Activity List
LIST OF MAINTENANCE ACTIVITIESWork Inventory
Code Activity Name Unit Unit
542.300 Roadway.311 Grading pass mile gravel road mile.312 Grading with roller pass mile gravel road mile.313 Gravel Replacement cubic yard gravel road mile.321 Pothole Repair ton paved road mile.322 Crack Sealing hours paved road mile.323 Blade Patching ton paved road mile.324 Seal Coating / BST road mile paved road mile.331 Shoulder Maintenance shoulder mile shoulder mile.332 Shoulder Repair cubic yard shoulder mile.390 Other Roadway Maint. hours road mile
542.400 Drainage.411 Ditching w/grader ditch mile ditch mile.412 Ditching w/ditcher ditch foot ditch mile.421 Culvert cleaning culvert culvert.422 Culvert repair/repl. lineal feet culvert.430 Catch basin cleaning each catch basin.490 Other Drainage Maint. hours road mile
542.500 Structures.511 Bridge Maint hours bridges.512 Bridge Repair hours bridges.590 Other Bridge/Str Maint hours bridges
542.600 Traffic.610 Sidewalks hours sidewalks.620 Special Purpose Paths hours paths.641 Sign Maintenance signs signs.642 Guardrail Maint/Repair lineal feet guardrail ft.643 Pavement Markings lineal feet road mile.660 Snow & Ice Control hours road mile.670 Street Cleaning hours road mile.690 Other Traffic Maint hours road mile
542.700 Roadside Development.712 Brush Control (Mech) shoulder mile shoulder mile.713 Brush Control (Man) hours shoulder mile.721 Chem Veg Control (Mech) shoulder mile shoulder mile.722 Chem Veg Control (Man) hours shoulder mile.731 Landscape Maint hours shoulder mile.751 Litter Control hours shoulder mile.761 Slope Repair hours shoulder mile.790 Other Roadside Maint hours shoulder mile
542.800 Ancillary Operations hours year542.900 Administration
.910 Maint Admin hours year
.920 Shop / Yard hours year
.930 Road Patrol hours year
.990 Other Admin hours year
Activity Guidelines
Activity Short List
SUGGESTED LIST OF MAINTENANCE ACTIVITIESInventory
Code Activity Name Unit
542.30 Roadway.31 Gravel Roads gravel road mile.32 Paved Roads paved road mile.33 Shoulders shoulder mile.39 Other Roadway Maint. road mile
542.40 Drainage.41 Ditching ditch mile.42 Culverts culvert.43 Catch basins catch basin.49 Other Drainage Maint. road mile
542.50 Structures.51 Bridges bridges.59 Other Structure Maint. structures
542.60 Traffic.61 Sidewalks sidewalks.62 Special Purpose Paths paths.63 Sign Maintenance signs.64 Guardrail Maint/Repair guardrail.66 Snow & Ice Control road mile.67 Street Cleaning road mile.69 Other Traffic Maint road mile
542.70 Roadside Development.71 Brush Control shoulder mile.72 Chemical Veg Control shoulder mile.73 Landscaping shoulder mile.75 Litter Control shoulder mile.76 Slope Repair shoulder mile.79 Other Roadside Maint shoulder mile
542.80 Ancillary Operations542.90 Admin. & Overhead
Suggested activity list for annual report to CRAB and WSDOT
HOURLYCODE CLASS QTY HOURS RATE COST
CREW TOTAL 0 0 #####
HOURLYCODE CLASS QTY HOURS RATE COST
EQUIPMENT TOTAL 0 0 #####
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0 0.00 #####
CONTRACT SERVICES #####
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENTUNIT COST ($/UNIT)
0.00
0.00
#DIV/0!
COST
COST
COST
% TOTALMATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
0.00
0.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME:
ACTIVITY CODE:
MEASUREMENT UNIT:
Std Daily Cost form
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
CODE CLASS QTY
CODE CLASS QTY
CODE CLASS QTY
BY:
WORK UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION:
SCHEDULING CONSIDERATIONS:
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
MATERIALS
QUANTITY FEATURE UNIT
PREV:
AVERAGE DAILY ACCOMPLISHMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
Set of Act Guide forms and cost sheets
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X
CODE QTYL203 1
CODE QTYE101 1E102 1
CODE QTY
BY:
CLASS
gravel roadWORK UNIT
MAINTENANCE FEATURE INVENTORYCODE
milespass miles4 to 12
CLASSGraderPickup
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
MATERIALS
QUANTITY FEATURE UNIT
PREV:
AVERAGE DAILY ACCOMPLISHMENT
ACTIVITY DESCRIPTION: Blading, shaping and smoothing gravel roads to restore proper grade, shape and drainage.
SCHEDULING CONSIDERATIONS: Grading is performed when ruts, grooves, or holes cause inadequate drainage, uncomfortable ride, or poor road conditions. The frequency of grading depends upon weather, traffic, and surface stability. Schedule drading to take advantage of natural moisture.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker III
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: GRADING
ACTIVITY CODE: 311 (542.311)
1. Establish traffic control as necessary.2. Grader generally makes two or more passes per lane mile and back blades as necessary.3. Road should be worked in increments less than 2 miles and when adequate moisture exists.
311 Grading
HOURLYCODE CLASS QTY HOURS RATEL203 Maintenace Worker III 1 8 28.64
CREW TOTAL 1 8 47%
HOURLYCODE CLASS QTY HOURS RATEE101 Road Grader 1 8 28.00E102 Pickup 1 8 4.00
EQUIPMENT TOTAL 2 16 53%
UNITCODE CLASS QTY COST
MATERIALS TOTAL 0 0 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENTUNIT COST ($/UNIT)
1240.43
pass miles
0.00
0.00
485.12
256.00
COST
COST
32.00
229.12
224.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
229.12COST
COST
COST
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: GRADING
ACTIVITY CODE: 311
MEASUREMENT UNIT: pass mile
311 Grading cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
CODE QTY31
CODE QTY1111
CODE QTY
ACTIVITY DESCRIPTION: Blading, shaping and smoothing and compacting gravel roads to restore proper grade, shape and drainage.
SCHEDULING CONSIDERATIONS: Grading is performed when ruts, grooves, or holes cause inadequate drainage, uncomfortable ride, or poor road conditions. The frequency of grading depends upon weather, traffic, and surface stability.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
MATERIALS
QUANTITY FEATURE UNIT
PREV:
AVERAGE DAILY ACCOMPLISHMENT
CLASSRoad GraderSteel RollerWater truckPickup
pass miles12 gravel roadWORK UNIT
MAINTENANCE FEATURE INVENTORYCODE
miles
BY:
CLASS
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: GRADING WITH ROLLER
ACTIVITY CODE: 312 (542.312)
1. Establish traffic control as necessary.2. Rip road to remove washboarding.3. Grader makes two or more passes per lane mile. 4. Work in increments less than 2 miles5. Apply water as needed to attain moisture6. Roll with roller and remove any large rocks7. Remove signs
312 Grading w roller
HOURLYCODE CLASS QTY HOURS RATE
Maintenace Worker III 3 8 28.64Maintenace Worker I 1 8 19.28
CREW TOTAL 4 16 63%
HOURLYCODE CLASS QTY HOURS RATE
Road Grader 1 8 28.00Steel Roler 1 8 20.00Water truck 1 8 10.00Pickup 1 8 4.00
EQUIPMENT TOTAL 4 32 37%
UNITCODE CLASS QTY COST
MATERIALS TOTAL 0 0 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENTUNIT COST ($/UNIT)
COST
COST
COST
% TOTALMATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
687.36COST
154.24
841.60
224.00
496.00
COST
COST
160.0080.0032.00
12111.47
pass miles
0.00
0.00
1,337.60
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: GRADING WITH ROLLER
ACTIVITY CODE: 312
MEASUREMENT UNIT: pass mile
312 Grading w roller cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X
CODE QTYL203 4L202 2
CODE QTYE101 1E102 1E103 3E110 1E105 1E106 1
CODE QTYM301 150 cy
BY:
Water truckLoader
milesWORK UNIT
MAINTENANCE FEATURE INVENTORYCODE
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
150 cubic yards gravel road
Dump TruckSteel Roller REFERENCE AND SAFETY
CLASS5/8" crushed rock
MATERIALS
Maint Worker IIIMaint Worker II
CLASSGraderPickup
PREV:
ACTIVITY DESCRIPTION: Blading and compacting gravel roads to restore cross section and grade, with the addition of crushed or screened rock to fill low spots and replace lost material.
SCHEDULING CONSIDERATIONS: Perform on areas with severe potholes, washboard, rutting, raveling (loss of fines), or base rock showing.
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
AVERAGE DAILY ACCOMPLISHMENTQUANTITY FEATURE UNIT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: GRAVEL REPLACEMENT / RE-GRAVELING
ACTIVITY CODE: 313 (542.313)
1. Regraveling is performed when planned2. Perform on roads whcih have lost a considerable amount of gravel 3. Place safety sign as necessary 4. Water road throughout operation5. Blade surface material from road edges to center6. Spread gravel along center7. Blade and smooth to proper crown and grade8. Compact surface and remove signs
313 Gravel Repl
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 4 8 28.64 916.48L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 6 16 31%
HOURLYCODE CLASS QTY HOURS RATE COSTE101 Grader 1 8 28.00 224.00E102 Pickup 1 8 4.00 32.00E103 Dump Truck 3 8 21.00 504.00E110 Steel Roller 1 8 20.00 160.00E105 Water truck 1 8 10.00 80.00E106 Loader 1 8 4.00 32.00
EQUIPMENT TOTAL 8 48 25%
UNITCODE CLASS QTY COST COSTM301 5/8" crushed rock 150 12.00
MATERIALS TOTAL 150 12.00 44%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 150UNIT COST ($/UNIT) 27.37
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
1,274.24
COST
COST
% TOTAL
cubic yards
1,800.00
1,032.00
1,800.00
0.00
4,106.24
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: GRAVEL REPLACEMENT/RE-GRAVELING
ACTIVITY CODE: 313
MEASUREMENT UNIT: cubic yards
313 Gravel Repl cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X
CODE QTYL202 2
CODE QTYE107 1
CODE QTYM302 2 ton
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Patching asphalt pavement with cold or hot mix to repair potholes, localized depressions, breaks and other irregularities in paved surfaces.
SCHEDULING CONSIDERATIONS: Perform work as needed. Generally, potholes should be repaired as soon as possible.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Workder II
CLASSPatch Truck
MATERIALSCLASScold mix
2 - 6 tonsWORK UNIT
BY:
paved road miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: POTHOLE REPAIR
ACTIVITY CODE: 321 (542.321)
1. Place signs and safety devices as necessary2. Rermove all loosse materials from hole3. Ensure sides of patchh area are vertical4. Place maintenance rock to within 2" of surface5. Place mix in hole and compact. Finish 1/2" above surrounding surface to allow for further compaction6. Sweep loose or excess material from surface7. Remove signs and safety devices
321 Pothole Repair
HOURLYCODE CLASS QTY HOURS RATE COSTL202 Maint Worker II 2 8 28.64 458.24
CREW TOTAL 2 8 76%
HOURLYCODE CLASS QTY HOURS RATE COSTE107 Patch truck 1 8 8.00 64.00
EQUIPMENT TOTAL 1 8 11%
UNITCODE CLASS QTY COST COSTM302 Cold mix 2 40.00
MATERIALS TOTAL 2 40.00 13%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 2UNIT COST ($/UNIT) 301.12
ton
80.00
64.00
80.00
0.00
602.24
COST
458.24
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: POTHOLE REPAIR
ACTIVITY CODE: 321
MEASUREMENT UNIT: ton
321 Pothole Rep cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X
CODE QTYL202 3
CODE QTYE102 1E108 1E107 1
CODE QTYM303 100 galM304
ACTIVITY DESCRIPTION: Cleaning, filling and sealing cracks in paved surfaces to prevent the passage of water into the base or subbase of the road. Not designed for use on areas of alligator cracking or where surface shows signs of base failure.
SCHEDULING CONSIDERATIONS: Perform work to prevent water from penetrating and damaging the roadway surface. Performed on cracks greater than 1/4" wide. Perform when temperature is above 50 F and dry. Sand seal after application.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITpaved road
Maint Worker II
CLASSPickupAir compressorPatch truck
MATERIALSCLASSLiquid crack fillersand
100 - 200 gallons
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CRACK SEALING
ACTIVITY CODE: 322 (542.322)
1. Place safety signs and devices2. Clean cracks as necessary3. Fill cracks with seal material4. Cover crack filler lightly with sand5. Remove safety signs and devices
322 Crack Sealing
HOURLYCODE CLASS QTY HOURS RATE COSTE202 Maint Worker II 3 8 28.64 687.36
CREW TOTAL 3 8 65%
HOURLYCODE QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00E108 Patch truck 1 8 10.00 80.00E107 Air compressor 1 8 6.00 48.00
EQUIPMENT TOTAL 3 24 15%CLASS
UNITCODE CLASS QTY COST COSTM303 crack sealer 100 2.00M304 sand 2 9.00
MATERIALS TOTAL 102 11.00 20%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 100UNIT COST ($/UNIT) 10.65
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
687.36
COST
COST
% TOTAL
gal
200.00
160.00
218.00
0.00
1,065.36
COST
18.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CRACK SEALING
ACTIVITY CODE: 322
MEASUREMENT UNIT: gal
322 Crack seal cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X
CODE QTYL203 5L202 3L205 2
CODE QTYE103 3E101 1E109 1E102 3E110 1E111 1
CODE QTYM301 150 tonM305 150 gal
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Placing hot asphalt or emulsion mix to level surface irregularities and/or failures, settlement, and depressions
SCHEDULING CONSIDERATIONS: Normally performed prior to seal coating or overlay. Also done to repari surface irregularities. Blade patching is performed at least 3 weeks before seal coating or overlay.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker IIFlagger
CLASSDump trucksGraderDistributor/Tack truckPickupSteel rollerPlate compactor
MATERIALSCLASSAsphalt/Emulsion MixTack oil
150 - 300 tonsWORK UNIT
BY:
paved road miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: BLADE PATCHING
ACTIVITY CODE: 323 (542.323)
1. Place signs and safety devices as necessary2. Remove all loose materials from surface3. Apply tack coat to area4. Place, spread and shape mix in 1" layer5. Compact between layers with steel roller; roll layers with rubber-tired roller6. Finish patch flush with existing pavement surface7. Remove signs and safety devices
323 Blade Patching
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 5 8 28.64 1,145.60L202 Maint Worker II 3 8 22.36 536.64L201 Maint Worker I 2
CREW TOTAL 10 16 19%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Grader 1 8 28.00 224.00E101 Pickup 3 8 4.00 96.00E109 Dump Truck 3 8 21.00 504.00E102 Steel Roller 1 8 20.00 160.00E110 Distributor/Tack truck 1 8 60.00 480.00E111 Plate compactor 1 8 3.00 24.00E112 Broom 1 8 35.00 280.00
EQUIPMENT TOTAL 11 56 20%
UNITCODE CLASS QTY COST COSTM301 Hot Mix Class G 150 35.00M305 Tack oil 150 0.80
MATERIALS TOTAL 300 35.80 61%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 150UNIT COST ($/UNIT) 58.80
ton
5,250.00
1,768.00
5,370.00
0.00
8,820.24
CO
120.00
1,682.24
CO
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TO
% TO
CO
% TO
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: BLADE PATCHING
ACTIVITY CODE: 323
MEASUREMENT UNIT: ton
323 Blade patch cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X
CODE QTYL209 1L203 5L202 11L201 4
CODE QTYE103 4E112 1E109 1E115 1E102 2E106 1E105 1E112 1
CODE QTYM307 15,000 galM301 400 cyM311
DistributorChip spreader REFERENCE AND SAFETY
ACTIVITY DESCRIPTION: Application of emulsified asphalt material and aggregate on paved roadways to seal the surface, restore surface life, flexibility and skid resistance.
SCHEDULING CONSIDERATIONS: Seal coating is typcially performed on a 5-8 year rotation. Roadway failure repairs, patching, pre-leveling and sweeping are completed prior to seal coating. Temperature should be above 60 F.
WORK CONSIDERATIONS
MONTHLYSCHEDULE
PERSONNELCLASS
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
MAINTENANCE FEATURE INVENTORYCODE
CLASSDump trucksRubber tired roller
SupervisorMaint Worker IIIMaint Worker IIMaint Worker I
EQUIPMENT
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
UNIT
PREV:BY:
QUANTITY FEATURE
PickupLoader
Self propelled broom
CLASSMATERIALS
Water truck
CRS2 or CMS2 emul3/8" - 5/8" rockcenterline markers
3 road miles
1. Sweep and clean prior to application 2. Establish traffic control--detour or 30 min. pilot car 3. Apply liquid asphalt at .45 gal/sq yd for emulsions 4. Spread aggregate uniformly at approx 30 lbs/sq yd 5. Raker follows chipspreader and levels gravel 6. Set by rolling immediately after application 7. Control asphalt and aggregate to ensure aggregate retention without bleeding 8. Approximately 5 days after completion, broom any excess aggregate from road.
paved road miles
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SEAL COATING (Bituminous Surface Treatment)
ACTIVITY CODE: 324 (542.324)
324 Seal Coating (BST)
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 5 8 28.64L202 Maint Worker II 11 8 22.36L201 Maint Worker I 4 8 20.00L209 Supervisor 1 8 30.00
CREW TOTAL 21 32 25%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Distributor 1 8 75.00E112 Pickup 6 8 4.00E109 Dump Truck 6 8 21.00E115 Rubber tired roller 1 8 20.00E102 Water truck 1 8 10.00E106 Chip spreader 1 8 90.00E105 Loader 1 8 35.00E112 Broom 1 8 35.00
EQUIPMENT TOTAL 18 64 19%
UNITCODE CLASS QTY COST COSTM307 CRS2 or CMS2 emul 15000 0.10M301 3/8" - 5/8" rock 400 18.00M311 centerline markers
MATERIALS TOTAL 55%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 3UNIT COST ($/UNIT) 5,244.43
7,200.00
COST
% TOTAL
road mile
1,500.00
8,700.00
0.00
15,733.28
COSTMATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
3,993.28
COST
280.00
160.0080.00
720.00280.00
3,040.00
1,145.601,967.68
640.00
1,008.00
600.00192.00
240.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SEAL COATING (Bituminous Surface Treatment)
ACTIVITY CODE: 324
MEASUREMENT UNIT: road mile
324 Seal Coat (BST) cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X
CODE QTYL203 2L202 2
CODE QTYE101 1E102 1E112 1
CODE QTY
BY:
shoulder miles
EFFECTIVE DATE:
4 shoulder milesWORK UNIT
PickupSelf propelled broom
MATERIALSCLASS
CLASSGrader
ACTIVITY DESCRIPTION: Grading of gravel shoulder with a motor grader to restore line and slope
SCHEDULING CONSIDERATIONS: Work is performed when shoulder drop off exceeds 1" or when extensive rutting, erosion, or loss of materials exists. Done to provide a uniform and level shoulder, matched to edge of paved surface. Performed prior to application of herbicides.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SHOULDER BLADING
ACTIVITY CODE: 331 (542.331)
1. Place safety signs and devices as necessary2. Grade and shape with grader using two or more passes per shoulder mile3. Perform when material is moist4. Remove excess material from pavement edge5. Remove safety signs and devices
331 Shoulder Maint
HOURLYCODE CLASS QTY HOURS RATE COSTE203 Maint Worker III 2 8 28.64 458.24E202 Maint Worker II 2 8 23.00 368.00
CREW TOTAL 4 16 61%
HOURLYCODE CLASS QTY HOURS RATE COSTE101 Grader 1 8 28.00 224.00E102 Broom 1 8 35.00 280.00E112 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 3 24 39%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 4UNIT COST ($/UNIT) 340.56
1,362.24
COST
shoulder mile
0.00
0.00
826.24
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
536.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SHOULDER MAINTENANCE
ACTIVITY CODE: 331
MEASUREMENT UNIT: shoulder mile
331 Shoulder maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X
CODE QTYL203 2L202 2
CODE QTYE103 1E102 1E112 1
CODE QTYM301 20 cy
EFFECTIVE DATE:
miles
PREV:
20 cubic yards
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
MATERIALSCLASSGravel
CLASSDump trucksPickupSelf propelled broom
Maint Worker IIIMaint Worker II
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITshoulder
ACTIVITY DESCRIPTION: Patching shoulder irregularities with granular material.
SCHEDULING CONSIDERATIONS: Work is done to re-establish shoulder width, elevation and slope to allow proper road drainage and prevent shoulder erosion.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SHOULDER REPAIR
ACTIVITY CODE: 332 (542.332)
1. Place safety signs and devices as necessary2. Place additional material as needed3. Compact granular material--gravel should be even with pavement edge4. Remove excess material from pavement edge5. Remove safety signs and devices
332 Shoulder Repair
HOURLYCODE CLASS QTY HOURS RATE COSTE203 Maint Worker III 2 8 28.64 458.24E202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 4 16 53%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Dump Truck 1 8 21.00 168.00E102 Pickup 1 8 4.00 32.00E112 Loader 1 8 35.00 280.00
EQUIPMENT TOTAL 3 24 31%
UNITCODE CLASS QTY COST COSTM301 3/4" crushed rock 20 12.00
MATERIALS TOTAL 20 12.00 16%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 20UNIT COST ($/UNIT) 76.80
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
816.00
COST
COST
% TOTAL
cubic yards
240.00
480.00
240.00
0.00
1,536.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SHOULDER REPAIR
ACTIVITY CODE: 332
MEASUREMENT UNIT: cubic yards
332 Shoulder Rep cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE CLASS QTYL202 2
CODE CLASS QTYL102 1
CODE CLASS QTYM391 20
16
BY:
miles
Misc
hoursWORK UNIT
road
MAINTENANCE FEATURE INVENTORYCODE
ACTIVITY DESCRIPTION: Any other road maintenance activity
SCHEDULING CONSIDERATIONS: As needed
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
Maint Worker II
Pickup
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
MATERIALS
QUANTITY FEATURE UNIT
PREV:
AVERAGE DAILY ACCOMPLISHMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: OTHER ROAD MAINTENANCE
ACTIVITY CODE: 390 (542.390)
1. Place safety signs and devices as necessary2. Determine necessary labor, equipment and materials for type of work planned3. Perform activity as needed4. Clean work area5. Remove safety signs and devices
390 Other Road Maint
HOURLYCODE CLASS QTY HOURS RATE COSTL202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 2 8 87%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 1 8 8%
UNITCODE CLASS QTY COST COSTM391 Misc road materrials 20 1.00
MATERIALS TOTAL 20 1.00 5%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 25.61
hour
20.00
32.00
20.00
0.00
409.76
COST
357.76
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: OTHER ROAD MAINTENANCE
ACTIVITY CODE: 390
MEASUREMENT UNIT: hour
390 Other Rd Maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X
CODE QTYL203 2L202 2
CODE QTYE101 1E102 1E112 1
CODE QTY
BY:
ditch miles
EFFECTIVE DATE:PLANNING GUIDELINE APPROVAL
UNIT
PREV:
2 - 4 ditch miles
REFERENCE AND SAFETY
MATERIALSCLASS
CLASSGraderPickupBroom
Maint Worker IIIMaint Worker II
QUANTITY FEATUREAVERAGE DAILY ACCOMPLISHMENT
WORK UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Clearing, cleaning and shaping ditch flow lines to ensure proper drainage. Includes clearing and cleaning culvert areas.
SCHEDULING CONSIDERATIONS: Clean dithces and culverts before flow is restricted or obstructed. Correct culvert erosion at inlet and outlet and loss of riprap and bank protection.
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: DITCHING WITH GRADER
ACTIVITY CODE: 411 (542.411)
1. Place safety signs and devices as necessary2. Cut ditch to proper shape and grade for flow3. Avoid undercutting of slopes4. Regrade backslope if necessary5. Load and haul unsuitable material to disposal site6. When cleaning at culvert ends, clean inlet/outlet ditches at least 50' beyond culvert ends7. Clean area as required8. Remove safety signs and devices
411 Ditching - grader
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 2 8 28.64 458.24L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 4 16 62%
HOURLYCODE CLASS QTY HOURS RATE COSTE101 Grader 1 8 28.00 224.00E102 Pickup 1 8 4.00 32.00E112 Broom 1 8 30.00 240.00
EQUIPMENT TOTAL 3 24 38%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 3UNIT COST ($/UNIT) 437.33
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
816.00
COST
COST
% TOTAL
ditch mile
496.00
0.00
0.00
1,312.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: DITCHING WITH GRADER
ACTIVITY CODE: 411
MEASUREMENT UNIT: ditch mile
411 Ditching grader cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X
CODE QTYL203 4L202 2
CODE QTYE114 1E103 2E102 2
CODE QTY
BY:
ditch miles
EFFECTIVE DATE:
600 ditch feetWORK UNIT
Dump trucksPickup
REFERENCE AND SAFETY
MATERIALSCLASS
CLASSExcavator/Backhoe
ACTIVITY DESCRIPTION: Clearing, cleaning and shaping ditch, front slope and lower back slope with a front end loader, backhoe or excavator.
SCHEDULING CONSIDERATIONS: Used on deep ditches. Scheduled during minimum water flow.
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: DITCHING WITH DITCHER/BACKHOE
ACTIVITY CODE: 412 (542.412)
1. Place safety signs and devices as necessary2. Cut ditch to proper shape and grade for flow3. Avoid undercutting of slopes4. Regrade backslope if necessary5. Load and haul unsuitable material to disposal site6. When cleaning at culvert ends, clean inlet/outlet ditches at least 50' beyond culvert ends7. Clean area as required8. Remove safety signs and devices
412 Ditching - ditcher
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 4 8 28.64 916.48L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 6 16 59%
HOURLYCODE CLASS QTY HOURS RATE COSTE114 Excavator/ditcher 1 8 60.00 480.00E103 Pickup 2 8 4.00 64.00E102 Dump Truck 2 8 21.00 336.00
EQUIPMENT TOTAL 5 24 41%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 600UNIT COST ($/UNIT)
ditch feet
880.00
0.00
0.00
2,154.24
COST% TOTAL
1,274.24
COST
% TOTAL
% TOTAL
COST
3.59
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: DITCHING WITH DITCHER
ACTIVITY CODE: 412
MEASUREMENT UNIT: ditch feet
412 Ditching ditcher cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE102 1
CODE QTY
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Removing obstructions and debris from culverts, inlet channel and outlet channel. Straightening bent ends and restoring headwalls and eroded areas around culvert inlet and outlet. Record condition in culvert log while performing routine cleaning.
SCHEDULING CONSIDERATIONS: This is a preventative maintenance activity, but can also be used during flood related activities to monitor problem area culverts. Also for required maintenace activities identified during routine checks.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSPickup
MATERIALSCLASS
10 - 30 culvertsWORK UNIT
BY:
culvert each
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CULVERT CLEANING
ACTIVITY CODE: 421 (542.421)
1. Locate pickup safely off roadway2. Remove and dispose or dirt and debris from culvert and/or from inlet and outlet3. Inspect culvert and note if further cleaning or repair is needed4. Notify supervisor if further work needed
421 Culvert cleaning
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 93%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 1 8 7%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 20UNIT COST ($/UNIT) 22.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
408.00
COST
COST
% TOTAL
culverts
32.00
0.00
0.00
440.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CULVERT CLEANING
ACTIVITY CODE: 421
MEASUREMENT UNIT: culverts
421 Culvert cleaning cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X
CODE QTYL203 2L202 4
CODE QTYE106 1E103 2E102 2
CODE QTYM301 40 cyM308 40 ftM391 40 $
ACTIVITY DESCRIPTION: Install, replace or repair culverts to provide for drainage.
SCHEDULING CONSIDERATIONS: Work performed to restore or improve roadway drainage. Normally done to enlarge existing culverts or catch basins, replaace deteriorated pipe or to open up new drainage.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITculvert
Maint Worker IIIMaint Worker II
CLASSLoaderDump truckPickup
MATERIALSCLASSbackfill gravelculvertmisc materials
40 lineal feet
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
each
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CULVERT REPAIR/REPLACEMENT
ACTIVITY CODE: 422 (542.422)
1. Place safety signs and devices as necessary2. Excavate and remove existing culvert or portion of culvert to be repaired3. Prepare bed for culvert4. Backfill and compact material in 12"-15" lifts5. Repair roadway surface6. Clean work area7. Remove safety signs and devices
422 Culvert rep-repl
HOURLYCODE CLASS QTY HOURS RATE COST
Maint Worker III 2 8 28.64 458.24Maint Worker II 4 8 22.36 715.52
CREW TOTAL 6 16 41%
HOURLYCODE CLASS QTY HOURS RATE COSTE106 Dump Truck 2 8 21.00 336.00E103 Pickup 2 8 4.00 64.00E102 Loader 1 8 35.00 280.00
EQUIPMENT TOTAL 5 24 24%
UNITCODE CLASS QTY COST COSTM301 backfill gravel 40 12.00M308 culvert 40 12.00M391 misc materials 20 1.00
MATERIALS TOTAL 100 25.00 35%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 40UNIT COST ($/UNIT) 70.84
lineal feet
480.00
980.00
0.00
2,833.76
480.0020.00
COST
1,173.76
COST
680.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CULVERT REPAIR/REPLACEMENT
ACTIVITY CODE: 422
MEASUREMENT UNIT: lineal feet
422 Culvert rep cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 2L202 2
CODE QTYE115 1E103 1E102 1
CODE QTY
EFFECTIVE DATE:
each
PREV:
20 catch basins
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
MATERIALSCLASS
CLASSVactor truckDump truckPickup
Maint. Worker IIIMaint. Worker II
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITcatch basin
ACTIVITY DESCRIPTION: Clean catch basin
SCHEDULING CONSIDERATIONS: Work performed to restore or improve capacity of drainage structure
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CATCH BASIN CLEANING
ACTIVITY CODE: 430 (542.430)
1. Place safety signs and devices as necessary2. Clean catch basin manually and/or with Vactor truck3. Clean work area4. Remove safety signs and devices
430 Catch basin clean
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 2 8 28.64 458.24L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 4 16 58%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Dump Truck 1 8 21.00 168.00E102 Pickup 2 8 4.00 64.00E115 Vactor 1 8 45.00 360.00
EQUIPMENT TOTAL 4 24 42%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 20UNIT COST ($/UNIT) 70.40
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
816.00
COST
catch basins
0.00
592.00
0.00
0.00
1,408.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CATCH BASIN CLEANING
ACTIVITY CODE: 430
MEASUREMENT UNIT: catch basin
430 Catch basin clean cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE103 1E102 1
CODE QTYM391 20
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Other drainage maintenance not covered under other activities.
SCHEDULING CONSIDERATIONS: As needed.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSDump truckPickup
MATERIALSCLASSMisc road materials
16 hoursWORK UNIT
BY:
road mile
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: OTHER DRAINAGE MAINTENANCE
ACTIVITY CODE: 490 (542.490)
1. Place safety signs and devices as necessary2. Take measures to ensure that no contaminants get into moving water. See Best Management Practices (BMPs) for work near water course
490 Other drainage maint
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 65%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Dump Truck 1 8 21.00 168.00E102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 2 16 32%
UNITCODE CLASS QTY COST COSTM391 Misc road materials 20 1.00
MATERIALS TOTAL 20 1.00 3%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 39.25
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
408.00
COST
COST
% TOTAL
hours
20.00
200.00
20.00
0.00
628.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: OTHER DRAINAGE MAINTENANCE
ACTIVITY CODE: 490
MEASUREMENT UNIT: hours
490 Other drainage maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X
CODE QTYL203 1L202 2
CODE QTYL102 1L103 1
CODE QTY
ACTIVITY DESCRIPTION: Cleaning, maintaining, repairing bridge decks, railings, superstructure and headwalls.
SCHEDULING CONSIDERATIONS: As required from bridge maintenance report or as needed. Work method will vary on type of work required.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITbridge
Maint Worker IIIMaint Worker II
CLASSPickupDump truck
MATERIALSCLASS
24 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
each
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: BRIDGE/STRUCTURE MAINTENANCE
ACTIVITY CODE: 511 (542.511)
1. Review inspection reports to determine the need for cleaning and/or repair2. Identify necessary labor crew and equipment3. Work method will vary as needed4. Place safety signs and devices5. Perform work as needed6. Clean area of work7. Remove safety signs and devices
511 Bridge maint
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 3 16 70%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00E103 Dump Truck 1 8 28.00 224.00
0.000.000.000.00
EQUIPMENT TOTAL 2 16 30%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 24UNIT COST ($/UNIT) 35.12
hours
0.00
256.00
0.00
0.00
842.88
COST
586.88
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: BRIDGE/STRUCTURE MAINTENANCE
ACTIVITY CODE: 511
MEASUREMENT UNIT: hours
511 Bridge maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X
CODE QTYL203 1L202 2
CODE QTYE102 2E103 2
CODE QTYM391 100
EFFECTIVE DATE:
each
PREV:
24 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
MATERIALSCLASSMisc materials
CLASSPickupDump truck
Maint Worker IIIMaint Worker II
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITbridge
ACTIVITY DESCRIPTION: Repairing bridge decks, railings, superstructure and headwalls.
SCHEDULING CONSIDERATIONS: As required from bridge maintenance report or as needed. Work method will vary on type of work required.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: BRIDGE REPAIR
ACTIVITY CODE: 512 (542.512)
1. Review inspection reports to determine the need for cleaning and/or repair2. Identify necessary labor crew and equipment3. Work method will vary as needed4. Place safety signs and devices5. Perform work as needed6. Clean area of work7. Remove safety signs and devices
512 Bridge repair
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 3 16 62%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00E103 Dump Truck 1 8 28.00 224.00
EQUIPMENT TOTAL 2 16 27%
UNITCODE CLASS QTY COST COSTM391 Misc materials 100 1.00
MATERIALS TOTAL 100 1.00 11%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 24UNIT COST ($/UNIT) 39.29
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
586.88
COST
COST
% TOTAL
hours
100.00
256.00
100.00
0.00
942.88
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: BRIDGE REPAIR
ACTIVITY CODE: 512
MEASUREMENT UNIT: hours
512 Bridge repair cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 2
CODE QTYE103 1E102 1
CODE QTYM391 40
ACTIVITY DESCRIPTION: Other bridge repair and heavy maintenance activities.
SCHEDULING CONSIDERATIONS: As required from bridge maintenance report or as needed. Work method will vary on type of work required.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITbridge
Maint Worker IIIMaint Worker II
CLASSDump truckPickup
MATERIALSCLASSMisc materials
24 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
each
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: OTHER BRIDGE/STRUCTURE MAINTENANCE
ACTIVITY CODE: 590 (542.590)
1. Place safety signs and devices as necessary2. Take measures to ensure that no contaminants get into moving water. See Best Management Practices (BMPs) for work near water course
590 Other bridge str maint
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 3 16 66%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00E103 Dump Truck 1 8 28.00 224.00
EQUIPMENT TOTAL 2 16 29%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 5%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 24UNIT COST ($/UNIT) 36.79
hours
40.00
256.00
40.00
0.00
882.88
COST
586.88
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: OTHERBRIDGE/STRUCTURE MAINTENANCE
ACTIVITY CODE: 590
MEASUREMENT UNIT: hours
590 Other bridge str maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE102 1
CODE QTYM391 40
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Minor sidewalk repair to correct spalling, chipping, grade separation, and/or broken area.
SCHEDULING CONSIDERATIONS: Performed when sidewalk condition is a hazard to pedestrians.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSPickup
MATERIALSCLASSMisc materials
16 hoursWORK UNIT
BY:
sidewalk lineal feet
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SIDEWALK MAINTENANCE
ACTIVITY CODE: 610 (542.610
1. Determine necessary crew, equipment and materials for maintenance operation2. Place safety signs and devices3. Clean, repair or replace as necessary4. Clean work area6. Dispose of waste material properly7. Remove safety signs and devices
610 Sidewalks
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 85%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
0.00
EQUIPMENT TOTAL 1 8 7%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 8%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 30.00
hours
40.00
32.00
40.00
0.00
480.00
COST
408.00
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SIDEWALK MAINTENANCE
ACTIVITY CODE: 610
MEASUREMENT UNIT: hours
610 Sidewalk maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X
CODE QTYL203 1L202 1
CODE QTYL102 1
CODE QTYM391 40
ACTIVITY DESCRIPTION: Cutting brush, mowing or clearing path
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITpaths
Maint Worker IIIMaint Worker II
CLASSPickup
MATERIALSCLASSMisc materials
16 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
lineal feet
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SPECIAL PURPOSE PATHS
ACTIVITY CODE: 620 (542.620)
1. Determine necessary crew, equipment and materials for maintenance operation2. Place safety signs and devices3. Clean, repair or replace as necessary4. Clean work area6. Dispose of waste material properly7. Remove safety signs and devices
620 Special purpose paths
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 85%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 1 8 7%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 8%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 30.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
408.00
COST
COST
% TOTAL
hours
40.00
32.00
40.00
0.00
480.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SPECIAL PURPOSE PATHS
ACTIVITY CODE: 620
MEASUREMENT UNIT: hours
620 Spec purpose paths cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL206 2
CODE QTYE119 1
CODE QTYM392 100
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Maintenance of signs and traffic control devices
SCHEDULING CONSIDERATIONS: Maintain signs and traffic control devices
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSSign tech
CLASSSign truck
MATERIALSCLASSsign materials
10 signsWORK UNIT
BY:
signs each
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SIGN MAINTENANCE
ACTIVITY CODE: 641 (542.641)
1. Place safety signs and devices as necessary2. Clean, repair and/or replace traffic signs in accordance with the Uniform Traffic Control Devices manual.3. Remove safety signs and devices
641 Sign Maint
HOURLYCODE CLASS QTY HOURS RATE COSTL206 Sign Tech 2 8 28.64 458.24
CREW TOTAL 2 8 74%
HOURLYCODE CLASS QTY HOURS RATE COSTE119 Utility/Sign truck 1 8 8.00 64.00
EQUIPMENT TOTAL 1 8 10%
UNITCODE CLASS QTY COST COSTM392 sign materials 100 1.00
MATERIALS TOTAL 100 1.00 16%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 10UNIT COST ($/UNIT) 62.22
signs
100.00
64.00
100.00
0.00
622.24
COST
458.24
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SIGN MAINTENANCE
ACTIVITY CODE: 641
MEASUREMENT UNIT: signs
641 Sign Maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL206 2
CODE QTYE119 1
CODE QTYM391 100
BY:
guardrail lineal feet
EFFECTIVE DATE:
60 lineal feetWORK UNIT
MATERIALSCLASSguardrail materials
CLASSSign/utility truck
ACTIVITY DESCRIPTION: Repair of guardrail
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSSign tech
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: GUARDRAIL REPAIR
ACTIVITY CODE: 642 (542.642)
1. Place safety signs and devices as necessary2. Repair and/or replace guardrail in accordance with the Uniform Traffic Control Devices manual.3. Remove safety signs and devices
642 Guardrail rep
HOURLYCODE CLASS QTY HOURS RATE COSTL206 Sign Tech 2 8 28.64 458.24
CREW TOTAL 2 8 74%
HOURLYCODE CLASS QTY HOURS RATE COSTE119 Utility/Sign truck 1 8 8.00 64.00
EQUIPMENT TOTAL 1 8 10%
UNITCODE CLASS QTY COST COSTM391 guardrail materials 100 1.00
MATERIALS TOTAL 100 1.00 16%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 60UNIT COST ($/UNIT) 10.37
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
458.24
COST
lineal feet
100.00
64.00
100.00
0.00
622.24
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SIGN MAINTENANCE
ACTIVITY CODE: 640
MEASUREMENT UNIT: lineal feet
642 Guardrail rep cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL206 2
CODE QTYE119 1
CODE QTYM392 900
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Placement of traffic markings including striping and markers
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSSign tech
CLASSSign/utility truck
MATERIALSCLASSmisc sign materials
2000 lineal feetWORK UNIT
BY:
paved road mile
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: TRAFFIC MARKINGS
ACTIVITY CODE: 643 (542.643)
1. Place safety signs and devices as necessary2. Place markings in accordance with the Uniform Traffic Control Devices manual.3. Remove safety signs and devices
643 Traffic Markings
HOURLYCODE CLASS QTY HOURS RATE COSTL206 Sign Tech 2 8 28.64 458.24
CREW TOTAL 2 8 32%
HOURLYCODE CLASS QTY HOURS RATE COSTE119 Utility/Sign truck 1 8 8.00 64.00
EQUIPMENT TOTAL 1 8 4%
UNITCODE CLASS QTY COST COSTM392 Misc sign materials 900 1.00
MATERIALS TOTAL 900 1.00 63%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 2000UNIT COST ($/UNIT) 0.71
lineal feet
900.00
64.00
900.00
0.00
1,422.24
COST
458.24
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: TRAFFIC MARKINGS
ACTIVITY CODE: 643
MEASUREMENT UNIT: lineal feet
643 Traffic Markings cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X
CODE QTYL203 1
CODE QTYE103 1
CODE QTYM304M309
ACTIVITY DESCRIPTION: Snow removal and application of sand and/or chemicals on roadway surfaces.
SCHEDULING CONSIDERATIONS: Prepare for this activity when weather forecast predicts appreciable snowfall or icing conditions. Consult snow removal policy.
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITroad
Maint Worker III
CLASSDump truck w/plow
MATERIALSCLASSsand/salt mixtureanti-icing chemical
8 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SNOW & ICE CONTROL
ACTIVITY CODE: 660 (542.660)
1. Apply abrasives or de-icing chemical on planned and assigned routes at spots or continuous locations2. Plow snow along assigned routes and as per snow removal policy on prioritized roads
660 Snow & Ice control
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12
CREW TOTAL 1 8 33%
HOURLYCODE CLASS QTY HOURS RATE COSTE103 Dump Truck w/plow 1 8 28.00 224.00
EQUIPMENT TOTAL 1 8 32%
UNITCODE CLASS QTY COST COSTM304 sand 20 12.00M309 de-icer
MATERIALS TOTAL 20 12.00 35%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 8UNIT COST ($/UNIT) 86.64
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
229.12
COST
COST
% TOTAL
hours
240.00
224.00
240.00
0.00
693.12
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SNOW & ICE CONTROL
ACTIVITY CODE: 660
MEASUREMENT UNIT: hours
660 Snow & Ice control cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 3
CODE QTYE120 1E102 1E105 1E112 1
CODE QTY
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Cleaning of road surface
SCHEDULING CONSIDERATIONS: As needed
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSVacuum SweeperPickupWater truckBroom (op)
MATERIALSCLASS
32 hoursWORK UNIT
BY:
road miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: STREET CLEANING
ACTIVITY CODE: 670 (542.670)
1. Check equipment and warning devices2. Place safety signs as necessary3. Use water to flush street to reduce dust (op)4. Sweep area5. Pick up waste material. Haul and dispose6. Remove safety signs
670 Street cleaning
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 3 8 22.36 536.64
CREW TOTAL 4 16 46%
HOURLYCODE CLASS QTY HOURS RATE COSTE120 Vacuum sweeper 1 8 60.00 480.00E102 Pickup 1 8 4.00 32.00E105 Water truck 1 8 15.00 120.00E112 Broom 1 8 35.00 280.00
EQUIPMENT TOTAL 4 32 54%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 32UNIT COST ($/UNIT) 52.43
hours
0.00
912.00
0.00
0.00
1,677.76
COST
765.76
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: STREET CLEANING
ACTIVITY CODE: 670
MEASUREMENT UNIT: hours
670 Street cleaning cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL206 2
CODE QTYE119 1
CODE QTYM392 60
ACTIVITY DESCRIPTION: Other traffic control maintenance activities.
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITroad
Sign tech
CLASSSign truck
MATERIALSCLASSMisc sign materials
16 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: OTHER TRAFFIC MAINTENANCE
ACTIVITY CODE: 690 (542.690)
1. Place safety signs as necessary2. Perform activity as needed3. Clean area4. Remove safety signs and devices
690 Other traffic maint
HOURLYCODE CLASS QTY HOURS RATE COSTL206 Sign tech 2 8 28.64 458.24
CREW TOTAL 2 8 67%
HOURLYCODE CLASS QTY HOURS RATE COSTE119 Sign truck/Utility truck 1 8 21.00 168.00
EQUIPMENT TOTAL 1 8 24%
UNITCODE CLASS QTY COST COSTM392 Misc sign materials 60 1.00
MATERIALS TOTAL 60 1.00 9%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 42.89
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
458.24
COST
COST
% TOTAL
hours
60.00
168.00
60.00
0.00
686.24
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: OTHER TRAFFIC MAINTENANCE
ACTIVITY CODE: 690
MEASUREMENT UNIT: hours
690 Other traffic maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 2
CODE QTYE121 1E102 1
CODE QTYM391 40
ACTIVITY DESCRIPTION: Control of vegetation using brush machines
SCHEDULING CONSIDERATIONS: As required for work on road right-of-way
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITshoulder
Maint Worker IIIMaint Worker II
CLASSMower/brush cutterPickup
REFERENCE AND SAFETY
MATERIALSCLASSMisc materials
3 shoulder mile
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: BRUSH CONTROL--MECHANICAL
ACTIVITY CODE: 712 (542.712)
1. Identify work areas2. Check equipment before leaving shop3. Place safety signs and devices4. Establsish communication system if necessary5. Cut brush and small trees approx 8 feet beyond ditch line6. Chip brush and tree imbs with chipper7. Clean roadway of debris8. Remove safety signs and devices
712 Brush control - mech
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 3 16 50%
HOURLYCODE CLASS QTY HOURS RATE COSTE121 Mower 1 8 60.00 480.00E102 Pickup 2 8 4.00 64.00
EQUIPMENT TOTAL 3 16 46%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 3%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 3UNIT COST ($/UNIT) 390.29
1,170.88
COST
shoulder mile
40.00
40.00
0.00
586.88
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
544.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: BRUSH CONTROL--MECHANICAL
ACTIVITY CODE: 712
MEASUREMENT UNIT: hours
712 Brush control mech cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 2L202 4
CODE QTYE117 1E103 1E102 2E116 1
CODE QTYM391 40
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Control of roadside brush using manual methods
SCHEDULING CONSIDERATIONS: As required for control of vegetation to maintain drainage and site distance
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSChainsawDump truckPickupChipper REFERENCE AND SAFETY
MATERIALSCLASSMisc materials
48 hoursWORK UNIT
BY:
shoulder miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: BRUSH CONTROL--MANUAL
ACTIVITY CODE: 713 (542.713)
1. Identify work areas2. Check equipment before leaving shop3. Place safety signs and devices4. Establsish communication system if necessary5. Cut brush and small trees approx 8 feet beyond ditch line6. Chip brush and tree imbs with chipper7. Clean roadway of debris8. Remove safety signs and devices
713 Brush control - man
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 2 8 28.64 458.24L202 Maint Worker II 4 8 22.36 715.52
CREW TOTAL 6 16 69%
HOURLYCODE CLASS QTY HOURS RATE COSTE116 Chipper 1 8 25.00 200.00E102 Pickup 2 8 4.00 64.00E103 Dump Truck 1 8 21.00 168.00E117 Chainsaw 2 8 3.00 48.00
EQUIPMENT TOTAL 6 32 28%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 2%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 48UNIT COST ($/UNIT) 35.29
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
1,173.76
COST
COST
% TOTAL
hours
40.00
480.00
40.00
0.00
1,693.76
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: BRUSH CONTROL--MANUAL
ACTIVITY CODE: 713
MEASUREMENT UNIT: hours
713 Brush control man cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE122 1
CODE QTYM393 100
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Control of roadside vegetation using chemicals applied from a spray truck
SCHEDULING CONSIDERATIONS: As required to control roadside vegetation
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSSpray truck
MATERIALSCLASSspray materials
12 shoulder milesWORK UNIT
BY:
shoulder miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CHEMICAL VEGETATION CONTROL--MECH
ACTIVITY CODE: 721 (542.721)
1. Wear all necessary protective clothing2. Read and follow label instructions3. Mix chemicals properly4. Place safety signs and devices5. Apply chemicals to appropriate areas, avoiding "no spray" areas6. Record appropriate data7. Remove safety signs and devices
721 Chemical Veg control - mech
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 21%
HOURLYCODE CLASS QTY HOURS RATE COSTE122 Spray truck 1 8 45.00 360.00
EQUIPMENT TOTAL 1 8 18%
UNITCODE CLASS QTY COST COSTM393 spray materials 100 12.00
MATERIALS TOTAL 100 12.00 61%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 12UNIT COST ($/UNIT) 164.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
408.00
COST
COST
0.00
1,968.00
COST
shoulder miles
% TOTAL
1,200.00
360.00
1,200.00
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CHEMICAL VEGETATION CONTROL--MECH
ACTIVITY CODE: 721
MEASUREMENT UNIT: shoulder miles
721 Chem veg control mech cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE122 1E123 1E102 1
CODE QTYM393 50
ACTIVITY DESCRIPTION: Control of roadside vegetation using chemicals applied manually
SCHEDULING CONSIDERATIONS: Control of roadside vegetation using chemicals applied manually
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITshoulder
Maint Worker IIIMaint Worker II
CLASSSpray truckBackpack spray unitPickup
MATERIALSCLASSspray materials
16 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: CHEMICAL VEGETATION CONTROL--MANUAL
ACTIVITY CODE: 722 (542.722)
1. Wear all necessary protective clothing2. Read and follow label instructions3. Mix chemicals properly4. Place safety signs and devices5. Apply chemicals to appropriate areas, avoiding "no spray" areas6. Record appropriate data7. Remove safety signs and devices
722 Chem veg control - man
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 29%
HOURLYCODE CLASS QTY HOURS RATE COSTE122 Spray truck 1 8 45.00 360.00E123 Pickup 1 8 4.00 32.00E102 Backpack sprayer 1 8 3.00 24.00
EQUIPMENT TOTAL 3 24 29%
UNITCODE CLASS QTY COST COSTM393 spray material 50 12.00
MATERIALS TOTAL 50 12.00 42%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 89.00
hours
600.00
416.00
600.00
0.00
1,424.00
COST
408.00
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: CHEMICAL VEGETATION CONTROL--MANUAL
ACTIVITY CODE: 722
MEASUREMENT UNIT: hours
722 Chem veg control man cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X
CODE QTYL202 4
CODE QTYE102 2
CODE QTYM391 60
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Maintenance of landscaped area
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker II
CLASSPickupHand tools
MATERIALSCLASSMisc materials
32 hoursWORK UNIT
BY:
shoulder miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: LANDSCAPE MAINTENANCE
ACTIVITY CODE: 731 (542.731)
1. Perform as needed in landscaped areas2. Establish work area control to protect public3. Wear appropriate eye and ear protection4. Clean work area and dispose of debris
731 Landscape maint
HOURLYCODE CLASS QTY HOURS RATE COSTL202 Maint Worker II 4 8 23 736.00
0.00
CREW TOTAL 4 8 87%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 2 8 4.00 64.00
EQUIPMENT TOTAL 2 8 8%
UNITCODE CLASS QTY COST COSTM391 Misc materials 50 1.00
MATERIALS TOTAL 50 1.00 6%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 32UNIT COST ($/UNIT) 26.56
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
736.00
COST
COST
% TOTAL
hours
50.00
64.00
50.00
0.00
850.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: LANDSCAPE MAINTENANCE
ACTIVITY CODE: 731
MEASUREMENT UNIT: hours
731 Landscape maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL202 2
CODE QTYE102 1
CODE QTYM391 40
ACTIVITY DESCRIPTION: Control of litter along roadside
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITshoulder
Maint Worker II
(work release crew)
CLASSPickup
MATERIALSCLASSMisc materials
16 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: LITTER CONTROL
ACTIVITY CODE: 751 (542.751)
1. Place safety signs and devices2. Begin litter pickup at designated location3. Be aware of traffic and safety4. Remove collected debris and litter
751 Litter control
HOURLYCODE CLASS QTY HOURS RATE COSTE202 Maint Worker II 2 8 23 368.00
CREW TOTAL 2 8 84%
HOURLYCODE CLASS QTY HOURS RATE COSTL102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 1 8 7%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 9%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 27.50
hours
40.00
32.00
40.00
0.00
440.00
COST
368.00
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: LITTER CONTROL
ACTIVITY CODE: 751
MEASUREMENT UNIT: hours
751 Litter control cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X
CODE QTYL203 2L202 2
CODE QTYE114 1E103 1E102 1
CODE QTYM301 10
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Repair and dressing of slopes
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSExcavator/BackhoeDump truckPickup
MATERIALSCLASScrushed rock
32 hoursWORK UNIT
BY:
shoulder miles
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: SLOPE REPAIR
ACTIVITY CODE: 761 (542.761)
1. Place safety signs and devices2. Check for location of underground utilities3. Grade and contour as necessary4. Avoid undercuttting slopes5. Load and haul waste to disposal site6. Clean work area7. Remove safety signs and devices
761 Slope repair
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 2 8 28.64 458.24L202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 4 16 50%
HOURLYCODE CLASS QTY HOURS RATE COSTE114 Excavator 1 8 45.00 360.00E102 Pickup 1 8 4.00 32.00E103 Dump Truck 1 8 21.00 168.00
EQUIPMENT TOTAL 3 24 35%
UNITCODE CLASS QTY COST COSTM301 crushed rock 20 12.00
MATERIALS TOTAL 20 12.00 15%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 32UNIT COST ($/UNIT) 50.50
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
816.00
COST
COST
% TOTAL
hours
240.00
560.00
240.00
0.00
1,616.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: SLOPE REPAIR
ACTIVITY CODE: 761
MEASUREMENT UNIT: hours
761 Slope repair cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 2L202 2
CODE QTYE102 1E103 1E114 1
CODE QTYM391 40
ACTIVITY DESCRIPTION: Other maintenance activities required along road right-of-way
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITshoulder
Maint Worker IIIMaint Worker II
CLASSPickupDump truckExcavator
MATERIALSCLASSMisc materials
32 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
miles
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: OTHER ROADSIDE MAINTENANCE
ACTIVITY CODE: 790 (542.790)
1. Place safety signs and devices2. Check for location of underground utilities3. Perform work as necessary4. Clean work area5. Remove safety signs and devices
790 Other roadside maint
HOURLYCODE CLASS QTY HOURS RATE COSTE204 Maint Worker III 2 8 28.64 458.24E202 Maint Worker II 2 8 22.36 357.76
CREW TOTAL 4 16 58%
HOURLYCODE CLASS QTY HOURS RATE COSTE114 Excavator 1 8 45.00 360.00E102 Pickup 1 8 4.00 32.00E103 Dump Truck 1 8 21.00 168.00
EQUIPMENT TOTAL 3 24 40%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 3%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 32UNIT COST ($/UNIT) 44.25
hours
40.00
560.00
40.00
0.00
1,416.00
COST
816.00
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: OTHER ROADSIDE MAINTENANCE
ACTIVITY CODE: 790
MEASUREMENT UNIT: hours
790 Other roadside maint cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYL203 1L202 1
CODE QTYE102 1
CODE QTYM391 40
PREV:
AVERAGE DAILY ACCOMPLISHMENT
PLANNING GUIDELINE APPROVAL
PERSONNEL
EQUIPMENT
QUANTITY FEATURE UNITMAINTENANCE FEATURE INVENTORY
CODE
ACTIVITY DESCRIPTION: Other maintenance activities including work on ferries, docks, moveable bridges or work performed for other departments/agencies
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
MONTHLYSCHEDULE
CLASSMaint Worker IIIMaint Worker II
CLASSPickup
REFERENCE AND SAFETY
MATERIALSCLASSMisc materials
16 hoursWORK UNIT
BY:
year one
EFFECTIVE DATE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: ANCILLARY OPERATIONS
ACTIVITY CODE: 800 (542.800)
1. Determine specific activity to be performed and location(s)2. Identify necessary labor, equipment and materials to complete activity3. Place safety signs as needed4. Follow safety procedures5. Adhere to any special requirements for type of activity and corodinate with other agencies as needed
800 Ancillary operations
HOURLYCODE CLASS QTY HOURS RATE COSTL203 Maint Worker III 1 8 28.64 229.12L202 Maint Worker II 1 8 22.36 178.88
CREW TOTAL 2 16 85%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
EQUIPMENT TOTAL 1 8 7%
UNITCODE CLASS QTY COST COSTM391 Misc materials 40 1.00
MATERIALS TOTAL 40 1.00 8%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 16UNIT COST ($/UNIT) 30.00
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
408.00
COST
COST
% TOTAL
hours
40.00
32.00
40.00
0.00
480.00
COST
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: ANCILLARY OPERATIONS
ACTIVITY CODE: 800
MEASUREMENT UNIT: hours
800 Ancillary ops cost
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DECX X X X X X X X X X X X
CODE QTYE209 1
CODE QTYE102 1
CODE QTY
ACTIVITY DESCRIPTION: Administrative activities related to maintenance operations.
SCHEDULING CONSIDERATIONS: As required
WORK CONSIDERATIONS
REFERENCE AND SAFETY
MONTHLYSCHEDULE
CLASSPERSONNEL
EQUIPMENT
MAINTENANCE FEATURE INVENTORYCODE
PLANNING GUIDELINE APPROVAL
QUANTITY FEATURE UNITyear
Supt/Supv/Mgr
CLASSPickup
MATERIALSCLASS
8 hours
BY:
AVERAGE DAILY ACCOMPLISHMENTWORK UNIT
EFFECTIVE DATE:
one
PREV:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME:
ACTIVITY CODE:
WASHINGTON COUNTIESMaintenance Management
MAINTENANCE ACTIVITY PLANNING GUIDELINEACTIVITY NAME: MAINTENANCE ADMINISTRATION
ACTIVITY CODE: 910 (542.910)
910 Maint admin
HOURLYCODE CLASS QTY HOURS RATE COSTL206 Sup/Supv/Mgr 1 8 31 248.00
CREW TOTAL 1 8 89%
HOURLYCODE CLASS QTY HOURS RATE COSTE102 Pickup 1 8 4.00 32.00
0.000.000.000.000.00
EQUIPMENT TOTAL 1 8 11%
UNITCODE CLASS QTY COST COST
MATERIALS TOTAL 0 0.00 0%
CONTRACT SERVICES 0%
SUMMARY:TOTAL DAILY COSTAVERAGE DAILY ACCOMPLISHMENT 8UNIT COST ($/UNIT) 35.00
hours
0.00
32.00
0.00
0.00
280.00
COST
248.00
COST
MATERIALS
PERSONNEL/CREW COSTS
EQUIPMENT
% TOTAL
% TOTAL
COST
% TOTAL
WASHINGTON COUNTIESMaintenance Management
ACTIVITY COSTING -- STANDARD DAILY COSTSACTIVITY NAME: MAINTENANCE ADMINISTRATION
ACTIVITY CODE: 910
MEASUREMENT UNIT: hours
910 Maint admin cost