PHOTO PHOTO PHOTO PHOTO Oakland, Ca September 9, 2008 LNG TERMINAL ENGINEERING AND MAINTENANCE STANDARDS (LNGTEMS) Presented by: Gayle Johnson

Upload: others

Post on 08-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

PHOTO

PHOTO

PHOTO

PHOTO

Oakland, Ca

September 9, 2008

LNG TERMINAL ENGINEERING

AND MAINTENANCE

STANDARDS (LNGTEMS)

Presented by:

Gayle Johnson

Page 2: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Presentation Preview

Project Background

Project Status

Key Issues

Path Forward

Page 3: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08 Numerous projects proposed in California

Lempert-Keene-Seastrand Oil Spill

Prevention Act gives CSLC jurisdiction

Project Commencement – 2006

Halcrow – Prime

– Aker Kvaerner (LNG systems)

– Energo Engineering (fixed platforms)

Project Background

Page 4: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Project Scope

4 Configurations

Conventional Pier/Wharf

Page 5: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 6: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Project Scope

4 Configurations

Conventional Pier/Wharf

Deep Water Port

Page 7: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 8: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 9: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Project Scope

4 Configurations

Conventional Pier/Wharf

Deep Water Port

LNG Vessel Adjacent to Existing

Platform

Page 10: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 11: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Project Scope

4 Configurations

Conventional Pier/Wharf

Deep Water Port

LNG Vessel Adjacent to Existing Platform

Gravity Based Structure (GBS)

Page 12: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 13: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Not Covered

Vessels

– FSRUs

– LNG Tank Vessels

– Tugs

Siting

Page 14: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Topics

Similar to MOTEMS

– Structural Loading, Analysis, Performance

– Mooring and Berthing

– Geotechnical Hazards

– Component Structural Analysis and Design

– Fire Prevention, Detection, Suppression

– Piping and Pipelines

– Mechanical / Electrical

– Audits and Inspections

Focus on LNG Specific Design Issues

Extra Emphasis on Hazards and Risk Analyses

Page 15: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key References

MOTEMS

NFPA 59A

API RP 2A

Mexican LNG Code

Sandia Guidance Document

DnV

ABS

Page 16: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Project Status

Mechanical systems complete

Fixed platform configuration complete

GBS remaining

Workshops to take place

Page 17: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Page 18: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 19: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Nearshore vs. Offshore Design

Page 20: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Nearshore vs. Offshore Design

Seismic Design Standards

Page 21: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Nearshore vs. Offshore Design

Seismic Design Standards

– ISO 19901-2

–API RP 2EQ

–1/2500 P(f) for SSE

–Some Europeans pushing for 10,000 year RP

Page 22: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Nearshore vs. Offshore Design

Seismic Design Standards

New Technologies

Page 23: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Key Issues

Varying Levels of CSLC Jurisdiction

Nearshore vs. Offshore Design

Seismic Design Standards

New Technologies

Risk Perception

Page 24: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

LNG Risk

Perceived by many to be comparable to

nuclear power plants

Page 25: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 26: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

LNG Risk

Perceived by many to be comparable to

nuclear power plants

Attempting to capture “best practice”

Need to accept that we can’t eliminate risk

completely

Page 27: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Page 28: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

Path Forward

Draft within next 6 months

Workshop in Houston

Workshop in California

Page 29: LNG TERMINAL ENGINEERING AND MAINTENANCE PHOTO … · 2018. 9. 24. · –API RP 2EQ –1/2500 P(f) for SSE –Some Europeans pushing for 10,000 year RP. 2008 Key Issues Varying Levels

Ca

lifo

rnia

Sta

te L

an

ds C

om

mis

sio

n P

reve

ntio

n F

irst

20

08

And that’s all I have to say about that …