List of KALAHICIDSS Subprojects KC Extension Region Province Municipality Prio Barangay Subproject Name Total Project Amount Physical Status CAR Mountain Province Besao Agawa Construction of Apapa, Nabanig, Bengaw Drainage System 786,400.00 completed CAR Mountain Province Besao Ambagiw Improvement of Tokok Communal Irrigation System 399,325.00 completed CAR Mountain Province Besao Banguitan Improvement of Saysayagan to Katawaen Farm to Market Road 1,363,400.00 completed CAR Mountain Province Besao Catengan Improvement of Catengan Water Supply System 715,000.00 completed CAR Mountain Province Besao Gueday Improvement of Agawa to Dayocan, Patay to Binangbangda & Nabago to Batogyan Pathways 756,800.00 completed CAR Mountain Province Besao Lacmaan Concreting of Lacmaan Drainage System 751,150.00 completed CAR Mountain Province Besao Padangaan Construction of Day Care Center 950,700.00 completed CAR Mountain Province Besao Suquip Improvement of Suquip Water Supply System 370,000.00 completed CAR Mountain Province Besao Tamboan Improvement of KinIway to Tamboan Farm to Market Road 1,820,470.00 completed Caraga Agusan Del Sur Veruela Anitap Construction of Barangay Health Station 834,052.00 completed Caraga Agusan Del Sur Veruela Bacay Construction of Rain Water Collector 1,295,906.00 completed Caraga Agusan Del Sur Veruela Caigangan Construction of Barangay Health Station 830,122.00 completed Caraga Agusan Del Sur Veruela Candiis Installation of Corn Sheller 246,591.00 completed Caraga Agusan Del Sur Veruela Limot Construction of Barangay Health Station 834,052.00 completed Caraga Agusan Del Sur Veruela Sawagan Construction of Individual FerroCement Cylindrical Rain Water Collector (166 Units) 2,127,815.00 completed Caraga Agusan Del Sur Veruela Sisimon Construction of Potable Water System Level II (Pump Driven) 2,089,442.00 completed Caraga Surigao Del Norte Pilar Asinan Rehabilitation of Brgy. Road from Purok Tessa to Bayabas 844,585.00 completed Caraga Surigao Del Norte Pilar Caridad Construction of 1 Unit PreSchool Building (PS) 727,289.00 completed Caraga Surigao Del Norte Pilar Centro Construction of Solar Dryer Pavement 291,000.00 completed Caraga Surigao Del Norte Pilar Consolacion Rehabilitation of 660 Ln.m Road from Crossing Highway to Brgy. Proper 1,206,943.00 completed Caraga Surigao Del Norte Pilar Datu Construction of Day Care Center 641,462.00 completed

Upload: others

Post on 31-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • List of KALAHI‐CIDSS Subprojects ‐ KC Extension

    Region Province Municipality Prio Barangay Subproject Name Total Project 

    Amount Physical Status

    CAR Mountain Province Besao AgawaConstruction of Ap‐apa, Nabanig, Bengaw Drainage System

           786,400.00  completed

    CAR Mountain Province Besao AmbagiwImprovement of Tokok Communal Irrigation System

           399,325.00  completed

    CAR Mountain Province Besao BanguitanImprovement of Saysayagan to Katawaen Farm to Market Road

       1,363,400.00  completed

    CAR Mountain Province Besao Catengan Improvement of Catengan Water Supply System        715,000.00  completed

    CAR Mountain Province Besao GuedayImprovement of Agawa to Dayocan, Patay to Binangbangda & Nabago to Batogyan Pathways

           756,800.00  completed

    CAR Mountain Province Besao Lacmaan Concreting of Lacmaan Drainage System        751,150.00  completedCAR Mountain Province Besao Padangaan Construction of Day Care Center        950,700.00  completed

    CAR Mountain Province Besao Suquip Improvement of Suquip Water Supply System        370,000.00  completed

    CAR Mountain Province Besao TamboanImprovement of Kin‐Iway to Tamboan Farm to Market Road

       1,820,470.00  completed

    Caraga Agusan Del Sur Veruela Anitap Construction of Barangay Health Station        834,052.00  completedCaraga Agusan Del Sur Veruela Bacay Construction of Rain Water Collector    1,295,906.00  completedCaraga Agusan Del Sur Veruela Caigangan Construction of Barangay Health Station        830,122.00  completedCaraga Agusan Del Sur Veruela Candiis Installation of Corn Sheller        246,591.00  completedCaraga Agusan Del Sur Veruela Limot Construction of Barangay Health Station        834,052.00  completed

    Caraga Agusan Del Sur Veruela SawaganConstruction of Individual Ferro‐Cement Cylindrical Rain Water Collector (166 Units)

       2,127,815.00  completed

    Caraga Agusan Del Sur Veruela SisimonConstruction of Potable Water System Level II (Pump Driven)

       2,089,442.00  completed

    Caraga Surigao Del Norte Pilar AsinanRehabilitation of Brgy. Road from Purok Tessa to Bayabas

           844,585.00  completed

    Caraga Surigao Del Norte Pilar Caridad Construction of 1 Unit Pre‐School Building (PS)        727,289.00  completed

    Caraga Surigao Del Norte Pilar Centro Construction of Solar Dryer Pavement        291,000.00  completed

    Caraga Surigao Del Norte Pilar ConsolacionRehabilitation of 660 Ln.m Road from Crossing Highway to Brgy. Proper

       1,206,943.00  completed

    Caraga Surigao Del Norte Pilar Datu Construction of Day Care Center        641,462.00  completed

  • Caraga Surigao Del Norte Pilar Jaboy Construction of 1 Unit Elem. School Building (Elem)        727,289.00  completed

    Caraga Surigao Del Norte Pilar Katipunan Construction of Health Station        797,450.00  completed

    Caraga Surigao Del Norte Pilar MaasinConstruction of River Protection Cum Fishermen's Wharf

           616,947.00  completed

    Caraga Surigao Del Norte Pilar Mabuhay Construction of Health Station        707,450.00  completedCaraga Surigao Del Norte Pilar Punta Rehabilitation and Upgrading of Sea Wall        684,781.00  completedCaraga Surigao Del Norte Pilar Salvacion Construction of Sea Wall        658,354.00  completedCaraga Surigao Del Norte Pilar San Roque Construction of 1 Unit School Building (Elem)        727,289.00  completed

    Caraga Surigao Del Norte Socorro Del PilarConstruction of 400 ln.m. Junction Del Pilar‐Kapihan FMR (Gravelling)

           894,357.00  completed

    Caraga Surigao Del Norte Socorro Doña Helene Rehabilitation/Upgrading of Brgy. Street (336 ln.m)        504,949.00  completed

    Caraga Surigao Del Norte Socorro HonradoConstruction of Honrado‐Tugbungan FMR with RCPC Installation (Gravelling 350 ln.m)

           886,505.00  completed

    Caraga Surigao Del Norte Socorro N. Estrella Construction of Barangay Health Station        856,860.00  completedCaraga Surigao Del Norte Socorro Pamosaingan Construction of Day Care Center        834,201.00  completedCaraga Surigao Del Norte Socorro San Roque Construction of Level II Gravity Water System        843,271.00  completedCaraga Surigao Del Norte Socorro Sering Construction of 100 ln.m. Sea Wall    1,162,540.00  completedCaraga Surigao Del Norte Socorro Songkoy Construction of Barangay Health Station        856,860.00  completedCaraga Surigao Del Norte Socorro Sta. Cruz Construction of Level II Gravity Water System    1,273,052.00  completed

    Caraga Surigao Del Sur Cagwait Bitaugan EastConstruction of 1 Unit 2 Classroom School Building (HS)

       1,458,519.00  completed

    Caraga Surigao Del Sur Cagwait Bitaugan West Construction of Bailey Bridge    3,781,548.00  completedCaraga Surigao Del Sur Cagwait La Purisima Construction of Barangay Health Station        764,107.00  completedCaraga Surigao Del Sur Cagwait Mat‐e Construction of River Bank Protection    1,263,615.00  completedCaraga Surigao Del Sur Cagwait Poblacion Construction of Drainage Canal    1,171,796.00  completedCaraga Surigao Del Sur Cagwait Tawagan Construction of Barangay Health Station        780,415.00  completedIV‐A Quezon Catanauan Barangay 8 Construction of Drainage Canal    2,991,000.00  completedIV‐A Quezon Catanauan Camandiison Improvement of FMR    3,034,000.00  completedIV‐A Quezon Catanauan Doongan Ibaba Improvement of FMR    3,055,760.93  completedIV‐A Quezon Catanauan Macpac Improvement of Water System    1,304,000.00  completedIV‐A Quezon Catanauan Milagrosa Improvement of FMR    4,142,031.97  completedIV‐A Quezon Catanauan San Pablo Suha Improvement of FMR    4,849,000.00  completedIV‐A Quezon Catanauan San Vicente Silangan Improvement of FMR    2,163,000.00  completed

    IV‐A Quezon Catanauan Tagabas IbabaConstruction of 1 Unit 4 Classroom School Building (HS)

       2,728,000.00  completed

    IV‐A Quezon Catanauan Tagabas Ilaya Improvement of FMR    3,444,000.00  completedIV‐A Quezon Macalelon Candangal Expansion of Water System (1,825 ln m)    1,715,014.00  completed

  • IV‐A Quezon Macalelon Damayan Construction of Open Line Canal    1,052,764.00  completedIV‐A Quezon Macalelon Luctob Construction of Seawall    6,427,292.00  completedIV‐A Quezon Macalelon Mabini Ilaya Construction of Day Care Center        749,553.00  completedIV‐A Quezon Macalelon Olongtao Ibaba Construction of Health Station        775,024.00  completedIV‐A Quezon Macalelon Rizal Construction of Day Care Center        645,956.00  completed

    IV‐A Quezon Macalelon San JoseRe‐construction of 1.874 FMR with 600m concreting

       2,972,990.00  completed

    IV‐A Quezon Macalelon Taguin Construction of Health Station        758,527.00  completedIV‐A Quezon Macalelon Vista Hermosa Construction of Cable Bridge    2,715,532.00  completedIX Zamboanga Del Norte Leon Postigo Bogabongan Construction of Day Care Center        645,964.00  completed

    IX Zamboanga Del Norte Leon Postigo ManilConstruction of Water System Level II (Gravity Type)

           918,843.00  completed

    IX Zamboanga Del Norte Leon Postigo Mawal Construction of Water System Level I (Hand Pump)        656,473.00  completed

    IX Zamboanga Del Norte Leon Postigo Morob Road Improvement    1,809,582.00  completed

    IX Zamboanga Del Norte Leon Postigo NasibacConstruction of 1 Unit 2 Classroom Elem. School Building (Elem)

       1,145,256.00  completed

    IX Zamboanga Del Norte Leon Postigo SipakongConstruction of Water System Level II (Gravity Type)

           977,309.00  completed

    IX Zamboanga Del Norte Leon Postigo Sta. MariaConstruction of 2 Units 4 Classrooms School Building (Elem)

       2,250,875.00  completed

    IX Zamboanga Del Norte Leon Postigo TalingaConstruction of 1 Unit 1 Classroom School Building (Elem)

           611,398.00  completed

    IX Zamboanga Del Norte Leon Postigo TinuyopConstruction of 1 Unit 2 Classroom School Building (HS)

       1,139,256.00  completed

    IX Zamboanga Del Norte Leon Postigo Titik Construction of Day Care Center        756,829.00  completedIX Zamboanga Del Norte Mutia Diolen Appropriate Farming Technology Support        478,858.00  completedIX Zamboanga Del Norte Mutia G. Bergado (New Casul) Construction of Day Care Center        697,092.00  completedIX Zamboanga Del Norte Mutia New Siquijor Appropriate Farming Technology Support        485,608.00  completedIX Zamboanga Del Norte Mutia Pasorio Sectional Road Concreting    3,017,004.00  completedIX Zamboanga Del Norte Mutia San Miguel Construction of Barangay Health Station        742,445.00  completedIX Zamboanga Del Norte Mutia Totongon Construction of Trading Post        552,050.00  completedIX Zamboanga Del Norte Mutia Tubac Construction of Day Care Center        699,661.00  completedIX Zamboanga Del Norte Mutia Unidos Construction of Water System Level II    3,408,975.00  completedIX Zamboanga Del Norte Siayan Datagan Construction of Birthing Center        880,000.00  completedIX Zamboanga Del Norte Siayan Diongan Construction of Trading Center        800,000.00  completedIX Zamboanga Del Norte Siayan Domogok Construction of Day Care Center        705,960.00  completedIX Zamboanga Del Norte Siayan Dumpilas Concreting on Critical Slope of Barangay Road    1,122,996.41  completed

  • IX Zamboanga Del Norte Siayan Guibo Construction of 1 Unit 2 CL School Building (Elem)    1,360,000.00  completed

    IX Zamboanga Del Norte Siayan Gunyan Construction of Day Care Center        730,000.00  completedIX Zamboanga Del Norte Siayan Macasing Construction of Day Care Center        762,000.00  completedIX Zamboanga Del Norte Siayan Moyo Construction of Day Care Center        715,500.00  completedIX Zamboanga Del Norte Siayan Muñoz Road Improvement    1,560,000.00  completedIX Zamboanga Del Norte Siayan Pange Construction of Day Care Center        520,000.00  completedIX Zamboanga Del Norte Siayan Paranglumba Construction of Line Ditch        680,000.00  completedIX Zamboanga Del Norte Siayan Poblacion Construction of Flood Control    1,090,600.00  completedIX Zamboanga Del Norte Siayan Sayaw Concreting on Critical Slope of Barangay Road    1,960,000.00  completedIX Zamboanga Del Norte Siayan Soguilon Road Improvement        550,000.00  completedIX Zamboanga Sibugay Alicia Alegria Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Bagong‐Buhay Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Bella Construction of Livelihood Training Center        800,487.00  completedIX Zamboanga Sibugay Alicia Calades Construction of Barangay Health Station        697,570.00  completedIX Zamboanga Sibugay Alicia Dawa‐Dawa Construction of Livelihood Training Center        835,364.00  completedIX Zamboanga Sibugay Alicia Gulayon Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Ilisan Construction of Barangay Health Station        697,570.00  completedIX Zamboanga Sibugay Alicia Kapatagan Construction of Livelihood Training Center        835,364.00  completedIX Zamboanga Sibugay Alicia Kawayan Construction of Birthing Homes        677,009.60  completedIX Zamboanga Sibugay Alicia Lambuyogan Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Lapirawan Construction of Barangay Health Station        697,570.00  completedIX Zamboanga Sibugay Alicia Litayon Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Lutiman Construction of Livelihood Training Center        835,364.00  completedIX Zamboanga Sibugay Alicia Milagrosa Construction of Barangay Health Station        697,570.00  completedIX Zamboanga Sibugay Alicia Naga‐Naga Construction of Warehouse        708,800.00  completedIX Zamboanga Sibugay Alicia Pandan‐Pandan Construction of Livelihood Training Center        800,487.00  completedIX Zamboanga Sibugay Alicia Payongan Construction of Livelihood Training Center        800,487.00  completed

    IX Zamboanga Sibugay Alicia Poblacion Construction of Solar Dryer with Mini Warehouse        913,204.00  completed

    IX Zamboanga Sibugay Alicia Sta. Maria Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Sto. Niño Construction of Barangay Health Station        697,570.00  completed

    IX Zamboanga Sibugay Alicia TalaptapConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,200,322.00  completed

    IX Zamboanga Sibugay Alicia Tampalan Construction of Barangay Health Station        697,570.00  completedIX Zamboanga Sibugay Alicia Tandiong‐Muslim Construction of Day Care Center        680,488.00  completedIX Zamboanga Sibugay Alicia Timbang‐Timbang Construction of Day Care Center        680,488.00  completed

    IX Zamboanga Sibugay Tungawan Batungan Construction of 1 Unit 1 CL Pre‐School Building (PS)        634,850.50  completed

  • IX Zamboanga Sibugay Tungawan Cayamcam Construction of Health Station        715,124.33  completedIX Zamboanga Sibugay Tungawan Datu Tumanggong Construction of Day Care Center        641,433.00  completedIX Zamboanga Sibugay Tungawan Gaycon Construction of Barangay Health Station        718,777.00  completed

    IX Zamboanga Sibugay Tungawan Langon Construction of 1 Unit 1 CL Pre‐School Building (PS)        613,850.50  completed

    IX Zamboanga Sibugay Tungawan Libertad Construction of Day Care Center        633,433.00  completed

    IX Zamboanga Sibugay Tungawan Linguisan Construction of 1 Unit 1 CL Pre‐School Building (PS)        641,850.50  completed

    IX Zamboanga Sibugay Tungawan Little Margos Construction of Day Care Center        655,433.00  completed

    IX Zamboanga Sibugay Tungawan Loboc Construction of 1 Unit 1 CL Pre‐School Building (PS)        639,350.50  completed

    IX Zamboanga Sibugay Tungawan Lower Tungawan Construction of 1 Unit 1 CL Pre‐School Building (PS)        613,850.50  completed

    IX Zamboanga Sibugay Tungawan Malungon Construction of Barangay Health Station        727,243.00  completedIX Zamboanga Sibugay Tungawan Masao Construction of Barangay Health Station        715,934.00  completed

    IX Zamboanga Sibugay Tungawan San Pedro Construction of 1 Unit 2 CL School Building (Elem)    1,172,076.00  completed

    IX Zamboanga Sibugay Tungawan Sto. Niño Construction of Barangay Health Station        725,934.00  completedIX Zamboanga Sibugay Tungawan Taglibas Construction of Barangay Health Station        717,595.00  completedIX Zamboanga Sibugay Tungawan Tigbanuang Construction of Barangay Health Station        715,934.00  completedIX Zamboanga Sibugay Tungawan Tigbucay Construction of Health Station        715,124.33  completed

    IX Zamboanga Sibugay Tungawan Tigpalay Construction of 1 Unit 2 CL School Building (Elem)    1,179,273.00  completed

    IX Zamboanga Sibugay Tungawan Timbabauan Construction of Health Station        717,596.00  completed

    IX Zamboanga Sibugay Tungawan Upper Tungawan Construction of 1 Unit 2 CL School Building (Elem)    1,182,273.00  completed

    V Masbate Aroroy Ambolong Construction of Pathways    1,332,841.85  completed

    V Masbate Aroroy AmotagConstruction of 1 Classroom School Building (Concrete Slab Roofing) (Elem)

           972,119.00  completed

    V Masbate Aroroy Bagauma Road Concreting    1,155,356.00  completed

    V Masbate Aroroy BalawingConstruction of 1 Classroom School Building (Concrete Slab Roofing) (HS)

       1,077,012.00  completed

    V Masbate Aroroy Balete Construction of Water System Level II        951,491.85  completedV Masbate Aroroy Cabangcalan Construction of Day Care Center        887,349.00  completedV Masbate Aroroy Concepcion Road Concreting    1,038,882.21  completedV Masbate Aroroy Dayhagan Construction of Water System Level II    1,131,534.65  completedV Masbate Aroroy DP Dela Rosa Construction of Day Care Center        781,790.00  completedV Masbate Aroroy Lanang Road Concreting        934,649.73  completed

  • V Masbate Aroroy Luy‐aRe‐gravelling w/ Concrete Lined Canal & Concreting of Pathways

       1,003,105.00  completed

    V Masbate Aroroy Mataba Construction of Water System Level II    1,342,619.65  completed

    V Masbate Aroroy Matalang‐talangConstruction of Health Station (Concrete Slab Roofing)

           777,957.00  completed

    V Masbate Aroroy MatongogConstruction of Barangay Health Station (Concrete Slab Roofing)

           798,902.00  completed

    V Masbate Aroroy Nabongsoran Construction of Day Care Center        859,157.00  completedV Masbate Aroroy Pangle Road Concreting    1,834,321.00  completedV Masbate Aroroy Pinanaan Road Concreting        990,000.90  completedV Masbate Aroroy Poblacion Drainage Canal    1,231,643.90  completed

    V Masbate Aroroy Sawang Construction of 1 Classroom School Building (HS)    1,032,276.00  completed

    V Masbate Aroroy TalibConstruction of Day Care Center (Concrete Slab Roofing)

           992,087.00  completed

    V Masbate Aroroy Tigbao Extension of Water System Level II to Sitio Tangig    1,190,014.15  completed

    V Masbate Aroroy TinagoConstruction of Concrete Pathways with Box Culvert

       1,003,518.49  completed

    V Masbate Aroroy TinigbanConstruction of Barangay Health Station (Concrete Slab Roofing)

           932,502.00  completed

    V Masbate Cawayan BegiaConstruction of Barangay Health Station with Rain Water Collector

           867,714.98  completed

    V Masbate Cawayan CabayuganConstruction of 1 Unit Day Care Center with Rain Water Collector

           821,398.54  completed

    V Masbate Cawayan CabungahanConstruction of 1 Unit Warehouse Building and Solar Dryer

       1,351,564.64  completed

    V Masbate Cawayan CalapayanConstruction of 1 Unit 2 Classroom School with Rain Water Collector (Elem)

       1,353,808.64  completed

    V Masbate Cawayan ChicoConstruction of 1 Unit Health Station with Rain Water Collector

           964,257.13  completed

    V Masbate Cawayan GuiomConstruction of 1 Unit Day Care Center with Rain  Water Collector

           821,989.79  completed

    V Masbate Cawayan Itom‐BatoConstruction of 1 Unit Day Care Center with Rain Water Collector

           825,774.14  completed

    V Masbate Cawayan Lague‐LagueConstruction of 1 Unit 2 Classroom School with Rain Water Collector (Elem)

       1,375,548.64  completed

    V Masbate Cawayan LibertadConstruction of 1 Unit 2 Classroom School with Rain Water Collector (HS)

       1,363,862.39  completed

  • V Masbate Cawayan LoocConstruction of 1 Unit 3 Classroom School with Rain Water Collector (Elem)

       1,907,338.60  completed

    V Masbate Cawayan MactanConstruction of 1 Unit Day Care Center with Rain Water Collector

           812,303.54  completed

    V Masbate Cawayan MadbadConstruction of 1 Unit Day Care Center with Rain Water Collector

           815,781.14  completed

    V Masbate Cawayan MalbugConstruction of 1 Unit 3 Classroom School Building with Rain Water Collector (HS)

       1,823,367.60  completed

    V Masbate Cawayan Panan‐awanConstruction of 1 Unit 2 Classroom School Building with Rain Water Collector (Elem)

       1,401,643.64  completed

    V Masbate Cawayan Pin‐AsConstruction of 1 Unit Day Care Center with Rain Water Collector

           839,711.84  completed

    V Masbate Cawayan PulotConstruction of 1 Unit 2 Classroom School Building with Rain Water Collector (Elem)

       1,378,819.99  completed

    V Masbate Cawayan Punta‐BatsanConstruction of 1 Unit 3 Classroom School with Rain Water Collector (Elem)

       1,911,538.60  completed

    V Masbate Cawayan RecodoConstruction of 1 Unit Health Station with Rain Water Collector

           883,622.38  completed

    V Masbate Cawayan San VicenteConstruction of 1 Unit 2 Classroom School Building with Rain Water Collector (Elem)

       1,356,908.63  completed

    V Masbate Cawayan VillahermosaConstruction of 1 Unit 2 Classroom School with Rain Water Collector (Elem)

       1,382,984.82  completed

    V Masbate San Pascual Boca‐Chica Construction of Flood Control        796,905.10  completed

    V Masbate San Pascual Bolod Construction of 1 Classroom School Building (HS)        795,969.50  completed

    V Masbate San Pascual Cueva Construction of  Mini‐Port    1,026,828.98  completedV Masbate San Pascual Dancalan Construction of Water System Level II    1,228,731.35  completedV Masbate San Pascual Halabangbaybay Pathway        627,854.75  completedV Masbate San Pascual Iniwaran Pathway    1,221,384.70  completedV Masbate San Pascual Ki‐Romero Construction of Health Station        787,874.15  completed

    V Masbate San Pascual Laurente Concreting of One (1) Lane Farm to Market Road        914,569.25  completed

    V Masbate San Pascual Mabuhay Pathway    1,005,818.96  completedV Masbate San Pascual Malaking Ilog Concreting of Pathway        765,313.16  completedV Masbate San Pascual Nazareno Concreting of Pathway    1,404,715.50  completed

    V Masbate San Pascual Quintina Construction of 1 Classroom School Building (HS)        863,292.10  completed

    V Masbate San Pascual San Jose Pathway        864,778.38  completedV Masbate San Pascual San Pedro Construction of Day Care Center        758,824.94  completed

  • V Masbate San Pascual San Rafael Construction of Day Care Center        802,184.50  completedV Masbate San Pascual Sta. Cruz Concreting Pathway    1,011,255.58  completedV Sorsogon Juban Binanuahan Concreting of Pathway    2,015,480.00  completedV Sorsogon Juban Biriran Concreting of Pathway    1,305,237.00  completedV Sorsogon Juban Calmayon Concreting of Pathway    2,711,196.00  completedV Sorsogon Juban Caruhayon Concreting of Pathway        460,955.00  completed

    V Sorsogon Juban Catanusan Construction of Irrigation System (500.00 ln.m)    1,529,830.00  completed

    V Sorsogon Juban Embarcadero Construction of School Building (Elem)        771,070.00  completedV Sorsogon Juban Maalo Concreting of Pathway    3,346,519.00  completedV Sorsogon Juban Rangas Conctruction of Barangay Health Station        764,971.00  completedV Sorsogon Juban Sablayan Construction of Water System Level II        741,849.00  completedV Sorsogon Juban Tinago Concreting of Pathway        844,025.00  completed

    V Sorsogon Pilar AbasConstruction of Community and Productivity Center (Concrete Slab Roofing)

           797,463.00  completed

    V Sorsogon Pilar Banuyo Drainage Facility    1,204,815.00  completedV Sorsogon Pilar Bayasong Construction of Barangay Health Station        783,000.00  completedV Sorsogon Pilar Bayawas Construction of Barangay Day Care Center        742,858.00  completedV Sorsogon Pilar Binanuahan Drainage Facility    1,208,994.00  completedV Sorsogon Pilar Calongay Irrigation Facility        406,141.00  completedV Sorsogon Pilar Catamlangan Strategic Access Facility (Pathway)        684,472.00  completedV Sorsogon Pilar Danlog Construction of Barangay Health Station        748,004.00  completedV Sorsogon Pilar Dao Drainage Facility    1,346,210.00  completedV Sorsogon Pilar Dapdap Farm to Market Road    2,088,713.00  completed

    V Sorsogon Pilar Esmerada Construction of 1 Classroom School Building (HS)        758,000.00  completed

    V Sorsogon Pilar Esperanza Strategic Access Facility (Pathway)        984,719.00  completedV Sorsogon Pilar Inapugan Construction of Barangay Health Station        774,122.00  completedV Sorsogon Pilar Lipason Community & Productivity Center        799,463.00  completed

    V Sorsogon Pilar Lourdes Construction of Barangay  Water System Level II    1,205,026.00  completed

    V Sorsogon Pilar Lubiano Construction of Barangay Health Station        772,740.00  completed

    V Sorsogon Pilar Lumbang Construction of Barangay Water System Level II    1,360,401.00  completed

    V Sorsogon Pilar Lungib Construction of Barangay Health Station        771,940.00  completedV Sorsogon Pilar Marifosque Construction of Day Care Center        700,000.00  completed

    V Sorsogon Pilar Mercedes Construction of Barangay Water System Level II        823,919.00  completed

    V Sorsogon Pilar Naspi Construction of Day Care Center        700,000.00  completed

  • V Sorsogon Pilar Palanas Barangay Community Market        677,166.00  completedV Sorsogon Pilar Pinagsalog Construction of Barangay Health Station        771,740.00  completed

    V Sorsogon Pilar Pineda Construction of Barangay Water System Level II    1,002,035.00  completed

    V Sorsogon Pilar Pudo Construction of Barangay Health Station        771,940.00  completedV Sorsogon Pilar Sacnangan Construction of Barangay Health Station        771,940.00  completedV Sorsogon Pilar San Antonio (Millabas) Construction of Irrigation System        860,264.00  completedV Sorsogon Pilar San Antonio (Sapa) Concreting of Pathway    1,291,964.00  completedV Sorsogon Pilar Santa Fe Construction of Flood Control System    1,193,718.00  completed

    VI Capiz Jamindan Agbun‐odRoad Improvement with Intermittent Construction of PCCP 310 ln.m FMR

           754,333.99  completed

    VI Capiz Jamindan AgcagayRoad Improvement with Intermittent Construction of PCCP 360 ln.m FMR

           747,585.38  completed

    VI Capiz Jamindan AglolowayRoad Improvement with Intermittent Construction of PCCP 400 ln.m FMR

           895,741.29  completed

    VI Capiz Jamindan Baye‐BayeRoad Improvement with Intermittent Construction of PCCP 320 ln.m FMR

           576,466.68  completed

    VI Capiz Jamindan EsperanzaRoad Improvement with Intermittent Construction of PCCP 320 ln.m FMR

           738,164.98  completed

    VI Capiz Jamindan Fe Road Improvement of 250 ln.m PCCP FMR        700,775.11  completed

    VI Capiz Jamindan IgangRoad Improvement with Intermittent Construction of PCCP 300 ln.m FMR

           698,866.73  completed

    VI Capiz Jamindan Jaena SurRoad Improvement with Intermittent Construction of PCCP 300 ln.m FMR

           692,504.69  completed

    VI Capiz Jamindan Jagnaya Construction of Community Market        563,324.29  completedVI Capiz Jamindan Lapaz Road Improvement of 150 ln.m PCCP FMR        432,180.01  completed

    VI Capiz Jamindan LuceroImprovement of 1.88 Km. RMR with Intermittent Concreting of 160 ln.m PCCP

       1,292,562.07  completed

    VI Capiz Jamindan MaantolRoad Improvement with Intermittent Construction of PCCP 380 ln.m FMR

           795,077.25  completed

    VI Capiz Jamindan Masgarau Road Improvement of 200 on.m PCCP FMR        444,861.38  completedVI Capiz Jamindan Milan Road Upgrading of 2.10 Km. FMR    1,212,453.41  completed

    VI Capiz Jamindan MolitRoad Improvement with Intermittent Construction of PCCP 250 ln.m FMR

           605,219.28  completed

    VI Capiz Jamindan Pangabat Road Improvement of 115 ln.m FMR        550,616.01  completed

    VI Capiz Jamindan PangabuanRoad Improvement with Intermittent Construction of PCCP 360 ln.m FMR

           730,792.50  completed

    VI Capiz Jamindan Pasol‐o Road Improvement of 1.0 Km. FMR    1,234,247.77  completed

  • VI Capiz Jamindan PoblacionConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,021,435.29  completed

    VI Capiz Jamindan San JuanRoad Improvement with Intermittent Construction of PCCP 460 ln.m FMR

       1,067,622.50  completed

    VI Capiz Jamindan San Vicente Improvement of Brgy. Road with 210 ln.m. PCCP        616,045.76  completed

    VI Capiz Jamindan Sto. RosarioRoad Improvement with Intermittent Construction of PCCP 320 ln.m FMR

           690,745.73  completed

    VI Iloilo Ajuy AdcadaraoConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,402,600.00  completed

    VI Iloilo Ajuy Agbobolo Construction of Health Station with Basic Facilities        735,450.00  completed

    VI Iloilo Ajuy Badiangan Construction of Reinforced Concrete Pipe Culvert        174,630.00  completed

    VI Iloilo Ajuy BarridoConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,390,284.00  completed

    VI Iloilo Ajuy Bay‐angConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,388,159.00  completed

    VI Iloilo Ajuy Bucana BunglasConstruction of 1 Unit 1 Classroom School Building with Facilities (Elem)

           736,530.00  completed

    VI Iloilo Ajuy CentralConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,373,750.00  completed

    VI Iloilo Ajuy CulasiConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,436,469.00  completed

    VI Iloilo Ajuy LucaConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,362,070.00  completed

    VI Iloilo Ajuy MalayuanConstruction of 1 Unit 1 Classroom School Building with Facilities (Elem)

           735,180.00  completed

    VI Iloilo Ajuy MangorocoroConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,364,930.00  completed

    VI Iloilo Ajuy Pantalan Navarro Road Improvement of 0.48 Km. FMR        641,520.00  completed

    VI Iloilo Ajuy Pedada Road Improvement of 1.031 Km. Drainage Culvert        947,640.00  completed

    VI Iloilo Ajuy PiliConstruction of 1 Unit 2 Classroom School Building with Amenities (HS)

       1,424,120.00  completed

    VI Iloilo Ajuy PoblacionConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,411,300.00  completed

    VI Iloilo Ajuy Puente BunglasConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,401,870.00  completed

  • VI Iloilo Ajuy Punta BuriConstruction of 1 Unit 1 Classroom School Building with Facilities (Elem)

           752,340.00  completed

    VI Iloilo Ajuy Rojas Road Improvement of 0.34 Km. FMR        464,150.00  completed

    VI Iloilo Ajuy San AntonioConstruction of 1 Unit 2 Classroom School Building with Facilities (HS)

       1,502,800.00  completed

    VI Iloilo Ajuy SilagonConstruction of Day Care Center with Basic Facilities

           739,590.00  completed

    VI Iloilo Ajuy TagubanhanConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,395,330.00  completed

    VI Iloilo Ajuy Taguhangin Construction of 448 sq.m. Solar Dryer        470,100.00  completed

    VI Iloilo Bingawan Agba‐o Construction of Day Care Center with Facilities        689,415.18  completed

    VI Iloilo Bingawan BulabogConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,281,547.46  completed

    VI Iloilo Bingawan Cairohan Road Improvement of 1.2 Km. FMR    1,772,481.72  completed

    VI Iloilo Bingawan GuinhulacanConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,281,547.46  completed

    VI Iloilo Bingawan Malitbog IlayaConstruction of 1 Unit 2 Classroom School Building with Facilities (Elem)

       1,281,547.46  completed

    VI Iloilo Bingawan Ngingi‐an Construction of Day Care Center with Facilities        689,415.18  completed

    VI Iloilo Bingawan Quinang‐yana Construction of Day Care Center with Facilities        689,415.18  completed

    VI Iloilo Bingawan Quinar‐upan Construction of Day Care Center with Facilities        689,415.18  completed

    VI Iloilo Bingawan Tapacon Construction of Day Care Center with Facilities        689,415.18  completed

    VI Iloilo Concepcion AgnagaConstruction of 1 Unit Classroom School Building (PS)

           648,206.37  completed

    VI Iloilo Concepcion Bacjawan SurConstruction of 1 Unit 2 Classroom School Building (HS)

       1,207,367.04  completed

    VI Iloilo Concepcion BatitiConstruction of 1 Unit Classroom School Building (PS)

           647,732.79  completed

    VI Iloilo Concepcion Botlog Fabrication and Installation of Artificial Reefs        437,242.30  completed

    VI Iloilo Concepcion CalamiganConstruction of 1 Unit Classroom School Building (PS)

           637,091.37  completed

    VI Iloilo Concepcion Dungon Solar Electrification (50 Units)    1,132,854.10  completed

    VI Iloilo Concepcion Jamul‐awonConstruction of Post Harvest Facility (Recirculating Mechanical Dryer)

       1,122,517.14  completed

  • VI Iloilo Concepcion LoongConstruction of 1 Unit Classroom School Building (HS)

           637,356.37  completed

    VI Iloilo Concepcion MacalbangConstruction of 1 Unit Classroom School Building (Elem)

           638,541.37  completed

    VI Iloilo Concepcion Macatunao Construction of Brgy. Trail with Foot Bridge    1,158,589.34  completedVI Iloilo Concepcion Malangabang Construction of Mini‐Market        915,310.50  completed

    VI Iloilo Concepcion Maliog‐liogConstruction of 1 Unit Classroom School Building (Elem)

           669,046.65  completed

    VI Iloilo Concepcion NiñoConstruction of 1 Unit Classroom School Building (PS)

           647,616.37  completed

    VI Iloilo Concepcion Nipa Fabrication and Installation of Artificial Reefs        472,062.05  completedVI Iloilo Concepcion Plandico Construction of Health Station        841,856.25  completedVI Iloilo Concepcion Poblacion Construction of Drainage Canal    1,182,222.55  completed

    VI Iloilo Concepcion PolopinaConstruction of 1 Unit Classroom School Building (HS)

           882,525.37  completed

    VI Iloilo Concepcion SalvacionConstruction of 1 Unit Classroom School Building (Elem)

           670,871.65  completed

    VI Iloilo Concepcion Talo‐toan Construction of Day Care Center        743,121.67  completed

    VI Iloilo Concepcion TambalizaConstruction of 1 Unit 2 Classroom School Building (HS)

       1,075,736.54  completed

    VI Iloilo Concepcion Tamis‐ac Road Improvement    1,144,836.52  completed

    VI Iloilo Janiuay Abangay Construction of Two (2) Classroom Building (Elem)    1,235,835.33  completed

    VI Iloilo Janiuay Aguingay Construction of One (1) Classroom Building (Elem)        708,190.90  completed

    VI Iloilo Janiuay Aquino Nobleza East Drainage System Improvement    1,466,338.00  completed

    VI Iloilo Janiuay Barasalon Construction of One (1) Classroom Building (Elem)        733,082.41  completed

    VI Iloilo Janiuay BongolRoad Improvement of 0.30 Km. Farm to Market Road

       1,731,186.00  completed

    VI Iloilo Janiuay Calmay Construction of Flood Control/Dike    1,364,778.00  completedVI Iloilo Janiuay Canauili Construction of Health Station        770,244.51  completed

    VI Iloilo Janiuay Canauillian Construction of One (1) Classroom Building (Elem)        770,868.21  completed

    VI Iloilo Janiuay Capt. A. Tirador Drainage System Improvement        613,428.00  completedVI Iloilo Janiuay Caranas Construction of Health Station        723,821.06  completed

    VI Iloilo Janiuay CaraudanRoad Improvement of 0.30 Km. Farm to Market Road

       1,124,563.00  completed

  • VI Iloilo Janiuay CariganganRoad Improvement of 0.30 Km. Farm to Market Road

       1,049,355.00  completed

    VI Iloilo Janiuay CunsadRoad Improvement of 0.22 Km. Farm to Market Road

           957,247.75  completed

    VI Iloilo Janiuay Dabong Construction of Two (2) Classroom Building (Elem)    1,087,336.40  completed

    VI Iloilo Janiuay Damires Construction of Two (2) Classroom Building (Elem)    1,084,936.40  completed

    VI Iloilo Janiuay Damo‐ongRoad Improvement of 1.124 Km. Farm to Market Road

       2,018,688.86  completed

    VI Iloilo Janiuay Danao Construction of Flood Control/Dike        901,703.00  completed

    VI Iloilo Janiuay MañacabacRoad Improvement of 0.30 Km. Farm to Market Road

       1,252,671.00  completed

    VI Iloilo Janiuay Mangil Construction of Hanging Bridge    1,286,775.00  completed

    VI Iloilo Janiuay Monte MagapaRoad Improvement of 1.02 Km. Farm to Market Road

       2,096,533.75  completed

    VI Iloilo Janiuay Pangilihan Construction of One (1) Classroom Building (Elem)        708,310.90  completed

    VI Iloilo Janiuay Panuran Construction of One (1) Classroom Building (Elem)        710,548.28  completed

    VI Iloilo Janiuay Pararinga Construction of Health Station        725,621.06  completedVI Iloilo Janiuay Patong‐Patong Construction of Day Care Center        618,097.48  completed

    VI Iloilo Janiuay Quipot Construction of Two (2) Classroom Building (HS)    1,148,941.34  completed

    VI Iloilo Janiuay San JulianRoad Improvement of 0.50 Km. Farm to Market Road

           882,304.00  completed

    VI Iloilo Janiuay San Pedro Drainage System Improvement        464,307.00  completedVI Iloilo Janiuay Sarawag Construction of Day Care Center        618,097.48  completed

    VI Iloilo JaniuaySM Villa, Aquino West, DTL West and Sta. Rita

    Construction of Two (2) Classroom School Building (Elem)

       1,303,322.90  completed

    VI Iloilo Janiuay Tambal Construction of One (1) Classroom Building (Elem)        708,235.90  completed

    VI Iloilo Janiuay Tamu‐an Construction of One (1) Classroom Building (Elem)        708,790.90  completed

    VI Iloilo Janiuay TiringananRoad Improvement of 1.20 Km. Farm to Market Road

       1,383,718.14  completed

    VI Iloilo Janiuay Tolarucan Construction of Two (2) Classroom Building (Elem)    1,085,536.40  completed

    VI Iloilo Janiuay Tuburan Construction of Day Care Center        620,257.48  completed

  • VI Iloilo Maasin Abay Road Improvement of 0.47 Km.    1,512,748.00  completedVI Iloilo Maasin Abilay Construction of Day Care Center        761,740.00  completedVI Iloilo Maasin Agrocel Riverwall Protection of 267 Ln.m    2,086,716.50  completedVI Iloilo Maasin Amerang Road Improvement of 0.55 Km. FMR    1,433,627.00  completedVI Iloilo Maasin Bulay Road Improvement of 0.43 Km. FMR    1,452,600.70  completedVI Iloilo Maasin Cabangcalan Road Improvement of 0.27 Km. FMR    1,283,976.00  completedVI Iloilo Maasin Cabatac Creekwall Protection of 0.220 Km.        689,000.00  completed

    VI Iloilo Maasin CaigonRoad Improvement of 0.30 Km. Farm to Market Road

           411,546.00  completed

    VI Iloilo Maasin Cananghan Road Improvement of 0.410 Km. FMR    1,434,788.80  completedVI Iloilo Maasin Canawili Road Improvement of 0.30 Km. FMR    1,405,959.00  completedVI Iloilo Maasin Dagami Road Improvement of 0.35 Km. FMR    1,542,531.00  completedVI Iloilo Maasin Inabasan Road Improvement of 0.400 Km. FMR    1,399,298.00  completedVI Iloilo Maasin Linagan Calsada Creekwall Protection of 180 Ln.m        795,669.00  completedVI Iloilo Maasin Linagan Tacas Construction of Day Care Center        733,631.00  completedVI Iloilo Maasin Mabriz Riverwall Protection of 410 Ln.m    3,570,469.25  completedVI Iloilo Maasin Miapa Road Improvement of 0.208 Km. FMR    1,155,447.01  completedVI Iloilo Maasin Pispis Road Improvement 0.37 Km. FMR    1,520,048.00  completedVI Iloilo Maasin Sinubsuban Road Improvement of 1.08 Km. FMR    1,161,182.00  completedVI Iloilo Maasin THTP Riverwall Protection of 224 Ln.m    1,810,731.50  completedVI Iloilo Maasin Tigbauan Construction of Day Care Center        749,501.00  completedVI Iloilo Maasin Tubang Road Improvement of 1.60 Km. FMR    1,006,199.00  completedVI Iloilo Maasin Tulahong Road Improvement of 0.26 Km. FMR    1,243,606.00  completedVI Iloilo Maasin Tuy‐an East Road Improvement of 0.20 Km. FMR    1,113,696.50  completed

    VI Iloilo San Dionisio Agdaliran Improvement of 0.40 Km. Farm to Market Road        525,596.04  completed

    VI Iloilo San Dionisio AmayongRoad Improvement of 0.50 Km. Farm to Market Road w/ 0.20 Km. Road Concreting

           834,288.01  completed

    VI Iloilo San Dionisio BatuanConstruction of One (1) Classroom School Building (Elem)

           766,293.08  completed

    VI Iloilo San Dionisio BondulanRoad Improvement of 0.54 Km. Farm to Market Road

           725,084.12  completed

    VI Iloilo San Dionisio Borongon Concreting of 0.17 Km. Brgy. Road        794,911.76  completed

    VI Iloilo San Dionisio CapinangConstruction of One (1) Classroom School Building (Elem)

           763,514.99  completed

    VI Iloilo San Dionisio Cubay Improvement of 2 Km. Farm to Market Road    1,582,215.50  completed

    VI Iloilo San Dionisio Cudionan Construction of 1 Unit Solar Dryer with Warehouse        580,040.11  completed

  • VI Iloilo San Dionisio DugmanConstruction of One (1) Classroom School Building (Elem)

           760,777.10  completed

    VI Iloilo San Dionisio Hacienda ConchitaConstruction of Two (2) Classroom School Building (HS)

       1,295,412.49  completed

    VI Iloilo San Dionisio MotoPurchased of Pre and Post Harvest Facilities with Construction of Garage

           900,014.74  completed

    VI Iloilo San Dionisio Naborot Concreting of 0.13 Km. Brgy. Footpath        324,837.64  completed

    VI Iloilo San Dionisio OdionganRoad Improvement of 0.45 Km. Farm to Market Road

           615,293.51  completed

    VI Iloilo San Dionisio PaseConstruction of Two (2) Classroom School Building (HS)

       1,293,732.49  completed

    VI Iloilo San Dionisio Poblacion Improvement of 427 Ln.m Drainage Canal        761,335.19  completedVI Iloilo San Dionisio Santol Construction of Day Care Center        697,845.89  completed

    VI Iloilo San Dionisio SiemprevivaRoad Improvement of 0.30 Km. Farm to Market Road with 0.30 Km. Road Concreting

       1,180,898.37  completed

    VI Iloilo San Dionisio Sua Construction of Health Station        781,454.96  completedVI Iloilo San Dionisio Talo‐ato Concreting of 0.40 Km. Brgy. Road    1,417,730.31  completed

    VI Iloilo San Dionisio Tamangi Construction of 1 Unit Solar Dryer with Warehouse        596,158.97  completed

    VI Iloilo San Dionisio TubleConstruction of Two (2) Classroom School Building (Elem)

       1,295,292.49  completed

    VI Iloilo San Rafael AripdipCosntructionn of 1 Unit 1 Classroom School Building (Elem)

           785,530.05  completed

    VI Iloilo San Rafael BagacayConstruction of 1 Unit 1 Classroom School Building (Elem)

           785,530.05  completed

    VI Iloilo San Rafael Ilongbukid 0.1 Km. Road Upgrading with 3 Barrel Box Culvert    1,420,317.21  completed

    VI Iloilo San Rafael PoblacionConstruction of 1 Unit 1 Classroom School Building (PS)

           785,530.05  completed

    VI Iloilo San Rafael PoscolonConstruction of 1 Unit 1 Classroom School Building (PS)

           785,530.05  completed

    VI Iloilo San Rafael San AndresConstruction of 1 Unit 1 Classroom School Building (Elem)

           785,530.05  completed

    VI Iloilo San Rafael San DionisioConstruction of 1 Unit 1 Classroom Day Care Center with Water Tank

           649,355.73  completed

    VI Iloilo San Rafael San Florentino Construction of 1 Unit 1 Classroom Day Care Center        649,355.73  completed

    VI Negros Occidental La Castellana Cabagna‐anConstruction of 1 Unit 2 Classroom School Building (HS)

       1,116,437.00  completed

  • VI Negros Occidental La Castellana Lalagsan Construction of Day Care Center        566,174.00  completed

    VI Negros Occidental La Castellana ManghanoyConstruction of 1 Unit 1 Classroom School Building (HS)

           672,098.00  completed

    VI Negros Occidental La Castellana PusoRoad Improvement of 2.22 km Farm to Market Road

           973,901.00  completed

    VI Negros Occidental La Castellana Robles Construction of (Tricycle Lane) Bridge        898,832.00  completed

    VI Negros Occidental La Castellana Sag‐angConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,079,798.00  completed

    VI Negros Occidental La Castellana TalaptapRoad Improvement of 3.23 Km Farm to Market Road

       1,997,976.14  completed

    VI Negros Occidental Moises Padilla Crossing MagallonAcquisition of One (1) Unit Pre‐Harvest Equipment (Farm Tractor) w/ Complete implements & garage

       2,459,831.00  completed

    VI Negros Occidental Moises Padilla Guinpanaan Construction of Day Care Center        591,855.00  completedVI Negros Occidental Moises Padilla Inolingan Road Improvement    1,428,748.00  completedVI Negros Occidental Moises Padilla Macagahay Road Improvement    1,040,789.00  completedVI Negros Occidental Moises Padilla Magallon Cadre Construction of Day Care Center        591,855.00  completedVI Negros Occidental Moises Padilla Montilla Construction of Day Care Center        591,855.00  completed

    VI Negros Occidental Moises Padilla Poblacion 1,2,3,4,5 & 7Construction of One (1) Unit Two (2) Classroom Building (HS)

       1,149,020.00  completed

    VI Negros Occidental Moises Padilla Quintin Remo Road Improvement    1,411,380.00  completedVIII Eastern Samar Hernani Batang Construction of Drainage Canal        329,500.00  completedVIII Eastern Samar Hernani Cacatmonan Construction of Water and Sanitation System        344,300.00  completedVIII Eastern Samar Hernani Canciledes Construction of Sanitary Toilets        531,700.00  completedVIII Eastern Samar Hernani Carmen Construction of River Control        605,900.00  completedVIII Eastern Samar Hernani Garawon Construction of Water System        895,900.00  completedVIII Eastern Samar Hernani Nagaja Construction of Sanitary Toilets        683,250.00  completed

    VIII Eastern Samar Hernani Padang Construction of Water System Level I With Pathway        279,000.00  completed

    VIII Eastern Samar Hernani Poblacion 1 Construction of Drainage System    1,438,300.00  completedVIII Eastern Samar Hernani Poblacion 2 Construction of Day Care Center        700,000.00  completedVIII Eastern Samar Hernani Poblacion 3 Construction of Sanitary Toilets        565,000.00  completedVIII Eastern Samar Hernani Poblacion 4 Construction of Day Care Center        699,000.00  completedVIII Eastern Samar Hernani San Miguel Construction of Water System        403,500.00  completedVIII Northern Samar San Roque Balnasan Construction of Concrete Pathway        964,149.00  completed

    VIII Northern Samar San Roque CoroconogConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,432,653.00  completed

    VIII Northern Samar San Roque DaleConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,427,828.00  completed

  • VIII Northern Samar San Roque Lao‐anganConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,427,828.00  completed

    VIII Northern Samar San Roque Zone 1 Construction of Drainage Canal        789,826.00  completedVIII Northern Samar San Roque Zone 2 Construction of Drainage Canal        573,046.00  completedVIII Northern Samar San Roque Zone 3 Construction of Drainage Canal        949,970.00  completedVIII Northern Samar San Roque Zone 4 Construction of Drainage Canal        756,464.00  completedVIII Northern Samar San Roque Zone 6 Construction of River Control        851,860.00  completedX Lanao Del Norte Kapatagan Balili Construction of Water System Level II    1,704,535.00  completedX Lanao Del Norte Kapatagan Bel‐is Construction of Water System Level II    1,294,764.00  completedX Lanao Del Norte Kapatagan Buenavista Construction of Water System Level II    1,499,996.00  completed

    X Lanao Del Norte Kapatagan ButadonConstruction of Solar Dryer with Warehouse and Ricemill

       1,378,757.00  completed

    X Lanao Del Norte Kapatagan Curvada Construction of Farm to Market Road    3,662,768.00  completedX Lanao Del Norte Kapatagan La Libertad Construction of Water System Level II    1,919,323.00  completedX Lanao Del Norte Kapatagan Poblacion Construction of Drainage Canal    2,947,437.40  completedX Lanao Del Norte Kapatagan Sta. Cruz Construction of Farm to Market Road        903,389.00  completed

    X Misamis Occidental Bonifacio BagumbangDredging and Construction of Slope Protection @ Dupol Creek/Bagumbang River

       1,003,055.00  completed

    X Misamis Occidental Bonifacio BaybayConstruction of 1 Classroom Pre‐School Building (PS)

           772,265.00  completed

    X Misamis Occidental Bonifacio Buenavista Construction of 2 Classrooms School Building (HS)    1,211,000.00  completed

    X Misamis Occidental Bonifacio Buracan Construction of Potable Water System Level II    2,060,000.00  completed

    X Misamis Occidental BonifacioKanao‐Kanao, Dullan & Upper Usugan

    Construction of Potable Water System Level II    4,000,000.00  completed

    X Misamis Occidental Bonifacio Linconan Construction of Solar Dryer        665,995.00  completed

    X Misamis Occidental Bonifacio Lodiong Construction of Potable Water System Level II    1,391,000.00  completed

    X Misamis Occidental Bonifacio Lower Usugan Construction of Barangay Road    1,875,000.00  completedX Misamis Occidental Bonifacio Poblacion Construction of Day Care Center        796,542.00  completedX Misamis Occidental Bonifacio R. Lumapas Construction of Barangay Health Station        800,663.00  completed

    X Misamis Occidental Bonifacio Sibuyon Construction of Potable Water System Level II    1,094,000.00  completed

    X Misamis Occidental Bonifacio Tiaman Improvement of Barangay Road    1,176,000.00  completed

    X Misamis Occidental Bonifacio Tusik Construction of Potable Water System Level II    2,275,000.00  completed

    XI Compostela Valley Laak Aguinaldo Construction of Birthing Facility    2,062,327.00  completed

  • XI Compostela Valley Laak Ampawid Construction of 2 Classroom School Building (Elem)    1,292,047.00  completed

    XI Compostela Valley Laak Bayanihan Construction of Barangay Health Station        746,927.00  completedXI Compostela Valley Laak Belmonte Construction of Day Care Center        683,116.00  completed

    XI Compostela Valley Laak Buhi Construction of 3 Classroom School Building (Elem)    1,881,251.00  completed

    XI Compostela Valley Laak Candiis Construction of Day Care Center        687,716.00  completedXI Compostela Valley Laak Concepcion Construction of Day Care Center        689,616.00  completedXI Compostela Valley Laak Dalimdim (Kapatagan) Construction of Day Care Center        680,116.00  completedXI Compostela Valley Laak Datu Ampunan Construction of Barangay Health Station        759,602.00  completed

    XI Compostela Valley Laak Datu Davao Construction of 2 Classroom School Building (Elem)    1,287,747.00  completed

    XI Compostela Valley Laak Doña Josefa Construction of Barangay Health Station        748,927.00  completedXI Compostela Valley Laak El Katipunan Construction of Barangay Health Station        732,527.00  completedXI Compostela Valley Laak Hinagtungan Construction of Barangay Health Station        745,327.00  completedXI Compostela Valley Laak IL Papa Construction of Multi‐Purpose Pavement        395,400.00  completedXI Compostela Valley Laak Inakayan Reinforced Concrete Pipe Culvert        132,825.00  completedXI Compostela Valley Laak Kagawasan Construction of Barangay Health Station        748,227.00  completedXI Compostela Valley Laak Katipunan Construction of Multi‐Purpose Pavement        394,600.00  completedXI Compostela Valley Laak Kibaguio Construction of Day Care Center        684,966.00  completedXI Compostela Valley Laak Kidawa Construction of Barangay Health Station        747,127.00  completedXI Compostela Valley Laak Kinabuhian Construction of Day Care Center        685,966.00  completedXI Compostela Valley Laak Libuton Construction of Barangay Health Station        714,127.00  completedXI Compostela Valley Laak Limot Construction of Barangay Health Station        748,927.00  completedXI Compostela Valley Laak Longganapan Construction of Barangay Health Station        740,727.00  completedXI Compostela Valley Laak LS Sarmiento Construction of Barangay Health Station        750,127.00  completed

    XI Compostela Valley Laak Mabuhay Construction of 2 Classroom School Building (Elem)    1,284,372.00  completed

    XI Compostela Valley Laak Mag‐abay Construction of Barangay Health Station        745,527.00  completedXI Compostela Valley Laak Malinao Construction of Barangay Health Station        758,002.00  completed

    XI Compostela Valley Laak Melale Construction of 2 Classroom School Building (Elem)    1,284,307.00  completed

    XI Compostela Valley Laak Pahamutang Construction of Day Care Center        680,116.00  completed

    XI Compostela Valley Laak Sabud Construction of 2 Classroom School Building (Elem)    1,285,547.00  completed

    XI Compostela Valley Laak Sisimon Construction of Barangay Health Station        744,127.00  completed

  • XI Davao Del Norte New Corella Del MonteCapability Building on Sustainable Agriculture with Diversified Farming System Model Farm and Rubber Nursery Establishment

       1,195,429.00  completed

    XI Davao Del Norte New Corella Del Pilar Construction of Potable Water System Level II    1,200,680.00  completed

    XI Davao Del Norte New Corella New SambogCapability Building Program on Sustainable Agriculture

       1,250,574.00  completed

    XI Davao Del Norte New Corella Patrocenio Construction of 3 Classroom Building (Elem)    1,687,292.00  completedXI Davao Del Norte New Corella Poblacion Construction of Health Station        735,329.00  completed

    XI Davao Del Norte New Corella San JoseConstruction of Potable Water System Gravity Source Level II

       1,195,045.00  completed

    XI Davao Del Norte New Corella San Roque Improvement of Level II Potable Water System        737,395.00  completed

    XI Davao Del Norte New Corella Sta. Fe Construction of 3 Classroom Building (HS)    1,687,292.00  completed

    XI Davao Del Norte New Corella Sto. Niño Construction of Potable Water System Level II    1,002,710.00  completed

    XI Davao Del Norte New Corella Suawon Construction of Potable Water System Level II    1,013,484.00  completed

    XI Davao Oriental Gov. Generoso Anitap Construction of Flood Control Facility        964,306.00  completed

    XI Davao Oriental Gov. Generoso Don Aurelio Chicote Construction of Potable Water System Level II    1,622,487.00  completed

    XI Davao Oriental Gov. Generoso Oregon Construction of Hanging Cable Foot Bridge    1,969,605.00  completed

    XI Davao Oriental Gov. Generoso Sergio Osmeña Construction of Potable Water System Level II        971,095.00  completed

    XI Davao Oriental Gov. Generoso Surop & Nangan Construction of Potable Water System Level II    2,359,078.00  completed

    XI Davao Oriental Gov. Generoso Tagabebe Capability Building on Fish Shelter    1,401,829.00  completedXI Davao Oriental Gov. Generoso Tamban Construction of Flood Control Facility        691,289.00  completed

    XI Davao Oriental Gov. Generoso Tandang Sora Construction of Potable Water System Level II        985,799.00  completed

    XI Davao Oriental Gov. Generoso Tibanban Construction of Drainage Line Canal    1,685,112.00  completedXI Davao Oriental Gov. Generoso Upper Tibanban Construction of Flood Control Facility        716,922.00  completed

    XII North Cotabato Arakan BinoonganConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,384,286.32  completed

    XII North Cotabato Arakan DallagConstruction of 1 Unit 1 Classroom School Building (Elem)

           702,099.40  completed

    XII North Cotabato Arakan Datu MatangkilConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,338,678.40  completed

  • XII North Cotabato Arakan Doroluman Construction of Barangay Public Terminal        872,736.82  completed

    XII North Cotabato Arakan GanatanConstrcution of 1 Unit 2 Classroom School Building (HS)

       1,318,287.40  completed

    XII North Cotabato Arakan Kabalantian Concreting of 200M Poblacion‐Lamaticun FMR    1,458,228.87  completed

    XII North Cotabato Arakan Kulaman Valley Construction of 30M Hanging Bridge        699,900.00  completedXII North Cotabato Arakan Lanao Kuran Concreting of 200M Bagtok‐Lanao Kuran FMR    1,627,339.50  completed

    XII North Cotabato Arakan LibertadConstruction of 1 Unit 2 Classroom School Building (Elem)

       1,340,553.85  completed

    XII North Cotabato Arakan MalibatuanConstruction of 1 Unit 2 Classroom School Building (HS)

       1,291,452.40  completed

    XII North Cotabato Arakan MeocanConstruction of 1 Unit 2 Classroom School Building (HS)

       1,329,847.40  completed

    XII North Cotabato Arakan NapalicoConstruction of 1 Unit 2 Classroom School Builing (HS)

       1,378,105.32  completed

    XII North Cotabato Arakan Tumanding Concreting of 108M Centro‐ES FMR        830,259.74  completed

    XII Sarangani Maasim Amsipit Construction of 2 Classroom School Building (HS)    1,242,504.00  completed

    XII Sarangani Maasim Kanalo Construction of 2 Classroom School Building (Elem)    1,202,004.00  completed

    XII Sarangani Maasim Lumasal Construction of 3 Classroom School Building (HS)    1,663,449.00  completed

    XII Sarangani Maasim Lumatil Construction of 2 Classroom School Building (HS)    1,202,004.00  completed

    XII Sarangani Maasim Malbang Construction of 3 Classroom School Building (Elem)    1,658,449.00  completed

    XII Sarangani Maasim Poblacion Construction of 3 Classroom School Building (Elem)    1,658,449.00  completed

    XII Sarangani Maitum BatianInstallation of 2 Units Corn Mill with Mini‐Warehouse

       1,207,742.55  completed

    XII Sarangani Maitum KalaongConstruction of Water System Spring Development Level II

       2,269,310.66  completed

    XII Sarangani Maitum KiambingConstruction of 1 Unit 3 Classroom School Building (Elem)

       1,743,607.79  completed

    XII Sarangani Maitum New La UnionInstallation of Corn Mill & Corn Sheller with Solar Dryer and Warehouse

       1,436,116.42  completed

    XII Sarangani Maitum UpoConstruction of 1 Unit 3 Classroom School Building (Elem)

       1,845,309.39  completed

  • XII Sarangani Maitum WaliConstruction of 1 Unit 3 Classroom School Building (Elem)

       1,839,603.19  completed

    XII Sarangani Malapatan Daan Suyan Construction of 2 Classroom School Building (Elem)    1,350,000.00  completed

    XII Sarangani Malapatan Kinam Construction of 2 Classroom School Building (Elem)    1,520,840.00  completed

    XII Sarangani Malapatan Libi Proposed Drilling of Potable Water System        980,460.00  completed

    XII Sarangani Malapatan Patag Construction of 1 Classroom School Building (Elem)        779,450.00  completed

    XII Sarangani Malapatan Tuyan Construction of 2 Classroom School Building (Elem)    1,234,000.00  completed

    XII Sarangani Malapatan Upper Suyan Installation of 1 Unit Corn Mill with Warehouse    1,595,250.00  completed

    XII Sultan Kudarat Columbio Datalblao Construction of 1 Unit School Building (Elem)        662,561.50  completedXII Sultan Kudarat Columbio Eday Construction of Solar Dryer (800 sq.m)        506,507.12  completedXII Sultan Kudarat Columbio Elbebe Contruction of Potable Water System Level II        768,770.50  completedXII Sultan Kudarat Columbio Lasak Construction of 2 Units 20m x 20m Solar Drier        506,507.12  completedXII Sultan Kudarat Columbio Libertad Construction of Solar Drier        506,507.12  completed

    XII Sultan Kudarat Columbio Lomoyon Improvement of Potable Water System Level II        384,080.45  completed

    XII Sultan Kudarat Columbio Makat Construction of 1 Unit School Building (Elem)        662,561.50  completed

    XII Sultan Kudarat Columbio Maligaya Construction of 2 Units 20m x 20m Solar Driers        506,507.12  completed

    XII Sultan Kudarat Columbio Mayo Construction of 2 Units 20m x 20m Solar Driers        506,507.12  completed

    XII Sultan Kudarat Columbio Natividad Construction of 1 Unit Day Care Center        526,898.32  completed

    XII Sultan Kudarat Columbio New Bantangan Construction of 2 Units 20m x 20m Solar Driers        506,507.12  completed

    XII Sultan Kudarat Columbio Poblacion Construction of Farm to Market Road    1,017,561.26  completed

    XII Sultan Kudarat ColumbioPolomolokPolomolok

    Construction of Potable Water System Level II        460,848.55  completed

    XII Sultan Kudarat Columbio Sinapulan Construction of 1 Unit School Building (Elem)        662,561.50  completedXII Sultan Kudarat Columbio Sucob Construction of Health Station        574,396.32  completed

    XII Sultan Kudarat Columbio Telafas Construction of 2 Units 20m x 20m Solar Driers        506,507.12  completed