructure Projects - Construction of

Day Care CenterDAY CARE CENTER 1 3,446,572.00 TBD

ARMM Lanao Del Sur Lumbayanague 2015 Protective Services: Infrastructure Projects - Construction of

Day Care Center

Protective Services: Infrastructure Projects - Construction of

Day Care CenterDAY CARE CENTER 1 1,300,000.00 TBD

ARMM Lanao Del Sur Maguing 2015 Protective Services: Infrastructure Projects - Construction of

Day Care Center

Protective Services: Infrastructure Projects - Construction of

Day Care CenterDAY CARE CENTER 1 3,000,000.00 TBD

ARMM Lanao Del Sur Masiu 2015 Protective Services: Infrastructure Projects Protective Services: Infrastructure Projects PSB 1 500,000.00 TBD

ARMM Lanao Del Sur Tamparan 2015 Protective Services: Infrastructure Projects - Construction of

Group Handwashing Facility in Day Care Centers

Protective Services: Infrastructure Projects - Construction of

Group Handwashing Facility in Day Care CentersDAY CARE CENTER 1 5,028,000.00 TBD

ARMM Lanao Del Sur Tugaya 2015 Protective Services: Infrastructure Projects - Construction of

Day Care Center

Protective Services: Infrastructure Projects - Construction of

Day Care CenterDAY CARE CENTER 1 1,000,000.00 TBD

ARMM Lanao Del Sur Tugaya 2015 Protective Services: Infrastructure Projects - Cosntruction of

Women Crisis Center

Protective Services: Infrastructure Projects - Cosntruction of

Women Crisis CenterBUILDING FACILITY 1 1,000,000.00 TBD

ARMM Maguindanao SULTAN KUDARAT (NULING) Dalumangcob (Pob.) 2013 Construction of Livelihood Training Center Construction of Livelihood Training Center BUILDING FACILITY 1 136.99 meter2 1,500,000.00 - 1,500,000.00 March 2015 completed

ARMM MaguindanaoSHARIFF AGUAK (MAGANOY)

(Capital)2015 Protective Services: Infrastructure Projects - Construction of

Evacuation Center

Protective Services: Infrastructure Projects - Construction of

Evacuation CenterBUILDING FACILITY 1 3,000,000.00 TBD

ARMM Maguindanao Upi 2015 Protective Services: Infrastructure Projects - Cosntruction of

Municipal Crisis Center

Protective Services: Infrastructure Projects - Cosntruction of

Municipal Crisis CenterBUILDING FACILITY 1 1,500,000.00 proposed

ARMM Basilan Sumisip

Bacung

Baiwas

Basak

Benembengan Lower

Benembengan Upper

Bohe-languyan

Buli-buli

Cabcaban

Cabengbeng Lower

Cabengbeng Upper

Ettub-ettub

Guiong

Kaum-Air

Kaumpamatsakem

Libug

Limbocandis

Lukketon

Luuk-Bait

Mahatalang

Manaul

Mangal (Pob.)

Marang

Mebak

Sahaya Bohe Bato

Sapah Bulak

Sumisip Central

2014 Sports Facilities Provision Sports Equipment to Youth Groups BUILDING FACILITY 29 2 250,000.00 250,000.00 pipelined

ARMM Maguindanao GEN. S. K. PENDATUN Upper Lansangan 2014 Construction of Basic access Infastructure Construction of Foot Bridge FOOT BRIDGE 1 17 meters 1,000,000.00 50,000.00 1,050,000.00 pipelined

ARMM Sulu JOLO (Capital) 2015 Construction of Municipal Evacuation Center Construction of Municipal Evacuation Center BUILDING FACILITY 1 19,000,000.00 proposed

ARMM SuluPANGLIMA ESTINO (NEW

PANAMAO)2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 3,500,000.00 TBD

ARMM SULU PATIKUL 2015 Skills Training Center with Materials Skills Training Center with Materials PSB 1 1,500,000.00 TBD

ARMM SULU PATIKUL 2015 Evacuation Center with Facilities Evacuation Center with Facilities BUILDING FACILITY 1 5,000,000.00 TBD

ARMM SULU TALIPAO Kabatuhan, Bilaan 2014Community Demand Driven Development through

Community Development AssistanceConstruction of Barangay Health Station BUILDING FACILITY 2 7,500,000.00 7,500,000.00 pipelined

ARMM SULU TALIPAO Kabatuhan, Bilaan 2014 Contruction of Community Learning Center BUILDING FACILITY 2 pipelinedARMM SULU TALIPAO Lower Kamuntayan 2014 Contruction of Community Learning Center BUILDING FACILITY 1 pipelinedARMM SULU TALIPAO Lower Kamuntayan 2014 Construction of 1 CL School Building SCHOOL BUILDING 1 pipelinedARMM SULU TALIPAO Bandang 2014 Construction of Elementary Stage SCHOOL FACILITY 1 pipelinedARMM SULU TALIPAO Bandang 2014 Rehabilitation of 3 CL Unit School Building SCHOOL BUILDING 1 pipelinedARMM SULU TALIPAO Bandang 2014 Construction of Barangay Health Station HEALTH CENTER 1 pipelinedARMM SULU TALIPAO Tiis 2014 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedARMM SULU TALIPAO Tiis 2014 Construction of Barangay Health Station HEALTH CENTER 1 pipelinedARMM SULU TALIPAO Dalih 2014 Construction of Barangay Health Station HEALTH CENTER 1 pipelinedARMM SULU TALIPAO Dalih 2014 Contruction of Community Learning Center BUILDING FACILITY 1 pipelinedARMM SULU TALIPAO 2015 Construction of Day Care Centers with Facilities Construction of Day Care Centers with Facilities DAY CARE CENTER 1 6,600,000.00 TBD

ARMM SULU TALIPAO 2015 Community Demand Driven Development through

Community Development Assistance

Community Demand Driven Development through

Community Development AssistancePSB 1 7,625,000.00 TBD

ARMM TAWI-TAWI BONGAO (Capital)languyan, languyan meron

bogao, languyan wala2014

(Non-Menu ) Capacity building for Csos, Pos and Basic

Sectors on Organizational and Financial Management.

Registration/ Accreditation to different agencies and LGU

special Bodies.

Capability Enhancement and values formation for Senior

Citizens and mentoring of parentsPSB 4 500,000.00 500,000.00 pipelined

CAR ABRA BUCAY Bangbangcag 2014Improvement of Day Care Center (Bangbangcag, Tabiog,

Palaquio, Pagala, Dugong;105 children; 5 DCC)Improvement Of Day Care Center: Bangbangcag DAY CARE CENTER 1 237,500.00 237,500.00 ongoing

CAR ABRA BUCAY Tabiog 2014 Improvement Of Day Care Center at Tabiog DAY CARE CENTER 1 - ongoing

CAR ABRA BUCAY Palaquio 2014 Improvement Of Day Care Center at Palaquio DAY CARE CENTER 1 - ongoing

CAR ABRA BUCAY Pagala 2014 Improvement Of Day Care Center at Pagala DAY CARE CENTER 1 - ongoing

CAR ABRA BUCAY Dugong 2014 Improvement Of Day Care Center at Dugong DAY CARE CENTER 1 - pipelined

CAR ABRA BUCAY 2015 Evacuation Facility Evacuation Facility EVACUATION CENTER 1 8,000,000.00 proposed

CAR ABRA BUCLOC Longsad, Lingey 2014 Construction of 100meter footbridge (Longsad, Lingey) Construction of 100meter footbridge (Longsad, Lingey) FOOT BRIDGE 2 100 meter 1,000,000.00 1,000,000.00 pipelined

CAR ABRA BUCLOC Guisang, Lingey 2014 Construction of 126meter footbridge (Guisang, Lingey) Construction of 126meter footbridge (Guisang, Lingey) FOOT BRIDGE 2 126 meter 1,200,000.00 1,200,000.00 pipelined

CAR ABRA BUCLOC Ducligan 2014 Construction of 142meter footbridge (Ducligan) Construction of 142meter footbridge (Ducligan) FOOT BRIDGE 1 142 meter 1,000,000.00 1,000,000.00 pipelined

CAR ABRA BUCLOC Solden, Lingey 2014 Construction of 75meter footbridge (Solden, Lingey) Construction of 75meter footbridge (Solden, Lingey) FOOT BRIDGE 2 75 meter 650,000.00 650,000.00 pipelined

CAR ABRA BUCLOC Kablaan, Lamao 2014 Construction of 80meter footbridge (Kablaan, Lamao) Construction of 80meter footbridge (Kablaan, Lamao) FOOT BRIDGE 2 80 meter 1,500,000.00 1,500,000.00 pipelined

CAR ABRA BUCLOC Lamao 2014 Construction of Day Care Center (Lamao; 1 unit) Construction of Day Care Center (Lamao; 1 unit) DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

CAR ABRA BUCLOC Palali 2015 Palali Footbridge Construction Palali Footbridge Construction FOOT BRIDGE 1 2,300,000.00 TBDCAR ABRA BUCLOC 2015 Rehabilitation of Day Care Center Rehabilitation of Day Care Center DAY CARE CENTER 1 400,000.00 TBDCAR ABRA BUCLOC 2015 Construction of Footbridge Construction of Footbridge FOOT BRIDGE 1 1,000,000.00 TBD

CAR ABRA DOLORES 2015 Protective Services - Infrastructure project: Construction of

Day Care CentersConstruction of Day Care Centers*** DAY CARE CENTER 1 3,500,000.00 proposed

CAR ABRA LACUB Gangit 2014 Construction of Gangit footbridge Construction of Gangit footbridge FOOT BRIDGE 1 800,000.00 800,000.00 pipelinedCAR ABRA LACUB 2014 Construction of footpath Construction of footpath FOOT BRIDGE 1 600,000.00 600,000.00 pipelinedCAR ABRA LACUB Upper Poblacion 2015 Construction of Upper Poblacion Day Care Center Construction of Upper Poblacion Day Care Center DAY CARE CENTER 1 864,000.00 TBDCAR ABRA LACUB Talampac 2015 Construction of Talampac Day Care Center Construction of Talampac Day Care Center DAY CARE CENTER 1 864,000.00 TBDCAR ABRA LACUB Lan-ag 2015 Construction of lan-ag Day Care Center Construction of lan-ag Day Care Center DAY CARE CENTER 1 864,000.00 TBD

CAR ABRA LAGANGILANG Poblacion 2014Improvement of Day Care Centers (5 DCCs: Poblacion,

Lagben, Tagodtod, Aguet, Palpalitpit)Improvement Of Day Care Center at Poblacion DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

CAR ABRA LAGANGILANG Lagben 2014 Improvement Of Day Care Center at Lagben DAY CARE CENTER 1 - pipelinedCAR ABRA LAGANGILANG Tagodtod 2014 Improvement Of Day Care Center at Tagodtod DAY CARE CENTER 1 - pipelinedCAR ABRA LAGANGILANG Aguet 2014 Improvement Of Day Care Center at Aguet DAY CARE CENTER 1 - pipelinedCAR ABRA LAGANGILANG Palpalitpit 2014 Improvement Of Day Care Center at Palpalitpit DAY CARE CENTER 1 - pipelinedCAR ABRA LAGANGILANG 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 3,000,000.00 TBDCAR ABRA LAGANGILANG 2015 Construction of Senior Citizen's Building Construction of Senior Citizen's Building BUILDING FACILITY 1 1,000,000.00 TBD

CAR ABRA LICUAN-BAAY (LICUAN) Lenneng 2014Rehabilitation of two (2) Day Care Centers (Lenneng,

Subagan)Rehabilitation of Day Care Centers -Lenneng DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

CAR ABRA LICUAN-BAAY (LICUAN) Subagan 2014 Rehabilitation of Day Care Centers - Subagan DAY CARE CENTER 1 - pipelinedCAR ABRA LUBA 2014 2km road improvement 2km road improvement ROAD 1 1,000,000.00 1,000,000.00 ongoingCAR ABRA LUBA Dagsian 2014 Repair/improvement of Dagsian Footbridge Repair/improvement of Dagsian Footbridge FOOT BRIDGE 1 200,000.00 200,000.00 ongoing

CAR ABRA MALIBCONG Pacgued 2014 Construction of Day Care Center (Pacgued;265 HHs; 1 unit) Construction of Day Care Center at Pacgued DAY CARE CENTER 1 1 735,000.00 735,000.00 pipelined

CAR ABRA MALIBCONG Duldulao 2015 Construction of Duldulao Foot Bridge Construction of Duldulao Foot Bridge FOOT BRIDGE 1 1,200,000.00 pipelinedCAR ABRA MALIBCONG Gacab 2015 Construction of Mabolo (Gacab) Foot Bridge Construction of Mabolo (Gacab) Foot Bridge FOOT BRIDGE 1 1,000,000.00 pipelined

CAR ABRA PILAR Poblacion, Gapang 2014 Improvement of 1km road in Poblacion Gapang Improvement of 1km road in Poblacion Gapang ROAD 2 1 kilometer 1,800,000.00 1,800,000.00 pipelined

CAR ABRA PILAR 2015 Construction of Day Care Centers Repair and Construction of Day Care Centers*** DAY CARE CENTER 1 5,000,000.00 pipelinedCAR ABRA SALLAPADAN Naguilian 2013 Construction of daycare center Construction of 1 unit daycare center at Naguilian DAY CARE CENTER 1 1,000,000.00 1,000,000.00 completedCAR ABRA SALLAPADAN Sacaang 2013 Construction of 1 unit daycare center at Sacaang DAY CARE CENTER 1 - completed

CAR ABRA SALLAPADAN Subusob 2014 Rehabilitation of 1.04km road Rehabilitation of 1.04km road ROAD 1 1.04 kilometer 1,155,000.00 1,155,000.00 June 2015 completed

CAR ABRA SALLAPADAN Sacaang 2014 Rehabilitation of 2.4km road Rehabilitation of 4km road ROAD 1 4 kilometer 1,960,000.00 1,960,000.00 ongoing

CAR Abra Tubo Wayangan 2014 Construction of footbridge in Wayangan Construction of footbridge in Wayangan FOOT BRIDGE 1 1,806,455.45 1,806,455.45 ongoing

CAR Abra Villaviciosa 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 1,200,000.00 pipelined

CAR Abra Villaviciosa 2015 Construction of ALS Community Learning Center Construction of ALS Community Learning Center BUILDING FACILITY 1 800,000.00 pipelined

CAR APAYAO CONNER Malama 2014 Construction of ASC Cubet-Main Campus, Malama road Construction of ASC Cubet-Main Campus, Malama road ROAD 1 450,000.00 450,000.00 completed

CAR APAYAO CONNER Daga 2014 Construction of BLMNHS, Daga road Construction of BLMNHS, Daga road ROAD 1 270,000.00 270,000.00 ongoingCAR APAYAO CONNER Tataggat,Batumbong 2014 Construction of Calafug, Tataggat to Batumbong Construction of Calafug, Tataggat to Batumbong BUILDING FACILITY 2 900,000.00 900,000.00 ongoing

CAR APAYAO CONNER Paddig Banayu- Pigo 2014 Construction of footbridge (Paddig Banayu- Pigo) Construction of footbridge at Paddig Banayu- Pigo FOOT BRIDGE 2 850,000.00 850,000.00 ongoing

CAR APAYAO CONNER Guinaang-Buguit 2014 Improvement of Guinaang-Buguit road Improvement of Guinaang-Buguit road ROAD 2 450,000.00 450,000.00 ongoing

CAR APAYAO CONNER Guinamgaman 2014 Improvement of Mabaguio-Purag, Guinamgaman road Improvement of Mabaguio-Purag, Guinamgaman road ROAD 1 450,000.00 450,000.00 ongoing

CAR APAYAO CONNER Puguin-Bakbakot 2014 Improvement of Puguin-Bakbakot road Improvement of Puguin-Bakbakot road ROAD 2 180,000.00 180,000.00 ongoingCAR APAYAO CONNER Ripang (Old Pob.) 2014 Improvement of Ripang road Improvement of Ripang road ROAD 1 900,000.00 900,000.00 ongoing

CAR APAYAO CONNER Bubog-Buneg, Nabuangan 2014Phase 1 construction of footbridge (Bubog-Buneg,

Nabuangan)

Phase 1 construction of footbridge (Bubog-Buneg,

Nabuangan)FOOT BRIDGE 2 1,200,000.00 1,200,000.00 ongoing

CAR APAYAO CONNER Kelpat, Cupis 2014 Phase 1 construction of footbridge (Kelpat, Cupis) Phase 1 construction of footbridge (Kelpat, Cupis) FOOT BRIDGE 2 1,200,000.00 1,200,000.00 ongoing

CAR APAYAO CONNER Karikitan-Tilang 2014Phase II-Improvement of Gassud, Karikitan to Tilang road

and construction of footbridge

Phase II-Improvement of Gassud, Karikitan to Tilang road

and construction of footbridgeFOOT BRIDGE 2 653,000.00 653,000.00 ongoing

CAR APAYAO CONNER 2015 Construction of Day Care Center Phase I Construction of Day Care Center Phase I DAY CARE CENTER 1 500,000.00 proposed

CAR APAYAO CONNER Paddig Banayu- Pigo 2015 Construction of Paddig Banayu-Pigo Hanging Bridge Construction of Paddig Banayu-Pigo Hanging Bridge BRIDGE 2 1,000,000.00 proposed

CAR APAYAO CONNER 2015 Construction of Footbridge Phase II Construction of Footbridge Phase II FOOT BRIDGE 1 1,000,000.00 proposedCAR APAYAO CONNER 2015 Construction of Catbridge Construction of Catbridge BRIDGE 1 600,000.00 proposedCAR APAYAO FLORA 2015 Construction of Evacuation Center Construction of Evacuation Center BUILDING FACILITY 1 4,000,000.00 pipelined

CAR APAYAO KABUGAO (Capital) Laco-Kumao-Baliwanan 2014 Rehabilitation of Laco-kumao-Baliwanan Foot Trail Rehabilitation of Laco-kumao-Baliwanan Foot Trail FOOT BRIDGE 3 1,275,000.00 1,275,000.00 pipelined

CAR APAYAO KABUGAO (Capital) Sta. Pukaw 2014 Rehabilitation of Poblacion DCC-2, Sta. Pukaw, Poblacion Rehabilitation of Poblacion DCC, Sta. Pukaw DAY CARE CENTER 1 255,000.00 255,000.00 pipelined

CAR APAYAO KABUGAO (Capital) Poblacion 2014 Rehabilitation of Poblacion DCC, Poblacion DAY CARE CENTER 1 - pipelinedCAR APAYAO KABUGAO (Capital) Poblacion-Guisic 2014 Rehabilitation of Poblacion-Guisic road Rehabilitation of Poblacion-Guisic road ROAD 2 1,220,000.00 1,220,000.00 pipelinedCAR APAYAO KABUGAO (Capital) 2015 Construction of Footbridges Construction of Footbridges FOOT BRIDGE 1 1,180,000.00 pipelinedCAR APAYAO PUDTOL 2015 Protective Services - Infrastructure Project Protective Services - Infrastructure Project PSB 1 1,025,000.00 pipelined

CAR BENGUET BAGUIO CITY 2015 Rehabilitation/Expansion/Upgrading of an Existing

Infrastructure - Evacuation Center for the City of BaguioRehabilitation/Expansion/Upgrading of Evacuation Center BUILDING FACILITY 1 3,500,000.00 pipelined

CAR BENGUET BAGUIO CITY 2015 Upgrading of Senior Citizen's Center Upgrading of Senior Citizen's Center BUILDING FACILITY 1 2,300,000.00 pipelinedCAR BENGUET BAKUN Cabutotan 2015 Improvement of Cabutotan Day Care Center Improvement of Cabutotan Day Care Center DAY CARE CENTER 1 500,000.00 pipelinedCAR BENGUET BOKOD Poblacion 2015 Construction of Poblacion Day Care Center Construction of Poblacion Day Care Center DAY CARE CENTER 1 1,000,000.00 pipelined

CAR BENGUET BUGUIAS Buyacaoan 2014 Completion of Buyacaoan Day Care Center - 500 households Completion of Buyacaoan Day Care Center - 500 households DAY CARE CENTER 1 595,000.00 595,000.00 June 2015 completed

CAR BENGUET BUGUIAS Natubleng 2014 Repair of Natubleng Day Care Center - 50 households Repair of Natubleng Day Care Center - 50 households DAY CARE CENTER 1 127,500.00 127,500.00 June 2015 completed

CAR BENGUET BUGUIAS 2015 Construction of Social Protection Center Construction of Social Protection Center BUILDING FACILITY 1 2,350,000.00 pipelinedCAR BENGUET BUGUIAS Abatan 2015 Construction of Abatan Barangay Health Center Construction of Abatan Barangay Health Center BUILDING FACILITY 1 1,000,000.00 pipelined

CAR BENGUET BUGUIAS JNR-Sinipsip-Maalad-Nabalicong 2015 Improvement of JNR-Sinipsip-Maalad-Nabalicong Road

(Nansabatan Section)

Improvement of JNR-Sinipsip-Maalad-Nabalicong Road

(Nansabatan Section)ROAD 4 500,000.00 pipelined

CAR BENGUET BUGUIAS Kimpit 2015 Construction of Kimpit Day Care Center Construction of Kimpit Day Care Center DAY CARE CENTER 1 650,000.00 pipelined

CAR BENGUET KABAYAN Pacso, Ballay Proper, Adaoay, Tenaleb Bally 2014Day Care Center - Pacso, Balla Proper, Adaoay, Tenaleb

BallayRehabilitation of Day Care Center - Pacso DAY CARE CENTER 4 1,900,000.00 1,900,000.00 ongoing

CAR BENGUET KABAYAN Ballay Proper 2014 Rehabilitation of Day Care Center - Balla Proper DAY CARE CENTER 1 - completedCAR BENGUET KABAYAN Adaoay 2014 Rehabilitation of Day Care Center - Adaoay DAY CARE CENTER 1 - ongoingCAR BENGUET KABAYAN Tenaleb 2014 Rehabilitation of Day Care Center - Tenaleb Ballay DAY CARE CENTER 1 - ongoingCAR BENGUET KABAYAN Abuyon 2014 Rehabilitation of Day Care Center - Abuyon DAY CARE CENTER 1 pipelinedCAR BENGUET KABAYAN 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 600,000.00 proposed

CAR BENGUET KIBUNGAN Tacadang 2015 Construction of a Sanitary Toilet for the Tacadang National

High School

Construction of a Sanitary Toilet for the Tacadang National

High SchoolSANITARY FACILITY 1 500,000.00 proposed

CAR BENGUET LA TRINIDAD (Capital) 2015 Construction of Women Crisis Center (with designated room

for each of abused women and child-girl)Construction of Women Crisis Center BUILDING FACILITY 1 2,500,000.00 proposed

CAR BENGUET MANKAYAN Bedbed 2014 Improvement of Day Care Center Improvement of Day Care Center DAY CARE CENTER 1 60,000.00 60,000.00 June 2015 completedCAR BENGUET MANKAYAN Mogao 2014 Construction of Mogao Day care Center Construction of Mogao Day care Center DAY CARE CENTER 1 300,000.00 300,000.00 June 2015 completedCAR BENGUET MANKAYAN Palatong 2014 Improvement of Palatong Day care Center Improvement of Palatong Day care Center DAY CARE CENTER 1 50,000.00 50,000.00 June 2015 completedCAR BENGUET MANKAYAN Guinaoang 2014 Repair of Guinaoang Day Care Centers Repair of Guinaoang Day Care Centers DAY CARE CENTER 1 200,000.00 200,000.00 June 2015 completedCAR BENGUET MANKAYAN Poblacion 5 2014 Improvement of Day Care Centers Improvement of Day Care Centers DAY CARE CENTER 1 200,000.00 200,000.00 June 2015 completedCAR BENGUET MANKAYAN Cabiten 2014 Improvement of Cabiten Day Care Center Improvement of Cabiten Day Care Center DAY CARE CENTER 1 400,000.00 400,000.00 June 2015 completedCAR BENGUET MANKAYAN Lap-angan 2014 Lap-angan Day Care Center Improvement Lap-angan Day Care Center Improvement DAY CARE CENTER 1 300,000.00 300,000.00 June 2015 completedCAR BENGUET MANKAYAN Colalo 2014 Colalo Day Care Center Improvement Colalo Day Care Center Improvement DAY CARE CENTER 1 300,000.00 300,000.00 June 2015 completed

CAR BENGUET MANKAYAN Agaki 2015 Agaki Water Source Protection Agaki Water Source Protection Phase I (Canal and Fencing) WATER SYSTEM 1 500,000.00 pipelined

CAR BENGUET SABLAN 2015 Footbridge Footbridge FOOT BRIDGE 1 1,440,000.00 pipelined

CAR BENGUET TUBLAY Belong-Sayatan 2014 Construction of Day Care Center at Sitio Belong-Sayatan Construction of Day Care Center at Sitio Belong-Sayatan DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed

CAR BENGUET TUBLAY King Solomon, Ambassador 2014 Construction of Day Care Centers at Sitio King Solomon Construction of Day Care Centers at Sitio King Solomon DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed

CAR BENGUET TUBLAY Mamuyod, Ambassador 2014 Construction of Day Care Centers at Sitio Mamuyod Construction of Day Care Centers at Sitio Mamuyod DAY CARE CENTER 2 475,000.00 475,000.00 June 2015 completed

CAR IFUGAO AGUINALDO 2015 Construction of CICL - Women Crisis Center Construction of CICL - Women Crisis Center BUILDING FACILITY 1 1,500,000.00 proposed

CAR IFUGAO ASIPULO Siku-Luum 2014 Concreting of Siku-Luum Road Concreting of Siku-Luum Road ROAD 2 1,350,000.00 1,350,000.00 June 2015 completedCAR IFUGAO ASIPULO Baggu- Witig 2014 Improvement of Baggu- Witig road Improvement of Baggu- Witig road ROAD 2 900,000.00 900,000.00 June 2015 completedCAR IFUGAO ASIPULO Mayubba-Panacligan 2014 Improvement of Mayubba-Panacligan road Improvement of Mayubba-Panacligan road ROAD 2 450,000.00 450,000.00 pipelinedCAR IFUGAO ASIPULO Nunteg-Tuyong 2014 Improvement of Nunteg-Tuyong Road Improvement of Nunteg-Tuyong Road ROAD 2 360,000.00 360,000.00 June 2015 completed

CAR IFUGAO ASIPULO Tinoc 2014 Improvement of Taaw mun . Nursery access road Improvement of Taaw mun . Nursery access road (haliap) ROAD 1 450,000.00 450,000.00 June 2015 completed

CAR IFUGAO ASIPULO Uggew-Ungol 2014 Improvement of uggew-ungol Road Improvement of uggew-ungol Road ROAD 2 1,800,000.00 1,800,000.00 June 2015 completed

CAR IFUGAO HINGYON Hulungan/Mompolia - Luhadan 2014 Opening of Umalbong - Hulungan/Mompolia - Luhadan road Opening of Umalbong - Hulungan/Mompolia - Luhadan road ROAD 3 500,000.00 500,000.00 ongoing

CAR IFUGAO HUNGDUAN Hagonghong 2015 Hagonghong Junction to Hallagan Access Trail Improvement Hagonghong Junction to Hallagan Access Trail Improvement TRAIL WAY 1 500,000.00 proposed

CAR IFUGAO HUNGDUAN Magalo-Balyagan 2015 Magalo-Balyagan Access Trail Improvement Magalo-Balyagan Access Trail Improvement TRAIL WAY 2 500,000.00 proposed

Page 2: List of KALAHI-CIDSS Subprojects - BUB

CAR IFUGAO LAMUT Bannit 2014Completion of Day Care Centers - Bannit Payawan, Bulao

Sanafe, Lower Lucban

Completion of Day Care Centers - Bannit Payawan, Bulao

Sanafe, Lower LucbanDAY CARE CENTER 1 427,500.00 427,500.00 June 2015 completed

CAR IFUGAO LAMUT Landing 2014Construction of Day Care Centers - Landing Hapid,

Panopdopan prop., Dilan Payawan, Payawan Prop., Pulaan

Bimpal

Construction of Day Care Centers - Landing Hapid,

Panopdopan prop., Dilan Payawan, Payawan Prop., Pulaan

Bimpal

DAY CARE CENTER 1 2,375,000.00 2,375,000.00 June 2015 completed

CAR IFUGAO LAMUT Halimutoc 2014Rehabilitation of Day Care Centers -halimutoc, Jolowon

Proper, Lawig ProperRehabilitation of Day Care Centers -Halimutoc DAY CARE CENTER 1 285,000.00 285,000.00 June 2015 completed

CAR IFUGAO LAMUT Jolowon Proper 2014 Rehabilitation of Day Care Centers, Jolowon Proper DAY CARE CENTER 1 - completed

CAR IFUGAO LAMUT Lawig Proper 2014 Rehabilitation of Day Care Centers, Lawig Proper DAY CARE CENTER 1 - completedCAR KALINGA BALBALAN Pulay 2015 Pulay Foot Path Pulay Foot Path FOOT BRIDGE 1 500,000.00 proposedCAR KALINGA BALBALAN Bassao 2015 Concreting of Bassao Pathway Concreting of Bassao Pathway PATHWAY 1 500,000.00 proposedCAR KALINGA BALBALAN Mt. Calvary 2015 Concreting of Mt. Calvary Footpath Concreting of Mt. Calvary Footpath FOOT BRIDGE 1 600,000.00 proposedCAR KALINGA BALBALAN Bonong and Tawang 2015 Construction of Bonong & Tawang Proper Construction of Bonong & Tawang Proper BUILDING FACILITY 2 500,000.00 proposed

CAR Kalinga Lubuagan 2014 Rehabilitation/Improvement of Day Care Center Kitchen Rehabilitation/Improvement of Day Care Center Kitchen DAY CARE CENTER 1 1 150,000.00 150,000.00 June 2015 completed

CAR Kalinga Lubuagan Lower Uma 2014 Rehabilitation/Improvement of Lower Uma Day Care center Rehabilitation/Improvement of Lower Uma Day Care center DAY CARE CENTER 1 100,000.00 100,000.00 June 2015 completed

CAR Kalinga Pasil 2013Conduct of Community Driven

Entrepreneurship Development Training

Conduct of Community Driven

Entrepreneurship Development TrainingTRAINING 1 129,000.00 129,000.00 completed

CAR Kalinga Pasil Dalupa 2014 Improvement of Dalupa Road Improvement of Dalupa Road ROAD 1 1,000,000.00 1,000,000.00 ongoing

CAR Kalinga Pinukpuk Penepec, Baay 2014 Construction of 1 Unit Day Care Center : Penepec, Baay Construction of 1 Unit Day Care Center at Penepec, Baay DAY CARE CENTER 2 500,000.00 500,000.00 pipelined

CAR Kalinga Pinukpuk Pong-ad,Taga 2014 Construction of 1 Unit Day Care Center : Pong-ad, Taga Construction of 1 Unit Day Care Center at Pong-ad, Taga DAY CARE CENTER 2 150,000.00 150,000.00 pipelined

CAR Kalinga Pinukpuk Ballayangon East 2014Construction of 2 Units Day Care Center : Ballayangon East

and WestConstruction of 1 Units Day Care Center at Ballayangon East DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

CAR Kalinga Pinukpuk Ballayangon West 2014 Construction of 1 Unit Day Care Center at Ballayangon West DAY CARE CENTER 1 - pipelined

CAR Kalinga Pinukpuk 2014 Construction of Concrete Tire Path Construction of Concrete Tire Path* PATHWAY 1 500,000.00 500,000.00 pipelined

CAR Kalinga Pinukpuk 2014 Repair of 2 Classrooms Repair of 2 Classrooms* SCHOOL FACILITY 1 - pipelined

CAR Kalinga Pinukpuk 2014 Continuation of road Continuation of road ROAD 1 350,000.00 350,000.00 pipelined

CAR Kalinga Pinukpuk 2014 Continuation of road Continuation of road ROAD 1 500,000.00 500,000.00 pipelined

CAR Kalinga Pinukpuk 2014 Rehab & Completion of road Rehab & Completion of road ROAD 1 500,000.00 500,000.00 pipelined

CAR Kalinga Pinukpuk 2014 Rehab/Improvement of road Rehab/Improvement of road ROAD 1 250,000.00 250,000.00 pipelined

CAR Kalinga Pinukpuk 2014 Road Improvement/Tire Path Road Improvement/Tire Path ROAD 1 100,000.00 100,000.00 pipelined

CAR Kalinga Tanudan 2014 Construction of Concrete Slab Footbridge Construction of Concrete Slab Footbridge FOOT BRIDGE 1 200,000.00 200,000.00 pipelined

CAR Kalinga Tanudan Bawak, Anggacan Sur 2014 Construction of DCC : Bawak, Anggacan Sur Construction of DCC : Bawak, Anggacan Sur DAY CARE CENTER 2 500,000.00 500,000.00 pipelined

CAR Kalinga Tinglayan Ayyum 2014 Construction of Ayyum foot bridge Construction of Ayyum foot bridge FOOT BRIDGE 1 1,400,000.00 1,400,000.00 ongoing

CAR Kalinga Tinglayan Mar-o-Arong 2014 Construction of Mar-o to Arong Pathway Construction of Mar-o to Arong Pathway PATHWAY 1 1,000,000.00 1,000,000.00 June 2015 completed

CAR Kalinga Tinglayan Matoc 2014 Construction of Matoc road Construction of Matoc road ROAD 1 1,000,000.00 1,000,000.00 ongoing

CAR Kalinga Tinglayan Poblacion 2015 Improvement of Tinglayan Day Care Center Improvement of Tinglayan Day Care Center DAY CARE CENTER 1 2,000,000.00 proposed

CAR Mt. Province Bauko Abatan 2015 Abatan Toilet with Deep Well Abatan Toilet with Deep Well SANITARY FACILITY 1 1,500,000.00 pipelined

CAR Mt. Province Bontoc 2013 Augmentation of Daycare workers honorarium Augmentation of Daycare workers honorarium DAY CARE CENTER 1 800,000.00 800,000.00 completed

CAR Mt. Province Bontoc 2013 Construction of daycare center Construction of daycare center DAY CARE CENTER 1 300,000.00 300,000.00 March 2015 completed

CAR Mt. Province Natonin 2015 Construction of Various Pathways Construction of Various Pathways PATHWAY 1 3,000,000.00 pipelined

CAR Mt. Province Natonin 2015 Rehabilitation of Pathways Rehabilitation of Pathways PATHWAY 1 3,000,000.00 pipelined

CAR Mt. Province Paracelis Aplitud-Bagwang 2015 Construction of Aplitud-Bagwang Footbridge Construction of Aplitud-Bagwang Footbridge FOOT BRIDGE 2 1,500,000.00 pipelined

CAR Mt. Province Sabangan 2015 Improvement of Various Pathways leading to the potential

tourist spots

Improvement of Various Pathways leading to the potential

tourist spotsPATHWAY 1 2,500,000.00 ongoing

CAR Mt. Province Sadanga Saclit 2014 Construction of Poyo- Churao Foot Bridge in barangay Saclit Construction of Poyo- Churao Foot Bridge in barangay Saclit FOOT BRIDGE 1 300,000.00 300,000.00 ongoing

CAR Mt. Province Sadanga Betwagan 2014Construction of Daycare Center at Betwagan; Target/output:

1 day care center Construction of Daycare Center at Betwagan DAY CARE CENTER 1 650,000.00 650,000.00 ongoing

CAR Mt. Province Sadanga Anabel 2014Construction of Daycare Center Sanitary toilet at barangay

Aanabel; Target/Output: 1 unit sanitary toilet constructed

Construction of Daycare Center Sanitary toilet at barangay

AanabelDAY CARE CENTER 1 150,000.00 150,000.00 pipelined

CAR Mt. Province Sadanga Belwang 2014Construction of Sanitary toilet for Daycare center at

barangay Belwang; Target /Output: 1 unit sanitary toilet

constructed

Construction of Sanitary toilet for Daycare center at

barangay BelwangDAY CARE CENTER 1 100,000.00 100,000.00 ongoing

CAR Mt. Province Sadanga Poblacion 2014Opening of Fagwang-Nabenngan Road in barangay

Poblacion

Opening of Fagwang-Nabenngan Road in barangay

PoblacionROAD 1 1,000,000.00 ongoing

CAR Mt. Province Sadanga 2015 Learning Center for the Marginalized and Disadvantaged

Women

Learning Center for the Marginalized and Disadvantaged

WomenTRAINING 1 1,500,000.00 ongoing

CAR Mt. Province Sadanga Nabenngan 2015 Completion of Nabenngan Cable Foot Bridge Completion of Nabenngan Cable Foot Bridge FOOT BRIDGE 1 1,500,000.00 pipelined

CARAGA Agusan Del Norte Buenavista Poblacion 2014Road Opening (San Antonio And Sagap, Bangued, Abra; 1.5

Km; 167 Hhs)Rehabilitation of 16 Day Care Centers DAY CARE CENTER 1 16 units 1,800,000.00 1,800,000.00 June 2015 completed

CARAGA Agusan Del Norte City of Butuan Pianing 2013Construction/establishment of Day Care Centers in Tribal

Communities

Construction of Day Care Center in Tribal Communities in

Brgy. Pianing (630,000)DAY CARE CENTER 1 48 meter2 1,300,000.00 150,000.00 800,000.00 13-Dec-13 23-Feb-14 completed

CARAGA Agusan Del Norte City of Butuan Anticala 2013Construction of Day Care Center in Tribal Communities in

Brgy. Anticala (630,000)DAY CARE CENTER 1 48 meter2 150,000.00 800,000.00 03-Jan-14 16-Mar-14 completed

CARAGA Agusan Del Norte City of Butuan Anticala 2015 COMMUNITY PRODUCTION & ECONOMIC FACILITY

CENTER

COMMUNITY PRODUCTION & ECONOMIC FACILITY

CENTERBUILDING FACILITY 1 500,000.00 ongoing

CARAGA Agusan Del Norte City of Butuan Basag 2015 DAY CARE CENTER AT BRGY. BASAG DAY CARE CENTER AT BRGY. BASAG DAY CARE CENTER 1 700,000.00 ongoing

CARAGA Agusan Del Norte City of Butuan Pianing 2015 TRIBAL HOUSING/SHELTER AT PIANING TRIBAL HOUSING/SHELTER AT PIANING BUILDING FACILITY 1 500,000.00 ongoing

CARAGA Agusan Del Norte City of Cabadbaran Mahaba 2013 Construction of DCC Construction of Day Care Centers in Brgy. Mahaba DAY CARE CENTER 1 48 meter2 2,500,000.00 30,534.67 863,868.01 04-Dec-13 17-Feb-14 completed

CARAGA Agusan Del Norte City of Cabadbaran Sanghan 2013 Construction of Day Care Centers in Brgy. Sanghan DAY CARE CENTER 1 48 meter2 30,534.67 863,868.00 05-Dec-13 18-Feb-14 completed

CARAGA Agusan Del Norte City of Cabadbaran Bayabas 2013 Construction of Day Care Centers in Brgy. Bayabas DAY CARE CENTER 1 48 meter2 30,534.67 863,868.00 05-Dec-13 18-Feb-14 completed

CARAGA Agusan Del Norte City of Cabadbaran La Union 2015 CONSTRUCTION OF 3 DAY CARE CENTERS (PROTECTIVE

SERVICES)Construction of 1-Unit Day Care Center DAY CARE CENTER 1 2,000,000.00 ongoing

CARAGA Agusan Del Norte City of Cabadbaran Barangay 10 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

CARAGA Agusan Del Norte City of Cabadbaran Barangay 11 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

CARAGA Agusan Del Norte Jabonga Bangonay 2013 Construction of 3 units ECCDConstruction of Day Care Center in Brgy.Bangonay (Sitio

Tagbuaya)DAY CARE CENTER 1 48 meter2 1,900,000.00 29,862.00 779,862.00 15-Oct-13 14-Dec-13 completed

CARAGA Agusan Del Norte Jabonga Baleguian 2013Construction of Day Care Center in Brgy.Baleguian (Sitio

Tamping)DAY CARE CENTER 1 48 meter2 29,862.00 779,862.00 08-Oct-13 07-Dec-13 completed

CARAGA Agusan Del Norte Jabonga Poblacion 2013 Rehabilitation of DCC in Brgy. Poblacion DAY CARE CENTER 1 167,169.00 567,169.00 24-Jan-14 completed

CARAGA Agusan Del Norte Jabonga Baleguian 2014 Construction Of River Dike Brgy. BaleguianRechanneling and Embankment of 153 ln.m. Baleguian

RiverWATER CONTROL 1 120 Ln M 1,304,347.83 248,152.00 1,552,499.83 completed

CARAGA Agusan Del Norte Jabonga Poblacion 2014 Establishment Of 1 Unit Ip Evacuation Center Poblacion Construction of 1 Unit IP Evacuation Center EVACUATION CENTER 1 126 meter2 1,173,913.04 1,173,913.04 completed

CARAGA Agusan Del Norte Jabonga Libas 2014Excavation Of 1.5 Kilometers And 600 Meters Gabions

Brgy. Libas

Rechanneling and Construction of Boulder Riprap along

Tagbonoan CreekEVACUATION CENTER 1 320 Ln M 1,304,347.83 1,304,347.83 completed

CARAGA Agusan Del Norte Jabonga Poblacion 2015 COMPLETION OF EVACUATION CENTER COMPLETION OF EVACUATION CENTER BUILDING FACILITY 1 1,100,000.00 ongoing

CARAGA Agusan Del Norte Jabonga Sto Nino 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,500,000.00 ongoing

CARAGA Agusan Del Norte Jabonga Poblacion 2015 CONSTRUCTION OF HALFWAY CENTER WITH COMPLETE

AMENITIES FOR VAWC & CICL VICTIMS

CONSTRUCTION OF HALFWAY CENTER WITH COMPLETE

AMENITIES FOR VAWC & CICL VICTIMSBUILDING FACILITY 1 1,150,000.00 ongoing

CARAGA Agusan Del Norte Kitcharo Jaliobong 2015 CONSTRUCTION OF 2 SECTIONS GABION RIVER CONTROL

CLUSTER PROJECT

CONSTRUCTION OF 2 SECTIONS GABION RIVER CONTROL

CLUSTER PROJECTWATER CONTROL 1 7,500,000.00 ongoing

CARAGA Agusan Del Norte Nasipit Culit, Camagong and Aclan 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 3 2,500,000.00 ongoing

CARAGA Agusan Del Norte RTR Panaytayon 2014 Construction Of Day Care Center Panaytayon Construction of 1 unit DCC with 1m embankment DAY CARE CENTER 1 48 meter2 475,000.00 475,000.00 completed

CARAGA Agusan Del Norte RTR Poblacion 1 2015 CONSTRUCTION OF EVACUATION CENTER -POBLACION I CONSTRUCTION OF EVACUATION CENTER -POBLACION I BUILDING FACILITY 1 5,000,000.00 ongoing

CARAGA Agusan Del Norte Tubay Don Rosario 2014Construction/ Installation Of Drainage System Of Municipal

Public Market Constructed Drainage System Dona Rosario

Construction/ Installation Of Drainage System Of Municipal

Public Market Constructed Drainage System Dona RosarioDRAINAGE SYSTEM 1 372.242 Line

Meter 1,000,000.00 1,000,000.00 completed

CARAGA Agusan Del Norte Tubay Poblacion 2 2014Repair/Rehab Of River Flood Control (Armour Rock Piling)

Repair & Rehab Of River Flood Control Pob. 2

Repair/Rehab Of River Flood Control (Armour Rock Piling)

Repair & Rehab Of River Flood Control Pob. 2WATER CONTROL 1 281

Line

Meter 3,050,000.00 3,050,000.00 completed

CARAGA Agusan Del Norte Tubay Lawigan 2015PROTECTIVE SERVICE INFRA PROJECTS: CONSTRUCTION

OF DAY CARE CENTER

PROTECTIVE SERVICE INFRA PROJECTS: CONSTRUCTION

OF DAY CARE CENTERDAY CARE CENTER 1 650,000.00 ongoing

CARAGA Agusan Del Sur City of Bayugan 2013 Construction of Core Shelter Houses Construction of Core Shelter Houses CORE SHELTER 1 3,000,000.00 3,000,000.00 15-Sep-14 completed

CARAGA Agusan Del Sur City of Bayugan Langag 2013 Construction of Day Care Center-Langag Construction of Day Care Center-Langag DAY CARE CENTER 1 48 meter2 660,000.00 660,000.00 30-Mar-14 completed

CARAGA Agusan Del Sur City of Bayugan Tagabase 2013 Construction of Day Care Center-Tagabase Construction of Day Care Center-Tagabase DAY CARE CENTER 1 48 meter2 600,000.00 600,000.00 30-Apr-14 completed

CARAGA Agusan Del Sur BunawanBunawan Brook

Poblacion2015 CONSTRUCTION DAY CARE CENTERS CONSTRUCTION DAY CARE CENTERS DAY CARE CENTER 1 1,200,000.00 ongoing

CARAGA Agusan Del Norte Las Nieves Lingayao 2014 Evacuation Center 2 Evacuation Centers Constructed Construction of 1 unit Evacuation Center BUILDING FACILITY 1 120 meter2 1,050,000.00 1,050,000.00 ongoing

CARAGA Agusan Del Sur Loreto 2013 Establishment of Skills Training Center Establishment of Skills Training Center BUILDING FACILITY 1 132.2 meter2 1,500,000.00 1,500,000.00 completed

CARAGA Agusan Del Sur Loreto Jandayugong, Poblacion 2014Construction Of Hanging Bridge Accessibility Of Farm

Products Jandayugong, Poblacion

Construction Of Hanging Bridge Accessibility Of Farm

Products Jandayugong, PoblacionBRIDGE 2 3,600,000.00 3,600,000.00 ongoing

CARAGA Agusan Del Sur Prosperidad Poblacion 2014construction of standard day care center 5 units poblacion,

azpetia, san roque, san vicente, and sta. mariaConstruction of 1 Unit of Day Care Center in poblacion DAY CARE CENTER 1 48 meter2 3,187,500.00 3,187,500.00 ongoing

CARAGA Agusan Del Sur Prosperidad Azpetia 2014 Construction of 1 Unit of Day Care Center in azpetia DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur Prosperidad San Roque 2014 Construction of 1 Unit of Day Care Center in san roque DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur Prosperidad San Vicente 2014 Construction of 1 Unit of Day Care Center in san vicente DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur Prosperidad Sta. Maria 2014 Construction of 1 Unit of Day Care Center in sta. maria DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur ProsperidadLa Union

San Jose 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,500,000.00 ongoing

CARAGA Agusan Del Sur Rosario Bayugan Sentro 2014

Construction & Rehabilitation Of Dccs Construction Of 4 Units

Dccs And Repair Of 7 Units Dccs Ugoban, Cabugan, Bay3

Annex, Masabong, Cabantao, Sitio Loring, P5 Wasian,Sinug-

Ang

Construction of I Unit DCC - Bayugan Sentro DAY CARE CENTER 1 48 meter2 2,680,000.00 2,680,000.00 ongoing

CARAGA Agusan Del Sur Rosario Bayugan 2014 Construction of I Unit DCC - Bayugan Masbong DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur Rosario Bayugan Wasian 2014 Construction of I Unit DCC - Bayugan Wasian DAY CARE CENTER 1 48 meter2 - ongoing

CARAGA Agusan Del Sur Rosario Poblacion 2014 Rehabilitation of I Unit DCC - Poblacion DAY CARE CENTER 1 1 unit - ongoing

CARAGA Agusan Del Sur Rosario Libuac 2014 Rehabilitation of I Unit DCC - Libuac DAY CARE CENTER 1 1 unit - ongoing

CARAGA Agusan Del Sur San Francisco Barangay 4 2015 CONSTRUCTION OF DAY CARE CENTER AT BRGY. 4 CONSTRUCTION OF DAY CARE CENTER AT BRGY. 4 DAY CARE CENTER 1 900,000.00 ongoing

CARAGA Agusan Del Sur San Francisco Barangay 3 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER BUILDING FACILITY 1 4,000,000.00 ongoing

CARAGA Agusan Del Sur San Luis Dona Maxima 2015 INDOOR & OUTDOOR FACILITIES FOR DAY CARE CENTERS INDOOR & OUTDOOR FACILITIES FOR DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 ongoing

CARAGA Agusan Del Sur Trento Langkilaan 2015 REHABILITATION OF DAY CARE CENTERS REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 850,000.00 ongoing

CARAGA Agusan Del Sur Trento Poblacion 2015ESTABLISHMENT OF SENIOR CITIZEN'S HEALTH CARE &

WELLNESS CENTER

ESTABLISHMENT OF SENIOR CITIZEN'S HEALTH CARE &

WELLNESS CENTERBUILDING FACILITY 1 500,000.00 ongoing

CARAGA Agusan Del Sur Trento Poblacion 2015 WOMEN, CHILD AND YOUTH FRIENDLY HOME WOMEN, CHILD AND YOUTH FRIENDLY HOME PSB 1 850,000.00 ongoing

CARAGA Dinagat Islands Basilisa (Rizal) Rita Glenda 2013 Construction of Daycare Center Construction of Daycare Center in Brgy. Rita Glenda DAY CARE CENTER 1 48 meter2 750,000.00 750,000.00 28-Dec-13 completed

CARAGA Dinagat Islands Basilisa (Rizal) Roma 2015 CONSTRUCTION OF 1 UNIT DAYCARE CENTER CONSTRUCTION OF 1 UNIT DAYCARE CENTER DAY CARE CENTER 1 48 meter2 750,000.00 ongoing

CARAGA Dinagat Islands Basilisa (Rizal)Cortes

Melgar2015 REPAIR OF 3 UNITS DAY CARE CENTER REPAIR OF 2 UNITS DAY CARE CENTER DAY CARE CENTER 1 48 meter2 750,000.00 ongoing

CARAGA Dinagat Islands Basilisa (Rizal) 27 Barangays 2015PROVISION OF ECCD LEARNING MATERIALS AND SNP FOR

27 DAY CARE CENTERS

PROVISION OF ECCD LEARNING MATERIALS AND SNP FOR

27 DAY CARE CENTERSDAY CARE CENTER 1 48 meter2 500,000.00 ongoing

CARAGA Dinagat Islands Cagdianao Poblacion 2014Construction Of Day Care Center For Poor Children 1 Unit 2

Storey Day Care Building Brgy. Poblacion, Cagdianao, D.I.construction of 1 unit DCC in Brgy. Poblacion cadianao DAY CARE CENTER 1 48 meter2 850,000.00 850,000.00 completed

CARAGA Dinagat Islands Cagdianao Laguna 2015 CONSTRUCTION OF 100 M SEAWALL CONSTRUCTION OF 100 M SEAWALL SEAWALL 1 48 meter2 3,000,000.00 ongoing

CARAGA Dinagat Islands Dinagat Cabayawan 2013 Crisis Center Day Care Center Construction (Brgy. Cabayawan - 650,000) DAY CARE CENTER 1 48 meter2 400,000.00 400,000.00 17-Feb-14 completed

CARAGA Dinagat Islands Dinagat Escolta 2014Construction Of Brgyescoltadrainage Canal (Flood Control)

150 Meters Flood Control In Barangay Escolta Escoltaconstruction of 85 meters drainage canal in brgy. Escolta DRAINAGE SYSTEM 1 85 meters 336,758.40 336,758.40 completed

CARAGA Dinagat Islands Dinagat Cayetano 2015 DAY CARE CENTER CAYETANO DAY CARE CENTER CAYETANO DAY CARE CENTER 1 800,000.00 ongoing

CARAGA Dinagat Islands Dinagat Zamora 2015 DAY CARE CENTER SITIO ZAMORA GOMEZ DAY CARE CENTER SITIO ZAMORA GOMEZ DAY CARE CENTER 1 800,000.00 ongoing

CARAGA Dinagat Islands Loreto Magsaysay, Liberty and Helen 2015 REPAIR AND UPGRADING OF DAY CARE CENTERS REPAIR AND UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 3 800,000.00 ongoing

CARAGA Dinagat Islands San Jose San Juan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 453,400.00 ongoing

CARAGA Dinagat Islands Tubajon Mabini 2015 CONTRUCTION OF EVACUATION CENTER CONTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 3,030,000.00 ongoing

CARAGA Surigao Del Norte Algeria Camp Edward 2014Const. Of Concrete Pathway 165 Linear Meters Camp

Edward

Const. Of Concrete Pathway 165 Linear Meters Camp

EdwardPATHWAY 1 579,731.00 579,731.00 completed

CARAGA Surigao Del Norte Algeria Julio Quano 2014 Const. Of Drainage Canal 183 Linear Meters Julio Quano Const. Of Drainage Canal 183 Linear Meters Julio Quano DRAINAGE SYSTEM 1 507,151.00 507,151.00 completed

CARAGA Surigao Del Norte Algeria Budlingin 2014 Const. Of Drainage Canal 173 Linear Meters Budlingin Const. Of Drainage Canal 173 Linear Meters Budlingin DRAINAGE SYSTEM 1 535,994.00 535,994.00 completed

CARAGA Surigao Del Norte Algeria San Pedro 2014 Const. Of Drainage Canal 183.5 Linear Meters San Pedro Const. Of Drainage Canal 183.5 Linear Meters San Pedro DRAINAGE SYSTEM 1 499,177.00 499,177.00 completed

CARAGA Surigao Del Norte Algeria San Juan & Alipao 2014Const. Of Intake Box & Main Line 1 Unit 8.6 Sq.M San Juan

& Alipao

Const. Of Intake Box & Main Line 1 Unit 8.6 Sq.M San Juan

& Alipao1 1,006,151.00 1,006,151.00 completed

CARAGA Surigao Del Norte Bacuag Poblacion 2014Construction Of Dike In Bacuag National Agro-Industrial

School 150 Meters Dike Barangay Poblacion

Construction Of Dike In Bacuag National Agro-Industrial

School 150 Meters Dike Barangay PoblacionSCHOOL FACILITY 1 150 meters 500,000.00 500,000.00 completed

CARAGA Surigao Del Norte Bacuag Poblacion 2014Construction Of Women And Child Crisis Center 1 Crisis

Center Barangay Poblacion

Construction Of Women And Child Crisis Center 1 Crisis

Center Barangay PoblacionBUILDING FACILITY 1 950,000.00 950,000.00 completed

CARAGA Surigao Del Norte Bacuag Cabugao and Poblacion 2014Improvement Of Drainage System Barangays Cabugao And

Poblacion

Improvement Of Drainage System Barangays Cabugao And

PoblacionDRAINAGE SYSTEM 1 950,000.00 950,000.00 completed

CARAGA Surigao Del Norte Bacuag Campo Bacuag 2014Repair/Rehabilitation Of Day Care Centers 10 Day Care

Centers All Barangays Except Brgy. Sto. RosarioRepair/Rehabilitation Of Day Care Center - Campo Bacuag DAY CARE CENTER 1 1,900,000.00 1,900,000.00 completed

CARAGA Surigao Del Norte Bacuag Cambuayon 2014 Repair/Rehabilitation Of Day Care Center - Cambuayon DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Bacuag Pautao 2014 Repair/Rehabilitation Of Day Care Center - Pautao DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Bacuag Pungtod 2014 Repair/Rehabilitation Of Day Care Center - Pungtod DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Bacuag Payapag 2014 Repair/Rehabilitation Of Day Care Center - Payapag DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Bacuag Dugsangon 2014 Repair/Rehabilitation Of Day Care Center - Dugsangon DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Bacuag Poblacion 2014 Repair/Rehabilitation Of Day Care Center - Poblacion DAY CARE CENTER 1 - completed

CARAGA Surigao Del Norte Burgos Matin-ao 2015 BARANGAY HEALTH STATION - MATIN-AO BARANGAY HEALTH STATION - MATIN-AO HEALTH CENTER 1 2,160,000.00 ongoing

CARAGA Surigao Del Norte Burgos San Mateo 2015 BARANGAY HEALTH STATION - SAN MATEO BARANGAY HEALTH STATION - SAN MATEO HEALTH CENTER 1 2,160,000.00 ongoing

CARAGA Surigao Del Norte Claver Bagakay-Ladgaron 2014Construction Of Flood Control And Slope Protection Bagakay-

Ladgaron Phase Iii Flood Control And Slope Protection

Constructed Ladgaron

Construction Of Flood Control And Slope Protection Bagakay-

Ladgaron Phase Iii Flood Control And Slope Protection

Constructed Ladgaron

WATER CONTROL 2 1,700,000.00 1,700,000.00 completed

CARAGA Surigao Del Norte DapaSta. Felomina

Buenavista (Coastal)2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,000,000.00 ongoing

CARAGA Surigao Del Norte Del Carmen 2013 Protective Services Construction Of Day Care Center DAY CARE CENTER 1 48 meter2 300,000.00 300,000.00 30-Apr-14 completed

CARAGA Surigao Del Norte Del Carmen San Jose 2014Construction Of Evacuation Center With Facilities In

Poblacion Del CarmenCompletion of Evacuation Center EVACUATION CENTER 1 4,000,000.00 completed

CARAGA Surigao Del Norte Del Carmen Alburo (Bagacay) 2014 Day Care Center In Brgy. Cabugao Renovation of 1 Unit Day Care Center DAY CARE CENTER 1 300,000.00 completed

CARAGA Surigao Del Norte Gigaquit Alambique 2013 Purchase of Day Care Center Facilities Acqusition of DCC Learning Facilities and Equipments DAY CARE CENTER 1 19 Units 670,000.00 670,000.00 17-Feb-14 completed

CARAGA Surigao Del Norte Gigaquit Camam-uman 2013 LIVELIHOODConstruction of Day Care Center in Brgy.Camam-uman w/

Indoor-Outdoor FacilitiesDAY CARE CENTER 1 48 meter2 3,200,000.00 3,200,000.00 25-Jan-14 completed

CARAGA Surigao Del Norte Gigaquit Lahi 2013Construction of Day Care Center in Brgy.Lahi w/ Indoor-

Outdoor Facilities DAY CARE CENTER 1 48 meter2 - 05-Feb-14 completed

CARAGA Surigao Del Norte Gigaquit Anibongan 2013Construction of Day Care Center in Brgy.Anibongan w/

Indoor-Outdoor Facilities DAY CARE CENTER 1 48 meter2 - 17-Dec-13 completed

CARAGA Surigao Del Norte Gigaquit Alambique 2013Construction of Day Care Center w/ Indoor-Outdoor

FacilitiesDAY CARE CENTER 1 48 meter2 - 17-Feb-14 completed

CARAGA Surigao Del Norte Gigaquit Villaflor 2014 Construction Of Footbridge 20 Meters Lahi P1 To P2 Construction Of 260 l.m. Farmbridge BRIDGE 1 260 Ln.M. 80,000.00 - 594,006.00 completed

Page 3: List of KALAHI-CIDSS Subprojects - BUB

CARAGA Surigao Del Norte Gigaquit 2014 Construction Of Footbridge 20 Meters Villaflor P-4 P-7 FOOT BRIDGE 1 75,000.00 completed

CARAGA Surigao Del Norte Gigaquit San Isidro 2014Construction Of Footbridge 40 Meters, 20 M, 20 M, 25 M,

60 M Pili, San IsidroConstruction of 42 Linear Meter Farmbridge BRIDGE 1 42 Ln.M. 150,000.00 246,335.00 396,335.00 completed

CARAGA Surigao Del Norte Gigaquit 2014 Construction Of Footbridge 25 Meters Villaflor P6-Kinabutan FOOT BRIDGE 1 500,000.00 completed

CARAGA Surigao Del Norte Gigaquit Mahanub 2014 Construction Of Footbridge 60 Meters Ips, Tiltilan, Mahanub Construction of Farmbridge 16 meters lps, tiltilan, mahanub BRIDGE 1 160 Ln.M. 450,000.00 93,424.00 543,424.00 completed

CARAGA Surigao Del Norte Gigaquit Alambique 2014 Construction Of Pwd Center 1 Building Poblacion Construction of 1 Unit Person with Disability (PWD) Center 1 450,000.00 111,518.00 561,518.00 completed

CARAGA Surigao Del Norte Gigaquit Anibongan 2014 Improvement Of Women'S Center 1 Building Anibongan Improvement Of Women'S Center 1 Building Anibongan BUILDING FACILITY 1 100,000.00 44,630.00 144,630.00 completed

CARAGA Surigao Del Norte Gigaquit Villafranca 2014 Renovation Of Womens Center 1 Building Villafranca Renovation Of Womens Center 1 Building Villafranca BUILDING FACILITY 1 50,000.00 32,497.00 82,497.00 completed

CARAGA Surigao Del Norte City of Surigao Day-asan 2013 Construction of Day Care Centers (5 Brgys) Day Care Center Construction in Bgry. Day-asan DAY CARE CENTER 1 48 meter2 1,000,000.00 250,000.00 1,250,000.00 19-Dec-13 completed

CARAGA Surigao Del Norte City of Surigao Zaragosa 2013 Day Care Center Construction in Bgry. Zaragosa DAY CARE CENTER 1 48 meter2 250,000.00 250,000.00 30-Dec-13 completed

CARAGA Surigao Del Norte City of Surigao Libuac 2013 Rehabilitation of Day Care Centers Day Care Center Rehab in Brgy. Libuac DAY CARE CENTER 1 52.5 meter2 100,000.00 250,000.00 350,000.00 19-Dec-13 completed

CARAGA Surigao Del Norte City of Surigao San Juan 2013 Day Care Center Rehab in Brgy. San Juan DAY CARE CENTER 1 76.6 meter2 250,000.00 250,000.00 12-Nov -13 completed

CARAGA Surigao Del Norte Mainit Silop 2014Construction Of Barangay Health Station 1 Bhs Constructed

Silop

Construction Of Barangay Health Station 1 Bhs Constructed

SilopHEALTH CENTER 1 51 meter2 750,000.00 #VALUE! 819,736.00 completed

CARAGA Surigao Del Norte Mainit San Francisco 2014 Farm To Market Road .42 Kms San Francisco Farm to market road .265 kms San Francisco ROAD 1 0.305 Km. 1,190,000.00 #VALUE! 1,268,643.00 completed

CARAGA Surigao Del Norte Malimono Binocaran 2014 Kalahi-Cidss: Tribal Housing/ Shelter tribal learning and development center 1 80 meter2 650,000.00 650,000.00 completed

CARAGA Surigao Del Norte Pilar Caridad 2014Barangay Health Station 1 Unit Health Center Constructed

Brgy. Caridad

Barangay Health Station 1 Unit Health Center Constructed

Brgy. CaridadHEALTH CENTER 1 51 meter2 750,000.00 #VALUE! 810,106.00 06-Oct-14 completed

CARAGA Surigao Del Norte Pilar Consolacion 2014Farm To Market Road 600 Linear Meter Fmr Embanked

Brgy. Consolacion - HighwayImprovement of 600 meters FMR in barangay consolacion ROAD 1 600 Ln. M. 750,000.00 #VALUE! 828,384.00 completed

CARAGA Surigao Del Norte Pilar Pilaring 2014Farm To Market Road 500 Linear Meters Road Paved Brgy.

Pilaring Improvement of 600 meters FMR in barangay Pilaring ROAD 1 500 meters 1,800,000.00 #VALUE! 1,999,922.00 completed

CARAGA Surigao Del Norte Pilar Jaboy 2014Farm To Market Road Frm Embanked Brgy. Jaboy -

Highway

Farm To Market Road Frm Embanked Brgy. Jaboy -

HighwayROAD 1 600 Ln. M. 750,000.00 #VALUE! 828,423.00 completed

CARAGA Surigao Del Norte Placer Bugas-Bugas 2014

Day Care Center Indoor & Outdoor Facilities 7 Day Care

Centers Sta. Cruz, Magupange, Mabini, Magsaysay, Suyoc,

Mmcmapaso, Lakandula

Purchase of outdoor/indoor facilities - magsaysay lead brgy DAY CARE CENTER 1 42 CD 1,400,000.00 148,903.00 1,548,903.00 completed

CARAGA Surigao Del Norte Placer Central 2014Improvement Of Senior Citizen Bldg. Repair Of Senior Citizen

Building And Provision Of Facilities CentralImprovement of Senior Citizen Building BUILDING FACILITY 1 155.3 meter2 475,000.00 #VALUE! 519,533.00 completed

CARAGA Surigao Del Norte Placer Pananay-an and Macalaya 2015CONSTRUCTION OF DAY CARE CENTERS AT BRGYS.

PANANAY-AN & MACALAYA

CONSTRUCTION OF DAY CARE CENTERS AT BRGYS.

PANANAY-AN & MACALAYADAY CARE CENTER 1 1,200,000.00 ongoing

CARAGA Surigao Del Norte San Francisco Banbanon 2014Rehabilitation Of Day Care Center Standard Day Care

Services Banbanon

Rehabilitation Of Day Care Center Standard Day Care

Services BanbanonDAY CARE CENTER 1 57.75 meter2 239,750.00 #VALUE! 279,791.00 21-Nov-14 completed

CARAGA Surigao Del Norte San Francisco Diaz 2014Rehabilitation Of Day Care Center Standard Day Care

Services DiazRehabilitation of DCC DAY CARE CENTER 1 64 meter2 95,000.00 203,208.00 298,208.00 20-Nov-14 completed

CARAGA Surigao Del Norte San Francisco 2014Rehabilitation Of Day Care Center Standard Day Care

Services Linongganan

Rehabilitation Of Day Care Center Standard Day Care

Services LinonggananDAY CARE CENTER 1 66,500.00 completed

CARAGA Surigao Del Norte San Francisco 2014Rehabilitation Of Day Care Center Standard Day Care

Services Poblacion

Rehabilitation Of Day Care Center Standard Day Care

Services PoblacionDAY CARE CENTER 1 95,000.00 completed

CARAGA Surigao Del Norte San Francisco Magtangale 2014

Tribal Hall Rehabilitation/Establishment For Indigenious

People (Non-Formal Education Venue And Livelihood

Interventions) Established Trival Hall For I Ps As Venue

For Livelihood Intervention And Non-Formal Education

Magtangale

Construction of tribal hall BUILDING FACILITY 1 18 meter2 200,000.00 36,829.00 236,829.00 20-Nov-14 completed

CARAGA Surigao Del Norte Sison Gacepan 2014Day Care Center Rehab. 8 Dcc Repaired Lower Patag,

Gacepan, Tagbayani, Ima, San Pablo, San Isidro, San Isidro

& Mabuhay

Rehab/ Repair of Day Care Center at Gacepan DAY CARE CENTER 1 76,000.00 12,792.00 88,792.00 completed

CARAGA Surigao Del Norte Sison San Pedro P2 2014 Day Care Center Const. 2 Dcc San Pedro, Tinogpahan Construction of (1) Unit DCC in San Pedro DAY CARE CENTER 1 48 meter2 1,425,000.00 (622,812.00) 802,188.00 completed

CARAGA Surigao Del Norte Sison San Pedro P7 2014 Construction of (1) Unit DCC in San Pedro DAY CARE CENTER 1 48 meter2 802,188.00 802,188.00 completed

CARAGA Surigao Del Norte Socorro Sering 2014Construction Of Salog To Kabalawan Junction Farm To

Market Road 600 Meters Fmr Barangay Sering, Socorro,

Surigao Del Norte

improvement of 320 L.M Access road from Sitio Bulwak to

sitio Salog TungaROAD 1 320 Ln.M. 700,000.00 161,402.00 861,402.00 07-Nov-14 completed

CARAGA Surigao Del Norte Socorro Honrado 2014Construction Of 330 Meters Farm To Market Road 330

Meters Fmr Barangay Honrado, Socorro, Surigao Del Norte

improvement of 180 L.M access Road from brgy. Honrado

to sitio TugbanganROAD 1 180 Ln.M. 300,000.00 57,670.00 357,670.00 06-Nov-14 completed

CARAGA Surigao Del Norte Socorro Pamosaingan 2014Construction Of 50 Meters Sea Wall 50 Meters Sea Wall

Barangay Pamosaingan, Socorro, Surigao Del NorteConstruction of 40 L.M SEAWALL SEAWALL 1 40 Ln.M. 1,000,000.00 70,279.00 1,070,279.00 05-Nov-14 completed

CARAGA Surigao Del Norte Socorro Sudlon 2014Construction Of 550 Meters Farm To Market Road 550

Meters Farm To Market Road Barangay Sudlon, Socorro,

Surigao Del Norte

Improvement of 200 LM access Road from Sudlon to Sitio

TinagoROAD 1 200 Ln.M. 500,000.00 150,223.00 650,223.00 12-Nov-14 completed

CARAGA Surigao Del Norte Socorro San Roque 2014Construction Of 550 Meters Farm To Market Road 550

Meters Fmr Barangay San Roque, Socorro, Surigao Del

Norte

Improvement of 340 LM access Road from San Roque to

sitio SinibayanROAD 1 340 Ln.M. 500,000.00 115,337.00 615,337.00 12-Nov-14 completed

CARAGA Surigao Del Norte Socorro Songkoy 2014Construction Of 550 Meters Farm To Market Road 550

Meters Fmr Barangay Songkoy, Socorro, Surigao Del Norte

Improvement of 140 LM access Road from Barangay

Songkoy to Sitio CarbonROAD 1 140 Ln.M. 500,000.00 199,327.00 699,327.00 11-Nov-14 completed

CARAGA Surigao Del Norte Socorro Rizal 2014Construction Of 80 Meters Sea Wall 80 Meters Sea Wall

Barangay Rizal, Socorro, Surigao Del NorteConstruction of 70 LM SEAWALL SEAWALL 1 70 Ln.M. 2,000,000.00 131,867.00 2,131,867.00 06-Nov-14 completed

CARAGA Surigao Del Norte Socorro Taruc 2014Construction Of 80 Meters Sea Wall 80 Meters Sea Wall

Barangay Taruc, Socorro, Surigao Del NorteConstruction of 70 LM SEAWALL SEAWALL 1 70 Ln.M. 2,000,000.00 06-Nov-14 completed

CARAGA Surigao Del Norte Surigao City Luna 2014

Construction Of Day Care Centers Construction Of Dccs In 5

Priority Areas - 400 Day Care Children So. Tagbasingan, Mat-

I; Danawan; So. Pinaypayan, Mat-I; Pu. 1-A San Juanipil;

So. Guiso Capalayan; So. File, Mat-I

Construction of 1 unit Day Care Center DAY CARE CENTER 1 48 meter2 1,500,000.00 (599,296.00) 900,704.00 10-Nov-14 completed

CARAGA Surigao Del Norte Surigao City San Pedro 2014 Construction of 1 unit Day Care Center DAY CARE CENTER 1 48 meter2 900,472.00 900,472.00 13-Nov-14 completed

CARAGA Surigao Del Norte Surigao City Sitio Putsan,Mat-i 2015CONSTRUCTION OF DAY CARE CENTERS AT PAYAWAN 2

LUNA, SAN PEDRO, SAN ROQUEConstruction of 1-Unit Day Care Center DAY CARE CENTER 2 1,500,000.00 ongoing

CARAGA Surigao Del Norte Surigao City San Roque 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

CARAGA Surigao Del Norte Surigao City San Isidro 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

CARAGA Surigao Del Norte Surigao City Balibayon 2015REPAIR/ UPGRADING OF DAY CARE - BALIBAYON, SAN

ISIDRORepair/Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 500,000.00 ongoing

CARAGA Surigao Del Norte Surigao City Sitio Palawan, Luna 2015UPGRADING OF RESIDENTIAL CENTER FOR

STREETCHILDRENConstruction of 1-Unit Day Care Center DAY CARE CENTER 2 500,000.00 ongoing

CARAGA Surigao Del Norte Surigao City Anomar 2015COMPLETION OF THE BAHAY PAG-ASA ANF EQUIPMENT

COPLEMNTATIONConstruction of 1-Unit Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

CARAGA Surigao Del Norte Taganaan Himamaug 2014Construction Of Daycare Centers Day Care Center

Constructed Himama-Ug & Opong

Construction Of Daycare Centers Day Care Center

Constructed Himama-Ug DAY CARE CENTER 1 48 meter2 1,500,000.00 (658,132.00) 841,868.00 completed

CARAGA Surigao Del Norte Taganaan Opong 2014Construction Of Daycare Centers Day Care Center

Constructed OpongDAY CARE CENTER 1 48 meter2 877,688.00 877,688.00 completed

CARAGA Surigao Del Norte Taganaan Sampaguita 2015 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL CONSTRUCTION OF BAHAY PAG-ASA FOR CICL BUILDING FACILITY 1 2,000,000.00 ongoing

CARAGA Surigao Del Norte Taganaan 16 DCC 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 600,000.00 ongoing

CARAGA Surigao Del Norte Taganaan Azucena 2015 CONSTRUCTION OF OPDA CONSTRUCTION OF OPDA BUILDING FACILITY 1 600,000.00 ongoing

CARAGA Surigao Del Sur Barobo Javier 2013Construction of Javier Day Care Center with in door and

outdoor facilities

Construction of Javier Day Care Center with in door and

outdoor facilitiesDAY CARE CENTER 1 48 meter2 700,000.00 700,000.00 30-Jan-14 completed

CARAGA Surigao Del Sur Barobo Causwagan 2013Renovation of Brgy. Causwagan, Kiddie Care Day Care

Center with indoor and outdoor facilities

Renovation of Brgy. Causwagan, Kiddie Care Day Care

Center with indoor and outdoor facilitiesDAY CARE CENTER 1 48 meter2 700,000.00 700,000.00 02-Feb-14 completed

CARAGA Surigao Del Sur Barobo Cabacungan 2013Construction of Cabacungan Proper Day Center with indoor

and outdoor facilities

Construction of Cabacungan Proper Day Center with indoor

and outdoor facilitiesBUILDING FACILITY 1 48 meter2 700,000.00 700,000.00 03-Feb-14 completed

CARAGA Surigao Del Sur Barobo Poblacion 2013 Food Processing and Women Display Center Food Processing and Women Display Center 1 30 meter2 500,000.00 500,000.00 01-Feb-14 completed

CARAGA Surigao Del Sur Barobo Bahi 2013 Construction of Day Care Center at Brgy. 5Sito Bog-o, Kauswagan Day Care Center with indoor and

outdoor facilitiesDAY CARE CENTER 1 700,000.00 700,000.00 01-Feb-14 completed

CARAGA Surigao Del Sur Barobo San Vicente 2013Construction of San Vicente Day Care Center with indoor and

outdoor facilities

Construction of San Vicente Day Care Center with indoor and

outdoor facilitiesDAY CARE CENTER 1 700,000.00 700,000.00 08-Feb-14 completed

CARAGA Surigao Del Sur Barobo Amaga 2013Construction of Amaga Day Care Center with in door and

outdoor facilities

Construction of Amaga Day Care Center with in door and

outdoor facilitiesDAY CARE CENTER 1 700,000.00 700,000.00 27-Jan-14 completed

CARAGA Surigao Del Sur Barobo Gamut 2014

Construction Of 1 Unit Day Care Center With Outdoor And

Indoor Facilities 49 Sq. Meters Sito Malindog @ Brgy.

Gamut, Wakat, Unidad, Garden Tambis, Kinayan,Mamis,

Sabang, Gamut

Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. CabacunganDAY CARE CENTER 1 49 meter2 4,760,000.00 completed

CARAGA Surigao Del Sur Barobo Proper Gamut 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Sitio Malindog, GamotDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Poblacion 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - GamutDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Unidad 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. UnidadDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Sitio Creek B 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. WakatDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Cabacungan 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. KinayanDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Kinayan 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. MamisDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Wakat 2014Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. TambisDAY CARE CENTER 1 49 meter2 completed

CARAGA Surigao Del Sur Barobo Poblacion 2014Rehabilitation Of Building For Drop - In Center - Poblacion

Barobo

Construction of DCC With Outdoor And Indoor Facilities 49

Sq2 - Brgy. PoblacionDAY CARE CENTER 1 49 meter2 552,500.00 completed

CARAGA Surigao Del Sur Barobo Poblacion 2015 SENIOR CITIZEN & PWD DUPLEX BUILDING SENIOR CITIZEN & PWD DUPLEX BUILDING BUILDING FACILITY 1 1,200,000.00 ongoing

CARAGA Surigao Del Sur Barobo San Jose 2015 CONST. OF DCC W/ IN-OUTDOOR FACILITIES CONST. OF DCC W/ IN-OUTDOOR FACILITIES DAY CARE CENTER 1 1,000,000.00 ongoing

CARAGA Surigao Del Sur City of Bislig Tumanan 2013 Construction of Day Care Center Construction of Day Care Center in Brgy. Tumanan DAY CARE CENTER 1 2,100,000.00 2,100,000.00 30-Dec-13 completed

CARAGA Surigao Del Sur City of Bislig Borboanan 2013 Construction of Day Care Center in Brgy. Borboanan DAY CARE CENTER 1 - 08-Feb-14 completed

CARAGA Surigao Del Sur City of Bislig San Roque 2013 Construction of Day Care Center in Brgy. San Roque DAY CARE CENTER 1 - 04-Jan-14 completed

CARAGA Surigao Del Sur City of Bislig Mangagoy 2013 Repair of Day Care Center Day Care Center in Brgy. Mangagoy DAY CARE CENTER 1 300,000.00 300,000.00 15-Feb-14 completed

CARAGA Surigao Del Sur City of Bislig Cumawas 2014 Construction Of Cumawas Day Care Center Construction of 1 Unit Day Care Center DAY CARE CENTER 1 384,000.00 completed

CARAGA Surigao Del Sur City of Bislig Guava Poblacion 2014 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur City of Bislig San Andress Maharlika 2014 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur City of Bislig San Antonio 2014 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur City of Bislig Tabon 2014 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur City of Bislig San Isidro 2014 Rice Post Harvest Facility San Isidro Rice Post Harvest Facility at San Isidro 1 1,152,000.00 completed

CARAGA Surigao Del Sur City of Bislig Guicob Tabon 2015 CONSTRUCTION BAHAY PAG-ASA FOR CICL Improvement of Existing CICL Center BUILDING FACILITY 1 1,400,000.00 ongoing

CARAGA Surigao Del Sur City of Bislig Guicob Tabon 2015 CONSTRUCTION OF BOYS TOWN (DROP IN CENTER) Improvement of Drop-in Center BUILDING FACILITY 1 1,562,500.00 ongoing

CARAGA Surigao Del Sur City of Bislig Mangagoy 2015CONSTRUCTION OF WOMEN'S TRAINING & DISPLAY

CENTER

CONSTRUCTION OF WOMEN'S TRAINING & DISPLAY

CENTERBUILDING FACILITY 1 900,000.00 ongoing

CARAGA Surigao Del Sur City of Bislig Guicob Tabon 2015 CONSTRUCTION OF WOMEN'S CRISES CENTER Improvement of Home for Girls 1 1,000,000.00 ongoing

CARAGA Surigao Del Sur City of Bislig Mangagoy 2015REPAIR OF TAWAG & PRODUCTIVITY FOR SPECIAL

CHILDREN CENTERRepair of Tawag and Productivity Center for Special Children BUILDING FACILITY 1 500,000.00 ongoing

CARAGA Surigao Del Sur City of Bislig Bucto and Lawigan 2015 REPAIR AND REHAB OF DAY CARE CENTERS REPAIR AND REHAB OF DAY CARE CENTERS DAY CARE CENTER 2 1,500,000.00 ongoing

CARAGA Surigao Del Sur Cagwait Poblacion 2014

Flood Control Project (Tawagan And Poblacion) @ 750K Each

Seawall Construction @ Brgy. Tawagan Barangay Site Amd

Poblacion Townsite. Tawagan And Poblacion

Flood Control Project (Poblacion) @ 750K Each Seawall

Construction @ Brgy. Poblacion SEAWALL 1 1,350,000.00 completed

CARAGA Surigao Del Sur Cagwait Tawagan 2014Flood Control Project (Tawagan) @ 750K Each Seawall

Construction @ Brgy. Tawagan Barangay Site SEAWALL 1 completed

CARAGA Surigao Del Sur Cagwait Bitanugan East 2014

Rehabilitation Of Day Care Centers 5 Units Day Care Centers

Rehabilitated Unidad, Mat-E, Bitaugan East And Bitaugan

West

Repair of 1 Unit Day Care Center - Brgy. Bitanugan East DAY CARE CENTER 1 1,140,000.00 completed

CARAGA Surigao Del Sur Cagwait Bitanugan West 2014 Repair of 1 Unit Day Care Center - Brgy. Bitaugan West DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur Cagwait Mat-E 2014 Repair of 1 Unit Day Care Center - Brgy. Mat-E DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur Cagwait Unidad 2014 Repair of 1 Unit Day Care Center - Brgy. Unidad DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur Cagwait Lupalupa Brgy West 2014 Repair of 1 Unit Day Care Center - Brgy.Bitanugan West DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur Cantilan Buntalid 2014Construction Of Hanging Bridge At Buntalid Sur Transport Of

Agri Products Buntalid Sur

Construction Of Hanging Bridge At Buntalid Sur Transport Of

Agri Products Bantalid SurBRIDGE 1 850,000.00 completed

CARAGA Surigao Del Sur Cantilan Alamyo, Cabas-an 2014Construction Of Hanging Bridge At Cabas-An Alamyo River

Transport Of Agri Products Cabas-An, Parang, Bugsukan,

Calagdaan

Construction Of Hanging Bridge At Cabas-An Alamyo River

Transport Of Agri Products Cabas-An, Parang, Bugsukan,

Calagdaan

WATER CONTROL 2 850,000.00 completed

CARAGA Surigao Del Sur Cantilan Cagpangi, Cabas-an 2014Construction Of Wooden Bridge At CagpAngi And Upgrading

Of Roads Transport Of Agri Products Sitio Kagpangi, Agsam,

Cabas-An

Construction Of Wooden Bridge At Cag[Angi And Upgrading

Of Roads Transport Of Agri Products Sitio Kagpangi, Agsam,

Cabas-An

ROAD 2 425,000.00 completed

CARAGA Surigao Del Sur Cantilan Calagdaan 2014Construction Og Domoyog Pathway (1.5 Km) Transport Of

Agri Products Domoyog, Calagdaan

Construction Og Domoyog Pathway (1.5 Km) Transport Of

Agri Products Domoyog, CalagdaanPATHWAY 1 850,000.00 completed

CARAGA Surigao Del Sur Cantilan Consuelo 2014Repair Of Consuelo Footbridge Transport Of Agri Products

Consuelo

Repair Of Consuelo Footbridge Transport Of Agri Products

ConsueloFOOT BRIDGE 1 850,000.00 completed

CARAGA Surigao Del Sur Cantilan Cabas-an 2014Repair Of Day Care Center And Support Of Education

Materials Cecrease Illiteracy All Barangays

Repair Of Day Care Center And Support Of Education

Materials Cecrease Illiteracy All BarangaysDAY CARE CENTER 1 850,000.00 completed

CARAGA Surigao Del Sur Cantilan Tigabong 2014Repair Of Tigabong Timber Bridge Transport Of Agri

Products Tigabong

Repair Of Tigabong Timber Bridge Transport Of Agri

Products Tigabong BRIDGE 1 340,000.00 completed

CARAGA Surigao Del Sur Cantilan Magasang 2015CONSTRUCTION OF EVACUATION GROUNDS / PICNIC AREA

OF THE MUNICIPAL ECOLOGICAL PARK

CONSTRUCTION OF EVACUATION GROUNDS / PICNIC AREA

OF THE MUNICIPAL ECOLOGICAL PARKEVACUATION CENTER 1 500,000.00 ongoing

CARAGA Surigao Del Sur Carmen Poblacion 2015 CONSTRUCTION OF ONE UNIT PROTECTIVE SERVICES CONSTRUCTION OF ONE UNIT PROTECTIVE SERVICES BUILDING FACILITY 1 1,000,000.00 ongoing

CARAGA Surigao Del Sur Carrascal Baculod 2014Construction Of Evacuation Center Constructed Evacuation

Center Brgy. Bon-Ot

Construction Of Evacuation Center Constructed Evacuation

Center Brgy. Bon-OtEVACUATION CENTER 1 2,000,000.00 completed

CARAGA Surigao Del Sur Cortes Uba and Burgos 2015 RENOVATION OF DAY CARE CENTER RENOVATION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 ongoing

CARAGA Surigao Del Sur Hinatuan Aquino 2014 Aquino Seawall - Aquino, Hinatuan, Sds Construction of 147 LM Seawall SEAWALL 1 147 Ln.M. 2,500,000.00 completed

CARAGA Surigao Del Sur Hinatuan Sto. Nino 2014 Sto. Nino Seawall - Sto.Nino, Hinatuan, Sds Construction of 80 LM Seawall SEAWALL 1 80 Ln.M. 1,000,000.00 completed

CARAGA Surigao Del Sur Hinatuan Tidman 2014Tidman Banacud-Hirog Fmr - Banacud-Hirog, Tidman,

Hinatuan, SDSConstruction of 0.5 km Banacud Hirog FMR ROAD 1 0.55 kilometer 1,000,000.00 completed

CARAGA Surigao Del Sur Hinatuan Roxas 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

CARAGA Surigao Del Sur Hinatuan Sasa 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

CARAGA Surigao Del Sur Lanuza Zone I, II, III and IV 2014

Construction Of Drainage System Construction Of 2,139

Meters Drainage System Zone I, Zone Ii, Zone Iii And Zone

Iv

Construction Of Drainage System Construction Of 1650

Meters Drainage System Zone I, Zone Ii, Zone Iii And Zone

Iv

DRAINAGE SYSTEM 4 1650 meters 3,000,000.00 completed

Page 4: List of KALAHI-CIDSS Subprojects - BUB

CARAGA Surigao Del Sur Lanuza Gamuton 2014

Construction Of Drainage System Construction Of 500

Meters Drainage System With Concrete Culvert Purok I,

Gamuton

Construction Of Drainage System Construction Of 150

Meters Drainage System With Concrete Culvert Purok I,

Gamuton

DRAINAGE SYSTEM 1 150 meter 500,000.00 completed

CARAGA Surigao Del Sur Lanuza Zone II 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 4,000,000.00 ongoing

CARAGA Surigao Del Sur Lianga Liatimco 2014

Rehabilitation And Improvement Of Day Care Center 15 Day

Care Centers 13 Barangays & 2 Sitios (Neptune &

Huwangan)

Construction of 1 Unit Day Care Center - Liatimco DAY CARE CENTER 1 1,140,000.00 completed

CARAGA Surigao Del Sur Lianga Saint Cristine 2014 Rehabilitation of 1 unit Day Care Center - St. Christine DAY CARE CENTER 1 completed

CARAGA Surigao Del Sur Lianga Diatagon 2014Tribal Core Shelter Cum Social Service Facilities 1 Unit Social

Service Facilities For All Tribal Residents/Ips Kilometer 9,

Sitio Han-Ayan, Diatagon

Tribal Core Shelter Cum Social Service Facilities 1 Unit Social

Service Facilities For All Tribal Residents/Ips Kilometer 9,

Sitio Han-Ayan, Diatagon

CORE SHELTER 1 860,000.00 completed

CARAGA Surigao Del Sur Lingig Pagtilaan 2014

Construction/ Repair/ Rehabilitation Of Fmr With 26 Lm

Hanging Bridge Passable Roads For Farm Products To

Reduce Cost Of Transporting Crop Yeild To The Town Proper

And Neighboring Municipalities Sitio Tamisan, Pagtilaan

Construction/ Repair/ Rehabilitation Of Fmr With 26 Lm

Hanging Bridge Passable Roads For Farm Products To

Reduce Cost Of Transporting Crop Yeild To The Town Proper

And Neighboring Municipalities Sitio Tamisan, Pagtilaan

ROAD 1 1,500,000.00 completed

CARAGA Surigao Del Sur Lingig Sabang 2014Rehabiliation Of Drainage Canal : Public Market To Inyoy,

Edsa To Quarry And Sabang. Reduced Incidence Of Flooding

During Rainy Season Poblacion

rehabilitation of 390 l.m covered drainage canal w/ RCBC DRAINAGE SYSTEM 1 700,000.00 completed

CARAGA Surigao Del Sur Lingig Sabang 2014Rehabilitation Of Day Care Center Repaired 1 Classroom Dc

Center Sabang

Rehabilitation Of Day Care Center Repaired 1 Classroom Dc

Center SabangDAY CARE CENTER 1 200,000.00 completed

CARAGA Surigao Del Sur Lingig Poblacion 2014Water, Sanitation Facilities Of Day Care Center Established

Water And Sanitation Facility Sabangwater and sanitation of facilities of DCC - Poblacion DAY CARE CENTER 1 100,000.00 completed

CARAGA Surigao Del Sur Lingig Bonggan 2015KC-NCDDP PROJECTS (CONSTRUCTION OF DRAINAGE

CANAL & BOX CULVERTS) FOR BRGYS. POBLACION,

BONGAN & MAHAYAHAY

Installation of RCPC in critical sections of Barangay Road of

Bongan, Lingig, Surigao del SurROAD 1 1,500,000.00 proposed

CARAGA Surigao Del Sur Lingig Poblacion 2015 Construction of Drainage Canal DRAINAGE SYSTEM 1 ongoing

CARAGA Surigao Del Sur Madrid 2015REPAIR/UPGRADING OF DAY CARE CENTER FOR BRGYS.

SAN VICENTE, BAYOGO, SITIO

REPAIR/UPGRADING OF DAY CARE CENTER FOR BRGYS.

SAN VICENTE, BAYOGO, SITIODAY CARE CENTER 1 650,000.00 ongoing

CARAGA Surigao Del Sur Madrid 2015 CONST. OF WOMEN CRISIS CENTER CONST. OF WOMEN CRISIS CENTER BUILDING FACILITY 1 500,000.00 ongoing

CARAGA Surigao Del Sur Marihatag San Isidro 2014 Evacuation Center One Unit San Isidro construction of tribal Evacuation center one unit San Isidro EVACUATION CENTER 1 680,000.00 completed

CARAGA Surigao Del Sur Marihatag Antipolo 2014Indoor And Outdoor Facilities For Day Care Center One Unit

MararagProvision of outdoor and indoor facilities 1 680,000.00 completed

CARAGA Surigao Del Sur Marihatag Poblacion 2014 Repair & Maintenance Of Fmr 200 Meters Municipal Wide Concreting of 200 ln.m. Farm to Market Road ROAD 1 1,540,250.00 completed

CARAGA Surigao Del Sur San Agustin Sto. Nino 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,706,875.38 ongoing

CARAGA Surigao Del Sur San Miguel Poblacion 2015 CONSTRUCTION OF DRAINAGE CONSTRUCTION OF DRAINAGE DRAINAGE SYSTEM 1 700,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Baras 2015 1 UNIT DAY CARE CENTER 1 UNIT DAY CARE CENTER DAY CARE CENTER 1 800,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Bolhoon 2015 RIVER PROTECTION DIKE CONTRUCTION RIVER PROTECTION DIKE CONTRUCTION WATER CONTROL 1 800,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Siagao 2015 CONCRETING OF DRAINAGE CANAL CONCRETING OF DRAINAGE CANAL DRAINAGE SYSTEM 1 500,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Bitaugan 2015CONSTRUCTION OF PATHWAY FROM RIVERSIDE TO BRGY.

PROPER

CONSTRUCTION OF PATHWAY FROM RIVERSIDE TO BRGY.

PROPERPATHWAY 1 500,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Mahayag 2015 CONCRETING OF DRAINAGE CANAL CONCRETING OF DRAINAGE CANAL DRAINAGE SYSTEM 1 500,000.00 completed

CARAGA Surigao Del Sur San Miguel Libas Sud 2015CONSTRUCTION OF DRAINAGE OF 100 HAS ABANDONED

RICEFIELD

CONSTRUCTION OF DRAINAGE OF 100 HAS ABANDONED

RICEFIELDDRAINAGE SYSTEM 1 500,000.00 completed

CARAGA Surigao Del Sur San Miguel Calatngan 2015 CONSTRUCTION OF DAYCARE CENTER PUROK 2 CONSTRUCTION OF DAYCARE CENTER PUROK 3 DAY CARE CENTER 1 500,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Patong 2015 CONSTRUCTION OF OPEN CONCRETE DRAINAGE/CANAL CONSTRUCTION OF OPEN CONCRETE DRAINAGE/CANAL DRAINAGE SYSTEM 1 500,000.00 ongoing

CARAGA Surigao Del Sur San Miguel Sagbayan 2015 CONSTRUCTION OF CONCRETE DRAINAGE / CANAL CONSTRUCTION OF CONCRETE DRAINAGE / CANAL DRAINAGE SYSTEM 1 500,000.00 ongoing

CARAGA Surigao Del Sur Tagbina Manambia 2013 Construction of Evacuation Center Construction of Evacuation Center-Manambia EVACUATION CENTER 1 1,700,000.00 1,700,000.00 08-Jan-14 completed

CARAGA Surigao Del Sur Tagbina Magsaysay 2013 Improvement of Multi-Purpose Hall Improvement of Multi-Purpose Hall - Magsaysay 1 400,000.00 400,000.00 05-Dec-13 completed

CARAGA Surigao Del Sur Tagbina Dona Carmen 2013 Construction of Day Care Centers Construction of Day Care Center in Dona Carmen - 800,000 DAY CARE CENTER 1 1,600,000.00 1,600,000.00 15-Dec-13 completed

CARAGA Surigao Del Sur Tagbina Poblacion 2013 Construction of Day Care Center in Poblacion - 800,000 DAY CARE CENTER 1 - 09-Dec-13 completed

CARAGA Surigao Del Sur Tagbina Poblacion 2014 Construcrtion Of 1 Unit Disability Center 0 Poblacion Tagbina Construcrtion Of 1 Unit Disability Center -Poblacion Tagbina BUILDING FACILITY 1 425,000.00 425,000.00 completed

CARAGA Surigao Del Sur Tagbina Santa Juana 2014Construction Of 1 Unit Day Care Center With Indoor And

Outdoor Facilities 48 Sqm Sitio Nazareth, Sta/ Juana

Construction Of 1 Unit Day Care Center With Indoor And

Outdoor Facilities 48 Sqm Sitio Nazareth, Sta. JuanaDAY CARE CENTER 1 680,000.00 680,000.00 completed

CARAGA Surigao Del Sur Tagbina Uguban 2014Construction Of Slab Bridge (8 Linear Meters) 180 Sqm

Uguban

Construction Of Slab Bridge (8 Linear Meters) 180 Sqm

UgubanBRIDGE 1 850,000.00 850,000.00 completed

CARAGA Surigao Del Sur Tagbina Catipunan, Manambia 2014Establishment Of 1 Unit Day Care Center With Indoor And

Outdoor Facilities 48 Sqm Catipunan, Manambia

Establishment Of 1 Unit Day Care Center With Indoor And

Outdoor Facilities 48 Sqm Catipunan, ManambiaDAY CARE CENTER 2 680,000.00 680,000.00 completed

CARAGA Surigao Del Sur Tagbina Sta Fe 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,200,000.00 ongoing

CARAGA Surigao Del Sur Tagbina Carpenito 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,200,000.00 ongoing

CARAGA Surigao Del Sur Tagbina Sta. Maria 2015 CONSTRUCTION OF BHS CONSTRUCTION OF BHS BUILDING FACILITY 1 800,000.00 ongoing

CARAGA Surigao Del Sur Tago Badong 2014Construction Of Day Care Center · Construct Day Care Center

For Children Conducive Learning Place Pangian, Lindoy

Construction Of Day Care Center · Construct Day Care Center

For Children Conducive Learning Place Pangian, LindoyDAY CARE CENTER 1 652,174.00 652,174.00 completed

CARAGA Surigao Del Sur Tago Gamut 2014Construction Of Day Care Center · Construct Day Care Center

For Children Conducive Learning Place Sumo-SumoElderly Center in Gamot 1 652,174.00 652,174.00 completed

CARAGA Surigao Del Sur Tago Sumo-sumo 2014Construction Of Day Care Center · Construct Day Care Center

For Children Conducive Learning Place Sumo-Sumo

Construction Of Day Care Center · Construct Day Care Center

For Children Conducive Learning Place Sumo-SumoDAY CARE CENTER 1 652,174.00 652,174.00 completed

NCR NCR 3rd DISTRICT CALOOCAN CITY 2013Construction of Community Center to Serve as an

Educational CenterConstruction of Day Care Centers DAY CARE CENTER 1 8,750,000.00 completed

NCR NCR 3rd DISTRICT CALOOCAN CITY 2013Construction of Multi- purpose Hall to Serve as Day Center to

Cater the Needs of the Elderly and the Disadvantaged

Sectors

Establishment of Multi-purpose Hall for Disadvantaged

Sectors1 2,520,000.00 completed

NCR NCR 3rd DISTRICT CALOOCAN CITY 2015 Fencing and Improvement of Bahay Pag-Asa Center for the

Children in Conflict in the Law

Fencing and Improvement of Bahay Pag-Asa Center for the

Children in Conflict in the LawBUILDING FACILITY 1 750,000.00 TBD

NCR NCR 2nd DISTRICT CITY OF MARIKINA 2013 Establishment of Office for Persons with Disability Establishment of Office for Persons with Disability 1 115,500.00 ongoingNCR NCR 2nd DISTRICT CITY OF MARIKINA 2013 Improvement of Day Care Centers in the City Improvement of Day Care Centers in the City DAY CARE CENTER 1 770,000.00 completed

NCR NCR 2nd DISTRICT CITY OF MARIKINA 2014

PhilHealth Policy Dev't. (social insurance program of workers

in informal sectors) (Accesibility of insurances; Insured

workers; to workers in Informal Sectors)

Educational Assistance program 1 595,000.00 completed

NCR NCR 2nd DISTRICT CITY OF MARIKINA 2015Provision of Community kitchen and Toilet for selected three

(3) pilot barangay evacuation centers

Provision of Community kitchen and Toilet for selected three

(3) pilot barangay evacuation centersBUILDING FACILITY 1 1,200,000.00 TBD

NCR Metropolitan Manila City 2015 Rehabilitation of Reception and Action Center (RAC) - Bahay

Pag-Asa for CICL

Rehabilitation of Reception and Action Center (RAC) - Bahay

Pag-Asa for CICLBUILDING FACILITY 1 5,000,000.00 TBD

NCR Metropolitan Manila City 2015 Community-based Rehabilitation Program Community-based Rehabilitation Program 1 1,500,000.00 TBD

NCR Metropolitan Manila City 2015

"Lav ko to" Construction of Group

Handwashing/toothbrushing facilities for Day Care Center

(with complete set of sopa, toobrush and flouride gel

toothpaste)

"Lav ko to" Construction of Group

Handwashing/toothbrushing facilities for Day Care Center

(with complete set of sopa, toobrush and flouride gel

toothpaste)

DAY CARE CENTER 1 2,990,000.00 TBD

NCR NCR 4th DISTRICT CITY OF MUNTINLUPA 2013Assistance given to PWDs needing special assistive devices

such as special wheelchair for celebral palsy, hearing aide

and special eye glasses

Support to Social Development Center in maintenance and

operating expenses1 2,000,000.00 ongoing

NCR NCR 4th DISTRICT CITY OF MUNTINLUPA 2015 Community Rehabilitation Programs for PWDs (Assistive

Devices to PWD and Senior Citizens)

Community Rehabilitation Programs for PWDs (Assistive

Devices to PWD and Senior Citizens)1 1,428,000.00 TBD

NCR NCR 4th DISTRICT CITY OF MUNTINLUPA 2015 Construction of Group Hand washing facility in Day Care

Centers

Construction of Group Hand washing facility in Day Care

CentersDAY CARE CENTER 1 1,785,000.00 TBD

NCR NCR 3rd DISTRICT CITY OF NAVOTAS 2015 Potestive Services: Inrastructure Project - Construction of

Bahay Pag-Asa

Potestive Services: Inrastructure Project - Construction of

Bahay Pag-Asa BUILDING FACILITY 1 7,500,000.00 TBD

NCR NCR 4th DISTRICT PATEROS 2015 Repair of Day Care Center Repair of Day Care Center DAY CARE CENTER 1 3,000,000.00 TBD

NCR NCR 2nd DISTRICT QUEZON CITY 2015 Day Care Center Services for Elderly / Senior Citizen Day Care Center Services for Elderly / Senior Citizen DAY CARE CENTER 1 4,000,000.00 TBD

NCR NCR 4th DISTRICT TAGUIG CITY 2015 Urban Poor: Community Water Service thru KC NCDDP

(Purified and Mineral Based Water)

Urban Poor: Community Water Service thru KC NCDDP

(Purified and Mineral Based Water)WATER SYSTEM 1 2,319,000.00 TBD

I La Union Agoo Sta. Ana (Guidday) 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 2,050,021.00 2,050,021.00 pipelinedI La Union Agoo Macalva Norte (Tapaw) 2015 Construction of Day Care Center DAY CARE CENTER 1 pipelined

I La Union Bacnotan Arosip 2014 10. Upgrading of Day Care Centers (1000 CHILDREN) Improvement of Day Care Centers DAY CARE CENTER 1 809,000.00 40,450.00 849,450.00 25-Mar-15 completed

I La Union Bacnotan Nagsaraboan 2014 Improvement of Day Care Centers DAY CARE CENTER 1 40,450.00 40,450.00 25-Mar-15 completedI La Union Bacnotan Paagan 2014 Improvement of Day Care Centers DAY CARE CENTER 1 40,450.00 40,450.00 25-Mar-15 completedI La Union Bacnotan Raois 2015 Evacuation Center Evacuation Center BUILDING FACILITY 1 3,000,000.00 3,000,000.00 pipelinedI La Union Bagulin Suyo 2013 Constn of training center bldg. Construction of Training Center Bldg. - Brgy. Suyo BUILDING FACILITY 1 1,000,000.00 100,000.00 1,100,000.00 March 2015 completed

I La Union Bagulin Wallayan 2013 Construction of Day Care CenterConstruction of 1 Day Care Center (DCC) in Wallayan,

BagulinDAY CARE CENTER 1 600,000.00 100,000.00 700,000.00 March 2015 completed

I La Union Bagulin Tio-Angan 2013 Construction of senior citizen center Construction of 1 Senior Citizen Center in Tio-angan, Bagulin BUILDING FACILITY 1 900,000.00 100,000.00 1,000,000.00 March 2015 completed

I La Union Bagulin Cambaly 2014 10. Hanging footbridge (3 units Hanging footbridges

provided with Steel matting)

Hanging footbridge (3 units Hanging footbridges provided

with Steel matting)FOOT BRIDGE 1 200,000.00 10,000.00 210,000.00 completed

I La Union Bagulin Alibangsay 2014 11. Hanging footbridge (1 unit -80 meters HFB constructed) Hanging footbridge (1 unit -80 meters HFB constructed) FOOT BRIDGE 1 300,000.00 30,000.00 330,000.00 completed

I La Union Bagulin 2014 Rehabilitation of Access Road ROAD 1 - completed

I La Union Bagulin Suyo 2014 12. Completion of Training Center (1 unit Training center

Completed)

Completion of Training Center (1 unit Training center

Completed)BUILDING FACILITY 1 500,000.00 50,000.00 550,000.00 ongoing

I La Union Bagulin Cambaly 2014 16. Completion of Day Care Center (1 unit Day Care Center

completely constructed)

Completion of Day Care Center (1 unit Day Care Center

completely constructed)DAY CARE CENTER 1 150,000.00 7,500.00 157,500.00 ongoing

I La Union Bagulin Suyo 2014 19. Rehab of Water Supply (Suyo Water system

Rehabilitated)Rehab of Water Supply (Suyo Water system Rehabilitated) WATER SYSTEM 1 300,000.00 30,000.00 330,000.00 completed

I La Union Bagulin 2014 Rehabilitation of Access Road ROAD 1 completed

I La Union Bagulin Libbo 2014 2. Provision of small farm machinery (small rotovator) (1

unit)Provision of small farm machinery (small rotovator) (1 unit) 1 85,000.00 4,250.00 89,250.00 ongoing

I La Union Bagulin Cardiz 2015 Protective Services - Infrastructure Project Infrastructure Project 1 500,000.00 500,000.00 ongoing

I La Union Bagulin Suyo 2015 Protective Services - Infrastructure ProjectImprovement / Upgrading and Rehabilitation of Day Care

CenterDAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelined

I La Union Bagulin Dagup 2015 Improvement / Upgrading and Rehabilitation of Day Care

CenterDAY CARE CENTER 1 pipelined

I La Union Bagulin Cambaly 2015 Improvement / Upgrading and Rehabilitation of Day Care

CenterDAY CARE CENTER 1 pipelined

I La Union Bagulin Tagudtud 2015 Improvement / Upgrading and Rehabilitation of Day Care

CenterDAY CARE CENTER 1 pipelined

I La Union Bagulin Baay 2015 Improvement / Upgrading and Rehabilitation of Day Care

CenterDAY CARE CENTER 1 pipelined

I La Union Balaoan Sablut 2015 Repair of Sablut Day Care Center Repair of Sablut Day Care Center DAY CARE CENTER 1 500,000.00 500,000.00 pipelinedI La Union Balaoan Calungbuyan 2015 Repair of Calungbuyan Day Care Center Repair of Calungbuyan Day Care Center DAY CARE CENTER 1 500,000.00 500,000.00 pipelinedI La Union Balaoan Baracbac Este 2015 Repair of Baracbac Este Day Care Center Repair of Baracbac Este Day Care Center DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

I La Union Bangar Maria Cristina East 2013 Construction of Livelihood Training Center at Maria Cristina

West Bangar

Construction of Livelihood Training Center at Maria Cristina

West BangarBUILDING FACILITY 1 2,000,000.00 2,000,000.00 March 2015 completed

I La Union Bangar Baracca 2013 Barraca Day Care Center Extension Improvement of Day Care Center DAY CARE CENTER 1 100,000.00 100,000.00 March 2015 completedI La Union Bangar 2013 Electric Installation Electric Installation 1 50,000.00 50,000.00 March 2015 completedI La Union Bangar Central West No 3 2013 Floor Tiling Floor Tiling - Central West no. 3* (52,498) 1 500,000.00 500,000.00 completedI La Union Bangar Maria Cristina East 2013 Floor Tiling - Maria Cristina East (52,498) 1 - completedI La Union Bangar Mindoro 2013 Floor Tiling - Mindoro (52,498) 1 - completedI La Union Bangar Paratong Norte 2013 Floor Tiling - Paratong Norte (30,803) 1 - completedI La Union Bangar Quintarong 2013 Floor Tiling - Quintarong (52,498) 1 - completedI La Union Bangar Central East No 1 2013 Floor Tiling - Central East no. 1 (27,588) 1 - March 2015 completedI La Union Bangar Agdeppa 2013 Floor Tiling - Agdeppa (52,498) 1 39.85 sq. m. - March 2015 completedI La Union Bangar Sinapangan Sur 2013 Floor Tiling - Sinapangan Sur (52,498) 1 - March 2015 completedI La Union Bangar Nagsabaran 2013 Floor Tiling - Nagsabaran (66,048) 1 28 sq. m. - March 2015 completedI La Union Bangar Barraca 2013 Floor Tiling - Barraca (60,573) 1 - March 2015 completedI La Union Bangar Gen. Prim East 2013 Gen. Prim East Day Care Center Extension Improvement of Day Care Center DAY CARE CENTER 1 100,000.00 100,000.00 March 2015 completed

I La Union Bangar Quintarong 2013 Provision of Comfort Room Tiles DCC Comfort Room Repair: Tiling - Quintarong* (15,500) DAY CARE CENTER 1 100,000.00 100,000.00 completed

I La Union Bangar Maria Cristina East 2013 DCC Comfort Room Repair: Tiling - Maria Cristina East

(15,500)DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar Mindoro 2013 DCC Comfort Room Repair: Tiling - Mindoro (15,500) DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar Paratong Norte 2013 DCC Comfort Room Repair: Tiling - Paratong Norte (11,250) DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar Central West No 3 2013 DCC Comfort Room Repair: Tiling - Central West no. 3

(15,500)DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar Central East No 1 2013 DCC Comfort Room Repair: Tiling - Central East no. 1

(15,500)DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar San Blas 2013 DCC Comfort Room Repair: Tiling - San Blas (15,500) DAY CARE CENTER 1 - March 2015 completed

I La Union Bangar Central East No 1 2013 Purchase of Program MaterialsPurchase of Program Materials including Purchase of Tables

and Chair - Central East no. 1* (13,793.1)1 300,000.00 300,000.00 March 2015 completed

I La Union Bangar Maria Cristina East 2013 Purchase of Tables and Chair Purchase of Program Materials including Purchase of Tables

and Chair - Maria Cristina East (13,793.1)1 100,000.00 100,000.00 March 2015 completed

I La Union Bangar Quintarong 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Quintarong (13,793.1) 1 - March 2015 completed

I La Union Bangar Mindoro 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Mindoro (13,793.1)1 - March 2015 completed

I La Union Bangar Paratong Norte 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Paratong Norte (13,793.1)1 - March 2015 completed

I La Union Bangar Central West No 3 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Central West no. 3 (13,793.1)1 - March 2015 completed

I La Union Bangar Agdeppa 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Agdeppa (13,793.1)1 - March 2015 completed

I La Union Bangar Sinapangan Sur 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Sinapangan Sur (13,793.1)1 - March 2015 completed

I La Union Bangar Nagsabaran 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Nagsabaran (13,793.1)1 - March 2015 completed

I La Union Bangar Barraca 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Barraca (13,793.1)1 - March 2015 completed

I La Union Bangar San Blas 2013 Purchase of Program Materials including Purchase of Tables

and Chair - San Blas (13,793.1)1 - March 2015 completed

I La Union Bangar Sinapangan Norte 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Sinapangan Norte (13,793.1)1 - March 2015 completed

I La Union Bangar Gen Prim East 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Gen Prim East (13,793.1)1 - March 2015 completed

I La Union Bangar Gen Prim West 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Gen Prim West (13,793.1)1 - March 2015 completed

I La Union Bangar Bangaoilan East 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Bangaoilan East (13,793.1)1 - March 2015 completed

I La Union Bangar Bangaoilan West 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Bangaoilan West (13,793.1)1 - March 2015 completed

I La Union Bangar Luzong Norte 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Luzong Norte (13,793.1)1 - March 2015 completed

I La Union Bangar Luzong Sur 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Luzong Sur (13,793.1)1 - March 2015 completed

Page 5: List of KALAHI-CIDSS Subprojects - BUB

I La Union Bangar Rissing 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Rissing (13,793.1)1 - March 2015 completed

I La Union Bangar Cadapli 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Cadapli (13,793.1)1 - March 2015 completed

I La Union Bangar Ubbog 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Ubbog (13,793.1)1 - March 2015 completed

I La Union Bangar Reyna Regente 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Reyna Regente (13,793.1)1 - March 2015 completed

I La Union Bangar General Terrero 2013 Purchase of Program Materials including Purchase of Tables

and Chair - General Terrero (13,793.1)1 - March 2015 completed

I La Union Bangar Paratong 3 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Paratong 3 (13,793.1)1 - March 2015 completed

I La Union Bangar Paratong 4 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Paratong 4 (13,793.1)1 - March 2015 completed

I La Union Bangar Alzate 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Alzate (13,793.1)1 - March 2015 completed

I La Union Bangar Maria Cristina West 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Maria Cristina West (13,793.1)1 - March 2015 completed

I La Union Bangar San Cristobal 2013 Purchase of Program Materials including Purchase of Tables

and Chair - San Cristobal (13,793.1)1 - March 2015 completed

I La Union Bangar Consuegra 2013 Purchase of Program Materials including Purchase of Tables

and Chair - Consuegra (13,793.1)1 - March 2015 completed

I La Union Bangar Sipangan 2013 Sinapangan Day Care Extension Extension and Repair of Day Care Center DAY CARE CENTER 1 100,000.00 100,000.00 March 2015 completed

I La Union Bangar Maria Cristina East 2013 Procurement of Livelihood Training Equipments and

Facilities

Procurement of Livelihood Training Equipments and

Facilities1 1,000,000.00 1,000,000.00 March 2015 completed

I La Union Bangar Barraca 2014 10. KALAHI-CIDDS Project – Environmental Protection (Soil

protection/riprap construction at Barraca

KALAHI-CIDDS Project – Environmental Protection (Soil

protection/riprap construction at Barraca1 1,312,000.00 196,800.00 1,508,800.00 ongoing

I La Union Bauang Pilar 2014 6. Repair/Renovation of Two (2) Day Care Centers for brgys

Pilar & Upper San AgustinRepair/Renovation of Two (1) Day Care Centers - Pilar DAY CARE CENTER 1 1,500,000.00 225,000.00 1,725,000.00 completed

I La Union Bauang Upper San Agustin 2014 Repair/Renovation of Two (1) Day Care Centers - Upper San

AgustinDAY CARE CENTER 1 - ongoing

I La Union Burgos Linuan 2015 Improvement / upgrading and rehabilitation of Day Care

Center

Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 1,650,000.00 1,650,000.00 ongoing

I La Union Burgos Delles "A" 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Delles "A" 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Lower Tumapoc 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Upper Tumapoc 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Caoayan 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Old Poblacion 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Dalacdac 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Dilis 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos New Poblacion 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Libtong 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Burgos Imelda 2015 Improvement / upgrading and rehabilitation of Day Care

CenterDAY CARE CENTER 1 - pipelined

I La Union Caba Urayong 2014 13. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Urayong)

13. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Urayong)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba Santiago Sur 2014 14. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Santiago Sur)

14. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Santiago Sur)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba San Jose 2014 15. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Juan Cartas)

15. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy San Jose)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba Wencelslao 2014 16. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Wenceslao)

16. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Wenceslao)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba San Cornelio 2014 17. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy San Gregorio)

17. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy San Cornelio)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba Liquicia 2014 18. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Liquicia)

18. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy Liquicia)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba San Fermin 2014 19. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy San Fermin)

19. Repair/Upgrading and Rehabilitation of Day Care Center

(Brgy San Fermin)DAY CARE CENTER 1 123,571.00 6,178.55 129,749.55 ongoing

I La Union Caba 2015 Evacuation Facility Evacuation Facility EVACUATION CENTER 1 2,040,000.00 2,040,000.00 pipelined

I La Union Luna Ayaoan 2014 8. Improvement of Day Care Centers and Provision of Water

Facilities

8. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 690,000.00 103,000.00 793,000.00 ongoing

I La Union Luna Magsiping 2014 8. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Rimos #2 2014 8. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Rimos #5 20148. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Pitpitac 2014 8. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Sto. Domingo 20148. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Rimos # 4 20148. Improvement of Day Care Centers and Provision of Water

FacilitiesDAY CARE CENTER 1 ongoing

I La Union Luna Cabalitucan 2015 Repair/upgarding of DCC Repair/upgarding of DCC DAY CARE CENTER 1 1,500,000.00 1,500,000.00 pipelinedI La Union Luna Nagrebcan 2015 Repair/upgarding of DCC DAY CARE CENTER 1 pipelinedI La Union Luna Rimos #4 2015 Repair/upgarding of DCC DAY CARE CENTER 1 pipelinedI La Union Luna Rimos #5 2015 Repair/upgarding of DCC DAY CARE CENTER 1 pipelinedI La Union Naguilian Aguioas 2014 10. Improvement of Day Care Centers 10. Improvement of Day Care Centers DAY CARE CENTER 1 3,700,000.00 15,000.00 115,000.00 completedI La Union Naguilian Al-alinao Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Al-alinao Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Ambaracao Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Ambaracao Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Angin 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Balecbec 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Bancagan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Baraoas Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Baraoas Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Bariquir 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Bato 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Bimmotobot 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Cabaritan Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Cabaritan Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Casilagan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Dal-lipaoen 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Daramuangan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Guesset 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Gusing Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Gusing Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Imelda 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Lioac Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Lioac Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Magungunay 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Mamat-ing Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Mamat-ing Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Nagsidorisan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Natividad 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Ortiz 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Ribsuan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian San Antonio 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian San Isidro 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Sili 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Suguidan Norte 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Suguidan Sur 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completedI La Union Naguilian Tuddingan 2014 10. Improvement of Day Care Centers DAY CARE CENTER 1 15,000.00 115,000.00 completed

I La Union Naguilian Natividad 2015Upgrading of Evacuation Center - Repaired Comfort Rooms

with Septic Vault. Roof Screen and painted walls

Upgrading of Evacuation Center - Repaired Comfort Rooms

with Septic Vault. Roof Screen and painted wallsBUILDING FACILITY 1 580,000.00 580,000.00 pipelined

I La Union Rosario Poblacion 2015 Establishment of OPDA Establishment of OPDA 1 500,000.00 500,000.00 pipelinedI La Union Rosario Nangamotian 2015 Construction/Rehabilitation of DayCareCenter Construction/Rehabilitation of DayCareCenter DAY CARE CENTER 1 3,000,000.00 3,000,000.00 pipelinedI La Union Rosario Casilagan 2015 Construction/Rehabilitation of DayCareCenter DAY CARE CENTER 1 proposedI La Union Rosario San Jose 2015 Construction/Rehabilitation of DayCareCenter DAY CARE CENTER 1 proposedI La Union Rosario Carunungan East 2015 Construction/Rehabilitation of DayCareCenter DAY CARE CENTER 1 proposedI La Union Rosario 2015 Rehabilitation of Evacuation Center Rehabilitation of Evacuation Center BUILDING FACILITY 1 750,000.00 750,000.00 pipelined

I La Union San Fernando 2015Protective Services - Construction of hand washing facilities

for 63 Day Care Center with complete kit; soap, tootbrush

and flouride toothpaste

Protective Services - Construction of hand washing facilities

for 63 Day Care Center with complete kit; soap, tootbrush

and flouride toothpaste

DAY CARE CENTER 1 1,701,000.00 1,701,000.00 pipelined

I La Union San Gabriel Bumbuneg (Sitio Salangsang) 2015 Construction of Day Care Centers Construction of Day Care Center DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

I La Union Santo Tomas Patac 201417. Day Care Centers - Construction of Day Care Center (1

unit Day Care Center)

17. Day Care Centers - Construction of Day Care Center (1

unit Day Care Center)DAY CARE CENTER 1 750,000.00 37,500.00 787,500.00 ongoing

I La Union Santo Tomas Malabago 201418. Day Care Centers - Improvement of Day Care Centers (8

folded tables, 160 folded chairs, 16 storage cabinets, 16

chalkboards

18. Day Care Centers - Construction of Day Care Center (1

Unit Day Care Center)DAY CARE CENTER 1 626,500.00 31,325.00 657,825.00 ongoing

I La Union Santo Tomas Balsaan 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 750,000.00 750,000.00 pipelined

I La Union Sudipen Old Central 2015Upgrade / Provision of Day Care Centers' Playground

Facilities

Upgrade / Provision of Day Care Centers' Playground

FacilitiesDAY CARE CENTER 1 500,000.00 100,000.00 pipelined

I La Union Sudipen Ilocano 2015Upgrade / Provision of Day Care Centers' Playground

FacilitiesDAY CARE CENTER 1 100,000.00 pipelined

I La Union Sudipen Ipet 2015Upgrade / Provision of Day Care Centers' Playground

FacilitiesDAY CARE CENTER 1 100,000.00 pipelined

I La Union Sudipen Castro 2015Upgrade / Provision of Day Care Centers' Playground

FacilitiesDAY CARE CENTER 1 100,000.00 pipelined

I La Union Sudipen San Francisco Sur 2015Upgrade / Provision of Day Care Centers' Playground

FacilitiesDAY CARE CENTER 1 100,000.00 pipelined

I La Union Sudipen Poblacion 2015 Establishment of office of the Person with Disability Affairs Establishment of office of the Person with Disability Affairs 1 1,000,000.00 1,000,000.00 pipelined

I La Union Tubao Poblacion 2015 Completion of Evacuation Center Completion of Evacuation Center BUILDING FACILITY 1 2,000,000.00 2,000,000.00 ongoingI Ilocos Norte Bacarra 2015 Protective Services - Infrastructure Project Protective Services - Infrastructure Project 1 2,800,000.00 2,800,000.00 pipelinedI Ilocos Norte Bacarra 2015 Construction of Evacuation Centers Construction of Evacuation Centers BUILDING FACILITY 1 2,000,000.00 2,000,000.00 pipelined

I Ilocos Norte Badoc Aring 2014Kapit-Bisig-Laban sa Kahirapan-Comprehensive and

Integrated Delivery of Social Services (KALAHI-CIDSS) (

Barangay Aring)

Kapit-Bisig-Laban sa Kahirapan-Comprehensive and

Integrated Delivery of Social Services (KALAHI-CIDSS) (

Barangay Aring)

1 450,000.00 67,000.00 517,000.00 ongoing

I Ilocos Norte Badoc Alay 2015 Repair / Upgrading of Various DCC Repair / Upgrading of Various DCC DAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelinedI Ilocos Norte Badoc Madupayas 2015 Repair / Upgrading of Various DCC DAY CARE CENTER 1 - pipelinedI Ilocos Norte Badoc Pagsanahan Norte 2015 Repair / Upgrading of Various DCC DAY CARE CENTER 1 - pipelinedI Ilocos Norte Badoc Pagsanahan Sur 2015 Repair / Upgrading of Various DCC DAY CARE CENTER 1 - pipelined

I Ilocos Norte Bangui San Lorenzo 2015 Construction of Evacuation Center at Brgy. San Lorenzo Construction of Evacuation Center at Brgy. San Lorenzo BUILDING FACILITY 1 3,200,000.00 3,200,000.00 pipelined

I Ilocos Norte Batac City Quiling Norte 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 700,000.00 700,000.00 pipelinedI Ilocos Norte Batac City San Julian 2015 Construction of Women Crisis Center Construction of Women Crisis Center BUILDING FACILITY 1 1,000,000.00 1,000,000.00 pipelinedI Ilocos Norte Burgos Paayas 2015 Upgrading / Repairs of Day Care Centers Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 2,200,000.00 2,200,000.00 pipelinedI Ilocos Norte Burgos Bobon 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Bayog 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Ablan 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Saoit 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Pacali 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Buduan 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Poblacion 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Nagsurot 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Tanap 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposedI Ilocos Norte Burgos Agaga 2015 Upgrading / Repairs of Day Care Centers DAY CARE CENTER 1 proposed

I Ilocos Norte Carasi Barbequezo 2015 Construction of VAWC, Women, CICL and PWD Center Construction of VAWC, Women, CICL and PWD Center BUILDING FACILITY 1 704,943.79 704,943.79 pipelined

I Ilocos Norte Currimao Salugan 2015 Evacuation Facility Evacuation Facility EVACUATION CENTER 1 3,000,000.00 3,000,000.00 pipelinedI Ilocos Norte Dingras 2015 Construction of Brgy. Health Station Construction of Brgy. Health Station HEALTH CENTER 1 1,500,000.00 1,500,000.00 pipelinedI Ilocos Norte Laoag City Cabungaan 2015 Construction of Bahay Pag-Asa for CICL Construction of Bahay Pag-Asa for CICL BUILDING FACILITY 1 2,000,000.00 2,000,000.00 pipelinedI Ilocos Norte Marcos 2015 Construction of Women Center Construction of Women Center BUILDING FACILITY 1 2,000,000.00 2,000,000.00 pipelinedI Ilocos Norte Marcos 2015 Repair / Maintenance / Improvement of 18 DCCS Repair / Maintenance / Improvement of 18 DCCS DAY CARE CENTER 1 450,000.00 450,000.00 pipelinedI Ilocos Norte Nueva Era 2015 Improvement of seven (7) Day Care Centers Improvement of seven (7) Day Care Centers DAY CARE CENTER 1 2,200,000.00 2,200,000.00 pipelinedI Ilocos Norte Paoay Veronica 2015 Protective Services - Infrastructure Project Repair / Upgrading of Day care Center DAY CARE CENTER 1 900,000.00 50,000.00 950,000.00 pipelined

I Ilocos Norte Pasuquin 2015 Construction of group Hand washing facility in Day Care

Centers (with soap, toothbrush and flouride toothpaste

Construction of group Hand washing facility in Day Care

Centers (with soap, toothbrush and flouride toothpasteDAY CARE CENTER 1 600,000.00 pipelined

I Ilocos Norte Pasuquin 2015 Construction of Day Care Centers Construction of Day Care Centers DAY CARE CENTER 1 1,400,000.00 1,400,000.00 pipelinedI Ilocos Norte Piddig Dupitak 2015 Construction of Day Care Centers Construction of Day Care Centers DAY CARE CENTER 1 3,000,000.00 600,000.00 pipelinedI Ilocos Norte Piddig Gayamat 2015 Construction of Day Care Centers DAY CARE CENTER 1 600,000.00 pipelinedI Ilocos Norte Piddig Maab-abaca 2015 Construction of Day Care Centers DAY CARE CENTER 1 600,000.00 pipelinedI Ilocos Norte Piddig Tangaoan 2015 Construction of Day Care Centers DAY CARE CENTER 1 600,000.00 pipelinedI Ilocos Norte Piddig Lo-ing 2015 Construction of Day Care Centers DAY CARE CENTER 1 600,000.00 pipelinedI Ilocos Norte Pinili 2015 Repair and Upgrading of Day Care Centers Repair and Upgrading of Day Care Centers DAY CARE CENTER 1 900,000.00 pipelined

I Ilocos Norte Pinili 2015 Establishment of office of the Person with Disability Affairs Establishment of office of the Person with Disability Affairs 1 975,000.00 pipelined

I Ilocos Norte San Nicolas Tamurong 2015 Repair and Upgrading of Day Care Centers Construction of Day CareCenter DAY CARE CENTER 1 500,000.00 pipelinedI Ilocos Norte San Nicolas San Marcos 2015 Construction of Day CareCenter DAY CARE CENTER 1 proposedI Ilocos Norte San Nicolas Sta. Monica 2015 Construction of Day CareCenter DAY CARE CENTER 1 proposedI Ilocos Norte San Nicolas San Lucas 2015 Construction of Day CareCenter DAY CARE CENTER 1 proposedI Ilocos Norte San Nicolas San Jose 2015 Construction of Day CareCenter DAY CARE CENTER 1 proposedI Ilocos Norte Sarrat 2015 Upgrading / Improvement of Day Care Centers Upgrading / Improvement of Day Care Centers DAY CARE CENTER 1 2,000,000.00 pipelinedI Ilocos Norte Solsona Manalpac 2015 Construction of Day Care Center Buildings Construction of Day Care Center Buildings DAY CARE CENTER 1 1,850,000.00 pipelinedI Ilocos Norte Solsona Mananteng 2015 Construction of Day Care Center Buildings DAY CARE CENTER 1 proposedI Ilocos Norte Solsona Santiago 2015 Construction of Day Care Center Buildings DAY CARE CENTER 1 proposedI Ilocos Sur Banayoyo Poblacion 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 1,011,600.00 for compliance proposedI Ilocos Sur Banayoyo Bagbagutot 2015 Construction of Day Care Center DAY CARE CENTER 1 1,011,600.00 pipelined

I Ilocos Sur Bantay An-annam 2014

Upgrading of Day Care Centers Facilities - 25 Day Care

Centers for Construction of Toilets

(Brgy.I,Brgy.II,,Brgy.IV,Brgy.V, An-annam, Mira, Taleb,

Boquig, Cabusligan, Malingeb, Tay-ac, Centro, Tay-ac,

Portugues, Naguiddayan, Lingsat, Quimmarayan, Sagneb,

Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - An-

annam

DAY CARE CENTER 1 1,352,095.00 67,604.75 1,419,699.75 completed

I Ilocos Sur Bantay Balaleng 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - BalalengDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Banaoang 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Banaoang

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Brgy. I 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Brgy.IDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Brgy. II 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Brgy. IIDAY CARE CENTER 1 - completed

Page 6: List of KALAHI-CIDSS Subprojects - BUB

I Ilocos Sur Bantay Brgy. IV 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Brgy. IVDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Brgy. VI 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Brgy. VIDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Bulag 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - BulagDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Boquig 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - BoquigDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Cabalanggan 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Cabalanggan

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Cabusligan 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Cabusligan

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Capangdanan 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Capangdanan

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Lingsat 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - LingsatDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Malingeb 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Malingeb

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Mira 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - MiraDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Naguiddayan 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Naguiddayan

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Puspus 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - PuspusDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Quimmarayan 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) -

Quimmarayan

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Sagneb 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - SagnebDAY CARE CENTER 1 - completed

I Ilocos Sur Bantay San Julian 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - San

Julian

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay San Mariano 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - San

Mariano

DAY CARE CENTER 1 - completed

I Ilocos Sur Bantay Taleb 2014 Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - TalebDAY CARE CENTER 1 completed

I Ilocos Sur Bantay Tay-ac Centro 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Tay-ac

Centro

DAY CARE CENTER 1 completed

I Ilocos Sur Bantay Tay-ac Portugues 2014Upgrading of Day Care Center Facilities (Construction and

Improvement of Day Care Center Comfort Rooms) - Tay-ac

Portugues

DAY CARE CENTER 1 - completed

I Ilocos Sur Burgos Bangbangar 2015 Protective Services - Infrastructure Project Infrastructure Project 1 760,000.00 760,000.00 For validation proposedI Ilocos Sur Burgos Davangui 2015 Infrastructure Project 1 proposedI Ilocos Sur Burgos Callitong 2015 Infrastructure Project 1 proposedI Ilocos Sur Burgos Talliao 2015 Infrastructure Project 1 proposedI Ilocos Sur Burgos Mambug 2015 Infrastructure Project 1 760,000.00 760,000.00 pipelinedI Ilocos Sur Cabugao Caellayan 2014 Improvement of Day Care Center Improvment of Day Care Centers DAY CARE CENTER 1 720,000.00 127,050.00 847,050.00 completedI Ilocos Sur Cabugao Catucdaan 2014 Improvment of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Cabugao Pug-os 2014 Improvment of Day Care Centers DAY CARE CENTER 1 completed

I Ilocos Sur Cabugao Margaay 2015 Protective Services - Infrastructure project : Construction of

Day Care Center - MargaayConstruction of Day Care Center - Margaay DAY CARE CENTER 1 800,000.00 800,000.00 pipelined

I Ilocos Sur Cabugao Sabang 2015 Protective Services - Infrastructure project : Construction of

Day Care Center - SabangConstruction of Day Care Center - Sabang DAY CARE CENTER 1 800,000.00 800,000.00 pipelined

I Ilocos Sur Galimuyod Poblacion 2015 Protective Services - Infrastructure Projects Construction of OSCA-OPDA BUILDING FACILITY 1 796,000.00 796,000.00 pipelinedI Ilocos Sur Galimuyod Kilang 2015 Protective Services - Infrastructure Projects Construction of Day Care Center DAY CARE CENTER 1 796,000.00 796,000.00 pipelinedI Ilocos Sur Galimuyod Sabangan-bato 2015 Protective Services - Infrastructure Projects Construction of Day Care Center DAY CARE CENTER 1 796,000.00 796,000.00 pipelinedI Ilocos Sur Gregorio Del Pilar Dapdappig 2015 Construction of DCCs Construction of DCCs DAY CARE CENTER 1 1,600,000.00 1,600,000.00 pipelinedI Ilocos Sur Gregorio Del Pilar Concepcion 2015 Construction of DCCs DAY CARE CENTER 1 pipelinedI Ilocos Sur Lidlidda Tay-ac 2015 Protective Services - Infrastructure Projects Infrastructure Project 1 1,750,000.00 1,750,000.00 pipelinedI Ilocos Sur Lidlidda Poblacion Norte 2015 Infrastructure Project 1 pipelinedI Ilocos Sur Lidlidda Bugui 2015 Infrastructure Project 1 pipelinedI Ilocos Sur Lidlidda Suysuyan 2015 Infrastructure Project 1 pipelinedI Ilocos Sur Lidlidda Carcarabasa 2015 Infrastructure Project 1 pipelinedI Ilocos Sur Lidlidda Poblacion Sur 2015 Infrastructure Project 1 pipelined

I Ilocos Sur Magsingal Sta. Monica 2015 Protective Services - Infrastructure Projects:

Repair/Upgrading of Day Care CenterRepair and Upgrading of Day Care Center DAY CARE CENTER 1 3,000,000.00 3,000,000.00 pipelined

I Ilocos Sur Magsingal San Viceente 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Cabaroan 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Pagsaan Norte 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Sarsaracat 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Namalpalan 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Alangan 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Magsingal Puro II 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur Nagbukel 2015 Construction of OTOP Building Construction of OTOP Building BUILDING FACILITY 1 1,100,000.00 1,100,000.00 pipelined

I Ilocos Sur Narvacan Rivadabia 2015 Protective Services - Infrastructure Projects: Day Care Center

Repair/Upgrading Day Care Center Repair/Upgrading DAY CARE CENTER 1 1,054,000.00 1,054,000.00 pipelined

I Ilocos Sur Narvacan Codoog 2015 Day Care Center Repair/Upgrading DAY CARE CENTER 1 pipelinedI Ilocos Sur Narvacan San Pablo 2015 Day Care Center Repair/Upgrading DAY CARE CENTER 1 pipelinedI Ilocos Sur Narvacan Orence 2015 Day Care Center Repair/Upgrading DAY CARE CENTER 1 pipelinedI Ilocos Sur Narvacan Camarao 2015 Day Care Center Repair/Upgrading DAY CARE CENTER 1 pipelinedI Ilocos Sur Salcedo Cabaroan-Dinaratan 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 2 1,600,000.00 1,600,000.00 pipelinedI Ilocos Sur Salcedo Boquibog 2015 Construction of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Emilio San Miliano, Sitio Mangmanga 2015 Construction of Day Care Centers Phase 1 Construction of Day Care Center Phase 1 DAY CARE CENTER 2 1,170,000.00 1,170,000.00 pipelinedI Ilocos Sur San Emilio San Miliano, Sitio Malengleng Siblucan 2015 Construction of Day Care Center Phase 1 DAY CARE CENTER 3 pipelinedI Ilocos Sur San Emilio Sibsibu 2015 Improvement of Day Care Centers Phase 1 Improvement of Day Care Center Phase 1 DAY CARE CENTER 1 2,380,000.00 2,380,000.00 pipelinedI Ilocos Sur San Emilio Kalumsing 2015 Improvement of Day Care Center Phase 1 DAY CARE CENTER 1 pipelinedI Ilocos Sur San Emilio San Miliano, Sitio Cumcumaoan 2015 Improvement of Day Care Center Phase 1 DAY CARE CENTER 2 pipelinedI Ilocos Sur San Emilio Paltoc 2015 Improvement of Day Care Center Phase 1 DAY CARE CENTER 1 pipelinedI Ilocos Sur San Emilio Cabaroan, Sitio Baang 2015 Improvement of Day Care Center Phase 1 DAY CARE CENTER 2 pipelinedI Ilocos Sur San Emilio Cabaroan, Sitio Singson 2015 Improvement of Day Care Center Phase 1 DAY CARE CENTER 2 pipelined

I Ilocos Sur San Esteban Cabaroan 2015 Repair/Upgrading of Cappa-Cappa and Cabaroan Day Care

CenterRepair/Upgrading of Day Care Center DAY CARE CENTER 1 1,400,000.00 1,400,000.00 pipelined

I Ilocos Sur San Esteban Cappa-Cappa 2015 Construction of Day Care Center DAY CARE CENTER 1 proposedI Ilocos Sur San Esteban Bateria 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 proposed

I Ilocos Sur San Ildefonso Bahet 2015Protective Services - Infrastructure project: Construction of

Day Care Center and Repair and Upgrading of Day Care

Centers

Repair and Upgrading of Day Care Center DAY CARE CENTER 1 1,300,000.00 1,300,000.00 pipelined

I Ilocos Sur San Ildefonso Otol-Patac 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Ildefonso Iboy 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Ildefonso Busiing 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Ildefonso Bungro 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelined

I Ilocos Sur San Juan Barbar Centro 2015 Protective Services - Infrastructure project: Construction of

Day Care Center Construction of Day Care Center DAY CARE CENTER 1 2,250,000.00 2,250,000.00 pipelined

I Ilocos Sur San Juan Asilang 2015 Construction of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Lapting 2015 Construction of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Barbar East 2015 B. Repair and Upgrading of Day Care Center Constrution of Day Care Center DAY CARE CENTER 1 1,650,000.00 1,650,000.00 pipelinedI Ilocos Sur San Juan Nagsabaran 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Bacsil 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Saoang 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Sabangan 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Malamin 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Labnig 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Juan Dardarat 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Ilocos Sur San Vicente San Sebastian 2015 Construction / Repair of Day Care Centers Construction of Day Care Centers DAY CARE CENTER 1 2,100,000.00 2,100,000.00 pipelinedI Ilocos Sur San Vicente Bantaoay 2015 Construction of Day Care Centers DAY CARE CENTER 1 pipelinedI Ilocos Sur San Vicente Lubong 2015 Construction of Day Care Centers DAY CARE CENTER 1 pipelinedI Ilocos Sur San Vicente Pudoc 2015 Construction of Day Care Centers DAY CARE CENTER 1 pipelinedI Ilocos Sur San Vicente Nagtupaacan 2015 Construction of Day Care Centers DAY CARE CENTER 1 pipelined

I Ilocos Sur Santa Lucia 2015Construction of Group Hand washing facility in DCCs with

complete Soap, Toothbrush, Flouride Toothpaste

Construction of Group Hand washing facility in DCCs with

complete Soap, Toothbrush, Flouride ToothpasteDAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelined

I Ilocos Sur Santa Maria Maynganay Sur 2015 Construction of Day Care Centers Construction of Day Care Centers DAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelinedI Ilocos Sur Santa Maria Maynganay Norte 2015 Construction of Day Care Centers DAY CARE CENTER 1 pipelinedI Ilocos Sur Santa Maria Poblacion Sur 2015 Construction of Evacuation Centers Construction of Evacuation Centers BUILDING FACILITY 1 1,100,000.00 1,100,000.00 pipelinedI Ilocos Sur Sinait Macabiag 2015 Construction of 4 Units Day Care Center Construction of 1-Unit Day Care Center DAY CARE CENTER 1 3,200,000.00 3,200,000.00 proposedI Ilocos Sur Sinait Rang-ay 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposedI Ilocos Sur Sinait Sapriana 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposedI Ilocos Sur Sinait Cabulalaan 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

I Ilocos Sur Suyo Urzadan 2014 KALAHI-CIDSS Project (Two(2) Day Care Centers

constructed: Urzadan and Suyo ProperKALAHI-CIDSS Project: Upgrading of 1 unit Day Care Center - Urzadan DAY CARE CENTER 1 900,000.00 45,000.00 945,000.00 ongoing

I Ilocos Sur Suyo Suyo Proper 2014KALAHI-CIDSS Project: Upgrading of 1 unit Day Care Center -

Suyo ProperDAY CARE CENTER 1 - ongoing

I Ilocos Sur Suyo Baringcucurong 2014

Upgrading of Day Care Centers (Upgrading of 12 Day Care

Centers and 12 Day Care workers;All 8 Barangays:

Baringcucurong, Cabugao, Man-atong, Patoc-ao, Poblacion,

Suyo Proper, Urzadan and Uso)

Upgrading of Day Care Centers - Baringcucurong DAY CARE CENTER 1 600,000.00 30,000.00 630,000.00 ongoing

I Ilocos Sur Suyo Cabugao 2014 Upgrading of Day Care Centers - Cabugao DAY CARE CENTER 1 - ongoing

I Ilocos Sur Suyo Cayapa, Poblacion 2014 Upgrading of Day Care Centers - Cayapa, Poblacion DAY CARE CENTER 2 - ongoing

I Ilocos Sur Suyo Poblacion Proper 2014 Upgrading of Day Care Centers - Poblacion Proper DAY CARE CENTER 1 - ongoingI Ilocos Sur Suyo Ida, Patoc-ao 2014 Upgrading of Day Care Centers - Ida, Patoc-ao DAY CARE CENTER 2 - ongoingI Ilocos Sur Suyo Lubnac, Patoc-ao 2014 Upgrading of Day Care Centers - Lubnac, Patoc-ao DAY CARE CENTER 2 - ongoingI Ilocos Sur Suyo Uso Proper 2014 Upgrading of Day Care Centers - so Proper DAY CARE CENTER 1 - ongoingI Ilocos Sur Suyo Batiangan, Uso 2014 Upgrading of Day Care Centers - Batiangan, Uso DAY CARE CENTER 2 - ongoing

I Ilocos Sur Suyo Paytocan, Suyo Proper 2014 Upgrading of Day Care Centers - Paytocan, Suyo Proper DAY CARE CENTER 2 ongoing

I Ilocos Sur Suyo Longboy, Suyo Proper 2014 Upgrading of Day Care Centers - Longboy, Suyo Proper DAY CARE CENTER 2 ongoing

I Ilocos Sur Suyo Butac, Man-atong 2014 Upgrading of Day Care Centers - Butac, Man-atong DAY CARE CENTER 2 ongoing

I Ilocos Sur Suyo Man-atong 2014 Upgrading of Day Care Centers - Man-atong DAY CARE CENTER 1 - ongoing

I Ilocos Sur Suyo 2015 Protective Services - Infrastructure Project: Construction of 2

Unit Day Care Center

Protective Services - Infrastructure Project: Construction of 2

Unit Day Care CenterDAY CARE CENTER 1 900,000.00 900,000.00 ongoing

I Ilocos Sur Tagudin Ag-aguman 2014 19. Repair and rehabilitation of Day Care Centers (100% of

Day Care Centers needing repair and rehabilitation)Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 2,000,000.00 300,000.00 2,300,000.00 completed

I Ilocos Sur Tagudin Ambalayat 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Baracbac 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Bario-an 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Baritao 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Becques 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Bimmanga 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Bitalag 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Borono 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Bucao East 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Bucao West 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Cabaroan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Cabugbugan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Cabulanglangan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Dardarat 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Del Pilar 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 ongoingI Ilocos Sur Tagudin Farola 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Gabur 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Garitan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Jardin 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Lacong 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Lantag 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Las-ud 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Libtong 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Lubnac 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Malacañang 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Pacac 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Pallogan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Pudoc East 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Pudoc West 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Pula 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Quirino 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Ranget 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Rizal 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Salvacion 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin San Miguel 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Sawat 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Sitio Kadamortisan 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Tallaoen 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin Tampugo 2014 Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 completedI Ilocos Sur Tagudin 2015 Repair/Upgrading of Day Care Center Repair/Upgrading of Day Care Center DAY CARE CENTER 1 1,350,000.00 1,350,000.00 pipelined

I Pangasinan Agno Aloleng 201413. Repair of Evacuation Center Preparedness (Aloleng

Constituents)

13. Repair of Evacuation Center Preparedness (Aloleng

Constituents)EVACUATION CENTER 1 300,000.00 45,000.00 345,000.00 ongoing

I Pangasinan Agno Magsaysay 2014 24. Construction of Day Care Centers (5 Barangays) Construction of 1 unit Day Care Center DAY CARE CENTER 1 54 sq. m. 2,105,500.00 375,000.00 2,480,500.00 January 2015 completed

I Pangasinan Agno Viga 2014 Construction of 1 unit Day Care Center DAY CARE CENTER 1 54 sq. m. - completedI Pangasinan Agno Sitio Abagatanen, Macaboboni 2014 Construction of 1 unit Day Care Center DAY CARE CENTER 2 54 sq. m. - completed

I Pangasinan Alaminos City Pogo 20141. Kapit-Bisig Laban sa Kahirapan-Comprehensive and

Integrated Delivery of Social Services (KALAHATI-CIDSS) (4

daycare centers; Sanitation Facility)

Construction of Pogo and Magsaysay Day Care Center DAY CARE CENTER 1 1,914,800.00 671,200.00 2,586,000.00 March 2015 completed

I Pangasinan Alaminos City Sitio Campila, Magsaysay 2014 Construction of Pogo and Magsaysay Day Care Center DAY CARE CENTER 2 - ongoing

I Pangasinan Alaminos City 2015 Upgrading of Day Care Centers Upgrading of Day Care Centers DAY CARE CENTER 1 1,800,000.00 1,800,000.00 pipelined

Page 7: List of KALAHI-CIDSS Subprojects - BUB

I Pangasinan Alaminos City 2015 Establishment of PDAO Establishment of PDAO 1 500,000.00 500,000.00 pipelined

I Pangasinan Alcala 2015Protective Service - Infrastructure Project: Construction of

Day Care CentersConstruction of Day Care Centers DAY CARE CENTER 1 750,000.00 750,000.00 pipelined

I Pangasinan Alcala 2015 Upgrading of Day Care Centers Upgrading of Day Care Centers DAY CARE CENTER 1 500,000.00 500,000.00 pipelinedI Pangasinan Asingan 2015 Provision of ECCD Learning Materials Provision of ECCD Learning Materials 1 500,000.00 500,000.00 pipelinedI Pangasinan Asingan Carosucan Sur 2015 Construction of Day Care Centers Construction of Day Care Center DAY CARE CENTER 1 750,000.00 750,000.00 pipelinedI Pangasinan Asingan Ariston West 2015 Repair and Upgrading of Day Care Centers Repair and Upgrading of Day Care Center DAY CARE CENTER 1 750,000.00 750,000.00 pipelinedI Pangasinan Asingan San Vicente East 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Asingan San Vicente West 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Asingan Domanpot 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Asingan Sinapog 2015 Repair and Upgrading of Day Care Center DAY CARE CENTER 1 pipelined

I Pangasinan Balungao Angayan Norte 20142. Rehabilitation/Repair of Day Care Centers (Day Care

centers of Angayan Norte, San Aurelio II, San Aurelio III,

San Miguel, San Marcelino, Angayan Sur & Pugaro)

Rehabilitation/Repair of Day Care Centers - Angayan Norte DAY CARE CENTER 1 872,000.00 43,600.00 915,600.00 completed

I Pangasinan Balungao San Aurelio II 2014 Rehabilitation/Repair of Day Care Centers - San Aurelio II DAY CARE CENTER 1 - completed

I Pangasinan Balungao San Aurelio III 2014 Rehabilitation/Repair of Day Care Centers - San Aurelio III DAY CARE CENTER 1 - completed

I Pangasinan Balungao San Miguel 2014 Rehabilitation/Repair of Day Care Centers - San Miguel DAY CARE CENTER 1 - completed

I Pangasinan Balungao San Marcelino 2014 Rehabilitation/Repair of Day Care Centers - San Marcelino DAY CARE CENTER 1 - completed

I Pangasinan Balungao Angayan Sur 2014 Rehabilitation/Repair of Day Care Centers - Angayan Sur DAY CARE CENTER 1 - completed

I Pangasinan Balungao Pugaro 2014 Rehabilitation/Repair of Day Care Centers - Pugaro DAY CARE CENTER 1 - completed

I Pangasinan Balungao Kita-kita 2015 Protective Service - Infrastructure Project Infrastructure Project 1 500,000.00 500,000.00 pipelinedI Pangasinan Balungao San Aurelio I 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao Rajal 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao Mauban 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao San Leon 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao Rajal Bagong 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao Esmeralda 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao San Andres 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao San Raymundo 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao San Joaquin 2015 Infrastructure Project 1 pipelinedI Pangasinan Balungao San Julian 2015 Infrastructure Project 1 pipelinedI Pangasinan Basista Nabatat 2015 Protective Service - Infrastructure Project Infrastructure Project 1 1,600,000.00 1,600,000.00 pipelinedI Pangasinan Basista Poblacion 2015 Infrastructure Project 1 pipelinedI Pangasinan Bautista Artacho 2014 12. Repair and Improvement of DCC (18 DCCs) Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 1,000,000.00 53,000.00 1,053,000.00 completedI Pangasinan Bautista Cabuaan 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Cacandongan 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Ketegan 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Nibalew Norte 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Nandacan 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Nibalew Sur 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Pugo 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Poponto 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Primicias 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Villanueva 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Baluyot 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Cuarenta Diaz 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Diaz Centro 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Namolan Norte Diaz 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Palisoc 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Pob. West 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista Vacante 2014 Repair and Improvement of 1 Unit DCC DAY CARE CENTER 1 completedI Pangasinan Bautista 2015 Construction of Day Care Centers Construction of Day Care Centers DAY CARE CENTER 1 2,250,000.00 2,250,000.00 pipelined

I Pangasinan Bayambang Maigpa 2014Improvement of Day Care Center Facilities in barangays (3

Day Care Centers)Improvement of (1) Unit Day Care Center Facilities DAY CARE CENTER 1 130,434.78 20,165.22 150,600.00 completed

I Pangasinan Bolinao Catungi 2014 Construction of Day Care Center Construction Of 1-Unit Day Care Center DAY CARE CENTER 1 510,000.00 510,000.00 ongoingI Pangasinan Bolinao Luna, Sitio Tanobong 2014 Construction Of 1-Unit Day Care Center DAY CARE CENTER 2 - ongoingI Pangasinan Bolinao 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 850,000.00 850,000.00 pipelinedI Pangasinan Bugallon 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 2,500,000.00 375,000.00 2,875,000.00 pipelined

I Pangasinan Dasol Alilao 20142. Construction, Rehabilitation and Improvement of Day

Care Centers (Two (2) DCC and 16 DCCs)

Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 1,700,000.00 300,000.00 2,000,000.00 ongoing

I Pangasinan Dasol Tambobong 2014 Construction of Day Care Center DAY CARE CENTER 1 ongoing

I Pangasinan Dasol Amalbalan 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Bobonot 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Viga 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Tambac 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Eguia 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Petal 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Hermosa 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Macalang 2014 Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Gais-guipe 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol San Vicente 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Malimpin 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Poblacion 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Malacapas 2014Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Magsaysay 2014 Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Uli 2014 Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Dasol Osmena 2014 Construction, Rehabilitation and Improvement of Day Care

CenterDAY CARE CENTER 1 ongoing

I Pangasinan Infanta Poblacion 2014 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 510,000.00 90,000.00 600,000.00 ongoingI Pangasinan Infanta Patima 2015 Construction of 1 Unit Day care Center at Brgy . Patima Construction of 1 Unit Day care Center at Brgy . Patima DAY CARE CENTER 1 750,000.00 750,000.00 pipelinedI PANGASINAN LAOAC Panaga 2015 Day Care Center Construction Day Care Center Construction DAY CARE CENTER 1 1,500,000.00 1,500,000.00 pipelinedI PANGASINAN LAOAC Inmanduyan 2015 Day Care Center Construction DAY CARE CENTER 1 pipelined

I PANGASINAN LINGAYEN (Capital) Wawa 201412. Establishment and Renovation of Day Care Centers (120-

150 Day Care Children)Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 2,000,000.00 340,000.00 2,340,000.00 completed

I PANGASINAN LINGAYEN (Capital) Lasip 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 completedI PANGASINAN LINGAYEN (Capital) Alewekwek 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 completedI PANGASINAN LINGAYEN (Capital) Namolan 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 completedI PANGASINAN LINGAYEN (Capital) Quibaol 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 completedI PANGASINAN LINGAYEN (Capital) Tumbar 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 completedI PANGASINAN LINGAYEN (Capital) Basing 2014 Enhancement of 1-Unit Day Care Center DAY CARE CENTER 1 - June 2015 completed

I PANGASINAN LINGAYEN (Capital) Libsong East 2015 Protective Services - Infrastructure Project : Construction of

Day Care CenterConstruction Of 1-Unit Day Care Center DAY CARE CENTER 1 2,000,000.00 2,000,000.00 pipelined

I PANGASINAN LINGAYEN (Capital) Domalandan Center 2015 Construction Of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI PANGASINAN LINGAYEN (Capital) Balangobong 2015 Construction Of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

I Pangasinan Mangaldan Poblacion II 201422. Provision of Potable Water Supply to Day Care Centers

(7 Brgys (10 Day Care Centers)Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 425,000.00 425,000.00 ongoing

I Pangasinan Mangaldan Municipal DCC 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Poblacion I 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Nibaliw 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Lanas 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Talogtog 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Beteng West 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Beteng East 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Guilig 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Bari 2014 Provision of Potable Water Supply to Day Care Center DAY CARE CENTER 1 - ongoing

I Pangasinan Mangaldan Landas 2014 26. Kalahi – CIDSS Project (Rehabilitation of the DCC) Rehabilitation of the DCC DAY CARE CENTER 1 170,000.00 170,000.00 ongoing

I Pangasinan Mangaldan Guesang 2014 Rehabilitation of the DCC DAY CARE CENTER 1 ongoing

I Pangasinan Mangatarem Caturay 2014 15. Establishment of Day Care Centers (3 Day Care Centers) Establishment of 1 unit Day Care Center DAY CARE CENTER 1 1,275,000.00 225,000.00 1,500,000.00 completed

I Pangasinan Mangatarem Salavante 2014 Establishment of 1 unit Day Care Center DAY CARE CENTER 1 - completed

I Pangasinan Mangatarem Dorongan Sawat 2014 14. Rehabilitation of Day Care Centers (2 Day Care Centers) Rehabilitation of Day Care Center DAY CARE CENTER 1 214,540.00 30,860.00 245,400.00 completed

I Pangasinan Mangatarem Baracbac 2014 Rehabilitation of Day Care Center DAY CARE CENTER 1 - completedI Pangasinan Mangatarem Parian 2015 Establishment of Day Care Centers Establishment of Day Care Centers DAY CARE CENTER 1 1,900,000.00 1,900,000.00 pipelinedI Pangasinan Mangatarem Nancasalan 2015 Establishment of Day Care Centers DAY CARE CENTER 1 pipelinedI Pangasinan Mangatarem Sapang 2015 Establishment of Day Care Centers DAY CARE CENTER 1 pipelined

I Pangasinan Mapandan Apaya 2014Institutionalization of Supervised Neighborhood Play (SNP)

through the construction of 7 Day Care Centers (DCC) in 7

brgys (SNP in 7 newly constructed DCCs)

Construction of 1 unit Day Care Center (SNP) DAY CARE CENTER 1 1,785,000.00 315,000.00 2,100,000.00 completed

I Pangasinan Mapandan Amanoaoac 2014 Construction of 1 unit Day Care Center (SNP) DAY CARE CENTER 1 - ongoingI Pangasinan Mapandan Luyan 2014 Construction of 1 unit Day Care Center (SNP) DAY CARE CENTER 1 - ongoingI Pangasinan Mapandan Nilombot 2014 Construction of 1 unit Day Care Center (SNP) DAY CARE CENTER 1 - ongoingI Pangasinan Mapandan Pias 2014 Construction of 1 unit Day Care Center (SNP) DAY CARE CENTER 1 - ongoingI Pangasinan Mapandan 2015 Construction of 2-Unit day Care Center Construction Of 1-Unit Day Care Center DAY CARE CENTER 1 1,275,000.00 1,275,000.00 pipelinedI Pangasinan Mapandan 2015 Construction Of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

I Pangasinan Pozorubio 2015Environmental Protection and Conservation: Sanitation

Facilities - Distribution / Installation of Sanitary toilet

materials

Environmental Protection and Conservation: Sanitation

Facilities - Distribution / Installation of Sanitary toilet

materials

SANITARY FACILITY 1 1,500,000.00 1,500,000.00 ongoing

I Pangasinan San Carlos Matagdem 2015 Construction of 6 Day Care Centers Construction of1-Unit Day Care Center DAY CARE CENTER 1 6,000,000.00 6,000,000.00 pipelinedI Pangasinan San Carlos Calomboyan 2015 Construction of1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Carlos Palaming 2015 Construction of1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Carlos Pangoloan 2015 Construction of1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Carlos Balococ 2015 Construction of1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Carlos Calobaoan 2015 Construction of1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Fabian 2015 Development/Improvement of Evacuation Center Development/Improvement of Evacuation Center BUILDING FACILITY 1 2,160,000.00 2,160,000.00 pipelinedI Pangasinan San Manuel Poblacion I 2015 Upgrading of Day Care Center Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 750,000.00 pipelinedI Pangasinan San Manuel Poblacion III 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Manuel Poblacion IV 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Manuel Flores 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Manuel Lapalo 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Manuel San Roque Centro 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan San Nicolas Sta. Maria West 2015 Upgrading/Repair of Day Care Centers Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 2,000,000.00 2,000,000.00 pipelinedI Pangasinan San Nicolas Lungao 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 proposedI Pangasinan San Nicolas Camindoroan 2015 Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

I Pangasinan Santa Barbara Poblacion Norte 2015 Protective Services - Infrastructure Projects:

Repair/Upgrading of Day Care Centers Phase IRepair/Upgrading of Day Care Centers Phase I DAY CARE CENTER 1 580,000.00 580,000.00 pipelined

I Pangasinan Santa Barbara Malanay 2015 Repair/Upgrading of Day Care Centers Phase I DAY CARE CENTER 1 pipelinedI Pangasinan Santa Barbara Sonquil 2015 Repair/Upgrading of Day Care Centers Phase I DAY CARE CENTER 1 pipelinedI Pangasinan Santa Barbara Minien East 2015 Repair/Upgrading of Day Care Centers Phase I DAY CARE CENTER 1 pipelinedI Pangasinan Santa Barbara Maronong II, Sitio Bengal 2015 Repair/Upgrading of Day Care Centers Phase I DAY CARE CENTER 2 pipelinedI Pangasinan Santa Maria 2015 Construction of Bahay Pag-Asa for CICL Construction of Bahay Pag-Asa for CICL BUILDING FACILITY 1 1,860,000.00 1,860,000.00 ongoingI Pangasinan Santo Tomas La Lona 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 800,000.00 800,000.00 pipelinedI Pangasinan Santo Tomas 2015 Upgrading/Repair of Day Care Centers Upgrading/Repair of Day Care Centers DAY CARE CENTER 1 600,000.00 600,000.00 pipelinedI Pangasinan Santo Tomas 2015 Construction of Evacuation Center Construction of Evacuation Center BUILDING FACILITY 1 4,100,000.00 4,100,000.00 pipelined

I Pangasinan Tayug C. Lichauco 2014Construction of Daycare Centers ( 9 Day Care Centers: C.

Lichauco, Evangelista, Guzon, Libertad, Saleng, Sto.

Domingo, Toketec, Zamora, Poblacion B )

Construction of Daycare Centers - C. Lichauco DAY CARE CENTER 1 6,300,000.00 1,462,500.00 7,762,500.00 ongoing

I Pangasinan Tayug Evangelista 2014 Construction of Daycare Centers - Evangelista DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Guzon 2014 Construction of Daycare Centers - Guzon DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Libertad 2014 Construction of Daycare Centers - Libertad DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Saleng 2014 Construction of Daycare Centers - Saleng DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Sto. Domingo 2014 Construction of Daycare Centers - Sto. Domingo DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Toketec 2014 Construction of Daycare Centers -Toketec DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Zamora 2014 Construction of Daycare Centers - Zamora DAY CARE CENTER 1 - ongoingI Pangasinan Tayug Poblacion 2014 Construction of Daycare Centers - Poblacion DAY CARE CENTER 1 - ongoing

I Pangasinan Tayug Poblacion C 201418. Construction of rehabilitation center for abandoned

children & CICL (1 unit)

Construction of (1 unit) Rehabilitation Center for abandoned

children & CICL BUILDING FACILITY 1 2,000,000.00 2,000,000.00 ongoing

I Pangasinan Tayug Lawak 2014 2. Repair/rehabilitation of Day Care Center (1 DCC; Lawak) Repair/rehabilitation of Day Care Center -Lawak) DAY CARE CENTER 1 100,000.00 100,000.00 ongoing

I Pangasinan Tayug Poblacion I 2015 Repair/ Upgrading of 12 Day Care Centers Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 2,400,000.00 2,400,000.00 pipelinedI Pangasinan Tayug Poblacion II 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Barangay C 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Agno 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Amistad II 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Amistad III 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Legaspi 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Poblacion A 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Trenchera 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Panganiban 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Magallanes 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelinedI Pangasinan Tayug Barangobong 2015 Repair/ Upgrading of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

I Pangasinan Umingan 2015 "Sagut Para iti Babassit"; Repair and Upgrading of 20 DCCS Repair and Upgrading of 20 DCCS DAY CARE CENTER 1 1,400,000.00 1,400,000.00 pipelined

I Pangasinan Umingan 2015 "Sagut Para iti Babassit"; Construction of Group

Handwashing facility for 40 DCCS

"Sagut Para iti Babassit"; Construction of Group

Handwashing facility for 40 DCCSDAY CARE CENTER 1 980,000.00 980,000.00 pipelined

I Pangasinan CITY OF URDANETA San Jose 2014 8. Repair of Daycare Centers (7 DCCs for 210 Pre-schoolers) Repair of 1 unit Daycare Center DAY CARE CENTER 1 938,000.00 26,714.29 964,714.29 ongoing

I Pangasinan CITY OF URDANETA Dilan-Paurido 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoingI Pangasinan CITY OF URDANETA Camanang Roadside 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoingI Pangasinan CITY OF URDANETA Anonas II 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoingI Pangasinan CITY OF URDANETA Sitio Awed 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoingI Pangasinan CITY OF URDANETA Camantiles 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoing

Page 8: List of KALAHI-CIDSS Subprojects - BUB

I Pangasinan CITY OF URDANETA San Vicente Centro 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 26,714.29 26,714.29 ongoingI Pangasinan CITY OF URDANETA 2015 Construction of Evacuation Center Construction of Evacuation Center BUILDING FACILITY 1 7,100,000.00 7,100,000.00 pipelinedI Pangasinan Villasis Poblacion Zone II 2014 4. Repair of Daycare Centers (7 Barangays) Repair of 1 unit Daycare Center DAY CARE CENTER 1 1,500,000.00 300,000.00 1,800,000.00 completedI Pangasinan Villasis Poblacion Zone III 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - completedI Pangasinan Villasis Piaz 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - completedI Pangasinan Villasis Amamperez 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - 19-Mar-15 April 2015 completedI Pangasinan Villasis Labit 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - completedI Pangasinan Villasis Capulaan 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - 23-Feb-15 18-Mar-15 completedI Pangasinan Villasis Caramutan 2014 Repair of 1 unit Daycare Center DAY CARE CENTER 1 - completedI Pangasinan Villasis Bacag 2015 Repair / Rehabilitation of Day Care Center Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 2,100,000.00 ongoingI Pangasinan Villasis San Blas 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoingI Pangasinan Villasis San Blas 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoingI Pangasinan Villasis Tombod 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoingI Pangasinan Villasis Baracca 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoingI Pangasinan Villasis Puelay 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoingI Pangasinan Villasis Barangobong 2015 Repair / Rehabilitation of Day Care Center DAY CARE CENTER 1 ongoing

II Batanes Ivana 2015 Construction of Bahay Pag-Asa for CICL Construction of Bahay Pag-Asa for CICL BUILDING FACILITY 1 2,500,000.00 proposed

II Batanes Sabtang 2015 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 1,000,000.00 proposed

II Cagayan Abulug 2015 Protective Services: Construction of Evacuation Center Protective Services: Construction of Evacuation Center BUILDING FACILITY 1 3,040,000.00 ongoing

II Cagayan Amulung 2014 installation of playground facilities in day care centers installation of playground facilities in day care centers DAY CARE CENTER 1 293,000.00 June 2015 completed

II Cagayan Amulung 2015 Construction of DCC with Handwashing Facility (Complete

with Soap and Flouride Toothpaste)

Construction of DCC with Handwashing Facility (Complete

with Soap and Flouride Toothpaste)DAY CARE CENTER 1 3,210,000.00 pipelined

II Cagayan Baggao 2015 Protective Services - Infrastructure Project : Establishment of

Women/Children Cirisis Center

Protective Services - Infrastructure Project : Establishment of

Women/Children Cirisis CenterBUILDING FACILITY 1 1,000,000.00 proposed

II Cagayan Calayan 2015 Core Shelter Project Core Shelter Project 1 2,000,000.00 proposed

II Cagayan Enrile 2015 Construction of Day care Center Construction of Day care Center DAY CARE CENTER 1 1,620,000.00 pipelined

II Cagayan PEÑABLANCA 2015 Protective Services: Construction/Repair and Upgrading of

Day Care Centers and provision of ECCD Materials for DCC

Protective Services: Construction/Repair and Upgrading of

Day Care Centers and provision of ECCD Materials for DCCDAY CARE CENTER 1 1,225,790.00 pipelined

II Cagayan Piat Baung 2014 Improvement Of Day Care Centers - Baung Improvement Of Day Care Centers - Baung DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Calaoagan 2014 Improvement Of Day Care Centers - Calaoagan Improvement Of Day Care Centers - Calaoagan DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Macapil 2014 Improvement Of Day Care Centers - Macapil Improvement Of Day Care Centers - Macapil DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Maguilling 2014 Improvement Of Day Care Centers - Maguilling Improvement Of Day Care Centers - Maguilling DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Poblacion 02 2014 Improvement Of Day Care Centers - Poblacion 02 Improvement Of Day Care Centers - Poblacion 02 DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Villareyno 2014 Improvement Of Day Care Centers - Villareyno Improvement Of Day Care Centers - Villareyno DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat Warat 2014 Improvement Of Day Care Centers - Warat Improvement Of Day Care Centers - Warat DAY CARE CENTER 1 120,000.00 ongoing

II Cagayan Piat 2015 Repair/upgrading of 8 Day Care Center Repair/upgrading of 8 Day Care Center DAY CARE CENTER 1 855,000.00 proposed

II Cagayan Piat 2015 Standard Evacuation Centers (with toilet for Men, Women

and PWDs)at PNHS

Standard Evacuation Centers (with toilet for Men, Women

and PWDs)at PNHSEVACUATION CENTER 1 1,350,000.00 proposed

II Cagayan Sanchez-Mira Minanga and Pureg 2015 Maintenance and rehabilitation of Day care center Maintenance and rehabilitation of Day care center DAY CARE CENTER 1 600,000.00 pipelined

II Cagayan Santa Ana 2015 Repair/Upgrading of Day Care Center Repair/Upgrading of Day Care Center DAY CARE CENTER 1 700,000.00 proposed

II Cagayan Santa Ana 2015 Starter Kit Starter Kit 1 560,000.00 proposed

II Cagayan Santa Ana 2015 Nego cart Nego cart 1 600,000.00 proposed

II Cagayan Santa Ana 2015 Agta Literacy on Food and Livelihood Program (AGLIFOLIP) Agta Literacy on Food and Livelihood Program (AGLIFOLIP) 1 1,500,000.00 proposed

II Cagayan Santa Ana 2015 Basura ko Buhay Ko (B+K3) Basura ko Buhay Ko (B+K3) 1 3,000,000.00 proposed

II Cagayan Santa Praxedes 2015 Protective Services infrastructure Enhancement Programs Protective Services infrastructure Enhancement Programs 1 500,000.00 ongoing

II Cagayan TUGUEGARAO CITY (Capital) 2015 Temporary Center for CICL and VAWC Temporary Center for CICL and VAWC 1 1,000,000.00 proposed

II Isabela Alicia 2015 REHABILITATION OF DAY CARE CENTERS REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 1,500,000.00 ongoing

II Isabela Alicia 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 ongoing

II Isabela Angadanan 2015 CONTRUCTION OF DAY CARE CENTER CONTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 ongoing

II Isabela Aurora 2015 INFRASTRUCTURE SERVICES - CONSTRUCTION & REPAIR

OF DAY CARE CENTERS

INFRASTRUCTURE SERVICES - CONSTRUCTION & REPAIR

OF DAY CARE CENTERSDAY CARE CENTER 1 1,634,000.00 proposed

II Isabela Benito Soliven 2015 CONCRETING OF PATHWAY FOR SENIOR CITIZENS CONCRETING OF PATHWAY FOR SENIOR CITIZENS PATHWAY 1 500,000.00 pipelined

II Isabela Benito Soliven 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

II Isabela Burgos 2015 PROTECTIVE SERVICES (REPAIR/UPGRADING OF DAY CARE

CTRS)

PROTECTIVE SERVICES (REPAIR/UPGRADING OF DAY CARE

CTRS)DAY CARE CENTER 1 1,200,000.00 proposed

II Isabela Cabagan 2015

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS WITH COMPLETE SET OF SOAP AND

FLUORIDE TOOTHPASTE AT 30,000 PER DAY CARE

CENTERS

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS WITH COMPLETE SET OF SOAP AND

FLUORIDE TOOTHPASTE AT 30,000 PER DAY CARE

CENTERS

DAY CARE CENTER 1 624,000.00 pipelined

II Isabela Cabagan 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,200,000.00 pipelined

II Isabela Cabagan 2015 CONSTRUCTION OF EVACUATION CENTERS CONSTRUCTION OF EVACUATION CENTERS BUILDING FACILITY 1 800,000.00 pipelined

II Isabela Cabatuan 2015 PROTECTIVE SERVICES – INFRA.PROJECTS:

CONSTRUCTION OF DCC

PROTECTIVE SERVICES – INFRA.PROJECTS:

CONSTRUCTION OF DCCDAY CARE CENTER 1 1,112,000.00 ongoing

II Isabela CITY OF CAUAYAN 2015 CONSTRUCTION OF TWO UNITS DAY CARE CENTER CONSTRUCTION OF TWO UNITS DAY CARE CENTER DAY CARE CENTER 1 1,000,000.00 proposed

II Isabela Cordon 2015 DAY CARE CENTER DAY CARE CENTER DAY CARE CENTER 1 1,800,000.00 pipelined

II Isabela DELFIN ALBANO (MAGSAYSAY) 2015 CONSTRUCTION OF DAY CARE CENTER BUILDINGS CONSTRUCTION OF DAY CARE CENTER BUILDINGS DAY CARE CENTER 1 1,276,000.00 ongoing

II Isabela Dinapigue 2015 CONSTRUCTION OF CLIMATE CHANGE RESILIENT

EVACUATION CENTER

CONSTRUCTION OF CLIMATE CHANGE RESILIENT

EVACUATION CENTERBUILDING FACILITY 1 2,500,000.00 ongoing

II Isabela Gamu 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS (PSIP) PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS (PSIP) 1 1,700,000.00 pipelined

II Isabela ILAGAN City (Capital) 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 600,000.00 proposed

II Isabela Mallig 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,400,000.00 pipelined

II Isabela REINA MERCEDES 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 2,000,000.00 ongoing

II Isabela Naguilian 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,040,000.00 ongoing

II Isabela Naguilian 2015 CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN

DAY CARE CENTERS

CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 650,000.00 proposed

II Isabela Quezon Barucboc 2014 Coreshelter Housing Project Coreshelter Housing Project 1 1,050,000.00 ongoing

II Isabela Quezon 2015 CONSTRUCTION OF DAYCARE CENTER CONSTRUCTION OF DAYCARE CENTER DAY CARE CENTER 1 1,200,000.00 pipelined

II Isabela Quezon 2015 REPAIR/UPGRADING OF DAYCARE CENTER REPAIR/UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 900,000.00 pipelined

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).

water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 1,050,000.00 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2014water system of day care center and barangay health center

(pressurized water pump).DAY CARE CENTER 1 June 2015 completed

II Isabela Quirino 2015 Repair/Upgrading of Day Care Center Repair/Upgrading of Day Care Center DAY CARE CENTER 1 1,575,000.00 proposed

II Isabela Roxas Marcos 2014kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project

kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project1 1,845,000.00 June 2015 completed

II Isabela Roxas Dona Concha 2014kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project1 June 2015 completed

II Isabela Roxas Imbiao 2014kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project1 June 2015 completed

II Isabela Roxas Sinamar 2014kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project1 June 2015 completed

II Isabela Roxas San Palcido 2014kapit bisig laban sa kahirapan-comprehensive and

integrated delivery of social services (kalahi-cidss) project1 June 2015 completed

II Isabela Roxas 2015 REPAIR/UPGRADING OF 5 DAY CARE CENTERS REPAIR/UPGRADING OF 5 DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 pipelined

II Isabela Roxas 2015 CONSTRUCTION OF SOTERO NUESA DAY CARE CENTER CONSTRUCTION OF SOTERO NUESA DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

II Isabela Roxas 2015CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

33 DAY CARE CENTERS (WITH COMPLETE SET OF SOAP

AND FLOURIDE GEL TOOTHPASTE)

CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

33 DAY CARE CENTERS (WITH COMPLETE SET OF SOAP

AND FLOURIDE GEL TOOTHPASTE)

DAY CARE CENTER 1 644,000.00 pipelined

II Isabela Roxas 2015 CASH FOR WORK CASH FOR WORK 1 1,375,000.00 pipelined

II Isabela San Guillermo 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 800,000.00 ongoing

II Isabela San Guillermo 2015 CONSTRUCTION/REHABILITATION OF DAY CARE CENTERS CONSTRUCTION/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 pipelined

II Isabela San Isidro 2015

REPAIR/UPGRADING OF DAY CARE CENTERS,

CONSTRUCTION OF GROUP HAND WASHING FACILITY

WITH COMPLETE SET OF SOAP AND FLUORIDE GEL

TOOTHPASTE

REPAIR/UPGRADING OF DAY CARE CENTERS,

CONSTRUCTION OF GROUP HAND WASHING FACILITY

WITH COMPLETE SET OF SOAP AND FLUORIDE GEL

TOOTHPASTE

DAY CARE CENTER 1 2,000,000.00 proposed

II Isabela San Manuel 2015 CONSTRUCTION OF DAY CARE SCHOOL BUILDING CONSTRUCTION OF DAY CARE SCHOOL BUILDING DAY CARE CENTER 1 500,000.00 pipelined

II Isabela San Mariano 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,500,000.00 pipelined

II Isabela San Mariano 2015 CONSTRUCTION OF RELIEF OPERATION CENTER CONSTRUCTION OF RELIEF OPERATION CENTER BUILDING FACILITY 1 1,000,000.00 pipelined

II Isabela San Mateo 2015 UPGRADING OF DAY CARE CENTERS (DCC) UPGRADING OF DAY CARE CENTERS (DCC) DAY CARE CENTER 1 1,000,000.00 proposed

II Isabela San Mateo 2015 SAN MATEO WOMEN CRISIS CENTER SAN MATEO WOMEN CRISIS CENTER BUILDING FACILITY 1 500,000.00 ongoing

II Isabela San Pablo 2015 CONSTRUCTION OF 5 UNITS DAY CARE CENTER WITH

COMPLETE FACILITIES @ 400,000 EACH

CONSTRUCTION OF 5 UNITS DAY CARE CENTER WITH

COMPLETE FACILITIES @ 400,000 EACHDAY CARE CENTER 1 1,720,000.00 proposed

II Isabela San Pablo 2015REPAIR/INSTALLATION OF HAND WASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLUORIDE GEL TOOTHPASTE ) FOR 24 BRGYS.

REPAIR/INSTALLATION OF HAND WASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLUORIDE GEL TOOTHPASTE ) FOR 24 BRGYS.

DAY CARE CENTER 1 785,610.00 proposed

II Isabela CITY OF SANTIAGO Annafunan 201412. provision of male and female children's comfort rooms in

selected day-care centers

Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 500,000.00 June 2015 completed

II Isabela CITY OF SANTIAGO District 1 2014Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 June 2015 completed

II Isabela CITY OF SANTIAGO District 4 2014Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 June 2015 completed

II Isabela CITY OF SANTIAGO Lingaling 2014Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 June 2015 completed

II Isabela CITY OF SANTIAGO San Pedro 2014Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 June 2015 completed

II Isabela CITY OF SANTIAGO Santa Visitacion 2014Provision of male and female children's comfort rooms in

DCCDAY CARE CENTER 1 June 2015 completed

II Isabela CITY OF SANTIAGO 2015 CORE SHELTER PROJECT CORE SHELTER PROJECT 1 1,240,000.00 proposed

II Isabela Santo Tomas 2015 CONSTRUCTION OF DAY CARE CENTER ("CAP") CONSTRUCTION OF DAY CARE CENTER ("CAP") DAY CARE CENTER 1 1,500,000.00 proposed

II Isabela Tumauini 2014 Clearing/Desilting And Rehabilitation Of Drainage System Clearing/Desilting And Rehabilitation Of Drainage System DRAINAGE SYSTEM 1 3,751,000.00 June 2015 completed

II Isabela Tumauini 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 1,795,000.00 proposed

II Nueva Vizcaya Ambaguio 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 500,000.00 ongoing

II Nueva Vizcaya Ambaguio 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 500,000.00 ongoing

II Nueva Vizcaya Bagabag 2015 PROTECTIVE SERVICES—INFRASTRUCTURE PROGRAM PROTECTIVE SERVICES—INFRASTRUCTURE PROGRAM 1 500,000.00 pipelined

II Nueva Vizcaya BAYOMBONG (Capital) 2015

REPAIR/UPGRADING OF DAY CARE CENTERS AND

CONSTRUCTIONS OF GROUP HAND WASHING FACILITY

WITH COMPLETE SET OF SOAP AND FLOURIDE GEL

TOOTHPASTE

REPAIR/UPGRADING OF DAY CARE CENTERS AND

CONSTRUCTIONS OF GROUP HAND WASHING FACILITY

WITH COMPLETE SET OF SOAP AND FLOURIDE GEL

TOOTHPASTE

DAY CARE CENTER 1 1,500,000.00 proposed

II Nueva Vizcaya Diadi 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

II Nueva Vizcaya Dupax Del Sur 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

II Nueva Vizcaya Kasibu 2014 a) imprvt/instl’n of potable water facility Improvement/installation of potable water facility WATER SYSTEM 1 1,275,000.00 ongoing

II Nueva Vizcaya Kasibu 2014 Improvement/installation of potable water facility WATER SYSTEM 1 ongoing

II Nueva Vizcaya Kasibu 2014 Improvement/installation of potable water facility WATER SYSTEM 1 ongoing

II Nueva Vizcaya Kasibu 2014 Improvement/installation of potable water facility WATER SYSTEM 1 ongoing

II Nueva Vizcaya Kasibu 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 800,000.00 proposed

II Nueva Vizcaya Kayapa 2015

PROTECTIVE SERVICES- INFRASTRUCTURE

PROJECT(CONSTRUCTION OF GROUP HANDWASHING

FACILITY IN THE DAYCARE CENTERS WITH COMPLETE SET

OF SOAP AND FLOURIDE GEL TOOTHPASTE)

PROTECTIVE SERVICES- INFRASTRUCTURE

PROJECT(CONSTRUCTION OF GROUP HANDWASHING

FACILITY IN THE DAYCARE CENTERS WITH COMPLETE SET

OF SOAP AND FLOURIDE GEL TOOTHPASTE)

DAY CARE CENTER 1 500,000.00 pipelined

II Nueva Vizcaya Quezon 2015PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS-

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS-

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS

DAY CARE CENTER 1 650,000.00 pipelined

II Nueva Vizcaya Santa Fe 2014 physical restoration of dswd physical restoration of dswd 1 100,000.00 June 2015 completed

II Nueva Vizcaya Santa Fe 2014 repair/rehabilitation of day care centers repair/rehabilitation of day care centers DAY CARE CENTER 1 500,000.00 June 2015 completed

II Nueva Vizcaya Santa Fe 2014 repair/rehabilitation of day care centers DAY CARE CENTER 1 June 2015 completed

II Nueva Vizcaya Santa Fe 2014 repair/rehabilitation of day care centers DAY CARE CENTER 1 June 2015 completed

Page 9: List of KALAHI-CIDSS Subprojects - BUB

II Nueva Vizcaya Santa Fe 2014 repair/rehabilitation of day care centers DAY CARE CENTER 1 June 2015 completed

II Quirino CABARROGUIS (Capital) 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 600,000.00 proposed

II Quirino CABARROGUIS (Capital) 2015 PROVISION OF EMERGENCY SHELTER PROVISION OF EMERGENCY SHELTER 1 500,000.00 proposed

II Quirino Diffun 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF EVACUATION CENTERS(MULTI-

PURPOSE)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF EVACUATION CENTERS(MULTI-

PURPOSE)

BUILDING FACILITY 1 1,000,000.00 proposed

II Quirino Maddela 2015 CONSTRUCTION/REPAIR OF DAYCARE CENTER CONSTRUCTION/REPAIR OF DAYCARE CENTER DAY CARE CENTER 1 1,503,000.00 pipelined

II Quirino Maddela 2015 CORE SHELTER ASSISTANCE PROJECT CORE SHELTER ASSISTANCE PROJECT 1 2,497,000.00 pipelined

II Quirino Nagtipunan 2015 CONSTRUCTION/REHABILITATION/ UPGRADING OF DAY

CARE CENTER

CONSTRUCTION/REHABILITATION/ UPGRADING OF DAY

CARE CENTERDAY CARE CENTER 1 504,000.00 proposed

II Quirino Nagtipunan 2015 CONSTRUCTION OF DAY CENTER CONSTRUCTION OF DAY CENTER BUILDING FACILITY 1 504,000.00 proposed

II Quirino Nagtipunan 2015 CONSTRUCTION OF DAY CENTER FOR OLDER SENIOR

CITIZEN

CONSTRUCTION OF DAY CENTER FOR OLDER SENIOR

CITIZENBUILDING FACILITY 1 504,000.00 proposed

II Quirino Saguday 2015 CORE SHELTER PROG(20 UNITS) CORE SHELTER PROG(20 UNITS) 1 560,000.00 ongoing

III Aurora Casiguran 2015CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN

DCC WITH COMPLETE SET OF SOAP,FLOURIDE GEL, AND

TOOTH PASTE

CONSTRUCTION OF GROUP HAND-WASHING FACILITY IN

DCC WITH COMPLETE SET OF SOAP,FLOURIDE GEL, AND

TOOTH PASTE

DAY CARE CENTER 1 400,000.00 pipelined

III Aurora Dilasag 2015 IMPROVEMENT OF DAY CARE CENTER IMPROVEMENT OF DAY CARE CENTER DAY CARE CENTER 1 607,600.00 proposed

III Aurora Dilasag 2015 REPAIR OF CIC ADDITIONAL FUND REPAIR OF CIC ADDITIONAL FUND 1 434,000.00 proposed

III Aurora Dingalan 2014 not specified Repair/Rehabilitation of Day Care Centers DAY CARE CENTER 1 629,000.00 completed

III Aurora Dingalan 2014 Repair/Rehabilitation of Day Care Centers DAY CARE CENTER 1 June 2015 completed

III Aurora Dingalan 2015 REPAIR AND IMPROVEMENT OF DAY CARE CENTER REPAIR AND IMPROVEMENT OF DAY CARE CENTER DAY CARE CENTER 1 1,529,400.00 pipelined

III Aurora Dingalan 2015PROGRAM OF MATERIALS AND PLAYGROUND FACILITIES

AND BUILDING FOR DC WORKERS/SNP

VOLUNTEERS(20OCW AND 7SNP VOLUNTEERS)

PROGRAM OF MATERIALS AND PLAYGROUND FACILITIES

AND BUILDING FOR DC WORKERS/SNP

VOLUNTEERS(20OCW AND 7SNP VOLUNTEERS)

BUILDING FACILITY 1 849,600.00 proposed

III Aurora Dipaculao 2015 REHABILITATION OF SENIOR CITIZEN DAY CENTER WITH

COMPLETE FACILITIES

REHABILITATION OF SENIOR CITIZEN DAY CENTER WITH

COMPLETE FACILITIESBUILDING FACILITY 1 1,000,000.00 pipelined

III Aurora Dipaculao 2015 PROGRAM MATERIALS AND PLAYGROUND FACILITIES PROGRAM MATERIALS AND PLAYGROUND FACILITIES 1 1,000,000.00 pipelined

III Aurora MARIA AURORA 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

III Aurora San Luis 2015 KAALAMAN AT KASANAYAN NG KABATAAN CENTER (K NA

K CENTER)

KAALAMAN AT KASANAYAN NG KABATAAN CENTER (K NA

K CENTER)BUILDING FACILITY 1 1,760,000.00 pipelined

III Bataan Abucay 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTER AND BAHAY-PAG-

ASA)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTER AND BAHAY-PAG-

ASA)

DAY CARE CENTER 1 2,300,000.00 pipelined

III Bataan Bagac 2015 PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS (REPAIR

AND REHAB OF DAY CARE CENTER)

PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS (REPAIR

AND REHAB OF DAY CARE CENTER)DAY CARE CENTER 1 453,774.14 pipelined

III Bataan Bagac 2015PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS

(CONSTRUCTION DAY CARE CENTER & PLAYGROUND

EQUIPMENT)

PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS

(CONSTRUCTION DAY CARE CENTER & PLAYGROUND

EQUIPMENT)

DAY CARE CENTER 1 575,775.31 pipelined

III Bataan Bagac 2015PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS)

PROTECTIVE SERVICE INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS)

DAY CARE CENTER 1 301,930.95 pipelined

III Bataan Dinalupihan 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION AND REPAIR / UPGRADING OF DAY CARE

CENTER

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION AND REPAIR / UPGRADING OF DAY CARE

CENTER

DAY CARE CENTER 1 1,500,000.00 pipelined

III Bataan Hermosa 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 1 805,280.00 pipelined

III Bataan Mariveles 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT

(CONSTRUCTION OF DAY CARE CENTERS)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT

(CONSTRUCTION OF DAY CARE CENTERS)DAY CARE CENTER 1 2,000,000.00 pipelined

III Bataan Mariveles 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT

(REPAIR AND UPGRADING OF DAY CARE CENTERS)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT

(REPAIR AND UPGRADING OF DAY CARE CENTERS)DAY CARE CENTER 1 1,537,000.00 pipelined

III Bataan Morong 2015 PROTECTIVE SERVICES INFRA PROJECTS (BAHAY

SILUNGAN)

PROTECTIVE SERVICES INFRA PROJECTS (BAHAY

SILUNGAN)1 900,000.00 pipelined

III Bataan Morong 2015 PROTECTIVE SERVICES INFRA PROJECTS (DAY CARE

CENTER)

PROTECTIVE SERVICES INFRA PROJECTS (DAY CARE

CENTER)DAY CARE CENTER 1 1,800,000.00 pipelined

III Bataan Pilar 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(BAHAY SILUNGAN)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(BAHAY SILUNGAN)1 2,000,000.00 pipelined

III Bataan Pilar 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR OF DAY CARE CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR OF DAY CARE CENTER)DAY CARE CENTER 1 300,000.00 pipelined

III Bataan Samal 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECT

(CONSTRUCTION OF BAHAY PAG-ASA)

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECT

(CONSTRUCTION OF BAHAY PAG-ASA)BUILDING FACILITY 1 1,000,000.00 pipelined

III Bulacan Angat 2015 REHABILITATION OF DAY CARE REHABILITATION OF DAY CARE DAY CARE CENTER 1 2,500,000.00 pipelined

III Bulacan BALAGTAS (BIGAA) 2015 REPAIR /UPGRADING OF DAY CARE CENTER/FEEDING

CENTER

REPAIR /UPGRADING OF DAY CARE CENTER/FEEDING

CENTERDAY CARE CENTER 1 2,000,000.00 pipelined

III Bulacan BALAGTAS (BIGAA) 2015 REPAIR OF TRAINING CENTER REPAIR OF TRAINING CENTER BUILDING FACILITY 1 500,000.00 pipelined

III Bulacan BALIUAG 2015 WOMEN I9N CRISIS CENTER WOMEN I9N CRISIS CENTER BUILDING FACILITY 1 2,500,000.00 proposed

III Bulacan BOCAUE 2015 SLP: GULONG PANGKABUHAYAN-SKILLS ENAHNCEMENT

TRAINING

SLP: GULONG PANGKABUHAYAN-SKILLS ENAHNCEMENT

TRAINING1 3,000,000.00 proposed

III Bulacan BULACAN 2015

PROTECTIVE SERVICE -CONSTRUCTION OF DAY CARE

CENTERS; REPAIR AND UPGRADING OF DAY CARE/

CONSTRUCTION OF HANDWASHING FACILITIES FOR DCC;

CAP. BLDG. ECCD LEARNING MAT'LS & HYGIENE

KIT/SUPERVISE NEIGHBORHOOD PLAY; CONTINUOUS CAP.

BLDG FOR DAY CARE WORKERS, SOLO PARENTS, SENIOR

CITIZENS, PWDS & 4PS BENEFICIARIES

PROTECTIVE SERVICE -CONSTRUCTION OF DAY CARE

CENTERS; REPAIR AND UPGRADING OF DAY CARE/

CONSTRUCTION OF HANDWASHING FACILITIES FOR DCC;

CAP. BLDG. ECCD LEARNING MAT'LS & HYGIENE

KIT/SUPERVISE NEIGHBORHOOD PLAY; CONTINUOUS CAP.

BLDG FOR DAY CARE WORKERS, SOLO PARENTS, SENIOR

CITIZENS, PWDS & 4PS BENEFICIARIES

DAY CARE CENTER 1 1,800,000.00 proposed

III Bulacan BUSTOS 2015 PROTECTIVE SERVICES- INFRA PROJ PROTECTIVE SERVICES- INFRA PROJ 1 2,000,000.00 proposed

III Bulacan CALUMPIT 2015 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER

CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTERBUILDING FACILITY 1 3,000,000.00 proposed

III Bulacan CALUMPIT 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 4,000,000.00 proposed

III Bulacan HAGONOY 2015 REHABILITATION OF DAY CARE CENTERS REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 1,520,000.00 pipelined

III Bulacan CITY OF MALOLOS (Capital) 2015 REPAIR & UPGRADING OF DAY CARE CENTERS (DCC) REPAIR & UPGRADING OF DAY CARE CENTERS (DCC) DAY CARE CENTER 1 571,429.00 proposed

III Bulacan CITY OF MALOLOS (Capital) 2015 CONSTRUCTION/REHAB OF DAY CARE CENTERS (DCC) CONSTRUCTION/REHAB OF DAY CARE CENTERS (DCC) DAY CARE CENTER 1 2,499,999.72 proposed

III Bulacan CITY OF MEYCAUAYAN 2015

PROTECTIVE SERVICES - INFRA PROJECTS FOR THE DROPIN

CENTER FACILITY ACQUISITION/PROCUREMENT OF

EQUIPMENT REPAIR/REHAB OF DAYCARE CENTERS,

CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION

OF HAND WASHING FACILITY IN ALL DAY CARE CENTERS

(W/ COMPLETE SET OF SOAP & FLOURIDE GEL)

PROTECTIVE SERVICES - INFRA PROJECTS FOR THE DROPIN

CENTER FACILITY ACQUISITION/PROCUREMENT OF

EQUIPMENT REPAIR/REHAB OF DAYCARE CENTERS,

CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION

OF HAND WASHING FACILITY IN ALL DAY CARE CENTERS

(W/ COMPLETE SET OF SOAP & FLOURIDE GEL)

DAY CARE CENTER 1 2,640,000.00 pipelined

III Bulacan Norzagaray 2015 IMPROVEMENT OF BLDG FOR MULTIPURPOSE(BY:

MSWDO)

IMPROVEMENT OF BLDG FOR MULTIPURPOSE(BY:

MSWDO)1 2,500,000.00 pipelined

III Bulacan Obando 2015 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS -

EVACUATION CENTERS

PROTECTIVE SERVICES INFRASTRACTURE PROJECTS -

EVACUATION CENTERSBUILDING FACILITY 1 9,500,000.00 proposed

III Bulacan Pandi 2015 REPAIR & REHAB OF DAY CARE CENTER & INSTRUCTIONAL

MATERIALS & EQUIPM

REPAIR & REHAB OF DAY CARE CENTER & INSTRUCTIONAL

MATERIALS & EQUIPMDAY CARE CENTER 1 940,000.00 pipelined

III Bulacan Paombong 2015 PROTECTIVE SERVICES / INFRA PROJECTS PROTECTIVE SERVICES / INFRA PROJECTS 1 750,000.00 pipelined

III Bulacan Plaridel 2015 CONSTRUCTION OF WOMEN AND YOUTH IN CRISIS

CENTERS

CONSTRUCTION OF WOMEN AND YOUTH IN CRISIS

CENTERSBUILDING FACILITY 1 2,473,000.00 proposed

III Nueva Ecija Bongabon 2014Establishment Of Two(2) Units Center/Rehabilitation/Repair

Of Temporary Centers For Abuse Women And Children And

Children In Conflict With Laws

Establishment Of Two(2) Units Center/Rehabilitation/Repair

Of Temporary Centers For Abuse Women And Children And

Children In Conflict With Laws

BUILDING FACILITY 1 1,870,000.00 pipelined

III Nueva Ecija Bongabon 2014Establishment Of Two(2) Units Center/Rehabilitation/Repair

Of Temporary Centers For Abuse Women And Children And

Children In Conflict With Laws

Establishment Of Two(2) Units Center/Rehabilitation/Repair

Of Temporary Centers For Abuse Women And Children And

Children In Conflict With Laws

1 - dropped

III Nueva Ecija Cabanatuan City 2015 ESTABLISHMENT OF RESIDENTIAL/ HOME CARE SERVICES

FOR SENIOR CITIZENS

ESTABLISHMENT OF RESIDENTIAL/ HOME CARE SERVICES

FOR SENIOR CITIZENS1 816,906.00 pipelined

III Nueva Ecija Cabanatuan City 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW (CICL)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW (CICL)

BUILDING FACILITY 1 5,000,000.00 pipelined

III Nueva Ecija Cabanatuan City 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 3,000,000.00 proposed

III Nueva Ecija Cabiao 2015 DAYCARE CENTER REHABILITATION DAYCARE CENTER REHABILITATION DAY CARE CENTER 1 400,000.00 pipelined

III Nueva Ecija Carranglan Binbin 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Binbin

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - BinbinDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan Calistan 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Calistan

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - CalistanDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan Camanggahan 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Camanggahan

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - CamanggahanDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan Abebeg 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Abebeg

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - AbebegDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan Baluarte Proper 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Baluarte Proper

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Baluarte ProperDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan Putlan 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Putlan

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - PutlanDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Carranglan RA Padilla 2014Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Ra Padilla

Kalahi Cidds (Enhancement Of Day Care Centers) For

Learning Centers - Ra PadillaDAY CARE CENTER 1 255,000.00 June 2015 completed

III Nueva Ecija Llanera 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,600,000.00 pipelined

III Nueva Ecija Llanera 2015 CONSTRUCTION OF WOMEN, YOUTH, ELDERLY AND PWD

CENTER

CONSTRUCTION OF WOMEN, YOUTH, ELDERLY AND PWD

CENTERBUILDING FACILITY 1 2,560,000.00 pipelined

III Nueva Ecija Lupao 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 1,304,347.83 pipelined

III Nueva Ecija Pantabangan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,400,000.00 proposed

III Nueva Ecija Peñaranda 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,800,000.00 pipelined

III Nueva Ecija Quezon 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS :

CONSTRUCTION OF DAY CARE CENTERS

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS :

CONSTRUCTION OF DAY CARE CENTERSDAY CARE CENTER 1 991,131.54 pipelined

III Nueva Ecija Quezon 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS COMPLETE WITH HANDWASHING SET

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS COMPLETE WITH HANDWASHING SET

DAY CARE CENTER 1 693,567.00 pipelined

III Nueva Ecija Rizal 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,728,000.00 pipelined

III Nueva Ecija San Antonio 2015 REPAIR/ CONSTRUCTION OF DAY CARE CENTER REPAIR/ CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 6,000,000.00 pipelined

III Nueva Ecija San Jose City 2015 CONSTRUCTION OF CRISIS INTERVENTION CENTER CONSTRUCTION OF CRISIS INTERVENTION CENTER BUILDING FACILITY 1 2,500,000.00 pipelined

III Nueva Ecija SAN LEONARDO 2015 DAY CARE CENTER REHABILITATION DAY CARE CENTER REHABILITATION DAY CARE CENTER 1 1,150,000.00 completed

III Nueva Ecija SANTA ROSA 2015 REPAIR/ UPGRADING OF DAY CARE CENTER REPAIR/ UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 2,500,000.00 pipelined

III Nueva Ecija SCIENCE CITY OF MUÑOZ 2015 HANDWASHING FACILITY WITH KIT FOR DAY CARE CENTER HANDWASHING FACILITY WITH KIT FOR DAY CARE CENTER DAY CARE CENTER 1 960,000.00 pipelined

III Nueva Ecija SANTO DOMINGO 2015 CONSTRUCTION OF WOMEN AND CHILDREN'S CRISIS

CENTER WITH DESIGNATED ROOMS FOR EACH CASES

CONSTRUCTION OF WOMEN AND CHILDREN'S CRISIS

CENTER WITH DESIGNATED ROOMS FOR EACH CASESBUILDING FACILITY 1 1,000,000.00 pipelined

III Nueva Ecija SANTO DOMINGO 2015 CONSTRUCTION OF DAY CARE CENTER FOR 2 BARANGAYS CONSTRUCTION OF DAY CARE CENTER FOR 2 BARANGAYS DAY CARE CENTER 1 1,000,000.00 pipelined

III Nueva Ecija TALAVERA 2015 PROTECTIVE SERVICES: CONSTRUCTION OF DAY CARE

CENTER

PROTECTIVE SERVICES: CONSTRUCTION OF DAY CARE

CENTERDAY CARE CENTER 1 400,000.00 pipelined

III Nueva Ecija TALAVERA 2015 REPAIR OF DAY CARE CENTER REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 400,000.00 pipelined

III Nueva Ecija Talugtug 2015 PROTECTIVE SERVICES: SUPPORT TO DAY CARE CENTER PROTECTIVE SERVICES: SUPPORT TO DAY CARE CENTER DAY CARE CENTER 1 1,350,000.00 pipelined

III Nueva Ecija Zaragoza 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 pipelined

III Pampanga Arayat 2015 4. CONSTRUCTION OF DAY CARE CENTER 4. CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposed

III Pampanga Arayat 2015 5. CONSTRUCTION OF DROP-IN CENTER FOR CHILDREN IN

CONFLICT WITH THE LAW

5. CONSTRUCTION OF DROP-IN CENTER FOR CHILDREN IN

CONFLICT WITH THE LAWBUILDING FACILITY 1 1,000,000.00 pipelined

III Pampanga Arayat 2015 6. REPAIR/UPGRADING OF 10 DAY CARE CENTERS 6. REPAIR/UPGRADING OF 10 DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 pipelined

III Pampanga Bacolor 2015 REPAIR/UPGRADING OF DAY CARE CENTERS REPAIR/UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 1,000,000.00 pipelined

III Pampanga Candaba 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTERS)

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTERS)DAY CARE CENTER 1 2,500,000.00 pipelined

III Pampanga Candaba 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

(REPAIR OF DAY CARE CENTERS)

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

(REPAIR OF DAY CARE CENTERS)DAY CARE CENTER 1 4,000,000.00 pipelined

III Pampanga City of San Fernando 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 1 3,550,000.00 pipelined

III Pampanga Guagua 2015 ROTECTIVE SERVICES INFRASTRUCTURE PROJECTS FOR

DAY CARE CENTERS, MENTALLY III PERSON

ROTECTIVE SERVICES INFRASTRUCTURE PROJECTS FOR

DAY CARE CENTERS, MENTALLY III PERSONDAY CARE CENTER 1 2,133,500.00 pipelined

III Pampanga Lubao 2015 CONSTRUCTION/REPAIR/REHABILITATION OF DAY CARE

CENTERS

CONSTRUCTION/REPAIR/REHABILITATION OF DAY CARE

CENTERSDAY CARE CENTER 1 1,000,000.00 pipelined

III Pampanga Mabalacat City 2015 1. CONSTRUCTION OF 2 DAY CARE CENTERS 1. CONSTRUCTION OF 2 DAY CARE CENTERS DAY CARE CENTER 1 550,000.00 pipelined

III Pampanga Mabalacat City 2015 2. CONSTRUCTION OF DROP-IN CENTER WITH FENCE 2. CONSTRUCTION OF DROP-IN CENTER WITH FENCE BUILDING FACILITY 1 1,500,000.00 pipelined

III Pampanga Macabebe 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 500,000.00 pipelined

III Pampanga Macabebe 2015 CONSTRUCTION/REPAIR OF DAYCARE CENTER CONSTRUCTION/REPAIR OF DAYCARE CENTER DAY CARE CENTER 1 1,000,000.00 pipelined

III Pampanga Magalang 2015 CONSTRUCTION OF WOMEN CRISIS BLDG. CONSTRUCTION OF WOMEN CRISIS BLDG. BUILDING FACILITY 1 1,000,000.00 pipelined

III Pampanga Masantol 2015 PROVISION OF 30 UNIT CORE SHELTERS PROVISION OF 30 UNIT CORE SHELTERS 1 1,826,086.96 proposed

III Pampanga Minalin 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 970,000.00 pipelined

III Pampanga Minalin 2015 REHABILITATION OF DAY CARE CENTER BUILDING REHABILITATION OF DAY CARE CENTER BUILDING DAY CARE CENTER 1 500,000.00 pipelined

III Pampanga Minalin 2015 REHABILITATION OF DAY CARE CENTER BUILDING REHABILITATION OF DAY CARE CENTER BUILDING DAY CARE CENTER 1 500,000.00 pipelined

III Pampanga Porac 2015 CONSTRUCTION OF 5 DAY CARE CENTER CONSTRUCTION OF 5 DAY CARE CENTER DAY CARE CENTER 1 4,100,000.00 proposed

III Pampanga San Luis 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS 1 850,000.00 proposed

III Pampanga San Simon 2015 15. ESTABLISHMENT/PROVISION OF WOMEN CRISIS

CENTER

15. ESTABLISHMENT/PROVISION OF WOMEN CRISIS

CENTERBUILDING FACILITY 1 2,087,500.00 pipelined

III Pampanga Santa Rita 2015 PROTECTIVE SERVICES (INFRA); REPAIR/UPGRADING OF

DAY CARE CENTERS

PROTECTIVE SERVICES (INFRA); REPAIR/UPGRADING OF

DAY CARE CENTERSDAY CARE CENTER 1 800,000.00 pipelined

III Pampanga SASMUAN (Sexmoan) 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 1 894,400.00 pipelined

III Tarlac Anao 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

III Tarlac Capas 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 2,149,560.00 pipelined

III Tarlac Concepcion 2014 Basic Education Facilitiesrepair of day care center - 50 day care centers in all the

barangaysDAY CARE CENTER 1 2,000,000.00 June 2015 completed

III Tarlac Gerona 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

CONSTRUCTION OF DAY CARE CENTER

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS

CONSTRUCTION OF DAY CARE CENTERDAY CARE CENTER 1 1,900,000.00 pipelined

III Tarlac La Paz 2015 REPAIR & UPGRADING OF DAYCARE CENTERS REPAIR & UPGRADING OF DAYCARE CENTERS DAY CARE CENTER 1 2,000,000.00 pipelined

III Tarlac Mayantoc 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

CONSTRUCTION OF DAY CARE CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

CONSTRUCTION OF DAY CARE CENTER)DAY CARE CENTER 1 800,000.00 proposed

III Tarlac Mayantoc 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

REPAIR/UPGRADING OF DAY CARE CENTERS @

P300,000.00/CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

REPAIR/UPGRADING OF DAY CARE CENTERS @

P300,000.00/CENTER)

DAY CARE CENTER 1 1,500,000.00 proposed

III Tarlac Ramos 2015 PROTECTIVE SERVICES-INFRASTRACTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTER)

PROTECTIVE SERVICES-INFRASTRACTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTER)DAY CARE CENTER 1 2,000,000.00 pipelined

III Tarlac SANTA IGNACIA 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR AND UPGRADING OF DAY CARE CENTERS)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR AND UPGRADING OF DAY CARE CENTERS)DAY CARE CENTER 1 1,300,000.00 pipelined

Page 10: List of KALAHI-CIDSS Subprojects - BUB

III Tarlac CITY OF TARLAC (Capital) 2015 PROTECTIVE SERVICES - A. INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - A. INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

III Tarlac CITY OF TARLAC (Capital) 2015CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLOURIDE GEL TOOTHPASTE)

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLOURIDE GEL TOOTHPASTE)

DAY CARE CENTER 1 525,000.00 pipelined

III Zambales Candelaria 2015 VOCATIONAL BUILDING CONSTRUCTED ( 120 SQ.M. ) VOCATIONAL BUILDING CONSTRUCTED ( 120 SQ.M. ) BUILDING FACILITY 1 527,360.00 proposed

III Zambales IBA (Capital) 2015 PROTECTED SERVICES INFRASTRUCTURE PROJECTS PROTECTED SERVICES INFRASTRUCTURE PROJECTS 1 2,200,000.00 pipelined

III Zambales Masinloc 20155 UNITS DAY CARE CENTER UPGRADED BASED ON

PROGRAM OF WORK FROM OFFICE OF THE MUNICIPAL

ENGINEER.

5 UNITS DAY CARE CENTER UPGRADED BASED ON

PROGRAM OF WORK FROM OFFICE OF THE MUNICIPAL

ENGINEER.

DAY CARE CENTER 1 500,000.00 proposed

III Zambales Palauig 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 1,500,000.00 proposed

III Zambales San Antonio 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 609,000.00 proposed

III Zambales San Felipe 2015 1 HOUSE TYPE BUILDING WITH BEDROOMS AND SESSION

AREA AND UPGRADED DCC

1 HOUSE TYPE BUILDING WITH BEDROOMS AND SESSION

AREA AND UPGRADED DCCDAY CARE CENTER 1 1,750,000.00 pipelined

III Zambales San Marcelino 2015 CONSTRUCTION, REPAIR AND REHABILITATION OF DAY

CARE CENTERS

CONSTRUCTION, REPAIR AND REHABILITATION OF DAY

CARE CENTERSDAY CARE CENTER 1 1,100,000.00 pipelined

III Zambales Subic 2015PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) -

REHABILITATION/IMPROVEMENT OF 28 DAY CARE

CENTERS

PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) -

REHABILITATION/IMPROVEMENT OF 28 DAY CARE

CENTERS

DAY CARE CENTER 1 4,650,000.00 pipelined

IV-A Batangas Balayan Barangay 9 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 700,000.00 130,000.00 proposed

IV-A Batangas Balayan Navotas 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 130,000.00 proposed

IV-A Batangas Balayan San Juan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 130,000.00 proposed

IV-A Batangas Balayan Gumamela 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 130,000.00 proposed

IV-A Batangas Balayan San Piro 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 100,000.00 proposed

IV-A Batangas Balayan Caloocan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 80,000.00 proposed

IV-A Batangas Balete Malabanan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR OF DAY CARE CENTERS)REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 2,758,350.00 212,190.00 Pipelined

IV-A Batangas Balete Makina 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Kalsara 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Poblacion 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Looc 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete San Sebastian 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Sampalocan 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Solis 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Magate 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Sala 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Kalawit 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Alangilan 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Balete Paligawan 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 212,180.00 Pipelined

IV-A Batangas Bauan Aplaya 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERS

CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 500,000.00 18,518.00 Pipelined

IV-A Batangas Bauan Alagao 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan As Is 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Balayong 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Bolo 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Cupang 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Gulibay 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Inicbulan 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Locloc 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Manalupang 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Manghinao Prop 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Manghinao Uno 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Poblaion 1 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Poblaion 2 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Poblaion 3 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Poblaion 4 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Agustin 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Andres Prop 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Miguel 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Roque 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Teodoro 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan San Pedro 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Sta. Maria 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Sto. Domingo 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Sinala 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,518.00 Pipelined

IV-A Batangas Bauan Tano Road 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,525.00 Pipelined

IV-A Batangas Bauan Poblacion a&b 2015 CONSTRUCTION OF GROUPHAND WASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 18,525.00 Pipelined

IV-A Batangas Laurel Poblacion 2 2015 REPAIR /UPGRADING OF DAYCARE CENTER REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 1,000,000.00 100,000.00 ongoing

IV-A Batangas Laurel Balakilong 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Berinayan 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel San Gabriel 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Leviste 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Molinete 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Sat. Maria 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Bugaan East 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Gulod 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Laurel Niyugan 2015 REPAIR /UPGRADING OF DAYCARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Lemery Mataas na Bayan 2014 improvement of sk bldg. for gad resource center improvement of sk bldg. for gad resource center 1 130.68 sqm 2,300,000.00 345,000.00 2,645,000.00 June 2015 completed

IV-A Batangas Laurel 2015CONSTRUCTION OF THREE-CLASSROOM DAYCARE CENTER

BUILDING

CONSTRUCTION OF THREE-CLASSROOM DAYCARE CENTER

BUILDINGDAY CARE CENTER 1 130.68 sqm 2,300,000.00 345,000.00 2,645,000.00 ongoing

IV-A Batangas Lemery Anak Dagat 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CARE

CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 1,000,000.00 50,000.00 ongoing

IV-A Batangas Lemery Arumahan 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Balanga 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Bukal 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Cahilan I 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Cahilan II 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery District I 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Dita 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Malinis 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Mayasang 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Niogan 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Palanas 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Payapa Ilaya 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Sambal Ilaya 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Sangalang 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery San Isidro Itaas 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Sinisian East 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Sinisian West 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Talaga 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Wawa Ibaba 2015 CONSTRUCTION OF HANDWASHING FACILITIES FOR DAY

CAREDAY CARE CENTER 1 50,000.00 ongoing

IV-A Batangas Lemery Dita 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,149,960.00 574,980.00 ongoing

IV-A Batangas Lemery Cahilan I 2015 CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 574,980.00 ongoing

IV-A Batangas Lemery Anak Dagat 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER @

11,112.00 FOR 45 DCCHYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 500,040.00 11,112.00 ongoing

IV-A Batangas Lemery Arumahan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Ayao-Iyao 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Bagong Pook 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Bagong Sikat 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Balanga 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Bukal 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Cahilan I 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Cahilan II 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Dayapan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery District I 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery District II 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery District III 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery District IV 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Dita 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Gulod 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Lucky 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Maguihan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Mahabang Dahili 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Mahayahay 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Maigsing Dahilig 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Maligaya 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Malinis 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Masalisi 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Mataas na Bayan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Matingain I 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Matingain II 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Masayang 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Niogan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Nonong Casto 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Palanas 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Payapa Ibaba 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Payapa Ilaya 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Rizal 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Sambal Ibaba 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Sambal Ilaya 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery San Isidro Ibaba 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery San Isidro Itaas 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Sangalang 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Sinisian East 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Sinisian West 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Talaga 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Tubigan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Tubuan 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Lemery Wawa Ibaba 2015 HYGIENE KIT/MATERIALS FOR DAY CARE CENTER DAY CARE CENTER 1 11,112.00 ongoing

IV-A Batangas Nasugbu Poblacion I 2015 PROTECTIVE SERVICES - INFRA PROJECTS - HANDWASHING

FACILITY FOR ALL DAY CARE CENTERSCONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 610,000.00 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion II 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion IV 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 20,678.00 Pipelined

IV-A Batangas Nasugbu Poblacion V 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion VI 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion VII 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion VIII 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion X 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion XI 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Poblacion XII 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Aga 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 31,017.00 Pipelined

IV-A Batangas Nasugbu Balaytigue 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 20,678.00 Pipelined

IV-A Batangas Nasugbu Banilad 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Bilaran 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 20,678.00 Pipelined

IV-A Batangas Nasugbu Bucana 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Bulihan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Bunducan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Butucan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

Page 11: List of KALAHI-CIDSS Subprojects - BUB

IV-A Batangas Nasugbu Calayo 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Catandaan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 31,017.00 Pipelined

IV-A Batangas Nasugbu Cogunan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Dayap 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Kaylaway 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 51,695.00 Pipelined

IV-A Batangas Nasugbu Karilao 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Latag 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Looc 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 20,678.00 Pipelined

IV-A Batangas Nasugbu Lumbangan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 41,355.00 Pipelined

IV-A Batangas Nasugbu Mataas na Pulo 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Maugat 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Munting Indang 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Natipuan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Pantalan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Papaya 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Putat 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Reparo 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 20,678.00 Pipelined

IV-A Batangas Nasugbu Talangan 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Tumalim 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Utod 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 10,339.00 Pipelined

IV-A Batangas Nasugbu Wawa 2015 CONSTRUCTION OF HANDWASHING FACILITY SANITARY FACILITY 1 51,695.00 Pipelined

IV-A Batangas San Nicolas Abelo 2015 REPAIR/UPGRADING OF DAY CARE CENTER REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 1,200,000.00 100,000.00 ongoing

IV-A Batangas San Nicolas Bancoro 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Balete 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Baluk-Baluk 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Bangin 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Sto. Nino 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Munlawin 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Talang 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Calangay 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Poblacion 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Maabud North 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas San Nicolas Maabud South 2015 REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 100,000.00 ongoing

IV-A Batangas Taal Poblacion 2015 BILIHAN NG MASA BILIHAN NG MASA (Construction of Mini-market) 1 850,000.00 850,000.00 Pipelined

IV-A Batangas Talisay Tabla 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 500,000.00 ongoing

IV-A Batangas Talisay Poblacion 6 2015 CONSTRUCTION OF PAG-ASA CENTER FOR CICL/ WOMEN

CRISIS CENTER PRODUCTION

CONSTRUCTION OF PAG-ASA CENTER FOR CICL/ WOMEN

CRISIS CENTER PRODUCTION1 2,000,000.00 2,000,000.00 ongoing

IV-A Batangas Tuy Acle 2015 REPAIR/UPGRADING OF DAY CARE CENTER REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 800,000.00 88,888.00 ongoing

IV-A Batangas Tuy Dalima 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Dao 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Luntal 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Magahis 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Mataywanac 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Palincaro 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Putol 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Batangas Tuy Toong 2015 REPAIR/UPGRADING OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 88,889.00 ongoing

IV-A Cavite Alfonso Alfonso 2015 CONSTRUCTION OF THERAPY CENTER FOR CHILDREN WITH

DISABILITYConstruction of Theraphy Center for Children with Disability 1 1,500,000.00 1,500,000.00 Pipelined

IV-A Cavite BACOOR CITY Poblacion 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF THERAPY CENTER AT GIRL'S HOME)

Protective Services-Infrastructure Projects (Construction of

Theraphy Center at Girl's Home)BUILDING FACILITY 1 600,000.00 600,000.00 proposed

IV-A Cavite Cavite City Hen. M. Alvarez 2015 TEXTBOOKS FOR DAY CARE CENTERS TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 500,000.00 10,638.25 Pipelined

IV-A Cavite Cavite City C. Tirona 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Kingfisher 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Lawin 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Love Bird 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Aguila 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Loro 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Kilyawan 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Martines 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Klapati 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Maya 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Gemini 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Virgo 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Scorpio 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Leo 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Aquarius 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Libra 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Capricorn 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Cancer 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Sagitarius 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Taurus 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Lao-lao 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Bid-bid 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Maya-maya 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Salay-salay 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Buwan buwan 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Lapu-lapu 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Hasa-hasa 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Sap sap 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Cadena De Amor 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Sampaguita 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Jasmine 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Gumamela 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Rosal 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Pinagbuklod 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Pinagpala 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Maligaya 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Kaunlaran 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Sinagtala 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Pagkakaisa 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Narra 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Akasya 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Kabalyero 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Kamagong 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Ipil 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Yakal 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,638.25 Pipelined

IV-A Cavite Cavite City Pechay 2015 TEXTBOOKS FOR DAY CARE CENTERS DAY CARE CENTER 1 pcs 10,640.50 Pipelined

IV-A Cavite CITY OF DASMARIÑAS San Esteban 2015 CONSTRUCTION OF BAHAY KALINGA BLDG. Construction of BAHAY KALINGA (BK) Building BUILDING FACILITY 1 800,000.00 200,000.00 1,000,000.00 proposed

IV-A Cavite Gen. Mariano Alvarez Poblacion 1 2015 EVACUATION CENTERS Construction of Two-storey Evacuation center BUILDING FACILITY 1 300 sqm 3,000,000.00 3,000,000.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 1 2015 CONSTRUCTION OF WOMEN CRISIS CENTERS CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 72 sqm 1,500,000.00 1,500,000.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Aldiano Olaes 2015 BIO INTENSIVE GARDENS FOR THE 27 BRGY & DAYCARES Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 1,000,000.00 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 1 (Area I) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 2 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 3 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 4 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Poblacion 5 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Benjamin Tirona (Area D) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Bernardo Pulido (Area H) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Epifanio Malia 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Francisco de Castro 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Francisco Reyes (San Jose) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Florello Calimag (Area C) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Gavino Maderan (Area J) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Gregoria de Jesus (San Jose) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Inocencio Salud (Area F) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Jacinto Lumbrera (Area J) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Kapitan Kua (Area F) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Koronel Jose P. Elises (Area E) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Macario Dacon (area D) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Marcellino Memije (Area H) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Nicolasa Virata (San Jose) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Pantaleon Granados (Area G) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Ramon Cruz (Area J) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez San Gabriel (Area K) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez San Jose (San Jose) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Severino delas Alas (Area J) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,037.00 Pipelined

IV-A Cavite Gen. Mariano Alvarez Tiniente Tiago (San Jose) 2015 Bio Intensive Gardens for the 27 Brgy & Daycares DAY CARE CENTER 1 37,038.00 Pipelined

IV-A Cavite GENERAL TRIAS Alingaro 2015 CONSTRUCTION OF DAY CARE CENTERS Construction of Day Care Center DAY CARE CENTER 1 2,000,000.00 500,000.00 Pipelined

IV-A Cavite GENERAL TRIAS Tapia 2015 Construction of Day Care Center DAY CARE CENTER 1 500,000.00 Pipelined

IV-A Cavite GENERAL TRIAS Santiago 2015 Construction of Day Care Center DAY CARE CENTER 1 500,000.00 Pipelined

IV-A Cavite GENERAL TRIAS Biclatan 2015 Construction of Day Care Center DAY CARE CENTER 1 500,000.00 Pipelined

IV-A Cavite GENERAL TRIAS Tejero 2015 BAHAY PAG-ASA FOR CICL (PHASE 1) BAHAY PAG-ASA FOR CICL (PHASE 1) 1 2,000,000.00 2,000,000.00 Pipelined

IV-A Cavite IMUS CITY Buhay na Tubig 2015 SENIOR CITIZEN CENTER - PHASE 1 & 2 Senior Citizen Center Phase I BUILDING FACILITY 1 2,000,000.00 1,000,000.00 Pipelined

IV-A Cavite IMUS CITY Anabu 2015 SEnior Citizen Center Phase II BUILDING FACILITY 1 1,000,000.00 Pipelined

IV-A Cavite Indang Agus-us 2015 CONSTRUCTION OF HANDWASHING FACILITIES CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 500,000.00 25,000.00 Pipelined

IV-A Cavite Indang Alulod 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Banaba Cerca 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Banaba Lejos 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Bancod 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Buna Cerca 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Buna Lejos I 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Buna Lejos II 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Calumpang Cerca 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Calumpang Lejos I 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Carasuchi 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Kayquit I 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Daine I 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Guyam Malaki 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Guyam Munti 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Harasan 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Kaytambog 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Limbon 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Lumampong Balagbag 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Indang Lumampong Halayhay 2015 CONSTRUCTION OF HANDWASHING FACILITIES SANITARY FACILITY 1 25,000.00 Pipelined

IV-A Cavite Kawit 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT-

EVACUATION CENTERConstruction of Evacuation Center BUILDING FACILITY 1 1,000,000.00 - proposed

IV-A Cavite Kawit 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT-

CONSTRUCTION OF CICLConstruction of CICL BUILDING FACILITY 1 2,500,000.00 - proposed

IV-A Cavite Kawit 2015 TINDAHANG BAYAN Construction of Tindahang Bayan BUILDING FACILITY 1 1,000,000.00 - proposed

IV-A Cavite Magallanes Barangay 1 2015 CONSTRUCTION OF DAY CARE CENTERS WITH COMPLETE

FACILITIES

CONSTRUCTION OF DAY CARE CENTERS WITH COMPLETE

FACILITIESDAY CARE CENTER 1 48 sqm 1,000,000.00 1,000,000.00 ongoing

IV-A Cavite Magallanes San Agustin 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 1,000,000.00 142,857.00 ongoing

IV-A Cavite Magallanes Caluangan 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,857.00 ongoing

IV-A Cavite Magallanes Bendita 2 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,857.00 ongoing

IV-A Cavite Magallanes Bendita 1 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,857.00 ongoing

IV-A Cavite Magallanes Pacheco 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,857.00 ongoing

IV-A Cavite Magallanes Baliwag 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,857.00 ongoing

IV-A Cavite Magallanes Tua 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 142,858.00 ongoing

IV-A Cavite Naic Balsahan 2015KAPIT-BISIG LABAN SA KAHIRAPAN – COMPREHENSIVE

AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-

NCDDP SUB PROJECT: SOIL PROTECTION, RIPRAP)

KAPIT-BISIG LABAN SA KAHIRAPAN – COMPREHENSIVE

AND INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-

NCDDP SUB PROJECT: SOIL PROTECTION, RIPRAP)

1 3,000,000.00 3,000,000.00 proposed

IV-A Cavite Naic Sabang 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER)

BUILDING FACILITY 1 1,800,000.00 1,800,000.00 proposed

IV-A Cavite TAGAYTAY CITY Kaybagal South 2015 DAY CENTER FOR THE ELDERLY Day Center for the Elderly BUILDING FACILITY 1 2,000,000.00 2,000,000.00 proposed

IV-A Cavite Tanza 2015 IMPROVEMENT/EXTENSION OF TCLC IMPROVEMENT/EXTENSION OF TCLC 1 2,000,000.00 - Pipelined

IV-A Cavite TRECE MARTIRES CITY (Capital) 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF BAHAY PAG ASA FOR CICLConstruction of Bahay Pag-Asa BUILDING FACILITY 1 3,000,000.00 - Pipelined

IV-A Laguna CITY OF BIÑAN Zapote 2015 PROTECTIVE SERVICES AND INFRASTRACTURE PROJECTS Construction of Bahay Pag-asa for CICL BUILDING FACILITY 1 2,500,000.00 2,500,000.00 proposed

IV-A Laguna Kalayaan San Antonio 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJ. Construction of Day Care Center DAY CARE CENTER 1 48 sqm 500,000.00 500,000.00 Pipelined

IV-A Laguna Luisiana San Buenaventura 2015 PROTECTIVE SERVICES- INFRASTRUCTURE Construction of Day Care Center DAY CARE CENTER 1 48 sqm 850,000.00 850,000.00 Pipelined

IV-A Laguna Paete Quinale 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS Construction of Day Care Center DAY CARE CENTER 1 48 sqm 1,540,000.00 710,000.00 1,500,000.00 Pipelined

IV-A Laguna Paete Bagumbayan 2015 Construction of Day Care Center DAY CARE CENTER 1 48 sqm 750,000.00 Pipelined

IV-A Laguna Pagsanjan Bagumbayan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT Construction of Crisis Center/CICL BUILDING FACILITY 1 2,500,000.00 1,500,000.00 4,000,000.00 Pipelined

IV-A Laguna Pangil Sulib 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS Repair of Sulib Day Care Center DAY CARE CENTER 1 48 sqm 1,000,000.00 600,000.00 proposed

IV-A Laguna Pangil Isla 2015 Construction of Group Handwashing Facility SANITARY FACILITY 1 200,000.00 proposed

IV-A Laguna Pangil Balian 2015 Construction of Group Handwashing Facility SANITARY FACILITY 1 200,000.00 proposed

IV-A Laguna Pila Pinagbayanan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 500,000.00 38,461.50 proposed

IV-A Laguna Pila Bulihan Sur 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Bulihan Norte 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Pook 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Mojon 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Pansol 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Sta. Clara Norte 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Sta. Clara Sur B 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Aplaya 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Masico 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 38,461.50 proposed

IV-A Laguna Pila Labuin 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 115,385.00 proposed

IV-A Laguna SAN PABLO CITY Bautista 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS,

REPAIR OF DAY CARE CENTERS (2)Repair of Day Care Center DAY CARE CENTER 1 500,000.00 250,000.00 500,000.00 Pipelined

IV-A Laguna SAN PABLO CITY Del Remedio 2015 Repair of Day Care Center DAY CARE CENTER 1 250,000.00 500,000.00 Pipelined

IV-A Laguna SAN PABLO CITY San Jouquin 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS,

CONSTRUCTION OF DAY CARE CENTERS (1)

PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS,

CONSTRUCTION OF DAY CARE CENTERS (1)DAY CARE CENTER 1 500,000.00 500,000.00 1,000,000.00 Pipelined

IV-A Laguna SANTA CRUZ (Capital) Oogong 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTSProtective Services - Infrastracture Projects (Construction of

Bahay Pag-asa for CICL)1 1,120,000.00 1,120,000.00 proposed

IV-A Laguna SANTA MARIA Poblacion Dos 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN CRISIS CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN CRISIS CENTER)BUILDING FACILITY 1 500,000.00 500,000.00 Pipelined

IV-A Laguna Victoria Banca-Banca 2015 PROTECTIVE-SERVICES-INFRASTRUCTURE PROJECTProtective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 1,000,000.00 100,000.00 Pipelined

IV-A Laguna Victoria Daniw 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Laguna Victoria Masapang 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Laguna Victoria Nanhaya (Pob) 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 200,000.00 Pipelined

IV-A Laguna Victoria Pangalangan 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Laguna Victoria San Benito 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Laguna Victoria San Felix 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

Page 12: List of KALAHI-CIDSS Subprojects - BUB

IV-A Laguna Victoria San Francisco 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Laguna Victoria San Roque (Pob) 2015 Protective Services-Infrastructure Project (Repair/Rehab. Of

Day Care Center)DAY CARE CENTER 1 100,000.00 Pipelined

IV-A Quezon Atimonan Angeles 2015 REPAIR OF 28 DAY CARE CENTERS Repair of Day Care Center DAY CARE CENTER 1 1,000,000.00 34,483.00 Pipelined

IV-A Quezon Atimonan Balubad 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Lubi 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Kilait 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Manggalayan LBK 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Buhangin 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Lumulan 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Zone I 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Zone II 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Zone III 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Zone IV 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Tagbakin 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan San Isidro 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Sapaan 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan San Andres Labak 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Tinandog 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Rizal 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Malinao Ibaba 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Magsaysay 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Malinao Ilaya 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Sta. Catalina 2015 Repair of Day Care Center DAY CARE CENTER 1 68,959.00 Pipelined

IV-A Quezon Atimonan Talaba 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Malusak 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Ponon 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan San Rafel 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Inalig 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Caridad Ibaba 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan Caridad Ilaya 2015 Repair of Day Care Center DAY CARE CENTER 1 34,483.00 Pipelined

IV-A Quezon Atimonan San Juan 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 1,000,000.00 1,000,000.00 Pipelined

IV-A Quezon Buenavista Villa Batabat 2014 Repair/Rehabilitation Of Villa Batabat-San Vicente road Concreting of 112lm Critical Slope FMR 1 448 sqm 495,000.00 72,000.00 567,000.00 completed

IV-A Quezon Burdeos Poblacion 2014 Road project Construction of 2m x 150lm Pathway with RCBC and RCPC PATHWAY 1 150 lnm 450,000.00 153,124.00 603,124.00 03-Feb-15 June 2015 completed

IV-A Quezon Burdeos Cabungalunan 2014 Road project Construction of 1m x 400lm Pathway with RCBC PATHWAY 1 400 sqm 591,075.00 69,107.50 660,182.50 16-Feb-15 June 2015 completed

IV-A Quezon Burdeos Bonifacio 2014 Road project Construction of 460lm Pathway PATHWAY 1 920 sqm 900,000.00 108,000.00 1,008,000.00 05-Feb-15 ongoing

IV-A Quezon Burdeos Rizal 2014 Road project Construction of 520lm Pathway PATHWAY 1 832 sqm 900,000.00 128,000.00 1,028,000.00 02-Feb-15 ongoing

IV-A Quezon Burdeos Mabini 2014 Road project Construction of 470lm Pathway PATHWAY 1 940 sqm 900,000.00 134,000.00 1,034,000.00 06-Feb-15 ongoing

IV-A Quezon Burdeos Amot 2014 Road project Concreting of 470lm FMR Critical Section 1 940 sqm 900,000.00 117,000.00 1,017,000.00 04-Feb-15 June 2015 completed

IV-A Quezon Burdeos Anibawan 2014 Road project Construction of 800lm Pathway PATHWAY 1 1600 sqm 1,682,337.00 179,662.00 1,861,999.00 19-Feb-15 June 2015 completed

IV-A Quezon Burdeos Aluyon 2014 Road project Improvement of 800lm FMR with RCBC & RCPC 1 800 lnm 1,682,338.00 237,662.00 1,920,000.00 02-Mar-15 ongoing

IV-A Quezon Calauag Lainglaingan 2013 Construction of Day Care Center (500,000.00) Construction of Day Care Center - Lainglaingan DAY CARE CENTER 1 sqm 500,000.00 500,000.00 11-Apr-14 15-Dec-14 completed

IV-A Quezon Calauag Apad Lutao 2013 Construction of Day Care Center (500,000.00) Construction of Day Care Center - Apad Lutao DAY CARE CENTER 1 sqm 500,000.00 500,000.00 11-Apr-14 15-Dec-14 completed

IV-A Quezon Calauag 2013 Construction of ECCD Resource Center (500,000.00) Construction of ECCD Resource Center 1 sqm 500,000.00 500,000.00 11-Apr-14 15-Dec-14 completed

IV-A Quezon Calauag Bukal 2013 Construction of Day Care Center (500,000.00) Construction of Day Care Center - Bukal DAY CARE CENTER 1 sqm 500,000.00 500,000.00 11-Apr-14 15-Dec-14 completed

IV-A Quezon Calauag Anahawan 2014 construction of day care centers (dcc) const. Of Day Care Centers Dcc DAY CARE CENTER 1 48 sqm 1,350,000.00 67,500.00 517,500.00 ongoing

IV-A Quezon Calauag Kunalum 2014 const. Of Day Care Centers Dcc DAY CARE CENTER 1 48 sqm 77,750.00 527,750.00 ongoing

IV-A Quezon Calauag Apad Taisan 2014 const. Of Day Care Centers Dcc DAY CARE CENTER 1 48 sqm 68,373.00 518,373.00 ongoing

IV-A Quezon Calauag Apad Lutao 2014construction/fabrication of playground devices for day care

centers bgy apad lutao

Fabrication of playground devices for day care centers bgy

apad lutaoDAY CARE CENTER 1 4 unit 100,000.00 10,000.00 110,000.00 June 2015 completed

IV-A Quezon Calauag Bukal 2014construction/fabrication of playground devices for day care

centers bgy bukal

Fabrication of playground devices for day care centers bgy

bukalDAY CARE CENTER 1 4 unit 100,000.00 10,000.00 110,000.00 June 2015 completed

IV-A Quezon Calauag Lagay 2014construction/fabrication of playground devices for day care

centers bgy lagay

Fabrication of playground devices for day care centers bgy

lagayDAY CARE CENTER 1 4 unit 100,000.00 10,000.00 110,000.00 June 2015 completed

IV-A Quezon Calauag Poblacion 3 2014construction/fabrication of playground devices for day care

centers bgy poblacion tres

Fabrication of playground devices for day care centers bgy

poblacion tresDAY CARE CENTER 1 6 unit 100,000.00 100,000.00 June 2015 completed

IV-A Quezon Calauag Sabang 2 2014construction/fabrication of playground devices for day care

centers bgy sabang ii

Fabrication of playground devices for day care centers bgy

sabang iiDAY CARE CENTER 1 5 unit 100,000.00 10,000.00 110,000.00 June 2015 completed

IV-A Quezon Calauag 2015 PROTECTION SERVICES -INFRASTRUTURE PROJECT Construction of 1-Unit Day Care Center DAY CARE CENTER 1 48 sqm 1,700,000.00 70,000.00 770,000.00 proposed

IV-A Quezon Calauag 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,000,000.00 proposed

IV-A Quezon Catanauan Bulagsong 2014 Rehabilitation of road project Improvement of Barangay Road ROAD 1 700 m 600,000.00 105,000.00 705,000.00 completed

IV-A Quezon Catanauan Madulao 2014 Rehabilitation of road project in Sitio Bobo to Sitio TambonConstruction of 120lm Stone Masonry Canal with 24lm Cross

Drain1 120 m 200,000.00 40,000.00 240,000.00 completed

IV-A Quezon GENERAL LUNA Sumilang 2014 Concreting of road project Concreting of 260lm FMR with 260lm Stone Masonry Canal 1 840 sqm 800,000.00 100,000.00 900,000.00 completed

IV-A Quezon GENERAL LUNA Sumilang 2014 Regraveling of road project Regraveling of road project ROAD 1 200,000.00 - completed

IV-A Quezon GENERAL LUNA Villarica 2014 Regraveling of road projectConcreting of 500lm Critical Section FMR with 80lm Stone

Masonry Canal1 1000 sqm 500,000.00 100,385.00 1,100,385.00 ongoing

IV-A Quezon GENERAL LUNA Villarica 2014 Regraveling of road project Regraveling of road project ROAD 1 500,000.00 - ongoing

IV-A Quezon GENERAL LUNA Magsaysay 2014 Regraveling of road projectConcreting of 90lm Critical Slope FMR with 90lm Stone

Masonry Canal & 10lm Pipe Culvert1 90 lnm 500,000.00 50,000.00 550,000.00 ongoing

IV-A Quezon GENERAL LUNA Lavides 2014 Regraveling of road projectConcreting of 200lm Critical Section FMR with 125lm Stone

Masonry Line Canal1 400 sqm 500,000.00 50,400.00 550,400.00 ongoing

IV-A Quezon GENERAL LUNA Bacong Ilaya 2014 Regraveling of road projectConcreting of 230lm Critical Section FMR with 60lm Stone

Masonry Canal (Sitio Ugatan)1 460 sqm 500,000.00 50,000.00 550,000.00 June 2015 completed

IV-A Quezon GENERAL LUNA Bacong Ilaya 2014 Regraveling of road projectConcreting of 120lm Critical Section FMR with 100lm Stone

Masonry canal (Sitio Bindoy)1 420 sqm 500,000.00 50,000.00 550,000.00 June 2015 completed

IV-A Quezon GENERAL LUNA San Isidro Ilaya 2014 Regraveling of road projectConcreting of 280lm Critical Section FMR with 90lm Stone

Masonry Canal & 4m RCPC1 560 sqm 600,000.00 79,000.00 679,000.00 June 2015 completed

IV-A Quezon GENERAL LUNA San Nicolas 2014 Regraveling of road projectConstruction of 830lm Pathway with 150 meters Stone

Masonry Canal & 6lm RCPCPATHWAY 1 830 m 1,800,000.00 180,000.00 1,980,000.00 ongoing

IV-A Quezon GENERAL LUNA Poblacion 2015 CONSTRUCTION AND PRODUCTIVITY CENTER CONSTRUCTION OF PRODUCTIVITY CENTER BUILDING FACILITY 1 500,000.00 500,000.00 proposed

IV-A Quezon GENERAL NAKAR 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 1,000,000.00 1,000,000.00 proposed

IV-A Quezon Gumaca 2015 CONSTRUCTION OF TWO DAY CARE CENTER (2

BARANGAYS, 700,000.00 PER BARANGAYConstruction of Day Care Center DAY CARE CENTER 1 48 sqm 1,400,000.00 700,000.00 Pipelined

IV-A Quezon Gumaca 2015 Construction of Day Care Center DAY CARE CENTER 1 48 sqm 700,000.00 Pipelined

IV-A Quezon Lopez Villa Espina 2014 Cable bridge project Construction of 20lm Vented Spillway 1 20 lnm 1,062,542.85 238,857.15 1,301,400.00 completed

IV-A Quezon Padre Burgos 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 48 sqm 500,000.00 500,000.00 Pipelined

IV-A Quezon Padre Burgos 2015 CONSTRUCTION OF SHELTER/REHABILITATION CENTER CONSTRUCTION OF SHELTER/REHABILITATION CENTER BUILDING FACILITY 1 500,000.00 500,000.00 Pipelined

IV-A Quezon Patnanungan Poblacion 2015 EXPANSION/IMPROVEMENT OF DAY CARE CENTER EXPANSION/IMPROVEMENT OF DAY CARE CENTER DAY CARE CENTER 1 48 sqm 500,000.00 500,000.00 proposed

IV-A Quezon Polillo Pinaglubayan 2014 kalahi-cidss area (provision of basic education facilities) Improvement of Existing 3 CL Elementary School Building SCHOOL FACILITY 1 800,000.00 271,085.50 June 2015 completed

IV-A Quezon Polillo Salipsip 2014 Improvement of Existing 3 CL Elementary School Building SCHOOL FACILITY 1 285,031.00 completed

IV-A Quezon Polillo Canicanian 2014 Improvement of Existing 3 CL Elementary School Building SCHOOL FACILITY 1 243,883.50 completed

IV-A Quezon Polillo Pilion 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 48 sqm 550,000.00 550,000.00 Pipelined

IV-A Quezon Polillo 2015 TOILET CONSTRUCTION,TRAINING AND PROGRAM

MONITORING

TOILET CONSTRUCTION,TRAINING AND PROGRAM

MONITORINGSANITARY FACILITY 1 550,000.00 - Pipelined

IV-A Quezon Quezon Poblacion 3 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 500,000.00 22,727.00 Pipelined

IV-A Quezon Quezon Poblacion 4 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Poblacion 5 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Poblacion 6 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Cagbalogo 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Tagkawa 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Caridad 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Cometa 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Magsino 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Apad 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Guinhawa 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Montana 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Mascarina 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Silangan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Gumubat 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Villa Mercedes 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Villa Francia 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Argosino 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Villa Belen 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Villa Gomez 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Del Pilar 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,727.00 Pipelined

IV-A Quezon Quezon Sabang 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 22,733.00 Pipelined

IV-A Quezon Sampaloc 2015 ESTABLISHMENT OF DAY CENTER ESTABLISHMENT OF DAY CENTER BUILDING FACILITY 1 2,000,000.00 2,000,000.00 ongoing

IV-A Quezon SAN FRANCISCO (AURORA) 2013 Provision of facilities in senior citizen center Provision of facilities in senior citizen center 1 lot 260,000.00 260,000.00 25-Oct-13 10-Mar-14 completed

IV-A Quezon SAN FRANCISCO (AURORA) Sto. Nino 2014 Road project Concreting of 250lm FMR with 180lm Stone Masonry Canal 1 250 lnm 1,305,000.00 205,750.00 1,510,750.00 06-Jan-15 June 2015 completed

IV-A Quezon SAN FRANCISCO (AURORA) Silongin 2014 Road project Concreting of 204lm FMR with 210lm Stone Masonry Canal 1 204 lnm 1,305,000.00 205,750.00 1,510,750.00 10-Jan-15 June 2015 completed

IV-A Quezon SAN FRANCISCO (AURORA) Cawayan II 2014 Road project Concreting of 370lm Farm to Market Road ROAD 1 370 m 1,630,000.00 254,500.00 1,884,500.00 12-Jan-15 June 2015 completed

IV-A Quezon SAN FRANCISCO (AURORA) Casay 2014 Road projectConstruction of 450lm FMR with 5 Sta. 6lm 310mm dia Cross

Drain1 450 m 1,700,000.00 265,000.00 1,965,000.00 08-Jan-15 June 2015 completed

IV-A Quezon San Narciso San Vicente 2014 Concreting of San Vicente road project Construction of 1.80km Farm to Market Road ROAD 1 1565 lnm 1,275,000.00 1,860,500.00 3,135,500.00 ongoing

IV-A Quezon San Narciso 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 48 sqm 1,850,000.00 925,000.00 Pipelined

IV-A Quezon San Narciso 2015 CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 48 sqm 925,000.00 Pipelined

IV-A Quezon Tagkawayan Bamban 2014 Construction of .50km road projectConstruction of 0.50km Barangay Road @ Sitio Mabaang-

Bamban Road with 1000 m2 PCCP, 10lm RCPC & 28lm

Grouted Riprap for Slope Protection

ROAD 1 0.5 km 1,528,314.00 64,166.00 1,592,480.00 22-Sep-14 31-Dec-14 completed

IV-A Quezon Tagkawayan Aldavoc 2014 Construction of 650ln concrete pathway with canal Construction of 650ln concrete pathway with canal PATHWAY 1 650 lnm 785,583.00 87,610.00 873,193.00 21-Sep-14 19-Jan-15 completed

IV-A Quezon Tagkawayan 2015 EXTENSION OF SEAWALL (1) EXTENSION OF SEAWALL (1) SEAWALL 1 600,000.00 600,000.00 Pipelined

IV-A Quezon Tagkawayan 2015 EXTENSION OF SEAWALL (1) EXTENSION OF SEAWALL (1) SEAWALL 1 1,000,000.00 1,000,000.00 Pipelined

IV-A Quezon Unisan FB Jesus 2015 PROTECTIVE SERVICE - INFRASTRUCTURE PROJECTSProtective Service-Infrastructure Projects (Construction of

Crisis Center/Evacuation Center)BUILDING FACILITY 1 2,550,000.00 2,550,000.00 ongoing

IV-A Rizal Baras Pinugay 2015 PROTECTIVE SERVICES -INFRASTRUCTURE PROJECTSPROTECTIVE SERVICES -INFRASTRUCTURE PROJECTS

(Construction of Day Care Centers (2)DAY CARE CENTER 1 96 sqm 1,000,000.00 1,000,000.00 Pipelined

IV-A Rizal Binangonan 2015 CONSTRUCTION OF A BAHAY PAG ASA HALFWAY HOUSE

AT SITIO PULONG PARANG

CONSTRUCTION OF A BAHAY PAG ASA HALFWAY HOUSE

AT SITIO PULONG PARANG1 2,000,000.00 2,000,000.00 proposed

IV-A Rizal Jala-jala 2014 community-based training program community-based training program 1 56 manday 500,000.00 500,000.00 26-Feb-15 completed

IV-A Rizal Jala-jala 2015CONSTRUCTION OF MSWD PROTECTIVE CRISIS CENTER

FOR WOMEN, SENIOR CITIZEN, PWD AND CHILDREN IN

CRISIS

CONSTRUCTION OF MSWD PROTECTIVE CRISIS CENTER

FOR WOMEN, SENIOR CITIZEN, PWD AND CHILDREN IN

CRISIS

BUILDING FACILITY 1 3,450,000.00 3,450,000.00 proposed

IV-A Rizal Morong 2015 CONSTRUCTION OF EVACUATION CENTER (DSWD-04) CONSTRUCTION OF EVACUATION CENTER (DSWD-04) BUILDING FACILITY 1 1,500,000.00 1,500,000.00 ongoing

IV-A Rizal Pililla 2015 CONSTRUCTION OF DAY CARE CONSTRUCTION OF DAY CARE DAY CARE CENTER 1 48 sqm 500,000.00 500,000.00 proposed

IV-A Rizal Pililla 2015 CONSTRUCTION OF DAY CARE CONSTRUCTION OF DAY CARE DAY CARE CENTER 1 48 sqm 500,000.00 500,000.00 proposed

IV-A Rizal Pililla Malaya 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 540,000.00 60,000.00 proposed

IV-A Rizal Pililla Niogan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Quisao 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Halayhayan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Bagumbayan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Imatong 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Takungan 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Hulo 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal Pililla Wawa 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERSDAY CARE CENTER 1 60,000.00 proposed

IV-A Rizal RODRIGUEZ (MONTALBAN) 2015 REPAIR AND PURCHASE OF FACILITIES FOR WOMEN

SHELTER

REPAIR AND PURCHASE OF FACILITIES FOR WOMEN

SHELTER1 800,000.00 800,000.00 Pipelined

IV-A Rizal San Mateo 2015 BIGASANG BAYAN BIGASANG BAYAN 1 1,000,000.00 1,000,000.00 Pipelined

IV-A Rizal Tanay 2015 CONSTRUCTION OF WOMEN'S CRISIS CENTER CONSTRUCTION OF WOMEN'S CRISIS CENTER BUILDING FACILITY 1 2,000,000.00 2,000,000.00 Pipelined

IV-A Rizal Taytay 2015 CONSTRUCTION OF BAHAY PAG-ASA CONSTRUCTION OF BAHAY PAG-ASA 1 2,500,000.00 2,500,000.00 Pipelined

IV-A Rizal Taytay 2015 IMPROVEMENT OF OSCA FACILITIES IMPROVEMENT OF OSCA FACILITIES 1 1,500,000.00 1,500,000.00 Pipelined

IV-A Rizal Teresa 2015 REPAIR / UPGRADING OF 10 DAY CARE CENTERS AND

CONSTRUCTION OF GROUP DISHWASHING FACILITY-Bagumbayan Day Care Center DAY CARE CENTER 1 1,276,000.00 127,600.00 ongoing

IV-A Rizal Teresa 2015 GMC Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 Calumpang/Sto. Cristo Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 CHE II Dalig Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 Dulumbayan Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 Little Star Day Care Center-Sitio Ibabaw DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 May-Iba Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 Prinza Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 San Gabriel Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 San Roque Day Care Center DAY CARE CENTER 1 127,600.00 ongoing

IV-A Rizal Teresa 2015 CONSTRUCTION OF DAY CARE CENTER Abuyod Day Care Center DAY CARE CENTER 1 3,000,000.00 1,000,000.00 ongoing

IV-A Rizal Teresa 2015 CHE II Dalig Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

IV-A Rizal Teresa 2015 Buhangin Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

IV-B Marinduque Buenavista Bicas-Bicas 2014 Construction of Brgy. Bicas Bicas road Construction of Brgy. Bicas Bicas Road ROAD 1 900,000.00 June 2015 completed

IV-B Marinduque Buenavista Malbog 2014 Construction of Brgy. Malbog road Construction of Brgy. Malbog Road ROAD 1 900,000.00 June 2015 completed

IV-B Marinduque Buenavista Sihi 2014 Construction of Brgy. Sihi road Construction of Brgy. Sihi Road ROAD 1 900,000.00 June 2015 completed

IV-B Marinduque Buenavista Tungib Lipata 2014 Construction of Brgy. Tungib Lipata road Construction of Brgy. Tungib Lipata Road ROAD 1 900,000.00 June 2015 completed

IV-B Marinduque Buenavista 2014website development and reproduction of promotional

materialsRehabilitation of DCC DAY CARE CENTER 1 475,000.00 ongoing

IV-B Marinduque Buenavista Timbog 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 600,000.00 proposed

IV-B Marinduque Buenavista Daykitin 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

IV-B Marinduque Buenavista Sihi 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

IV-B Marinduque Gasan 2015 PROTECTIVE SERVICES-INFRA PROJECTS (CONSTRUCTION

OF WOMEN CRISIS CENTER)Construction of Women Crisis Center BUILDING FACILITY 1 1,800,000.00 proposed

IV-B Marinduque Mogpog 2015 CONSTRUCTION OF DAY CARE CENTERS Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,000,000.00 proposed

IV-B Marinduque Torrijos Buangan 2014 Rehabilitation of Buangan road Rehabilitation of Buangan Road ROAD 1 241,577.95 ongoing

IV-B Marinduque Torrijos Kay Duke 2014 Rehabilitation of Kay Duke road Rehabilitation of Kayduke Road ROAD 1 1,350,000.00 ongoing

IV-B Marinduque Torrijos 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 proposed

IV-B Marinduque Torrijos Buangan 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 proposed

IV-B Occidental Mindoro Calintaan 2013 Improvement of 44 Day Care Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 400,000.00 completed

Page 13: List of KALAHI-CIDSS Subprojects - BUB

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan 2013 Construction of 1-uint Hand Washing Facilities SANITARY FACILITY 1 completed

IV-B Occidental Mindoro Calintaan Poblacion 2015 REPAIR/UPGRADE OF SENIOR CITIZEN CENTER Repair / Upgrade of Senior Citizen Building BUILDING FACILITY 1 1,000,000.00 proposed

IV-B Occidental Mindoro Lubang Sitio Balaguin, Maliig 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DCC WITH COMPLETE SET OF SOAP AND TOOTHPASTE

Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 2 500,000.00 proposed

IV-B Occidental Mindoro Lubang Proper, Maliig 2015 Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 2 proposed

IV-B Occidental Mindoro Lubang Tangal 2015 Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 1 proposed

IV-B Occidental Mindoro Lubang Tagbac 2015 Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 1 proposed

IV-B Occidental Mindoro Lubang Sitio Buli Cabra 2015 Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 1 proposed

IV-B Occidental Mindoro Lubang Libis, Cabra 2015 Construction of Group Handwashing Facility in DCC with

complete Set of Soap and ToothpasteDAY CARE CENTER 2 proposed

IV-B Occidental Mindoro Magsaysay Poblacion 2015 CONSTRUCTION OF CONDUCIVE SPACIOUS DAY CENTER

AND OFICE OF PWD'S AND ELDERLIES

Construction of Conducive Spacious Day Center and Office of

PWDs and ElderlyBUILDING FACILITY 1 607,000.00 proposed

IV-B Occidental Mindoro Magsaysay Laste 2015 CONSTRUCTION OF HAND WASHING FACILITIES AND

PROVISION OF HYGIENE KIT

Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 500,000.00 proposed

IV-B Occidental Mindoro Magsaysay Alibog 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Talawag 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Sitio Fernandez 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Munting Kamalayan 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Cabag Poblacion 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Brgy Nicolas 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Sitio Santo Cristo Lourdes 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Proper Lourdes 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro Magsaysay Gapasan 2015 Construction of 1-Unit Hand Washing Facilities and Provision

of Hygiene KitSANITARY FACILITY 1 proposed

IV-B Occidental Mindoro MAMBURAO (Capital) Barangay 8 2015 CONSTRUCTION OF EVACUATION CENTER Construction of Evacuation Center BUILDING FACILITY 1 2,850,000.00 proposed

IV-B Occidental Mindoro MAMBURAO (Capital) Barangay 8 2015 CONSTRUCTION OF BAHAY PAG-ASA (YOUTH CENTER) Construction of Bahay Pag-Asa (CICL) 1 700,000.00 proposed

IV-B Occidental Mindoro San Jose 2015 PROTECTIVE SERVICES (INFRA SUPPORT) -

CONSTRUCTION/REPAIR/UPGRADING OF DCCS AND SNPS1 3,000,000.00 proposed

IV-B Occidental Mindoro San Jose 2015 PROTECTIVE SERVICES (INFRA SUPPORT) - CONSTRUCTION

OF WOMEN/VAWC CRISIS CENTERConstruction of Women/VAWC Crisis Center BUILDING FACILITY 1 1,500,000.00 proposed

IV-B Occidental Mindoro SANTA CRUZ poblacion II 2014 constructrion of sea wall Construction of Sea Wall - Poblacion II 1 1,912,500.00 pipelined

IV-B Occidental Mindoro SANTA CRUZ poblacion II 2014 crisis center Construction of Crisis Building - Bahay Pag-Asa BUILDING FACILITY 1 850,000.00 pipelined

IV-B Occidental Mindoro SANTA CRUZ poblacion II 2014 evacuation center Construction of Multi-Purpose Building Phase III BUILDING FACILITY 1 1,700,000.00 pipelined

IV-B Occidental Mindoro SANTA CRUZ Dayap 2014 Road project Road Project - Dayap ROAD 1 1,350,000.00 pipelined

IV-B Occidental Mindoro SANTA CRUZ 2015 IMPROVEMENT OF DAY CARE CENTERS 1 623,386.34 proposed

IV-B Oriental Mindoro Baco Lantuyang 2014 concrete bridge project in lantuyang Core Shelter Assistance 1 425,000.00 pipelined

IV-B Oriental Mindoro Baco 2014 core shelter assitance core shelter assitance 1 2,023,000.00 pipelined

IV-B Oriental Mindoro Baco Mangangan 1 2014 daycare center / facilities Construction of 1-Unit Day Care Center DAY CARE CENTER 1 2,550,000.00 pipelined

IV-B Oriental Mindoro Baco Mangangan 2 2014 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IV-B Oriental Mindoro Baco Dulangan 2014 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IV-B Oriental Mindoro Bansud Alcadesma 2014 construction of model day care center Construction of Day Care Center - Alcadesma DAY CARE CENTER 1 1,275,000.00 June 2015 completed

IV-B Oriental Mindoro Bansud Sumagui 2014 Construction of Day Care Center - Sumagui DAY CARE CENTER 1 June 2015 completed

IV-B Oriental Mindoro Bansud Proper Bansud 2014 core shelter assistance project Core Shelter Assistance Project 1 1,190,000.00 pipelined

IV-B Oriental Mindoro Bansud 2014 emergency shelter assistance Emergency Shelter Assistance 1 127,500.00 pipelined

IV-B Oriental Mindoro Bansud Villa Pagasa, Sumagui, Conrazon 2015 FLOOD CONTROL- RIVER PROTECTION DIKE Construction of River Control WATER CONTROL 3 12,500,000.00 proposed

IV-B Oriental Mindoro Bongabong Hagan 2014 Construction Of Cable Bridge Construction Of Cable Bridge BRIDGE 1 1,700,000.00 ongoing

IV-B Oriental Mindoro Bongabong Lisap 2014 Construction Of Foot Bridge Construction Of Foot Bridge FOOT BRIDGE 1 425,000.00 ongoing

IV-B Oriental Mindoro Bongabong Malitbog 2014 Construction of road project with drainage canal Construction of road project with drainage canal ROAD 1 850,000.00 pipelined

IV-B Oriental Mindoro BULALACAO (SAN PEDRO) Bagong Sikat - Talon 2014 Construction of Bagong Sikat to Talon road Construction of Bagong Sikat to Talon road ROAD 2 1,000,000.00 ongoing

IV-B Oriental Mindoro BULALACAO (SAN PEDRO) Cabugao - San Isidro 2014 Improvement of Cabugao to San Isidro road Improvement of Cabugao to San Isidro road ROAD 2 1,000,000.00 ongoing

IV-B Oriental Mindoro BULALACAO (SAN PEDRO) Milagrosa - Bating 2014 Rehabilitation of Milagrosa to Bating Rehabilitation of (Road from) Milagrosa to Bating ROAD 1 1,000,000.00 ongoing

IV-B Oriental Mindoro CITY OF CALAPAN (Capital) 2015 CONSTRUCTION OF SENIOR CITIZENS BUILDING CONSTRUCTION OF SENIOR CITIZENS BUILDING BUILDING FACILITY 1 800,000.00 pipelined

IV-B Oriental Mindoro Gloria 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 pipelined

IV-B Oriental Mindoro Gloria 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 pipelined

IV-B Oriental Mindoro Gloria 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 pipelined

IV-B Oriental Mindoro Naujan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF DAY CARE CENTER

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF DAY CARE CENTERDAY CARE CENTER 1 1,500,000.00 proposed

IV-B Oriental Mindoro Pinamalayan Marayos 2013 Comprehensive Integrated (Improvement of 3 DCCs) Improvement of 1-Unit DCC - Marayos DAY CARE CENTER 1 300,000.00 completed

IV-B Oriental Mindoro Pinamalayan Sabang 2013 Improvement of 1-Unit DCC - Marayos DAY CARE CENTER 1 completed

IV-B Oriental Mindoro Pinamalayan Panggulayan 2013 Improvement of 1-Unit DCC - Marayos DAY CARE CENTER 1 completed

IV-B Oriental Mindoro Pinamalayan 2014 cidss - kalahi Construction of water system project WATER SYSTEM 1 850,000.00 pipelined

IV-B Oriental Mindoro Pinamalayan Poblacion 2014 core shelter assistance Core Shelter Assistance 1 850,000.00 pipelined

IV-B Oriental Mindoro Pinamalayan 2014 crisis center operation Crisis Center Operation and Management 1 85,000.00 pipelined

IV-B Oriental Mindoro Pinamalayan Sta. Rita 2014 evacuation center Construction Evacuation Center EVACUATION CENTER 1 1,700,000.00 pipelined

IV-B Oriental Mindoro Pinamalayan Antipolo, Santa Rita 2014 rehabilitation of day care center Rehabilitation of 1 Unit Day Care Center DAY CARE CENTER 2 255,000.00 pipelined

IV-B Oriental Mindoro Pinamalayan Rosario, Santa Rita 2014 Rehabilitation of 1 Unit Day Care Center DAY CARE CENTER 2 pipelined

IV-B Oriental Mindoro Pinamalayan Inclanay, Santa Rita 2014 Rehabilitation of 1 Unit Day Care Center DAY CARE CENTER 2 pipelined

IV-B Oriental Mindoro Pinamalayan 2015 PROVISION OF PHYSICAL FITNESS EQUIPMENT FOR

SENIOR CITIZENSProcurement of Physical Fitness Equipment for Senior Citizen 1 500,000.00 proposed

IV-B Oriental Mindoro Mansalay 2013 WASIG CONSTRUCTION OF DCC WASIG CONSTRUCTION OF DCC DAY CARE CENTER 1 700,000.00 completedIV-B Oriental Mindoro Mansalay 2013 CONSTRUCTION OF DCC CONSTRUCTION OF DCC DAY CARE CENTER 1 270,000.00 completed

IV-B Oriental Mindoro PUERTO GALERA 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN CRISIS CENTER)Construction of Women Crisis Center BUILDING FACILITY 1 500,000.00 proposed

IV-B Oriental Mindoro SAN TEODORO Poblacion 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 650,000.00 proposed

IV-B Palawan AGUTAYA Algeciras - Lek 2014 Concreting of Poblacion Algeciras to Lek road Concreting of Poblacion Algeciras to Lek Road ROAD 1 950,000.00 ongoing

IV-B Palawan AGUTAYA 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposed

IV-B Palawan Araceli 2015CONSTRUCTION OF WOMEN CRISIS CENTER (WITH

DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND

GIRLS - CHILD ABUSES.)

CONSTRUCTION OF WOMEN CRISIS CENTER (WITH

DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND

GIRLS - CHILD ABUSES.)

BUILDING FACILITY 1 1,500,000.00 proposed

IV-B Palawan Araceli 2015 REPAIR/UPGRADING OF DAY CARE CENTER REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 680,000.00 proposed

IV-B Palawan Balabac 2015 WOMEN CRISIS CENTER WOMEN CRISIS CENTER BUILDING FACILITY 1 1,175,000.00 proposed

IV-B Palawan Balabac 2015 DAY CARE CENTER UPGRADING AND CONSTRUCTION DAY CARE CENTER UPGRADING AND CONSTRUCTION DAY CARE CENTER 1 1,175,000.00 proposed

IV-B Palawan Bataraza 2013 Training Center Contruction of Extension of OSCA Building BUILDING FACILITY 1 600,000.00 March 2015 completed

IV-B Palawan Culion 2015 CONSTRUCTION OF DAY-CARE CENTER PROJECT CONSTRUCTION OF DAY-CARE CENTER PROJECT BUILDING FACILITY 1 500,000.00 pipelined

IV-B Palawan Dumaran 2014const. Of Water And Sanitation Facilities For Day Care

Centers

Construction and Improvement of DCCs with Water and

Sanitation Facilities DAY CARE CENTER 1 300,000.00 pipelined

IV-B Palawan Dumaran 2014 improvement and rehabilitation of day care centers improvement and rehabilitation of day care centers DAY CARE CENTER 1 1,530,000.00 pipelined

IV-B Palawan EL NIDO (BACUIT) 2014support services: conduct of series of meetings, formation of

association, registration of association to sec, preparation of

project proposals

Series Of Meetings on Formation and Registration Of

Association To SEC1 50,000.00 pipelined

IV-B Palawan Linapacan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 500,000.00 pipelined

IV-B Palawan Linapacan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 900,000.00 pipelined

IV-B Palawan Narra Princess Urduja 2014 Construction Of 60M Hanging Bridge Construction of 60M Hanging Bridge BRIDGE 1 500,000.00 pipelined

IV-B Palawan Narra Poblacion 2014 construction of flood control project Construction of Flood Control Project WATER CONTROL 1 4,800,000.00 ongoing

IV-B Palawan Narra Borirao 2014kalahi-cidds project comprehensive and integrated delivery

of social services c. construction of one (1) unit classroomConstruction of 1-Unit 1 Classrooms High School Building SCHOOL FACILITY 1 750,000.00 ongoing

IV-B Palawan Narra Poblacion 2014kalahi-cidds project comprehensive and integrated delivery

of social services

construction of two (2) classrooms

Construction of 1-Unit 2 Classroom Elementary School

BuildingSCHOOL FACILITY 1 1,500,000.00 ongoing

IV-B Palawan Narra Estrella Village 2014kalahi-cidds project comprehensive and integrated delivery

of social services

b. construction of one (1) unit classroom

Construction of 1-Unit 1 Classrooms High School Building SCHOOL FACILITY 1 750,000.00 ongoing

IV-B Palawan Narra 2015

CONSTRUCTION OF 4 DAY CARE CENTERS (PUROK

MAUNLAD, BRGY. ARAMAYWAN; PUROK PAGKAKAISA,

BRGY. MALINAO; PUROK DAMAYAN, BRGY. PANACAN 2;

PUROK ULIRAN, BRGY. PANACAN)

CONSTRUCTION OF 4 DAY CARE CENTERS (PUROK

MAUNLAD, BRGY. ARAMAYWAN; PUROK PAGKAKAISA,

BRGY. MALINAO; PUROK DAMAYAN, BRGY. PANACAN 2;

PUROK ULIRAN, BRGY. PANACAN)

DAY CARE CENTER 1 2,086,956.52 proposed

IV-B Palawan Narra 2015CONSTRUCTION OF ONE UNIT PWD SHELTERED

WORKSHOP AND AREA VOCATIONAL REHABILITATION

CENTER

CONSTRUCTION OF ONE UNIT PWD SHELTERED

WORKSHOP AND AREA VOCATIONAL REHABILITATION

CENTER

BUILDING FACILITY 1 1,000,000.00 proposed

IV-B PalawanPUERTO PRINCESA CITY

(Capital)2015 GROUP HAND WASHING FAILITY FOR DAY CARE CENTERS GROUP HAND WASHING FAILITY FOR DAY CARE CENTERS DAY CARE CENTER 1 3,334,848.48 proposed

IV-B Palawan Quezon Tabon 2013 Day Care Centers CONSTRUCTION OF 1 UNIT DAYCARE CENTER - TABON DAY CARE CENTER 1 100,000.00 March 2015 completed

IV-B Palawan Quezon Isugod - Labangan 2014 Construction of Isugod-Labangan road Construction of Isugod-Labangan Road ROAD 1 850,000.00 pipelined

IV-B Palawan Quezon Sarangsang 2014 Repair of So Sarangsang road Repair of So Sarangsang Road ROAD 1 255,000.00 pipelined

IV-B Palawan Quezon Tabon 2014 Road project in Tumarbong, Tabon Road Project in Tumarbong, Tabon ROAD 1 850,000.00 pipelined

IV-B Palawan RIZAL (MARCOS) 2015 ESTABLISHMENT OF WOMEN CRISES CENTER ESTABLISHMENT OF WOMEN CRISES CENTER BUILDING FACILITY 1 1,000,000.00 proposed

IV-B Palawan RIZAL (MARCOS) 2015 ESTABLISHMENT OF PERSON WITH DISABILITY (PWD)

OFFICE

ESTABLISHMENT OF PERSON WITH DISABILITY (PWD)

OFFICE1 1,000,000.00 proposed

IV-B Palawan SOFRONIO ESPAÑOLA 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,120,000.00 proposed

IV-B Palawan Taytay 2015 RAINWATER COLECTOR RAINWATER COLECTOR WATER SYSTEM 1 800,000.00 proposed

IV-B Palawan Taytay 2015 BAHAY PAG-ASA BAHAY PAG-ASA 1 3,000,000.00 proposed

IV-B Romblon Cajidiocan Cambajao 2014 Maintenance and repair of road Maintenance and Repair fo Road ROAD 1 1,300,000.00 ongoing

IV-B Romblon Cajidiocan Cambalo 2014 Maintenance and Repair fo Road ROAD 1 ongoing

IV-B Romblon Cajidiocan Gutivan 2014 Maintenance and Repair fo Road ROAD 1 ongoing

IV-B Romblon Cajidiocan 2015 BAHAY PAG-ASA FOR CICL BAHAY PAG-ASA FOR CICL 1 1,500,000.00 proposed

IV-B Romblon Calatrava Pagsangahan 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTERS Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,560,000.00 proposed

IV-B Romblon Calatrava Talisay 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 proposed

IV-B Romblon Concepcion Masadya 2015 CONSTRUCTION OF DAY CARE CENTERS AND PROVISION

OF NECESSARY LEARNING MATERIALS

Construction of 1-Unit Day Care Center with provision of

Learning MaterialsDAY CARE CENTER 1 1,500,000.00 proposed

IV-B Romblon Concepcion Masudsud 2015 Construction of 1-Unit Day Care Center with provision of

Learning MaterialsDAY CARE CENTER 1 proposed

IV-B Romblon Concepcion Sampong 2015 Construction of 1-Unit Day Care Center with provision of

Learning MaterialsDAY CARE CENTER 1 proposed

IV-B Romblon Concepcion Bachawan 2015 Construction of 1-Unit Day Care Center with provision of

Learning MaterialsDAY CARE CENTER 1 proposed

IV-B Romblon Concepcion San Pedro 2015 Construction of 1-Unit Day Care Center with provision of

Learning MaterialsDAY CARE CENTER 1 proposed

IV-B Romblon San Fernando 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 1,042,550.00 proposed

IV-B Romblon San Fernando 2015 REPAIR OF DAY CARE CENTER/REHABILITATION OF DAY

CARE CENTER

REPAIR OF DAY CARE CENTER/REHABILITATION OF DAY

CARE CENTERDAY CARE CENTER 1 800,000.00 proposed

IV-B Romblon San Fernando 2015 PROVISION OF HAND WASHING FACILITY AND HYGIENE

KIT

PROVISION OF HAND WASHING FACILITY AND HYGIENE

KITSANITARY FACILITY 1 500,000.00 proposed

IV-B Romblon Santa Fe 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 1,000,000.00 proposed

IV-B Romblon San Jose Busay - Tipok Pok 2014 Improvement of Busay-Tipok Pok road Improvement of Busay-Tipok Pok road ROAD 1 1,200,000.00 pipelined

IV-B Romblon San Jose Pinamihagan-Combot 2014 Improvement of Pinamihagan-Combot road Improvement of Pinamihagan-Combot road ROAD 1 1,500,000.00 pipelined

V Albay Bacacay 2015 REPAIR/UPGRADING OF DAY CARE CENTER REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 900,000.00 pipelined

V Albay DARAGA (LOCSIN) 2015 ESTABLISHMENT OF PDAO ESTABLISHMENT OF PDAO 1 500,000.00 pipelined

V Albay DARAGA (LOCSIN) 2015 PROTECTIVE SERVICES - INFRA PROJECTS

UPGRADING/REPAIR OF DCCS

PROTECTIVE SERVICES - INFRA PROJECTS

UPGRADING/REPAIR OF DCCSDAY CARE CENTER 1 3,000,000.00 pipelined

V Albay DARAGA (LOCSIN) 2015 CONSTRUCTION OF DCC WITH AMENITIES AND

PROVISION OF ECCD LEARNING MATERIALS

CONSTRUCTION OF DCC WITH AMENITIES AND

PROVISION OF ECCD LEARNING MATERIALSDAY CARE CENTER 1 1,500,000.00 pipelined

V Albay GUINOBATAN 2014

Technical Training for CSO strengthening and CSO- LGU

Partnership Building - Municipal Wide (About Twenty- Two

Sectors: Women, elderly, Coconut Farmers, Fishefolks,

PWDs, Laborers (informal), youth (out-of-school-youths),

faith-based Organization, Rice Fa

Technical Training for CSO strengthening and CSO- LGU

Partnership Building - Municipal Wide (About Twenty- Two

Sectors: Women, elderly, Coconut Farmers, Fishefolks,

PWDs, Laborers (informal), youth (out-of-school-youths),

faith-based Organization, Rice Fa

BUILDING FACILITY 1 500,000.00 pipelined

V Albay GUINOBATAN 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 3,000,000.00 pipelined

V Albay LEGAZPI CITY (Capital) 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER BUILDING FACILITY 1 2,500,000.00 pipelined

V Albay LEGAZPI CITY (Capital) 2015 PROTECTIVE SERVICES/INFRASTRUCTURE PROJECT-

CONST. OF EVACUATION CENTER

PROTECTIVE SERVICES/INFRASTRUCTURE PROJECT-

CONST. OF EVACUATION CENTERBUILDING FACILITY 1 11,500,000.00 pipelined

V Albay Libon 2015CONSTRUCTION OF DCC WITH COMPLETE AMENITIES,

PROVISION OF ECCD MATERIALS AND IMPROVEMENT OF

PLAYGROUND

CONSTRUCTION OF DCC WITH COMPLETE AMENITIES,

PROVISION OF ECCD MATERIALS AND IMPROVEMENT OF

PLAYGROUND

DAY CARE CENTER 1 2,000,000.00 pipelined

V Albay Libon 2015CONSTRUCTION OF 2-STOREY SHELTER HOME FOR

ABUSED, DISPLACED, ABANDONED WOMEN AND

CHILDREN (BAHAY KALINGA PROGRAM)

CONSTRUCTION OF 2-STOREY SHELTER HOME FOR

ABUSED, DISPLACED, ABANDONED WOMEN AND

CHILDREN (BAHAY KALINGA PROGRAM)

1 1,500,000.00 pipelined

V Albay Polangui Amoguis 2014KALAHI -CIDDS Project - All 44 Barangays of the Municipality

(Poorest barangays in Polangui)Construction of DCC DAY CARE CENTER 1 2,164,000.00 ongoing

V Albay Polangui Agos 2014 Construction of DCC DAY CARE CENTER 1 ongoing

V Albay Polangui Cotnogan 2014 Construction of DCC DAY CARE CENTER 1 ongoing

V Albay CITY OF TABACO 2015 YOUTH HOME YOUTH HOME 1 5,200,000.00 pipelined

V Albay Rapu-Rapu Gaba 2014Construction of Concrete Road Pathway - Gaba to Sitio

Pundado

Construction of Concrete Road Pathway - Gaba to Sitio

PundadoROAD 1 1,700,000.00 ongoing

V Camarines Norte Capalonga 2013 Construction of youth Crisis Center/Evacuation MPHall Construction of youth Crisis Center/Evacuation MPHall EVACUATION CENTER 1 2,000,000.00 completed

V Camarines Norte Capalonga Catioan 2014Basic social Services Sub-projects (Const. of Day Care

Center) - brgy Catioan,Capalonga,CN (for 3-5 yrs children in

brgy Catioan & nearby brgys)

Basic social Services Sub-projects (Const. of Day Care

Center) - brgy Catioan,Capalonga,CN (for 3-5 yrs children in

brgy Catioan & nearby brgys)

DAY CARE CENTER 1 500,000.00 ongoing

V Camarines Norte Capalonga Purok 2 Poblacion 2014

Basic social Services Sub-projects (Electrification of Baywalk

Project) - Purok 2 brgy poblacion (entire populace of

Capalonga 32032 pilgrims, devotees & other tourists)

Basic social Services Sub-projects (Electrification of Baywalk

Project) - Purok 2 brgy poblacion (entire populace of

Capalonga 32032 pilgrims, devotees & other tourists)

1 445,000.00 ongoing

V Camarines Norte Jose Panganiban 2013 Construction of Day Care Center CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 completed

V Camarines Norte Jose Panganiban 2013 Repair/rehab of day care center Repair/rehab of day care center DAY CARE CENTER 1 500,000.00 completed

V Camarines Norte Jose Panganiban 2015 CONSTRUCTION/REPAIR OF MUNICIPAL DAY CARE

CENTERS

CONSTRUCTION/REPAIR OF MUNICIPAL DAY CARE

CENTERSDAY CARE CENTER 1 1,000,000.00 pipelined

V Camarines Norte Labo 2015I. PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) -

1ST PHASE - REPAIR/UPGRADING OF DAY CARE CENTER

AND PROVISION OF GROUP HANDWASHING FACILITY

I. PROTECTIVE SERVICES (INFRASTRUCTURE PROJECTS) -

1ST PHASE - REPAIR/UPGRADING OF DAY CARE CENTER

AND PROVISION OF GROUP HANDWASHING FACILITY

DAY CARE CENTER 1 1,550,000.00 pipelined

V Camarines Norte Mercedes Manguisoc-Mambungalon 2014 Manguisoc-Mambungalon Road project Manguisoc-Mambungalon Road project ROAD 1 1,000,000.00 ongoing

V Camarines Norte SAN LORENZO RUIZ (IMELDA) 2015 PROTECTIVE SERVICES A. CONSTRUCTION OF CRISIS

CENTER FOR WOMEN AND CHILDREN

PROTECTIVE SERVICES A. CONSTRUCTION OF CRISIS

CENTER FOR WOMEN AND CHILDRENBUILDING FACILITY 1 1,000,000.00 pipelined

V Camarines Norte SAN LORENZO RUIZ (IMELDA) 2015 PROTECTIVE SERVICES CONSTRUCTION AND

REHABILITATION OF DAY CARE

PROTECTIVE SERVICES CONSTRUCTION AND

REHABILITATION OF DAY CAREDAY CARE CENTER 1 2,000,000.00 pipelined

V Camarines Sur Baao 2015 CONSTRUCTION OF STANDARDIZED DAY CARE CENTER CONSTRUCTION OF STANDARDIZED DAY CARE CENTER DAY CARE CENTER 1 1,250,000.00 pipelined

V Camarines Sur Bato 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 2,000,000.00 pipelined

V Camarines Sur Calabanga 2015 CONSTRUCTION & REHABILITATION OF DAY CARE

CENTERS

CONSTRUCTION & REHABILITATION OF DAY CARE

CENTERSDAY CARE CENTER 1 850,000.00 pipelined

V Camarines Sur Camaligan 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 600,000.00 pipelined

V Camarines Sur Camaligan 2015 CONSTRUCTION/INSTALLATION OF GROUP

HANDWASHING FACILITIES

CONSTRUCTION/INSTALLATION OF GROUP

HANDWASHING FACILITIESSANITARY FACILITY 1 500,000.00 pipelined

V Camarines Sur Caramoan Oring - Daraga - Tabgon 2014Sea Wall - Oring - 0.13 km; Daraga - 0.13 km; Tabgon -

0.13 km (Oring - 175 HHs ;Daraga - 157 HHs; Tabgon - 98

HHs)

Sea Wall - Oring - 0.13 km; Daraga - 0.13 km; Tabgon -

0.13 km (Oring - 175 HHs ;Daraga - 157 HHs; Tabgon - 98

HHs)

1 5,100,000.00 ongoing

Page 14: List of KALAHI-CIDSS Subprojects - BUB

V Camarines Sur Del Gallego Poblacion I, II and III 2014Rehabilitation of Drainage Canal - Poblacion Zone I, II, III,

Sinuknipan I and other adjoining Brgy. (3 Brgys. Of

Poblacion area)

Rehabilitation of Drainage Canal - Poblacion Zone I, II, III,

Sinuknipan I and other adjoining Brgy. (3 Brgys. Of

Poblacion area)

DRAINAGE SYSTEM 3 3,000,000.00 ongoing

V Camarines Sur Del Gallego 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF 1 UNIT BAHAY PAG ASA FOR CICL

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS -

CONSTRUCTION OF 1 UNIT BAHAY PAG ASA FOR CICL1 1,200,000.00 pipelined

V Camarines Sur Lagonoy Gubat-Pinamihagan 2014Construction of Farm to Market Road - Gubat-Pinamihagan

Rd Sec. (2350 population)

Construction of Farm to Market Road - Gubat-Pinamihagan

Rd Sec. (2350 population)ROAD 1 4,500,000.00 pipelined

V Camarines Sur Lagonoy Sipaco & Balaton 2014

Drainage/Riprap & Seawall Construction & Expansion Project

- Balaton, Bocogan, Sipaco, Mangogon, Del Carmen, Sta.

Cruz, Lagonoy, Csur (Area Populace 1,305HHs/6,819

Population)

Drainage/Riprap & Seawall Construction & Expansion Project SEAWALL 1 4,250,000.00 ongoing

V Camarines Sur Lagonoy Bocogan 2014 1 ongoing

V Camarines Sur Lagonoy Mangogon 2014 1 pipelined

V Camarines Sur Lagonoy Del Carmen 2014 1 ongoing

V Camarines Sur Lagonoy Sta. Cruz 2014 1 ongoing

V Camarines Sur Lagonoy Himagtocon 2014Drainage/Riprap and seawall Construction and Expansion

Project - Himagtocon, san Sebastian, Omalo, Cabotonan

Drainage/Riprap and seawall Construction and Expansion

Project SEAWALL 1 4,080,000.00 ongoing

V Camarines Sur Lagonoy San Sebastian 2014 1 ongoing

V Camarines Sur Lagonoy Omalo 2014 1 ongoing

V Camarines Sur Lagonoy Cabotonan 2014 1 ongoing

V Camarines Sur Lagonoy Agcata Tabog 2013Ingrated Community Development Program (1village site

devt, 5 DCC, 1 EC cum Training Center)Construction of DCC (Agcata [Tabog] - 800,000) DAY CARE CENTER 1 4,000,000.00 completed

V Camarines Sur Lagonoy Agosais 2013 Village Site Development (Agosais - 1,000,000.00) 1 ongoing

V Camarines Sur Lagonoy Balaton 2013 Construction of DCC (Balaton - 800,000.00) DAY CARE CENTER 1 ongoing

V Camarines Sur Lagonoy Cobotonan 2013 Construction of DCC (Cobotonan - 800,000.00) DAY CARE CENTER 1 completed

V Camarines Sur Lagonoy Panicuan 2013KALAHI-CIDSS Program (lumped with the other item with

total of 8.5M)Construction of DCC (Panicuan - 800,000.00) DAY CARE CENTER 1 4,500,000.00 completed

V Camarines Sur Lagonoy San Rafael 2013 Construction of DCC (San Rafael - 792,500.00) DAY CARE CENTER 1 completed

V Camarines Sur Lagonoy Sta. Maria 2013Construction of Evacuation Center cum Training Center -

3,000,000.00)BUILDING FACILITY 1 ongoing

V Camarines Sur Magarao 2015 CONSTRUCTION OF DAY CARE CENTER AND PROVISION OF

ECCD LEARNING MATERIALS

CONSTRUCTION OF DAY CARE CENTER AND PROVISION OF

ECCD LEARNING MATERIALSDAY CARE CENTER 1 1,310,000.00 pipelined

V Camarines Sur Minalabac 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 5,312,000.00 pipelined

V Camarines Sur Nabua 2013 Honorarium of 5 daycare workers Honorarium of 5 daycare workers DAY CARE CENTER 1 60,000.00 completed

V Camarines Sur Nabua 2013 Repair/rehab of daycare centers Repair/rehab of daycare centers DAY CARE CENTER 1 500,000.00 completed

V Camarines Sur Naga City 2015 REPAIR & UPGARDING OF DCCS REPAIR & UPGARDING OF DCCS DAY CARE CENTER 1 975,000.00 pipelined

V Camarines Sur Naga City 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,200,000.00 pipelined

V Camarines Sur Ocampo 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 2,400,000.00 pipelined

V Camarines Sur Pamplona 2015 CONSTRUCTION OF CRISIS INTERVENTION CENTER CONSTRUCTION OF CRISIS INTERVENTION CENTER BUILDING FACILITY 1 1,450,000.00 pipelined

V Camarines Sur Pasacao 2015 REPAIR/ENHANCEMENT OF SCHOOL BUILDINGS AND

HEALTH CENTER/DCCS

REPAIR/ENHANCEMENT OF SCHOOL BUILDINGS AND

HEALTH CENTER/DCCSBUILDING FACILITY 1 1,000,000.00 pipelined

V Camarines Sur Pasacao 2015 ENHANCEMENT OF CRISIS INTERVENTION

CENTER/STRANDEES CENTER

ENHANCEMENT OF CRISIS INTERVENTION

CENTER/STRANDEES CENTERBUILDING FACILITY 1 500,000.00 pipelined

V Camarines Sur PRESENTACION (PARUBCAN) 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER BUILDING FACILITY 1 750,000.00 pipelined

V Camarines Sur Ragay Buenasuerte, GRS, to Cabadisan & Agrupacion 2014Additional Road - Brgy. Buenasuerte,GRS, to Cabadisan &

Agrupacion to Cabinitan

Additional Road - Brgy. Buenasuerte,GRS, to Cabadisan &

Agrupacion to CabinitanROAD 4 1,770,000.00 pipelined

V Camarines Sur SAGÑAY 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF 7 UNITS DAY CARE CENTERS

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF 7 UNITS DAY CARE CENTERSDAY CARE CENTER 1 3,800,000.00 pipelined

V Camarines Sur Sipocot 2015 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 1 2,000,000.00 pipelined

V Camarines Sur Sipocot 2015 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 1 2,774,200.00 pipelined

V Camarines Sur Sipocot 2015 PROTECTIVE SERVICES INFRASTRACTURE PROJECTS PROTECTIVE SERVICES INFRASTRACTURE PROJECTS 1 700,000.00 pipelined

V Camarines Sur Siruma San Andres 2014 Concreting of road - Brgy. San Andres Concreting of road - Brgy. San Andres ROAD 1 1,197,692.00 ongoing

V Camarines Sur Siruma Salvacion 2014 Concreting of road - Brgy. Salvacion Concreting of road - Brgy. Salvacion ROAD 1 1,659,836.00 ongoing

V Catanduanes Baras 2013 Construction of DCC Construction of DCC DAY CARE CENTER 1 2,000,000.00 completed

V Catanduanes Baras 2013 DAY CARE CENTER 1 completed

V Catanduanes Baras 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,000,000.00 pipelined

V Catanduanes Baras 2015 REHAB/REPAIR OF DAY CARE CENTER REHAB/REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 600,000.00 pipelined

V Catanduanes Bato 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 800,000.00 pipelined

V Catanduanes Caramoran 2015 CONST. OF DAY CARE CENTER CONST. OF DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 pipelined

V Catanduanes Caramoran 2015 REPAIR OF DAY CARE CENTER REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 2,000,000.00 pipelined

V Catanduanes Gigmoto 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER BUILDING FACILITY 1 2,000,000.00 pipelined

V Catanduanes Pandan Baldoc 2013 Upgrading of Day Care Centers Construction of DCC (Badoc - 800,000.00) DAY CARE CENTER 1 1,000,000.00 completed

V Catanduanes Pandan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

V Catanduanes Pandan 2015 UPGRADING OF DAY CARE CENTER UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 700,000.00 pipelined

V Catanduanes SAN ANDRES (CALOLBON) 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER BUILDING FACILITY 1 1,900,000.00 pipelined

V Catanduanes SAN ANDRES (CALOLBON) 2015 UPGRADING OF DCC UPGRADING OF DCC DAY CARE CENTER 1 500,000.00 pipelined

V Catanduanes San Miguel 2013 Empowering/and strengthening the capability of CSOs Empowering/and strengthening the capability of CSOs 1 500,000.00 completed

V Catanduanes San Miguel San Miguel 2014Construction of Day Care Center - District II, San Miguel

(Ther are more or less 20 Day care pupils who will benefit

from the porposed project.)

Construction of Day Care Center - District II, San Miguel DAY CARE CENTER 1 500,000.00 ongoing

V Catanduanes San Miguel 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 pipelined

V Catanduanes Viga 2013 Strengthening of CSO Organization Strengthening of CSO Organization 1 300,000.00 completed

V Catanduanes VIRAC (Capital) 2015 UPGRADING OF DAY CARE CENTER UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

V Catanduanes VIRAC (Capital) 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

V Masbate Aroroy Baga-Uma 2014 Construction of drainage canal - 3 brgys (2,000 HH) Construction of drainage canal - 3 brgys (2,000 HH) DRAINAGE SYSTEM 1 1,020,000.00 June 2015 completed

V Masbate Balud 2013Construction of Multi-purpose hall (VAWC,Sr. Citizens, Risk

Reduction Center)

Construction of Multi-purpose hall (VAWC,Sr. Citizens, Risk

Reduction Center)1 2,500,000.00 March 2015 completed

V Masbate Balud Baybay, Mabuhay 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 2 1,600,000.00 pipelined

V Masbate Batuan Poblacion 2014Construction of 4 Standard Day Care Centers - 4 brgys (3-4

year old children)Construction of 4 Standard Day Care Centers - Poblacion DAY CARE CENTER 1 3,420,000.00 ongoing

V Masbate Batuan Canvanes 2014 Construction of 4 Standard Day Care Centers - Canvanes DAY CARE CENTER 1 ongoing

V Masbate Batuan Costa Rica 2014 Construction of 4 Standard Day Care Centers - Costa Rica DAY CARE CENTER 1 ongoing

V Masbate Batuan Sawang 2014 Construction of 4 Standard Day Care Centers - Sawang DAY CARE CENTER 1 ongoing

V Masbate Batuan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 4,250,000.00 pipelined

V Masbate Cataingan 2015 CONSTRUCTION OF DAY CARE CENTER FOR THE ELDERLY CONSTRUCTION OF DAY CARE CENTER FOR THE ELDERLY DAY CARE CENTER 1 1,000,000.00 pipelined

V Masbate Cataingan 2015 CONSTRUCTION OF STANDARD EVACUATION CENTER CONSTRUCTION OF STANDARD EVACUATION CENTER BUILDING FACILITY 1 3,000,000.00 pipelined

V Masbate Cawayan 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT

(CONSTRCUTION OF EVACUATION CENTER)

PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT

(CONSTRCUTION OF EVACUATION CENTER)BUILDING FACILITY 1 7,000,000.00 pipelined

V Masbate Claveria Poblacion Imelda 2014KALAHI-CIDSS (Construction of Daycare Center) - Pob.

Imelda (100 3-5 year old children)

KALAHI-CIDSS (Construction of Daycare Center) - Pob.

Imelda (100 3-5 year old children)DAY CARE CENTER 1 1,530,000.00 ongoing

V Masbate Esperanza Poblacion ang Agoho 2014Construction of Standard Day Care & Feeding Center - Brgy

Pob and Agoho (2 brgys)Construction of Standard Day Care Center - Brgy Poblacion DAY CARE CENTER 1 648,000.00 ongoing

V Masbate Mandaon 2015 CONSTRUCTION OF DCC OF SITIO CAN-INITON,

POBLACION

CONSTRUCTION OF DCC OF SITIO CAN-INITON,

POBLACIONDAY CARE CENTER 1 500,000.00 pipelined

V Masbate Mandaon 2015CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

DCC WITH COMPLETE SET OS SOAP, FLOURIDE GEL AND

TOOTHPASTE.

CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

DCC WITH COMPLETE SET OS SOAP, FLOURIDE GEL AND

TOOTHPASTE.

DAY CARE CENTER 1 510,000.00 pipelined

V Masbate Mandaon 2015CONSTRUCTION OF WOMEN CRISIS CENTER (WITH

DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND

GIRL-CHILD ABUSE)

CONSTRUCTION OF WOMEN CRISIS CENTER (WITH

DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND

GIRL-CHILD ABUSE)

BUILDING FACILITY 1 895,500.00 pipelined

V Masbate Mobo Luyong Catungan 2013 Improvement of day care centers Improvement of DCC (Luyong Catungan - 210,340.00) DAY CARE CENTER 1 1,450,000.00 March 2015 completed

V Masbate Mobo Mandali 2013 Improvement of DCC (Mandali - 316,830.00) DAY CARE CENTER 1 March 2015 completed

V Masbate Mobo Nasunduan 2013 Construction of DCC (Nasunduan - 776,770) DAY CARE CENTER 1 March 2015 completed

V Masbate Mobo Umabay Exterior 2013 Improvement of DCC (Umabay Exterior - 145,060.00) DAY CARE CENTER 1 March 2015 completed

V Masbate Monreal 2015 CONSTRUCTION OF DAY CARE CENTER (DCC) CONSTRUCTION OF DAY CARE CENTER (DCC) DAY CARE CENTER 1 1,000,000.00 pipelined

V Masbate Palanas Sta. Cruz 2014 Road project in Sitio Bateres to National road Construction of Pathway - Brgy. Sta. Cruz PATHWAY 1 1,500,000.00 pipelined

V Masbate Palanas 2015 CONSTRUCTION OF DAYCARE CENTERS CONSTRUCTION OF DAYCARE CENTERS DAY CARE CENTER 1 700,000.00 pipelined

V Masbate PIO V. CORPUZ (LIMBUHAN) Poblacion 2014 Expansion of Drainage System - Brgy Poblacion (25hh) Cnstruction of Drainage System -Brgy. Poblacion DRAINAGE SYSTEM 1 465,000.00 pipelined

V Masbate PIO V. CORPUZ (LIMBUHAN) 2015 CONSTRUCTION OF DAYCARE CENTERS CONSTRUCTION OF DAYCARE CENTERS DAY CARE CENTER 1 2,000,000.00 pipelined

V Masbate Placer 2015 CONSTRUCTION OF WOMEN CONSTRUCTION CENTER /

HALFWAY HOUSE FOR VAWC VICTIMS

CONSTRUCTION OF WOMEN CONSTRUCTION CENTER /

HALFWAY HOUSE FOR VAWC VICTIMSBUILDING FACILITY 1 2,400,000.00 pipelined

V Masbate San Jacinto 2015 CONST. OF FLOOD/RIVER CONTROL PROJECT CONST. OF FLOOD/RIVER CONTROL PROJECT WATER CONTROL 1 500,000.00 pipelined

V Masbate San Jacinto 2015 CONST. OF FLOOD/RIVER CONTROL PROJECT CONST. OF FLOOD/RIVER CONTROL PROJECT WATER CONTROL 1 500,000.00 pipelined

V Masbate San Jacinto 2015 CONST. OF CRISIS INTERVENTION CENTER CONST. OF CRISIS INTERVENTION CENTER BUILDING FACILITY 1 1,000,000.00 pipelined

V Masbate San Pascual niwaran, Busing, Laurente, Nazareno, Boca Chica, San Rafael and Sta. Cruz 2014Motorized Banca - Brgy Iniwaran, Busing, Laurente,

Nazareno, Boca Chica, San Rafael and Sta. Cruz (Fisherfolks,

Coastal Brgy Residents)

Motorized Banca - Brgy Iniwaran, Busing, Laurente,

Nazareno, Boca Chica, San Rafael and Sta. Cruz (Fisherfolks,

Coastal Brgy Residents)

3 1,785,000.00 pipelined

V Masbate San Pascual 2015 PROTECTIVE SERVICES - INFRASTRACTURE PROJECTS:

CONSTRUCTION OF TWO (2) DAY CARE CENTERS

PROTECTIVE SERVICES - INFRASTRACTURE PROJECTS:

CONSTRUCTION OF TWO (2) DAY CARE CENTERSDAY CARE CENTER 1 2,000,000.00 pipelined

V Masbate Uson 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT 1 800,000.00 pipelined

V Sorsogon Barcelona San Vicente 2014Const. of Crisis Mgt. Center - San Vicente (102 squatters in

the municipality)

Construction of of Youth Center - Pob Sur (1,859 youth age

17-21 years old)BUILDING FACILITY 1 500,000.00 ongoing

V Sorsogon Barcelona Poblacion Sur 2014Construction of of Youth Center - Pob Sur (1,859 youth age

17-21 years old)

Construction of of Youth Center - Pob Sur (1,859 youth age

17-21 years old)BUILDING FACILITY 1 500,000.00 ongoing

V Sorsogon Bulan 2015 CONSTRUCTION OF DCC CONSTRUCTION OF DCC DAY CARE CENTER 1 1,600,000.00 proposed

V Sorsogon Bulusan San Roque 2014

Repair/Rehabilitation of Barangay Day Care Center - Brgy.

Sta. Barbara, Mabuhay, Sapngan, Dapdap and sitio

Capiricohan (Ninety Three (93) 3-4 years old day care

children)

Construction of DCC - Brgy. San Roque (800,000) DAY CARE CENTER 1 500,000.00 ongoing

V Sorsogon Bulusan San Isidro 2014Upgrading of Women Crisis Center Facility and Services -

Brgy. Dapdap, Bulusan, Sorsogon (Four Hundred (400)

Women, elderly, PWD-Children)

Repair of DCC - Brgy. San Isidro Sitio Capiricohan (200,000) DAY CARE CENTER 1 400,000.00 ongoing

V Sorsogon Bulusan 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 pipelined

V Sorsogon Casiguran Boton 2013 Rehab of day care center Rehabilitation of DCC (Boton - 200,000) DAY CARE CENTER 1 400,000.00 completed

V Sorsogon Casiguran Central 2013 Rehabilitation of DCC (Central - 200,000) DAY CARE CENTER 1 completed

V Sorsogon Casiguran 2015 REHAB/REPAIR OF DAY CARE CENTER REHAB/REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 1,500,000.00 pipelined

V Sorsogon Castilla Poblacion 2014Educational Facility Enhancement - 34 Brgys (60 Day Care

Centers)

Educational Facility Enhancement - 34 Brgys (60 Day Care

Centers)DAY CARE CENTER 1 1,275,000.00 ongoing

V Sorsogon Castilla 2015 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER

CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTERBUILDING FACILITY 1 899,900.00 pipelined

V Sorsogon Donsol Gogon 2014Construction of Day Care Center - Gogon and Tinanogan

(Barangay Gogon 45 Day Care Children/ Barangay

Tinanogan 43 Day Care Children)

Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,500,000.00 ongoing

V Sorsogon Donsol Tinanogan 2014 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

V Sorsogon Gubat Beriran 2014 Concreting of road - Beriran CONSTRUCTION OF PATHWAY PATHWAY 1 900,000.00 June 2015 completed

V Sorsogon Gubat Nazareno 2014 Concreting of road - Nazareno CONSTRUCTION OF PATHWAY PATHWAY 1 900,000.00 June 2015 completed

V Sorsogon Gubat Villareal 2014 Concreting of road - Villareal CONSTRUCTION OF PATHWAY PATHWAY 1 900,000.00 June 2015 completed

V Sorsogon Gubat Brgy Cabigaan 2014 Concreting of road - Brgy Cabigaan CONSTRUCTION OF PATHWAY PATHWAY 1 810,000.00 June 2015 completed

V Sorsogon Gubat Tigkiw 2014Expansion of Day Care Center - Tigkiw (35 day-care

students)Improvement of DCC - Tigkiw DAY CARE CENTER 1 127,500.00 June 2015 completed

V Sorsogon Gubat Payawin 2014Improvement of Day Care Center - Payawin (30 day care

students)Improvement of DCC - Payawin DAY CARE CENTER 1 127,500.00 June 2015 completed

V Sorsogon Gubat 2015 IMPROVEMENT OF DAY CARE CENTERS IMPROVEMENT OF DAY CARE CENTERS DAY CARE CENTER 1 510,000.00 pipelined

V Sorsogon Irosin Tinampo 2014Construction of Day Care Center - Tinampo (55 Day Care

Pupils)

Construction of Day Care Center - Tinampo (55 Day Care

Pupils)DAY CARE CENTER 1 665,876.40 ongoing

V Sorsogon Irosin 2015 CONSTRUCTION OF CARRIEDO DAY CARE CENTER CONSTRUCTION OF CARRIEDO DAY CARE CENTER DAY CARE CENTER 1 640,000.00 pipelined

V Sorsogon Irosin 2015 CONSTRUCTION OF BACOLOD DAY CARE CENTER CONSTRUCTION OF BACOLOD DAY CARE CENTER DAY CARE CENTER 1 640,000.00 pipelined

V Sorsogon Irosin 2015 CONSTRUCTION OF SAN PEDRO DAY CARE CENTER CONSTRUCTION OF SAN PEDRO DAY CARE CENTER DAY CARE CENTER 1 640,000.00 pipelined

V Sorsogon Irosin 2015 CONSTRUCTION OF SAN JULIAN DAY CARE CENTER CONSTRUCTION OF SAN JULIAN DAY CARE CENTER DAY CARE CENTER 1 640,000.00 pipelined

V Sorsogon Juban Guruyan and Catanusan 2014Concrete paving in Mangog-Catanusan road in Sitio

Mangog, Guruyan and CatanusanConstruction of farm to market road ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Magallanes Bacalon 2014Construction of Day Care Centers - Brgy Bacalon and Siuton

(80 Day Care Children aged 3-4 years old/ 2 Day Care

Workers)

Construction of Day care Center DAY CARE CENTER 1 1,500,000.00 ongoing

V Sorsogon Magallanes Siuton 2014 Construction of Day care Center DAY CARE CENTER 1 ongoing

V Sorsogon Magallanes 2015 PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS 1 2,000,000.00 pipelined

V Sorsogon Matnog 2014KALAHI-CIDDS -Environmental Protection & conservation -

Sanitation facilities - municipal wide (40 brgys)

KALAHI-CIDDS -Environmental Protection & conservation -

Sanitation facilities - municipal wide (40 brgys)1 2,000,000.00 pipelined

V Sorsogon Matnog 2014Provision of Core Shelter Unit - Municipal Wide (indigent

victims of disaster and calamities)

Provision of Core Shelter Unit - Municipal Wide (indigent

victims of disaster and calamities)1 1,000,000.00 pipelined

V Sorsogon Matnog 2015 CONSTRUCTION OF SANITATION FACILITIES CONSTRUCTION OF SANITATION FACILITIES 1 1,500,000.00 pipelined

V Sorsogon Pilar Cagdongon 2014 Concreting of road in Cagdongon Concreting of road in Cagdongon ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Leona 2014 Concreting of road in Leona Concreting of road in Leona ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Lourdes 2014 Concreting of road in Lourdes Concreting of road in Lourdes ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Lumbang 2014 Concreting of road in Lumbang Concreting of road in Lumbang ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Migabod 2014 Concreting of road in Migabod Concreting of road in Migabod ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Milabas 2014 Concreting of road in Millabas Concreting of road in Millabas ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon Pilar Pinagsalog 2014 Concreting of road in Pinagsalog Concreting of road in Pinagsalog ROAD 1 1,000,000.00 June 2015 completed

V Sorsogon SANTA MAGDALENA San Isidro 2014

Construction of fish wharf and sea wall for the fish and coral

sanctuary, with provision of artificial and natural coral reefs

rehabilitation and protection - Poblacion Barangays (50% of

the unemployed and underemployed members of the labor

force

2 Access Road Cnstruction ROAD 1 9,025,000.00 pipelined

V Sorsogon SANTA MAGDALENA San Eugenio 2014 3 Access Road Cnstruction ROAD 1 ongoing

V Sorsogon SANTA MAGDALENA Poblacion 3 20141 construction of Livelihood Training Center (5,325,000 -

Brgy Poblacion 3)BUILDING FACILITY 1 pipelined

V Sorsogon SANTA MAGDALENA Poblacion 4 2014 Construction of DCC DAY CARE CENTER 1 pipelined

V Sorsogon SANTA MAGDALENA La Esperanza 2014 Construction of DCC DAY CARE CENTER 1 pipelined

V Sorsogon SANTA MAGDALENA San Sebastian 2014 Construction of DCC DAY CARE CENTER 1 pipelined

V Sorsogon SANTA MAGDALENA 2015 CONST. OF PUBLIC MARKET CONST. OF PUBLIC MARKET 1 10,000,000.00 pipelined

VI Aklan Banga Taba-ao 2014 1. repair/maintenance of taba-ao day care center, taba-ao, banga, aklan Repair of DCC @ Brgy. Taba-ao DAY CARE CENTER 1 48,000.00 June 2015 completed

VI Aklan Banga 20143. repair/maintenance of poblacion day care center,banga,

aklan (merged with 2 SPs above)

3. repair/maintenance of poblacion day care center,banga,

aklan (merged with 2 SPs above)DAY CARE CENTER 1 61,000.00 June 2015 completed

VI Aklan Banga Polocate 20142. repair/maintenance of polocate day care center, sitio

mampahon, polocate, banga, aklanRepair of DCC @ Brgy. Polocate DAY CARE CENTER 1 42,000.00 June 2015 completed

VI Aklan Banga 20144. repair/maintenance of badiangan day care

center,badiangan, banga, aklan (merged with 2 SPs above)

4. repair/maintenance of badiangan day care

center,badiangan, banga, aklan (merged with 2 SPs above)DAY CARE CENTER 1 62,000.00 June 2015 completed

VI Aklan Banga 2014c. handicraft making (bamboo, buri, nito, rattan, tigbao,

etc.) in several barangays

Product Development and Productivity Enhancement

Training Nito Weaving and Herbal Soap Making with

Provision of Starter Kits

1 300,000.00 300,000.00 June 2015 completed

VI Aklan Banga Poblacion 2015 CONSTRUCTION OF BARANGAY POBLACION DAY CARE

CENTER WITH AMENITIES

CONSTRUCTION OF BARANGAY POBLACION DAY CARE

CENTER WITH AMENITIESDAY CARE CENTER 1 1,000,000.00 ongoing

VI Aklan Ibajay Agbago 2014 construction of drainage system in barangay agbago Construction of 470 in m concrete drainage w/ hauling DRAINAGE SYSTEM 1 1,955,000.00 1,955,000.00 ongoing

VI Aklan Makato Mantiguib 2014 Concreting Of .5 Km Mantiguib road concreting of 2.7 km farm to market roads of ten brgys ROAD 1 369,000.00 36,000.00 8,446,000.00 completed

VI Aklan Makato Libang 2014 Concreting Of .8 Km Libang road Concreting Of .8 Km Libang road ROAD 1 661,000.00 June 2015 completed

VI Aklan Makato Agbalogo 2014 Concreting Of 1 Km Agbalogo road Concreting Of 1 Km Agbalogo road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Aglucay 2014 Concreting Of 1 Km Aglucay road Concreting Of 1 Km Aglucay road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Cabatanga 2014 Concreting Of 1 Km Cabatanga road Concreting Of 1 Km Cabatanga road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Cajilo 2014 Concreting Of 1 Km Cajilo road Concreting Of 1 Km Cajilo road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Cayangwan 2014 Concreting Of 1 Km Cayangwan road Concreting Of 1 Km Cayangwan road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Tibiawan 2014 Concreting Of 1Km Tibiawan road Concreting Of 1Km Tibiawan road ROAD 1 738,000.00 June 2015 completed

VI Aklan Makato Poblacion 2014 Concreting Of 2 Km Poblacion road Concreting Of 2 Km Poblacion road ROAD 1 1,476,000.00 June 2015 completed

VI Aklan Makato Bagong Barrio 2014 Concreting Of 2Km Bagong Barrio road Concreting Of 2Km Bagong Barrio road ROAD 1 1,476,000.00 June 2015 completed

VI Aklan Makato 2015 REHABILITATION/REPAIR OF DAY CARE CENTERS Construction of 1 Unit Day Care Center DAY CARE CENTER 1 2,300,000.00 ongoing

VI Aklan Makato 2015 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Aklan Makato 2015 Construction of 1 Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Aklan Tangalan Dapdap 2014 Concreting Of 0.288 Kms. road - DapdapConcreting of 0.19800 km farm to market road at Brgy

DapdapROAD 1 900,000.00 900,000.00 June 2015 completed

VI Aklan Tangalan Dapdap 2014 Concreting Of 0.288 Kms. road - DapdapConcreting of 0.40600 km farm to market road at sto tanza

bill brgy pudiotROAD 1 1,800,000.00 1,800,000.00 June 2015 completed

VI Aklan Tangalan Tamalagon 2014 Concreting Of 0.288 Kms. road - TamalagonConcreting of 0.19800 km farm to market road at sto

tagaytay brgy tamalagonROAD 1 900,000.00 900,000.00 ongoing

VI Aklan Tangalan Tondog 2014 Concreting Of 0.288 Kms. road - TondogConcreting of 0.19800 km farm to market road at sto

bangkiling brgy taudogROAD 1 900,000.00 900,000.00 June 2015 completed

VI Aklan Tangalan Afga 2014 Concreting Of 0.576 Kms. road - AfgaConcreting of 0.40600 km farm to market road at sto centro

brgy afgaROAD 1 1,800,000.00 1,800,000.00 June 2015 completed

Page 15: List of KALAHI-CIDSS Subprojects - BUB

VI Aklan Tangalan Jawili 2015 CONSTRUCTION OF 1 UNIT 2 CLASSROOM HIGH SCHOOL

BUILDING WITH AMENITIES AND HAULINGConcreting of fmr from brgy tamalagon to brgy jawili 1 1,243,000.00 ongoing

VI Aklan Tangalan Dapdap 2015 CONSTRUCTION OF 1 UNIT 2 CLASSROOM ELEMENTARY

SCHOOL BUILDING WITH AMENITIESConcreting of ftmr from brgy panayakan to brgy dapdap 1 1,243,000.00 ongoing

VI Aklan Tangalan 2015 CONSTRUCTION OF 1 UNIT 2 CLASSROOM HIGH SCHOOL

BUILDING WITH AMENITIES

CONSTRUCTION OF 1 UNIT 2 CLASSROOM HIGH SCHOOL

BUILDING WITH AMENITIESSCHOOL FACILITY 1 1,243,000.00 ongoing

VI Antique Barbaza Poblacion 2015PURCHASE OF VARIOUS EQUIPMENT AND MATERIALS OF

THE FASHION SETTER-DRESSMAKING & TAILORING

GROUP

PURCHASE OF VARIOUS EQUIPMENT AND MATERIALS OF

THE FASHION SETTER-DRESSMAKING & TAILORING

GROUP

1 500,000.00 ongoing

VI Antique Barbaza Poblacion 2015 PHASE 1 RETAINING WALL CONSTRUCTION PHASE 1 RETAINING WALL CONSTRUCTION 1 500,000.00 ongoing

VI Antique Belison Poblacion 2015 ESTABLISHMENT OF MUNICIPAL SHELTERED WORKSHOP

AND AREA VOCATIONAL REHABILITATION CENTER

ESTABLISHMENT OF MUNICIPAL SHELTERED WORKSHOP

AND AREA VOCATIONAL REHABILITATION CENTERBUILDING FACILITY 1 1,500,000.00 ongoing

VI Antique Bugasong Pojo, Cubay South & Jinalinan 2014environmental protection and conservation-drainage

system in brgy pojo, cubay south & jinalinan

Construction of Environmental Protection and Conservation -

Drainage System in Bugasong, AntiqueDRAINAGE SYSTEM 3 1,850,000.00 1,850,000.00 ongoing

VI Antique Bugasong Cubay South 2015 REPAIR/ UPGRADING OF 5 DAY CARE CENTERS REPAIR/ UPGRADING OF 1 UNIT DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 ongoing

VI Antique Bugasong Lacayon 2015 REPAIR/ UPGRADING OF 1 UNIT DAY CARE CENTERS DAY CARE CENTER 1 ongoing

VI Antique Bugasong Sabang West 2015 REPAIR/ UPGRADING OF 1 UNIT DAY CARE CENTERS DAY CARE CENTER 1 ongoing

VI Antique Caluya Hiningaan 2014 Road project (Sitio Masikap To Brgy Hiningaan)Concreting of 0.128km Brgy. Road at Purok Masikap, Brgy.

Hininga-an Caluya, AntiqueROAD 1 800,000.00 800,000.00 ongoing

VI Antique Caluya Poblacion 2015 ESTABLISHMENT OF COCO-OIL MILL PROJECT ESTABLISHMENT OF COCO-OIL MILL PROJECT 1 2,000,000.00 ongoing

VI Antique Hamtic 2014 repair / rehabilitation of day care center in 45 brgys Repair/Rehabilitation of DCC in Hamtic, Antique DAY CARE CENTER 1 1,000,000.00 1,000,000.00 ongoing

VI Antique Laua-an Guisijan 2013 Construction and Repair of 3 Day Care Centers Repair of Day Care Centers @ Brgy. Guisijan - 270,000 DAY CARE CENTER 1 990,000.00 270,000.00 completed

VI Antique Laua-an Lindero 2013 Const. of Day Care Center @ Brgy. Lindero - 720,000 DAY CARE CENTER 1 720,000.00 completed

VI Antique Laua-an Lugta 2014provision of counterpart for kalahi-cidss (construction of 1.2

x 80 lm hanging foot bridge)

Construction of Day Care Center w/ Amenities (Brgy Lugta -

750,000)DAY CARE CENTER 1 3,000,000.00 750,000.00 June 2015 completed

VI Antique Laua-an Poblacion 2014Construction of Day Care Center w/ Amenities (Poblacion -

750,000 )DAY CARE CENTER 1 750,000.00 completed

VI Antique Laua-an Jaguiquian 2014Construction of Day Care Center w/ Amenities- Jaguiquian

- 750,000 )DAY CARE CENTER 1 750,000.00 completed

VI Antique Laua-an Santiago 2014Construction of Day Care Center w/ Amenities (Santiago -

750,000 )DAY CARE CENTER 1 750,000.00 completed

VI Antique Laua-an Bagongbayan 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTER WITH

AMENITIES

CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH

AMENITIESDAY CARE CENTER 1 1,500,000.00 ongoing

VI Antique Laua-an Maria 2015 CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH

AMENITIESDAY CARE CENTER 1 ongoing

VI Antique Libertad Union 2014 day care center construction in brgy tininduganConstruction of 1 unit DCC with amenities & hauling at Sitio

Taboc Brgy union DAY CARE CENTER 1 637,500.00 637,500.00 ongoing

VI Antique Libertad Union II 2014 day care center construction in brgy union (union ii) Construction of DCC w/ amenities DAY CARE CENTER 1 637,500.00 142,500.00 780,000.00 ongoing

VI Antique Libertad Union III 2014 day care center construction in brgy union (union iii)Construction of 1 unit DCC with amenities & hauling at Sitio

Ibabao, etcDAY CARE CENTER 1 637,500.00 142,500.00 780,000.00 ongoing

VI Antique Libertad Tinindugan 2014 day care center construction in sitio igtabongConstruction of 1 unit DCC with amenities at Sitio, Igtabong,

Brgy Tinindugan, Libertad AntiqueDAY CARE CENTER 1 637,500.00 637,500.00 ongoing

VI Antique Libertad Barusbus 2014day care center rehabilitation/ improvement in brgy

barusbusConstruction of 1 unit DCC with amenities @ Brgy Barusbus DAY CARE CENTER 1 425,000.00 420,000.00 845,000.00 ongoing

VI Antique Libertad Bulanao 2014 day care center rehabilitation/ improvement in brgy bulanao Construction of 1 unit DCC with amenites@ Brgy Bulanao DAY CARE CENTER 1 425,000.00 550,000.00 975,000.00 ongoing

VI Antique Libertad Inyawan 2014day care center rehabilitation/ improvement in brgy

inyawan

Construction of 1 Unit DCC with amenities @Brgy. Inyawan,

Libertad, AntiqueDAY CARE CENTER 1 425,000.00 - 425,000.00 ongoing

VI Antique Libertad Maramig 2014day care center rehabilitation/ improvement in brgy

maramigConstruction of 1 unit DCC with amenities @ Brggy Maramig DAY CARE CENTER 1 425,000.00 625,000.00 ongoing

VI Antique Libertad 2014 lesta-school supply store in libertad central school lesta-school supply store in libertad central school 1 200,000.00 - ongoing

VI Antique Libertad Pajo 2014 day care center rehabilitation/ improvement in brgy pajoConstruction of 1 Unit Day Care Center with amenities

@Brgy Pajo, Libertad AntiqueDAY CARE CENTER 1 425,000.00 460,000.00 885,000.00 ongoing

VI Antique Libertad Panangkilon 2014day care center rehabilitation/ improvement in brgy

panangkilon

Construction of 1 Unit Dcc with amenities @ Brgy.

Panangkilon, Libertad, AntiqueDAY CARE CENTER 1 425,000.00 425,000.00 ongoing

VI Antique Libertad San Roque 2014day care center rehabilitation/ improvement in brgy san

roqueConstruction of 1 Unit DCC with amenities @Brgy. San Roque DAY CARE CENTER 1 637,500.00 212,500.00 850,000.00 ongoing

VI Antique Libertad Union 2014 day care center rehabilitation/ improvement in brgy unionConstruction of 1 Unit Day care center with amenities@ brgy

union, Libertad AntiqueDAY CARE CENTER 1 425,000.00 425,000.00 ongoing

VI Antique Pandan Municipal wide 2015 SUSTAINABLE LIVELIHOOD FOR OUT OF SCHOOL YOUTH

ON MOTORCYCLE REPAIR WITH EQUIPMENTS

SUSTAINABLE LIVELIHOOD FOR OUT OF SCHOOL YOUTH

ON MOTORCYCLE REPAIR WITH EQUIPMENTS1 500,000.00 ongoing

VI Antique Patnongon Magarang 2015 REHABILITATION OF 6 DAY CARE CENTERSCONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH

AMENITIES & PLAYGROUND DEVICESDAY CARE CENTER 1 900,000.00 ongoing

VI Antique San Jose de Buenavista Dalipe 2015 CONSTRUCTION OF SUSTAINABLE WOODCRAFT AND

FASHION ACCESSORIES PRODUCTION CENTER

CONSTRUCTION OF SUSTAINABLE WOODCRAFT AND

FASHION ACCESSORIES PRODUCTION CENTERBUILDING FACILITY 1 500,000.00 ongoing

VI Antique San Jose de Buenavista Municipal wide 2015 DOY PACK RECYCLING/PROVISION OF 18 UNITS ELECTRIC

SEWING MACHINES

DOY PACK RECYCLING/PROVISION OF 18 UNITS ELECTRIC

SEWING MACHINES1 501,000.00 ongoing

VI Antique San Remigio Atabay 2014 construction of hanging footbridge in atabay construction of hanging footbridge in atabay FOOT BRIDGE 1 1,275,000.00 225,000.00 1,500,000.00 ongoing

VI Antique San Remigio Bugo 2015 CONSTRUCTION OF 2 DAY CARE CENTER WITH AMENITIESCONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

AMENITIESDAY CARE CENTER 1 1,800,000.00 ongoing

VI Antique San Remigio Sumaray 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

AMENITIESDAY CARE CENTER 1 ongoing

VI Antique San Remigio Municipal wide 2015 VOCATIONAL TRAINING FOR SMALL ENGINE REPAIR WITH

TOOL KITS

VOCATIONAL TRAINING FOR SMALL ENGINE REPAIR WITH

TOOL KITS1 750,000.00 ongoing

VI Antique Sebaste Poblacion 2014 completion of senior citizen center in brgy poblacionCompletion of Senior Citizen recreation Center 2 Brgy

Poblacion 1 475,000.00 475,000.00 ongoing

VI Antique Sibalom Lambayagan 2015 CONSTRUCTION/ IMPROVEMENT OF DAY CARE CENTERS CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 1,500,000.00 ongoing

VI Antique Sibalom Villafont 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 ongoing

VI Antique Tibiao Poblacion 2015 ESTABLISHMENT OF MANTODA MOTORCYCLE SPARE

PARTS, LUBRICANTS AND ACCESSORIES TRADING

ESTABLISHMENT OF MANTODA MOTORCYCLE SPARE

PARTS, LUBRICANTS AND ACCESSORIES TRADING1 500,000.00 ongoing

VI Antique TOBIAS FORNIER (DAO) Poblacion Norte 2014b. solar/ mechanical salt production for ip-ati families of brgy

pob. nortemerged with PSB project as stated. 1 50,000.00 50,000.00 ongoing

VI Antique VALDERRAMA Bakiang 2015 IMPROVEMENT OF PATHWAY IMPROVEMENT OF PATHWAY PATHWAY 1 207,700.00 ongoing

VI Antique VALDERRAMA Binanogan 2015 CONSTRUCTION OF HANGING TRICYCLE LANE BRIDGE CONSTRUCTION OF HANGING TRICYCLE LANE BRIDGE BRIDGE 1 1,672,100.00 ongoing

VI Antique VALDERRAMA Buluangan 2015 CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES DAY CARE CENTER 1 742,000.00 ongoing

VI Antique VALDERRAMA Pandanan 2015 CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES DAY CARE CENTER 1 742,000.00 ongoing

VI Antique VALDERRAMA Takas 2015 IMPROVEMENT OF PATHWAY IMPROVEMENT OF PATHWAY PATHWAY 1 1,029,900.00 ongoing

VI Antique VALDERRAMA Tigmamale 2015 CONSTRUCTION OF HANGING FOOT BRIDGE CONSTRUCTION OF HANGING FOOT BRIDGE FOOT BRIDGE 1 1,579,200.00 ongoing

VI Antique VALDERRAMA Ubos 2015 CONSTRUCTION OF RIVER WALL/ PROTECTIVE CONCRETE

MASONRY DIKE

CONSTRUCTION OF RIVER WALL/ PROTECTIVE CONCRETE

MASONRY DIKEWATER CONTROL 1 2,182,600.00 ongoing

VI Capiz Dao 2015 INFRASTRUCTURE PROJECTS: REPAIR / UPGRADING OF DAY

CARE CENTERS (12 DAY CARE CENTERS REPAIR/REHAB)Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

VI Capiz Dao 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dao 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dao 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dao 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dao 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 CONSTRUCTION OF 1 UNIT DAYCARE CENTER WITH

AMENITIESConstruction of One (1) Unit Day Care Center with Amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI Capiz Dumalag 2015 REHABILITATION OF DAYCARE CENTERS FOR QUALITY

LEARNING DEVELOPMENTRehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumalag 2015 Rehabilitation of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Dumarao Aglalana 2014Rehabilitation Of 600M Access Road In Purok 4, Brgy.

Aglalana

Road Concreting of .27km Farmm to market road projec at

purok 4 brgy AglalanaROAD 1 1,100,000.00 1,100,000.00 ongoing

VI Capiz Dumarao 2015 CONSTRUCTION OF 2-STOREY WOMEN CRISIS CENTER/

BAHAY PAG-ASA WITH AMENITIES

CONSTRUCTION OF 2-STOREY WOMEN CRISIS CENTER/

BAHAY PAG-ASA WITH AMENITIES1 6,500,000.00 ongoing

VI Capiz Jamindan North Lucero - Agbun-Od 20141Km Road Rehab. W/ 300 Ln.M. Spot Concreting In North

Lucero To Agbun-Od

Funds Merged: Road Improvement of 2.08km ftmr with 1.2

km spot concreting @ Brgy Pasol to linambasan jaena norte

bayebaye lucero agbunod

ROAD 1 1,100,000.00 4,350,000.00 ongoing

VI Capiz Jamindan Pangabuan 2014Rehabilitation Of road Including (0.30 Km.) Concreting Of

Road From Day Care Center To Health Center Of Barangay

Pangabuan

Rehabilitation Of road Including (0.30 Km.) Concreting Of

Road From Day Care Center To Health Center Of Barangay

Pangabuan

DAY CARE CENTER 1 750,000.00 ongoing

VI Capiz Jamindan Jaena Norte Propper 2014Rehabilitation Of road Including .30 Km Road Improvement

With 0.20 Km. Pccp In Jaena Norte Proper Going To

Elementary School

Rehabilitation Of road Including .30 Km Road Improvement

With 0.20 Km. Pccp In Jaena Norte Proper Going To

Elementary School

ROAD 1 500,000.00 ongoing

VI Capiz Jamindan Bayebaye 2014Rehabilitation Of road Including 500 Ln.M.. Road Concreting

From Sitio Proper To Sitio Badlan, Barangay Bayebaye

Rehabilitation Of road Including 500 Ln.M.. Road Concreting

From Sitio Proper To Sitio Badlan, Barangay BayebayeROAD 1 1,000,000.00 ongoing

VI Capiz Jamindan Pasol-O 2014Rehabilitation Of road Including 600 Ln.M. Road

Improvement & 200 Ln.M. Pccp In Sitio Lumboy To Pasol-O

Overflow

Rehabilitation Of road Including 600 Ln.M. Road

Improvement & 200 Ln.M. Pccp In Sitio Lumboy To Pasol-O

Overflow

ROAD 1 1,000,000.00 ongoing

VI Capiz Jamindan 2015 CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH

AMENITIESConstruction of One (1) unit Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

VI Capiz MA-AYON 2015 CONSTRUCTION OF 5 UNITS DAY CARE CENTER Construction of One (1) unit Day Care Center DAY CARE CENTER 1 3,900,000.00 ongoing

VI Capiz MA-AYON 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz MA-AYON 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz MA-AYON 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz MA-AYON 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz Mambusao 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJETCS

(BUILDINGS AND AMENITIES)Construction of One Unit Crisis Center with Amenities 1 1,000,000.00 ongoing

VI Capiz Panitan 2015 RENOVATION OF CULTURAL CENTER AS WOMEN CRISIS

CENTERConstruction of One (1) unit Crisis Center 1 2,000,000.00 ongoing

VI Capiz Pontevedra 2015 CONSTRUCTION OF BALAY PAG-ULIKID - BALAY-PAGULIKID

CRISIS CENTERConstruction of One (1) Unit Balay Pag-ulikid Crisis Center 1 1,000,000.00 ongoing

VI Capiz President Roxas 2015 PROTECTIVE SERVICES - REPAIR / UPGRADE OF DAY CARE

CENTERSConstruction of One (1) unit Day Care Center DAY CARE CENTER 1 1,500,000.00 ongoing

VI Capiz President Roxas 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Capiz President Roxas 2015 Construction of One (1) unit Day Care Center DAY CARE CENTER 1 ongoing

VI Guimaras Buenavista Bacjao 2014 construction of i unit day care center in brgy bacjao Construction of DCC DAY CARE CENTER 1 680,000.00 120,000.00 800,000.00 ongoing

VI Guimaras Buenavista Daragan 2015 REPAIR/UPGRADING OF TWO (2) DAY CARE CENTERS (BRGY

DARAGAN & SUPANG)Reopair/Upgrade of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 ongoing

VI Guimaras Buenavista Supang 2015 Reopair/Upgrade of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI Guimaras Nueva Valencia 2015

LIVELIHOOD PROJECTS FOR SOLO PARENTS, RURAL

IMPROVEMENT CLUB, PANTAWID PAMILYANG PILIPINO

PROGRAM (4PS), PERSONS WITH DISABILITIES & OUT OF

SCHOOL YOUTH ( NATIVE CHICKEN PROJECT)

LIVELIHOOD PROJECTS FOR SOLO PARENTS, RURAL

IMPROVEMENT CLUB, PANTAWID PAMILYANG PILIPINO

PROGRAM (4PS), PERSONS WITH DISABILITIES & OUT OF

SCHOOL YOUTH ( NATIVE CHICKEN PROJECT)

1 1,000,000.00 ongoing

VI Guimaras Nueva Valencia 2015 COMPLETION OF SENIOR CITIZENS CENTER COMPLETION OF SENIOR CITIZENS CENTER 1 500,000.00 ongoing

VI Guimaras Sibunag Dasal 2014

it literacy program for out of school youth and youth with

disabilities (i unit building with 26 unit computers/

honorarium of resource persons) in dasal, sibunag

Construction of Information Technology for youth with

amenities1 1,791,985.00 94,315.00 1,886,300.00 ongoing

VI Guimaras Sibunag 2014Road Improvement Of 460 Linear Meter Road From Sitio

Centro Going To Sitio Utod

Road Improvement Of 460 Linear Meter Road From Sitio

Centro Going To Sitio UtodROAD 1 1,328,850.00 1,328,850.00 ongoing

VI Guimaras Sibunag Balanga 2015 IMPROVEMENT/ REPAIR OF BALANGA DAY CARE CENTER IMPROVEMENT/ REPAIR OF BALANGA DAY CARE CENTER DAY CARE CENTER 1 300,000.00 ongoing

VI Guimaras Sibunag Naoway 2015 IMPROVEMENT/ REPAIR OF NAOWAY DAY CARE CENTER IMPROVEMENT/ REPAIR OF BALANGA DAY CARE CENTER DAY CARE CENTER 1 300,000.00 ongoing

VI Guimaras Sibunag Palhe 2015 CONSTRUCTION OF PALHE DAY CARE CENTER CONSTRUCTION OF PALHE DAY CARE CENTER DAY CARE CENTER 1 800,000.00 ongoing

VI Iloilo Ajuy Bay-ang 2014250 Linear Meters Road Upgrading With Spot Concreting In

Brgy. Bay-Ang, Ajuy

250 Linear Meters Road Upgrading With Spot Concreting In

Brgy. Bay-Ang, AjuyROAD 1 1,913,050.00 - ongoing

VI Iloilo Ajuy 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS

(UPGRADING OF DAY CARE CENTERS)Construction of 1-Unit of DCC with amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI Iloilo Ajuy 2015 Construction of 1-Unit of DCC with amenities DAY CARE CENTER 1 ongoing

VI Iloilo Ajuy Pedada 2014250 Linear Meters Road Upgrading With Spot Concreting In

Brgy. Pedada, Ajuy

250 Linear Meters Road Upgrading With Spot Concreting In

Brgy. Pedada, AjuyROAD 1 1,913,050.00 3,826,100.00 ongoing

VI Iloilo Ajuy Rojas 2014 construction of day care center in brgy. rojas, ajuy construction of day care center in brgy. rojas, ajuy DAY CARE CENTER 1 695,650.00 144,350.00 840,000.00 ongoing

VI Iloilo Badiangan Bitaoyan 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTERS WITH

AMENITIESConstruction of 1-Unit of DCC with amenities DAY CARE CENTER 1 1,560,000.00 ongoing

VI Iloilo Badiangan Calansanan 2015 Construction of 1-Unit of DCC with amenities DAY CARE CENTER 1 ongoing

VI Iloilo Balasan 2015 CONSTRUCTION OF THREE (3) DAY CARE CENTERS WITH

AMENITIESConstruction of CICL with amenities 1 1,350,000.00 ongoing

VI Iloilo Banate 2015 CONSTRUCTION OF 3 UNITS DAYCARE CENTERS USING THE

TANDARD PLANConstruction of 1-Unit Standard DCC DAY CARE CENTER 1 2,340,000.00 ongoing

VI Iloilo Banate 2015 Construction of 1-Unit Standard DCC DAY CARE CENTER 1 ongoing

VI Iloilo Banate 2015 Construction of 1-Unit Standard DCC DAY CARE CENTER 1 ongoing

VI Iloilo Batad Poblacion 2014 construction of senior citizen's center in brgy poblacion Construction of senior citizen center with amenities 1 1,000,000.00 50,000.00 1,050,000.00 ongoing

VI Iloilo Batad 2015 REPAIR/REHABILITATION OF DAY CARE CENTERS Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 2,500,000.00 ongoing

VI Iloilo Batad 2015 Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 ongoing

VI Iloilo Batad 2015 UPGRADING OF 1-UNIT DCC DAY CARE CENTER 1 ongoing

VI Iloilo Batad 2015 UPGRADING OF 1-UNIT DCC DAY CARE CENTER 1 ongoing

VI Iloilo Cabatuan 2015PROTECTIVE SERVICES-INFRASTRUCTURE

(ESTABLISHMENT OF OPDA OFFICE/ACCESSIBILITY

FACILITY FOR PWDS AND SCS

PROTECTIVE SERVICES-INFRASTRUCTURE

(ESTABLISHMENT OF OPDA OFFICE/ACCESSIBILITY

FACILITY FOR PWDS AND SCS

1 500,000.00 ongoing

VI Iloilo Cabatuan 2015 PROTECTVE SERVICES-INFRASTRUCTURE (CONSTRUCTION

/ UPGRADING OF DCC)

PROTECTVE SERVICES-INFRASTRUCTURE (CONSTRUCTION

/ UPGRADING OF DCC)DAY CARE CENTER 1 500,000.00 ongoing

VI Iloilo CabatuanSulanga, Tupol

Oeste, Inabasan2015 IMPROVEMENT OF EVACUATION CENTER WITH

AMENITIESCONCRETING OF FMR EVACUATION CENTER 4 1,500,000.00 ongoing

VI Iloilo Calinog 2014

sustainable livelihood program with micro-finance (for ips,

kalipi, youth, religious sector, small medium entrepreneurs,

pwd, senior citizens, bhws, 4ps parent leader, farmers) in all

brgys

Capacity building and provision of seed capital for pantawid

pamilya farmers women senior citizens and the indigenous

people sector of calinog iloilo

BUILDING FACILITY 1 1,690,000.00 1,690,000.00 June 2015 completed

VI Iloilo Calinog Poblacion, Ilaya 2015 ETABLISHMENT OF 200 SQ.MTRS. CRISIS CENTER ETABLISHMENT OF 200 SQ.MTRS. CRISIS CENTER 2 200 meter2 2,650,773.50 ongoing

VI Iloilo Calinog Alibanon 2015 CONSTRUCTION OF 30 L.M. FLOOD CONTROL CONSTRUCTION OF 30 L.M. FLOOD CONTROL WATER CONTROL 1 30 Ln. Meter 1,726,096.87 ongoing

VI Iloilo Calinog Badu 2015 3KMS ROAD REHABILITATION (KC) 3KMS ROAD REHABILITATION (KC) ROAD 1 3 Kilometer 1,049,071.89 ongoing

VI Iloilo Calinog Malag it, Guiso, Canabajan 2015 3KMS ROAD REHABILITATION (KC) 3KMS ROAD REHABILITATION (KC) ROAD 3 3 Kilometer 2,682,046.63 ongoing

VI Iloilo Calinog Guiso, Malaguinabot 2015 CONSTRUCTION OF 100 L.M. HANGING FOOT BRIDGE CONSTRUCTION OF 100 L.M. HANGING FOOT BRIDGE FOOT BRIDGE 2 100 Ln. Meter 3,180,928.20 ongoing

VI Iloilo Calinog Rizal Ilawod 2015 CONSTRUCTION OF 600 L.M. DRAINAGE CANAL (KC) CONSTRUCTION OF 600 L.M. DRAINAGE CANAL (KC) DRAINAGE SYSTEM 1 600 Ln. Meter 1,211,082.91 ongoing

VI Iloilo Concepcion 2015 CONSTRUCTION OF EVACUATION CENTER WITH

AMENITIES

CONSTRUCTION OF EVACUATION CENTER WITH

AMENITIESEVACUATION CENTER 1 8,420,000.00 ongoing

VI Iloilo Estancia 2014assisstive devices (pwd) (wheel-chairs, crutches, canes,

hearing aids) to identified pwds in the municipality of

estancia

Improvement of DCC with amenities DAY CARE CENTER 1 61,790.00 61,790.00 June 2015 completed

VI Iloilo Estancia Poblacion 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER 1 2,250,000.00 ongoing

VI Iloilo Guimbal Anono-o 2015 CONSTRUCTION OF 1 UNIT DAY CARE CENTER CONSTRUCTION OF 1 UNIT DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

VI Iloilo Igbaras Signe 2015 CONSTRUCTION OF CRISIS CENTER WITH AMENITIES CONSTRUCTION OF CRISIS CENTER WITH AMENITIES 1 2,500,000.00 ongoing

VI Iloilo Igbaras Lutongan 2015 REHABILITATION OF DAY CARE CENTER Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 750,000.00 ongoing

VI Iloilo Igbaras Tigbanaba 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

VI Iloilo Janiuay Damu-ong 2015 CONSTRUCTION OF 1 UNIT DAY CARE CENTER WITH

AMENITIESConstruction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 780,000.00 ongoing

VI Iloilo Lambunao Caguisanan 2014 Farm Bridge In Brgy Agsirab Construction of 3 barrel box culvert 1 1,000,000.00 1,000,000.00 June 2015 completed

VI Iloilo Lambunao Sagcup 2014 Farm Bridge In Brgy Sagcup Construction of 32 linear meter hanging bridge BRIDGE 1 1,000,000.00 1,000,000.00 June 2015 completed

VI Iloilo LambunaoAbunlawan, Jorog Maite Grande, Sibaguan Natividad, Caloy-Ahan, Pughanan, Capangyan, Badiangan, Agtuman & Caguisanan2014

Road Improvement Of 2.2727 Kms Fmr In Brgy.

Cabunlawan, Jorog Maite Grande, Sibaguan Natividad,

Caloy-Ahan, Pughanan, Capangyan, Badiangan, Agtuman

& Caguisanan

Improvement of 0.35 km farm to market road ROAD 9 1,500,000.00 1,500,000.00 June 2015 completed

VI Iloilo Lambunao Poblacion 2015 CONSTRUCTION OF WOMEN CRISIS CENTER WITH

AMENITIESConstruction of Crisis Center with Amenities 1 1,000,000.00 ongoing

VI Iloilo Lemery 2014 Concreting Of 0.260 Km Fmr At Brgy. Cabantohan Merge of Funds: Concreting of 0.570 km fmr w/ hauling 1 1,620,000.00 85,000.00 3,595,000.00 ongoing

VI Iloilo Lemery 2014 Road Concreting Of 0.300 Km Fmr In Brgy. Sincua Road Concreting Of 0.300 Km Fmr In Brgy. Sincua ROAD 1 1,890,000.00 ongoing

Page 16: List of KALAHI-CIDSS Subprojects - BUB

VI Iloilo Lemery Agpipili 2014Concreting Of Wheel (Tire) Path Of 0.250 Fmr @ Brgy

Agpipili

Merge of Funds: Concreting of 1.070 km wheel tire path

farm to market road with haulingROAD 1 900,000.00 32,500.00 4,172,500.00 ongoing

VI Iloilo Lemery Nasapahan 2014Concreting Of Wheel (Tire) Path 0.300 Km Fmr In Brgy.

Nasapahan

Concreting Of Wheel (Tire) Path 0.300 Km Fmr In Brgy.

NasapahanPATHWAY 1 1,125,000.00 ongoing

VI Iloilo Lemery Layogbato 2014Concreting Of Wheel (Tire) Path 0.45Km Fmr In Brgy.

Layogbato

Concreting Of Wheel (Tire) Path 0.45Km Fmr In Brgy.

LayogbatoPATHWAY 1 1,215,000.00 ongoing

VI Iloilo Lemery Anabo 2014Concreting Of Wheel (Tire) Path Of 0.250 Km Fmr @ Brgy

Anabo

Concreting Of Wheel (Tire) Path Of 0.250 Km Fmr @ Brgy

AnaboPATHWAY 1 900,000.00 ongoing

VI Iloilo Lemery San Diego 2014 Construction Of Farm Bridge In Brgy. San DiegoConstruction of 18 inch meter farm steel bridge with hauling

@ brgy san diegoBRIDGE 1 1,350,000.00 1,440,000.00 June 2015 completed

VI Iloilo Lemery Buenavista 2014 Road Construction Of 0.400 Km Fmr @ Brgy. Buenavista Construction of 0.250 km fmr w hauling @ brgy buenavista 1 900,000.00 900,000.00 ongoing

VI Iloilo Lemery Poblacion 2015 ONE (1) UNIT TEMPORARY SHELTER CONSTRUCTION OF CICL WITH AMENITIES 1 1,500,000.00 ongoing

VI Iloilo Leon 2014 rehabilitation of day care center rehabilitation of day care center DAY CARE CENTER 1 300,000.00 462,000.00 762,000.00 ongoing

VI Iloilo Maasin 2014construction/rehabilitatin of day care center (one (1) storey

building (80 sq. mtrs.) and facilities)

Construction of 1 unit DCC with amenities and playground

devicesDAY CARE CENTER 1 1,000,000.00 1,000,000.00 ongoing

VI Iloilo Miagao Buenavista Norte 2015 REPAIR AND UPGRADING OF DAY CARE CENTERS Repair/Upgrading of Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoing

VI Iloilo Miagao Lacadon 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 ongoing

VI Iloilo Miagao Baraclayan 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 ongoing

VI Iloilo Miagao Alimodias 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 ongoing

VI Iloilo Miagao Aguiauan 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 ongoing

VI Iloilo Miagao Olango 2015 Repair/Upgrading of Day Care Center DAY CARE CENTER 1 ongoing

VI Iloilo New lucena 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTER WITH

AMENITIESConstruction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI Iloilo New lucena 2015 Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 ongoing

VI Iloilo Oton Poblacion 2015 CONSTRUCTION OF WOMEN CRISIS CENTER WITH

AMENITIESConstruction of CICL wid amenities 1 5,000,000.00 ongoing

VI Iloilo Oton Poblacion 2015 Construction of Women Crisis Center 1 ongoing

VI Iloilo Pototan 2015 CONSTRUCTION OF 3-UNIT DAY CARE CENTER WITH

AMENITIESConstruction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 2,340,000.00 ongoing

VI Iloilo Pototan 2015 Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 ongoing

VI Iloilo Pototan 2015 Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 ongoing

VI Iloilo SAN DIONISIO Malanlog 2014 Concreting Of 100 M road Road In Brgy. MadanlogMerged of Funds: Concreting of 0.258 kms farm to market

roadROAD 1 1,000,000.00 2,200,000.00 ongoing

VI Iloilo SAN DIONISIO Pangi 2014 Concreting Of 120 M road In Sitio Malunoy, Brgy. Pangi Concreting Of 120 M road In Sitio Malunoy, Brgy. Pangi ROAD 1 1,200,000.00 ongoing

VI Iloilo SAN DIONISIO 2015 REPAIR/UPGRADING OF 36 DAY CARE CENTERS Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 2,000,000.00 ongoing

VI Iloilo SAN DIONISIO 2015 Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 ongoing

VI Iloilo San Enrique 2015 ESTABLISMENT OF REGIONAL SHELTERED WORKSHOP

AND AREA VOCATIONAL REHABILITATION CENTER

Establishment of Regional Sheltered Workshop and Area

Vocational Rehabilitation Center1 1,000,000.00 ongoing

VI Iloilo SAN ENRIQUE Poblacion Ilaya 2015 ESTABLISHMENT OF OPDA CENTER Construction of OPDA Center 1 1,000,000.00 ongoing

VI Iloilo SAN ENRIQUE 2015 ESTABLISHMENT OF TRIBAL OF INDEGINOUS PEOPLESConstruction of Tribal Hall with Amenities for Indigenous

People1 1,000,000.00 ongoing

VI Iloilo San Joaquin 2015 PROTECTIVE SERVICES INFRA PROJECT - 04 (PROVIDES

SERVICES AND PROGRAMS OF PWD'S)Costruction of Rehabilitation Center for PWDs w/ Amenities 1 1,950,000.00 ongoing

VI Iloilo San Rafael 2015 ACTIVE SERVICES-INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DY CARE CENTERS)

Active-Services-Infrastructure Projects: Construction of Day

Care CenterDAY CARE CENTER 1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL BACOLOD CITY (Capital) 2015 CONSTRUCTION OF 2 DAY CARE CENTERS Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,600,000.00 ongoing

VI NEGROS OCCIDENTAL BACOLOD CITY (Capital) 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL BACOLOD CITY (Capital) 2015 CONSTRUCTION OF 3RD PHASE YOUTH HOME Construction of Admin Building of Bacolod City Youth Home BUILDING FACILITY 1 3,000,000.00 ongoing

VI NEGROS OCCIDENTAL Bago City 2015 UPGRADING OF BAGO CITY CRISIS CENTER FOR WOMEN

AND CHILDREN

Upgrading of Bogo City Crisis Center For Women and

Children1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL Binalbagan Mabilog, Amontay 2014 construction of day care centersConstruction of DCC in Sitio Mabilog, Brgy. Amontay,

Binalbagan, Neg. Occ.DAY CARE CENTER 2 3,750,000.00 750,000.00 ongoing

VI NEGROS OCCIDENTAL Binalbagan Bi-ao Proper 2014Construction of Day Care Center in Brgy. Bi-ao Proper

Binalbagan, Negros Occ.DAY CARE CENTER 1 750,000.00 ongoing

VI NEGROS OCCIDENTAL Binalbagan Tambu, Amontay 2014Construction of Day Care Center in Sitio Tambu Brgy.

AmontayDAY CARE CENTER 2 100,000.00 850,000.00 ongoing

VI NEGROS OCCIDENTAL Binalbagan Candida, Bi-ao 2014 Construction of Day Care Center in Sitio Candida. Brgy Bi-ao DAY CARE CENTER 2 20,000.00 770,000.00 ongoing

VI NEGROS OCCIDENTAL Binalbagan Santol 2014 Construction of Day Care Center in Sitio Cabiti Brgy. Santol DAY CARE CENTER 1 750,000.00 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 CONSTRUCTION OF 10 UNITS DAY CARE CENTER Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 8,000,000.00 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Cadiz City 2015 Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Calatrava Bantayanon 2013 Construction of Evacuation Center Construction of Evacuation Center @ Brgy. Bantayanon EVACUATION CENTER 1 3,245,520.00 3,245,520.00 March 2015 completed

VI NEGROS OCCIDENTAL Calatrava 2015 CONSTRUCTION OF TWO (2) DAY CARE CENTERS Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,600,000.00 ongoing

VI NEGROS OCCIDENTAL Calatrava 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Candoni 2013 Day Care Center Construction of Child Minding Center 1 350,000.00 350,000.00 completed

VI NEGROS OCCIDENTAL Cauayan Mambugsay 2014Concreting of road 100 Lineal Meters Purok 5-7,

Mambugsay

Merged of Funds: Concreting of FTMR in 7 brgys. Of

Cauayan1 540,000.00 420,000.00 4,200,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Bulata 2014Concreting of road Road 100 Lineal Meters Purok 4,5,6 & 7

Bulata

Concreting of road Road 100 Lineal Meters Purok 4,5,6 & 7

BulataROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Tiling 2014Concreting of road Road 100 Lineal Meters Baluarte To

Candolan, Tiling

Concreting of road Road 100 Lineal Meters Baluarte To

Candolan, TilingROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Sura 2014Concreting of road Road 100 Lineal Meters Purok 1, Brgy

Sura

Concreting of road Road 100 Lineal Meters Purok 1, Brgy

SuraROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Abaca 2014Concreting of road Road 100 Lineal Meters Purok 2-7 Brgy

Abaca

Concreting of road Road 100 Lineal Meters Purok 2-7 Brgy

AbacaROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Baclao 2014Concreting of road Road 100 Linieal Meters Purok 4 Brgy

Baclao

Concreting of road Road 100 Linieal Meters Purok 4 Brgy

BaclaoROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL Cauayan Elihan 2014Construction of road 100 Lineal Meters Purok 1&2 Brgy

Elihan

Construction of road 100 Lineal Meters Purok 1&2 Brgy

ElihanROAD 1 540,000.00 ongoing

VI NEGROS OCCIDENTAL ENRIQUE B. MAGALONA

(SARAVIA)2015 CONSTRUCTION OF 1 DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 875,333.00 ongoing

VI NEGROS OCCIDENTAL ENRIQUE B. MAGALONA

(SARAVIA)2015

CONSTRUCTION OF GROUP HANDWASHING FACILITY IN

DAY CARE CENTERS WITH COMPLETE SET OF SOAP AND

FLOURIDE GEL TOOTHPASTE

Construction of Group Handwashing Facility in Day Care

Centers with Complete Soap and Flouride Gel ToothpasteDAY CARE CENTER 1 437,667.00 ongoing

VI NEGROS OCCIDENTAL CITY OF ESCALANTE 2015COMPREHENSIVE JUVENILE

INTERVENTION/REHABILITATION PROGRAM PACKAGE

FOR CICL

Comprehensive Juvenile Intervention /Rehabilitation

Program Package for CICL1 600,000.00 ongoing

VI NEGROS OCCIDENTAL HINIGARAN 2014 Oyster Sauce Processing CenterConstruction of Oyster Sauce Processing Center with

amenities1 1,418,300.00 1,417,156.86 ongoing

VI NEGROS OCCIDENTAL HINOBA-AN (ASIA) Pook 2014 crisis center for women and childrenCostruction of Crisis Center For Women and Children w/

Amenities @ Brgy. Pook Hinoba-an, Neg. Occ.1 1,700,000.00 1,700,000.00 ongoing

VI NEGROS OCCIDENTAL HINOBA-AN (ASIA) 2015 CONSTRUCTION OF INTEGRATED TRANSPORT TERMINAL Construction of Integrated Transport Terminal 1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL Ilog Dancalan 2014 Improvement of road projectConcreting of Farm to Market Road of Sito Lunoy Brgy.

Dancalan, Ilog, Negros Occ.ROAD 1 1,500,000.00 1,500,000.00 ongoing

VI NEGROS OCCIDENTAL Ilog Dancalan 2014 km. 110 dancalanConstruction of Day Care Center with / amenities @ Brgy.

Dancalan Municipality of Ilog, Negros OccDAY CARE CENTER 1 700,000.00 700,000.00 ongoing

VI NEGROS OCCIDENTAL Ilog 2014 Rehabilitation & Improvement Of Potable Water Supply Rehabilitation & Improvement Of Potable Water Supply WATER SYSTEM 1 - ongoing

VI NEGROS OCCIDENTAL Ilog 2014 Rehabilitation Of Classrooms Rehabilitation Of Classrooms SCHOOL FACILITY 1 - ongoing

VI NEGROS OCCIDENTAL CITY OF KABANKALAN 2015 REHABILITATION AND UPGRADE OF CRISIS CENTER Rehabilitation and Upgrade of Crisis Center 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF KABANKALAN 2015 REHABILITATION/UPGRADING OF FAMILY LIFE RESOURCE

CENTERRehabilitation and Upgrade of Family Life Resource Center 1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF KABANKALAN 2015 CONSTRUCTION OF TWO-UNITS SATELLITE HEALTH

CENTERConstruction of two-units satellite health center HEALTH CENTER 1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF KABANKALAN 2015PWD ASSISTIVE DEVICES ASSEMBLY (CONSTRUCTION OF

ASSEMBLY AREA AND WORK SHOP OF PWD ASSISTIVE

DEVICES)

Construction of Assembly Area and Workshop of PWD

assistive device1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL LA CARLOTA CITY 2015 CONSTRUCTION OF WOMENS AND CHILDRENS CRISIS

CENTER

Constructions of Women and Children Crisis Center with

amenities1 1,400,000.00 ongoing

VI NEGROS OCCIDENTAL LA CARLOTA CITY 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,100,000.00 ongoing

VI NEGROS OCCIDENTAL La Castellana 2015 CONSTRUCTION OF IRRIGATION Construction of Irrigation 1 2,000,000.00 ongoing

VI NEGROS OCCIDENTAL Manapla Punta Mesa Proper 2014 Upgrading of Punta Mesa (Proper) Day Care Center Construction of Day Care Center in Brgy. Punta Mesa DAY CARE CENTER 1 510,000.00 510,000.00 ongoing

VI NEGROS OCCIDENTAL Manapla 2015 CONSTRUCTION OF DAY CARE CENTERS Construction of 1-Unit Standard Day Care Center DAY CARE CENTER 1 750,000.00 ongoing

VI NEGROS OCCIDENTAL Manapla 2015 REPAIR/REHABILITATION OF 4 DAY CARE CENTERS Repair of 1-Unit Day Care Center DAY CARE CENTER 1 1,100,000.00 ongoing

VI NEGROS OCCIDENTAL Manapla 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL Manapla 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

VI NEGROS OCCIDENTAL MOISES PADILLA (MAGALLON) Quintin Remo 2014construction of one (1) unit day care center in so.lumlom,

brgy.quintin remo

Construction of 1 unit day care center with amenities@ brgy

quintin remoDAY CARE CENTER 1 600,000.00 90,000.00 690,000.00 ongoing

VI NEGROS OCCIDENTAL Murcia Minoyan 2014Construction Of Hanging Foot Bridge At So. Guinam-An,

Minoyan

Construction of Day Care with Handling @ Purok Guinam-an,

Brgy. MinoyanDAY CARE CENTER 1 700,000.00 558,301.86 ongoing

VI NEGROS OCCIDENTAL Murcia 2014Construction of Day Care Center with Hauling @ Purok

Guinam-an , Brgy. MinoyanDAY CARE CENTER 1 141,698.14 ongoing

VI NEGROS OCCIDENTAL Murcia 2015

KAPIT-BISIG LABAN SA KAHIRAPAN-COMPREHENSIVE AND

INTEGRATED DELIVERY OF SOCIAL SERVICES (KALAHI-

CIDDS) PROJECT - CONSTRUCTION OF COMPREHENSIVE

DRAINAGE SYSTEM (KC)

Construction ofComprehensive Drainage System DRAINAGE SYSTEM 1 1,450,000.00 ongoing

VI NEGROS OCCIDENTAL Murcia 2015 PROTECTIVE SERVICES (CONSTRUCTION OF DROP IN

CENTER FOR CICL)Construction of Children In Conflict with the Law Center 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL Pontevedra 2015 CONSTRUCTION OF OPDA (NOW PDAO) Construction of OPDA Center 1 850,000.00 ongoing

VI NEGROS OCCIDENTAL Pontevedra 2015 CONSTRUCTION OF PASALUBONG CENTER Construction of Pasalubong Center 1 2,460,000.00 ongoing

VI NEGROS OCCIDENTAL Pulupandan 2015 ESTABLISHMENT/CONSTRUCTION OF INFRASTRUCTURE -

WOMEN CRISIS CENTERConstruction of Women Crisis Center 1 750,000.00 ongoing

VI NEGROS OCCIDENTAL Pulupandan 2015 CONSTRUCTION OF EVACUATION CENTER WITH

AMENITIESConstruction of Evacuation Center with Amenities EVACUATION CENTER 1 2,500,000.00 ongoing

VI NEGROS OCCIDENTAL Sagay City 2013 Construction of daycare centerConstruction of Day Care Center w/ Amenities & 16 Outdoor

Playground Devices for 16 DCCsDAY CARE CENTER 1 1,000,000.00 1,000,000.00 March 2015 completed

VI NEGROS OCCIDENTAL Sagay City Poblacion 1 2013 repair and renovation of crisis centerImprovement of Women Center w/Amenities@ Brgy.

Poblacion 11 1,000,000.00 1,000,000.00 completed

VI NEGROS OCCIDENTAL SALVADOR BENEDICTO Bunga 2014construction of hanging footbridge (70 in.m.by 1.8 meter

wide hanging footbridge)

Construction of 7.5M x 1.8M Hanging Footbridge in Purok

Anahan Brgy. Bunga Salvador Benedicto, Neg. Occ.FOOT BRIDGE 1 3,800,000.00 200,000.00 4,000,000.00 ongoing

VI NEGROS OCCIDENTAL Salvador Benedicto 2015 CONSTRUCTION OF DAY CARE CENTER WITH COMPLETE

LEARNING AND HANDWASHING FACILITY

Construction of Day Care Center with Complete Learning and

Handwashing Facility DAY CARE CENTER 1 750,000.00 ongoing

VI NEGROS OCCIDENTAL Salvador Benedicto 2015 CONSTRUCTION OF BAHAY PAGASA FOR CICL Construction of Bahay Pag-asa for CICL 1 700,000.00 ongoing

VI NEGROS OCCIDENTAL San Carlos City Iliranan 2015 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES

(ILIRANAN)Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL San Carlos City 2015 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL San Carlos City Initihan 2015 CONSTRUCTION OF DAY CARE CENTER WITH AMENITIES

(INITIHAN)Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL San Carlos City Hagonoy 2015 REPAIR/UPGRADING OF HAGONOY DAY CARE CENTER Repair/Upgrading of Hagonoy Day Care Center DAY CARE CENTER 1 500,000.00 ongoing

VI NEGROS OCCIDENTAL San Carlos City 2015 REPAIR/UPGRADING OF WOMEN CRISIS CENTER Repair/Upgrading of Women Crisis Center 1 500,000.00 ongoing

VI NEGROS OCCIDENTAL Silay City 2015 CONSTRUCTION OF CRISIS CENTERConstruction of Crisis Center for women & children with

amenities1 2,142,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF SIPALAY 2015 REPAIR/UPGRADING OF CRISIS CENTER Repair / Upgrading of Crisis Center 1 1,500,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF SIPALAY 2015 CONSTRUCTION OF OPDA Construction of PDAO 1 1,000,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF SIPALAY 2015 ESTABLISHMENT OF HOLDING CENTER FOR CICL Construction of CICL Center 1 1,500,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF TALISAY 2015 CONSTRUCTION OF CONCRETE DISASTER-RESILIENT DCC

WITH HANDWASHING AREAConstruction of 1-Unit Day Care Center DAY CARE CENTER 1 700,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF TALISAY 2015 CONSTRUCTION OF SENIOR CITIZENS PHARMACY AND

PROCUREMENT OF FACILITIES/MEDICINESConstruction of Senior Citizen Pharmacy with Amenities 1 1,100,000.00 ongoing

VI NEGROS OCCIDENTAL Toboso 2015 CONSTRUCTION OF DAY CARE CENTERS Construction of 1-Unit Day Care Center with Amenities DAY CARE CENTER 1 1,280,000.00 ongoing

VI NEGROS OCCIDENTAL Valladolid 2015 CONSTRUCTION OF ONE UNIT DAY CARE CENTER CONSTRUCTION OF ONE UNIT DAY CARE CENTER DAY CARE CENTER 1 445,000.00 ongoing

VI NEGROS OCCIDENTAL Valladolid 2015 CONSTRUCTION OF WOMENS AND CHILDRENS CRISIS

CENTERRepair/Upgrading of Women and Children Crisis Center 1 445,000.00 ongoing

VI NEGROS OCCIDENTAL CITY OF VICTORIAS 2015 REPAIR AND UPGRADING OF DAYCARE CENTERS Repair and Upgrading of Day Care Centers DAY CARE CENTER 1 1,000,000.00 ongoing

VII Bohol Alicia Poblacion 2014 Rehabilitation Of Existing Cicl Center Rehabilitation Of Existing Cicl Center 1 60.754 sq.m. 799,539.00 40,000.00 839,539.00 16-Feb-15 15-Apr-15 completed

VII Bohol Anda 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT PROTECTIVE SERVICES- INFRASTRUCTURE PROJECT 1 3,500,000.00 pipelined

VII Bohol Balilihan For all barangays 2014 Kapit-Bisig Laban Sa Kahirapan Capability Building Training on Various Programs BUILDING FACILITY 1 850,000.00 - 850,000.00 pipelined

VII Bohol Bilar For all barangays 2014 For Insane And Feeble Minded Program Financial Assistance to Indigent Persons with Disability 1 50,000.00 5,264.00 55,264.00 pipelined

VII Bohol Bilar 2014 Subsidy For Poorest Of The Poor Farmers For Pcic Insurance Subsidy For Poorest Of The Poor Farmers For Pcic Insurance 1 50,000.00 - 50,000.00 pipelined

VII Bohol Buenavista Eastern Cabul an 2014 Commonal Toilet Construction of 2 units Commonal Toilet for Brgy Eastern

Cabul anSANITARY FACILITY 1 11.04 sq.m. 458,850.00 110,000.00 568,850.00 12-Mar-15 ongoing

VII Bohol Carmen 2015 CONSTRUCTION AND REPAIR OF DAY CARE CENTERS CONSTRUCTION AND REPAIR OF DAY CARE CENTERS DAY CARE CENTER 1 1,000,000.00 pipelined

VII Bohol Corella 2015 REHABILITATION AND RETROFITTING OF DAY CARE

CENTERS

REHABILITATION AND RETROFITTING OF DAY CARE

CENTERSDAY CARE CENTER 1 2,500,000.00 pipelined

VII Bohol Dagohoy 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER 1 1,500,000.00 pipelined

VII Bohol Dagohoy 2015 REPAIR/UPGRADING OF DAY CARE CENTERS REPAIR/UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 1,100,000.00 pipelined

VII Bohol Danao Poblacion 2014Construction Of Temporary Shelter For Abused Women And

Children Construction of Crisis Intervention Center 1 107.72 sq.m. 1,000,000.00 500,000.00 1,500,000.00 27-Apr-15 ongoing

VII Bohol Dauis 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

VII Bohol Duero Poblacion 2014 Construction Of Women And Children Center Construction Of Women And Children Center 1 71 sq.m. 475,000.00 25,000.00 500,000.00 02-Mar-15 ongoing

VII Bohol Inabanga 2015 CONSTRUCTION OF WOMENS CRISIS CENTER @

MUNICIPAL HALL COMPOUND

CONSTRUCTION OF WOMENS CRISIS CENTER @

MUNICIPAL HALL COMPOUND1 1,500,000.00 pipelined

VII Bohol Jagna 2015 CONSTRUCTION OF CRISIS CENTER OF JAGNA CONSTRUCTION OF CRISIS CENTER OF JAGNA 1 700,000.00 pipelined

VII Bohol Lila 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT -

CONSTRUCTION OF DAY CARE CENTERS

PROTECTIVE SERVICES INFRASTRUCTURE PROJECT -

CONSTRUCTION OF DAY CARE CENTERSDAY CARE CENTER 1 1,000,000.00 ongoing

VII Bohol Lila 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT -

REPAIR/UPGRADING OF DAY CARE CENTERS

PROTECTIVE SERVICES INFRASTRUCTURE PROJECT -

REPAIR/UPGRADING OF DAY CARE CENTERSDAY CARE CENTER 1 1,000,000.00 ongoing

VII Bohol Mabini 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECT PROTECTIVE SERVICES INFRASTRUCTURE PROJECT 1 1,500,000.00 pipelined

VII Bohol Maribojoc 2015 CONSTRUCTION OF PWD BUILDING – PHASE 1 CONSTRUCTION OF PWD BUILDING – PHASE 1 BUILDING FACILITY 1 500,000.00 pipelined

VII Bohol Panglao 2015 REPAIR OF ALL DAY CARE CENTERS REPAIR OF ALL DAY CARE CENTERS DAY CARE CENTER 1 1,300,000.00 pipelined

VII Bohol Pilar Poblacion 2014 Children In Conflict With Law (Cicl) Center Children In Conflict With Law (Cicl) Center 1 77.4 sq.m. 1,425,000.00 160,444.14 1,585,444.14 06-Jan-15 06-May -15 completed

VII Bohol Pilar Bayong 2014 Road project Construction of 0.15 km Farm to Market Road for Brgy

BayongROAD 1 150 meters 760,000.00 69,659.67 829,659.67 02-Feb-15 24-Mar-15 completed

VII BoholPRES. CARLOS P. GARCIA

(PITOGO)2015 CONSTRUCTION OF WOMEN'S CRISIS

CENTER/EVACUATION CENTER

CONSTRUCTION OF WOMEN'S CRISIS

CENTER/EVACUATION CENTEREVACUATION CENTER 1 500,000.00 pipelined

VII Bohol San Isidro Cambansag 2014 Construction Of Daycare Center Construction Of Daycare Center DAY CARE CENTER 1 600,000.00 - 600,000.00 pipelined

VII Bohol San Isidro 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 900,000.00 pipelined

VII Bohol San Isidro 2015 REHABILITATION OF FAMILY AND CHILD CARE CENTER REHABILITATION OF FAMILY AND CHILD CARE CENTER 1 800,000.00 pipelined

VII Bohol San Isidro 2015 REPAIR OF SENIOR CITIZEN BUILDING REPAIR OF SENIOR CITIZEN BUILDING BUILDING FACILITY 1 950,000.00 pipelined

VII Bohol Sevilla Bayawahan 2014 Repair Of Daycare Centers Repair of Bayawahan Day Care Center DAY CARE CENTER 1 1 lot 650,000.00 2,631.58 652,631.58 09-Mar-15 07-Apr-15 completed

VII Bohol Sevilla Licolico 2014 Repair of Licolico Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 10-Mar-15 08-Apr-15 completed

VII Bohol Sevilla Lobgob 2014 Repair of Lobgob Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 06-Apr-15 ongoing

VII Bohol Sevilla Poblacion 2014 Repair of Poblacion Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Magsaysay 2014 Repair of Magsaysay Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 15-Jun-15 ongoing

VII Bohol Sevilla Calinga-an 2014 Repair of Calinga-an Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Guinob-an 2014 Reapair of Guinob-an Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 18-May -15 ongoing

VII Bohol Sevilla Cabancalan 2014 Repair of Cabancalan Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Calinginan Norte 2014 Repair of Calinginan Norte Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Cambagui 2014 Repair of Cambagui Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Ewon 2014 Repair of Ewon Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 09-May -15 ongoing

VII Bohol Sevilla Calinginan Sur 2014 Repair of Calinginan Sur Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 pipelined

VII Bohol Sevilla Lagtangan 2014 Repair of Lagtangan Day Care Center DAY CARE CENTER 1 1 lot 2,631.58 2,631.58 05-Jun-15 ongoing

VII Bohol Sevilla 2015 IMPROVEMENT OF DAY CARE CENTERS IMPROVEMENT OF DAY CARE CENTERS DAY CARE CENTER 1 600,000.00 ongoing

VII Bohol Sevilla 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER EVACUATION CENTER 1 1,140,000.00 ongoing

VII Bohol Sikatuna 2015 REPAIR AND UPGRADING OF DAY CARE CENTERS REPAIR AND UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 ongoing

VII Bohol TAGBILARAN CITY (Capital) 2015 CONSTRUCTION OF TAGBILARAN CITY PAGLAUM CENTER

(CRISIS INTERVENTION CENTER)

CONSTRUCTION OF TAGBILARAN CITY PAGLAUM CENTER

(CRISIS INTERVENTION CENTER)1 5,000,000.00 pipelined

VII Bohol Talibon San Isidro 2014Community Based-Training Center And Processing Center

With Equipment

Community Based-Training Center And Processing Center

With Equipment 1 548 sq.m. 9,000,000.00 1,588,235.29 10,588,235.29 03-Feb-15 ongoing

Page 17: List of KALAHI-CIDSS Subprojects - BUB

VII Bohol Talibon Sto. Nino 2014Improvement Of Day Care Centers: Day Care Center, Purok

6, Sto. Niño, Talibon

Improvement Of Day Care Centers: Day Care Center, Purok

6, Sto. Niño, TalibonDAY CARE CENTER 1 1 Lot 100,000.00 63,696.06 163,696.06 16-Feb-15 20-Mar-15 completed

VII Bohol Talibon San Agustin 2014Improvement Of Day Care Centers: Day Care Center, Purok

Bunso, San Agustin, Talibon

Improvement Of Day Care Centers: Day Care Center, Purok

Bunso, San Agustin, TalibonDAY CARE CENTER 1 1 Lot 200,000.00 35,924.12 235,924.12 11-Feb-15 15-Mar-15 completed

VII Bohol Talibon San Jose 2014Improvement Of Day Care Centers: Day Care Center, Sitio

Moto, San Jose, Talibon

Improvement Of Day Care Centers: Day Care Center, Sitio

Moto, San Jose, Talibon DAY CARE CENTER 1 1 Lot 200,000.00 35,924.12 235,924.12 17-Feb-15 21-Mar-15 completed

VII Bohol Talibon Bagacay & Rizal 2014 Rehabilitation of Bagacay-Rizal Road Concreting of 0.167 km Bagacay-Rizal Farm to Market Road ROAD 2 167.3 meters 500,000.00 55,555.55 555,555.55 03-Feb-15 04-Apr-15 completed

VII Bohol Talibon San Jose & San Carlos 2014 Rehabilitation of San Jose-San Carlos-Sikatuna Road Concreting of 0.3 km San Jose-San Carlos-Sikatuna Farm to

Market RoadROAD 1 300 meters 1,000,000.00 111,111.11 1,111,111.11 03-Feb-15 04-Apr-15 completed

VII Bohol Tubigon 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 1,000,000.00 ongoing

VII Bohol Tubigon 2015 REHABILITATION/ IMPROVEMENT OF TUBIGON DROP-IN

CENTER

REHABILITATION/ IMPROVEMENT OF TUBIGON DROP-IN

CENTER1 500,000.00 ongoing

VII Bohol Tubigon 2015 REHABILITATION OF TUBIGON EVACUATION CENTER REHABILITATION OF TUBIGON EVACUATION CENTER EVACUATION CENTER 1 800,000.00 ongoing

VII Bohol Tubigon 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITIES

WITH COMPLETE SET OF HYGIENE KIT

CONSTRUCTION OF GROUP HANDWASHING FACILITIES

WITH COMPLETE SET OF HYGIENE KITSANITARY FACILITY 1 680,000.00 ongoing

VII Bohol VALENCIA 2015 CONSTRUCTION OF RIVER FLOOD CONTROL

(PANANGATAN RIVER)

CONSTRUCTION OF RIVER FLOOD CONTROL

(PANANGATAN RIVER)WATER CONTROL 1 2,500,000.00 ongoing

VII Cebu Alcantara 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF DAY CARE CENTER

PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS:

CONSTRUCTION OF DAY CARE CENTERDAY CARE CENTER 1 500,000.00 ongoing

VII Cebu Alcantara 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS:

ESTABLISHMENT OF OPDA

PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS:

ESTABLISHMENT OF OPDA1 500,000.00 pipelined

VII Cebu Alcoy 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 6,000,000.00 pipelined

VII Cebu Alegria 2014 Repair And Rehabilitation Of Day Care Centers Repair And Rehabilitation Of Day Care Centers DAY CARE CENTER 1 1,500,000.00 1,500,000.00 ongoing

VII Cebu Aloguinsan 2014 Core Shelter Assistance Program For Indigent Core Shelter Assistance Program For Indigent 1 1,900,000.00 1,900,000.00 pipelined

VII Cebu Aloguinsan 2014 Day Care Centers Day Care Centers DAY CARE CENTER 1 2,850,000.00 2,850,000.00 pipelined

VII Cebu Argao 2014 Construction Of Abused Women And Children Shelter Construction Of Abused Women And Children Shelter 1 520,000.00 520,000.00 ongoing

VII Cebu Argao 2014 Construction/Repair Of Day Care Center Construction/Repair Of Day Care Center DAY CARE CENTER 1 600,000.00 600,000.00 ongoing

VII Cebu Argao 2014 Core Shelter Assistance Program (Lot Acquisition For

Housing Units To Indigent Families On Disaster Prone Areas)

Core Shelter Assistance Program (Lot Acquisition For

Housing Units To Indigent Families On Disaster Prone Areas)1 1,070,000.00 1,070,000.00 ongoing

VII Cebu Bantayan 2014 Capability Building For Day Care Workers-2 DCOS Capability Building For Day Care Workers-2 DCOS DAY CARE CENTER 1 2,550.00 2,550.00 June 2015 completed

VII Cebu Bantayan 2014 Capability Building For Day Care Workers-48 DCWS Capability Building For Day Care Workers-48 DCWS DAY CARE CENTER 1 61,200.00 61,200.00 June 2015 completed

VII Cebu Bantayan 2014 Construction Of Senior Citizen Center Construction Of Senior Citizen Center 1 1,275,000.00 1,275,000.00 ongoing

VII Cebu Boljoon 2014 Environmental Sanitation Environmental Sanitation 1 147,250.00 147,250.00 ongoing

VII Cebu Boljoon 2014 Repair Of Day Care Center Repair Of Day Care Center DAY CARE CENTER 1 380,000.00 380,000.00 ongoing

VII Cebu CITY OF CARCAR 2015 PROTECTIVE SERVICES (CONSTRUCTION OF 2 DAYCARE

CENTERS)

PROTECTIVE SERVICES (CONSTRUCTION OF 2 DAYCARE

CENTERS)DAY CARE CENTER 1 1,520,000.00 pipelined

VII Cebu CITY OF CARCAR 2015 PROTECTIVE SERVICES (REPAIR AND UPGRADING OF

DAYCARE CENTERS)

PROTECTIVE SERVICES (REPAIR AND UPGRADING OF

DAYCARE CENTERS)DAY CARE CENTER 1 2,000,000.00 pipelined

VII Cebu CEBU CITY (Capital) 2015

ESTABLISHING A STIMULATION

THERAPEUTIC/REHABILITATION FOR PWDS; SHELTERED

WORKSHOP-INTEGRATION OF PWDS LIVELIHOOD (TO

CATER CRUTCHES, CANE, WHEEL CHAIR REPAIR, AND

PHOSTETIC MAKING AND REPAIR); CAPABILITY TRAINING

AS TRAINERS FOR PWDS ASSIGNED FOR REHABILITATION

AND PRODUCTION OF NEEDED EQUIPMENTS)

ESTABLISHING A STIMULATION

THERAPEUTIC/REHABILITATION FOR PWDS; SHELTERED

WORKSHOP-INTEGRATION OF PWDS LIVELIHOOD (TO

CATER CRUTCHES, CANE, WHEEL CHAIR REPAIR, AND

PHOSTETIC MAKING AND REPAIR); CAPABILITY TRAINING

AS TRAINERS FOR PWDS ASSIGNED FOR REHABILITATION

AND PRODUCTION OF NEEDED EQUIPMENTS)

1 1,800,000.00 pipelined

VII Cebu Cordova 2015 REPAIR AND IMPROVEMENT OF SENIOR CITIZENS’

BUILDING

REPAIR AND IMPROVEMENT OF SENIOR CITIZENS’

BUILDINGBUILDING FACILITY 1 750,000.00 pipelined

VII Cebu Daanbantayan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 1,300,000.00 pipelined

VII Cebu Dalaguete 2015 REPAIR/UPGRADING OF DAY CARE CENTERS REPAIR/UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 2,000,000.00 pipelined

VII Cebu Dalaguete 2015 CONSTRUCTION OF WOMEN'S CRISIS CENTER CONSTRUCTION OF WOMEN'S CRISIS CENTER 1 1,500,000.00 pipelined

VII Cebu Danao City 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 1,500,000.00 pipelined

VII Cebu Dumanjug 2014Construction Of Day Care Centers In Kanyuko, Tangil, Looc,

Balaygtiki, Calaboon, Kabatbatan, Bullogan, Cotcoton

Construction Of Day Care Centers In Kanyuko, Tangil, Looc,

Balaygtiki, Calaboon, Kabatbatan, Bullogan, CotcotonDAY CARE CENTER 1 2,000,000.00 2,000,000.00 ongoing

VII Cebu LAPU-LAPU CITY (OPON) 2013 Economic Activities Economic Activities 1 1,250,000.00 1,250,000.00 completed

VII Cebu LAPU-LAPU CITY (OPON) 2015 4.1. CONSTRUCTION OF TWO (2) DAY CARE CENTERS AT

P650,000.00Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,300,000.00 pipelined

VII Cebu LAPU-LAPU CITY (OPON) 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

VII Cebu Madridejos 2014

Construction Of One Day Care Center & One Pwd Bldg;

Renovation Of 13 Day Care Centers; Acquisition Of Chairs &

Equipment(Educ Equipments--Tv, Computers) For Children

In 14 Brgys

Construction Of One Day Care Center DAY CARE CENTER 1 3,500,000.00 3,500,000.00 ongoing

VII Cebu Madridejos 2014 Construction Of One PWD Bldg 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Madridejos 2014 Renovation Of 1 Unit Day Care Centers DAY CARE CENTER 1 - ongoing

VII Cebu Mandaue City 2015 CRISIS CENTER FOR CHILDREN CRISIS CENTER FOR CHILDREN 1 6,000,000.00 pipelined

VII Cebu Medellin 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS 1 3,300,000.00 pipelined

VII Cebu Medellin 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 700,000.00 pipelined

VII Cebu Minglanilla 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 pipelined

VII Cebu Moalboal 2014Renovation & Expansion Of Day Care Centers And Health

Center

Renovation & Expansion Of Day Care Centers And Health

CenterDAY CARE CENTER 1 1,425,000.00 1,425,000.00 ongoing

VII Cebu Moalboal 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 1,000,000.00 pipelined

VII Cebu Naga City 2015 PROCUREMENT OF FURNITURES AND EQUIPMENTS FOR

DCCS

PROCUREMENT OF FURNITURES AND EQUIPMENTS FOR

DCCSDAY CARE CENTER 1 2,000,000.00 pipelined

VII Cebu PINAMUNGAHAN 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,445,000.00 pipelined

VII Cebu PINAMUNGAHAN 2015 REPAIR OF DAY CARE CENTER REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 680,000.00 pipelined

VII Cebu Poro 2015 REPAIR OF DAY CARE CENTER REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

VII Cebu Poro 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 600,000.00 pipelined

VII Cebu San Fernando 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 2,750,000.00 pipelined

VII Cebu San Francisco 2014 Establishment Of Crisis Intervention Unit Establishment Of Crisis Intervention Unit 1 250,000.00 250,000.00 ongoing

VII Cebu San Francisco 2015 REPAIR OF DAY CARE CENTER AND SUPEVISED

NEIGHBORHOOD PLAYGROUNDS FACILITIES

REPAIR OF DAY CARE CENTER AND SUPEVISED

NEIGHBORHOOD PLAYGROUNDS FACILITIESDAY CARE CENTER 1 1,000,000.00 pipelined

VII Cebu San Remigio 2014 Core Shelter Assistance Program Core Shelter Assistance Program 1 425,000.00 425,000.00 ongoing

VII Cebu San Remigio 2015 INFRASTRUCTURE PROJECT INFRASTRUCTURE PROJECT 1 1,500,000.00 pipelined

VII Cebu Sibonga Catap, Banlot 2014 Construction Of Day Care Centers - Catap, Banlot Construction Of Day Care Centers - Catap, Banlot DAY CARE CENTER 2 300,000.00 300,000.00 ongoing

VII Cebu Sibonga Ongca, Banlot 2014 Construction Of Day Care Centers - Ongca, Banlot Construction Of Day Care Centers - Ongca, Banlot DAY CARE CENTER 2 300,000.00 300,000.00 ongoing

VII Cebu Sibonga Simala 2014 Construction Of Day Care Centers - Simala Construction Of Day Care Centers - Simala DAY CARE CENTER 1 200,000.00 200,000.00 ongoing

VII Cebu Sibonga Upper Bagacay 2014 Construction Of Day Care Centers - Upper Bagacay Construction Of Day Care Centers - Upper Bagacay DAY CARE CENTER 1 200,000.00 200,000.00 ongoing

VII Cebu Sogod 2014 Kalahi-Cidss Project Acquisition of Pump Boat with 8HP engine 1 360,000.00 360,000.00 June 2015 completed

VII Cebu Tabuelan 2014 Provision Of Holding Center Provision Of Holding Center 1 285,000.00 285,000.00 ongoing

VII Cebu Tabuelan 2014 Provision Of Standardized Daycare Center Provision Of Standardized Daycare Center DAY CARE CENTER 1 380,000.00 380,000.00 ongoing

VII Cebu Tabuelan 2014 Provision Of Women Training Center Provision Of Women Training Center 1 475,000.00 475,000.00 ongoing

VII Cebu Talisay City 2014 Kalahi-Cidss Project Construction of Communal Toilet (Phase I) SANITARY FACILITY 1 1,440,000.00 1,440,000.00 June 2015 completed

VII Cebu Talisay City 2015 PROTECTIVE SERVICES INFRA PROJ. UPGRADING OF DAY

CARE CTRS

PROTECTIVE SERVICES INFRA PROJ. UPGRADING OF DAY

CARE CTRSDAY CARE CENTER 1 1,000,000.00 pipelined

VII Cebu Talisay City 2015 PROTECTIVE SERVICES INFRA PROJ. COMMON HAND

WASHING FACILITIES

PROTECTIVE SERVICES INFRA PROJ. COMMON HAND

WASHING FACILITIESSANITARY FACILITY 1 500,000.00 pipelined

VII Cebu Talisay City 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 2,200,000.00 pipelined

VII Cebu Tuburan 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF CICL HOLDING CENTER)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF CICL HOLDING CENTER)1 500,000.00 pipelined

VII Cebu Tudela 2015 EVACUATION CENTER EVACUATION CENTER EVACUATION CENTER 1 2,000,000.00 ongoing

VII Cebu Tudela 2015 SENIOR CITIZEN, WOMEN, PWDS AND CHILD PROTECTION

CENTER

SENIOR CITIZEN, WOMEN, PWDS AND CHILD PROTECTION

CENTER1 1,000,000.00 ongoing

VII Negros Oriental AMLAN (AYUQUITAN) 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER 1 2,000,000.00 pipelined

VII Negros Oriental Ayungon 2014 Kalahi Cidss Project (Construction of Brgy Health Station) HEALTH CENTER 1 743,922.64 743,922.64 June 2015 completed

VII Negros Oriental Ayungon 2014 Kalahi Cidss Project (Basic Social Services Project) Kalahi Cidss Project (Basic Social Services Project) 1 1,785,000.00 1,785,000.00 ongoing

VII Negros Oriental Ayungon 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTERS)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF DAY CARE CENTERS)DAY CARE CENTER 1 1,200,000.00 pipelined

VII Negros Oriental Ayungon 2015PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR/UPGRADING OF DAY CARE CENTERS)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(REPAIR/UPGRADING OF DAY CARE CENTERS)DAY CARE CENTER 1 1,080,000.00 pipelined

VII Negros Oriental CITY OF BAYAWAN (TULONG) 2015 CONST. OF DAYCARE CENTER TALAO, SAN ISIDRO CONST. OF DAYCARE CENTER TALAO, SAN ISIDRO DAY CARE CENTER 1 640,000.00 ongoing

VII Negros Oriental CITY OF BAYAWAN (TULONG) 2015 REPAIR/REHAB. OF DAYCARE LAPAY, DAWIS REPAIR/REHAB. OF DAYCARE LAPAY, DAWIS DAY CARE CENTER 1 400,000.00 ongoing

VII Negros Oriental BINDOY (PAYABON) 2015CONSTRUCTION OF DAY CARE CENTER CUM EVACUATION

CENTER

CONSTRUCTION OF DAY CARE CENTER CUM EVACUATION

CENTERDAY CARE CENTER 1 2,030,000.00 pipelined

VII Negros Oriental DUMAGUETE CITY (Capital) 2014Capacity Building For Service Providers (Nurses, Rhms,

Bhws, Etc.)

Capacity Building For Service Providers (Nurses, Rhms,

Bhws, Etc.)BUILDING FACILITY 1 750,000.00 750,000.00 pipelined

VII Negros Oriental CITY OF GUIHULNGAN 2015 CRISIS CENTER CRISIS CENTER 1 3,000,000.00 pipelined

VII Negros Oriental CITY OF GUIHULNGAN 2015 DAY CARE CENTER DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

VII Negros Oriental Jimalalud 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 1 1,000,000.00 pipelined

VII Negros Oriental La Libertad 2015 PROTECTIVE SERVICES (CONSTRUCTION OF DAY CARE

CENTER)

PROTECTIVE SERVICES (CONSTRUCTION OF DAY CARE

CENTER)DAY CARE CENTER 1 2,088,167.05 pipelined

VII Negros Oriental Mabinay Camsug-As & Himocdongon 2014 Concreting of Roads in Brgys. Camsug-As & Himocdongon Concreting of Roads in Brgys. Camsug-As & Himocdongon ROAD 2 1,700,000.00 1,700,000.00 pipelined

VII Negros Oriental Mabinay Lumbangan 2014 Concreting Roads in Brgy. Lumbangan Concreting Roads in Brgy. Lumbangan ROAD 1 1,700,000.00 1,700,000.00 ongoing

VII Negros Oriental Mabinay Cambaliwag-Campo-Aling, Mayaposi 2014 Concreting Roads in Brgys. Cambaliwag-Campo-Aling, Mayaposi Concreting Roads in Brgys. Cambaliwag-Campo-Aling, Mayaposi ROAD 4 1,700,000.00 1,700,000.00 ongoing

VII Negros Oriental Mabinay Danawan & Tara 2014 Concreting Roads in Brgys. Danawan & Tara Concreting Roads in Brgys. Danawan & Tara ROAD 1 1,700,000.00 1,700,000.00 pipelined

VII Negros Oriental Mabinay Samac 2014 Gravelling of Roads in Brgy. Samac Gravelling of Roads in Brgy. Samac ROAD 1 850,000.00 850,000.00 pipelined

VII Negros Oriental Mabinay Hagtu 2014 Gravelling of Roads in Brgy.Hagtu Gravelling of Roads in Brgy.Hagtu ROAD 1 850,000.00 850,000.00 ongoing

VII Negros Oriental Mabinay Pansalagon & Tara 2014 Gravelling of Roads in Brgys. Pansalagon & Tara Gravelling of Roads in Brgys. Pansalagon & Tara ROAD 1 850,000.00 850,000.00 pipelined

VII Negros Oriental Mabinay Lower Campanun-An 2014 Gravelling of Roads in Lower Campanun-An Gravelling of Roads in Lower Campanun-An ROAD 1 850,000.00 850,000.00 ongoing

VII Negros Oriental Mabinay 2014 Gravelling of Roads in Main Roads Gravelling of Roads in Main Roads ROAD 1 850,000.00 850,000.00 ongoing

VII Negros Oriental Mabinay Dahile 2014 Gravelling Roads in Brgy. Dahile Gravelling Roads in Brgy. Dahile ROAD 1 850,000.00 850,000.00 ongoing

VII Negros Oriental Mabinay Luyang 2014 Gravelling Roads in Brgy. Luyang Gravelling Roads in Brgy. Luyang ROAD 1 850,000.00 850,000.00 ongoing

VII Negros Oriental Manjuyod Alangilanan & Tanglad 2014 Foot Bridges - Brgys. Alangilanan & Tanglad Foot Bridges - Brgys. Alangilanan & Tanglad FOOT BRIDGE 2 850,000.00 850,000.00 ongoing

VII Negros Oriental Pamplona 2015 PROTECTIVE SERVICES -INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES -INFRASTRUCTURE PROJECTS 1 376,000.00 pipelined

VII Negros Oriental San Jose Cansawas 2014 Construction Of Day Care Center - Brgy. Cansawas Construction Of Day Care Center - Brgy. Cansawas DAY CARE CENTER 1 500,000.00 500,000.00 ongoing

VII Negros Oriental San Jose 2014Procurement Of Materials And Equipment For Day Care

Centers - 14 Brgys.

Procurement Of Materials And Equipment For Day Care

Centers - 14 Brgys.DAY CARE CENTER 1 200,000.00 200,000.00 ongoing

VII Negros Oriental San Jose 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

VII Negros Oriental San Jose 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 ongoing

VII Negros Oriental Santa Catalina 2014 Concreting Of 250 Linear Meter road Concreting Of 250 Linear Meter road ROAD 1 1,102,500.00 1,102,500.00 ongoing

VII Negros Oriental Santa Catalina Poblacion 2014Establishment Of Terminal For Habal-Habal And Tricycle -

Brgy. Poblacion

Establishment Of Terminal For Habal-Habal And Tricycle -

Brgy. Poblacion1 297,500.00 297,500.00 ongoing

VII Negros Oriental Santa Catalina 2015 CONSTRUCTION OF DCC CONSTRUCTION OF DCC DAY CARE CENTER 1 750,000.00 pipelined

VII Negros Oriental Siaton 2013 Lump sump Living Allowance for Day Care Centers Lump sump Living Allowance for Day Care Centers DAY CARE CENTER 1 744,000.00 744,000.00 completed

VII Negros Oriental VALENCIA (LUZURRIAGA) 2015 CONSTRUCTION OF 4 DAY CARE CENTERS CONSTRUCTION OF 4 DAY CARE CENTERS DAY CARE CENTER 1 2,000,000.00 pipelined

VII Negros Oriental VALLEHERMOSO 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS 1 506,000.00 proposed

VII Siquijor Larena 2015 Construction of 2 units Day Care Centers Construction of 2 units Day Care Centers DAY CARE CENTER 1 1,700,000.00 pipelined

VII Siquijor Larena 2015 Repair/upgrading of 2 units Day Care Centers Repair/upgrading of 2 units Day Care Centers DAY CARE CENTER 1 500,000.00 pipelined

VII Siquijor Lazi 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

CONSTRUCTION OF BAHAYPAG-ASA FOR CICL)

PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS (

CONSTRUCTION OF BAHAYPAG-ASA FOR CICL)1 1,000,000.00 pipelined

VII Siquijor Maria 2014 Repair And Rehabilitation Of Day Care Center Repair And Rehabilitation Of Day Care Center DAY CARE CENTER 1 570,000.00 570,000.00 ongoing

VII Siquijor San Juan 2015 REPAIR OF DAY CARE CENTERS REPAIR OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 pipelined

VII Siquijor SIQUIJOR (Capital) 2014 Road project Road project ROAD 1 1,800,000.00 1,800,000.00 ongoing

VII Siquijor SIQUIJOR (Capital) 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

VIII Biliran Biliran Bato, Canila, Julita, Pinangomhan 2014 Rehabilitation of Day care Centers Rehabilitation of Day Care Center DAY CARE CENTER 3 723,750.00 - - ongoing

VIII Biliran Naval Imelda - Lico 2014 Imelda-Lico Road project Construction of Farm to Market Road ROAD 1 km. 1,012,749.97 - 1,012,749.97 Sept-15 ongoing

VIII Biliran Naval Talustusan 2014 Talustusan Road project Construction of Farm to Market Road ROAD 1 km. 1,260,000.00 - 1,260,000.00 Óct-15 ongoing

VIII Eastern Samar Balangiga Barangay 6 2014 Renovation of Seawall with Deflector Renovation of Seawall with Deflector - Brgy 6 SEAWALL 1 46.25 ln.m. 3,000,000.00 - 3,000,000.00 pipelined

VIII Eastern Samar Balangkayan Brgy. 02 2015 CONSTRUCTION OF EVACUATION CENTER Construction of Evacuation Center EVACUATION CENTER 1 1,000,000.00 1,000,000.00 pipelined

VIII Eastern Samar Balangkayan Brgy. 02 2015 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS CENTER Construction of Women and Children Protection Unit Center 1 1,000,000.00 1,000,000.00 pipelined

VIII Eastern Samar Balangkayan Brgy. 05 2015 CONSTRUCTION OF SENIOR CITIZENS SERVICES CENTER Construction of Senior Citizens Center 1 1,000,000.00 1,000,000.00 pipelined

VIII Eastern Samar BoronganBaras, Hebacong, Amantacop, Tabunan, San

Pablo, San Mateo, San Andres, Balacdas2015 CONSTRUCTION AND REHABILITATION OF DAY CARE

CENTERSConstruction of Day Care Center DAY CARE CENTER 8 384 5,920,000.00 5,920,000.00 pipelined

VIII Eastern Samar Can-avid Solong 2014 Concreting of road (Brgy. Solong). Concreting of 0.398 KM Farm to Market Road ROAD 1 0.398 km. 1,322,000.00 146,888.89 1,468,888.89 Óct-15 ongoing

VIII Eastern Samar GENERAL MACARTHUR San Isidro 2014 Flood Control Construction of 132 LM River Flood Control WATER CONTROL 1 132 ln.m. 5,000,000.00 - 5,000,000.00 Óct-15 ongoing

VIII Eastern Samar Giporlos 02 Poblacion, Biga 2015 CHILDREN PROTECTION PROGRAM

A. CONSTRUCTION OF DAY CARE CENTERConstruction of Day Care Center DAY CARE CENTER 2 1,800,000.00 - pipelined

VIII Eastern Samar Hernani Canciledes 2015 CONSTRUCTION OF ONE UNIT COMMUNITY LEARNING CENTER Construction of Day Care Center DAY CARE CENTER 1 1,500,000.00 1,500,000.00 pipelined

VIII Eastern Samar LAWAAN Barangay 1 2014 Construction of Drainage System Construction of Drainage System - Brgy 1 DRAINAGE SYSTEM 1 ln.m. 3,000,000.00 3,000,000.00 Aug-15 ongoing

VIII Eastern Samar Maslog Brgy. Taytay 2015 EVACUATION CENTER Construction of Evacuation Center EVACUATION CENTER 1 1,120,000.00 1,120,000.00 pipelined

VIII Eastern Samar Maydolong Canloterio 2015 CONSTRUCTION OF DAY CARE CENTER AT BARANGAY

CANLOTERIO

CONSTRUCTION OF DAY CARE CENTER AT BARANGAY

CANLOTERIODAY CARE CENTER 1 500,000.00 500,000.00 ongoing

VIII Eastern Samar Oras Oras 2014 Abbatoir Construction Abbatoir Construction - Brgy. Oras 1 sq.m. 2,500,000.00 131,578.95 2,631,578.95 Óct-15 ongoing

VIII Eastern Samar SAN JULIAN Pob 6 2015 CONSTRUCTION OF 2UNITS DAY-CARE CENTERS Construction of Day Care Center DAY CARE CENTER 1 1,359,800.00 679,900.00 ongoing

VIII Eastern Samar San Julian Lunang 2015 Construction of Day Care Center DAY CARE CENTER 1 679,900.00 ongoing

VIII Eastern Samar San Julian Pob 3 2015 CRISIS CENTER CONSTRUCTION Construction of Evacuation Center EVACUATION CENTER 1 1,000,000.00 1,000,000.00 pipelined

VIII Eastern Samar Sulat San Francisco 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER EVACUATION CENTER 1 7,500,000.00 7,500,000.00 pipelined

VIII Eastern Samar Taft Brgy. Binaloan 2014 CONSTRUCTION OF DAY CARE CENTER Construction Of One(1) Day Care Center - Brgy. Binaloan DAY CARE CENTER 1 48 sq.m. 3,200,000.00 42,105.00 842,105.00 Jul-2015 ongoing

VIII Eastern Samar Taft Brgy. Mantang 2014 Construction Of One(1) Day Care Center - Brgy. Mantang DAY CARE CENTER 1 48 sq.m. 42,105.00 842,105.00 Jul-2015 ongoing

VIII Eastern Samar Taft Brgy. Lomatod 2014 Construction Of One(1) Day Care Center - Brgy. Lomatod DAY CARE CENTER 1 48 sq.m. 42,105.00 842,105.00 Jul-2015 ongoing

VIII Eastern Samar Taft Brgy. Gayam 2014 Construction Of One(1) Day Care Center - Brgy. Gayam DAY CARE CENTER 1 48 sq.m. 42,105.00 842,105.00 pipelined

VIII Eastern Samar Taft Barangay 6 2014Construction Of Training Center For Capability Program For 4Ps Beneficiaries, Health Service Providers, Day Care Workers, Disaster PreparednessConstruction Of Training Center For Capability Program For

4Ps Beneficiaries, Health Service Providers, Day Care

Workers, Disaster Preparedness - Brgy. 6

DAY CARE CENTER 1 sq.m. 1,000,000.00 50,000.00 1,050,000.00 pipelined

VIII Eastern Samar Taft Dacul 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelined

VIII Leyte Alangalang Hubang 2014 Construction of Sanitary Toilets for Brgy. Hubang Construction of Sanitary Toilets for Brgy. Hubang SANITARY FACILITY 1 48 sq.m. 300,000.00 - 300,000.00 ongoing

VIII Leyte Albuera Mahayag 2015 CONSTRUCTION OF ONE (1) UNIT ECCD CENTER/DAY CARE CENTERCONSTRUCTION OF ONE (1) UNIT ECCD CENTER/DAY CARE

CENTERDAY CARE CENTER 1 680,000.00 680,000.00 pipelined

VIII Leyte Babatngon Dist. 1 2015 CONSTRUCTION OF BABATNGON YOUTH/WOMEN’S

CRISIS CENTER

CONSTRUCTION OF BABATNGON YOUTH/WOMEN’S

CRISIS CENTER1 750,000.00 750,000.00 pipelined

VIII Leyte Barugo Ibag 2015 ESTABLISHMENT OF DAY CARE CENTERS (DSWD) ESTABLISHMENT OF DAY CARE CENTERS (DSWD) DAY CARE CENTER 1 1,750,000.00 875,000.00 ongoing

VIII Leyte Barugo Tutug-an 2015 ESTABLISHMENT OF DAY CARE CENTERS (DSWD) DAY CARE CENTER 1 875,000.00 ongoing

VIII Leyte Bato Imelda 2014 Brgy.Buli-Brgy Imelda road project Brgy.Buli-Brgy Imelda road project ROAD 1 0.07 km. 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Buli 2014 Brgy. Buli - Sitio Talisayan road project Brgy. Buli - Sitio Talisayan road project ROAD 1 0.1 km, 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Liberty 2014 Brgy Liberty - Sitio Kabatyok road project Brgy Liberty - Sitio Kabatyok road project ROAD 1 0.185 km. 900,000.00 100,000.00 1,000,000.00 ongoing

VIII Leyte Bato San Agustin 2014 Brgy. Amagos- Brgy. San Agustin road project Brgy. Amagos- Brgy. San Agustin road project ROAD 1 0.2 km. 900,000.00 100,000.00 1,000,000.00 ongoing

VIII Leyte Bato Marcelo 2014 Brgy. Alegria Jct.- Brgy. Marcelo road project Brgy. Alegria Jct.- Brgy. Marcelo road project ROAD 1 48 sq.m. 900,000.00 100,000.00 1,000,000.00 ongoing

VIII Leyte Bato Amagos 2014 Brgy. Alegria- Brgy. Amagos road project Brgy. Alegria- Brgy. Amagos road project ROAD 1 0.22 km. 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Plaridel 2014 Brgy. Plaridel - Sitio Kabatyok road project Brgy. Plaridel - Sitio Kabatyok road project ROAD 1 0.22 km. 900,000.00 100,000.00 1,000,000.00 ongoing

VIII Leyte Bato Osmena 2014 Brgy. Osmena - Sitio Tugawehan road project Brgy. Osmena - Sitio Tugawehan road project ROAD 1 0.075 km. 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Himamaa 2014 Brgy. Himamaa- Sitio Biasong road project Brgy. Himamaa- Sitio Biasong road project ROAD 1 0.1 km. 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Bago 2014 Brgy. Bago- Sitio Kapudlusan road project Brgy. Bago- Sitio Kapudlusan road project ROAD 1 0.1 km. 900,000.00 100,000.00 1,000,000.00 ongoing

VIII Leyte Bato Ponong 2014 Brgy. Ponong- Sitio Canlambong road project Brgy. Ponong- Sitio Canlambong road project ROAD 1 0.2 km. 450,000.00 50,000.00 500,000.00 ongoing

VIII Leyte Bato Inigihan 2014 Flood Control Project Flood Control Project (Brgy. Inigihan) WATER CONTROL 1 ln.m. 1,000,000.00 52,631.58 1,052,631.58 ongoing

VIII Leyte Dagami Poponton to Bontay 2014 Implementation of KALAHI-CIDDS Construction of Access Trail from Brgy Poponton to Bontay TRAIL WAY 1 48 sq.m. 2,500,000.00 - 2,500,000.00 pipelined

VIII Leyte Hilongos Baliw 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 500,000.00 ongoing

VIII Leyte Hindang Doos del Sur 2015 CONSTRUCTION OF 1 UNIT BRGY. DAYCARE CENTER Construction of 1 unit Brgy. Day Care Center DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

VIII Leyte Isabel San Francisco 2015 REPAIR OF DAYCARE CENTERS REPAIR OF DAYCARE CENTERS DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

Page 18: List of KALAHI-CIDSS Subprojects - BUB

VIII Leyte JAVIER (BUGHO) Inayupan 2015 DAY CARE CENTER CONSTRUCTION IN BRGY. INAYUPAN DAY CARE CENTER CONSTRUCTION IN BRGY. INAYUPAN DAY CARE CENTER 1 700,000.00 700,000.00 pipelined

VIII Leyte JAVIER (BUGHO) Odiong 2015 DAY CARE CENTER CONSTRUCTION IN BRGY. ODIONG DAY CARE CENTER CONSTRUCTION IN BRGY. ODIONG DAY CARE CENTER 1 700,000.00 700,000.00 pipelined

VIII Leyte Julita Cuya-e 2015 SMALL BRIDGE (CUYA-E) SMALL BRIDGE (CUYA-E) BRIDGE 1 4,500,000.00 4,500,000.00 pipelined

VIII Leyte Kananga San Isidro to Kawayan 2014 Concreting of Barangay San Isidro-Kawayan road Concreting of Barangay San Isidro-Kawayan road ROAD 1 km, 1,223,600.76 135,955.64 1,359,556.40 pipelined

VIII Leyte Kananga Libongao 2014 Const.of Day Care Center,Libongao Const.of Day Care Center,Libongao DAY CARE CENTER 1 48 sq.m. 542,830.64 95,793.64 638,624.28 pipelined

VIII Leyte Kananga Poblacion 2014 Rechannel and Const. of flood control, Poblacion Rechannel and Const. of flood control, Poblacion WATER CONTROL 1 ln.m. 2,422,500.00 427,500.00 2,850,000.00 pipelined

VIII Leyte La Paz Sta. Ana 2014 Expansion of LAPWAS (La Paz Water System) Expansion of LAPWAS (La Paz Water System) WATER SYSTEM 1 ln.m. 2,846,500.00 - 2,846,500.00 pipelined

VIII Leyte Leyte Belen 2014 Rehabilitation of Palid 1 to palid II road Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. 1,800,000.00 - 880,000.00 ongoing

VIII Leyte Leyte Palid I 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 880,000.00 pipelined

VIII Leyte Leyte Consuegra 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 40,000.00 ongoing

VIII Leyte Leyte Poblacion 2014 Establishment of Women and children's Center Establishment of Women and children's Center 1 48 sq.m. 1,752,500.00 - 1,752,500.00 pipelined

VIII Leyte Mahaplag Palanogan 2014 Concreting of Paril Road Concreting of Palanogan Road ROAD 1 0.207 km. 1,000,000.00 - 1,000,000.00 ongoing

VIII Leyte MATAG-OB Masaba 2014 Concreting of Masaba RoadConcreting of 0.114km Road Section Along Brgy. Masaba

FMRROAD 1 0.114 ln.m. 700,000.00 - 700,000.00 ongoing

VIII Leyte Pastrana Patong, Guindapunan, Dist II, Dist. IV 2015REPAIR/UPGRADING OF DAY CARE CENTERS (BRGYS. OF

CANCARAJA, PATONG, GUINDAPUNAN, DIST II AND DIST

IV

REPAIR/UPGRADING OF DAY CARE CENTERS (BRGYS. OF

CANCARAJA, PATONG, GUINDAPUNAN, DIST II AND DIST

IV

DAY CARE CENTER 4 1,000,000.00 1,000,000.00 pipelined

VIII Leyte San Isidro Crossing 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER EVACUATION CENTER 1 1,600,000.00 1,600,000.00 pipelined

VIII Leyte San Isidro Crossing 2015 CONSTRUCTION OF WOMEN CENTER CONSTRUCTION OF WOMEN CENTER 1 800,000.00 800,000.00 pipelined

VIII Leyte San Miguel Poblacion 2015 CONSTRUCTION OF EVACUATION CENTER &

PROCUREMENT OF EVACUATION EQUIPMENT

CONSTRUCTION OF EVACUATION CENTER &

PROCUREMENT OF EVACUATION EQUIPMENTEVACUATION CENTER 1 2,500,000.00 2,500,000.00 pipelined

VIII Leyte Santa Fe Poblacion 2015CONSTRUCTION OF PROTECTIVE CENTER FOR VICTIMS OF

DOMESTIC VIOLENCE, CALAMITIES, ETC. IN NEED OF

COUNSELLING, STRESS DEBRIEFING,AND OTHERS

CONSTRUCTION OF PROTECTIVE CENTER FOR VICTIMS OF

DOMESTIC VIOLENCE, CALAMITIES, ETC. IN NEED OF

COUNSELLING, STRESS DEBRIEFING,AND OTHERS

BUILDING FACILITY 1 2,000,000.00 2,000,000.00 pipelined

VIII Leyte Tabango Poblacion 2015 CONSTRUCTION OF WOMEN CRISIS CENTER FOR

TABANGO, LEYTE

CONSTRUCTION OF WOMEN CRISIS CENTER FOR

TABANGO, LEYTE1 2,000,000.00 2,000,000.00 pipelined

VIII Leyte TabangoButason 1, Butason II, Campokpok, Catmon, Gibacungan, Inangatan, Manlawaan, Omaganhan, Poblacion, Tabing, Tugas, Sta. Rosa2015 UPGRADING OF THE 13 DAY CARE CENTERS IN TABANGO,

LEYTE

UPGRADING OF THE 13 DAY CARE CENTERS IN TABANGO,

LEYTEDAY CARE CENTER 12 1,500,000.00 1,500,000.00 pipelined

VIII Leyte TABONTABON Dist. II Rizal, Pob. 2015 CONSTRUCTION OF 200 L.M SOIL EROSION PROTECTION

(GABION)

CONSTRUCTION OF 200 L.M SOIL EROSION PROTECTION

(GABION)3 4,000,000.00 4,000,000.00 pipelined

VIII Leyte TABONTABON Dist. III Bonifacion, Pob. 2015 CONSTRUCTION OF 150 L.M SOIL EROSION PROTECTION

(GABION)

CONSTRUCTION OF 150 L.M SOIL EROSION PROTECTION

(GABION)3 4,000,000.00 4,000,000.00 pipelined

VIII Leyte TABONTABON Dist. II Rizal, Pob. 2015 CONSTRUCTION OF CRISES CENTER/CUM EVACUATION

CENTER

CONSTRUCTION OF CRISES CENTER/CUM EVACUATION

CENTEREVACUATION CENTER 3 3,000,000.00 3,000,000.00 pipelined

VIII Leyte Tanauan Ada 2014 Concreting of 0.300 km. Brgy. Ada road Concreting of 0.300 km. Brgy. Ada road ROAD 1 0.3 km. 1,084,641.30 - 1,084,641.30 ongoing

VIII Leyte Tanauan Calsadahay 2014 Road project in Calsadahay Road project in Calsadahay ROAD 1 0.235 km. 929,838.33 - 929,838.33 ongoing

VIII Leyte Tanauan Atipolo 2014 Road project in Sitio Naliwatan, Brgy. Atipolo Road project in Sitio Naliwatan, Brgy. Atipolo ROAD 1 km. 929,838.33 - 929,838.33 ongoing

VIII Leyte Tanauan Cabarasan Guti 2014 Road project in Cabarasan Guti Road project in Cabarasan Guti ROAD 1 0.235 km. 929,838.33 - 929,838.33 ongoing

VIII Leyte Tanauan San Isidro 2014 Road project in San Isidro Road project in San Isidro ROAD 1 48 sq.m. 1,284,132.60 - 1,284,132.60 ongoing

VIII Leyte Tanauan Canramos 2014 Road project in Sitio Canmoco, Canramos to Brgy. Sto. Nino ROAD 1 km 1,657,500.00 1,657,500.00 ongoing

VIII Leyte Tanauan Municipal Wide 2015 UPGRADE OF DAY CARE CENTERS UPGRADE OF DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 - 500,000.00 pipelined

VIII Leyte Tolosa Telegrafo, San Roque, Cantariwis 2015 MINI GROCERY MINI GROCERY 3 500,000.00 500,000.00 pipelined

VIII Leyte Tolosa Quilao & Burak 2015 EXPANSION OF POTABLE WATER SUPPLY EXPANSION OF POTABLE WATER SUPPLY WATER SYSTEM 1 600,000.00 600,000.00 pipelined

VIII Leyte Tolosa Poblacion 2015 REHABILITATION OF DAY CENTER FOR SENIOR CITIZENS REHABILITATION OF DAY CENTER FOR SENIOR CITIZENS 1 500,000.00 500,000.00 pipelined

VIII Leyte Tunga Poblacion 2015 CONSTRUCTION OF MUNICIPAL EVACUATION CENTER CONSTRUCTION OF MUNICIPAL EVACUATION CENTER EVACUATION CENTER 1 5,350,000.00 5,350,000.00 pipelined

VIII Leyte Tunga Poblacion 2015 UPGRADING OF DAY CARE CENTERS (INCLUDES

HANDWASHING FACILITY)

UPGRADING OF DAY CARE CENTERS (INCLUDES

HANDWASHING FACILITY)DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

VIII Leyte Tanauan Canramos 2014 Road project in Sitio Canmoco, Canramos to Brgy. Sto. Nino Road project in Sitio Canmoco, Canramos to Brgy. Sto. Nino ROAD 1 km. 1,657,500.00 - 1,657,500.00 ongoing

VIII Northern Samar Biri Poblacion 2014 Construction Of Training And Learning Center Construction Of Training And Learning Center 1 48 sq.m. 500,000.00 26,315.79 526,315.79 ongoing

VIII Northern Samar Lope de Vega Upper Caynaga 2014 Construction of 2 day care Center with Complete facilities Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. 1,400,000.00 36,842.10 736,842.10 ongoing

VIII Northern Samar Lope de Vega Poblacion, Purok 8 2014 Construction of Day Care Center DAY CARE CENTER 2 48 sq.m. 36,842.10 736,842.10 ongoing

VIII Northern Samar Lope de Vega Brgy Cag-aguingay 2014Construction of Concrete Pathwalk with RCBC and RCPC (2.56

KM)

Construction of Concrete Pathwalk with RCBC and RCPC (2.56

KM) Brgy Cag-aguingay)PATHWAY 1 2.56 km. 3,500,000.00 184,210.52 3,684,210.52 ongoing

VIII Northern Samar Lope de Vega Upper Caynaga 2014Construction of Concrete Pathwalk with steps and RCPC

(1.65 KM)

Construction of Concrete Pathwalk with steps and RCPC

(1.65 KM) Upper CaynagaPATHWAY 1 1.65 km. 2,500,000.00 131,578.95 2,631,578.95 ongoing

VIII Northern Samar Mondragon San Jose 2014 day care center construction day care center construction - Brgy. san jose DAY CARE CENTER 1 920,000.00 162,352.94 799,041.94 ongoing

VIII Northern Samar Mondragon Eco 2014 day care center construction - Brgy. Eco DAY CARE CENTER 1 283,311.00 pipelined

VIII Northern Samar Palapag Sangay 2014 Consruction of Day Care Centers Consruction of Day Care Centers - Brgy. Sagnay DAY CARE CENTER 1 48 sq.m. 2,250,000.00 132,353.00 882,353.00 ongoing

VIII Northern Samar Palapag Mapno 2014 Consruction of Day Care Centers - Brgy. Mapno DAY CARE CENTER 1 48 sq.m. 132,353.00 882,353.00 ongoing

VIII Northern Samar Palapag Campedico 2014 Consruction of Day Care Centers - Brgy. Campedico DAY CARE CENTER 1 48 sq.m. 132,353.00 882,353.00 ongoing

VIII Northern Samar Palapag Laniwan 2014 Establishment of Physical Fitness Facility for Senior Citizens Establishment of Physical Fitness Facility for Senior Citizens 1 100,000.00 17,647.05 117,647.05 ongoing

VIII NORTHERN SAMAR VICTORIA 19 DCC, 16 Brgys 2015PURCHASE OF INSTRUCTIONAL MATERIALS & FURNITURES/FACILITIES FOR DAY CARE CENTERSPurchase of Instructional Materials & Furnitures for Day

Care CenterDAY CARE CENTER 2 500,000.00 500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Basey Basiao 2013 Estabishment of day-care centers Estabishment of day-care centers 1 1,000,000.00 - 1,000,000.00 March 2015 completed

VIII SAMAR (WESTERN SAMAR) Basey Mercado 2014 Senior Citizen'S Center Senior Citizen'S Center 1 750,000.00 - 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Basey Brgy. San Antonio 2015 CONSTRUCTION OF BARANGAY DAY CARE CENTER Construction of Day Care Center DAY CARE CENTER 1 1,000,000.00 1,000,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Calbayog City City Wide 2015 ENHANCEMENT OF WOMAN AND CHILD FRIENDLY FACILITY ENHANCEMENT OF WOMAN AND CHILD FRIENDLY

FACILITY1 1,000,000.00 1,000,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Calbayog City Agikikan 2015 BAHAY PAG-ASA FOR CICL Establishment of Bahay PAG-ASA 1 1,500,000.00 1,500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) CITY OF CATBALOGAN (Capital) PNP Compound 2015 ESTABLISHMENT OF BAHAY PAG-ASA ESTABLISHMENT OF BAHAY PAG-ASA 1 3,084,790.00 3,084,790.00 pipelined

VIII SAMAR (WESTERN SAMAR) Gandara Samoyao 2014 Concreting of Samoyao-Jazmines road Concreting of Samoyao-Jazmines road ROAD 1 km. 1,700,000.00 1,700,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Gandara Burabud 2014 Concreting of Burabod II-Arong road Concreting of Burabod II-Arong road ROAD 1 km. 1,700,000.00 1,700,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Gandara Sto. Niño 2014 Concreting of Sto. Niňo-Sidmon road Concreting of Sto, Niňo-Sidmon road ROAD 1 km. 1,157,487.50 1,157,487.50 pipelined

VIII SAMAR (WESTERN SAMAR) Gandara 14 de Agosto 2014 Concreting of 14 de Agosto to Calirocan road Concreting of 14 de Agosto to Calirocan road ROAD 1 km. 1,700,000.00 1,700,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Marabut Malobago 2014 Construction of Day Care Center Construction of Day Care Center - Brgy. Malobago DAY CARE CENTER 1 48 sq.m. 7,000,000.00 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Caluwayan 2014 Construction of Day Care Center - Brgy. Caluwayan DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Canyoyo 2014 Construction of Day Care Center - Brgy. Canyoyo DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut San Roque 2014 Construction of Day Care Center - Brgy. San Roque DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Rono 2014 Construction of Day Care Center - Brgy. Rono DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Amambucale 2014 Construction of Day Care Center - Brgy. Amambucale DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Ferreras 2014 Construction of Day Care Center - Brgy. Ferreras DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Logero 2014 Construction of Day Care Center - Brgy. Logero DAY CARE CENTER 1 48 sq.m. 875,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) Marabut Sto. Niño 2015WOMEN AND CHILDREN PROTECTION CENTER FOR

VICTIMS AND ABUSE AND

WOMEN AND CHILDREN PROTECTION CENTER FOR

VICTIMS AND ABUSE AND1 500,000.00 500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Matuguinao Maduruto 2014 Concreting of Brgy. Maduruto to Brgy. Bag-otan road Concreting of Brgy. Maduruto to Brgy. Bag-otan road ROAD 1 km. 170,000.00 8,947.37 178,947.37 pipelined

VIII SAMAR (WESTERN SAMAR) Matuguinao Bagotan 2014 Concreting of Brgy. Bag-otan to Brgy. Sta. Cruz road Concreting of Brgy. Bag-otan to Brgy. Sta. Cruz road ROAD 1 km. 1,750,000.00 92,105.26 1,842,105.26 pipelined

VIII SAMAR (WESTERN SAMAR) Matuguinao Maduruto 2015 REHABILITATION OF 2 DAY CARE CENTERS Rehabilitation of Day care Center DAY CARE CENTER 1 1,000,000.00 500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Matuguinao Mabuligon 2015 Rehabilitation of Day care Center DAY CARE CENTER 1 500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Motiong Poblacion 1 A 2015 CONSTRUCTION OF WOMEN CRISIS CENTER / WOMEN

TRAINING CENTER

CONSTRUCTION OF WOMEN CRISIS CENTER / WOMEN

TRAINING CENTER1 800,000.00 800,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Motiong Oyandic 2015 CONSTRUCTION OF OYANDIC DAY CARE CENTER CONSTRUCTION OF OYANDIC DAY CARE CENTER DAY CARE CENTER 1 750,000.00 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Motiong Calapi 2015 CONSTRUCTION OF CALAPI DAY CARE CENTER CONSTRUCTION OF CALAPI DAY CARE CENTER DAY CARE CENTER 1 750,000.00 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Pagsanghan Viejo 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,200,000.00 600,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Pagsanghan Cambaye 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 600,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) Pinabacdao Poblacion 2014 Resettlement on Housing Project Low Cost Housing & Core

Shelter Project

Resettlement on Housing Project Low Cost Housing & Core

Shelter Project1 24 sq.m. 2,653,350.00 70,998.00 2,724,348.00 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Poblacion 2014 Establishment of Child Protection Facilities Establishment of Child Protection Facilities 1 sq.m. 1,980,000.00 104,210.53 2,084,210.53 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge San Juan 2014Additional Daycare Centers for brgys. Mombon, Blanca

Aurora, San Juan and La PazConstruction of Day Care Center - Brgy. San Juan (800,000) DAY CARE CENTER 1 48 sq.m. 3,200,000.00 42,105.26 842,105.26 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Mombon 2014 Construction of Day Care Center - Brgy. Mombon (800,000) DAY CARE CENTER 1 48 sq.m. 42,105.26 842,105.26 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Lapaz 2014 Construction of Day Care Center - Brgy. La Paz (800,000) DAY CARE CENTER 1 48 sq.m. 42,105.26 842,105.26 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Blanca Aurora 2014Construction of Day Care Center - Brgy. Blanca Aurora

(800,000)DAY CARE CENTER 1 42,105.26 842,105.26 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Sapinit 2015 DAY CARE CENTER DAY CARE CENTER DAY CARE CENTER 1 2,350,000.00 587,500.00 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Aurora 2015 DAY CARE CENTER DAY CARE CENTER 1 587,500.00 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Bulao 2015 DAY CARE CENTER DAY CARE CENTER 1 587,500.00 pipelined

VIII SAMAR (WESTERN SAMAR) San Jorge Poblacion 1 2015 DAY CARE CENTER DAY CARE CENTER 1 587,500.00 pipelined

VIII SAMAR (WESTERN SAMAR) SAN JOSE DE BUAN Poblacion 1 2014 River Flood Control River Flood Control - Poblacion I WATER CONTROL 1 ln.m. 2,000,000.00 105,263.16 2,105,263.16 ongoing

VIII SAMAR (WESTERN SAMAR) SAN JOSE DE BUAN Poblacion 1 2014 Drainage System Drainage System - Poblacion I DRAINAGE SYSTEM 1 ln.m. 1,000,000.00 52,631.58 1,052,631.58 ongoing

VIII SAMAR (WESTERN SAMAR) SANTA RITA Tagacay 2014 Construction of Brgy. Tagacay wharf. Construction of Brgy. Tagacay wharf. 1 ln.m. 400,000.00 80,000.00 480,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) SANTA RITA 2015 SUSTAINABLE LIVELIHOOD PROGRAM SUSTAINABLE LIVELIHOOD PROGRAM 1 1,500,000.00 1,500,000.00 turned over to SLP

VIII SAMAR (WESTERN SAMAR) SANTO NIÑO (FAIRE) Sitio Mactang 2015 REPAIR OF DAY CARE CENTER REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 500,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) TARANGNAN Baras 2014 Concreting of road Concreting of road ROAD 1 km. 1,000,000.00 166,033.11 1,166,033.11 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Lamingao 2014 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. 3,562,500.00 - 712,500.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Canmucat 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 712,500.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Ulayan 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 712,500.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Nagcaduha 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 712,500.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Mahayag 2014 Construction of Day Care Center DAY CARE CENTER 1 48 sq.m. - 712,500.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL Miramar 2014 Construction of Senior Citizen's Center Construction of Senior Citizen's Center 1 sq.m. 959,000.00 - 959,000.00 ongoing

VIII SAMAR (WESTERN SAMAR) VILLAREAL San Andres 2015 DAY CARE CENTER DAY CARE CENTER DAY CARE CENTER 1 1,500,000.00 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) VILLAREAL Lam-awan 2015 DAY CARE CENTER DAY CARE CENTER 1 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) ZUMARRAGA San Isidro 2015 CONSTRUCTION OF DAYCARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,500,000.00 750,000.00 pipelined

VIII SAMAR (WESTERN SAMAR) ZUMARRAGA Bontay 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 pipelined

VIII Southern Leyte Liloan Himay-angan 2014 Construction of Day Care Center (Himay-angan) Construction of Day Care Center (Himay-angan) DAY CARE CENTER 1 48 sq.m. 800,000.00 92,420.00 892,420.00 ongoing

VIII Southern Leyte Malitbog Sto. Niño 2014 Const'N/Imrovement Of Day Care Center Construction of Day Care Center - Brgy. Sto. Nino DAY CARE CENTER 1 48 sq.m. 1,178,000.00 589,000.00 dropped

VIII Southern Leyte Malitbog Canbato 2014 Rehabilitation of Day Care Center - Brgy. Canbato DAY CARE CENTER 1 48 sq.m. 589,000.00 dropped

IX Zamboanga del Norte BACUNGAN (Leon T. Postigo) Titik 2013Construction of Person With Disability (PWD) and Senior

Citizen’s Center

Construction of Person With Disability (PWD) and Senior

Citizen’s Center1 600,000.00 120,647.00 720,647.00 March 2015 completed

IX Zamboanga del Norte BACUNGAN (Leon T. Postigo) Poblacion 2013 IMPROVEMENT OF 44 DAYCARE CENTER Improvement of 44 Day Care Center DAY CARE CENTER 1 300,000.00 79,491.00 379,491.00 completed

IX Zamboanga del Norte Baliguian Diangas 2014 Concrete Paving in Diangas Concrete Paving in Diangas 1 900,000.00 143,300.00 1,043,300.00 ongoing

IX Zamboanga del Norte Baliguian Guimotan 2014 Concrete Paving in Guimotan Concrete Paving in Guimotan 1 945,000.00 151,875.00 1,096,875.00 ongoing

IX Zamboanga del Norte Baliguian Malinao 2014 Concrete Paving of road/Box Culvert - Malinao Concrete Paving of road/Box Culvert - Malinao ROAD 1 900,000.00 144,650.00 1,044,650.00 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Dancing Lady, Gulayon 2015 REHAB OF 50 DCC Repair of 1-Unit Day Care Center DAY CARE CENTER 2 2,000,000.00 - ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Parpagayo 4, Gulayon 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Bauno, Gulayon 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Balabag, Gulayon 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Villa Sta. Rosa, Turno 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Bougainvilla, Turno 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Santan, Turno, 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok 1, Lugdungan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Pamansalan, Diwan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Virginia, Diwan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Cayasan, Diwan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Guinsangaan, Diwan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Pina, Sangkol 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Proper, Sangkol 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Proper, San Jose 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Cogon 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Bayanihan, Lower Dicayas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Upper Dicayas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Relocation Site Upper Dicayas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Madasigon, Sicayab 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Buli, Minaog 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Cacao, Minaog 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Sto. Nino Village, Minaog 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Purok Bayanihan Sinaman 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) OFISCO, Olingan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Relocation, Olingan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Proper Olingan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Laoy, Olingan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Everlasting, Olingan 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Proper Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Lower Banicap, Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Tubod, Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) South Curvada II, Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Lubing-Ogis,Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) South Curvada, Galas 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Punta 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Evergreen, Sta. Filomena 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Bougainvilla, Sta. Filomena 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Mauswagon, Sta. Isabel 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Bless, Sta. Isabel 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Little Green Village, Sta. Isabel 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Fishermen’s Village Surf, Miputak 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Sunrise,Barra 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Sampaguita, Barra 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Katipunan St. Miputak 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital)Bougainvilla Magsaysay St.Purok Malipayon,

Miputak2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 5 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Governor’s Village, Estaka 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Looc, Estaka 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Calibo St. Biasong 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte DIPOLOG CITY (Capital) Garcia St. Central Barangay 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 ongoing

IX Zamboanga del Norte Godod Poblacion - Baluno 2014 CENTRAL BARANGAYConcreting Of Fmr 350lm road (Poblacion Baluno Road

Section)ROAD 1 1,500,000.00 150,000.00 1,650,000.00 ongoing

IX Zamboanga del Norte Godod Miampac - Banuangan 2014 1. Garcia St. Central Barangay,D.C.Concreting Of Fmr 230lm road ( Miampac- Banuangan Road

Section)ROAD 1 1,000,000.00 100,000.00 1,100,000.00 ongoing

IX Zamboanga del Norte Godod Raba - Sioron 2014 Concreting Of Fmr 200lm road ( Raba-Sioron Road Section) Concreting Of Fmr 200lm road ( Raba-Sioron Road Section) ROAD 1 1,000,000.00 100,000.00 1,100,000.00 ongoing

IX Zamboanga del Norte Godod Sarawagan - Guisapong - Rambon - Dipopor 2014Concreting Of Fmr 300lm road ( Sarawagan- Guisapong-

Rambon-Dipopor)

Concreting Of Fmr 300lm road ( Sarawagan- Guisapong-

Rambon-Dipopor)ROAD 1 1,500,000.00 150,000.00 1,650,000.00 ongoing

IX Zamboanga del Norte Gutalac Poblacion 2013 Drop in/Crisis Intervention Center Construction of Drop in/Crisis Intervention Unit 1 950,000.00 312,186.33 1,262,186.33 completed

IX Zamboanga del Norte KALAWIT Sitio Lower Pianon, Kalawit 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 2 800,000.00 - pipelined

IX Zamboanga del Norte Katipunan Dr. Jose Rizal 2013 Construction of Day Care Center (Brgy. Dr. Jose Rizal) Construction of Day Care Center DAY CARE CENTER 1 800,000.00 800,000.00 completed

IX Zamboanga del Norte Katipunan Miatan 2014 Concreting of road in Barangay Miatan Concreting of road in Barangay Miatan ROAD 1 1,710,000.00 190,000.00 1,900,000.00 ongoing

IX Zamboanga del Norte Katipunan Tuburan 2014 Road project in Barangay Tuburan Road project in Barangay Tuburan ROAD 1 720,000.00 80,000.00 800,000.00 ongoing

IX Zamboanga del Norte Katipunan Dr. Jose Rizal 2014 Road project in Brgy. Dr. Jose Rizal Road project in Brgy. Dr. Jose Rizal ROAD 1 1,080,000.00 120,000.00 1,200,000.00 ongoing

IX Zamboanga del Norte Mutia Pasorio -Newland 2014 Rehabilitation of FMR 1.5km road in Pasorio - Newland Rehabilitation of FMR 1.5km road in Pasorio - Newland ROAD 1 1,000,000.00 373,904.00 1,373,904.00 ongoing

IX Zamboanga del Norte PIÑAN (NEW PIÑAN) Purok 3, Barangay South 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 2 800,000.00 - pipelined

IX Zamboanga del Norte Polanco Villahermosa 2014 Construction Of Multi Food Processing Center Construction Of Multi Food Processing Center 1 1,466,250.00 1,466,250.00 ongoing

IX Zamboanga del Norte Polanco Poblacion 2014 Slp/Establishment Of Display Center Slp/Establishment Of Display Center 1 293,250.00 65,377.00 358,627.00 ongoing

IX Zamboanga del Norte Polanco San Miguel 2015PROTECTIVE SERVICES-INFRA PROJECTS(CONSTRUCTION

OF DAY CARE CENTERConstruction of 1-Unit Day Care Center DAY CARE CENTER 1 1,600,000.00 - pipelined

IX Zamboanga del Norte Polanco Purok Rose, Anastacio 2015PROTECTIVE SERVICES-INFRA PROJECTS(REPAIR AND

UPGRADING OF DAY CARE CENTERS)Repair of 1-Unit Day Care Center DAY CARE CENTER 2 500,000.00 - pipelined

IX Zamboanga del Norte Polanco Sitio Maralag, Guinles 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 pipelined

IX Zamboanga del Norte Polanco Sto.Nino 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Salug Dipolod - Binoni 2014 Rehabilitation of 4.8km road in Dipolod - Binoni Rehabilitation of 4.8km road in Dipolod - Binoni ROAD 1 1,500,000.00 186,555.00 1,686,555.00 ongoing

IX Zamboanga del Norte Salug Fatima - Tapalan 2014 Rehabilitation of 7.2km road in Fatima - Tapalan Rehabilitation of 7.2km road in Fatima - Tapalan ROAD 2 1,500,000.00 182,031.00 1,682,031.00 ongoing

IX Zamboanga del Norte Salug Lipacan 2013 Covered Court Construction of Covered Court 1 1,280,000.00 600,776.00 1,880,776.00 completed

IX Zamboanga del Norte Salug Ramon Magsaysay 2013 Day Care Center Construction of Day Care Center DAY CARE CENTER 1 480,000.00 220,000.00 700,000.00 completed

IX Zamboanga del Norte Salug Lipakan 2014 Construction Of Training Center - Brgy. Lipakan Construction Of Training Center - Brgy. Lipakan 1 2,500,000.00 904,365.00 2,904,365.00 ongoing

IX Zamboanga del Norte Salug Poblacion East 2014 Construction of Women Center 1 118,000.00 618,000.00 June 2015 completed

IX Zamboanga del Norte Siayan Poblacion 2013Provision of Audio visual teaching materials for Day Care

Service

Provision of Audio visual teaching materials for Day Care

ServiceDAY CARE CENTER 1 100,000.00 - completed

IX Zamboanga del Norte Siayan 2013 Day Care Centers Construction of Day Care Center DAY CARE CENTER 1 954,000.00 32,000.00 986,000.00 completed

IX Zamboanga del Norte Siayan 2013 Early childhood care and development for Day Care Workers Early childhood care and development for Day Care Workers DAY CARE CENTER 1 100,000.00 - completed

IX Zamboanga del Norte Siayan Poblacion 2013 Construction of Women Center Construction of Women Center - Poblacion Proper 1 500,000.00 - completed

Page 19: List of KALAHI-CIDSS Subprojects - BUB

IX Zamboanga del Norte Siayan Balunokan 2014Construction Of Hanging Footbridge (80Lm) - New Mapang,

Brgy. Balunokan

Construction Of Hanging Footbridge (80Lm) - New Mapang,

Brgy. BalunokanFOOT BRIDGE 1 1,700,000.00 318,688.00 2,018,688.00 ongoing

IX Zamboanga del Norte Siayan Sitio Basak, Domogok 2015 CONSTRUCTION OF DAYCARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 2 3,000,000.00 - pipelined

IX Zamboanga del Norte Siayan Sitio Lupot, Poblacion 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 2 pipelined

IX Zamboanga del Norte Siayan Sitio Pase, Moyo 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 2 pipelined

IX Zamboanga del Norte Siayan Sitio Matunog, Poblacion 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 2 pipelined

IX Zamboanga del Norte Sibuco Poblacion 2015CONSTRUCTION OF ALTERNATIVE LEARNING STUDY

CENTERConstruction of Alternative Learning Study Center 1 450,000.00 - pipelined

IX Zamboanga del Norte Sibuco Logdeck Extension, Barangay Sto Nino 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 3 800,000.00 - pipelined

IX Zamboanga del Norte Sibuco Sitio Gaddung, Kamarangan 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 2 800,000.00 - pipelined

IX Zamboanga del Norte Sindangan Poblacion 2014 Construction Of Drop In Center - Poblacion Construction Of Drop In Center - Poblacion 1 1,612,450.00 406,550.00 2,019,000.00 ongoing

IX Zamboanga del Norte Sindangan Calatunan 2015 CONSTRUCTION OF DCC (Calatunan) Construction of 1-Unit Day Care Center DAY CARE CENTER 1 900,000.00 - ongoing

IX Zamboanga del Norte Sindangan Upper Nipaan 2015 CONSTRUCTION OF DCC (Upper Nipaan) Construction of 1-Unit Day Care Center DAY CARE CENTER 1 900,000.00 - pipelined

IX Zamboanga del Norte Sindangan Sitio Dalaroa, R.G. Macias 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 2 pipelined

IX Zamboanga del Norte Sindangan Balok 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Sindangan Lagag 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Sindangan Tigbao 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Sindangan Lower Inuman and etc 2015 Repair of 1-Unit Day Care Center DAY CARE CENTER 1 1,800,000.00 - ongoing

IX Zamboanga del Norte Siocon Poblacion 2014 DSWD Multi Purpose Center - Poblacion DSWD Multi Purpose Center - Poblacion 1 1,275,000.00 256,090.00 1,531,090.00 ongoing

IX Zamboanga del Norte Sirawai Piyakan 2013 Delivery of Basic Social Programs & Projects: Daycare Center Health Station with Amenities / women Center Piyakan HEALTH CENTER 1 500,000.00 185,623.00 1,185,623.00 March 2015 completed

IX Zamboanga del Norte Sirawai Sirawai Proper 2013Delivery of Basic Social Programs & Projects: Womens

Center

Delivery of Basic Social Programs & Projects: Womens

Center1 500,000.00 500,000.00 March 2015 completed

IX Zamboanga del Norte Sirawai Saint Mary 2015PROTECTIVE SERVICE CAPABILITY INFRASTRUCTURE

PROJECTConstruction of 1-Unit Day Care Center DAY CARE CENTER 1 2,400,000.00 - pipelined

IX Zamboanga del Norte Sirawai Lubok 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Sirawai Danganon 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga del Norte Tampilisan Tininggan 2014 Construction Of Day Care Center - Brgy. Tininggan Construction Of Day Care Center - Brgy. Tininggan DAY CARE CENTER 1 475,000.00 282,588.00 757,588.00 June 2015 completed

IX Zamboanga del Norte Tampilisan Galingon 2014 Construction Of Day Care Center - Brgy. Galingon Construction Of Day Care Center - Brgy. Galingon DAY CARE CENTER 1 475,000.00 273,298.00 748,298.00 June 2015 completed

IX Zamboanga del Norte Tampilisan Poblacion 2015 CONSTRUCTION OF DAYCARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 - ongoing

IX Zamboanga del Norte Tampilisan Sandayong 2015 CONSTRUCRION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 - ongoing

IX Zamboanga Del Sur Aurora Balas 2015CONSTRUCTION OF DAYCARE CENTER AT BRGY.

KAUSWAGANConstruction of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 - ongoing

IX Zamboanga Del Sur Aurora 2015CONSTRUCTION OF DAYCARE CENTER AT BRGY.

KAUSWAGAN

CONSTRUCTION OF DAYCARE CENTER AT BRGY.

KAUSWAGANDAY CARE CENTER 1 850,000.00 - ongoing

IX Zamboanga Del Sur Dinas Pisaan 2013 Const of Day Care Center (Pisaan) Const of Day Care Center (Pisaan) DAY CARE CENTER 1 696,000.00 19,315.00 715,735.00 March 2015 completed

IX Zamboanga del Sur Dinas Legardatres 2014 Road Improvement With 200 Sec. Concreting, Legardatres Road Improvement With 200 Sec. Concreting, Legardatres ROAD 1 900,000.00 112,380.00 1,012,380.00 ongoing

IX Zamboanga del Sur Dinas Poblacion 2015ESTABLISHMENT OF SHELTER FOR CINSP/ABUSED

WOMENEstablishment of Shelter for CINSP/Abused Women 1 540,000.00 - ongoing

IX Zamboanga del Sur Dinas Upper Dimaya 2015 CONSTRUCTION OF DAY CARE CENTER Construction of 1-Unit Day Care Center DAY CARE CENTER 1 760,000.00 - ongoing

IX Zamboanga del Sur Kumalarang Bogayo 2014 Concreting Of road - Bogayo Concreting Of road - Bogayo ROAD 1 1,620,000.00 170,993.02 1,790,993.02 ongoing

IX Zamboanga del Sur Kumalarang Picanan 2014 Concreting Of road - Picanan Concreting Of road - Picanan ROAD 1 630,000.00 81,274.52 711,274.52 ongoing

IX Zamboanga del Sur Labangan Lower Sang-an 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 - ongoing

IX Zamboanga del Sur Labangan Cogonan 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 800,000.00 - ongoing

IX Zamboanga del Sur Lapuyan Tarpog 2014 Rehabilitation of road - Tarpog Rehabilitation of road - Tarpog ROAD 1 1,965,972.82 218,441.42 2,184,414.24 ongoing

IX Zamboanga del Sur Lapuyan Canal 2014 Rehabilitation of road - tininghalan Construction of Canal 1 276,325.14 56,674.00 332,999.14 ongoing

IX Zamboanga Del Sur Midsalip Dakayakan 2013 Day Care Center (Dakayakan) Day Care Center (Dakayakan) DAY CARE CENTER 1 663,000.00 135,060.04 798,060.04 completed

IX Zamboanga Del Sur Midsalip Sigapod 2013 Day Care Center (Sigapod) Day Care Center (Sigapod) DAY CARE CENTER 1 661,000.00 105,919.00 766,919.00 completed

IX Zamboanga del Sur Pitogo Panubigan 2014 Construction Of 6 Units Day Care Center Construction Of 1- Unit Day Care Center - Brgy Panubigan DAY CARE CENTER 1 4,800,000.00 95,388.50 895,388.50 June 2015 completed

IX Zamboanga del Sur Pitogo Poblacion 2014 Construction Of 1- Unit Day Care Center - Brgy Poblacion DAY CARE CENTER 1 95,388.50 895,388.50 June 2015 completed

IX Zamboanga del Sur Pitogo Lower Panikian 2014Construction Of 1- Unit Day Care Center - Brgy Lower

panikianDAY CARE CENTER 1 95,388.50 895,388.50 June 2015 completed

IX Zamboanga del Sur Pitogo Upper Panikian 2014Construction Of 1- Unit Day Care Center - Brgy Upper

PanikianDAY CARE CENTER 1 95,388.50 895,388.50 June 2015 completed

IX Zamboanga del Sur Pitogo Plecha 2014 Construction Of 1- Unit Day Care Center - Brgy Plecha DAY CARE CENTER 1 95,388.50 895,388.50 June 2015 completed

IX Zamboanga del Sur Pitogo Tungao 2014 Construction Of 1- Unit Day Care Center - Brgy Tungao DAY CARE CENTER 1 95,991.50 895,991.50 June 2015 completed

IX Zamboanga Del Sur San Pablo Kalilangan 2013 Construction of DAY CARE Center Construction of DAY CARE Center (Kalilangan -725,000.00) DAY CARE CENTER 1 1,450,000.00 151,933.99 876,933.99 completed

IX Zamboanga Del Sur San Pablo Sacbulan 2013 Construction of DAY CARE Center (Sacbulan -725,000.00) DAY CARE CENTER 1 151,582.17 876,582.17 completed

IX Zamboanga Del Sur San Pablo Songgoy 2015CONSTRUCTION OF MULTI PURPOSE PAVEMENT (MPP)

WITH CONCRETE BENCH

Construction of Multi-Purpose Pavement (MPP) with

concrete bench1 550,000.00 - ongoing

IX Zamboanga Del Sur San Pablo Lumbayao 2015CONSTRUCTION OF MULTI PURPOSE PAVEMENT (MPP)

WITH CONCRETE BENCH

Construction of Multi-Purpose Pavement (MPP) with

concrete bench1 500,000.00 - ongoing

IX Zamboanga Del Sur Tabina Poblacion 2013 Construction of One unit Day Care Center BuildingConstruction of One unit Day Care Center Building -

PoblacionDAY CARE CENTER 1 720,000.00 45,946.00 765,946.00 completed

IX Zamboanga del Sur Tabina Doña Josefina 2014 Concreting Of FMR (Dona Josefina) Concreting Of FMR (Dona Josefina) 1 1,350,000.00 150,000.00 1,500,000.00 ongoing

IX Zamboanga del Sur Tabina Tambulin 2014 Concreting Of FMR (Purok Tambulin) Concreting Of FMR (Purok Tambulin) 1 1,800,000.00 200,000.00 2,000,000.00 ongoing

IX Zamboanga del Sur Tabina Mabuhay 2014 Concreting Of FMR (Mabuhay) Concreting Of FMR (Mabuhay) 1 1,205,000.00 133,888.89 1,338,888.89 ongoing

IX Zamboanga Del Sur Tukuran Man-ilan 2013 Construction of 1 unit-4 classroom school building Construction of 1 unit-4 classroom school building SCHOOL BUILDING 1 2,400,000.00 - completed

IX Zamboanga del Sur Tukuran Man-ilan 2014 600m concrete road project in Man-Ilan 600m concrete road project in Man-Ilan ROAD 1 1,688,005.58 86,350.00 1,770,820.32 ongoing

IX Zamboanga del Sur Zamboanga City 2014 KALAHI-CIDSS Basic Social Services KALAHI-CIDSS Basic Social Services 1 3,360,000.00 3,360,000.00 ongoing

IX Zamboanga Sibugay Alicia Naga-Naga 2013Construction of Day Care Center with facilities and Learning

Materials

Construction of Day Care Center with facilities and Learning

MaterialsDAY CARE CENTER 1 700,000.00 - completed

IX Zamboanga Sibugay Buug Purok1 Barangay Poblacion 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,600,000.00 - pipelined

IX Zamboanga Sibugay Buug Purok1 Barangay Manlin 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 pipelined

IX Zamboanga Sibugay IPIL (Capital) Labe 2014 Concreting of 1.75km road in Brgy Domandan Concreting of 1.75km road in Brgy Domandan ROAD 1 1,800,000.00 288,497.00 2,088,497.00 ongoing

IX Zamboanga del Norte CITY OF ISABELA (Capital) 2015 CONSTRUCTION OF WOMEN CRISIS CENTER Construction of 1-Unit Women Crisis Center 1 933,445.71 - pipelined

IX Zamboanga Sibugay Mabuhay Abunda 2013 Construction of Day Care Building - Brgy Abunda Construction of Day Care Building - Brgy Abunda (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Bagong Silang 2013 Construction of Day Care Building - Brgy Bagong SilangConstruction of Day Care Building - Brgy Bagong Silang

(930,000)DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Bangkaw-bangkaw 2013 Construction of Day Care Building - Brgy Bangkaw2xConstruction of Day Care Building - Brgy Bangkaw2x

(930,000)DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Caliran 2013 Construction of Day Care Building - Brgy Caliran Construction of Day Care Building - Brgy Caliran (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Catipan 2013 Construction of Day Care Building - Brgy Catipan Construction of Day Care Building - Brgy Catipan (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Looc Barlac 2013 Construction of Day Care Building - Brgy Looc BarlacConstruction of Day Care Building - Brgy Looc Barlac

(930,000)DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Malinao 2013 Construction of Day Care Building - Brgy Malinao Construction of Day Care Building - Brgy Malinao (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Pamansaan 2013 Construction of Day Care Building - Brgy PamansaanConstruction of Day Care Building - Brgy Pamansaan

(930,000)DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Sawa 2013 Construction of Day Care Building - Brgy Sawa Construction of Day Care Building - Brgy Sawa (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Sioton 2013 Construction of Day Care Building - Brgy Sioton Construction of Day Care Building - Brgy Sioton (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Sto. Niño 2013 Construction of Day Care Building - Brgy Sto. Niño Construction of Day Care Building - Brgy Sto. Niño (930,000) DAY CARE CENTER 1 1,100,000.00 60,670.00 991,439.23 completed

IX Zamboanga Sibugay Mabuhay Bangkaw-bangkaw 2014 Construction of .75km access road to Boat landing facility Construction of .75km access road to Boat landing facility ROAD 1 600,000.00 50,000.00 650,000.00 June 2015 completed

IX Zamboanga Sibugay Mabuhay Sawa 2014 Construction of 1.2km road in Sawa to sitio bakwood Construction of 1.2km road in Sawa to sitio bakwood ROAD 1 800,000.00 26,418.00 826,418.00 June 2015 completed

IX Zamboanga Sibugay Mabuhay Catipan 2014 Rehabilitation of 2.2km road in Dungcaan-Capitan brgy Rehabilitation of 2.2km road in Dungcaan-Capitan brgy ROAD 1 1,210,000.00 45,096.00 1,245,096.00 June 2015 completed

IX Zamboanga Sibugay Malangas Palalian 2013 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 600,000.00 116,641.00 716,641.00 completed

IX Zamboanga Sibugay Malangas San Jose 2014 Construction of 1.5km road in Plalian-San Jose Construction of 1.5km road in Plalian-San Jose ROAD 1 1,020,000.00 113,333.33 1,133,333.33 ongoing

IX Zamboanga Sibugay Malangas Overland 2014 Road upgrading Road upgrading ROAD 1 805,000.00 89,444.44 894,444.44 ongoing

IX Zamboanga Sibugay Malangas Rebocon 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 - ongoing

IX Zamboanga Sibugay Malangas Lipacan 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 750,000.00 - ongoing

IX Zamboanga Sibugay Naga Sulo 2013 Construction of Day Care Center Construction of Day Care Center DAY CARE CENTER 1 620,000.00 205,304.00 825,304.00 completed

IX Zamboanga Sibugay Naga Marsolo 2014 Construction Of Day Care Center - Sitio Pisaan, Marsolo Construction Of Day Care Center - Sitio Pisaan, Marsolo DAY CARE CENTER 1 637,500.00 177,026.00 814,526.00 June 2015 completed

IX Zamboanga Sibugay Naga Mamagon 2014 Construction Of Day Care Center - Mamagon Construction Of Day Care Center - Mamagon DAY CARE CENTER 1 637,500.00 169,990.00 807,490.00 June 2015 completed

IX Zamboanga Sibugay Naga Bangkaw-bangkaw 2014 Rehabilitation of 2.5km road in Bankaw-Bankaw Multi-purpose anf Rehab Women Training Center 1 1,800,000.00 350,796.00 2,150,796.00 ongoing

IX Zamboanga Sibugay Naga Aguinaldo 2014 Rehabilitation fo 400m road in Aguinaldo Barangay Rehabilitation fo 400m road in Aguinaldo Barangay ROAD 1 360,000.00 89,568.00 449,568.00 June 2015 completed

IX Zamboanga Sibugay Naga Lower Sulitan 2014 Rehabilitation of 1.5km road in Lower Sulitan Rehabilitation of 1.5km road in Lower Sulitan ROAD 1 1,350,000.00 217,545.00 1,567,545.00 ongoing

IX Zamboanga Sibugay ROSELLER LIM Siawang 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 1,368,000.00 - ongoing

IX Zamboanga Sibugay ROSELLER LIM Palmera 2015 Construction of 1-Unit Day Care Center DAY CARE CENTER 1 TBD

IX Zamboanga Sibugay ROSELLER LIM Municipal Ground, Katipunan 2015CONSTRUCTION OF WOMEN CRISIS CENTER WITH

DESIGNATED ROOMS FOR EACH CASES OF WOMEN AND

GIRL-CHILDREN ABUSES

Construction of Women Crisis Center with degnated room for

each cases of women and girl-children abuses3 684,000.00 - ongoing

IX Zamboanga Sibugay Tungawan Linguisan 2013 6mx8m floor area/increase of no. of pupils(3-4 yrs old) Construction of Day Care Center DAY CARE CENTER 1 4,000,000.00 38,193.00 1,038,193.00 completed

IX Zamboanga Sibugay Tungawan Tigbucay 2013 Construction of Day Care Center DAY CARE CENTER 1 30,450.00 1,030,450.00 completed

IX Zamboanga Sibugay Tungawan Taglibas 2013 Construction of Day Care Center DAY CARE CENTER 1 30,450.00 1,030,450.00 completed

IX Zamboanga Sibugay Tungawan San Vicente 2013 Construction of Day Care Center DAY CARE CENTER 1 50,161.00 1,050,161.00 completed

IX Zamboanga Sibugay Tungawan Lower Tungawan 2015 CONSTRUCTION OF DCC Construction of 1-Unit Day Care Center DAY CARE CENTER 1 850,000.00 ongoing

X Bukidnon Baungon 2015ESTABLISHMENT OF OFFICE OF PERSON W/ DISABILITY

AFFAIRS

ESTABLISHMENT OF OFFICE OF PERSON W/ DISABILITY

AFFAIRS1 500,000.00 pipelined

X BUKIDNON CABANGLASAN 2015 REPAIR & UPGRADING OF 2 UNITS DCCS REPAIR & UPGRADING OF 2 UNITS DCCS DAY CARE CENTER 1 600,000.00 pipelined

X BUKIDNON CABANGLASAN 2015PLAYING DEVICES & FACILITIES FOR DCCS: MONKEY BAR,

SEESAW, SWING, SLIDE (5 UNITS @ P100,000/UNIT)

PLAYING DEVICES & FACILITIES FOR DCCS: MONKEY BAR,

SEESAW, SWING, SLIDE (5 UNITS @ P100,000/UNIT)DAY CARE CENTER 1 500,000.00 pipelined

X BUKIDNON CABANGLASAN 2015 PROVISION OF DEVICES FOR PWD PROVISION OF DEVICES FOR PWD 1 420,000.00 pipelined

X Bukidnon Kalilangan 2013Improvement of Children and Women Crisis Intervention

Center

Improvement of Children and Women Crisis Intervention

Center1 300,000.00 completed

X Bukidnon Kalilangan Pamotolon 2014 DCC Improvement/ Program Materials Rehabilitation of Day Care Center DAY CARE CENTER 1 48 meter2 1,275,000.00 ongoing

X Bukidnon Kalilangan Ninoy Aquino 2014 Construction of Day Care Center DAY CARE CENTER 1 48 meter2 ongoing

X Bukidnon Kalilangan Kibaning 2014 Rehabilitation of Day Care Center DAY CARE CENTER 1 48 meter2 ongoing

X Bukidnon Kalilangan 2015 INFRASTRUCTURE PROJECT INFRASTRUCTURE PROJECT 1 500,000.00 pipelined

X Bukidnon Kibawe Old Kibawe 2014 Construction of Daycare Center Construction of Daycare Center - Kibawe DAY CARE CENTER 1 48 meter2 301,402.00 ongoing

X Bukidnon Kibawe 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Bukidnon Kitaotao 2013 Construction of Children and Women Center Construction of Children and Women Center 1 400,000.00 completed

X Bukidnon Kitaotao Kauyunan 2014Installation of Playground devices & other Recreational

facilities for children

Installation of Playground devices & other Recreational

facilities for children - Kauyunan1 300,000.00 pipelined

X Bukidnon Kitaotao Sto. Rosario 2014Installation of Playground devices & other Recreational

facilities for children - Sto. Rosario1 pipelined

X Bukidnon Kitaotao Kalumihan 2014Installation of Playground devices & other Recreational

facilities for children - Kalumihan1 pipelined

X Bukidnon Kitaotao 2015 KC-NCDDP PROJECT KC-NCDDP PROJECT 1 1,000,000.00 pipelined

X Bukidnon Kitaotao 2015 KC-NCDDP PROJECT KC-NCDDP PROJECT 1 1,000,000.00 pipelined

X Bukidnon Lantapan 2015 REPAIR/UPGRADING OF DAY CARE CENTER REPAIR/UPGRADING OF DAY CARE CENTER DAY CARE CENTER 1 2,400,000.00 pipelined

X Bukidnon Lantapan 2015 CONST. OF GROUP HANDWASHING FACILITIES IN DCC CONST. OF GROUP HANDWASHING FACILITIES IN DCC DAY CARE CENTER 1 1,080,000.00 pipelined

X Bukidnon Libona Palabucan 2014 Repair and Rehab. Of Day Care Centers Repair and Rehabilitation of Day Care Center DAY CARE CENTER 1 48 meter2 150,000.00 June 2015 completed

X Bukidnon Libona Poblacion 2014Improvement/Rehab. Of Multipurpose Building for Children,

youth, Women, SCs, PWDs Shelter

Construction of Multipurpose Building for Children, youth,

Women, SCs, PWDs ShelterBUILDING FACILITY 1 54 meter2 834,000.00 June 2015 completed

X Bukidnon Libona 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

X Bukidnon Libona 2015CONSTRUCTION OF WOMEN CRISIS CENTER (W/

DESIGNATED ROOMS FOR EACH CASES OF WOMEN &

GIRL-CHILD ABUSES)

CONSTRUCTION OF WOMEN CRISIS CENTER (W/

DESIGNATED ROOMS FOR EACH CASES OF WOMEN &

GIRL-CHILD ABUSES)

1 900,000.00 pipelined

X Bukidnon CITY OF MALAYBALAY (Capital) 2015COMMON SERVICE FACILITIES- PURCHASE OF PRODUCT

PROCESSING FACILITIES

COMMON SERVICE FACILITIES- PURCHASE OF PRODUCT

PROCESSING FACILITIES1 500,000.00 pipelined

X Bukidnon CITY OF MALAYBALAY (Capital) 2015COMMON SERVICE FACILITIES- EQUIPMENT & FACILITIES

FOR AVRC

COMMON SERVICE FACILITIES- EQUIPMENT & FACILITIES

FOR AVRC1 500,000.00 pipelined

X Bukidnon CITY OF MALAYBALAY (Capital) 2015 HANDWASHING FACILITIES FOR DAY CARE CENTER HANDWASHING FACILITIES FOR DAY CARE CENTER DAY CARE CENTER 1 600,000.00 pipelined

X Bukidnon Malitbog 2013 Establishment of Day Care Centers Establishment of Day Care Centers DAY CARE CENTER 1 500,000.00 completed

X Bukidnon Malitbog 2015 CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Bukidnon Malitbog 2015 CONSTRUCTION OF ONE UNIT HOME FOR OLDER PERSONS CONSTRUCTION OF ONE UNIT HOME FOR OLDER PERSONS 1 2,300,000.00 pipelined

X Bukidnon Malitbog 2015 REPAIR/UPGRADING OF TWO (2) UNIT DAY CARE CENTERS REPAIR/UPGRADING OF TWO (2) UNIT DAY CARE CENTERS DAY CARE CENTER 1 600,000.00 pipelined

X Bukidnon Maramag 2015KAPIT-BISIG LABAN SA KAHIRAPAN- COMPREHENSIVE &

INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-NCDDP)

PROJECT

KAPIT-BISIG LABAN SA KAHIRAPAN- COMPREHENSIVE &

INTEGRATED DELIVERY OF SOCIAL SERVICES (KC-NCDDP)

PROJECT

1 700,000.00 pipelined

X Bukidnon Pangantucan Bacusanon 2014 Construction Of Day Care Center Pud-ong, Bacusanon Construction Of Day Care Center Pud-ong, Bacusanon DAY CARE CENTER 1 48 meter2 595,000.00 ongoing

X Bukidnon Pangantucan Kimanait 2014 Construction of Day Care Center Brgy. Kimanait Construction of Day Care Center Brgy. Kimanait DAY CARE CENTER 1 48 meter2 467,500.00 ongoing

X Bukidnon Pangantucan Kipaducan 2014 Construction Of Day Care Center Brgy. Kipaducan Construction Of Day Care Center Brgy. Kipaducan DAY CARE CENTER 1 48 meter2 467,500.00 ongoing

X Bukidnon Pangantucan Payad 2014 Construction Of Day Care Center Brgy. Payad Construction Of Day Care Center Brgy. Payad DAY CARE CENTER 1 48 meter2 467,500.00 ongoing

X Bukidnon Pangantucan Bangahan 2014 Construction of Daycare Center Bangahan Construction of Daycare Center Bangahan DAY CARE CENTER 1 48 meter2 467,500.00 ongoing

X Bukidnon Pangantucan Pigtauranan 2014 Construction of Daycare Center Pigtauranan Construction of Daycare Center Pigtauranan DAY CARE CENTER 1 48 meter2 467,500.00 ongoing

X Bukidnon Pangantucan 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 1,950,000.00 pipelined

X Bukidnon Quezon 2015 PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES- INFRASTRUCTURE PROJECTS 1 450,000.00 pipelined

X Bukidnon San Fernando Halapitan 2014 construction of senior citizen center construction of senior citizen center 1 150,025.00 ongoing

X Bukidnon San Fernando 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 501,000.00 pipelined

X Bukidnon San Fernando 2015CONSTRUCTION OF GROUP HAND WASHING FACILITY OF

DAY CARE CENTER (W/ COMPLETE SET OF SOAP &

TOOTHPASTE IN 23 DCC)

CONSTRUCTION OF GROUP HAND WASHING FACILITY OF

DAY CARE CENTER (W/ COMPLETE SET OF SOAP &

TOOTHPASTE IN 23 DCC)

DAY CARE CENTER 1 690,000.00 pipelined

X Bukidnon Sumilao Kisolon 2014 Improvement of Day Care Centers Rehabilitation of Day Care Center - Purok 1, Brgy. Kisolon DAY CARE CENTER 1 270,000.00 ongoing

X Bukidnon Sumilao Puntian 2014Rehabilitation of Day Care Center - Sitio Nangka, Brgy.

PuntianDAY CARE CENTER 1 ongoing

X Bukidnon Sumilao 2015 CONSTRUCTION OF CRISIS CENTER CONSTRUCTION OF CRISIS CENTER 1 2,500,000.00 pipelined

X Bukidnon Talakag 2015 CONST OF WOMENS CRISIS CENTER CONST OF WOMENS CRISIS CENTER 1 722,500.00 pipelined

X Bukidnon Talakag 2015 CONST. OF DCC CONST. OF DCC DAY CARE CENTER 1 1,660,000.00 pipelined

X Bukidnon Talakag 2015 REHAB OF DCC REHAB OF DCC DAY CARE CENTER 1 1,500,000.00 pipelined

X Bukidnon Talakag 2015 BIGASAN NG BRGY BIGASAN NG BRGY 1 500,000.00 pipelined

X Bukidnon Talakag 2015 BIGASAN NG BAYAN BIGASAN NG BAYAN 1 500,000.00 pipelined

X Bukidnon Talakag 2015 BIGASAN OUTLET BIGASAN OUTLET 1 500,000.00 pipelined

X Bukidnon CITY OF VALENCIA 2015 CONSTRUCTION OF CRISIS INTERVENTION CENTER CONSTRUCTION OF CRISIS INTERVENTION CENTER 1 3,550,000.00 pipelined

X Bukidnon CITY OF VALENCIA 2015 REPAIR & UPGRADING OF DAY CARE CENTERS REPAIR & UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 900,000.00 pipelined

X Camiguin Catarman 2015 REPAIR OF DAY CARE CENTERS PROJECT REPAIR OF DAY CARE CENTERS PROJECT DAY CARE CENTER 1 1,800,000.00 pipelined

X Camiguin Catarman 2015ESTABLISHMENT OF OFFICE OF PERSONS WITH

DISABILITIES PROJECT

ESTABLISHMENT OF OFFICE OF PERSONS WITH

DISABILITIES PROJECT1 1,000,000.00 pipelined

X Camiguin Guinsiliban 2015RENOVATION OF 9 DAY CARE CENTERS WITH SCHOOL

EQUIPMENTS AMENITIES AND LEARNING MATERIALS

RENOVATION OF 9 DAY CARE CENTERS WITH SCHOOL

EQUIPMENTS AMENITIES AND LEARNING MATERIALSDAY CARE CENTER 1 2,100,000.00 pipelined

X Camiguin Mahinog 2013 Acquisition of Lot for Housing Projects Acquisition of Lot for Housing Projects 1 1,000,000.00 completed

X Camiguin Mahinog Puntod 2014Construction of Day Care Center in Brgys Pontod and San

MiguelConstruction of Day Care Center - Brgy. Puntod DAY CARE CENTER 1 48 meter2 380,000.00 ongoing

X Camiguin MAMBAJAO (Capital) 2015 REHABILITATION OF DAY CARE CENTERS REHABILITATION OF DAY CARE CENTERS DAY CARE CENTER 1 1,625,000.00 pipelined

X Camiguin Sagay 2015PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS:

COGON, POBLACION DAY CARE CENTER

PROTECTIVE SERVICES-INFRASTRUCTURE PROJECTS:

COGON, POBLACION DAY CARE CENTERDAY CARE CENTER 1 500,000.00 pipelined

X Lanao del Norte Bacolod 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER EVACUATION CENTER 1 7,897,000.00 pipelined

X Lanao del Norte Balo-I 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Balo-I 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Balo-I 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Iligan City 2015IMPROVING EDUCATION & CULTURAL FACILITIES FOR

MUSLIMS & INDIGENOUS PEOPLE

IMPROVING EDUCATION & CULTURAL FACILITIES FOR

MUSLIMS & INDIGENOUS PEOPLE1 1,000,000.00 pipelined

X Lanao del Norte Iligan City 2015REPAIR & UPGRADING OF PROTECTIVE SERVICE CENTERS

FOR CHILDREN

REPAIR & UPGRADING OF PROTECTIVE SERVICE CENTERS

FOR CHILDREN1 1,700,000.00 pipelined

X Lanao del Norte Iligan City 2015STREET LIGHTING FOR RELOCATION SITES & CRITICAL

URBAN AREAS

STREET LIGHTING FOR RELOCATION SITES & CRITICAL

URBAN AREAS1 800,000.00 pipelined

X Lanao del Norte Kapatagan 2015UPGRADING OF EVACUATION CENTER FACILITIES (PHASE

1)

UPGRADING OF EVACUATION CENTER FACILITIES (PHASE

1)EVACUATION CENTER 1 6,000,000.00 pipelined

X Lanao del Norte Kauswagan Baraason 2014 Construction of 1 unit Day care Center Construction of 1 unit Day care Center -Brgy. Baraason DAY CARE CENTER 1 48 meter2 750,000.00 ongoing

X Lanao del Norte Kauswagan 2015 CONSTRUCTION 1 UNIT DAY CARE CENTER CONSTRUCTION 1 UNIT DAY CARE CENTER DAY CARE CENTER 1 1,000,000.00 pipelined

X Lanao del Norte Kauswagan 2015RENOVATION OF BARANGAY DELABAYAN DAY CARE

CENTER

RENOVATION OF BARANGAY DELABAYAN DAY CARE

CENTERDAY CARE CENTER 1 300,000.00 pipelined

X Lanao del Norte Lala Pendulunan 2014 Concreting of road Concreting of road - Brgy. Pendulunan ROAD 1 48 meter2 1,980,000.00 June 2015 completed

X Lanao del Norte Lala San Isidro Upper 2014 Repair of Seven (7) units Day Care Centers Rehabilitation of Day Care Center - Brgy. San Isidro Upper DAY CARE CENTER 1 48 meter2 1,785,000.00 June 2015 completed

Page 20: List of KALAHI-CIDSS Subprojects - BUB

X Lanao del Norte Lala San Isidro Lower 2014 Rehabilitation of Day Care Center - Brgy. San Isidro Lower DAY CARE CENTER 1 48 meter2 June 2015 completed

X Lanao del Norte Lala Gumagamot 2014 Rehabilitation of Day Care Center - Brgy. Gumagamot DAY CARE CENTER 1 48 meter2 June 2015 completed

X Lanao del Norte Lala Lanipao 2014 Rehabilitation of Day Care Center - Brgy. Lanipao DAY CARE CENTER 1 48 meter2 June 2015 completed

X Lanao del Norte Lala San Manuel 2014 Rehabilitation of Day Care Center - Brgy. San Manuel DAY CARE CENTER 1 48 meter2 June 2015 completed

X Lanao del Norte Lala 2015CONSTRUCTION OF SANTA TERESITA CRUZ LOWER DAY

CARE CENTER

CONSTRUCTION OF SANTA TERESITA CRUZ LOWER DAY

CARE CENTERDAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Lala 2015 CONSTRUCTION OF PENDULONAN DAY CARE CENTER CONSTRUCTION OF PENDULONAN DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Lala 2015CONSTRUCTION OF MATAMPAY BUCANA DAY CARE

CENTER

CONSTRUCTION OF MATAMPAY BUCANA DAY CARE

CENTERDAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Lala 2015 CONSTRUCTION OF DARUMAWANG DAY CARE CENTER CONSTRUCTION OF DARUMAWANG DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Magsaysay 2015UPGRADING OF BRGY. DAAN CAMPO & LUMBAC DAY CARE

CENTER

UPGRADING OF BRGY. DAAN CAMPO & LUMBAC DAY CARE

CENTERDAY CARE CENTER 1 600,000.00 pipelined

X Lanao del Norte Magsaysay 2015 CONSTRUCTION OF DURIANON DAY CARE CENTER CONSTRUCTION OF DURIANON DAY CARE CENTER DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Magsaysay 2015CONSTRUCTION OF EVACUATION CENTER IN BRGY.

POBLACION

CONSTRUCTION OF EVACUATION CENTER IN BRGY.

POBLACIONEVACUATION CENTER 1 1,300,000.00 pipelined

X Lanao del Norte Maigo Poblacion 2014 Establishment of Hardware MotorParts (Motorcab Drivers) Rehabilitation of Day Care Center - Brgy. Poblacion DAY CARE CENTER 1 300,000.00 ongoing

X Lanao del Norte Maigo 2015 CONSTRUCTION OF EVACUATION CENTER CONSTRUCTION OF EVACUATION CENTER EVACUATION CENTER 1 3,000,000.00 pipelined

X Lanao del Norte Matungao 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 600,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao del Norte Pantar 2015 DAY CARE CENTER BUILDING DAY CARE CENTER BUILDING DAY CARE CENTER 1 800,000.00 pipelined

X Lanao Del Norte Poona Piagapo Maliwanag 2013 Construction of Day Care Center Construction of Day Care Center (Maliwanag -300,000) DAY CARE CENTER 1 600,000.00 completed

X Lanao Del Norte Poona Piagapo Nunungan 2013 Construction of Day Care Center (Nunungan - 300,000) DAY CARE CENTER 1 completed

X Lanao del Norte Poona Piagapo Pendulunan 2014 Day Care Repair & Provision Facilities Rehabilitation of Day Care Center - Brgy. Madaya DAY CARE CENTER 1 48 meter2 400,000.00 ongoing

X Lanao del Norte Poona Piagapo Madaya 2014 Rehabilitation of Day Care Center - Brgy. Pendulunan DAY CARE CENTER 1 48 meter2 ongoing

X Lanao Del Norte Salvador Sudlon 2013 Day Care Center, Const. Core Shelter Assistance Construction of Day Care Center (Sudlon - 735,850,600) DAY CARE CENTER 1 7,520,000.00 completed

X Lanao Del Norte Salvador Bulacon 2013 Construction of Day Care Center (Bulacon - 743,250) DAY CARE CENTER 1 completed

X Lanao Del Norte Salvador Bulacon 2013Construction of Twenty Five (25) Units (5mX6m) Core

Shelters (Bulacon - 3,630,468)1 completed

X Lanao Del Norte Salvador Poblacion 2013Construction of Twenty Five (25) Units (5mX6m) Core

Shelters (Poblacion - 3,607,468)1 completed

X Lanao Del Norte Salvador Pagayawan 2013 Construction of Day Care Center (Pagayawan - 739,150) DAY CARE CENTER 1 completed

X Lanao Del Norte Salvador Patidon 2013 Construction of Day Care Center (Patidon - 736,250) DAY CARE CENTER 1 completed

X Lanao Del Norte Salvador Saumay 2013 Construction of Day Care Center - Saumay 736,850) DAY CARE CENTER 1 completed

X Lanao Del Norte Sapad 2015 4 DAY CARE CENTER 4 DAY CARE CENTER DAY CARE CENTER 1 4,095,000.00 pipelined

X Lanao Del Norte Sapad 2015 CORE SHELTER AT DISASTER PHRONE AREA CORE SHELTER AT DISASTER PHRONE AREA 1 4,500,000.00 pipelined

X Lanao Del Norte Sapad 2015POBLACION AREA CONCRETE DRAINAGE @ PUROK-1,4 &

13

POBLACION AREA CONCRETE DRAINAGE @ PUROK-1,4 &

13DRAINAGE SYSTEM 1 1,000,000.00 pipelined

X Lanao Del Norte Togoloan 2015CONSTRUCTION OF EVACUATION CENTER WITH TOILETS

FOR MEN, WOMEN, & PWD

CONSTRUCTION OF EVACUATION CENTER WITH TOILETS

FOR MEN, WOMEN, & PWDEVACUATION CENTER 1 2,300,000.00 pipelined

X MISAMIS OCCIDENTAL ALORAN Lumbayao 2014Protective Services (Repair/Improvement of Day Care

Centers)Rehabilitation of Day Care Center - Brgy. Lumbayao DAY CARE CENTER 1 48 meter2 500,000.00 ongoing

X MISAMIS OCCIDENTAL ALORAN Tugaya 2014 Rehabilitation of Day Care Center - Bgry. Tugaya DAY CARE CENTER 1 48 meter2 ongoingX MISAMIS OCCIDENTAL ALORAN Culpan 2014 Rehabilitation of Day Care Center - Brgy. Culpan DAY CARE CENTER 1 48 meter2 ongoingX MISAMIS OCCIDENTAL ALORAN Lawaan 2014 Rehabilitation of Day Care Center - Brgy. Lawaan DAY CARE CENTER 1 48 meter2 ongoingX MISAMIS OCCIDENTAL ALORAN Caputol 2014 Rehabilitation of Day Care Center - Brgy. Caputol DAY CARE CENTER 1 48 meter2 ongoing

X MISAMIS OCCIDENTAL BONIFACIO Mapurog 2013 Construction of 1 Day Care Center Construction of 1 Unit (6mX8m) Day Care Center - Mapurog DAY CARE CENTER 1 300,000.00 completed

X MISAMIS OCCIDENTAL BONIFACIO Poblacion 2013 Day Center for Senior Citizens Construction of Day Center of Senior Citizen - Poblacion 1 1,000,000.00 completed

X MISAMIS OCCIDENTAL BONIFACIO 2015 KC-NCDDP KC-NCDDP 1 550,000.00 pipelinedX MISAMIS OCCIDENTAL CALAMBA Mamalad-Singalat 2014 Concreting of Mamalad-Singalat road Concreting of Mamalad-Singalat road ROAD 1 1,760,000.00 June 2015 completed

X MISAMIS OCCIDENTAL CALAMBA 2015INSTALLATION OF HAND WASHING FACILITIES TO 20 DAY

CARE CENTERS

INSTALLATION OF HAND WASHING FACILITIES TO 20 DAY

CARE CENTERSDAY CARE CENTER 1 1,000,000.00 pipelined

X MISAMIS OCCIDENTAL CLARIN Sebase 2014Upgrading & Renovation of Nine (9) Day care Center of 4Ps

BrgysRehabilitation of Day Care Center - Brgy. Sebase DAY CARE CENTER 1 48 meter2 500,000.00 ongoing

X MISAMIS OCCIDENTAL CLARIN Segatec Daku 2014 Rehabilitation of Day Care Center - Brgy. Segatec Daku DAY CARE CENTER 1 48 meter2 ongoingX MISAMIS OCCIDENTAL CLARIN Poblacion IV 2014 Rehabilitation of Day Care Center - Brgy. Poblacion IV DAY CARE CENTER 1 48 meter2 ongoing

X MISAMIS OCCIDENTAL DON VICTORIANO CHIONGBIAN

(DON MARIANO MARCOS)2015 CONSTRUCTION OF INDIGENOUS PEOPLE (IP) CENTER CONSTRUCTION OF INDIGENOUS PEOPLE (IP) CENTER 1 1,000,000.00 pipelined

X MISAMIS OCCIDENTAL LOPEZ JAENA 2014*Enhancement Program for Persons w/ disability:

Installation of Comfort Room in PWD OfficeConstruction of Comfort Room in PWD Office 1 50,000.00 ongoing

X MISAMIS OCCIDENTAL LOPEZ JAENA 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROTECTIVE SERVICES INFRASTRUCTURE 1 800,000.00 pipelinedX MISAMIS OCCIDENTAL OROQUIETA CITY (Capital) 2013 Construction of Family Crisis Intervention Center Construction of Family Crisis Center (Phase 1) 1 2,000,000.00 completed

X MISAMIS OCCIDENTAL OROQUIETA CITY (Capital) 2013 Women Production Center Proposed Women Production Center @ City Hall Annex 1 1,000,000.00 completed

X MISAMIS OCCIDENTAL OZAMIS CITY 2015REHAB/REPAIR DAY CARE CENTER (ECCD) RESOURCE

CENTER CLUSTER

REHAB/REPAIR DAY CARE CENTER (ECCD) RESOURCE

CENTER CLUSTERDAY CARE CENTER 1 500,000.00 pipelined

X MISAMIS OCCIDENTAL OZAMIS CITY 2015 WOMAN CRISES CENTER WOMAN CRISES CENTER 1 1,500,000.00 pipelinedX MISAMIS OCCIDENTAL SINACABAN San Isidro Alto 2014 Rehab of road - San Isidro Alto Rehab of road - San Isidro Alto ROAD 1 80 meter2 640,000.00 June 2015 completed

X Misamis Occidental Tangub City Kimat 2013Improvements and Rehabilitation of Barangay Day Care

Centers.Construction of Day Care Center (Kimat - 321,834) DAY CARE CENTER 1 1,250,000.00 completed

X Misamis Occidental Tangub City Baluc 2013 Construction of Day Care Center (Baluc - 319,544) DAY CARE CENTER 1 completed

X Misamis Occidental Tangub City San Antonio 2013 Construction of Day Care Center (San Antonio - 302,650) DAY CARE CENTER 1 completed

X Misamis Occidental Tangub City Taguite 2013 Construction of Day Care Center (Taguite - 305,972) DAY CARE CENTER 1 completedX MISAMIS OCCIDENTAL TUDELA 2015 UPGRADING OF SENIOR CITIZENS DAY CARE CENTER UPGRADING OF SENIOR CITIZENS DAY CARE CENTER DAY CARE CENTER 1 500,000.00 pipelined

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) Cugman 2014 IP and Cultural Community Water System IP and Cultural Community Water System WATER SYSTEM 1 2,800,000.00 ongoing

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) Pagalungan 2014 IP and Cultural Community Water System WATER SYSTEM 1 ongoing

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) Pagalungan 2014 IP and Cultural Community Concreting of FMR IP and Cultural Community Concreting of FMR 1 12,060,000.00 ongoing

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) 2015ESTABLISHMENT OF REHABILITATION/DEVELOPMENTAL

CENTER FOR CHILDREN W/ SPECIAL NEEDS IN CAGAYAN DE

ORO CITY

ESTABLISHMENT OF REHABILITATION/DEVELOPMENTAL

CENTER FOR CHILDREN W/ SPECIAL NEEDS IN CAGAYAN DE

ORO CITY

1 130,000.00 pipelined

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 3,065,000.00 pipelined

X MISAMIS ORIENTAL CAGAYAN DE ORO CITY (Capital) 2015SUPPORT FOR SHELTERED VOCATIONAL WORKSHOP OF

PERSONS W/ DISABILITIES IN CAGAYAN DE ORO CITY

SUPPORT FOR SHELTERED VOCATIONAL WORKSHOP OF

PERSONS W/ DISABILITIES IN CAGAYAN DE ORO CITY1 240,000.00 pipelined

X Misamis Oriental Claveria Poblacion 2014 Crisis Intervention Units Financial Cash Assistance 1 255,000.00 ongoing

X Misamis Oriental Claveria 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 500,000.00 pipelined

X Misamis Oriental Gingoog City 2014 Anger Management Anger Management 1 12,000.00 ongoing

X Misamis Oriental Gitagum C.P. Garcia 2014Improvement of Day Care Center (5 DCC C.P. Garcia,

Kilangit, Matangad, Quezon, G. Pelaez)Construction of 1 unit Day care Center DAY CARE CENTER 1 48 meter2 748,125.00 ongoing

X Misamis Oriental Libertad 2015 CORE SHELTER ASSISTANCE PROGRAM CORE SHELTER ASSISTANCE PROGRAM 1 1,000,000.00 pipelined

X Misamis Oriental Medina North Poblacion 2014 Propose Construction of Crisis Center Propose Construction of Crisis Center - North Poblacion 1 200,000.00 pipelined

X Misamis Oriental Medina 2015PROPOSE CONSTRUCTION OF MULTI PURPOSE BLDG.

(EVACUATION CENTER)

PROPOSE CONSTRUCTION OF MULTI PURPOSE BLDG.

(EVACUATION CENTER)EVACUATION CENTER 1 3,000,000.00 pipelined

X Misamis Oriental Opol Malanang 2014 Rehabilitation of Day Care Centers (10 Day Care Centers)Construction of 1 unit Day care Center - Sitio Malaurog,

Brgy. MalanangDAY CARE CENTER 1 48 meter2 1,700,000.00 ongoing

X Misamis Oriental Opol Cauyunan 2014Construction of 1 unit Day care Center - Sitio Poblacion, Brgy.

CauyunanDAY CARE CENTER 1 48 meter2 ongoing

X Misamis Oriental Opol Bagocboc 2014Construction of 1 unit Day care Center - Sitio Sto. Nino, Brgy.

BagocbocDAY CARE CENTER 1 48 meter2 ongoing

X Misamis Oriental Opol 2015 CONSTRUCTION OF EVACUATION CENTER 2015 CONSTRUCTION OF EVACUATION CENTER 2015 EVACUATION CENTER 1 7,500,000.00 pipelined

X Misamis Oriental Salay 2015 ESTABLISHMENT OF OPDA ESTABLISHMENT OF OPDA 1 700,000.00 ongoing

X Misamis Oriental Salay 2015 REPAIR/UPGRADING OF DCC REPAIR/UPGRADING OF DCC DAY CARE CENTER 1 900,000.00 ongoing

X Misamis Oriental Talisayan Punta Santiago 2014Kapit-Bisig Laban Kahirapan (KALAHI-CIDDS) Improvement

of Day Care CenterImprovement of Day Care Center - Brgy. Punta Santiago DAY CARE CENTER 1 48 meter2 900,000.00 ongoing

X Misamis Oriental Talisayan Puting Balas 2014 Improvement of Day Care Center - Brgy. Puting Balas DAY CARE CENTER 1 48 meter2 ongoing

X Misamis Oriental Talisayan Mandahilag 2014 Improvement of Day Care Center - Brgy. Mandahilag DAY CARE CENTER 1 48 meter2 ongoing

X Misamis Oriental Talisayan Calamcam 2014 Improvement of Day Care Center - Brgy. Calamcam DAY CARE CENTER 1 48 meter2 - ongoing

X Misamis Oriental Talisayan San Jose 2014 Improvement of Day Care Center - Brgy. San Jose DAY CARE CENTER 1 48 meter2 - ongoingXI Compostela Valley Compostela Maparat 2014 Construction of Day Care Center Day Care Center(Brgy.Maparat) DAY CARE CENTER 1 695,656.00 19-Dec-14 10-Apr-15 completed

XI Compostela Valley Compostela Panansalan 2014 Construction Of roadConstruction Of road 1km. Farm to Market

Road(Panansalan)ROAD 1 1,130,441.00 19-Dec-14 10-Apr-15 completed

XI Compostela Valley Compostela Siocon 2014 Construction Of roadConstruction/Upgrading 0f 1.5 km FMR w/ cross drainage

and side dithches(Siocon)DRAINAGE SYSTEM 1 1,130,441.00 19-Dec-14 10-Apr-15 completed

XI Compostela Valley Compostela Lagab 2014 Construction of road (P2-P6)Construction/Upgrading 0f 1.5 km FMR w/ cross drainage

and side dithches(p2-p6)LagabDRAINAGE SYSTEM 1 1,130,441.00 19-Dec-14 10-Apr-15 completed

XI Compostela Valley Compostela Aurora 2014 Construction of road (P8-P4)Upgrading of 1.5km.FMR with cross drainage and side

dithches(Aurora)DRAINAGE SYSTEM 1 1,130,441.00 19-Dec-14 10-Apr-15 completed

XI Compostela Valley Compostela North Alegria 2014 Rehabilitation of road (P7-P5)Construction of 750mtrs.FMR with cross drainage & side

dithches (N.Alegria)DRAINAGE SYSTEM 1 1,130,441.00 19-Dec-14 10-Apr-15 completed

XI COMPOSTELA VALLEY LAAK (SAN VICENTE) Concepcion 2014 Improvement Of Concepcion –Patong Road Improvement Of Concepcion –Patong Road ROAD 1 1,000,000.00 19-Dec-14 10-Apr-15 completedXI COMPOSTELA VALLEY LAAK (SAN VICENTE) Bollukan 2014 Improvement Of Purok 2-Sitio Tubod Road Improvement Of Purok 2-Sitio Tubod Road ROAD 1 1,000,000.00 19-Dec-14 10-Apr-15 completedXI COMPOSTELA VALLEY MABINI (DOÑA ALICIA) 2014 not specified not specified 1 250,000.00 ongoing

XI COMPOSTELA VALLEY MABINI (DOÑA ALICIA) PINDASAN CROSSING 2015 REPAIR AND REHAB OF PINDASAN CROSSING DAY CARE

CENTERREHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 500,000.00 TBD

XI COMPOSTELA VALLEY MACO 2015 CONSTRUCTION OF OVERFLOW BRIDGE CONSTRUCTION OF OVERFLOW BRIDGE BRIDGE 1 1,400,000.00 TBDXI COMPOSTELA VALLEY MAWAB 2015 REPAIR AND UPGRADING OF 21 DAY CARE CENTERS REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 700,612.50 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI COMPOSTELA VALLEY MAWAB 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Compostela Valley Monkayo 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 505,835.00 proposed

XI Compostela Valley Monkayo 2015 CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE

FACILITIES

CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

COMPLETE FACILITIESDAY CARE CENTER 1 505,833.00 proposed

XI Compostela Valley Monkayo 2015 CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE

FACILITIES

CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

COMPLETE FACILITIESDAY CARE CENTER 1 505,833.00 proposed

XI Compostela Valley Monkayo 2015 CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE

FACILITIES

CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

COMPLETE FACILITIESDAY CARE CENTER 1 505,833.00 proposed

XI Compostela Valley Monkayo 2015 CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE

FACILITIES

CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

COMPLETE FACILITIESDAY CARE CENTER 1 505,833.00 proposed

XI Compostela Valley Monkayo 2015 CONSTRUCTION OF 1 DAY CARE CENTER WITH COMPLETE

FACILITIES

CONSTRUCTION OF 1-UNIT DAY CARE CENTER WITH

COMPLETE FACILITIESDAY CARE CENTER 1 505,833.00 proposed

XI Compostela Valley Pantukan Tambongon 2014 Construction of Daycare Center day care center(1 Unit)Brgy. Tambongon DAY CARE CENTER 1 800,000.00 June 2015 completedXI Compostela Valley Pantukan Matiao 2014 Construction Of road For Brgy Matiao Construction Of road For Brgy Matiao ROAD 1 850,000.00 June 2015 completedXI Compostela Valley Pantukan Kingking 2014 Construction Of road For Townsite Kingking Construction Of road For Townsite Kingking ROAD 1 1,800,000.00 June 2015 completed

XI Compostela Valley Pantukan 2015 CONSTRUCTION OF CRISIS INTERVENTION CENTER FOR

WOMEN AND CHILDREN

CONSTRUCTION OF CRISIS INTERVENTION CENTER FOR

WOMEN AND CHILDREN1 1,000,000.00 TBD

XI Compostela Valley Pantukan 2015 CONSTRUCTION OF ELDERLY DAY CENTER CONSTRUCTION OF ELDERLY DAY CENTER 1 1,000,000.00 TBDXI Davao Del Norte Asuncion (Salug) Cambanogoy 2013 Construction of Standard Drop in Center (IM) Construction of Drop-in Center - Brgy. Cambanogoy 1 1,000,000.00 completed

XI Davao Del Norte Asuncion (Salug) 2015CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLORIDE GEL TOOTHPASTE)

CONSTRUCTION OF GROUP HAND WASHING FACILITY IN

DAY CARE CENTERS (WITH COMPLETE SET OF SOAP AND

FLORIDE GEL TOOTHPASTE)

DAY CARE CENTER 1 500,000.00 proposed

XI DAVAO DEL NORTE BRAULIO E. DUJALI New Casay 2014 construction of day care centers day care center(Brgy.New Casay) DAY CARE CENTER 1 800,000.00 19-Dec-14 10-Apr-15 completedXI DAVAO DEL NORTE BRAULIO E. DUJALI 2015 REHABILITATION OF 5 DAY CARE CENTER REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposedXI DAVAO DEL NORTE BRAULIO E. DUJALI 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI DAVAO DEL NORTE BRAULIO E. DUJALI 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI DAVAO DEL NORTE BRAULIO E. DUJALI 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI DAVAO DEL NORTE BRAULIO E. DUJALI 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI DAVAO DEL NORTE CITY OF PANABO 2015 CONSTRUCTION OF CRISIS CENTER FOR WOMEN CONSTRUCTION OF CRISIS CENTER FOR WOMEN 1 1,500,000.00 proposed

XI DAVAO DEL NORTE CITY OF PANABO 2015 CONSTRUCTION OF REHABILITATION CENTER FOR

CHILDREN IN CICL

CONSTRUCTION OF REHABILITATION CENTER FOR

CHILDREN IN CICL1 1,500,000.00 proposed

XI DAVAO DEL NORTE CITY OF PANABO 2015 RENOVATION OF ANGEL BARACHAEL HOME FOR BOYS RENOVATION OF ANGEL BARACHAEL HOME FOR BOYS 1 600,000.00 proposed

XI DAVAO DEL NORTE ISLAND GARDEN CITY OF SAMAL 2015 CORE SHELTER ASSISTANCE CORE SHELTER ASSISTANCE 1 3,000,000.00 proposed

XI DAVAO DEL NORTE KAPALONG Capungagan 2014 Improvement Of Pasilungan Sa Kabataan FacilitiesRehabilitation of Day Care Centers(Brgy.Capungagan -

340,000) DAY CARE CENTER 1 680,000.00 19-Dec-14 10-Apr-15 completed

XI DAVAO DEL NORTE KAPALONG Samapaol 2014 *Rehabilitation of Day Care Centers(Brgy.SampaoI -

340,000) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI DAVAO DEL NORTE KAPALONG Sampao 2014 Core Shelter Assistance For Displaced Families For Prk. 1A

And 2A Sampao

Core Shelter Assistance For Displaced Families For Prk. 1A

And 2A Sampao1 255,000.00 19-Dec-14 10-Apr-15 completed

XI DAVAO DEL NORTE NEW CORELLA Del Monte 2014 Rehab Of road for Del Monte Rehabilitation Of road for Del Monte ROAD 1 1,000,000.00 June 2015 completedXI DAVAO DEL NORTE NEW CORELLA San Jose 2014 Rehab Of roads for San Jose To Bondoc Sr Rehab Of roads for San Jose To Bondoc Sr ROAD 1 1,000,000.00 June 2015 completedXI DAVAO DEL NORTE SANTO TOMAS Talomo 2013 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER - BRGY. TALOMO DAY CARE CENTER 1 600,000.00 completed

XI DAVAO DEL NORTE SANTO TOMAS Kinamayan Sentro 2014 Concreting Of Kinamayan Sentro-Sitio Muslog Area With

Box Culvert.Concreting of Road ROAD 2 1,750,000.00 19-Dec-14 10-Apr-15 completed

XI DAVAO DEL NORTE SANTO TOMAS Magwawa 2014 Const. Of FMR - Mahayahay Crossing To Purok 7 (Spring) Construction of FMR 1 1,750,000.00 19-Dec-14 10-Apr-15 completed

XI Davao Del Norte Talaingod Melyong 2013 Construction of Day Care Center (DCC) 1 Building Construction of Day Care Center - Brgy. Melyong 550,000 DAY CARE CENTER 1 600,000.00 completed

XI Davao Del Norte Talaingod Cuyas 2013 Day Care Center (1 Building) Construction of Day Care Center - Brgy. Cuyas 550,000 DAY CARE CENTER 1 1,600,000.00 completedXI Davao Del Norte Talaingod Barobo 2013 Construction of Day Care Center - Brgy. Barobo 550,000 DAY CARE CENTER 1 completedXI Davao Del Norte Talaingod Km 25 2013 Construction of Day Care Center - Km. 25 550,000 DAY CARE CENTER 1 March 2015 completedXI Davao del Norte Talaingod Central Baugan 2014 Day Care Center day care center (Brgy. Central Baugan) DAY CARE CENTER 1 800,000.00 June 2015 completed

XI Davao del Norte Talaingod 2015 CONSTRUCTION/ IMPROVEMENT OF WOMEN CRISIS

CENTER

CONSTRUCTION/ IMPROVEMENT OF WOMEN CRISIS

CENTER1 900,000.00 proposed

XI Davao Oriental Baganga San Isidro 2013 Acquisition of wooden chairs and tables, learning materials,

bathroom weighing scales for day care centersConstruction of Day Care Center (Brgy. San Isidro - 633,330) DAY CARE CENTER 1 800,000.00 completed

XI Davao Oriental Baganga Kinablangan 2013 Enhancement of 11 day care centersConstruction of Day Care Center (Brgy. Kinablangan -

633,330)DAY CARE CENTER 1 1,100,000.00 completed

XI Davao Oriental Baganga Dapnan 2013 Construction of Day Care Center (Brgy. Dapnan - 633,340) DAY CARE CENTER 1 completed

XI Davao Oriental Baganga 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 2,500,000.00 TBDXI Davao Oriental Banaybanay 2015 CONSTRUCTION OF ACCESS ROAD CONSTRUCTION OF ACCESS ROAD ROAD 1 1,300,000.00 proposedXI Davao Oriental Boston 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTER CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 proposedXI Davao Oriental Boston 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposed

XI Davao Oriental Cateel Poblacion 2014 Improvement/Rehab Of Day Care Center Learning Facilities Improvement /rehab. Of DCC DAY CARE CENTER 1 87,000.00 19-Dec-14 10-Apr-15 completed

XI Davao Oriental City of Mati (capital) 2015 CONSTRUCTION OF 1 UNIT DCC CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 800,000.00 proposed

XI Davao Oriental Lupon Mahayahay 2014 Kapit -Bisig Laban Sa Kahirapan-Comprehensive And

Integrated Delivery Of Social Service (Kalahi-Cidss) Project Rehabilitation of Day Care Center(Brgy.Mahayahay) DAY CARE CENTER 1 1,190,000.00 19-Dec-14 10-Apr-15 completed

Page 21: List of KALAHI-CIDSS Subprojects - BUB

XI Davao Oriental Lupon Central Poblacion 2014 Construction of Day Care CenterBrgy.Central,POB.) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI Davao Oriental Lupon 2015 REHABILITATION OF TWO (2) UNITS OF DAY CARE

CENTERSREHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposed

XI Davao Oriental Lupon 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Lupon 2015 CONSTRUCTION OF THREE (3) UNIT DAY CARE CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 2,400,000.00 proposedXI Davao Oriental Lupon 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Lupon 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Manay Holy Cross 2014 Improvement of road Improvement of road(Brgy.Holy Cross) ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay Zaragoza 2014 Improvement of road Improvement of road(Brgy.Zaragoza) ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay Del Pilar 2014 Improvement of road Improvement of road-Del Pilar ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay Manreza 2014 Improvement of road Improvement of road - Manreza ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay San Fermin 2014 Improvement of road Improvement of road-San Fermin ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay Central 2014 Improvement of road Improvement of road -Central ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay San Ignacio 2014 Improvement of road Improvement of road - San Ignacio ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completedXI Davao Oriental Manay Concepcion 2014 Improvement of road Improvement of road -Concepcion ROAD 1 1,351,875.00 19-Dec-14 10-Apr-15 completed

XI Davao Oriental Manay CAWAYAN 2015

BASIC SOCIAL SERVICE PROJECTS CONSTRUCTION/

REHABILITATION DAY CARE CENTER (1 UNIT

CONSTRUCTION AT BRGY. CAYAWAN AND REHAB OF DAY

CARE CENTER AT BRGY. CENTRAL 2 UNITS AND 1 UNIT

BRGY. SAN FERMIN)

CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 1,400,000.00 proposed

XI Davao Oriental Manay CENTRAL 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Manay CENTRAL 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Manay SAN FERMIN 2015 REHABILITATION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental San Isidro 2015 CONSTRUCTION OF 1 DAY CARE CENTER CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 800,000.00 proposed

XI Davao Oriental Tarragona Central 2014 Construction Of Day Care Center Complete With Amenities Construction of Municipal Evacuation Center EVACUATION CENTER 1 3,500,000.00 19-Dec-14 10-Apr-15 completed

XI Davao Oriental Tarragona Central 2014 Construction Of Multipurpose Building Especially For

Disaster Operation With Amenities1 1,700,000.00 19-Dec-14 10-Apr-15 completed

XI Davao Oriental Tarragona 2015 CONSTRUCTION OF FIVE (5) DAY CARE CENTER CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 4,000,000.00 proposedXI Davao Oriental Tarragona 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Tarragona 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Tarragona 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Oriental Tarragona 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao Del Sur Bansalan 2015 IMPROVEMENT OF BAHAY PAG-ASA FOR CICL IMPROVEMENT OF BAHAY PAG-ASA FOR CICL 1 850,000.00 proposed

XI Davao Del Sur Davao City Crossing Bayabas 2013 Construction of Child Friendly Comfort Rooms to Day Care

Centers

Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy Crossing Bayabas (70,000)DAY CARE CENTER 1 490,000.00 completed

XI Davao Del Sur Davao City Sasa 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy. Sasa 70,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Calinan 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy. Calinan (70,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Mintal 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy. Mintal (70,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Datu Salumay 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Datu Salumay (60,829)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Maa 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy. MaaDAY CARE CENTER 1 dropped

XI Davao Del Sur Davao City 27C 2013 Child w/ Disability-Friendly Comfort Rooms to Day Care

Centers - Brgy 27CDAY CARE CENTER 1 dropped

XI Davao Del Sur Davao City 39D 2013 Installation of Lavatory & Water Supply to Day Care CentersInstallation of Lavatory & Water Supply to Day Care Centers -

Brgy. 39-D, Davao City (85,780)DAY CARE CENTER 1 500,000.00 completed

XI Davao Del Sur Davao City Sirawan 2013 Installation of Lavatory & Water Supply to Day Care Centers -

Brgy. Sirawan, Davao City (100,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Tibungco 2013 Installation of Lavatory & Water Supply to Day Care Centers -

Brgy. Tibungco, Davao City (56,236)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Ilang 2013 Installation of Lavatory & Water Supply to Day Care Centers -

Brgy. Ilang, Davao City - 100,000DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Waan 2013 Installation of Lavatory & Water Supply to Day Care Centers -

Brgy. Waan, Davao CityDAY CARE CENTER 1 dropped

XI Davao Del Sur Davao City Marilog 2013 Repair and Rehabilitation of Day Care CentersRehabilitation of Day Care Center - Brgy. Marilog, Davao

City (273,364)DAY CARE CENTER 1 1,800,000.00 completed

XI Davao Del Sur Davao City Matina Aplaya 2013 Rehabilitation of Day Care Center - Brgy. Matina Aplaya,

Davao City (300,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Dumoy 2013 Rehabilitation of Day Care Center - Brgy. Dumoy, Davao City

(300,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City Sasa 2013 Rehabilitation of Day Care Center - Brgy. Sasa, Davao City

(288,630)DAY CARE CENTER 1 completed

XI Davao Del Sur Davao City 76 A 2013 Rehabilitation of Day Care Center - Brgy. 76-A, Davao City

600,000DAY CARE CENTER 1 March 2015 completed

XI Davao Del Sur Davao City 2013 Provision of Playground Apparatus in Day Care Centers Provision of Playground Apparatus in Day Care Centers DAY CARE CENTER 1 500,000.00 completed

XI Davao Del Sur Don Marcelino North Lamindan 2013 Construction of Day Care Centers Construction of Day Care Center - North Lamindan 800,000 DAY CARE CENTER 1 2,400,000.00 completed

XI Davao Del Sur Don Marcelino South Lamindan 2013 Construction of Day Care Center - South Lamindan 800,000 DAY CARE CENTER 1 completed

XI Davao Del Sur Don Marcelino Lawa 2013 Construction of Day Care Center - Lawa 800,000 DAY CARE CENTER 1 completed

XI Davao Del Sur Don Marcelino Kinanga 2013 Construction of Drop in Center/Half-way Home BuildingConstruction of Drop in Center/Half-way Home Building -

KinangaBUILDING FACILITY 1 750,000.00 completed

XI Davao del Sur Don Marcelino North Lamindan 2014 Construction Of Barangay Day Care Center With Complete

Facilities

Construction of DCC w/ Amenities( Brgy.North Lamidan -

800,000)DAY CARE CENTER 1 4,000,000.00 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Don Marcelino West Lamindan 2014 Construction of DCC w/ Amenities(West Lamidan - 800,000) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Don Marcelino Lanao 2014 Construction of DCC w/ Amenities(Brgy.Lanao - 800,000) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Don Marcelino Talaguton 2014 Construction of DCC w/ Amenities(Brgy.Talaguton -

800,000)DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Don Marcelino Calian 2014 Construction of DCC w/ Amenities(Calian - 800,000) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completedXI Davao del Sur Don Marcelino 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 3,200,000.00 TBDXI Davao del Sur Hagonoy 2015 CONSTRUCTION OF 3 DAY CARE CENTER CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 1,606,100.00 proposedXI Davao del Sur Hagonoy 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Hagonoy 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposed

XI Davao del Sur Hagonoy 2015 KALAHI CIDSS- CONSTRUCTION OF INDIGENOUS PEOPLE'S

TRIBAL CENTERCONSTRUCTION OF INDIGENOUS PEOPLE'S TRIBAL CENTER 1 1,000,000.00 proposed

XI Davao Del Sur Jose Abad Santos (Trinidad) Bukid 2013 Construction of Day Care Center Construction of Day Care Center - Brgy. Bukid (895,000) DAY CARE CENTER 1 2,000,000.00 completedXI Davao Del Sur Jose Abad Santos (Trinidad) Sugal 2013 Construction of Day Care Center - Brgy. Sugal (865,000) DAY CARE CENTER 1 completed

XI Davao del Sur Kiblawan San Isidro 2015 ACCESS ROAD - PUROK 1, MANUAL, BRGY. SITE, SAN

ISIDRO

ACCESS ROAD - PUROK 1, MANUAL, BRGY. SITE, SAN

ISIDROROAD 1 500,000.00 TBD

XI Davao del Sur Kiblawan 2015 ACCESS ROAD - GEN. LIM ST. TO BAGUMBAYAN ACCESS ROAD - GEN. LIM ST. TO BAGUMBAYAN ROAD 1 2,900,000.00 TBD

XI Davao del Sur Magsaysay 2015 SENIOR CITIZEN AND PWDS BUILDING (CONSTRUCTION OF

1 UNIT SENIOR CITIZEN AND PWDS BUILDING)

CONSTRUCTION OF 1 UNIT SENIOR CITIZEN AND PWDS

BUILDINGBUILDING FACILITY 1 500,000.00 proposed

XI Davao del Sur Magsaysay 2015 DAY CARE CENTERS (REPAIR OF 8 DCC) REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Magsaysay 2015 REPAIR OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 15 DAY CARE

CENTERS

REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 1,000,000.00 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malalag 2015 REHABILITATION/ IMPROVEMENT OF 1-UNIT DAY CARE

CENTERDAY CARE CENTER 1 proposed

XI Davao del Sur Malita 2015 REPAIR/UPGRADING OF DAY CARE CENTERS REPAIR/UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 1,000,000.00 proposed

XI Davao del Sur Matanao 2015CONSTRUCTION/ ESTABLISHMENT OF CRISIS CENTER,

BALAY PAG-ASA AND MULTI PURPOSE BUILDING FOR

PWD, WOMEN AND SENIOR CITIZEN

CONSTRUCTION/ ESTABLISHMENT OF CRISIS CENTER,

BALAY PAG-ASA AND MULTI PURPOSE BUILDING FOR

PWD, WOMEN AND SENIOR CITIZEN

BUILDING FACILITY 1 2,900,000.00 TBD

XI DAVAO DEL SUR PADADA 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF WOMEN CRISIS CENTER)CONSTRUCTION OF WOMEN CRISIS CENTER 1 1,200,000.00 proposed

XI Davao Del Sur Santa Maria Basiawan 2013 Construction/Renovation of 12 Day Care CentersConstruction of 1 unit Day Care Center - Basiawan

(1,440,000)DAY CARE CENTER 1 3,600,000.00 completed

XI Davao Del Sur Santa Maria Basiawan 2013 Construction of 1 unit Day Care Center - Basiawan

(1,440,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Santa Maria San Roque 2013 Construction of 1 unit Day Care Center - San Roque

(720,000)DAY CARE CENTER 1 completed

XI Davao Del Sur Santa Maria Poblacion 2013 PWD Multi-purpose Building Construction of PWD Multi-purpose Building BUILDING FACILITY 1 350,000.00 completedXI Davao Del Sur Santa Maria 2015 CONSTRUCTION OF 2 UNITS DAY CARE CENTER CONSTRUCTION OF1-UNIT DAY CARE CENTER DAY CARE CENTER 1 1,600,000.00 proposedXI Davao Del Sur Santa Maria 2015 CONSTRUCTION OF1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposed

XI Davao Del Sur Santa Maria 2015 CONSTRUCTION OF 1 UNIT DROP IN CENTER WITH

COMPLETE AMENITIES

CONSTRUCTION OF 1 UNIT DROP IN CENTER WITH

COMPLETE AMENITIES1 1,500,000.00 proposed

XI Davao Del Sur Santa Maria 2015 CONSTRUCTION OF DAY CENTER FOR SENIOR CITIZEN CONSTRUCTION OF DAY CENTER FOR SENIOR CITIZEN 1 1,000,000.00 proposedXI Davao del Sur Sarangani Mabila 2014 Extension Of Rehabilitation And Skills Training Center Extension of Skills Training Center 1 500,000.00 19-Dec-14 10-Apr-15 completedXI Davao del Sur Sarangani Mabila 2014 Repair Of Day Care Centers Consruction of Day Care Center (Brgy.Mabila - 800,000) DAY CARE CENTER 1 1,600,000.00 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Sarangani Camalig 2014 Consruction of Day Care Center(Brgy.Camalig - 800,000) DAY CARE CENTER 1 19-Dec-14 10-Apr-15 completed

XI Davao del Sur Sarangani 2015 CONSTRUCTION OF 6 DAY CARE CENTERS CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 2,300,000.00 proposedXI Davao del Sur Sarangani 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sarangani 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sarangani 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sarangani 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sarangani 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sulop 2015 CONSTRUCTION OF 3 UNIT DAY CARE CENTERS CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 2,400,000.00 proposedXI Davao del Sur Sulop 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposedXI Davao del Sur Sulop 2015 CONSTRUCTION OF 1-UNIT DAY CARE CENTER DAY CARE CENTER 1 proposed

XII COTABATO (NORTH COTABATO) Aleosan 2015 CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES

AND AMENITIES

CONSTRUCTION OF DAY CARE CENTER WITH FACILITIES

AND AMENITIESDAY CARE CENTER 1 750,000.00 ongoing

XII COTABATO (NORTH COTABATO) Antipas 2015 CONSTRUCTION OF WOMEN'S CENTER CONSTRUCTION OF WOMEN'S CENTER 1 1,000,000.00 TBDXII COTABATO (NORTH COTABATO) Arakan Meocan 2014 Rehabilitation of Meocan-Sitio road Rehabilitation of Meocan-Sitio road ROAD 1 1,500,000.00 pipelined

XII COTABATO (NORTH COTABATO) Arakan Santo Nino 2015CONSTRUCTION OF 1 UNIT DAY CARE CENTERS AT

BARANGAYS GAMBODES, GANATAN, KULAMAN VALLEY

AND SO. VALENCIA (STO. NIÑO)

CONSTRUCTION OF 1 UNIT DAY CARE CENTERS AT

BARANGAYS GAMBODES, GANATAN, KULAMAN VALLEY

AND SO. VALENCIA (STO. NIÑO)

DAY CARE CENTER 1 2,380,000.00 ongoing

XII COTABATO (NORTH COTABATO) Banisilan 2015 4 SEWING MACHINES WITH MATERIALS AND TRAININGS

TO 4PS WOMEN

4 SEWING MACHINES WITH MATERIALS AND TRAININGS

TO 4PS WOMEN1 500,000.00 TBD

XII COTABATO (NORTH COTABATO) Carmen 2015 DAY CARE CENTER DAY CARE CENTER DAY CARE CENTER 1 1,700,000.00 TBDXII COTABATO (NORTH COTABATO) Kabacan 2015 PROTECTIVE SERVICES -CAPACITY BUILDING PROTECTIVE SERVICES -CAPACITY BUILDING BUILDING FACILITY 1 1,620,000.00 TBDXII COTABATO (NORTH COTABATO)CITY OF KIDAPAWAN (Capital) 2015 EVACUATION FACILITY EVACUATION FACILITY EVACUATION CENTER 1 2,500,000.00 proposedXII COTABATO (NORTH COTABATO) Magpet Owas 2013 DSWD ( One unit Daycare Center Bldg.) Owas DSWD ( One unit Daycare Center Bldg.) Owas DAY CARE CENTER 1 679,000.00 completed

XII COTABATO (NORTH COTABATO) Magpet Pidlanan 2014 Road spot concreting along Pidlanan 2 to crossing Pidlanan Road spot concreting along Pidlanan 2 to crossing Pidlanan

(new)ROAD 1 1,000,000.00 ongoing

XII COTABATO (NORTH COTABATO) Magpet 2014 Road Spot Concreting At Sitio Caunod Road Spot Concreting At Sitio Caunod (new) ROAD 1 1,200,000.00 ongoingXII COTABATO (NORTH COTABATO) Magpet 2014 Road Spot Concreting At Sitio Plateau Road Spot Concreting At Sitio Plateau (new) ROAD 1 1,268,235.00 ongoingXII COTABATO (NORTH COTABATO) Makilala 2015 ESTABLISHMENT OF SENIOR CITIZENS BUILDING ESTABLISHMENT OF SENIOR CITIZENS BUILDING BUILDING FACILITY 1 600,000.00 proposed

XII COTABATO (NORTH COTABATO) Matalam 2015 CONSTRUCTION OF IMPROVISE/SIMPLIFIED CRISIS

CENTER

CONSTRUCTION OF IMPROVISE/SIMPLIFIED CRISIS

CENTER1 1,000,000.00 proposed

XII COTABATO (NORTH COTABATO) Midsayap 2013Construction of Crisis Center for Women and Childreb in Conflict with Law (CICL)Construction of Crisis Center for Women and Childreb in

Conflict with Law (CICL)1 1,000,000.00 completed

XII COTABATO (NORTH COTABATO) Midsayap 2013 MSWD - Construction of Center for Children In Conflict with the LawMSWD - Construction of Center for Children In Conflict with

the Law1 1,000,000.00 completed

XII COTABATO (NORTH COTABATO) Midsayap 2013 MSWD - Construction of CICL bahay Pasilungan Center MSWD - Construction of CICL bahay Pasilungan Center 1 300,000.00 completed

XII COTABATO (NORTH COTABATO) Midsayap 2013 MSWD - Improvement & Construction of additional Daycare Centers MSWD - Improvement & Construction of additional

Daycare CentersDAY CARE CENTER 1 500,000.00 completed

XII COTABATO (NORTH COTABATO) Midsayap 2013 MSWD- Children's Participation MSWD- Children's Participation 1 40,000.00 completedXII COTABATO (NORTH COTABATO) M'lang 2015 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL CONSTRUCTION OF BAHAY PAG-ASA FOR CICL 1 1,375,000.00 proposedXII COTABATO (NORTH COTABATO) M'lang 2015 CONSTRUCTION OF DAY CARE CENTER (3 DCCS) CONSTRUCTION OF DAY CARE CENTER (3 DCCS) DAY CARE CENTER 1 2,340,000.00 proposedXII COTABATO (NORTH COTABATO) M'lang 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 1,375,000.00 proposed

XII COTABATO (NORTH COTABATO) Pigcawayan 2015 CONSTRUCTION OF WOMEN'S CRISES CENTER FOR VAWC

VICTIMS

CONSTRUCTION OF WOMEN'S CRISES CENTER FOR VAWC

VICTIMS1 2,300,000.00 proposed

XII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of 5 Units Day Care Centers Construction Of 1 Unit Day Care Center - DAY CARE CENTER 1 3,060,000.00 pipelinedXII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of 1 Unit Day Care Center - DAY CARE CENTER 1 pipelinedXII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of 1 Unit Day Care Center - DAY CARE CENTER 1 pipelinedXII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of 1 Unit Day Care Center - DAY CARE CENTER 1 pipelinedXII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of 1 Unit Day Care Center - DAY CARE CENTER 1 pipelinedXII COTABATO (NORTH COTABATO) Pikit 2014 Construction Of Pasalubong Center Construction Of Pasalubong Center 1 486,000.00 ongoingXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBDXII COTABATO (NORTH COTABATO) Pikit 2015 CONSTRUCTION OF DAY CARE CENTERS CONSTRUCTION OF DAY CARE CENTERS DAY CARE CENTER 1 750,000.00 TBD

XII COTABATO (NORTH COTABATO) Tulunan 2013Acquire Mobile/Au Vehicle - mobile car for project monitoring and for emergency relief operationAcquire Mobile/Au Vehicle - mobile car for project

monitoring and for emergency relief operation1 400,000.00 completed

XII COTABATO (NORTH COTABATO) Tulunan 2013 Community- Based Enterprise Development: Community- Based Enterprise Development: 1 2,760,000.00 March 2015 completed

XII Sarangani ALABEL (Capital) 2015 HAND WASHING AND PLAYGROUND FACILITIES FOR DAY

CARE CENTER

HAND WASHING AND PLAYGROUND FACILITIES FOR DAY

CARE CENTERDAY CARE CENTER 1 1,000,000.00 proposed

XII Sarangani Glan 2015 CONSTRUCTION OF HALF-WAY HOME CONSTRUCTION OF HALF-WAY HOME 1 675,000.00 ongoingXII Sarangani Maasim Lumatil 2014 Repair Of Day Care Center Building At Lumatil Repair Of Day Care Center Building At Lumatil DAY CARE CENTER 1 375,000.00 ongoingXII Sarangani Maasim Kanalo 2014 Repair Of Day Care Center Building At Kanalo Repair Of Day Care Center Building At Kanalo DAY CARE CENTER 1 375,000.00 ongoingXII Sarangani Maasim Daliao 2014 Repair Of Day Care Center Building At Daliao Repair Of Day Care Center Building At Daliao DAY CARE CENTER 1 375,000.00 ongoingXII Sarangani Maasim Tinoto 2014 Repair Of Day Care Center Building At Snalang, Tinoto Repair Of Day Care Center Building At Snalang, Tinoto DAY CARE CENTER 1 375,000.00 ongoingXII Sarangani Maasim 2015 CONSTRUCTION OF WOMEN CRISIS CENTER CONSTRUCTION OF WOMEN CRISIS CENTER 1 2,000,000.00 TBDXII Sarangani Maitum 2014 Resettlement And Housing Program Resettlement And Housing Program 1 8,395,718.00 ongoingXII Sarangani Maitum 2014 Upgrading of Day Care Center Upgrading of Day Care Center DAY CARE CENTER 1 1,000,000.00 ongoingXII Sarangani Maitum 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 800,000.00 TBDXII Sarangani Maitum 2015 UPGRADING OF DAY CARE CENTERS UPGRADING OF DAY CARE CENTERS DAY CARE CENTER 1 800,000.00 TBD

XII Sarangani Maitum 2015 CONSTRUCTION OF MUNICIPAL EVACUATION CENTER W/

FACILITIES

CONSTRUCTION OF MUNICIPAL EVACUATION CENTER W/

FACILITIESEVACUATION CENTER 1 2,250,000.00 TBD

XII Sarangani Maitum 2014 Maitum Livelihood Training Center Maitum Livelihood Training Center 1 1,220,725.00 ongoingXII Sarangani Malapatan 2013 Construction of Day Care center(3 bldg.) in Sitio Banlas Sitio Clalang and Sitio Construction of Day Care Center in Sitio Banlas DAY CARE CENTER 1 300,000.00 completed

Page 22: List of KALAHI-CIDSS Subprojects - BUB

XII Sarangani Malapatan 2013 Construction of Day Care Center Sitio Clalang DAY CARE CENTER 1 completedXII Sarangani Malapatan 2013 Construction of Day Care Center DAY CARE CENTER 1 completedXII Sarangani Malapatan 2013 Construction of Day Care Centers in Sitio Bital Construction of Day Care Centers in Sitio Bital DAY CARE CENTER 1 400,000.00 March 2015 completed

XII Sarangani Malapatan Daan Suyan 2014Rehabilitation Of Hilado Compound- Tacal- Pitac Zone I And Ii, Daan Suyan RoadRehabilitation Of Hilado Compound- Tacal- Pitac Zone I And

Ii, Daan Suyan RoadROAD 1 200,000.00 pipelined

XII Sarangani Malapatan Proper 2014 Rehabilitation Of Brgy Proper- Sitio Layal Road Rehabilitation Of Brgy Proper- Sitio Layal Road ROAD 1 500,000.00 pipelined

XII Sarangani Malapatan 2014Rehabilitation Of Junction National Highway To Malaygang

Road,Islam- Kiupa road,Kalagumit To Calucob road, Nawa

To Islam road ,Jolohano road

Rehabilitation Of Junction National Highway To Malaygang

Road,Islam- Kiupa road,Kalagumit To Calucob road, Nawa

To Islam road ,Jolohano road

ROAD 1 300,000.00 pipelined

XII Sarangani Malapatan 2014 Rehabilitation Of Baldangi Mangga road 500M Rehabilitation Of Baldangi Mangga road 500M ROAD 1 200,000.00 pipelined

XII Sarangani Malapatan 2014 Repair And Rehabilitation Of Road Molo To Lun Masla Road Repair And Rehabilitation Of Road Molo To Lun Masla Road ROAD 1 200,000.00 pipelined

XII Sarangani Malapatan 2014 Rehabilitation Of Purok 3 To Bital Road Rehabilitation Of Purok 3 To Bital Road ROAD 1 500,000.00 pipelinedXII Sarangani Malapatan Proper to Kitulag 2014 Rehabilitation Of Brgy Proper To Kitulag, Kinam Rehabilitation Of Brgy Proper To Kitulag, Kinam 2 400,000.00 pipelined

XII Sarangani Malungon 2013Construction of Livelihood &Productivity Training Center for Women, OSY, PWD Construction of Livelihood &Productivity Training Center for

Women, OSY, PWD1 2,000,000.00 March 2015 completed

XII Sarangani Malungon 2014 Municipal Vocational Training Center (Building, Equipment And Facilities)Municipal Vocational Training Center (Building, Equipment

And Facilities)BUILDING FACILITY 1 1,000,000.00 ongoing

XII Sarangani Malungon 2014 Rehabilitation/Upgrading Of Datal Tampal - Waling-Waling road Rehabilitation/Upgrading Of Datal Tampal - Waling-Waling

roadROAD 1 750,000.00 ongoing

XII Sarangani Malungon Banati 2014 Repair Of Day Care Centers Repair of Day Care Center Brgy. Banati DAY CARE CENTER 1 1,000,000.00 ongoingXII Sarangani Malungon Upper Biangan 2014 Repair of Day Care Center Brgy. Upper Biangan DAY CARE CENTER 2 ongoingXII Sarangani Malungon J.P Laurel 2014 Repair of Day Care Center Brgy. J.P Laurel DAY CARE CENTER 1 ongoingXII Sarangani Malungon Lower Mainit 2014 Repair of Day Care Center Brgy. Lower Mainit DAY CARE CENTER 1 ongoing

XII Sarangani Malungon 2014 Upgrading Of Senior Citizen Building For Health And Wellness Upgrading Of Senior Citizen Building For Health And

WellnessBUILDING FACILITY 1 300,000.00 ongoing

XII Sarangani Malungon 2015 CONSTRUCTION OF CRISIS INTERVENTION CENTER CONSTRUCTION OF CRISIS INTERVENTION CENTER 1 781,300.00 proposed

XII SOUTH COTABATO GENERAL SANTOS CITY

(DADIANGAS)2014 Values Education To Improve Local Governance Values Education To Improve Local Governance 1 600,000.00 June 2015 completed

XII SOUTH COTABATOGENERAL SANTOS CITY

(DADIANGAS)2015

COMPLETION OF RESIDENTIAL FACILITY (BAHAY PAG-ASA)

WITH CICL ACTIVITY AREA TO INCLUDE INSTALLATION OF

WATER SYSTEM; ELECTRICAL SERVICE ENTRANCE

CONSTRUCTION WITH TRANSFORMER AND PERIMETER

COMPLETION OF RESIDENTIAL FACILITY (BAHAY PAG-ASA)

WITH CICL ACTIVITY AREA TO INCLUDE INSTALLATION OF

WATER SYSTEM; ELECTRICAL SERVICE ENTRANCE

CONSTRUCTION WITH TRANSFORMER AND PERIMETER

WATER SYSTEM 1 2,400,000.00 proposed

XII SOUTH COTABATO GENERAL SANTOS CITY

(DADIANGAS)2015 CONSTRUCTION OF DAY CARE CENTERS- CONSTRUCTION OF DAY CARE CENTERS- DAY CARE CENTER 1 3,240,000.00 proposed

XII SOUTH COTABATO GENERAL SANTOS CITY

(DADIANGAS)2015 IMPROVEMENT AND REPAIR OF MODEL SENIOR CITIZEN

CENTER TO INCLUDE PERIMETER FENCE

IMPROVEMENT AND REPAIR OF MODEL SENIOR CITIZEN

CENTER TO INCLUDE PERIMETER FENCE1 900,000.00 proposed

XII SOUTH COTABATO CITY OF KORONADAL (Capital) 2015 ESTABLISHMENT OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH LAW (CIC) OR YOUTH HOME

ESTABLISHMENT OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH LAW (CIC) OR YOUTH HOME1 3,580,060.00 proposed

XII South Cotabato Lake Sebu 2014 Rehabilitation of road -T'Boto-T'Ebong Lake Seloton Rehabilitation of road -T'Boto-T'Ebong Lake Seloton ROAD 1 1,000,000.00 ongoingXII South Cotabato Lake Sebu 2014 Rehabilitation of road -Upper Talubek-Traankini Road Rehabilitation of road -Upper Talubek-Traankini Road ROAD 1 800,000.00 ongoing

XII South Cotabato Lake Sebu 2015 PROTECTIVE SERVICES INFRASTRUCTURE -CONSTRUCTION

OF DAY CARE CENTER

PROTECTIVE SERVICES INFRASTRUCTURE -CONSTRUCTION

OF DAY CARE CENTERDAY CARE CENTER 1 1,500,000.00 TBD

XII South Cotabato Lake Sebu 2015 BASIC EDUCATION FACILITIES BASIC EDUCATION FACILITIES 1 1,000,000.00 TBDXII South Cotabato Norala 2014 Repair Of Day Care Center Repair Of Day Care Center DAY CARE CENTER 1 300,000.00 ongoingXII South Cotabato Norala 2015 IMPROVEMENT OF WOMEN CRISIS CENTER IMPROVEMENT OF WOMEN CRISIS CENTER 1 900,000.00 proposedXII South Cotabato Norala 2015 CONSTRUCTION OF GROUP HANDWASHING FACILITY CONSTRUCTION OF GROUP HANDWASHING FACILITY SANITARY FACILITY 1 500,000.00 proposedXII South Cotabato Norala 2015 REHABILITATION OF SENIOR CITIZEN BUILDINGS REHABILITATION OF SENIOR CITIZEN BUILDINGS BUILDING FACILITY 1 900,000.00 proposedXII SOUTH COTABATO SANTO NIÑO 2015 ENHANCEMENT OF SENIOR CITIZEN’S CENTER ENHANCEMENT OF SENIOR CITIZEN’S CENTER 1 500,000.00 proposed

XII SOUTH COTABATO SANTO NIÑO 2015 REPAIR OF POBLACION-C DCC AND EXPANSION OF

POBLACION-B DCC

REPAIR OF POBLACION-C DCC AND EXPANSION OF

POBLACION-B DCCDAY CARE CENTER 1 500,000.00 proposed

XII SOUTH COTABATO SANTO NIÑO 2015 RENOVATION OF AMBALGAN DCC AND EXTENSION OF

SUPERVISED NEIGHBORHOOD PLAY BUILDING

RENOVATION OF AMBALGAN DCC AND EXTENSION OF

SUPERVISED NEIGHBORHOOD PLAY BUILDINGDAY CARE CENTER 1 500,000.00 proposed

XII South Cotabato Surallah 2015 CONSTRUCTION OF BAHAY PAG-ASA FOR CICL CONSTRUCTION OF BAHAY PAG-ASA FOR CICL 1 3,000,000.00 proposedXII South Cotabato Surallah 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 750,000.00 proposed

XII South Cotabato Surallah 2015 CONSTRUCTION OF OFFICE OF PERSONS WITH DISABILITY

AFFAIRS

CONSTRUCTION OF OFFICE OF PERSONS WITH DISABILITY

AFFAIRS1 500,000.00 proposed

XII South Cotabato Surallah 2015 CONSTRUCTION OF DAY CENTER CONSTRUCTION OF DAY CENTER 1 1,000,000.00 proposed

XII South Cotabato Tampakan 2015 CONSTRUCTION OF DAY CARE CENTERS (SAN ISIDRO I &

MEDALLA MILAGROSA) WITH FACILITIES

CONSTRUCTION OF DAY CARE CENTERS (SAN ISIDRO I &

MEDALLA MILAGROSA) WITH FACILITIESDAY CARE CENTER 1 667,926.40 ongoing

XII South Cotabato Tampakan 2015 REPAIR OF CLASSROOM (TAPLAN ES, LIBERTY NHS, TNHS,

LAMBAYONG ES, DANLAG NHS)

REPAIR OF CLASSROOM (TAPLAN ES, LIBERTY NHS, TNHS,

LAMBAYONG ES, DANLAG NHS)SCHOOL FACILITY 1 1,336,400.00 ongoing

XII South Cotabato Tantangan 2014 Construction Of Youth Center (Bahay Pag-Asa Concept) Construction Of Youth Center (Bahay Pag-Asa Concept) 1 940,000.00 ongoingXII South Cotabato Tantangan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 783,066.66 proposedXII South Cotabato Tantangan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 783,066.66 proposedXII South Cotabato Tantangan 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 783,066.66 proposedXII South Cotabato Tantangan 2015 CLASSROOM REPAIRS CLASSROOM REPAIRS SCHOOL FACILITY 1 669,600.00 proposedXII South Cotabato Tantangan 2014 Construction Of Women Training Center Construction Of Women Training Center 1 1,670,000.00 ongoingXII South Cotabato T'boli 2014 Improvement Of Bahay Pag-Asa Bldg. Improvement Of Bahay Pag-Asa Bldg. 1 300,000.00 ongoingXII South Cotabato T'boli 2014 Improvement Of Training Center Improvement Of Training Center 1 40,000.00 ongoingXII South Cotabato T'boli 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 1 3,700,000.00 proposed

XII South Cotabato Tupi 2015 PRODUCTIVE SERVICES-INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF BAHAY PAG-ASA)

PRODUCTIVE SERVICES-INFRASTRUCTURE PROJECTS

(CONSTRUCTION OF BAHAY PAG-ASA)1 1,350,000.00 proposed

XII Sultan Kudarat Bagumbayan 2013 Construction of Crisis Center with Facilities Construction of Crisis Center with Facilities 1 2,000,000.00 March 2015 completedXII Sultan Kudarat Bagumbayan 2013 Construction of Crisis Center with facilities Construction of Crisis Center with facilities 1 March 2015 completedXII Sultan Kudarat Bagumbayan 2013 Enhancement of various PO/CSO Enhancement of various PO/CSO 1 300,000.00 completedXII Sultan Kudarat Columbio 2014 Rehabilitation Of Sinapulan-Colunsabak Road (3Kms) Rehabilitation Of Sinapulan-Colunsabak Road (3Kms) ROAD 1 1,000,000.00 pipelined

XII Sultan Kudarat Columbio 2014 Construction Of Sitio New Ilocos, Poblacion - Sinalcuan Roads (4Kms) Construction Of Sitio New Ilocos, Poblacion - Sinalcuan

Roads (4Kms)ROAD 1 1,000,000.00 pipelined

XII Sultan Kudarat Columbio 2014 Rehabilitation Of Maligaya-Sitio Mauno-Sinapulan Road (2Kms) Rehabilitation Of Maligaya-Sitio Mauno-Sinapulan Road

(2Kms)ROAD 1 1,000,000.00 June 2015 completed

XII Sultan Kudarat Columbio 2014 Construction Of Sitio Lamalis - Sitio Lamgawel Roads (2.6Kms) Construction Of Sitio Lamalis - Sitio Lamgawel Roads

(2.6Kms)ROAD 1 500,000.00 June 2015 completed

XII Sultan Kudarat Columbio 2014 Rehabilitation Of Telafas To Campo Uno (2Kms) Rehabilitation Of Telafas To Campo Uno (2Kms) 1 500,000.00 ongoingXII Sultan Kudarat Columbio 2014 Rehabilitation Of Sitio Malingen Maligaya Road (3Kms) Rehabilitation Of Sitio Malingen Maligaya Road (3Kms) ROAD 1 500,000.00 June 2015 completed

XII Sultan Kudarat Columbio 2014 Rehabilitation Of Lomoyon - Sitio Bialong, Polomolok Road Rehabilitation Of Lomoyon - Sitio Bialong, Polomolok Road ROAD 1 1,200,000.00 pipelined

XII Sultan Kudarat Columbio 2014 Rehabilitation Of Sinapulan-Malpikat Road Rehabilitation Of Sinapulan-Malpikat Road ROAD 1 1,000,000.00 ongoingXII Sultan Kudarat Columbio 2015 CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER CONSTRUCTION OF ONE (1) UNIT DAY CARE CENTER DAY CARE CENTER 1 633,810.00 proposed

XII Sultan Kudarat Columbio 2015 CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER

CONSTRUCTION OF WOMEN AND CHILDREN CRISIS

CENTER1 1,267,620.00 proposed

XII Sultan Kudarat Columbio 2015 REHAB OF POTABLE WATER SYSTEM LEVEL II REHAB OF POTABLE WATER SYSTEM LEVEL II WATER SYSTEM 1 422,540.00 proposedXII Sultan Kudarat Columbio 2015 REHAB OF POTABLE WATER SYSTEM REHAB OF POTABLE WATER SYSTEM WATER SYSTEM 1 422,540.00 proposedXII Sultan Kudarat Columbio 2015 REHAB OF POTABLE WATER SYSTEM LEVEL II REHAB OF POTABLE WATER SYSTEM LEVEL II WATER SYSTEM 1 845,080.00 proposedXII Sultan Kudarat Columbio 2015 CONSTRUCTION OF BOX CULVERT CONSTRUCTION OF BOX CULVERT 1 422,540.00 proposedXII Sultan Kudarat Columbio 2015 REHAB OF WATER SYSTEM LEVEL II REHAB OF WATER SYSTEM LEVEL II WATER SYSTEM 1 845,080.00 proposedXII Sultan Kudarat Columbio 2015 FLOOD PROTECTION DIKE FLOOD PROTECTION DIKE WATER CONTROL 1 1,690,160.00 proposedXII Sultan Kudarat Columbio 2015 CONSTRUCTION OF MARKET DRAINAGE CONSTRUCTION OF MARKET DRAINAGE DRAINAGE SYSTEM 1 845,080.00 proposed

XII Sultan Kudarat Esperanza 2013 Construction of Training Center and Provision of Facilities Construction of Training Center and Provision of Facilities 1 2,900,000.00 March 2015 completed

XII Sultan Kudarat Isulan (Capital) Kulanding 2013 Early Child Care and Development (ECCD)/Rehabilitation of Day care centers Rehabilitation of Day Care Center - Kulanding DAY CARE CENTER 1 2,500,000.00 completedXII Sultan Kudarat Isulan (Capital) Sampao 2013 Rehabilitation of Day Care Center - Sampao DAY CARE CENTER 1 completedXII Sultan Kudarat Isulan (Capital) Laguilayan 2013 Rehabilitation of Day Care Center - Laguilayan DAY CARE CENTER 1 completedXII Sultan Kudarat Isulan (Capital) Lagandang 2013 Rehabilitation of Day Care Center - Lagandang DAY CARE CENTER 1 completedXII Sultan Kudarat Isulan (Capital) Kalawag 2013 Rehabilitation of Day Care Center - Kalawag 1 DAY CARE CENTER 1 completedXII Sultan Kudarat Isulan (Capital) 2015 UPGRADING/REPAIR OF DAY CARE CENTER UPGRADING/REPAIR OF DAY CARE CENTER DAY CARE CENTER 1 1,530,000.00 proposedXII Sultan Kudarat Isulan (Capital) 2015 CHILD MINDING CENTER CHILD MINDING CENTER DAY CARE CENTER 1 1,445,000.00 proposedXII Sultan Kudarat Kalamansig Datuwasay 2013 Construction of 7 Daycare Centers Construction of Day Care Center - Datuwasay DAY CARE CENTER 1 875,000.00 completedXII Sultan Kudarat Kalamansig Sangay 2013 Construction of Day Care Center - Sangay DAY CARE CENTER 1 March 2015 completed

XII Sultan Kudarat Kalamansig 2013Provision of ECCD materials for DCCs. Consisting of early learning materials, story books, musical instruments, emergency kits, feeding utensils and equipment.Provision of ECCD materials for DCCs. Consisting of early

learning materials, story books, musical instruments,

emergency kits, feeding utensils and equipment.

DAY CARE CENTER 1 150,000.00 March 2015 completed

XII Sultan Kudarat Kalamansig 2013 Rehabilitation of 8 Old Day Care Centers Rehabilitation of 8 Old Day Care Centers DAY CARE CENTER 1 150,000.00 completedXII Sultan Kudarat Kalamansig 2015 REHABILITATION OF DAY CARE CENTER REHABILITATION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposed

XII Sultan Kudarat Kalamansig 2015 CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW

CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW1 500,000.00 proposed

XII Sultan Kudarat Kalamansig 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposedXII Sultan Kudarat Kalamansig 2015 CONSTRUCTION OF DAY CARE CENTER CONSTRUCTION OF DAY CARE CENTER DAY CARE CENTER 1 500,000.00 proposed

XII SULTAN KUDARAT LAMBAYONG (MARIANO

MARCOS)Poblacion 2013 Repair of Day Care Centers Repair of Day Care Center - Poblacion DAY CARE CENTER 1 500,000.00 completed

XII SULTAN KUDARAT LAMBAYONG (MARIANO

MARCOS)2015 COSNTRUCTION OF DAYCARE CENTERS COSNTRUCTION OF DAYCARE CENTERS DAY CARE CENTER 1 892,500.00 proposed

XII Sultan Kudarat Lebak Datu Karon 2014 Construction Of Dcc Datu Karon Construction Of Dcc Datu Karon DAY CARE CENTER 1 276,000.00 ongoingXII Sultan Kudarat Lebak Kinudalan 2014 Construction Of Dcc Kinudalan Construction Of Dcc Kinudalan DAY CARE CENTER 1 276,000.00 ongoingXII Sultan Kudarat Lebak Villamonte 2014 Construction Of Dcc Villamonte Construction Of Dcc Villamonte DAY CARE CENTER 1 276,000.00 ongoingXII Sultan Kudarat Lebak Capilan 2014 Construction Of Dcc Capilan Construction Of Dcc Capilan DAY CARE CENTER 1 276,000.00 pipelinedXII Sultan Kudarat Lebak Salaman 2014 Construction Of Dcc Salaman Construction Of Dcc Salaman DAY CARE CENTER 1 276,000.00 pipelinedXII Sultan Kudarat Lebak Tibpuan 2014 Core Shelter Assistance Program - Tibpuan Core Shelter Assistance Program - Tibpuan 1 4,025,000.00 ongoingXII Sultan Kudarat Lebak 2015 PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT PROTECTIVE SERVICES - INFRASTRUCTURE PROJECT 1 1,157,500.00 TBD

XII Sultan Kudarat Lebak 2015 ELECTRIFICATION OF 57 HOUSES UNDER THE CORE

SHELTER PROGRAM

ELECTRIFICATION OF 57 HOUSES UNDER THE CORE

SHELTER PROGRAM1 500,000.00 TBD

XII Sultan Kudarat Lutayan 2014 Road project Road project ROAD 1 1,888,888.89 ongoingXII Sultan Kudarat Lutayan 2014 Road project Road project ROAD 1 1,444,444.44 ongoingXII Sultan Kudarat Lutayan 2014 Road project Road project ROAD 1 1,444,444.44 ongoingXII Sultan Kudarat Lutayan 2014 Road project Road project ROAD 1 1,444,444.44 ongoingXII Sultan Kudarat Lutayan 2014 Road project Road project ROAD 1 1,444,444.44 ongoing

XII Sultan Kudarat Lutayan 2013Construction of Livelihood and Productivity Training Center

and Provision of Facilities for Women, Out of School Youth,

PWD and 4Ps beneficiaries

Construction of Livelihood and Productivity Training Center

and Provision of Facilities for Women, Out of School Youth,

PWD and 4Ps beneficiaries

LIVELIHOOD 1 2,000,000.00 completed

XII Sultan Kudarat Lutayan 2015 CONSTRUCTION OF WOMEN'S CRISIS CENTER WITH

COMPLETE FACILITIES

CONSTRUCTION OF WOMEN'S CRISIS CENTER WITH

COMPLETE FACILITIES1 1,275,000.00 TBD

XII Sultan Kudarat Lutayan 2015 CONSTRUCTION OF 3 DAY CARE CENTERS WITH COMPLETE

FACILITIES

CONSTRUCTION OF 3 DAY CARE CENTERS WITH COMPLETE

FACILITIESDAY CARE CENTER 1 2,975,000.00 TBD

XII Sultan Kudarat Palimbang 2014 Construction Of Three (3) Units Day Care Center Construction Of Three (3) Units Day Care Center DAY CARE CENTER 1 2,250,000.00 pipelinedXII Sultan Kudarat Palimbang 2015 PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS PROTECTIVE SERVICES INFRASTRUCTURE PROJECTS 1 4,500,000.00 ongoingXII SULTAN KUDARAT PRESIDENT QUIRINO 2015 CONSTRUCTION OF THREE (3) DAY CARE CENTER CONSTRUCTION OF THREE (3) DAY CARE CENTER DAY CARE CENTER 1 2,250,000.00 proposedXII SULTAN KUDARAT SEN. NINOY AQUINO Basag 2014 Road project in Basag proper Road project in Basag proper ROAD 1 700,000.00 pipelinedXII SULTAN KUDARAT SEN. NINOY AQUINO Bugso 2014 Road project in Bugso proper Road project in Bugso proper ROAD 1 700,000.00 pipelinedXII SULTAN KUDARAT SEN. NINOY AQUINO Buklod 2014 Road project in Buklod proper Road project in Buklod proper ROAD 1 700,000.00 pipelined

XII SULTAN KUDARAT SEN. NINOY AQUINO 2015 CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW

CONSTRUCTION OF BAHAY PAG-ASA FOR CHILDREN IN

CONFLICT WITH THE LAW1 2,000,000.00 proposed