10/23/2012 SUPPORT DOCUMENTS Page 1 LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE AGT TRAIN STATION RENOVATION AGT TRAIN STATION RENOVATION PROTOTYPE SPECS MILTON/PATE ASSOC 1 10/1/1993 1-E AGT ORIGINAL CONSTRUCTION AGT STAIRWELL ALARM SYSTEM SHAW COMMUNICATIONS 1 10/1/1989 8-B AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 1 WESTINGHOUSE 1 4/1/1978 3-F AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN CRITERIA WESTINGHOUSE 1 12/1/1977 3-F AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 2 WESTINGHOUSE 1 4/1/1978 3-F AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - STATION DOORS WESTINGHOUSE 1 6/1/1978 1-E AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW STATION DOORS WESTINGHOUSE 1 8/7/1978 3-F AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW APPENDIX 6- A CONTINUED WESTINGHOUSE 1 12/1/1977 3-F AGT GA POWER METERS APPARATUS SERVICE REPORTS / CPTC WESTINGHOUSE 1 5/2/1983 8-A AGT INDUSTRY SERVICES DIVISION WESTINGHOUSE TRAINING MANUAL AC/DC ROTATING MACHINES WESTINGHOUSE 1 6/24/1982 8-A AGT POWER SYSTEMS ANALYSIS SEMINAR WESTINGHOUSE TRAINING MANUAL WESTINGHOUSE 1 11/13/1981 8-A

Upload: others

Post on 02-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 1

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AGT TRAIN STATION RENOVATION AGT TRAIN STATION RENOVATION PROTOTYPE SPECS

MILTON/PATE ASSOC 1 10/1/1993 1-E

AGT ORIGINAL CONSTRUCTION AGT STAIRWELL ALARM SYSTEM SHAW COMMUNICATIONS

1 10/1/1989 8-B

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 1 WESTINGHOUSE 1 4/1/1978 3-F

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN CRITERIA WESTINGHOUSE 1 12/1/1977 3-F

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 2 WESTINGHOUSE 1 4/1/1978 3-F

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - STATION DOORS

WESTINGHOUSE 1 6/1/1978 1-E

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW STATION DOORS

WESTINGHOUSE 1 8/7/1978 3-F

AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW APPENDIX 6-A CONTINUED

WESTINGHOUSE 1 12/1/1977 3-F

AGT GA POWER METERS APPARATUS SERVICE REPORTS / CPTC WESTINGHOUSE 1 5/2/1983 8-A

AGT INDUSTRY SERVICES DIVISION WESTINGHOUSE TRAINING MANUAL AC/DC ROTATING MACHINES

WESTINGHOUSE 1 6/24/1982 8-A

AGT POWER SYSTEMS ANALYSIS SEMINAR

WESTINGHOUSE TRAINING MANUAL WESTINGHOUSE 1 11/13/1981 8-A

Page 2: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 2

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AGT POWER SYSTEMS ANALYSIS SEMINAR C/E-23

WESTINGHOUSE TRAINING MANUAL WESTINGHOUSE 1 6/14/1983 8-A

AGT FIS EXPANSION PHASE I TRAINING MANUAL, O & M OF ACCUFLOW INSTALLATION & START UP

WESTINGHOUSE 1 1/1/1986 8-A

AGT ORIGINAL CONSTRUCTION ON SITE CONSTRUCTION LOGIC DIAGRAMS WESTINGHOUSE 2 5/24/1978 3-F

AGT ORIGINAL CONSTRUCTION ON SITE CONSTRUCTION COMPUTER PRINTOUTS WESTINGHOUSE 1 5/24/1978 3-F

AGT ORIGINAL CONSTRUCTION BOILER CONTROLS INSTALLATION SCHEDULE WESTINGHOUSE 1 6/15/1977 9-A

AGT PROJECT T-2 CONTRACT DOCUMENTS STEVENS & WILKINSON 1 1/1/1977 1-F

AGT TRAIN STATION RENOVATION CONCOURSE B AGT TRAIN STATION RENOVATION PROTOTYPE SPECS APPENDIX A

MILTON PATE ASSOC 1 12/10/1993 1-D

AGT CONC E/AGT ADTRANZ TRAIN MAINTENANCE AREA

PRE-ACTION SPRINKLER--DELIVERY & ACCEPTANCE CERTIFICATE

HONEYWELL 1 3/13/1998 6-B

AGT T-2 CONTRACT MOTOROLA SPECIFICATIONS MOTOROLA 1 12/7/1977 1-D

AGT TUBE SMOKE REMOVAL SYSTEM MODS

AXIAL FLOW FANS INSTALLATION AND O & M MANUAL

CLARAGE 1 3/15/2004 2-A

AGT TUBE SMOKE REMOVAL SYSTEM MODS

CONTROLS O & M MANUAL JOHNSON CONTROLS 1 7/7/2004 3-E

Page 3: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 3

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AGT TUBE SMOKE REMOVAL SYSTEM MODS

ELECTRIC O & M MANUAL WHITEHEAD ELECTRIC 1 3/16/2004 2-A

AGT TUBE SMOKE REMOVAL SYSTEM MODS

DAMPERS, ACTUATORS, V.S.D. & EXHAUST FANS O & M MANUAL

W. B. WALLIS 1 3/16/2004 3-E

AGT COSMETIC UPGRADES CPTC APM MALL PROECT MANUAL - 95% OWNER REVIEW

HSST 2 5/11/2005 5-B

AGT REPLACEMENT OF AUTOMATIC CONTROL EQUIPMENT

REQUEST FOR PROPOSAL - PEOPLE MOVERS DOA 1 10/29/2004 7-E

AGT COSMETIC UPGRADES CPTC APM MALL O & M MANUAL NEW SOUTH CONSTRUCTION

1 9/20/2007 5-B

AGT SMOKE REMOVAL SYSTEM MODS

WARRANTY & CLOSE OUT DOCUMENTS CITY OF ATLANTA 1 9/22/2004 2-A

AGT AHU-16-1 SUBMITTAL FOR FAN REPLACEMENT PERFORMANCE MECH/YORK

1 1/11/2000 4-F

AGT ZIMBABWE SCULPTURE PROJECT

LIGHTING, SIGNAGE, DIPSLAY CASES & PHOTOMURALS

CHATHAM ART SERVICES

1 4/14/2000 3-F

AGT COSMETIC UPGRADES CPTC APM MALL O & M MANUAL FOR CONSTRUCTION

NEW SOUTH CONSTRUCTION

1 1/16/2006 5-B

AGT SMOKE REMOVAL SYSTEM MODS

BID DOCUMENTS CITY OF ATLANTA 1 8/19/2002 2-A

AOA MAINTENANCE COMPLEX PH I VEHICLE STORAGE GLYCOL FACILITY

CONTRACT DOCUMENTS & SPECIFICATIONS AAE 1 6/26/1989 8-C

Page 4: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 4

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AOA AATC PARKING LOT CONTRACT DOCUMENTS & SPECS AAE 1 8/5/1993 3-A

AOA AATC PARKING LOT O & M MANUAL INGLETT & STUBBS 1 3/1/1987 3-A

AOA ALAMO RENT-A-CAR SERVICE PLAZA FACILITY TRACT VI SPECIFICATIONS CONSTRUCT ASSOC & MAKUTA/CROPSEY

1 11/12/1981 2-E

AOA SNOW REMOVAL EQUIP BUILDING

PROJECT INFORMATION MANUAL CONLAN CO 1 3/11/1991 3-B

AOA SNOW REMOVAL EQUIP BUILDING

ADDENDUM #3 TO CONTRACT DOCUMENTS-SPECIFICATIONS

DERYCK MUEHLHAUSER ARCH

1 6/20/1990 3-B

AOA CONTRACT M5 PAVING, GRADING, & DRAINAGE FOR CPTC COMPLEX

CONTRACT DOCS & SPECS FOR APRONS & ASSOCIATED TAXIWAYS

AAE 1 6/3/1977 3-C

AOA SNOW REMOVAL EQUIP BUILDING

SPECIFICATIONS DERYK MUEHLHAUSER ARCH

1 6/20/1990 3-B

AOA DELTA DASH FACILITY OTIS ELEVATOR O & M MANUAL UNITED TECHNOLOGIES OTIS

1 11/23/1987 5-F

AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATIONS

PROJECT MANUAL / SPECIFICATIONS LAW ENGINEER. & ENVIRON. SERVICES

1 3/16/1996 3-B

AOA ADA REST ROOM RENOVATION PROJECT

SPECS, BID DOCS, CONTRACT DOCS, ADDENDUM 1, ATTACHMENTS 1 & 2, CLARIFI & MODS TO CONTRACT DOCS

AATC 1 2/18/1994 3-B

AOA STORM WATER DIVERSION PUMPING SYSTEM

O & M MANUALS PERFORMANCE MECHANICAL CO

1 11/2/1996 3-B

Page 5: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 5

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AOA STORM WATER DIVERSION PUMPING SYSTEM NEW SOUTH CONSTRUCTION

O & M MANUAL BOOK #2 FOXBORO COMPONENT

PERFORM. MECH CO & NEW SOUTH CONSTR

1 7/1/1996 3-B

AOA DELTA AIRLINES (OLD EASTERN HANGAR) VOL II

DELTA NORTH TECHNICAL CENTER PROJECT MANUAL

ROSSER FABRAP 1 7/18/1997 2-D

AOA B & B ELECTROMATIC ALUM. & CANTILEV. GATES

AOA ACCESS PREMIUM ALUMINUM GATES & CANTILEVER GATES & GATE CONTROLLERS

B & B ELECTROMATIC 1 5/1/1992 8-A

AOA AIRFIELD PAVEMENT REPAIRS & MISC. IMPROV.

BID DOCUMENTS / CITY OF ATLANTA FC-6840-97 DOA 1 6/16/1997 3-C

AOA SITE PREP FOR AIRPORT PROJECTS

BID DOCUMENTS FC-7277-00 PLACEMENT REVISION #1

DOA 1 8/1/2001 3-C

AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATION

PROJECT MANUAL LAW ENGINEERING 1 1/25/1999 3-B

AOA STORM WATER DIVERSION O & M MANUAL NSC JOB #9664 NEW SOUTH CONST. 2 10/25/1996 3-B

AOA STORMWATER DETENTION BASIN MAINTENANCE

BID DOCUMENTS FC-7446-02 ACE 1 5/28/2002 2-E

AOA NORTH & SOUTH PK DECK IMPROVEMENTS/REPAIRS

BID DOCUMENTS FC-7361-01 ACE 1 5/23/2002 2-D

AOA AIRFIELD EROSION CONTROL & REVEG.

BID DOCUMENTS FC-7480-02 ACE 1 5/29/2002 2-D

AOA RAMP WASTEWATER SCHEMATIC DESIGN - PROJECT MANUAL ACE 1 8/1/2002 2-A

Page 6: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 6

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AOA WATER MAINS-MAINTENANCE / UPGRADES

PLANNING REPORT - ACTIVITY FORECAST - FACILITY PROGRAMMING

ACE 1 10/25/2002 3-F

AOA SITE PREP FOR AIRPORT PROJECTS PLACEMENT

HIGH VOLTAGE TEST REPORTS - GENERATORS HOOD-PATTERSON & DEWAR/UPTIME ELECTRIC

1 8/28/2002 3-C

AOA BID DOCS SITE PREP FOR AIRPORT PROJECTS FC-7277-00 PLACEMENT REV. #1-DOA

DOA 1 12/15/2001 3-C

AOA GLYCOL DRAINAGE TANKS O & M MANUAL AIRCRAFT DEICING SOLUTIONS INC.

1 12/4/2002 7-D

AOA WEST CURB GROUND TRANSP. CANOPY UPGRADES

BID DOCUMENT DEPARTMENT OF AVIATION

1 8/29/2003 2-B

AOA NORTH & SOUTH DEICING FACILITIES PROJECT

PUMP O & M MANUALS PLAYER & CO. 1 1/12/2004 6-E

AOA DEICING CONTAINMENT & STORM WATER MANAGEMENT

O & M MANUAL F & S MECHANICAL 1 11/12/2004 6-E

AOA DELTA - TEST CELL CONTROL STATIONS

O & M MANUAL TELEMETRY & PROCESS CONTROLS

1 6/15/2005 9-D

AOA CONRAC ACCESS ROADWAY BID DOCUMENTS CITY OF ATLANTA 1 3/19/2007 2-E

AOA DEICING CONTAINMENT SYSTEM

PROJECT BOOK AATC 1 10/15/2004 6-E

AOA AIRPORT ADDRESSING SYSTEM METHODOLOGY

PROJECT MANUAL ACE 1 2/1/2000 7-E

Page 7: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 7

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

AOA DELTA DASH FACILITY O & M MANUAL NRG VISION, INC. 1 10/8/2009 5-F

AOA STORM WATER DIVERSION PUMPING SYSTEM IMPROVEMENT PROPOSAL LAW ENGINEERING 1 9/12/1994 3-B

AOA STORM WATER DIVERSION PUMPING SYSTEM

CLOSE OUT DOCUMENTS CPS 1 2/26/2010 3-B

AOA GATEWAY INTERNATIONAL CONVENTIONAL CENTER

APM STATION CITY OF ATLANTA 1 6/4/2007 2-E

AOA SNOW REMOVAL EQUIP BUILDING

ADDENDUM #2 TO CONTRACT DOCUMENTS-SPECIFICATIONS

DERYCK MUEHLHAUSER ARCH

1 6/20/1990 3-B

AOA STORM WATER & SANITARY SEWER PLAN

AIRFIELD UTILITIES INVENTORY ACE 1 2/28/1997 3-B

AOA RAMP WASTEWATER DISPOSAL FACILITIES PLANNING REPORT ACE 1 5/1/2002 2-A

AOA SWITCH BOARD TESTING GATE 59 JOB #10-172, #10-198 & #10-147 UPTIME / ETI ELECTRICAL TESTING

1 6/29/2010 6-B

AOA SOUTH GLYCOL DISPENSING STATION

NEXGEN O & M MANUAL ACTARIS 1 7/28/2005 7-D

AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATION

PROJECT MANUAL LAW ENGINEERING 1 8/16/1996 3-B

AOA WATER MAINS - MAINTENANCE / UPGRADES

ACTIVITY FORECAST - FACILITY PROGRAMMING FINAL REPORT

ACE 1 2/27/2003 3-F

Page 8: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 8

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

ATRIUM ORIGINAL CONSTRUCTION PROJECT SPECIFICATIONS MCDEVITT STREET BOVIS

1 1/7/1993 1-A

ATRIUM ORIGINAL CONSTRUCTION SUPPLEMENTAL DWG LIST MCDEVITT STREET BOVIS

1 2/17/1995 1-A

ATRIUM ORIGINAL CONSTRUCTION ESCALATORS - MONTGOMERY O & M DATA BOOK #1

MONTGOMERY 1 2/10/1983 5-F

ATRIUM ORIGINAL CONSTRUCTION ELEVATORS - MONTGOMERY O & M MANUAL BOOK #2

MONTGOMERY 1 9/1/1985 5-F

ATRIUM ORIGINAL CONSTRUCTION MECHANICAL O & M MANUAL BOOK #4 PERFORMANCE MECHANICAL

1 11/16/1993 1-A

ATRIUM ORIGINAL CONSTRUCTION PAGING SYSTEM BOOK #5 MCDEVITT STREET BOVIS

1 11/28/1994 1-A

ATRIUM ORIGINAL CONSTRUCTION CLOCK TOWER O & M MANUAL & WARRANTY BOOK #6

MCDEVITT STREET BOVIS

1 8/11/1994 4-A

ATRIUM ORIGINAL CONSTRUCTION ELECTRICAL MAINTENANCE MANUAL BOOK #7 SIEMENS ENERGY & AUTOMATION

1 2/23/1994 1-A

ATRIUM ORIGINAL CONSTRUCTION MAINTENANCE MANUAL - SWITCHGEAR BOOK #8

SIEMENS 1 6/1/1988 1-D

ATRIUM ORIGINAL CONSTRUCTION O & M MANUAL MISCELLANEOUS BOOK #9 MCDEVITT STREET BOVIS

1 7/26/1994 1-A

ATRIUM ORIGINAL CONSTRUCTION WARRANTY MCDEVITT STREET BOVIS

1 12/16/1994 4-A

Page 9: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 9

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

ATRIUM ORIGINAL CONSTRUCTION ADDENDUM #1 TURNER ASSOC 1 12/18/1992 1-F

ATRIUM ORIGINAL CONSTRUCTION RFI'S MCDEVITT STREET BOVIS

1 2/23/1993 7-F

ATRIUM TERMINAL REDEVELOPMENT PROGRAM PHASE I

SHORT CIRCUIT & COORDINATION STUDY BARNETT CONSULTING ENGINEERS

1 2/3/1995 6-A

ATRIUM VERTICAL TRANSPORTATION ZONE 3 ADDENDUM #1 - 7 TURNER ASSOC 1 2/1/1995 5-A

ATRIUM VERTICAL TRANSPORTATION ZONE 3 PROJECT MANUAL FOR FC-5999-94 TURNER ASSOC 1 1/20/1995 5-A

ATRIUM TERMINAL REDEVELOPMENT ATRIUM PASS-THROUGH

PHASE II TERM REDEVELOPMENT LIFE SAFETY & CEILING UPGRADE, TOILET RELOCATION, ATRIUM PASS-THROUGH

TURNER ASSOC 1 2/10/1995 2-C

ATRIUM DOA ADMIN OFFICES O & M MANUALS PIU'S, VAV'S, VALVES & PLUMBING EQUIP

WINTER 1 2/1/1994 2-F

ATRIUM DOA ADMIN & EXEC OFFICES FASHER PAINTING & DECORATING O & M MANUAL

WINTER 1 1/1/1995 2-F

ATRIUM DOA ADMIN OFFICES PHASE 2

O & M - MECHANICAL SYSTEM TOC/ELLIS-DON CONST. 1 5/1/2000 1-D

ATRIUM DOA ADMIN OFFICES PHASE 2

O & M - ELECTRICAL SYSTEM TOC/ELLIS-DON CONST. 1 5/1/2000 1-D

ATRIUM HVAC RETROFIT ATRIUM HVAC RETROFIT - CONCESSIONS HONEYWELL 1 9/1/1999 9-B

Page 10: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 10

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

ATRIUM HVAC RETROFIT ATRIUM HVAC RETROFIT - CONCESSIONS ROOF TOP AIR HANDLER

P. W. HEARD INC. 1 7/1/1999 2-B

ATRIUM ATRIUM RETROFIT SCOPE OF WORK & TECH. SPECS. CITY OF ATLANTA 1 6/1/1999 2-B

ATRIUM ATRIUM RETROFIT SUBMITTALS - TECH. SPECS. ACE 1 9/1/1999 2-B

ATRIUM DOA ADMIN OFFICE IMPROVEMENTS-PH 2

PROJECT MANUAL MCDUFFIE GROUP 1 3/10/1999 3-A

ATRIUM HVAC CONTROLS O & M MANUAL HONEYWELL 1 1/2/1996 9-C

ATRIUM LIGHTING PROJECT SPECIFICATIONS FOR ACCENT LIGHTING MALTESE SIGNS 1 1/29/2000 2-A

ATRIUM LIGHTING PROJECT O & M MANUAL MALTESE SIGNS 1 1/29/2000 2-A

ATRIUM CONTRACT DOCUMENTS FOR ATRIUM SECURITY UPGRADES-LEVELS 3&4 FC-7280-00

DOA 1 6/5/2002 2-E

ATRIUM HAIA MEDICAL CENTER GRADY HEALTH SYSTEM PROJECT MANUAL BID DOCUMENT

A. VINCENT POPE & ASSOC.

1 3/1/2002 2-A

ATRIUM RETROFIT - BUILDING AUTOMATION SYSTEM

DOA 3RD & 4TH FLOOR O & M MANUAL JOHNSON CONTROLS 1 9/28/2009 9-B

ATRIUM ELEVATORS & ADJACENT WALLS

WALL FINISH UPGRADES CLOSE OUT DOCUMENTS

CPS 1 6/9/2010 5-F

Page 11: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 11

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

ATRIUM CLOCK SYSTEM - THE SINGING TOWER

INSTRUCTION MANUAL - MUSIC CHIPS VERDIN 1 12/5/1996 4-D

BOILER PLANT BOILER PLANT EXPANSION UTILITY SUMMARY 1988 ABS 1 7/18/1993 1-B

BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION

PROJECT MANUAL FOR CONSTRUCTION-MECHANICAL PLANT EXPANSION 1991

STEVENS & WILKINSON 1 7/15/1991 6-A

BOILER PLANT BOILER PLANT EXPANSION ELECTRICAL EQUIPMENT WIRING DIAGRAMS COORDINATION STUDY

GOULD 1 4/9/1979 1-B

BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION

O & M MANUAL HOT & COLD WATER SYSTEM, CHILLERS & STARTERS - O & M MANUAL

PAUL W. HEARD CO 1 1/1/1992 6-A

BOILER PLANT CENTRAL PHYSICAL PLANT EXPANSION

OWNER'S MANUAL ASCO VOLUME I SYNCHROPOWER CONTROL SYSTEM

ASCO 1 10/1/1991 8-C

BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION

SHORT CIRCUIT & COORDINATION STUDY JEFFERS BARNETT & ASSOC

1 2/7/1992 6-A

BOILER PLANT WATER TREATMENT WATER TREATMENT NEWSLETTERS & HVAC UNIT LOCATION DRAWINGS

VARIOUS & DWGS BY HONEYWELL

1 2/11/1980 1-E

BOILER PLANT TEST REPORT FOR YORK CHILLER SYSTEM

PRODUCT DATA & TRAINING BOOKLETS YORK 1 6/7/1982 6-B

BOILER PLANT BOILER PLANT MOTOR CONTROL CENTER - O & M MANUAL GENERAL ELECTRIC 1 12/10/1993 2-E

BOILER PLANT BOILER PLANT DREW CHEMICAL CORP QUARTERLY REPORTS '81, '82, '83, '84, '85, '86, '89

DREW CHEMICAL 3 12/31/1989 6-C

Page 12: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 12

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

BOILER PLANT BETZ ENTEC WATER ANALYSIS REPORT E CONC W/ PROPOSAL TO FURNISH WATER TREATMENT

BETZ ENTEC 1 12/30/1993 2-B

BOILER PLANT PLANT INTERCONNECTION JOB #92050.02

PROJECT MANUAL FOR CONSTRUCTION OF PLANT INTERCONNECTION

STEVENS & WILKINSON 1 9/15/1993 2-B

BOILER PLANT WATER & PROCESS TREATMENT

BETZ DEARBORN FOURTH QUARTER 1996 REVIEW

BETZ DEARBORN MICHAEL A. HUTTON

1 12/20/1996 3-F

BOILER PLANT CENTRAL POWER PLANT 1990 MAINTENANCE AUDIT EQUIPMENT, SYSTEM, OPERATIONS

INTEC SERVICE INC 1 1/1/1990 4-F

BOILER PLANT GRAHAM VFD TERMINAL, BOILER PLANT, CON T & D

GRAHAM VARIABLE FREQUENCY DRIVE SUBMITTALS & O & M MANUALS

GRAHAM 1 11/7/1997 4-E

BOILER PLANT BOILER PLANT EQUIPMENT OPERATING PROCEDURES FOR PUMPS, COMPRESSORS, SOFTNERS & CONVERTERS

ABSA 1 5/2/1988 1-B

BOILER PLANT BOILER PLANT BOILER PLANT UTILITY SUMMARIES - 1980 TO 1987

NONE 1 1/1/1980 8-F

BOILER PLANT ABSORPTION CHILLER REPLACEMENT

PERFORMANCE BASED CONTRACTING PROFESSIONAL SERVICES

JOHNSON CONTROLS 1 5/7/2001 1-B

BOILER PLANT LITHIUM BROMIDE CLEAN-UP CHILLERS

STATUS REPORT YORK 1 9/19/1995 1-B

BOILER PLANT SWITCH BOARD O & M MANUAL SIEMENS 1 1/1/1986 6-B

BOILER PLANT VOLUME 1 MOTOR CONTROL MOTOR CONTROL CENTER G.E. EQUIP. SUBMITTAL DATA VOLUME 1

DIXIE ELECTRIC 1 11/22/1993 2-E

Page 13: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 13

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

BOILER PLANT CHILLER REPLACEMENT WARRANTY - CENTRAVAC TRANE 1 4/28/2003 4-A

BOILER PLANT CHILLER REPLACEMENT O & M MANUAL FOR CHILLER CONTROLS F & S MECHANICAL 1 12/2/2003 6-E

BOILER PLANT EQUIPMENT & DESIGN EVALUATION

PROJECT EVALUATION REPORT JOHN T. DENNING 1 10/1/1981 6-B

BOILER PLANT MECHANICAL SYSTEMS PRELIMINARY REPORT ON BLDG & OPERATING PROCEDURE

GUPTON ENGR 1 2/2/1982 6-B

BOILER PLANT BOILER REPLACEMENT BOILERS 4, 5, 6 O & M MANUAL VOLUMES 1 - 6 BABCOCK & WILCOX 6 3/24/2004 9-D

BOILER PLANT BOILER REPLACEMENT BOILERS 4, 5, 6 OPERATING INSTRUCTIONS - AS BUILT DOCUMENTATION

BABCOCK & WILCOX 1 2/25/2005 9-D

BOILER PLANT BOILER REPLACEMENT HEATED HOT WATER SYSTEMS OPERATIONS MANUAL

PRIME ENGINEERING 1 6/25/2004 3-F

BOILER PLANT BOILER REPLACEMENT O & M MANUAL CLEVELAND MECHANICAL

1 5/20/2004 3-F

BOILER PLANT BOILER REPLACEMENT SEPT 2004 EMISSIONS TESTING OF BOILERS SB04 AND SB05

GENERAL ENGINEERING

1 1/5/2005 3-F

BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB04 GENERAL ENGINEERING

1 1/5/2005 3-F

BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB05 GENERAL ENGINEERING

1 1/5/2005 3-F

Page 14: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 14

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB06 GENERAL ENGINEERING

1 1/5/2005 3-F

BOILER PLANT FUEL SYSTEM LUBRICANT INJECTION SYSTEM

O & M FOR CATERPILLAR MODULES (2) SUNBELT 1 11/12/1996 8-B

BOILER PLANT BOILER PLANT TANK MONITOR/200 O & M MANUAL RONAN ENGINEERING 1 1/1/1996 7-D

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

ELECTRIC CHILLER REPLACEMENT PROJECT FINAL COMMISSIONING REPORT

TOTAL SYSTEMS COMMISSIONING, INC

1 8/24/2007 1-A

BOILER PLANT BOILER SYSTEMS PLUS SEMINAR

BOILER SYTEMS PLUS SEMINAR - TRAINING CLEAVER BROOKS 1 1/16/1996 3-F

BOILER PLANT BOILER OPERATOR TRAINING BOILER OPERATOR TRAINING WORKBOOK BETZ DEARBORN 1 1/1/1997 3-F

BOILER PLANT HEATING HOT WATER SYSTEM REVIEW

LANDSIDE TERMINAL BUILDING BOILER PLANT NEWCOMB & BOYD 1 7/27/2007 7-E

BOILER PLANT 3456 GENERATOR SETS O & M MANUAL FOR CATERPILLAR 3456 GENERATOR

SUNBELT 1 3/1/2006 4-E

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT CHILLER & COOLER TOWER

100% DESIGN SPECS HSST 1 7/25/2008 8-F

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT CHILLER & COOLER TOWER

100 % DESIGN NARRATIVE HSST 1 7/25/2008 8-F

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT & EAST PLANT COOLING TOWER

WATER SAVINGS PROJECT FINAL CONSTRUCTION BID DOCUMENT SUBMITTAL

HSST 1 9/4/2009 8-F

Page 15: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 15

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

CHILLER & COOLING TOWER REPLACEMENT SUBMITTALS

F & S MECHANICAL 1 10/8/2008 8-F

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

CHILLER & COOLING TOWER REPLACMENT O & M MANUAL PART 1 OF 2

F & S MECHANICAL 1 11/1/2009 8-F

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

CHILLER & COOLING TOWER REPLACEMENT JCI O & M MANUAL

JOHNSON CONTROLS 2 11/15/2009 8-F

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

CHILLER & COOLING TOWER REPLACEMENT O & M MANUAL

F & S MECHANICAL 2 10/31/2008 8-F

BOILER PLANT CHILLER REPLACEMENT CENTRAVAC CUSTOMER WITNESS TEST TRANE 1 4/28/2003 5-C

BOILER PLANT LITHONIA FLUORESCENT LIGHTING

ELECTRICAL SPECIFICATIONS GRAYBAR 1 12/7/1993 2-E

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT UPGRADE

COMMISSIONING REPORT HEERY 2 5/19/2010 1-A

BOILER PLANT PERFORMANCE TEST ORIGINAL CONSTRUCTION LIMBACH 1 6/1/1979 4-F

BOILER PLANT BOILER PLANT CONTROL COMPONENTS & EQUIPMENT GRAYBAR ELECTRIC COMPANY

1 12/2/1993 4-F

BOILER PLANT YORK AIR CONDITIONING IREPORT OF EDDY CURRENT NSPECTION YORK 1 2/24/1988 6-B

BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION

MOTOR CONTROL CENTER SPECIFICATIONS & DRAWING TRANSMITTAL RECORD (LEAD SHEET)

SIEMENS 1 2/17/1992 1-E

Page 16: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 16

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

BOILER PLANT CENTRAL PHYSICAL PLANT EXPANSION

OWNER'S MANUAL ASCO VOLUME 2 SYNCHROPOWER CONTROL SYSTEM

ASCO 1 10/1/1991 8-C

BOILER PLANT TERMINAL CENTRAL UTILITY PLANT

CHILLER & COOLING TOWER REPLACEMENT O & M MANUAL PART 2 OF 2

F & S MECHANICAL 1 11/1/2009 8-F

CONC A TRANSFER POINT EXPANSION O & M MANUAL JOB #935-20006 HONEYWELL 1 5/8/1991 9-B

CONC A TRANSFER POINT EXPANSION AS BUILT, O & M MANUAL HONEYWELL 1 5/1/1991 9-B

CONC A TRANSFER POINT EXPANSION EQUIPMENT DATA HONEYWELL 1 4/4/1990 9-C

CONC A CONTROL TOWER MODIFICATIONS

CONCOURSE A AUTO. CONTROL INSTALLATION HONEYWELL 1 3/6/1991 9-C

CONC A DELTA CONC A & CONC B SOUTH RR EXPANSION

PROJECT MANUAL FOR A & B PUBLIC REST ROOM EXPANSION

DERYCK MUEHLHAUSER

1 11/28/1984 1-F

CONC A DELTA CONTROL TOWER TRANSFER MODIFICATIONS

SUBMITTALS FOR DELTA CONTROL TOWER PERFORMANCE MECHANICAL

1 2/5/1991 1-F

CONC A TRANSFER POINT EXPANSION CONC A - O & M MANUAL - VOLUME I GEORGIA SPECIALTY CONSTRUCTORS

1 4/1/1991 1-F

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS - OWNERS MANUAL DELTA TOWER #5 CC3388

DOVER ELEVATOR CO 1 8/1/1982 5-F

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS OWNERS MANUAL DELTA TOWER #6 EC3389

DOVER ELEVATOR CO 1 11/1/1982 5-F

Page 17: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 17

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS -- OWNERS MANUAL EB8786 DOVER ELEVATOR CO 1 3/1/1979 5-F

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS -- OWNERS MANUAL EB8784 DOVER ELEVATOR CO 1 3/1/1979 5-F

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS -- OWNERS MANUAL EB8785 DOVER ELEVATOR CO 1 3/1/1979 5-F

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS - OWNERS MANUAL -- DELTA TOWER 009E-C3389

DOVER ELEVATOR CO. 1 11/1/1982 5-F

CONC A TRANSFER POINT MODIFICATIONS

CONC A - O & M MANUAL CONTRACT #FC4483-89

MECHANICAL ASSOC. 1 4/11/1991 2-A

CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS

O & M MANUAL MECHANICAL ASSOC 1 2/12/1992 2-A

CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS

PROJECT MANUAL DERYCK MUEHLHAUSER

1 11/1/1990 2-A

CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS

SUBMITTAL DATA MECHANICAL ASSOC 1 2/14/1991 2-B

CONC A TRANSFER POINT MODS CONC A - PROJECT SUBMITTAL MECHANICAL ASSOC 1 4/30/1990 2-B

CONC A ORIGINAL CONSTRUCTION CONC A

ELEVATORS -- OWNERS MANUAL EB8787 DOVER ELEVATOR CO 1 8/1/1983 5-F

CONC A TRANSFER POINT MODS CONC A - ELEVATOR INSTRUCTION MANUAL #60222A

MONTGOMERY ELEVATOR

1 1/2/1984 5-F

Page 18: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 18

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A TRANSFER POINT MODS CONC A - ELEVATOR INSTRUCTION MANUAL #60223A

MONTGOMERY ELEVATOR

1 9/1/1985 5-F

CONC A DELTA SPEEDLINE O & M MANUAL PERFORMANCE MECH 1 8/13/1992 2-B

CONC A TRANSFER POINT MODS CONC A - O & M MANUAL -- RMU'S STRAND 1 4/11/1991 2-B

CONC A TRANSFER POINT EXPANSION CONC A - PROJECT MANUAL -- RMU'S STRAND 1 7/25/1990 2-B

CONC A TRANSFER POINT EXPANSION CONC A - CONTRACT DOCUMENTS DOA 1 2/28/1990 2-B

CONC A DELTA SPEEDLINE PROJECT MANUAL DERYCK MUEHLHAUSER

1 8/19/1992 2-B

CONC A DELTA STATION ADMINISTRATION OFFICE

O & M MANUAL MALLORY & EVANS 1 9/23/1981 2-D

CONC A DELTA CROWN ROOM O & M MANUAL MALLORY & EVANS 1 12/23/1981 2-D

CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS

O & M MANUAL ALL SOUTH SPRINKLER CO

1 8/29/1991 9-B

CONC A DELTA TOWER MODIFICATIONS

GENERAL CONSTRUCTION CLOSE OUT MANUAL DERYCK MUEHLHAUSER

1 8/23/1991 2-D

CONC A TRANSFER POINT EXPANSION CONC A - SPECIFICATIONS FC4483-89 DOA 1 10/16/1989 9-B

Page 19: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 19

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A DELTA CROWN ROOM EXPANSION

PROJECT SPECIFICATIONS DERYCK MUEHLHAUSER

1 12/11/1981 2-C

CONC A DELTA STATIONS ADMIN PHASE III

DELTA STATIONS ADMINISTRATION AREA ALTERATIONS & ADDITIONS PHASE III SPECIFICATIONS

FRED TOGUCHI ASSOC 1 9/24/1981 2-C

CONC A DELTA TOWER ELEVATORS DRAWINGS FOR ELEVATORS AT DELTA TOWER DOVER ELEVATORS 1 4/15/1991 5-F

CONC A ORIGINAL CONSTRUCTION CONC A PARTS & MAINTENANCE MANUAL PEELLE CONTRACT # 90-1283

PEELE COMPANY 1 12/1/1989 8-A

CONC A DELTA CONC A FACILITIES SUBMITTALS FOR REST ROOM EQUIPMENT HOLDER CONSTRUCTION CO

1 6/1/1981 2-C

CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS

RESUBMITTAL MECHANICAL ASSOC 1 3/1/1991 2-A

CONC A DELTA RESTROOM SURVEY SURVEY TO DETERMINE ADEQUACY OF FACILITIES & TO DEFINE EXISTING PROBLEMS

FRED TOGUCHI ASSOC 1 4/3/1981 6-B

CONC A VARIABLE TORQUE DRIVE 3 PHASE INPUT/OUTPUT

O & M AND INSTRUCTION MANUAL RELIANCE ELECTRIC 1 5/1/1984 8-A

CONC A DELTA STATIONS TRAINING & INFLIGHT REV

PROJECT MANUAL DERYCK MUEHLHAUSER

1 6/15/1988 3-B

CONC A SUPPLEMENTAL AIR HANDLING UNITS

SERVICE INSTRUCTIONS YORK 1 9/16/1981 8-A

CONC A DELTA STATIONS TRAINING O & M & INSTRUCTION MANUAL J. S. THOMAS CO. 1 6/5/1989 2-B

Page 20: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 20

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A DELTA CONTROL TOWER SUBMITTALS PERFORMANCE MECH 1 3/1/1991 1-F

CONC A DELTA CENTRALIZED LOAD PLANNING CENTER

EMERSON INDUSTRIAL CONTROLS EMERSON 1 12/15/1982 6-E

CONC A AATC MAINTENANCE FACILITY RELOCATION

PROJECT MANUAL & SPECIFICATIONS TRIMBLE ARCHITECTS 1 1/27/1995 2-A

CONC A HITACHI INVERTER J300 SERIES INSTRUCTION MANUAL HITACHI, LTD 1 4-D

CONC A DELTA PRECONDITIONED AIR UPGRADE & MODS

SPECIFICATIONS VOL. I - DIVISIONS 00 TO 13 AERO SYSTEMS ENGINEERING

1 1/30/1998 3-C

CONC A DELTA PRECONDITIONED AIR UPGRADE & MODS

SPECIFICATIONS VOL. II - DIVISIONS 15 & 16 AERO SYSTEMS ENGINEERING

1 1/30/1998 3-C

CONC A ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

CONC A HOULIHAN'S-TO-GO A-F3; MAGNOLIA GRILLE B-F12; HOULIHAN'S

WARRANTY PERFORMANCE MECHANICAL

1 7/8/1996 4-A

CONC A SPEEDLINE CAFETERIA SUBMITTAL DATA BROADWATER CONTROLS

1 8/12/1992 2-B

CONC A PLANE DELICIOUS PROJECT MANUAL RICHARD & WITTSCHIEBE

1 12/3/1999 3-A

CONC A DELTA B767-400 PROJECT PHASE 2

PROJECT SPECIFICATIONS AERO SYSTEMS ENGINEERING

1 6/23/2000 3-A

Page 21: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 21

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A DELTA A-17 CROWN ROOM LAVATORY FAUCET INFORMATION TABORET 1 1/26/1998 2-B

CONC A CHILI'S TOO RENOVATION SPECIFICATIONS - FOODSERVICE EQUIP. & FURNISHINGS

HOSPITALITY SERVICES 1 10/8/2001 2-B

CONC A COMMUNICATIONS CABLE RACEWAYS

EVALUATION OF CONDUIT VERSUS CABLE TRAY - CONC A & B

HNTB 1 2/7/2003 7-D

CONC A FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 2/12/2004 1-C

CONC A FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 2 OF 5 - CONCOURSE A

BUFFALO 1 2/28/2005 6-F

CONC A HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C

CONCOURSE A VOLUME 2 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F

CONC A HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C

CONCOURSE C VOLUME 2 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F

CONC A ESCALATOR UPGRADES COST PROPOSAL KONE 1 5/3/2006 5-F

CONC A ROOFING PROJECT CONCOURSE A & B ROOF REPLACEMENT CLOSE OUT DOCUMENTS

AATC 1 2/19/1998 4-A

CONC A DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION PROJECT

LETTER OF CERTIFICATION, WARRANTY LETTER, O & M MANUAL

JOHNSON CONTROLS 2 6/24/2009 4-A

CONC A RE-ROOFING PROJECT CONCOURSE A & B RE-ROOFING SPECS RAYMOND ENGINEERING

1 8/26/2006 4-A

Page 22: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 22

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC A SMOKING LOUNGE CON A SMOKING LOUNGE MECH, ELEC & FP SPECS

APADANA 1 12/22/2008 3-E

CONC A SMOKING ROOM WARRANTY AND O & M MANUAL FOR DOOR BESAM UNISLIDE 1 6/15/2009 4-A

CONC A TRANSFER POINT EXPANSION CONC A - O & M MANUAL - VOLUME II GEORGIA SPECIALTY CONSTRUCTORS

1 4/1/1991 1-F

CONC A DELTA AIRLINES A17 SKY CLUB CLOSEOUT MANUAL BRYSON 1 6/21/2011 7-A

CONC A VERTICAL TRANSPORTATION ESCALATOR A2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018981

KONE 1 7/30/2012 5-B

CONC A VERTICAL TRANSPORTATION ESCALATOR A1 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018981

KONE 1 7/30/2012 5-B

CONC B CENTER POINT EXPANSION CONC B - O & M MANUAL FOR SWITCHBOARD, PANELBOARDS, BUSWAY & TRANSFORMERS

SIEMENS ENERGY & AUTOMATION

1 5/11/1993 6-B

CONC B DELTA RESERVATION CROWN ROOM

PROJECT SPECIFICATIONS PERFORMANCE MECH 1 9/9/1991 2-C

CONC B TRANSFER POINT EXPANSION CONC B - SUBMITTAL DATA & HYDRAULIC CALCULATIONS

ALL SOUTH SPRINKLER CO

1 10/15/1993 5-E

CONC B DELTA MAIL SORTATION FACILITY

O & M MANUAL HONEYWELL 1 3/14/1995 9-B

CONC B DELTA MAIL SORTATION FACILITY

O & M MANUAL NEW SOUTH CONSTRUCTION

1 3/28/1994 2-D

Page 23: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 23

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC B TRANSFER POINT EXPANSION CONC B - SOUND SYSTEM & P.A. SYSTEM SUBMITTALS

BAKER AUDIO 1 8/24/1993 9-B

CONC B TRANSFER POINT EXPANSION CONC B - O & M MANUAL MECHANICAL ASSOC 1 2/28/1995 2-D

CONC B TRANSFER POINT EXPANSION CONC B - TECHNICAL SPECIFICATIONS ( REVISIONS)

MILTON PATE ASSOC 1 4/23/1993 2-D

CONC B TRANSFER POINT EXPANSION CONC B - DESIGN / CONSTRUCTION STANDARDS MANUAL

D.O.A. 1 10/19/1992 2-D

CONC B DELTA MAIL SORTATION @ CONC B NORTH

PROJECT MANUAL STANG & NEWDOW 1 4/15/1994 3-A

CONC B DELTA MAIL SORTATION FACILITY @ B NORTH

SHORT CIRCUIT & COORDINATION STUDY JEFFERS, BARNETT & ASSOC

1 5/6/1994 6-A

CONC B ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

CONC B ADTRANZ COMPUTER ROOM-MEZZ LEVEL

O & M MANUAL (WARRANTY INCLUDED) PERFORMANCE MECHANICAL

1 3/23/1999 9-B

CONC B DELTA B-SPINE COMM RM RENOV. PROJECT PHASE I

SPECS AND CONTRACT DOCUMENTS MACK YOUNG 1 4/3/1998 3-C

CONC B DELTA B18R COMM. RM. RENOV. PH. III

BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 6/11/1997 3-A

CONC B TRANSFER POINT EXPANSION O & M MANUAL JOB #936-23013 HONEYWELL 1 7/25/1994 9-B

Page 24: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 24

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC B FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 2/20/2004 1-C

CONC B FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 3 OF 5 - CONCOURSE B

BUFFALO 1 2/28/2005 6-F

CONC B DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

LOGISTICS PLAN NEW SOUTH 1 6/5/2007 9-F

CONC B UNDERGROUND STORAGE TANK SYSTEM

UNDERGROUND STORAGE TANK SYSTEM CATHODIC PROTECTION SYSTEM EVALUATION REPORT

CORRPRO 1 11/3/2008 1-B

CONC B BAGGAGE HANDLING SYSTEM EXP PROJECT (BHS)

CLOSEOUT DOCUMENTS NEW SOUTH 1 6/5/2007 6-E

CONC B ELECTRICAL EQUIPMENT RENOVATION

SCOPE OF WORK & SPECIFICATIONS CITY OF ATLANTA 1 10/7/2009 6-D

CONC B DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

FIRE ALARM O & M MANUAL KRATOS 1 10/26/2009 9-F

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

AUDIO / VISUAL O & M MANUAL BAKER AUDIO 1 9/18/2009 9-F

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

SPRINKLER O & M MANUAL GWINNETT SPRINKLER 1 10/27/2009 6-B

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

SWITCHGEAR O& M MANUAL SIEMENS 1 10/8/2009 9-F

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

MECH / PLUMBING O & M MANUAL 1 OF 2 W. B. WALLIS 1 9/22/2009 9-F

Page 25: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 25

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

MECH / PLUMBING O & M MANUAL 2 OF 2 W. B. WALLIS 1 9/22/2009 9-F

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

ELECTRICAL O & M MANUAL SIEMENS 1 9/18/2009 9-F

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

BID PACKAGE #4 - ADDENDUM #1 RECORDS SPECIFICATIONS

PGAL 1 9/10/2007 6-E

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

WARRANTY MANUAL VOL 1 NEW SOUTH 1 12/14/2009 4-C

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

WARRANTY MANUAL VOL 2 NEW SOUTH 1 12/14/2009 4-C

CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION

WARRANTY MANUAL VOL 3 NEW SOUTH 1 12/14/2009 4-C

CONC B ELECTRICAL EQUIPMENT RENOVATION

DESIGN NARRATIVE CITY OF ATLANTA 1 10/7/2009 6-D

CONC B HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C

CONCOURSE B VOLUME 2 PERFORMANCE MECH 1 11/7/2005 6-F

CONC B VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR B1 KONE 1 9/14/2010 5-A

CONC B VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR B2 KONE 1 9/14/2010 5-A

CONC B B SWITCHGEAR, BUS-DUCT PROJECT

GENERATOR O & M MANUAL CUMMINS 1 9/24/2010 7-B

Page 26: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 26

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC B ELECTRICAL EQUIPMENT RENOVATION

EQUIPMENT O & M MANUAL CLEVELAND ELECTRIC 1 12/3/2010 7-A

CONC B SWITCHGEAR RENOVATION / ELECTRICAL EQUIPMENT RENOVATION

ACCEPTANCE TESTING DATA CLEVELAND ELECTRICAL TESTING SERVICE

2 12/1/2010 8-E

CONC B DELTA AIRLINES B10 SKY CLUB PROJECT PHASE 2

WARRANTY MANUAL NEW SOUTH CONSTRUCTION

1 3/9/2011 7-A

CONC B SWITCHGEAR EQUIPMENT RENOVATION

TERMOGRAPHIC SURVEY REPORT CLEVELAND ELECTRICAL TERSTING SERVICES

1 11/3/2011 7-B

CONC B BOMBARDIER CONTROL ROOM HVAC UPGRADES CLOSE OUT DOCUMENTS

CPS 1 2/28/2012 5-C

CONC C DOBBS CONCESSION EXPANSION CN-1

SPECIFICATIONS MAKUTA CROPSEY 1 3/28/1983 2-D

CONC C CONC C RENOVATIONS HIP 96

TECHNICAL SPECIFICATIONS DIV. 01-16 STEVENS & WILKINSON 1 7/26/1995 2-D

CONC C RENOVATION HIP-38A PROJECT MANUAL--SPECIFICATIONS PATE / MC DUFFIE 1 7/26/1995 1-F

CONC C ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

CONC C SOUTH RENOVATION TECHNICAL SPECIFICATIONS FOR CONC C SOUTH RENOVATIONS

ACE 1 9/30/1999 3-C

CONC C RE-ROOF ROOF SYSTEMS SPECIFICATIONS MAINTENANCE MANUAL

BENCHMARK 1 3/22/2000 4-A

Page 27: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 27

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC C ASA C-NORTH RENOVATIONS ELEVATOR & WARRANTY MONTGOMERY KONE 1 10/1/1999 5-F

CONC C AIRTRAN RENOVATIONS SPECIFICATIONS ROBERT & CO. 1 9/30/1999 3-C

CONC C RE-ROOFING PROJECT AS-BUILT DRAWINGS & WARRANTY PREMIUM ROOFING 1 11/17/2003 4-A

CONC C PASCHALS' RESTAURANT / LA CAROUSEL LOUNGE

PROJECT MANUAL - C-F4 DENNIS MAKUTA 1 12/1/2003 1-A

CONC C CONTROL TOWER RENOV LIGHTING, RACEWAY, WIRING DEVICES MANUAL NEWCOMB & BOYD 1 7/11/2005 3-C

CONC C CONTROL TOWER RENOV HVAC SUBMITTALS ACTION ELECTRIC 1 5/12/2005 3-C

CONC C CROWN ROOM RENOV SAFETY MANUAL HOLDER CONST. 1 9/9/2005 2-C

CONC C SHORT CIRCUIT COORDINATION STUDY

STUDY DATA FOR CONC C HOOD-PATTERSON & DEWAR

1 6/28/2005 6-A

CONC C AIRTRAN O & M MANUAL SIEMENS 1 5/24/2006 7-E

CONC C COSMETIC UPGRADES O & M MANUALS - VOLUME 1 NEW SOUTH CONSTRUCTION

1 10/1/2007 5-B

CONC C COSMETIC UPGRADES O & M MANUALS - VOLUME 2 NEW SOUTH CONSTRUCTION

1 10/1/2007 5-B

Page 28: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 28

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC C C NORTH RENOVATION PROJECT MANUAL - 50% ROSSER INT'L 1 6/27/2005 7-D

CONC C FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 3/8/2004 1-C

CONC C FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 4 OF 5 - CONCOURSE C

BUFFALO 1 2/28/2005 6-F

CONC C CONTROL TOWER RENOV CONTROL TOWER SPECIFICATIONS NEWCOMB & BOYD 1 2/8/2005 3-C

CONC C EXPANSION - DELTA PASSENGER BOARDING BRIDGE INSTALLATION CONCOURSE C NORTH

ROBERT AND COMPANY

1 12/21/2007 5-C

CONC C C NORTH RENOVATION C NORTH RENOVATIONS LOGISTICS PLAN NEW SOUTH CONSTURCTION

1 1/30/2009 7-E

CONC C RE-ROOF PROJECT 2002 - 2003

WEEKLY PROGRESS SUMMARY & SCHEDULE RAYMOND ENGINEERING

1 6/21/2002 4-B

CONC C C NORTH EXPANSION PROJECT

O & M MANUAL VOL 1 NEW SOUTH CONSTRUCTION

2 8/13/2008 9-E

CONC C C NORTH EXPANSION PROJECT

O & M MANUAL VOL 2 NEW SOUTH CONSTRUCTION

2 8/13/2008 9-E

CONC C C NORTH EXPANSION PROJECT

O & M MANUAL VOL 3 NEW SOUTH CONSTRUCTION

2 8/13/2008 9-E

CONC C C NORTH EXPANSION PROJECT

JCI O & M MANUAL & PRODUCT DATA - PASSENGER BOARDING BRIDGES PHASE 3

JOHNSON CONTROLS 2 3/31/2009 9-E

Page 29: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 29

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC C ASA C-NORTH RENOVATION ROSSER 1 9/15/2006 4-F

CONC C HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C

CONCOURSE A VOLUME 1 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F

CONC C HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C

CONCOURSE C VOLUME 1 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F

CONC C FIBER BOARD DUCT REPLACEMENT PROJECT

CLOSE OUT DOCUMENTS PAUL W. HEARD 1 6/11/2010 4-F

CONC C C NORTH RENOVATION OIL/WATER SEPARATOR - FUELIING OWNERS MANUAL

ENQUIP, INC 1 10/21/1999 4-F

CONC C C NORTH ASA RENOVATION RATIO SYSTEM MODEL 10 BATH CONTROLLER

RANKIN AUTO. 1 10/21/1999 4-F

CONC C ASA RENOVATION O & M MANUALS ROOF TOP UNIT AND EXHAUST FAN

ROBERT & COMPANY 1 10/21/1991 3-E

CONC C VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR C4 KONE 1 12/16/2010 5-A

CONC C WATER HEATER GATE C45 LRR APRON LEVEL, O & M MANUAL AND WARRANTY INFORMATION

SIERRA CONSTRUCTION 1 3/31/2011 4-E

CONC C ASA CARPET INSTALLATION CLOSE OUT; WARRANTY AND O & M MANUAL J&J INVISION 1 5/16/2011 4-E

CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II

O & M MANUAL ESCALATOR C1 KONE 1 2/14/2012 5-A

Page 30: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 30

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II

O & M MANUAL ESCALATOR C3 KONE 1 2/14/2012 5-A

CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II

O & M MANUAL ELEVATOR C1 NEW SOUTH 1 5/11/2012 5-A

CONC C PARTIAL ROOF REPLACEMENT

CLOSE-OUT DOCUMENTS GATES C14 - C18 TIP TOP ROOFERS 1 5/6/2012 4-B

CONC C VERTICAL TRANSPORTATION ESCALATOR C2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018962

KONE 1 7/30/2012 5-A

CONC C PARTIAL ROOF REPLACEMENT PROJECT

GATES C14 - C18 CLOSE OUT DOCUMENTS TIP TOP ROOFERS 1 6/19/2012 4-B

CONC C DELTA AIRLINES SKY CLUB B25 & C37 SEAT DENSITY WARRANTY ONE SOURCE ELECTRIC 1 3/12/2012 4-E

CONC D AGT WALKWAY CONTRACT FC5814-94

AGT WALKWAY PROJECT MANUAL TURNER ASSOC 1 6/6/1994 2-D

CONC D ORIGINAL CONSTRUCTION T-1 CONTRACT

ELECTRICAL EQUIPMENT & LOAD CENTER DRAWINGS

GOULD 1 11/29/1977 8-A

CONC D AGT WALKWAY O & M MANUAL CONMAC CORPORATION

1 12/19/1994 2-D

CONC D ORIGINAL CONSTRUCT. ( GATE D-16 )

OWNERS MANUAL AIR CONDITIONING CARRIER 1 1/1/1989 6-E

CONC D NORTHWEST AIRLINES SPECIFICATIONS - COMPUTERIZED TICKETING SYS. TICKET COUNTER

HOAG-WISMAR PARTNERSHIP

1 11/1/1984 2-D

Page 31: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 31

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC D RESTROOM RENOVATIONS PROJECT MANUAL SIZEMORE FLOYD 1 9/25/1995 2-D

CONC D COND D RENOVATIONS PROJECT CLOSEOUT MANUAL - PROJECT 910-5112

MC DEVITT STREET BOVIS

1 11/26/1996 3-C

CONC D CONC D RENOVATIONS PROJECT MANUAL MC DEVITT STREET BOVIS

1 1/29/1997 3-C

CONC D NORTHWEST AIRLINES GATE SWAP

PROJECT MANUAL FOR PROJECT #ATL - 95-02 ROSSER 1 5/30/1997 2-D

CONC D ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

CONC D CONTINENTAL PRESIDENT'S CLUB

O & M MANUAL P.W. HEARD INC. 1 9/10/1999 2-A

CONC D CONTINENTAL PRESIDENT'S CLUB

AS-BUILT RECORD DWGS. UPTIME ELECTRIC 1 9/10/1999 2-A

CONC D NORTHWEST AIRLINES OFFICE CONSOLIDATION

PROJECT MANUAL KRA 1 5/3/1999 3-C

CONC D NORTHWEST AIRLINES GLYCOL TANKS REMOVAL

PROCEDURES DAMES & MOORE 1 5/5/1997 7-D

CONC D CONTINENTAL PRESIDENT'S CLUB

PROJECT MANUAL & ADDENDUM #1 GENSLER 1 5/3/1999 2-A

CONC D DELTA AIRLINES GATE D31, RAMP OFFICES - TECH. & SERVICE MANUAL FOR HEAT PUMP AIR CONDITIONERS

MITSUBISHI 1 4/13/2000 9-A

Page 32: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 32

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC D US AIRWAYS IMAGE UPGRADE JOB #9819

O & M MANUAL NEW SOUTH 1 10/22/1998 1-D

CONC D DELTA AIRLINES O & M MANUAL NEW SOUTH CONST. 1 4/24/2003 7-F

CONC D DELTA AIRLINES O & M MANUAL AND WARRANTY LETTER - ELEVATOR @ D27

SCHINDLER 1 6/3/2003 5-E

CONC D HVAC SYSTEMS UPGRADE O & M MANUAL W. B. WALLIS 1 12/22/2004 2-B

CONC D LOAD STUDY POWER SURVEY WINTER-SPRING 2005 PATTERSON & DEWAR 1 1/17/2006 7-D

CONC D SHORT CIRCUIT COORDINATION STUDY

STUDY DATA FOR CONC D HOOD-PATTERSON & DEWAR

1 6/15/2005 6-A

CONC D GATE ADDITIONS SL870 USER MANUAL LANDERS ENTERPRISES 1 2/1/2005 7-E

CONC D GATE ADDITIONS O & M MANUAL MECHANICAL ASST 1 2/28/2006 7-D

CONC D GATE ADDITIONS O & M MANUAL 10 HYDRANTS TO JET FUEL SYSTEM

ARCHER WESTERN 1 10/31/2008 7-E

CONC D GATE ADDITIONS O & M MANUAL FIRE ALARM SYSTEM WFI 1 9/4/2007 1-B

CONC D GATE ADDITIONS O & M MANUALS - VOLUME 1 SIEMENS 1 8/18/2006 7-E

Page 33: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 33

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC D GATE & HOLDROOMS O & M MANUALS JOHNSON CONTROLS 2 11/1/2006 7-D

CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 1 SP GROUP 1 3/14/2008 7-D

CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 2 SP GROUP 1 3/14/2008 7-D

CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 3 SP GROUP 1 3/14/2008 7-D

CONC D MIDPOINT EXPANSION BASIS OF DESIGN REPORT SP GROUP 1 3/14/2008 7-D

CONC D GATE ADDITIONS O & M MANUALS - VOLUME 2 SIEMENS 1 8/18/2006 7-E

CONC D FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 5 OF 5 - CONCOURSE D

BUFFALO 1 2/28/2005 6-F

CONC D MIDPOINT EXPANSION CONCEPT DEVELOPMENT - FINAL REPORT DOA 1 12/1/2006 7-D

CONC D COSMETIC UPGRADES O & M MANUAL-FANS, DDC CONTROLS, SOAP DISPENSER

W. B. WALLIS & COMPANY

1 8/1/2007 5-B

CONC D MIDPOINT EXPANSION PROJECT OPERATIONS PLAN SP GROUP 1 3/14/2008 7-D

CONC D GATE D35 ELEVATOR ENCLOSURE

CLOSE OUT DOCUMENTS DOBBS RAKER 1 12/17/2009 5-F

Page 34: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 34

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC D ROOF REPLACEMENT ROOF WARRANTY JOHNS MANVILLE 1 11/2/2009 4-A

CONC D ROOF REPLACEMENT CONCOURSE D ROOF REPLACEMENT CLOSE OUT DOCUMENTS

AATC 1 1/12/2010 4-A

CONC D ROOF SPECS CONCOURSE D ROOF REPLACEMENT SPECS AATC 1 2/1/2010 4-A

CONC D GATE ADDITIONS O & M MANUAL FOR EQUIPMENT SIEMENS 1 8/18/2006 7-D

CONC D COSMETIC UPGRADES RESTROOM O & M MANUAL - PARTITION, GRAB BAR, SEAT COVER DISP, NAPKIN DISPOSAL & DISP & COAT HOOK

BRYSON / ACCESSORIES UNLIMITED

1 4/3/2006 5-B

CONC D ROOF REPLACEMENT CONCOURSE D ROOF REPLACEMENT JOHN MANVILLE 1 11/2/2009 4-A

CONC D VERTICAL TRANSPORTATION ESCALATOR D2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20019039

KONE 1 7/9/2010 5-A

CONC D SENSOR OPERATED URINALS SPEC & INSTRUCT.

OPTIMA SYS ES-5 FLUSHOMETERS/ SLOAN

1 2/1/2001 4-F

CONC D PC AIR CONDITIONERS PCA START UP & COMMISSIONING FORMS AERO BRIDGEWORKS 1 7/11/2008 1-A

CONC D MIDPOINT EXPANSION O & M MANUAL NEW SOUTH 1 10/15/2010 7-A

CONC D JETBRIDGE SWITCHGEAR COMMISSIONING REPORT D&N ELECTRIC 1 9/22/2010 1-A

Page 35: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 35

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC D DELTA AIRLINES BREAKROOM EXPANSION - WARRANTY & CLOSE OUT DOCUMENTS

YATES CONSTRUCTION 1 11/22/2010 2-A

CONC D VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR D1 KONE 1 12/16/2010 5-A

CONC D COSMETIC UPGRADES D-CUP LIGHT FIXTURE WHITEHEAD ELECTRIC 1 3/8/2006 5-B

CONC D MIDPOINT EXPANSION AVANCED PACKAGE

SPECIFICATIONS SP GROUP 1 5/9/2011 7-D

CONC D COSMETIC UPGRADES SPECIFICATIONS SCOTT ASSOCIATES 1 11/18/2005 5-B

CONC D RENOVATION MAINTENANCE MANUAL KONE 1 9/5/2007 7-E

CONC D DELTA AIRLINES GATE D39 EXPANSION - INFILL PROJECT - CLOSE OUT

DELTA AIRLINES 1 11/9/2011 9-A

CONC D FIRE PUMP TESTING ANNUAL FIRE PUMP INSPECTION REPORT CINTAS 1 10/7/2011 6-B

CONC D VERTICAL TRANSPORTATION UPGRADE PHASE II

O & M MANUAL ESCALATOR D4 KONE 1 2/14/2012 5-A

CONC D VERTICAL TRANSPORTATION UPGRADES PHASE II

O & M MANUAL ESCALATOR D3 KONE 1 2/14/2012 5-A

CONC D DELTA AIRLINES D27 CLOSEOUT MANUAL BRYSON 1 6/21/2011 7-A

Page 36: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 36

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E AGT EXTENSION PHASE I & PHASE II

CENTRAL BASEMENT SHELL MECHANICAL GENERAL PROVISIONS

DOA 1 1-F

CONC E ORIGINAL CONSTRUCTION CPTC

SMOKING LOUNGE - SPECIFICATIONS ROSSER 1 7/27/1994 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

BUILDING AUTOMATION SYSTEMS TEMPERATURE CONTROLS

HONEYWELL 1 1/5/1993 9-B

CONC E YORK AIR MODULATOR IV AC MOTOR SPEED CONTROL

VARIABLE SPEED DRIVE YORK INSTALLATION & START UP

YORK 1 1/1/1996 4-D

CONC E FIRE COMMAND SYSTEM SYSTEMS POINT LIST HONEYWELL 1 2/14/1995 1-C

CONC E ORIGINAL CONSTRUCTION PHASE I

HYDRAULIC ELEVATORS RENEWAL PARTS CATALOG

SCHINDLER ELEVATOR 1 1/1/1990 5-E

CONC E ORIGINAL CONSTRUCTION PHASE I

ESCALATORS RENEWAL PARTS CATALOG SCHINDLER ELEVATOR 1 1/1/1990 5-E

CONC E ORIGINAL CONSTRUCTION PHASE I

GEARED ELEVATORS WITH SOLID STATE DRIVE RENEWAL PARTS CATALOG

SCHINDLER ELEVATOR 1 1/1/1990 5-E

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME I MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME II MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME III MC KENNEY 1 12/29/1993 3-D

Page 37: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 37

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME IV MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME V MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME VI MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC SUBMITTAL DATA VOLUME VII MC KENNEY 1 12/29/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE I

GRINNELL FIRE PROTECT. SYSTEMS OPERATION & MAINT. MANUAL SPEC. SECTION 01700 1.02B

TURNER/ GRINNELL FP 1 3/4/1994 1-B

CONC E ORIGINAL CONSTRUCTION PHASE I

CLOSE OUT DOCUMENTATION WARRANTY AND BONDS

ATLANTA CONSTRUCTION TEAM

1 5/30/1995 4-C

CONC E ORIGINAL CONSTRUCTION PHASE I

ELECTRICAL PANEL SCHEDULES DYNA ELECTRIC / STEVENS & WILKINSON

1 2/17/1993 3-C

CONC E ORIGINAL CONSTRUCTION PHASE I

TOTAL LIGHTING CONTROLS O & M MANUAL GENERAL ELECTRIC TECHNICAL SUPPORT

1 12/19/1994 6-E

CONC E ORIGINAL CONSTRUCTION PHASE I

LIGHTING / POWER PANELBOARDS SPECIFICATION SECTION 16050-2.11

DYNA ELECTRIC / TURNER ASSOC

1 7/31/1992 6-B

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. I JOB #561 MC KENNEY 1 11/16/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. II JOB #561 MC KENNEY 1 11/16/1993 3-E

Page 38: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 38

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. III JOB #561 MC KENNEY 1 11/16/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. IV JOB #561 MC KENNEY 1 11/16/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. V JOB #561 MC KENNEY 1 11/16/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

ELECTRICAL (DIVISION 16) SUBMITTAL DATA BOOK 1

DYNA ELECTRIC / TURNER ASSOC.

1 4/23/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE I

BOILER & BOILER STACK SUBMITTAL DATA MC KENNEY 1 11/16/1992 3-F

CONC E ORIGINAL CONSTRUCTION PHASE I

MECHANICAL REVIEW MC KENNY 1 10/22/1992 2-B

CONC E DELTA BUSINESS & FIRST CLASS LOUNGES

O & M MANUAL - ELECTRICAL DIVISION EQUITY / WHITEHEAD ELECTRICAL

1 11/3/1994 9-B

CONC E ORIGINAL CONSTRUCTION HUFCOR SERIES 5510 PARTITION DOORS - OWNERS MANUAL HMC #131236

ACOUSTI INC. 1 8/21/1992 8-A

CONC E EXPANSION ROLLING ATLAS DOORS WARRANTY & MAINTENANCE

ATLAS / ATL CONSTRUCT. TEAM

1 4/26/1993 6-E

CONC E ORIGINAL CONSTRUCTION PHASE II

RENEWAL PARTS CATALOG GENERAL ORDER #83557

SCHINDLER 1 12/5/1994 5-E

CONC E ORIGINAL CONSTRUCTION PHASE II

RENEWAL PARTS CATALOG GENERAL ORDER #85270

SCHINDLER 1 1/1/1990 5-E

Page 39: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 39

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE II

CLOSE OUT DOCUMENTATION SUBCONTRACTOR WARRANTY MANUAL

MC DEVITT STREET BOVIS

1 5/15/1995 1-D

CONC E ORIGINAL CONSTRUCTION PHASE II

TELECOMMUNICATIONS, HVAC ROOM O & M MANUAL

PERFORMANCE MECHANICAL

1 12/5/1994 8-A

CONC E ORIGINAL CONSTRUCTION PHASE II

MISC MECHANICAL SUBMITTALS FOR CPTC & CONC E

PERFORMANCE MECH. 1 11/16/1993 3-E

CONC E ORIGINAL CONSTRUCTION PHASE II

R.F.I. MANUAL - 400 TO 699 MC DEVITT STREET BOVIS

1 8/17/1994 1-E

CONC E ORIGINAL CONSTRUCTION PHASE II

R.F.I. MANUAL - 225 TO 399 MC DEVITT STREET BOVIS

1 6/7/1994 1-E

CONC E ORIGINAL CONSTRUCTION PHASE II

R.F.I. MANUAL - 3 TO 224 MC DEVITT STREET BOVIS

1 2/28/1994 1-E

CONC E ORIGINAL CONSTRUCTION PHASE II

A.S.I. MANUAL 1-98 MC DEVITT STREET BOVIS

1 5/15/1995 1-E

CONC E ORIGINAL CONSTRUCTION PHASE II

CLOSE OUT DOCUMENTS OPERATION & MAINT MANUAL DELTA NET GRAPHIC CENTRAL

HONEYWELL / MC DEVITT STREET BOVIS

1 5/15/1995 9-C

CONC E ORIGINAL CONSTRUCTION PHASE II

CLOSE OUT DOCUMENTS FIRE ALARM POINT & DETAILS

HONEYWELL 1 5/15/1995 9-C

CONC E ORIGINAL CONSTRUCTION PHASE II

HONEYWELL FIRE COMMAND SYSTEM POINTS LIST

HONEYWELL 1 2/14/1995 9-C

CONC E CONC E-ATRIUM-MER 8 ELECTRICAL SWITCHGEAR TESTING FOR AATC HOOD-PATTERSON DEWAR

1 10/1/1997 6-D

Page 40: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 40

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE II

EMERGENCY / PEAK SHAVE GENERATOR SYSTEM SITE TEST REPORT

CUMMINS / ONAN SOUTH

1 5/20/1994 1-E

CONC E ORIGINAL CONSTRUCTION PHASE II

ELECTRICAL CLOSE OUT DOCUMENTS: PANEL SCHEDULE MANUALS, LETTERS OF VERIFICATION

YUKON ELECTRIC 1 5/15/1995 2-B

CONC E ORIGINAL CONSTRUCTION PHASE II

HVAC O & M MANUAL VOL. I 1-5 PERFORMANCE MECH. 1 4/29/1994 2-F

CONC E ORIGINAL CONSTRUCTION PHASE II

ELECTRICAL PANEL SCHEDULES YUKON ELECTRIC 1 2/14/1994 8-A

CONC E ORIGINAL CONSTRUCTION PHASE II

HVAC O & M MANUAL VOL. II 6-12 PERFORMANCE MECH. 1 1/31/1994 3-B

CONC E ORIGINAL CONSTRUCTION PHASE II

SPECIFICATIONS & ADDENDUM #1 TURNER ASSOC 1 4/5/1993 3-C

CONC E ORIGINAL CONSTRUCTION PHASE II

VARIABLE SPEED DRIVES RESUBMITTALS RELIANCE ELECTRIC 1 12/8/1993 4-D

CONC E ORIGINAL CONSTRUCTION PHASE II

PANEL SCHEDULES DYNA ELECTRIC 1 11/2/1994 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

FIRESTONE ULTRA PLY ROOFING SUBMITTALS FIRST CHOICE ROOFING 1 8/28/1992 4-B

CONC E ORIGINAL CONSTRUCTION PHASE II

FIRE ALARM SYSTEM HONEYWELL 1 10/27/1992 1-C

CONC E ORIGINAL CONSTRUCTION PHASE II

OPERATION & MAINTENANCE INSTRUCTIONS MEDIUM VOLTAGE SWITCHGEAR

SIEMENS 1 5/30/1995 9-A

Page 41: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 41

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE II

DYNALECTRIC - SHORT CIRCUIT & COORD STUDY AGT PHASE II & CENTRAL BASE SHELL

DYNALECTRIC / JEFFERS BARNETT & ASSOC

1 3/31/1993 6-A

CONC E ORIGINAL CONSTRUCTION PHASE II

CATHODIC PROTECTION SYSTEM - POST INSTALL. REPORT - FOUR ELEVATOR SYSTEM - DYNALECTRIC

HARCO TECHNOLOGIES CORP.

1 2/22/1994 5-E

CONC E ORIGINAL CONSTRUCTION PHASE II

AUTOMATIC SPRINKLER PRODUCT DATA - GRINNELL

GRINNELL 1 10/12/1992 6-B

CONC E ORIGINAL CONSTRUCTION PHASE II

FIRE ALARM STROBE ZONE POWER SUPPLIES SUBMITTAL

HONEYWELL 1 10/12/1992 1-C

CONC E ORIGINAL CONSTRUCTION PHASE II

P.I.U. / V.A.V. BOX CONTROLLER SUBMITTAL B, C & D STATUS

HONEYWELL 1 8/21/1992 9-C

CONC E ORIGINAL CONSTRUCTION PHASE II

B.A.S. TEMPERATURE CONTROL PRODUCT DATA SUBMITTAL

HONEYWELL 1 9/10/1992 9-C

CONC E ORIGINAL CONSTRUCTION PHASE II

CLEANING AND MAINTENANCE MANUAL 10 YEAR SKYLIGHT WARRANTY

SUPER SKY PRODUCTS INC.

1 2/22/1994 4-A

CONC E ORIGINAL CONSTRUCTION PHASE II

CHILLER STARTERS AND ACCESSORIES RESUBMITTAL

STEVENS & WILKINSON 1 12/3/1992 4-D

CONC E ORIGINAL CONSTRUCTION PHASE II

CEN TRA VAC LIQUID CHILLERS (CTV-DS-1) TRANE 1 9/1/1992 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

OPERATION & MANUAL WATER - COOLED HERMETIC CEN TRA VAC (CVHB-M-5A)

TRANE 1 9/1/1992 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

INSTALLATION MANUAL - CONTROL PANEL HERMETIC CEN TRA VAC (CVHB-1N-5A)

TRANE 1 9/1/1992 8-B

Page 42: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 42

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE II

OPERATOR'S GUIDE CONTROL PANEL (CVMA-OG-1B)

TRANE 1 9/1/1992 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

SHORT CIRCUIT & COORD. STUDY VOL. I JEFFERS BARNETT & ASSOC. INC.

1 12/14/1992 6-A

CONC E ORIGINAL CONSTRUCTION PHASE II

AS-BUILT WIRING TABLES - PEAK SHAVING EMERGENCY GENERATOR SYSTEM

ENERGY ERECTORS INC. 1 7/18/1994 3-C

CONC E ORIGINAL CONSTRUCTION PHASE II

TECHNICAL SPECIFICATIONS - PEAK SHAVING EMERGENCY POWER SYSTEM

STEVENS & WILKINSON 1 7/17/1994 3-C

CONC E ORIGINAL CONSTRUCTION PHASE II

RECORD AND INFORMATION MANUAL HENRY SIGN CO. 1 12/2/1993 4-F

CONC E ORIGINAL CONSTRUCTION PHASE II

MUFFIN MONSTER O & M MANUAL JWC ENVIRONMENTAL 1 7/14/1994 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL - SIEMENS - DRY TYPE TRANSFORMERS - 6--V & BELOW

DYNALECTRIC 1 5/21/1993 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL - SIEMENS - MOTOR CONTROL CENTERS

DYNALECTRIC 1 6/9/1993 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL - ZENITH CONTROLS - AUTOMATIC TRANSFER SWITCH

DYNALECTRIC 1 6/11/1993 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL - POWER SIFTOR SYSTEM DYNALECTRIC 1 5/21/1993 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL - AUTOMATIC SWITCH CO. - LIGHTING CONTROLS

DYNALECTRIC 1 6/9/1993 8-B

Page 43: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 43

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION PHASE II

PROJECT MANUAL - INSTALLATION OF VOICE & DATA CABLING PART 2

TURNER ASSOC. 1 3/30/1994 1-F

CONC E ORIGINAL CONSTRUCTION PHASE II

PROJECT MANUAL - MUFIDS / BIDS EQUIPMENT & CABLING PART 3

MC DEVITT STREET BOVIS

1 5/25/1994 3-B

CONC E ORIGINAL CONSTRUCTION PHASE II

ELECTRIC SECURITY TURNSTILE INSTALLATION MANUAL

MC DEVITT STREET BOVIS

1 2/27/1995 8-A

CONC E DELTA TENANT WORK O & M MANUAL PAUL W. HEARD 1 8/1/1987 3-A

CONC E DELTA FIRST CLASS LOUNGES O & M MANUAL PAUL W. HEARD 1 5/2/1994 3-A

CONC E DELTA - BUSINESS CLASS LOUNGES & GROUP ROOMS

O & M MANUAL PAUL W. HEARD 1 5/18/1994 3-A

CONC E DELTA - BUSINESS CLASS LOUNGES & GROUP ROOMS

CHILL & HEATING HOT WATER - DOMESTIC WATER & SANITARY - TESTS/INSPECTIONS/FLUSHING REPORTS

PAUL W. HEARD 1 6/20/1994 6-B

CONC E ORIGINAL CONSTRUCTION MECHANICAL EQUIPMENT START-UP CHECK LIST MC KENNEY MECH 1 11/4/1993 3-C

CONC E AGT EXTENTION PHASE I & II AND CENTRAL BASEMENT

AGT EXT PH I & II AND CENTRAL BASEMENT SHELL TECH SPECS

A.A.E. 1 11/8/1991 3-A

CONC E DELTA FIRST CLASS LOUNGES CHILL & HEATING HOT WATER - DOMESTIC WATER & SANITARY - TESTS/INSPECTIONS/FLUSHING REPORTS

PAUL W. HEARD 1 8/11/1994 6-B

CONC E ORIGINAL CONSTRUCTION PROJECT MANUAL, SPECS VOL. I - BID & CONTRACT REQUIRE. & VOL. II MECHANICAL, ELEC, & CONTROLS

TURNER ASSOC 1 2/12/1992 3-A

Page 44: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 44

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E TELECOM RM HVAC UNITS - PHASE 2

O & M MANUAL PERFORMANCE MECHANICAL

1 3/14/1994 8-A

CONC E ORIGINAL CONSTRUCTION O & M MANUAL HONEYWELL 1 7/12/1994 9-B

CONC E ORIGINAL CONSTRUCTION O & M MANUAL TENANT MODIFICATIONS NEW SOUTH CONSTRUCT

1 2/24/1995 3-A

CONC E ORIGINAL CONSTRUCTION INSTALLATION & MAINTENANCE SERVICE MANUAL FOR COMMERCIAL STEEL DOORS

ATLAS ROLL - LITE DOOR CORP.

1 3/23/1993 8-A

CONC E ORIGINAL CONSTRUCTION INSTALLATION & MAINTENANCE SERVICE MANUAL FOR ROLL-LITE DOORS

ATLAS ROLL - LITE DOOR CORP.

1 3/1/1991 8-A

CONC E ORIGINAL CONSTRUCTION PHASE II

SUBMITTAL DATA MECHANICAL B & W MECHANICAL CO.

1 10/21/1992 4-E

CONC E DELTA BUSINESS LOUNGE O & M MANUAL HONEYWELL 1 1/1/1993 9-B

CONC E DELTA TENANT WORK O & M MANUAL HONEYWELL 1 1/1/1993 9-B

CONC E DELTA FIRST CLASS LOUNGE O & M MANUAL HONEYWELL 1 1/1/1993 9-B

CONC E ORIGINAL CONSTRUCTION TOTAL LIGHT

LIGHTING CONTROLS O & M MANUAL - SERIES 90-30 CONTROLLER

GENERAL ELECTRIC 1 1/1/1992 6-E

CONC E ORIGINAL CONSTRUCTION MECH, ELECT & CONTROLS

PROJECT MANUAL VOLUME II - FC5179-91 TURNER ASSOC 1 2/12/1992 3-B

Page 45: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 45

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION ELECTRICAL PANELBOARD SCHEDULE

PROJECT MANUAL VOLUME III - FC5179-91 TURNER ASSOC 1 2/12/1992 6-B

CONC E ORIGINAL CONSTRUCTION ADDENDUM NUMBER ONE FC5170-91 TURNER ASSOC 1 3/4/1992 3-B

CONC E ORIGINAL CONSTRUCTION REVISION NUMBER ONE FC5179-91 TURNER ASSOC 1 5/22/1992 3-B

CONC E UNOCCUPIED SMOKING ROOMS

PROJECT MANUAL TURNER ASSOC 1 12/19/1994 3-B

CONC E DIVISION 15 & 16 - PHASE II PROJECT MANUAL VOLUME II FC5529-93 TURNER ASSOC 1 4/5/1993 3-B

CONC E ORIGINAL CONSTRUCTION PHASE II ADDEND. #1

PROJECT MANUAL FC5529-93-ADDENDUM #1 TURNER ASSOC 1 4/26/1993 3-B

CONC E COMMUNICATIONS ADDEND #1

PROJECT MANUAL FOR INSTALLATION OF VOICE & DATA CABLING PART 2

STEVENS & WILKINSON 1 4/20/1994 1-F

CONC E VOICE & DATA CABLING PROJECT MANUAL PART 2 - BID & CONTRACT REQUIREMENTS DIV 01 -16

STEVENS & WILKINSON 1 3/30/1994 1-F

CONC E MUFIDS / BIDS EQUIP & CABLING

PROJECT MANUAL PART 3 - BID & CONTRACT REQUIREMENTS SPECIAL INSTRUCTIONS

STEVENS & WILKINSON 1 5/25/1994 3-B

CONC E TELEPHONE INSTRUMENT PROJECT MANUAL PART 4 STEVENS & WILKINSON 1 8/15/1994 3-B

CONC E ORIGINAL CONSTRUCTION SIGN SCHEDULE JONES WORLEY DESIGN 1 4/30/1992 3-B

Page 46: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 46

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION ADDENDUM #1 - EMERGENCY / PEAK SHAVING STEVENS & WILKINSON 1 8/19/1992 3-B

CONC E PEAK SHAVING / EMERG. POWER SYSTEM

BID MANUAL ATLANTA CONSTRUCTION TEAM

1 7/31/1992 3-B

CONC E DELTA - CONC E CONSTRUCTION - PHASE 1

CONTRACT SPECS. FOR SITE WORK FOR BAGG. TUNNELS, AGT EXTENS & CENTRAL BASEMENT SHELL

ASSOC ARCH & ENGIN. 1 10/24/1991 3-B

CONC E ORIGINAL CONSTRUCTION HVAC SUBMITTAL DRAWINGS MC KENNEY'S MECH. 28 DWGS

6/7/1993 3-D

CONC E ORIGINAL CONSTRUCTION PHASE II

O & M MANUAL VOLUME I PERFORMANCE MECH. 1 5/6/1994 3-B

CONC E CHILLER PLANT INTERCONNECT

O & M MANUAL & DRAWINGS MANN MECHANICAL CO.

1 2/15/1995 3-B

CONC E TRADE- AGREEMNT #9146-0145005

RENEWAL PARTS CATALOG SCHINDLER 1 12/1/1992 5-E

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUME 1

CUMMINS / ONAN 1 5/1/1994 8-C

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUME 2

CUMMINS / ONAN 1 5/1/1994 8-C

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUME 3

CUMMINS / ONAN 1 5/1/1994 8-C

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUME 4

CUMMINS / ONAN 1 5/1/1994 8-C

Page 47: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 47

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUME 5

CUMMINS / ONAN 1 5/1/1994 8-C

CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS

OPERATION & MAINTENANCE INSTRUCTION VOLUMC 6

CUMMINS / ONAN 1 5/1/1994 8-C

CONC E EMERSON VARIABLE FREQUENCY DRIVES

EMERSON VARIABLE FREQUENCY DRIVES TRI-TECH. 1 9/4/1992 4-F

CONC E GENERATORS GENERATORS CUMMINS / ONAN 1 11/29/1993 3-E

CONC E EMERSON INDUSTRIAL CONTROLS

APPROVAL SUBMITTALS CONTROL TECH GROUP 1 4/1/1992 4-F

CONC E E-MON D-MON METERS E-MON D-MON METERS E-MON CORP. 1 5/19/1995 8-B

CONC E COMMUNICATION PART 4 INSTALL OF TELEPHONES

PROJECT MANUAL - COMMUNICATION PART 4 INSTALLATION OF TELEPHONE INSTRUMENTS

M. A. B. 1 8/15/1994 8-B

CONC E ORIGINAL CONSTRUCTION PHASE II

CONTRACT #FC5179-91 PROJECT MANUAL VOLUMES 1 & 2

TURNER 1 2/12/1992 7-F

CONC E ELECTRICAL SWITCHGEAR TESTING

LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR

1 9/1/1994 6-D

CONC E DUTY FREE CORRIDOR / SOLID WASTE

PROJECT MANUAL TURNER ASSOC. 1 5/30/1995 2-A

CONC E ORIGINAL CONSTRUCTION PHASE II

SHORT CIRCUIT AND TIME-CURRENT COORDINATION STUDY VOLUME II

JEFFERS BARNETT & ASSOC.

1 12/14/1992 6-A

Page 48: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 48

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ORIGINAL CONSTRUCTION SUPERSTRUCT PHASE I

DIVISION 16 ELECTRICAL SUBMITTAL DATA BOOK II

TURNER / DYNAELEC. 1 4/23/1993 3-E

CONC E KLM AIRLINES @ CONC E KLM AIRLINES CONCOURSE E TENANT WORK DERYCK MUEHLHAUSER

1 8/17/1994 3-E

CONC E COOLING TOWER / BOILER WATER TREATMENT

COOLING TOWER WATER TREATMENT BOILER WATER TREATMENT PROGRAM & SERVICES (SONY DISK)

ANCO CHEMICAL CO. 1 2/12/1992 6-E

CONC E ESCALATORS, HYDRAULIC & GEARED ELEVATORS

RENEWAL PARTS CATALOG FOR HYDRAULIC & GEARED ELEV & ESCALATORS

SCHINDLER ELEVATOR 1 1/1/1989 5-E

CONC E TENANT WORK PROJECT #90-33 TENANT WORK BAKER AUDIO 1 11/30/1993 9-A

CONC E MULTI-USER FIDS / BIDS SYSTEM

SPECIFICATIONS FOR MULTI-USER FLIGHT & BAGGAGE INFORMATION DISPLAY SYSTEM

M. A. B. ENGINEERING 1 4/25/1994 3-F

CONC E AC DRIVES FOR 3-65 AMP SERVICE MANUAL FOR AC DRIVES FOR USE IN SERVICING 3-65 AMP

ABB SERVICE 1 8/1/1990 8-A

CONC E ORIGINAL CONSTRUCTION PROJECT MANUAL FOR CONTRACT FC5179-91 CPTC / VOL #3 ADDENDUM #1-REV #1

TURNER ASSOC 1 2/12/1992 7-F

CONC E SCHINDLER GEARED ELEVATORS

WIRING DIAGRAMS FOR GENERAL ORDER GEARED ELEVATORS PRINTS FOR SERVICING EQUIPMENT

SCHINDLER 1 11/12/1991 5-E

CONC E TENANT MODIFICATIONS PROJECT MANUALS, BIDDING REQUIREMENTS VOLUME 1 & VOLUME 2 WITH DWGS INCLUDED

DERYCK MUEHLHAUSER

2 8/15/1994 7-F

CONC E ORIGINAL CONSTRUCTION PHASE I SUPERSTRUCT

AUTOMATIC FIRE SPRINKLER SYSTEMSUBMITTAL MANUAL - GRINNELL

GRINNELL, S & W, TURNER

1 3/7/1994 6-B

Page 49: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 49

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E FIRESTONE ROOFING WARRANTY

ROOFING SYSTEM LIMITED WARRANTY - CONC E OUT BUILDING NORTH WITH STICKERS

PEACH STATE ROOFING, INC.

1 4/10/1998 4-A

CONC E ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

CONC E ELECTRICAL PANEL DIRECTORIES

AS BUILTS DOA 1 12/1/1998 8-B

CONC E DELTA IN-TRANSIT LOUNGE DELTA IN-TRANSIT LOUNGE-3RD FLOOR O & M MANUAL

MC DEVITT STREET BOVIS

1 3/2/1999 1-D

CONC E AIR FRANCE AIR FRANCE BUILD-OUT CONCOURSE E GATE 15 LINKS CONSTRUCTION 1 3/1/1999 2-D

CONC E TENANT WORK JAPAN AIRLINES-CONCOURSE E TENANT WORK DERYCK MUEHLHAUSER

1 7/25/1994 6-E

CONC E ORIGINAL CONSTRUCTION PHASE I

HVAC O & M MANUAL VOL. IV JOB #561 MC KENNEY 1 11/16/1993 3-E

CONC E UNOCCUPIED SPACES & SMOKING ROOMS

O & M MANUAL CONTRACT FC-6066-95 MECHANICAL ASSOC 1 1/1/1995 3-F

CONC E UNOCCUPIED SPACES/SMOKING ROOMS

OPERATION & MAINTENANCE INSTRUCTIONS INTERNATIONAL FIRE PROTECTION

1 2/7/1994 8-A

CONC E UNOCCUPIED SPACES & SMOKING ROOMS

O & M MANUAL YUKON ELECTRIC 1 2/27/1996 8-B

CONC E UNOCCUPIED SPACES & SMOKING ROOMS

ELECT AS-BUILTS-WARRANTY INFO, LIGHT FIXTURES, EMT CONDUIT, PANEL DIRECTORS

YUKON ELECTRIC 1 4/15/1996 8-B

Page 50: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 50

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E SPRINKLERS-FIRE PROTECTION SYSTEMS

O & M MANUALS INTERNATIONAL FIRE PROTECTION

1 1/1/1998 6-B

CONC E UNOCCUPIED SPACES FIRE ALARM, HVAC AND AUTOMATIC TEMPERATURE CONTROL WARRANTY

HONEYWELL 1 2/22/1996 9-C

CONC E OPERATOR MANUALS & INSTRUCTIONS

EXCEL CCT2190M-CEL, DELTANET MICROCEL REPEATER, TEMP SENSOR, EXCEL + CNTRLR

HONEYWELL 1 1/1/1994 9-C

CONC E BAGGAGE CLAIM EQUIPMENT

PROPOSAL - HIP '96 JERVIS B. WEBB CO. 1 8/22/1995 1-F

CONC E EXPANSION OF SECURITY SYSTEM

TECHNICAL SPECS - CONC E EXPANSION DOA 1 7/13/2000 3-C

CONC E EXPANSION CONTRACT DOCUMENTS FC-7129-99 DOA 1 1/24/2000 2-A

CONC E HVAC EXPANSION O & M MANUAL - MECHANICAL MCI ENTERPRISES 1 8/30/2001 2-B

CONC E EXPANSION - SWITCHBOARD FACTORY TEST CERTIFICATION SIEMENS 1 6/28/2001 6-B

CONC E EXPANSION - CATHODIC PROTECTION ELEV. CASINGS

TEST REPORTS CORRPRO 1 6/1/2000 1-B

CONC E BRITISH AIRWAYS TERRACES LOUNGE

PROJECT MANUAL - SPECIFICATIONS BEAME ARCH. 1 3/3/2000 9-B

CONC E BRITISH AIRWAYS TERRACES LOUNGE

PROJECT MANUAL APPENDICES BEAME ARCH. 1 3/3/2000 9-B

Page 51: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 51

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ROOF WARRANTY CAR WASH FACILITY - 10 YEAR WARRANTY FIRESTONE 1 4/1/1993 4-A

CONC E EXPANSION PRE-CONDITIONED AIR MODS. - BID DOCUMENTS

CITY OF ATLANTA 1 5/21/2001 3-A

CONC E EXPANSION ELEVATOR O & M MANUAL & WARRANTY LETTER

SCHINDLER 1 11/5/2001 5-E

CONC E EXPANSION ESCALATOR O & M MANUAL & WARRANTY LETTER

SCHINDLER 1 11/5/2001 5-E

CONC E EXPANSION ELECTRICAL O & M MANUAL GRIFFIN ELECTRIC 1 8/21/2001 6-E

CONC E CHILLER PLANT UPGRADE ABSORPTION CHILLERS O & M MANUAL JOHNSON CONTROLS 1 6/16/2001 3-A

CONC E HARDWARE - PHASE 1 CATALOG, SCHEDULE, O & M MANUAL A.G. MAURO CO. 1 3/15/1994 6-E

CONC E EXPANSION BID DOCUMENTS - 1ST DRAFT DOA 1 10/1/1999 2-A

CONC E ORIGINAL CONSTRUCTION PHASE II

R.F.I. MANUAL - 700 TO 794 MC DEVITT STREET BOVIS

1 10/6/1994 1-E

CONC E AATC/ABS OPERATIONS RELOCATION

RELOCATION PROJECT MANUAL (PROJECT ABANDONED)

ARCHTYPE SERVICES 1 1/3/1996 2-E

CONC E COOLING TOWER OPERATING MANUAL MARLEY COOLING TOWER

1 10/6/1994 8-B

Page 52: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 52

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E ANALYSIS OF CHILLER REFRIGERATION OIL ANALYSIS REPORT FOR TRANE CHILLER

GEORGIA TRANE SERVICE CO.

1 12/10/2002 1-B

CONC E REMOTE RECEIVER FACILITY RELOCATION

BID DOCUMENT FC-7556-03 CITY OF ATLANTA 1 4/14/2003 2-B

CONC E EXPANSION - FIRE ALARM SYSTEM

O & M MANUAL HONEYWELL 1 6/19/2001 9-C

CONC E MOVING WALKWAYS CONTRACT DOCUMENTS CITY OF ATLANTA 1 3/22/2004 2-E

CONC E GENERATOR RELOCATION SCHEMATIC DESIGN DOCS STANLEY, LOVE-STANLEY/NEWCOMB-BOYD

1 3/1/2004 1-D

CONC E GENERATOR RELOCATION FACILITY SYSTEMS ANALYSIS STANLEY, LOVE-STANLEY/NEWCOMB-BOYD

1 3/1/2004 1-D

CONC E PRECOND AIR MODIFICATIONS - PHASE III

PROJECT MANUAL CONTRACT FC-7428-02 CITY OF ATLANTA 1 10/7/2003 1-A

CONC E EXTERIOR EXPANSION JOINT REPLACEMENT

CLOSE OUT DOCUMENTS J.M.WILKERSON CONST. CO.

1 5/1/2006 9-C

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 1 CUMMINS SOUTH 1 12/2/2005 8-E

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 2 CUMMINS SOUTH 1 12/2/2005 8-E

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 3 CUMMINS SOUTH 1 12/2/2005 8-E

Page 53: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 53

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 4 CUMMINS SOUTH 1 12/2/2005 8-E

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 5 CUMMINS SOUTH 1 12/2/2005 8-E

CONC E EMERGENCY POWER SYSTEM RELOCATION

O & M MANUAL VOLUME 6 CUMMINS SOUTH 1 12/2/2005 8-E

CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 1/3 MANN MECHANICAL 1 12/5/2005 8-E

CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 2/3 MANN MECHANICAL 1 12/5/2005 8-E

CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 3/3 MANN MECHANICAL 1 12/5/2005 8-E

CONC E UNIT SUBSTATION #10 O & M MANUAL SIEMANS 1 12/11/2007 1-D

CONC E GENERATOR RELOCATION SPECIFICATION MANUAL STANLEY, LOVE-STANLEY/NEWCOMB & BOYD

1 7/15/2004 7-D

CONC E GENERATOR RELOCATION O & M MANUAL JOHNSON CONTROLS 1 10/1/2005 7-E

CONC E FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 1/30/2004 1-C

CONC E DELTA BREAK ROOM MECHANICAL O & M MANUAL PAUL HEARD 1 11/28/2007 5-D

Page 54: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 54

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E CENTRAL PLANT TECHNICAL SPECS - EARLY MEP PACKAGE H-JDP 1 12/5/2003 9-C

CONC E 480V GENERATORS FACILITY SYSTEMS ANALYSIS STANLEY, LOVE-STANLEY

1 10/3/2003 7-E

CONC E TICKET COUNTER REPLACEMENT PROJECT

O & M MANUAL NEW SOUTH CONSTRUCTION

1 11/10/2008 5-C

CONC E CENTRAL PLANT EXPANSION CECPE-CW PUMP REPLACEMENT O & M MANUAL, LETTER OF WARRANTY

BELL & GOSSETT 1 4/25/2008 5-C

CONC E UNIT SUBSTATION CON E UNIT SUBSTATION #10 & SOUTH AIRFIELD LIGHTING VAULT GENERATOR O & M MANUAL

CLEVELAND ELEC 1 1/10/2008 4-F

CONC E COSMETIC UPGRADES CONC E COSMETIC UPGRADES PHASE 1/BOARDING LEVEL 2 BID PACKAGE NO.3 - CORRIDOR & HOLDROOM WALL UPGRAD

SCOTT ASSOCIATES 1 12/18/2008 5-B

CONC E SOJOURNER'S SMOKING LOUNGE

O & M MANUAL PAUL W. HEARD AND COMPANY

1 8/28/2008 3-E

CONC E MHJIT APM ENABLING & MEP RELOCATION

O & M MANUAL FOR CONC E MEP RELOCATION F & S MECHANICAL & PLUMBING

1 2/1/2009 6-E

CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 2 BID PACKAGE NO 8 WALL UPGRADES & CEILING REPAIRS

SCOTT ASSOCIATES 1 4/9/2009 5-B

CONC E COSMETIC UPGRADES PHASE 1 - LEVEL 2 BID PKG NO 1 - COLUMN CLADDING

SCOTT ASSOCIATES 1 12/10/2008 5-B

CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 6 - CORRIDOR & WALL UPGRADES

SCOTT ASSOCIATES 1 12/30/2008 5-B

Page 55: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 55

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 5 - CEILING REPAIRS

SCOTT ASSOCIATES 1 12/30/2008 5-B

CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 4 - COLUMN CLADDING

SCOTT ASSOCIATES 1 12/30/2008 5-B

CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 7 - COLUMN CLADDING

SCOTT ASSOCIATES 1 4/9/2009 5-B

CONC E ORIGINAL CONSTRUCTION SPECS - DIVISIONS 13 & 15 TURNER ASSOC 1 2/12/1992 3-A

CONC E CUSTOMS & BORDER PATROL - EMERSON

LIEBERT MINI-MATE 2 - O & M MANUAL WG YATES 1 1/12/2009 6-E

CONC E CUSTOMS & BORDER PATROL WARRANTY & CLOSE OUT DOCS WG YATES 2 1/12/2009 4-A

CONC E UNIT SUBSTATION 10 DOOR CLOSURE & HARDWARE O & M MANUAL CLEVELAND 1 1/10/2008 5-C

CONC E WON-DOOR INSTALLION MANUAL WON-DOOR CORP 1 12/23/1994 8-C

CONC E LIGHTING VAULT SPECS FOR DIESEL GENERATORS CUMMINS-ONAN 1 11/18/1991 4-F

CONC E CEILING & LIGHTING REPLACEMENT

APM STATION SEPCIFICATIONS SCOTT ASSOCIATES 1 1/31/2011 5-F

CONC E CEILING & LIGHTING REPLACEMENT

APM STATION CLOSE OUT SCOTT ASSOCIATES 1 1/31/2011 5-F

Page 56: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 56

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC E COSMETIC UPGRADES CEILING & WAINSCOT CPS 1 3/15/2011 5-B

CONC E CHILLER REPLACEMENT WARRANTY - ECUP CHILLER INSTALLATION MANN MECHANICAL 1 4/26/2007 4-A

CONC E SPRINKLER SYSTEM HYDRAULIC CALCULATIONS - AGT LEVEL GRINNELL CORPORATON

1 8/9/1994 6-B

CONC E COSMETIC UPGRADES CARPET REPLACEMENT LEVELS 1, 2 & 3 BID PACKAGE 8 SPECIFICATIONS

DOA 1 3/31/2011 5-B

CONC E CARPET REPLACEMENT PROJECT

O & M MANUAL MAINTENANCE SPECIFICATION GUIDE

INTERFACE FLOORING SYSTEM

1 9/26/2011 5-B

CONC E COSMETIC UPGRADES LEVELS 1 & 3 PHASE 2 O & M MANUAL NEW SOUTH 1 4/28/2011 5-B

CONC E POWER POLES- ELECTRICAL O & M MANUAL NEW SOUTH 1 3/6/2012 3-C

CONC E DELTA AIRLINES E14 & E15 SKY CLUB CONSOLIDATION JCI O & M MANUAL

JOHNSON CONTROLS 1 4/13/2012 7-E

CONC E DELTA AIRLINES E14 & E15 SKY CLUB CONSOLIDATION O & M MANUAL

NEW SOUTH CONSTRUCTION

1 4/17/2012 7-E

CONC F MHJIT - CENTRAL PLANT EXPANSION

BID DOCUMENTS CITY OF ATLANTA 1 1/7/2004 7-F

CONC F MHJIT - CENTRAL PLANT EXPANSION

CONSTRUCTION DOCUMENTS ESTIMATE CITY OF ATLANTA 1 1/7/2004 7-F

Page 57: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 57

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04

CD PHASE SPECIFICATIONS - VOLUME 2 (DIVISIONS 7 - 9)

CITY OF ATLANTA 1 1/17/2005 9-D

CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04

CD PHASE SPECIFICATIONS - VOLUME 5A (DIVISIONS 16 - 17)

CITY OF ATLANTA 1 1/17/2005 9-D

CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04

CD PHASE SPECIFICATIONS - VOLUME 3 (DIVISIONS 10 - 13)

CITY OF ATLANTA 1 1/17/2005 9-D

CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04

CD PHASE SPECIFICATIONS - VOLUME 4 (DIVISIONS 14 - 15)

CITY OF ATLANTA 1 1/17/2005 9-D

CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04

CD PHASE SPECIFICATIONS - VOLUME 1 (DIVISIONS 1 - 6)

CITY OF ATLANTA 1 1/17/2005 9-D

CONC F MHJIT DESIGN DEVELOPMENT PHASE-FOUNDATIONS, CIVIL, & UTILITIES

DOA 1 2/2/2004 4-E

CONC F MHJIT - TERMINAL AND CONCOURSE

ROOM NUMBERING / DOOR SCHEDULE ATLANTA GATEWAY DESIGNERS

1 2/1/2011 9-D

CONC F MHJIT - LIFE SAFETY CODE ISSUES COA BUREAU OF BUILDINGS & FIRE MARSHAL

1 7/8/2011 7-F

CONC F DELTA AIRLINES SKY CLUB LOUNGE

CLOSE OUT DOCUMENTS - MILLWORK AS BUILTS, FANS, PLUMBING FIXTURES, WATER HEATER & VAV BOXES

CRESTON 1 5/10/2012 7-B

CONC F DELTA AIRLINES SKY CLUB LOUNGE

CRESTRON LIGHTING SYSTEM MANUALS CRESTON 1 5/10/2012 7-B

CONC T NORTH ORIGINAL CONSTRUCTION

OWNER'S MANUAL ELEVATORS EA4789 DOVER ELEVATOR CO. 1 3/1/1979 5-F

Page 58: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 58

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T NORTH ORIGINAL CONSTRUCTION

OWNER'S MANUAL ELEVATORS EA4790-91 DOVER ELEVATOR CO. 1 3/1/1979 5-F

CONC T NORTH ORIGINAL CONSTRUCTION

OWNER'S MANUAL ELEVATORS E-89435 DOVER ELEVATOR CO. 1 11/1/1982 5-F

CONC T MIDFIELD PROJECT ORIGINAL CONSTRUCTION

PAGING SYSTEMS BAKER AUDIO 1 7/23/1979 2-D

CONC T PUBLIC PAGING AND HOLDROOM SOUND SYS

O & M MANUAL - UPGRADE BAKER AUDIO 1 7/9/1987 8-B

CONC T EXPANSION SUBMITTAL-DISTRIBUTION EQUIPMENT INGLETT & STUBBS / G & B

1 10/14/1988 2-D

CONC T DELTA INTERNATIONAL CABIN SERVICE

PROJECT MANUAL & SPECIFICATIONS MILTON PATE ASSOC 1 2/11/1987 2-D

CONC T SOUTH - EXPANSION PHASE II O & M MANUAL PERFORMANCE MECH. 1 12/12/1988 2-E

CONC T SOUTH - EXPANSION PHASE II PROJECT MANUAL PERFORMANCE MECH. 1 1/1/1988 2-E

CONC T SOUTH - EXPANSION PHASE II OWNER'S MANUAL WARRANTY INFORMATION MC DEVITT STREET BOVIS

1 4/28/1989 4-A

CONC T NORTH ORIGINAL CONSTRUCTION

WARRANTY INFORMATION HOLDER / RUSSELL CONSTRUCTION CO

1 6/2/1980 4-A

CONC T SOUTH - PHASE II ELECTRICAL ELECTRICAL OWNER'S MANUALS INGLETT & STUBBS / G & B

1 3/27/1989 2-E

Page 59: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 59

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T FIS EXPANSION JOB CLOSE OUT BOOK - AS BUILTS HOLDER / RUSSELL CONSTRUCTION CO

1 2/16/1987 2-F

CONC T FIS FACILITY STANLEY MAGIC DOOR

MAINTENANCE & REPAIR MANUAL STANLEY 1 6/2/1975 6-E

CONC T NORTH ORIGINAL CONSTRUCTION

SUBMITTAL DATA DIXIE ELECTRIC 1 9/9/1979 2-F

CONC T FIS EXPANSION HVAC O & M MANUAL J. S. THOMAS 1 8/1/1986 6-E

CONC T DELTA CROWN ROOM RENOVATION

PROJECT MANUAL #9430 THOMPSON HANCOCK WITT ASSOC.

1 1/30/1995 2-D

CONC T FIS BAGGAGE CLAIM EXPANSION

PROJECT MANUAL DERYCK MUEHLHAUSER

1 9/16/1991 2-D

CONC T DELTA CROWN ROOM PROJECT CLOSEOUT MANUAL MC DEVITT STREET BOVIS

1 1/30/1995 2-C

CONC T FIS EXPANSION ELEC. ONELINE DIAG. & PROGRESS PRINT OUTS FOR VOLTAGE DROP, SHORT CIRCUIT & LOAD SUMMARY

STEVENS & WILKINSON 1 5/21/1986 6-A

CONC T FIS EXPANSION PHASE II ADDENDUM #1

SPECIFICATIONS TURNER / PATE 1 5/5/1988 2-F

CONC T FIS EXPANSION PHASE II SPECIFICATIONS- T SOUTH TURNER / PATE 1 4/18/1988 2-F

CONC T FIS EXPANSION PLUMBING SPECIFICATIONS DOA 1 4/16/1986 2-F

Page 60: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 60

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T FIS EXPANSION HVAC SPECIFICATIONS DOA 1 4/9/1986 2-F

CONC T FIS EXPANSION PHASE I SPECIFICATIONS TURNER / PATE 1 1 4/30/1986 2-F

CONC T FIS FACILITY INTERIM EXPANSION

BID DOCUMENTS - RENOVATION & EXP.PUBLIC WAITING AREA & BAG CLAIM

DOA 1 8/22/1985 2-F

CONC T FIS TENANT SPACE SPECIFICATIONS PATE / TURNER 1 1/30/1980 2-F

CONC T CLOCK SYSTEM INSTRUCTION MANUAL DIXIE ELECTRIC 1 8/20/1979 4-D

CONC T ORIGINAL CONSTRUCTION - NORTH FIS

ONAN GENERATOR: AUTO-LOAD TRANS-CONTROL SUBMITTAL

BLALOCK MACHINERY & EQUIPMENT

1 9/13/1979 4-E

CONC T FIS EXPANSION MAINTENANCE MANUAL AUTO SPRINKLER CO. 1 7/13/1987 6-E

CONC T LOCKHEED - MOBILE LOUNGE FACILITIES

MOBILE LOUNGE FACILITIES PROVISIONS - PROJECT MANUAL

DERYCK MUEHLHAUSER

1 3/4/1991 3-C

CONC T FIS COUNTER FIRE DOOR MAINTENANCE MANUAL COOKSON ROLLING DOORS

1 5/22/1980 8-A

CONC T LOCKHEED AIR TERMINAL - U.S. CUSTOMS KENNEL UNIT ADDITION

PROJECT MANUAL DERYCK MUEHLHAUSER

1 6/5/1992 3-C

CONC T FIS FACILITY SUBMITTAL DATA - OPERATIONS & MAINTENANCE & HVAC INSTRUCTIONS BOOK #3

MALLORY EVANS 1 7/9/1979 2-F

Page 61: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 61

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T AMERICAN AIRLINES NORTH RENOVATION

MECHANICAL & PLUMBING PACKAGE SPECIFICATIONS

CORGAN ASSOC. ARCHITECTS

1 12/2/1994 2-E

CONC T EXPANSION MAINTENANCE DATA & HYDRAULIC CALCULATIONS

ALLSOUTH SPRINKLER CO

1 3/29/1989 8-A

CONC T GSE OIL / WATER SEPARATOR ANALYSIS

FAW OIL / WATER SEPARATOR MANUAL ENQUIP INC 1 12/2/1983 8-A

CONC T SMOKING LOUNGE - CONC T, A, B & C

O & M MANUAL NEW SOUTH 1 3/17/1995 3-E

CONC T PAX CIRCULATION REVISIONS FIRE ALARM & BLDG. AUTOMATION SYSTEM O & M MANUAL

HONEYWELL 1 2/22/1996 1-C

CONC T PAX CIRCULATION REVISIONS 14310/14311 MONTGOMERY KONE ESCALATOR O & M MANUAL

MONTGOMERY 1 5/3/1996 5-F

CONC T PAX CIRCULATION REVISIONS 16010 ELECTRICAL GENERAL PROVISIONS O & M MANUAL

YUKON 1 5/6/1996 8-C

CONC T PAX CIRCULATION REVISIONS 13810, 13845 GENERAL PROJECT-WIDE FIRE ALARM & BLDG. AUTO. SYSTEMOPERATION & MAINTENANCE MANUAL

HONEYWELL 1 5/6/1996 1-C

CONC T AMERICAN AIRLINES T-GATE RENOVATION

O & M MANUAL -- ARCHITECTURAL -- BK 1/ 2 CORGAN / NEW SOUTH 1 5/1/1995 1-F

CONC T AMERICAN AIRLINES T-GATE RENOVATION

O & M MANUAL - MECH./ELEC./PLUMB. - BK 2/2 CORGAN / NEW SOUTH 1 5/1/1995 1-F

CONC T AMERICAN AIRLINES T-GATE RENOVATION

SCHINDLER RENEWAL PARTS CATALOG FOR ELEVATORS

SCHINDLER 1 5/1/1995 5-E

Page 62: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 62

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T SOUTH - DELTA OPERATIONS EXPANSION

PROJECT SPECIFICATIONS MILTON / PATE 1 6/20/1996 2-F

CONC T TERMINAL REDEVELOPMENT VERTICAL TRANSPORTATION

PROJECT MANUAL ZONE 3 TURNER ASSOC 1 1/20/1995 5-A

CONC T AMERICAN AIRLINES T-GATE RENOVATION

REVOLVING SECURITY DOORS -- ADJUSTMENT & TROUBLESHOOTING MANUAL

HORTON AUTOMATICS 1 5/30/1995 8-A

CONC T DOA EXECUTIVE OFFICES OPERATION & MAINT MANUAL FOR POWERED INDUCT, UNITS & VAV'S,FANS, VALVES & PLUMBING EQUIPMENT

WINTER 1 2/4/1994 2-F

CONC T DOA EXECTIVE OFFICE PRODUCT DATA/FINISH

OFFICE RELOCATION PRODUCT DATA & FINISHES MANUAL

WINTER 1 7/10/1996 2-F

CONC T DOA ADMIN & EXEC OFFICE GRINNELL FIRE PROTECT.

FOURTH FLOOR ADMIN & THIRD FLOOR EXECUTIVE OFFICE O & M MANUAL

TURNER & ASSOC 1 10/4/1996 1-F

CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS

WARRANTY MANUAL FOR MILLWORK, WATERPROOFING, SINGLE PLY ROOF & HARDWARE

ACI 1 5/22/1996 4-A

CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS

SPECIFICATIONS ADDENDUM #1 BOOK 1 OF 2 ROBERT & CO 1 11/22/1994 2-D

CONC T GATE RELOCATION- PHASE II UNITED AIRLINES-T NORTH GATES T-13, T-14, T-15

ROSSER INTERNATIONAL

1 11/7/1997 2-A

CONC T AMERICAN AIRLINES T-GATE RENOVATION

SPECIFICATIONS, BID DOCUMENTS, & CONTRACT CONDITIONS

CORGAN 1 10/28/1994 2-E

CONC T UNITED AIRLINES RED CARPET ROOM

O & M MANUALS ROSSER INTL 1 11/1/1998 2-E

Page 63: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 63

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T DELTA LINE GSE ROOF TOP UNITS 1 & 2

O & M MANUALS P. W. HEARD 1 1/2/1999 9-A

CONC T DELTA TRAINING RMS 3RD FLOOR

BIDS INFORMATION AND SPECS GRANT WEILAND 1 10/28/1996 3-C

CONC T ADMIRAL'S CLUB - WIRELESS INTERNET

PROJECT MANUAL FOR INSTALLATION OF SYSTEM

MOBILE STAR NETWORK

1 5/1/2000 3-A

CONC T SECURITY OFFICES DISPATCH CENTER

O & M MANUAL PERFORMANCE MECHANICAL

1 11/15/1995 8-A

CONC T AMERICAN AIRLINES ELEVATOR

O & M MANUAL - ELEVATOR SCHINDLER 1 6/1/1995 5-E

CONC T LINE GSE BOILER REPLACEMENT (DELTA)

O & M MANUAL HENDERSON MECHANICAL

1 2/28/2003 2-B

CONC T PUBLIC PAGING AND HOLDROOM SOUND SYSTEM UPGRADE

O & M MANUAL BAKER 1 7/9/1987 2-D

CONC T RED BRICK TAVERN/PIZZA HUT RENOVATION

SPECIFICATIONS - FOODSERVICE EQUIP. & FURNISHINGS

HOSPITALITY SERVICES 1 9/4/2001 2-B

CONC T CONCESSIONS FIT-OUT & RELOCATIONS

CONTRACT DOCUMENTS CITY OF ATLANTA 1 11/25/2003 1-F

CONC T CONCESSIONAIRES' OFFICE RELOCATION

CONSTRUCTION DOCUMENTS & SPECIFICATIONS CITY OF ATLANTA 1 10/3/2003 2-D

CONC T CONCESSIONAIRES OFFICES RELOCATION

O & M MANUAL MECHANICAL PERFORMANCE MECHANICAL

1 8/26/2004 2-D

Page 64: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 64

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T CONCESSIONAIRES OFFICES RELOCATION

O & M MANUAL BRYSON CONSTRUCTORS

1 8/27/2004 2-D

CONC T CONCESSIONAIRES OFFICES RELOCATION

O & MANUAL - SPRINKLER SYSTEM BRYSON CONSTRUCTION

1 8/27/2004 6-B

CONC T VISUAL OBSTRUCTION (T-SOUTH-3RD FL)

CONTRACT CITY OF ATLANTA 1 8/30/2005 2-B

CONC T ISD EXPANSION CONCESS FIT-OUT RELOCATION

O & M MANUAL BRYSON CONSTRUCTORS

1 9/6/2005 3-F

CONC T AIRPORT SAFETY / CENTRALIZED COMMAND & CONTROL CENTER

CONCEPT DEVELOPMENT FINAL REPORT HPC 1 9/1/2004 2-C

CONC T HVAC SYSTEMS UPGRADE RECORD SUBMITTAL - ACU-9, ACU-10, ACU-11, ACU-12

BUFFALO AIR HANDLING

1 9/19/2005 1-F

CONC T CONCESSIONAIRE'S OFFICE RELOCATION

CONTROLS SUBMITTAL WAYPOINT SYSTEMS 1 1/14/2004 1-F

CONC T CONCESSIONAIRE'S OFFICE RELOCATION

GE SWITCHGEAR SUBMITTALS UPTIME ELECTRIC 1 1/14/2004 1-F

CONC T SHORT CIRCUIT COORDINATION STUDY

STUDY DATA FOR CONC T HOOD-PATTERSON & DEWAR

1 6/15/2005 6-A

CONC T HVAC SYSTEMS UPGRADES O & M MANUAL FOR HVAC UPGRADES W. B. WALLIS 1 2/15/2007 7-F

CONC T HVAC SYSTEMS UPGRADES HVAC O & M MANUAL #6508 GWINNETT SPRINKER 1 12/1/2006 1-F

Page 65: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 65

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL BUFFALO 1 2/28/2006 6-F

CONC T PARTIAL DEMOLITION OF CONCOURSE T

SPECIFICATIONS - 95% CONSTRUCTION DOCUMENTS

HSST 1 11/5/2004 1-F

CONC T FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 1/15/2004 1-C

CONC T HARMONIC STUDY STUDY REPORT WHITEHEAD ELECTRIC 1 3/30/2006 1-A

CONC T HVAC SYSTEMS UPGRADES FIRE ALARM SYSTEM HJAIA CONCOURSE T HVAC UPGRADES - NOTIFIER - O & M MANUAL FIRE ALARM SYSTEM

WFI GEORGIA, INC 1 1/1/2001 1-B

CONC T COSMETIC UPGRADES O & M MANUAL BRYSON CONSTRUCTION

2 12/29/2008 5-B

CONC T TRANSFORMER VAULT & ELECTRICAL ROOM ADDITION PROJECT

O & M MANUAL AND WARRANTY BRYSON CONSTRUCTORS

2 7/28/2009 4-F

CONC T NORTH RETROFIT - BUILDING AUTOMATION SYSTEM

O & M MANUAL HVAC 3RD FLOOR AATC / LEGAL JOHNSON CONTROLS 1 9/28/2009 9-B

CONC T VERTICAL TRANSPORTATION ESCALATOR T7 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20019028

KONE 1 7/9/2010 5-A

CONC T VARIABLE SPEED DRIVES SUBMITTAL

HVAC BHI/YASHAWA 1 3/10/2006 4-B

CONC T PRODUCT DATA WALLCOVERING SAMPLE SUBMITTALS SPECIALTY FINISHES 1 11/1/1995 4-F

Page 66: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 66

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T LAPTOP CARRIER SPLIT SYSTEM A / C

O & M MANUAL & SPECIFICATIONS WEDGEFIELD ASSOCIATES, INC

1 11/1/1998 4-F

CONC T FIRE SPRINKLER TEST & INSPECTION

T CON NORTH GSE DELTA DASH LINC GSE CINTAS 1 7/8/2010 6-B

CONC T COSMETIC UPGRADES HVAC UPGRADES - CONSTRUCION DOC DOA/ COA 1 1/20/2006 5-B

CONC T COSMETIC UPGRADES RELEASE FOR CONSTRUCION DOA/ COA 1 10/17/2006 5-B

CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS

SPECIFICATIONS ADDENDUM #1 BOOK 2 OF 2 ROBERT & CO 1 11/22/1994 2-C

CONC T VERTICAL TRANSPORTATION UPGRADE PHASE II

O & M MANUAL ESCALATOR T-5B KONE 1 2/14/2012 5-A

CONC T ISD T3 TELECOM ROOM EXPANSION

COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC

1 12/7/2011 1-A

CONC T ISD T3 TELECOM ROOM EXPANSION

O & M MANUAL, SPECIFICATIONS & WARRANTIES

RDH MECHANICAL 1 12/7/2011 3-F

CONC T FIS FACILITY SUBMITTAL DATA- OPERATIONS & MAINTENANCE MAUNAL & HVAC INSTRUCTIONS BOOK # 1

MALLORY EVANS 1 7/9/1979 2-F

CONC T VERTICAL TRANSPORTATION ESCALATOR T6 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018954

KONE 1 7/30/2012 5-A

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECIFICATION 262416 - PANELBOARDS OPERATION & MAINTENANCE MANUAL

CLEVELAND ELECTRIC 1 6/28/2012 7-B

Page 67: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 67

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS M0.1- SPLIT SYSTEMS O & M MANUAL, WARRANTY; TERMINAL UNITS O & M MANUAL, FANS O & M MANUAL

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 260511- SHORT CIRCUIT/ COORDINATION STUDY

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 262500- ENCLOSED BUS OPERATION & MANUAL

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 262300 SWITCHGEAR, 26241 SWITCHBOARDS, 262416 PANELBOARDS, & 262500 ENCLOSED BUS FIELD REPORTS

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 263213 GENERATOR & 263600 TRANSFER SWITCH O & M MANUALS INCLUDING WARRANTIES

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 262300- SWITCHGEAR O & M MANUAL INCLUDING WARRANTY

CLEVELAND ELECTRIC 1 6/28/2012 7-B

CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECS 262413- SWITCHBOARDS O & M MANUAL INCLUDING WARRANTY

CLEVELAND ELECTRIC 1 7/18/2012 7-B

CPTC ORIGINAL CONSTRUCTION T-1 CONTRACT

PLUMBING EQUIPMENT MANUALS AMC HEARD 1 10/9/1980 1-D

CPTC ORIGINAL CONSTRUCTION CPTC

GENERATOR SET SERVICE MANUAL SPECIFICATIONS

CUMMINS 1 4/1/1978 8-B

CPTC GENERAL MANUAL - CONC A & CPTC

GENERATOR SET SERVICE MANUAL GENERATOR # KTA-1150-GS

CUMMINS 1 3/1/1977 8-B

CPTC ORIGINAL CONSTRUCTION CPTC

GENERATOR SET SERVICE MANUAL SPECIFICATIONS OPERATIONS/INSTRUC.

CUMMINS 1 11/13/1985 8-B

Page 68: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 68

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC ORIGINAL CONSTRUCTION REST ROOM RENOVATIONS

REST ROOM EQUIPMENT DATA CONTRACTOR WARRANTY

CONLAN CO 1 10/7/1992 4-A

CPTC ORIGINAL CONSTRUCTION SPECS FOR CONTRACT PURCHASE OF ROTARY LOBE CONTROL AIR COMPRESSOR & DESICANT AIR DRYER

ATLAS COPCO 1 12/10/1985 1-D

CPTC ORIGINAL CONSTRUCTION CPTC

SPECIFICATIONS FOR T-1 CONTRACT VOL III STEVENS & WILKINSON 1 11/20/1978 3-A

CPTC ORIGINAL CONSTRUCTION ESCALATOR ADDITIONS

BID DOCUMENTS FOR ESCALATOR ADDITIONS DOA 1 6/25/1984 5-F

CPTC ORIGINAL CONSTRUCTION OWNER'S MANUAL FOR POWER MODULE CATERPILLAR 1 5/1/1987 8-B

CPTC ELEVATOR EQUIPMENT EVALUATION

ORIGINAL CONSTRUCTION MILLICAN ASSOC 1 1/16/1990 5-A

CPTC ORIGINAL CONSTRUCTION CPTC

T-1 SPECIFICATIONS VOLUMES 1 & II STEVENS & WILKINSON 1 3/21/1979 3-A

CPTC ORIGINAL CONSTRUCTION CPTC

T-1 CONTRACT DRAWING LIST STEVENS & WILKINSON 1 5/23/1979 1-F

CPTC ORIGINAL CONSTRUCTION CPTC

AIR CONDITIONING SYSTEM DESIGN CARRIER 1 1/1/1972 1-D

CPTC DISPATCH CENTER & MISC SECURITY IMPROVEMENTS

CONTRACT DOCS & SPECS FOR FAR 107.14 DISPATCH CENTER & MISC SECURITY IMPROVEMENTS

ROBERT & CO 1 4/3/1995 7-F

CPTC ORIGINAL CONSTRUCTION CPTC

MOTOROLA REPEATER MOTOROLA 1 9/30/1977 8-B

Page 69: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 69

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC ORIGINAL CONSTRUCTION CPTC

TELEPHONE GROUPS EMERGENCY TELEPHONES BAKER AUDIO 1 3/26/1992 8-B

CPTC ORIGINAL CONSTRUCTION CPTC

PLUMBING, AC & FIRE DAMPER TAG CHARTS LIMBACH ECONOMY 1 1/1/1979 9-D

CPTC MONTGOMERY ESCALATOR MAINTENANCE MANUAL MONTGOMERY 1 5/15/1975 5-F

CPTC ELECTRICAL ELECTRICAL TEST REPORT HOOD-PATTERSON DEWAR

1 3/1/1986 6-B

CPTC JETWAY MODEL 54-107 O & M MANUAL P. I. STEEL CORP 1 6/5/1980 5-D

CPTC JETWAY EQUIPMENT O & M MANUAL ABEX 1 8/1/1979 5-D

CPTC SURVEY YORK WATER CHILLER SYSTEM-EQUIPMENT & TESTING

STEVENS & WILKINSON 1 5/24/1982 2-A

CPTC ADJUSTABLE FREQUENCY AC CONTROLLERS 15-60 HP

INSTALLATION STARTUP, 0PERATION & MAINTENANCE OF ACCUTROL 200

WESTINGHOUSE 1 7/1/1984 6-E

CPTC HONEYWELL DELTA 1000 HVAC CONTROL AND MONITORING SYSTEM

ENERGY MANAGEMENT HONEYWELL 1 11/20/1980 9-C

CPTC MECH, PLUMB, OUTSIDE AIR PIPING ANALYSES

DATA MANUAL-PIPING ANALYSIS STEVENS & WILKINSON 1 6/26/1996 1-E

CPTC INTERIOR SIGN SPEC & FID FORMS DESIGN DOCS

INTERIOR GRAPHIC DESIGN SYSTEMS ACE & OSGOOD & ASSOC

1 7/17/1995 5-D

Page 70: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 70

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC PROJECT DESIGN FOR RETAIL & FOOD CONCESS

CONCESSIONS DESIGN CRITERIA MANUAL HCM 1 7/28/1995 2-D

CPTC ELECTRICAL SWITCHGEAR TESTING

LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR

1 11/1/1991 6-D

CPTC HAIA SHORT TERM SIGNAGE RETROFIT

SPECS HAIA 1 8/1/1994 2-D

CPTC ASBESTOS REMOVAL & DISPOSAL POST JOB

SUBMITTAL INFORMATION TRANSITE SHEETING REMOVAL

NEW SOUTH 1 1/7/1997 4-E

CPTC WIRELESS SERVICE MOTOROLA HDII C.I.T.E. CELL PRELIMINARY PROPOSAL

AIR TOUCH CELLULAR 1 10/1/1995 8-A

CPTC LIFE SAFETY & ENVIRONMENTAL

PROPOSAL FOR UPGRADE OF EXISTING COMPUTER INTERFACE FOR BUILDING MANAGEMENT SYSTEM

HONEYWELL 1 12/24/1991 2-C

CPTC PNEUMATIC & ELECTRONIC EQUIPMENT

SPECIFICATIONS & PRICE REFERENCE GUIDE HONEYWELL 1 8/1/1991 9-C

CPTC YORK 1995 T. M. MEETING NOTEBOOK

HEATING AND AIR CONDITIONING TRAINING YORK 1 7/6/1995 6-E

CPTC YORK AIR CONDITIONING & REFRIGERATION

REPORTS OF EDDY CURRENT INSPECTION YORK 1 1/1/1996 6-B

CPTC NATL INSTITUTE FOR CERTIF IN ENG. TECH.

PROGRAM DETAIL MANUAL FOR CERT IN FIRE PROT, SPEC HAZARDS, LAYOUT, SPRINKLER & FIRE ALARMS

NICET 1 5/1/1996 6-B

CPTC FOXBORO COMPANY PRODUCT SPECIFICATION SHEETS

PRODUCT CATALOG INSTRUMENTATION SPEC FOXBORO 1 3/1/1997 9-C

Page 71: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 71

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC LEASE OUTLINE DWGS HCM LEASE OUTLINE DRAWINGS ALL LOCATIONS HCM 1 9/14/1995 2-E

CPTC TEXT OF PRERECORDED MESSAGES

BAKER AUDIO TELECOM BAKER AUDIO 1 9/14/1995 9-A

CPTC FOXBORO INSTRUCTION BOOK 3473

743CB FIELD STATION MICRO CONTROLLER FOXBORO 1 2/1/1996 9-A

CPTC ILLUMILES CORPORATION A LIGHTING RETROFIT FOR HARTSFIELD- PROPOSAL

ILLUMELEX CORP 1 8/16/1994 4-F

CPTC ELEVATOR MAINTENANCE EVAL SURVEY REPORT

ELEVATOR EQUIPMENT-EVALUATION SURVEY REPORT

G. ALAN NEWTON INC 1 5/31/1996 5-F

CPTC PTL EQUIPMENT MANUFACTURING

ELEVATOR FIXTURES PTL EQUIP MANUF CO 1 1/1/1992 5-E

CPTC CRISIS ALERT SYSTEM SUPERVISED COMMUNICATIONS SYSTEM PROPOSAL FOR HAIA

RING COMM INC 1 4/1/1992 8-A

CPTC FOXBORO INSTRUCTION BOOK 3435 1/A SERIES

INTELLIGENT MAGNETIC FLOW TRANSMITTER MODEL IMT20

FOXBORO 1 7/1/1996 8-A

CPTC PROJECT MANUAL TERMINAL REROOFING

TERMINAL ADMINISTRATIVE AREA & BOILER PLANT CONTRACT #01-5440.1

CONLEY DESIGN GROUP

1 9/1/1997 4-B

CPTC DELTA CARPETING PROJECT - CONC A, B & T

PROJECT MANUAL FOR DELTA JOB #41227.00 GENERAL CONSTRUCTION PHASE II A, B & T

ROSSER 1 12/16/1994 2-F

CPTC OIL-WATER SEPARATORS & ACCESSORIES

TECHNICAL ENGINEERING MANUAL FOR OIL-WATER SEPARATORS & ACCESSORIES

MC TIGHE INDUSTRIES 1 1/1/1993 8-B

Page 72: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 72

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC DELTA RENOVATION PROJECT - CONC A, B & T

PROJECT MANUAL & ADDENDUM #1 JOB NO. 41227.00 RENOV. PUBLIC AREAS/GROUP RMS

ROSSER 1 1/19/1995 2-F

CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES I (ALL CONCOURSES)

LIMBACH ECONOMY 1 10/12/1978 9-E

CPTC ELECTRICAL SYSTEM ANALYSIS - CONC A, B, C, D &T

ELECTRICAL SYSTEM ANALYSIS ROSSER FABRAP 1 3/1/1987 6-B

CPTC SMOKING LOUNGE EXHAUST DUCT CLEANING

POST PROJECT REPORT - CONCOURSE T, A, B & C A.R.M. ENVIRONMENTAL INC (ALAMEDA CRUZ)

1 3/8/1997 3-E

CPTC ROOFING STANDARDS & MAINTENANCE MANUAL

ROOFING STANDARDS & MAINTENANCE MANUAL

CONLEY DESIGN GROUP

1 2/1/1998 4-B

CPTC ROOFING PROJECT - CONC T & "L" SECTION

CENTIMARK ROOF SYSTEMS - REPORT & PROPOSAL (3 BOOKS)

CENTIMARK 3 11/16/1995 4-B

CPTC DELTA STATIONS TRAINING & INFLIGHT REVS

PROJECT MANUAL - CONCOURSE A & T DERYCK MUEHLHAUSER

1 6/15/1988 3-C

CPTC CENTRAL PLANT, ATRIUM, CONC B & CONC E PHASE II

HVAC SOFTWARE DOCUMENTATION CENTRAL PLANT, TERMINAL ATRIUM, B & E

HONEYWELL / MC DEVITT STREET BOVIS

1 5/15/1995 9-C

CPTC CONC E PH. II - DELTA TENANT ADDS @ CONC E & CONC B

O & M MANUAL DAL LOUNGES & GROUP RM, BAG LEVEL COND. UNITS, CONCESS & BRITISH AIRWAYS

HONEYWELL 1 1/1/1995 9-B

CPTC SPRINKLER SYSTEM INFO FOR TERM,T,A,B,E

TRIPPING RECORD OF DRY-PIPE VALVE FACTORY MUTUAL SYSTEM

1 7/3/1997 6-B

CPTC UNITED AIRLINES RED CARPET ROOM

ROOF PENETRATIONS PATTON CONSTRUCTION

1 9/18/1998 4-A

Page 73: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 73

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC ANTENNA PLATFORMS (SATELLITE)

CRITERIA FOR PLACEMENT OF ANTENNA STRUCTURES

ACE 1 8/1/1998 1-B

CPTC FIRE SPRINKLER INSPECTION INSPECTION LOG, DISCREPANCY REPORT, PROPOSED SOLUTIONS-ZON T2,B23,B29,T8,B3

GWINNETT SPRINKLER CO

8 9/24/1998 6-B

CPTC ROOFING PROJECT ROOFING MANAGEMENT PROGRAM CONLEY DESIGN GROUP

1 2/1/1998 4-B

CPTC BREAKER TEST RESULTS LOW VOLTAGE BREAKER TESTS HOOD-PATTERSON DEWAR

1 2/1/1996 6-D

CPTC ELECTRICAL SWITCHGEAR TESTING

LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR

1 3/1/1994 6-D

CPTC ELECTRICAL SWITCHGEAR TESTING

CONCOURSES A,B,C,D, E & ATRIUM, MER-8 HOOD-PATTERSON DEWAR

1 5/1/1999 6-D

CPTC SIGN & GRAPHICS STANDARDS

GUIDELINES ACE 1 7/1/1997 5-D

CPTC ELEVATOR / ESCALATOR SURVEY & INVENTORY

EVALUATION OF CONDITION LERCH, BATES & ASSOC.

1 11/22/1999 5-E

CPTC WASTE MANAGEMENT DISPOSAL STUDY

ECONOMICAL VIABILITY FOR INCINERATOR DOUCET & MAINKA 1 7/17/1990 6-B

CPTC FIRE PROTECTION ANNUAL FIRE PUMP INSPECTION REPORT - 2000, 2002, 2003

ALLIANCE FIRE PROTECTION

1 12/31/2003 1-B

CPTC MIC STATION INTERFACE CARD

UPGRADE TO IEO 500 ACS FROM 500C-B INNOVATIVE ELEC. DESIGNS/BAKER AUDIO

1 10/1/1997 9-A

Page 74: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 74

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 1/10/1996 6-B

CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 5/1/1998 6-B

CPTC ENERGY CONSERVATION PROGRAM

ANALYSIS & OPPORTUNITIES SOUTHERN COMPANY 1 12/22/1997 6-B

CPTC DELTA COOLING TOWER DRAINS

INSTALLATION DRAWINGS - CONCOURSE A & T PERFORMANCE MECHANICAL

1 8/2/2000 8-F

CPTC AATC WALL FINISH ENHANCEMENTS

PROJECT MANUAL SIZEMORE FLOYD 1 2/26/1999 5-F

CPTC FACILITY ASSESSMENT & CONDITION SURVEY

SPECIALIZED BUILDING SYSTEMS LAW GIBB GROUP 1 3/3/2000 6-A

CPTC FACILITY ASSESSMENT & CONDITION SURVEY

ELECTRICAL SYSTEMS LAW GIBB GROUP 1 3/3/2000 6-A

CPTC FACILITY ASSESSMENT & CONDITION SURVEY

UTILITY SYSTEMS LAW GIBB GROUP 1 4/10/2000 6-A

CPTC FACILITY ASSESSMENT & CONDITION SURVEY

MECHANICAL SYSTEMS LAW GIBB GROUP 1 4/10/2000 6-A

CPTC FIRE PROTECTION ANNUAL FIRE PROTECTION INSPECTION REPORT - 2001, 2002, 2003

ALLIANCE FIRE PROTECTION

1 12/31/2003 1-B

CPTC CONC A & B REST ROOMS PRODUCT DATA - EXHAUST FANS, DAMPERS, DUCT

SHUMATE MECHANICAL

1 9/26/1991 3-E

Page 75: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 75

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC FAUCET & TOILET REPLACEMENT

SPECIFICATIONS TOTO U.S.A. INC. 1 11/10/2000 2-B

CPTC DISPATCH CTR IMPROVEMENTS PHASE 2

SPECIFICATIONS ACE 1 6/5/1998 3-C

CPTC DELTA COMM. RM. RENEWAL PHASE I

BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 10/16/1998 3-A

CPTC DELTA CRITICAL INFRASTRUCTURE PH III

BID PACKAGE - APPENDIX #1 FIBER OPTIC CABLE REV.

MACK A. YOUNG 1 2/4/1998 3-A

CPTC DELTA COMM. RM. RENOV. PH. III CONC.B,C,D

BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 2/16/1999 3-A

CPTC DELTA FIDS RENEWAL BID PACKAGE - SPECS & CONTRACT DOCS PROJECT MANAGEMET SVCS.

1 12/22/2000 3-A

CPTC DELTA AIRLINES DELTA COMMUNICATION ROOM RENO PHASE IV TO53, GSE, DELTA DASH -BID PACKAGE - SPECS & CONTRACT DOCS

AVIATION FACILITIES GROUP

1 3/19/1999 3-A

CPTC DELTA CRITICAL INFRASTRUC. PHASE II

BID PACKAGE - SPECS & CONTACT DOCS CONC. A & B

AVIATION FACILITIES GROUP

1 9/16/1997 3-A

CPTC DELTA PH II NEW COMM. RM ON A, B, D

BID PACKAGE - SPECS & CONTRACT DOCS AVIATION FACILITIES GROUP

1 1/19/1999 3-A

CPTC FIRE RISK ANALYSIS VALIDATION REVIEW REPORT (DRAFT) ACE 1 8/20/2000 1-B

CPTC N/A PRODUCT REFERENCE MANUAL OVERHEAD DOOR CO. OF ATLANTA

1 2/1/2002 4-E

Page 76: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 76

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC RMU REPORTS TIME & EVENT PROGRAM REPORTS AATC 1 8/30/1984 6-B

CPTC COSMETIC UPGRADES CONTRACT DOCUMENTS FC-7258-00 - PHASE 1A DOA 1 2/1/2002 5-B

CPTC SIGNAGE SURVEY ORIENTATION TO THE HIP '96 SIGNING & WAYFINDING PROGRAM

ACE / OSGOOD & ASSOCIATES

1 6/29/1995 5-D

CPTC ELEVATOR / ESCALATOR CONDITION AUDIT

MAINTENANCE & EQUIPMENT CONDITION LERCH, BATES & ASSOC.

1 11/22/1999 5-E

CPTC FIBER OPTIC EQUIP. ROOMS & RACEWAY

BID DOCUMENTS FC-7437-02 ACE 1 1/1/2002 2-E

CPTC AUTOMATED EXTERNAL DEFIBRILLATORS PH I

BID DOCUMENTS FC-7405-02 ACE 1 1/1/2002 2-D

CPTC REST ROOMS UPGRADE - PROTOTYPES

BID DOCUMENTS - FC-7495-02 CITY OF ATLANTA 1 9/17/2002 2-A

CPTC FIRE RISK ANALYSIS REPORT FIRE & LIFE SAFETY TVA 1 1/20/1999 2-C

CPTC COSMETIC UPGRADES BID DOCUMENTS - FC-7258-00 - PHASE 1A DOA 1 2/1/2001 5-B

CPTC ELECTRICAL SYSTEM ASSESSMENT

SURVEY OF EXISTING ELECTRICAL SYSTEMS & EVALUATION PHASES FINAL REPORT

ACE 1 8/1/2002 8-C

CPTC ELEVATOR EQUIPMENT EVALUATION

EVALUATION FOR ELEVATOR EQUIPMENT MILLICAN & ASSOC. 1 1/15/1990 5-E

Page 77: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 77

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC ELECTRICAL SYSTEMS ELECTRICAL SYSTEMS MAINTENANCE EVALUATION

MACK YOUNG 1 3/15/1990 4-F

CPTC INTERIOR ROOM/DOOR NUMBERING SYSTEM SIGNS

BID DOCUMENTS - ISSUED FOR REVIEW CITY OF ATLANTA 1 9/23/2002 2-A

CPTC REST ROOMS UPGRADES - PROTOTYPES

BID DOCUMENTS CITY OF ATLANTA 1 7/1/2002 2-A

CPTC AIRPORT SAFETY/CENTRALIZED COMMAND & CONTROL

FINDINGS AND RECOMMENDATIONS ROSS & BARUZZINI AND GLOVER/RESNICK

1 7/30/2002 2-C

CPTC FIRE DETECTION ALARM SYSTEM & FIRE SPRINKLER SYSTEM

REPORT NEWCOMB & BOYD 1 2/14/2003 6-B

CPTC HDP'S AIRPORT PROJECTS PROGRAM STATUS REPORT FOR 9/03 HDP 1 9/30/2003 1-A

CPTC HVAC SYSTEMS UPGRADE SCHEMATIC DESIGN DOCUMENTS STANLEY, LOVE-STANLEY & NEWCOMB & BOYD

1 10/8/2003 5-C

CPTC FIBER OPTIC ROOMS & RACEWAYS #FC-7437-02

WARRANTY, CLOSE OUT INFO, O & M NEW SOUTH 1 6/3/2003 4-B

CPTC CATHODIC PROTECTION RESURVEY

EVALUATION OF CATHODIC PROT SYSTEM FOR METALLIC UNDERGROUND FUEL TANKS

CORRPRO 1 12/5/2003 1-B

CPTC UTILITIES MASTER PLAN PHASE I

UTILITY SYSTEMS REPORT - VOLUME 1 & VOLUME 2

HPC 2 1/31/2004 8-B

CPTC UTILITIES MASTER PLAN PHASE I

UTILITY SYSTEMS REPORT - VOLUME 2 - APPENDICES

HPC 1 1/31/2004 8-B

Page 78: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 78

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC PROPERTY RISK ANALYSIS REPORT / SURVEY ALLIANZ GLOBAL RISKS 1 10/10/2003 4-F

CPTC AUTO EXTERNAL DEFIBRILLATORS PH 2

SPECIFICATIONS ACE 1 12/16/2004 2-E

CPTC FIRE ALARM CONTROL SYSTEM

O & M MANUAL SUNTECH SYSTEMS 1 6/23/2005 1-C

CPTC FIRE SUPPRESSION SYSTEM O & M MANUAL GWINNETT SPRINKLER 1 11/18/2004 1-B

CPTC HVAC SYSTEMS UPGRADE APPROVED SUBMITTALS FOR CONCOURSES A, B, C

PERFORMANCE MECHANICAL

1 6/23/2005 2-F

CPTC FIRE ALARM FIRE SUPPRESSION

O & M MANUAL PERFORMANCE MECHANICAL

1 6/23/2005 1-C

CPTC HVAC SYSTEMS UPGRADE COMMISSIONING REPORTS MANUAL FOR CONC A,B,C, - RMU UNITS & TERMINAL UNITS

PERFORMANCE MECHANICAL

1 6/23/2005 1-A

CPTC FIRE ALARM/FIRE SUPPRESSION

NFPA 72 CERTIFICATIONS FOR LANDSIDE, CONC T, A, B, C, D & E & FIRE PUMP TESTING

NEW SOUTH/H/B JV 1 8/19/2005 1-C

CPTC FIRE ALARM FIRE SUPPRESSION-HVAC

FIRE ALARM FIRE SUPPRESSION ABOVE GROUND TEST (SIGNED) CERTIFICATES

GWINNETT SPRINKLER 1 12/13/2004 1-C

CPTC FIRE ALARM FIRE SUPPRESSION-HVAC

CLOSE OUT DOCUMENTS/O & M MANUALS LIGHT FIXTURES/LIGHTING CONTROL SYSTEM

INGLETT & STUBBS 1 11/17/2004 1-C

CPTC FIRE ALARM FIRE SUPPRESSION-HVAC

CLOSE OUT DOCS/ O &M MANUALS FIRE ALARM SYSTEM ROUGH-IN, PA SYSTEM SPEAKERS, MODULAR WIRING SYSTEM

INGLETT & STUBBS 1 11/17/2004 1-C

Page 79: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 79

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC WATER TREATMENT AUDIT WATER BASED SYSTEMS ANALLYSIS H2O MEYER 1 9/14/2005 2-A

CPTC UTILITIES MASTER PLAN PHASE I

ENERGY COST REDUCTION EVALUATION FINAL DRAFT SUBMITTAL

HPC 1 2/17/2003 7-E

CPTC FIRE PROTECTION 2005 ANNUAL FIRE SPRINKLER INSPECTION REPORT

LIFE SAFETY SYSTEMS 1 7/27/2005 6-B

CPTC CATHODIC PROTECTION UNDERGROUND TANKS

RESURVEY UNDERGROUND STORAGE TANK SYS EVALUATION REPORT

CORRPRO 1 11/24/2006 1-B

CPTC ELECTRICAL STUDY AUTO CAD DRAWINGS OF TERMINAL, A, B, C, D, & T

HOOD-PATTERSON & DEWAR

1 4/1/2005 7-F

CPTC SHORT CIRCUIT COORDINATION STUDY

STUDY DATA FOR MAIN TERMINAL HOOD-PATTERSON & DEWAR

1 6/13/2005 6-A

CPTC FIRE ALARM - FIRE SUPPRESSION

SUBMITTALS & BULLETINS NEWCOMB & BOYD 1 12/16/2003 1-C

CPTC CONSTRUCTION LOGISTIC 2008 FIRST QUARTER REVIEW DOA 1 1/23/2008 7-D

CPTC CONSTRUCTION LOGISTICS 2008 THIRD QUARTER REVIEW DEPT OF AVIATION 1 1/1/2008 7-D

CPTC DELTA AIRLINE ENABLING WORK BAGGAGE HANDLING SYSTEM EXP(BHS)

BID PACKAGE #4 - ADDENDUM No. 1 - CONFORMED DOCUMENTS

PGAL 1 9/10/2007 9-F

CPTC FACILITY ASSESSMENT & CONDITION SURVEY

REQUEST FOR PROPOSAL EMC ENGINEERS 1 6/18/1999 6-A

Page 80: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 80

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC AUTOMATED EXTERNAL DEFIBRILLATOR

TRANSITION PLAN DOA 1 11/1/2006 7-D

CPTC LIGHTING SURVEY LIFE SAFETY ANALYSIS SURVEY - VOL 1 NEWCOMB & BOYD 1 2/14/2003 2-C

CPTC LIGHTING SURVEY LIFE SAFETY ANALYSIS SURVEY - VOL 2 NEWCOMB & BOYD 1 2/14/2003 2-C

CPTC FIRE ALARM SYSTEM FIRE ALARM BACKBONE NEWCOMB & BOYD 1 1/9/2004 1-C

CPTC FA/FP/LS/HVAC UPGRADES CONTROL SYSTEM RESUBMITTAL CONCOURSES A, B, C, & D

NEWCOMB & BOYD 1 1/13/2005 9-D

CPTC FIRE ALARM SYSTEM EQUIPMENT DATA SHEET NEWCOMB & BOYD 1 11/5/2003 1-C

CPTC FIRE ALARM SYSTEM REVISED PRODUCT DATA NEWCOMB & BOYD 1 12/1/2003 1-C

CPTC FA/FS/HVAC UPGRADES CONCOURSES A, B, C, & D - CONTROL SYSTEM O & M MANUAL

JOHNSON CONTROLS 1 11/21/2005 9-D

CPTC FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 1 OF 5 - CPTC

BUFFALO 1 2/28/2005 6-F

CPTC SECURITY ACCESS CONTROL RFP DOA 1 7/1/2004 9-C

CPTC FIRE PROTECTION 2002 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION

1 12/31/2002 1-C

Page 81: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 81

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC FIRE PROTECTION 2002 ANNUAL FIRE PUMP INSPECTION REPORT ALLIANCE FIRE PROTECTION

1 12/31/2002 1-C

CPTC FIRE PROTECTION 2001 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION

1 12/31/2001 1-C

CPTC FIRE PROTECTION 2000 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION

1 12/31/2000 1-C

CPTC CENTRALIZED PAGING SYSTEM

CONCEPT DEVELOPMENT/SCHEMATIC DESIGN REPORT

HARTSFIELD PLANNING COLLABORATIVE

1 10/18/2004 7-F

CPTC INTERIOR ROOM/DOOR NUMBERING SYSTEM

SIGN SCHEDULES - REVISION 1 & PROJECT MANUAL

DOA 1 3/30/2004 2-A

CPTC REMOTE RECEIVER FACILITY RELOCATION

PROJECT SPECIFICATIONS DOA 1 12/5/2003 8-B

CPTC FIRE DETECTION AND ALARM SYSTEM MODIFICATIONS

LIFE SAFETY UPGRADES - REVISED SCHEMATIC DESIGN REPORT

ACE 1 6/1/2002 2-C

CPTC HVAC SYSTEMS UPGRADES CONC A, B, C, & D CONTRACT DOCUMENTS STANLEY, LOVE-STANLEY, NEWCOMB & BOYD

1 1/14/2004 7-F

CPTC DOA SOUTH SECURITY CHECKPOINT

SECURITY REVOLVING DOOR O & M MANUAL W G YATES & SONS CONSTRUCTION

1 11/14/2008 8-A

CPTC E-CONCOURSE TICKET COUNTER REPLACEMENT PROJECT

O & M MANUAL NEW SOUTH CONSTRUCTION

1 1/30/2009 7-E

CPTC BLAST FILM INSTALLATION PROJECT - CONC T AND BADGING OFFICE

AEGIS FILMS WARRANTY - MADICO SAFETYSHIELD WARRANTY - AEGIS FILMS - WINDOW CLEANING INSTRUCTIONS

AEGIS FILMS 1 2/19/2009 2-C

Page 82: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 82

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC BAKER AUDIO WARRANTY AND SERVICE PROCEDURES BAKER AUDIO 1 12/15/2006 4-B

CPTC FIRESTOP GEORGIA FIRESTOP INC. PROPOSAL GFI 1 2/10/2000 4-B

CPTC PASSPORT CONTROL LCD REPLACEMENT

SUBMITTALS INFAX, INC 2 7/6/2009 9-C

CPTC SKYLIGHT REPLACEMENT PHASE 1 - PROGRAM VALIDATIN & DEFINITION - REPORTS - TERM, CONC T, A & B FINAL

AVIATION CONSULTANTS

1 9/1/2009 4-C

CPTC LIFE SAFETY LIFE SAFETY REPORT - TERMINAL & CONCOURSES - PHASE I DWG & EVAC PLANS

R. L. BROWN & ASSOCIATES

1 7/14/2009 2-C

CPTC APM TUNNEL STRUCTURAL SURVEY

PROJECT DEFINITION FINAL REPORT - REVISED HSST 1 8/21/2009 9-A

CPTC APM TUNNEL STRUCTURAL SURVEY

PROJECT DEFINITION FINAL REPORT HSST 1 6/29/2009 9-A

CPTC DAL BAGGAGE HANDLING SYSTEM (BHS) PROJECT - PHASE 2

SITE SAFETY PLAN & HAZARDOUS COMMUNICATION PLAN

VANDERLANDE INDUSTRIES

1 12/1/2009 2-C

CPTC VERTICAL TRANSPORTATION UPGRADE PHASE 1

CODE COMPLIANT SAFETY UPGRADES PHASE 1 CLOSE OUT DOCUMENTS

KONE 1 1/12/2010 5-A

CPTC DOA SECURITY CHECKPOINT SECURITY REVOLVING DOOR O & M MANUAL / PARTS LIST

HORTON 1 2/6/2010 8-A

CPTC HVAC SYSTEMS UPGRADES CONC A, B, C, & D CONTRACT DOCUMENTS STANLEY, LOVE-STANLEY, NEWCOMB & BOYD

1 3/25/2004 8-B

Page 83: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 83

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC UPGRADES - CONC A & B SPECIFICATION - 7369 HSST 1 8/21/2008 1-F

CPTC TSA BAGGAGE HANDLING SYSTEM (BHS)

TRANSITION PLAN DOCUMENT DOA 1 9/1/2006 6-B

CPTC CARPET REPLACEMENT - CONC T, A, B, C, & D

CLOSEOUT DOCUMENTS CPS 1 2/26/2010 2-F

CPTC PASSPORT CONTROL SIGNAGE REPLACEMENT

CLOSE OUT DOCUMENTS INFAX 1 2/26/2010 9-C

CPTC FIRE RISK ANALYSIS EXECUTIVE BRIEF - FIRE AND LIFE SAFETY MANUAL & DRAWINGS

TVA 1 3/17/1999 2-C

CPTC CONRAC CPTC APM STATION CITY OF ATLANTA 1 5/14/2007 2-E

CPTC ATL AIRPORT LIFE SAFETY UPGRADES

FA /FP SYSTEMS UPGRADES ACE 1 3/20/2001 2-C

CPTC COSMETIC UPGRADES O & M MANUAL VOLUME 1 - CONCOURSE A & B NEW SOUTH CONSTRUCTION

1 8/1/2007 5-B

CPTC COSMETIC UPGRADES O & M MANUAL VOLUME 2 - CONCOURSE A & B NEW SOUTH CONSTRUCTION

1 8/1/2007 5-B

CPTC RE-ROOF PROJECT CONCOURSES A & B RE-ROOFING SPECIFICATIONS

RAYMOND ENGINEERING

2 10/5/2006 4-A

CPTC FIRE SAFETY PROGRAM POLICY & PROCEDURES CITY OF ATLANTA 1 5/17/2002 2-C

Page 84: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 84

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC TSA WBI REPOSITIONING WBI REPOSITIONING - ISSUE FOR CONSTRUCTION

CARTER BURGESS 1 2/9/2010 6-B

CPTC HJAIA FA/FS PROJECT CLOSE OUT DOCUMENTS / O & M MANUAL - LIGHT FIXTURES & LIGHTING CONTROL SYSTEM (A - D)

NEW SOUTH 1 11/17/2004 1-B

CPTC SKYLIGHT REPLACEMENT PHASE 2 - 95% CONSTRUCTION DOCUMENT REPORT - FINAL

DOA / CITY OF ATLANTA

1 4/30/2010 4-C

CPTC SKYLIGHT REPLACEMNT PHASE 2 - 95% CONSTRUCTION DOCUMENT SPECS

DOA / CITY OF ATLANTA

1 4/30/2010 4-C

CPTC HVAC INFORMATION MANUAL ABS 1 2/1/1998 4-F

CPTC LIGHTING ENERGY CONSERVATION

ORIGINAL CONSTRUCTION SPECS ENERTRON 1 9/1/1984 4-F

CPTC CHROMALOX HOT WATER CIRCULATION SYSTEMS

ORIGINAL CONSTRUCTION CHROMALOX 1 4/6/1984 4-F

CPTC SWITCHGEAR SWITCHGEAR AIR MAGNETIC CIRCULATION BREAKER WITH SOLENOID INSTRUCTION

ABB SERVICE 1 12/1/1973 4-F

CPTC BOARDING BRIDGES TROUBLESHOOTING PROCEDURES & DIAGRAMS STEARNS AIRPORT EQUIPMENT

1 5/1/1986 4-F

CPTC BRIGHTNESS CONTROL CONSTANT CURRENT REGULATION

INSTRUCTION MANUAL HEVI-DUTY ELECTRIC COMPANY

1 10/1/1997 4-F

CPTC ROOF REPAIRS CONC A, B, C & D, FIS INTERNATIONAL & BOILER ROOM

LANCE ROOF INSPECTION SERVICE

1 10/23/1989 4-A

Page 85: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 85

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC ELECTRICAL SYSTEM ASSESSMENT

SURVEY OF EXISTING ELECTRICAL SYSTEMS & EVALUATION, FINDINGS & RECOMMENDATIONS

ACE 1 5/1/2002 6-E

CPTC ELECTRICAL SWITCHGEAR TESTING

LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR

1 12/1/1987 6-D

CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 1/10/1996 6-B

CPTC MASTER PLAN TECHNICAL REPORT

VOLUME 1 - PUBLIC INVOLVEMENT, SUMMARY OF SCOPING SESSION, VISION & POLICY DOC & EXISITNG CONDITION

CITY OF ATLANTA / DOA

1 9/1/1996 6-C

CPTC MASTER PLAN TECHINICAL REPORT

VOLUME 2 - EVAL OF LONG TERM ALTERNATIVES, OPS & ECONOMIC ANALYSIS & FUNCTIONAL ANALYSIS

CITY OF ATLANTA / DOA

1 11/1/1998 6-C

CPTC MASTER PLAN TECHINICAL REPORT

VOLUME 3 - ENVIRONMENTAL EVAL, FINANCIAL PLAN, COMMUNITY DEVELOPMENT OPPORTUNITIES & RECOMMENDED PLA

CITY OF ATLANTA / DOA

1 9/1/1999 6-C

CPTC LIGHTING CONTROL SOLUTIONS

HSOFT-CM1 OPERATING SOFTWARE USER'S MANUAL

HORTON CONTROLS 1 1/1/2000 8-A

CPTC LLIGHTING CONTROL PROGRAMMING, MONITORING & CONTROL; WIN CONTROL FOR WIN 95/98 & NT

HORTON CONTROLS 1 2/15/2000 8-A

CPTC FIRE PUMP TESTING 2010 ANNUAL SPRINKLER REPORT - CONC A, B & E

CINTAS 1 11/18/2010 6-B

CPTC DELTA FIDS RENEWAL - PLASMA SCREENS

SPECS. - PIONEER 40" PANEL PDP-V401 PIONEER 1 9/1/1998 9-A

CPTC WIFI MUFIDS EQUIPMENT ROOMS

HVAC UPGRADE - MECHANICAL O & M MANUAL F & S MECHANICAL 1 10/28/2010 7-A

Page 86: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 86

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC WIFI MUFIDS EQUIPMENT ROOMS

HVAC UPGRADE -ELECTRICAL O & M MANUAL NEW SOUTH 1 10/28/2010 7-A

CPTC FIRE PROTECTION 2010 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION

1 12/31/2010 1-C

CPTC FIRE ALARM SYSTEM TRAINING

INTRODUCTION TO NETWORK LAYOUT AND MAJOR COMPONENTS

AATC 1 1/1/2011 1-B

CPTC SKYLIGHT REPLACEMENT SUBMITTALS - TERM, CONC T, A & B AVIATION CONSULTANTS

1 7/2/2010 4-C

CPTC FIRE ALARM/FIRE SUPPRESSION/HVAC

WARRNTY MANUAL - LANDSIDE, CONC T, A, B, C, D & E

NEW SOUTH/H/B JV 1 8/19/2005 1-C

CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES II (ALL CONCOURSES)

LIMBACH ECONOMY 1 10/12/1978 9-E

CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES III (ALL CONCOURSES)

LIMBACH ECONOMY 1 10/12/1978 9-E

CPTC DELTA AIRLINES SKY CLUBS T7, A17, A-SPINE, B25 & E15 CLOSE OUT MANUAL

BRYSON 1 3/15/2011 7-A

CPTC DELTA AIRLINES - BAGGAGE HANDLING SYSTEM (BHS) EXP ENABLING

CLOSEOUT MANUAL NEWCOMB & BOYD 1 3/14/2011 2-F

CPTC ROOF WARRANTY WARRANTY - MAIN TERMINAL, CONC T - E MISC COMPANIES 1 3/13/2007 4-A

CPTC T-MOBILE HOT SPOT INSTALLATION T-MOBILE 1 3/7/2003 8-A

Page 87: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 87

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC SMOKING LOUNGE SPECIFICATIONS STANLEY LOVE-STANLEY

1 7/30/2004 3-E

CPTC DELTA AIRLINES SKY CLUB PROJECT PHASE 2

CLOSE OUT DOCUMENTS - A17, A-SPINE, B25, E15 & T7

BRYSON 1 2/1/2011 7-A

CPTC COSMETIC UPGRADES CONCOURSE A & B SPECIFICATIONS 100% CONSTRUCTION DOC

HSST 1 11/29/2005 5-B

CPTC COSMETIC UPGRADE HOLDROOM WAINSCOT & CARPET TRIM CONCOURSES T, A, B, C, & D

SCOTT ASSOCIATES 1 1/28/2008 5-B

CPTC DOA CONCRETE REPAIR SPECIFICTIONS

HIGH EARLY STRENGTH CEMENT CONCRETE PAVEMENT - SPECIFICATIONS

DOA 1 7/13/2011 4-E

CPTC ELEVATOR INTERCOM SYSTEM UPGRADE - 2011

CLOSE OUT DOCUMENTS BAKER AUDIO 2 7/25/2011 9-A

CPTC UNDERGROUND STORAGE TANK SYSTEM

CATHODIC PROTECTION SYSTEM EVALUATION REPORTS - N & S TERM, CONC A-D

CORRPRO 1 8/12/2009 1-B

CPTC DELTA AIRLINES TENANT RELOCATION C33, D13 & D27 OWNERS MANUAL

BYRSON CONSTRUCTORS

1 9/7/2011 7-B

CPTC FIRE PUMP TESTING ANNUAL FIRE PUMP INSPECTION REPORT - TERM, CONC T - E

CINTAS 1 9/30/2011 6-B

CPTC DELTA AIRLINES CONCOURSES T, A & B ACS BREAKROOM INTERIOR UPGRADES APRON LEVEL

DELTA AIRLINES 1 11/1/2011 2-A

CPTC PAGING SYSTEM REPLACEMENT & UPGRADES

EQUIPMENT SUBMITTAL PEAVEY BAKER 1 7/20/2005 7-F

Page 88: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 88

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC STATIC UNINTERRUPTIBLE POWER SUPPLY

O & M MANUAL CLEVELAND ELECTRIC 1 8/30/2011 7-B

CPTC FIRE PROTECTION 2009 ANNUAL FIRE ALARM INSPECTION KRATOS 1 12/31/2009 1-B

CPTC FIRE PROTECTION 2007 ANNUAL SPRINKLER REPORT BROWN FIRE PROTECTION

1 7/30/2007 1-B

CPTC FIRE PROTECTION 2007 ANNUAL FIRE ALARM INSPECTION WFI 1 2/1/2007 1-B

CPTC ABOVE GROUND PIPING CONTRACT'S MATERIAL & TEST CERTIFICATE GWINNETT SPRINKLER 1 8/4/2004 6-B

CPTC FIRE PROTECTION 2008 ANNUAL FIRE ALARM INSPECTION KRATOS 1 12/30/2008 1-A

CPTC HVAC LOAD CALCULATIONS CONCOURSES A & B FOR YEAR 2015 - DRAFT COPY

NEWCOMB & BOYD 1 4/1/2003 5-C

CPTC NOTI-FIRE-NET NOTIFIER SYSTEM TRAINING MANUAL NOTIFIER 1 8/12/2004 1-B

CPTC ELECTRICAL EQUIPMENT RENOVATIONS

CONC C & D LOW VOLTAGE ELECTRICAL DISTRIBUTION STUDY

CITY OF ATLANTA 1 10/7/2011 8-A

CPTC NOTIFIER TRAINING MANUAL NOTIFER/HONEYWELL 1 3/24/2005 1-B

CPTC LIGHTING CONTROL SHOP DRAWINGS, CONTROL, MODULAR WIRING SYSTEM

NEWCOMB & BOYD 1 12/19/2003 8-A

Page 89: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 89

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

CPTC TERMINAL & CONCOURSE LIFE SAFETY UPGRADES & UPDATES PHASE II

SPECIFICATIONS SCOTT & ASSOCIATES 1 10/12/2011 2-C

CPTC CONCOURSE T & TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

LETTER OF WARRANTY - DEFICIENCY LIST CLEVELAND ELECTRIC 1 7/18/2012 5-E

CPTC CONCOURSE T & TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS

SPECIFICATIONS - CONCESSIONS SWITCHBOARDS, PANELS & ENCLOSED BUS O & MANUAL

CLEVELAND ELECTRIC 1 6/28/2012 5-D

CPTC VERTICAL TRANSPORTATION PHASE II

ECO MODS WARRANTY KONE 1 9/14/2012 5-A

CPTC FIRE ALARM/ FIRE SUPRESSION PROJECT

MODULAR WIRE SYSTEM RESUBMITTALS FOR APPROVAL

INGLETT & STUBS 1 2/1/2004 7-B

MHJIT GLYCOL RELOCATION O & M MANUAL PLAYER AN COMPANY 1 2/13/2006 7-D

REFERENCE EXPANSION JT COMPRESSION SEALS ARCHITECTURAL JOINTS

ARCHITECTURAL CATALOG - ALSO FIRE BARRIERS, CONCRETE REPAIR

WATSON BOWMAN ACME

1 8/24/2004 4-E

REFERENCE PROGRAMMING DATA FOR FIS AIR UNITS

PROGRAMMING DATA FOR FIS AIR UNITS HONEYWELL 1 9/2/1986 9-C

REFERENCE ENGINEERING DATA FOR FIS ENGINEERING DATA FOR FIS HONEYWELL 1 4/1/1978 9-C

REFERENCE MAINTENANCE MANUAL MAINTENANCE MANUAL RP920A-D MODULAR PNEUMATIC CONTROLLER

HONEYWELL 1 2/1/1984 9-C

REFERENCE ASSET MANAGEMENT PROGRAMMING DATA

ASSET MANAGEMENT PROGRAMMING DATA HONEYWELL 1 7/21/1977 9-D

Page 90: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 90

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE ASSET MANAGEMENT ENGINEERING DATA

ASSET MANAGEMENT ENGINEERING DATA HONEYWELL 1 1/22/1982 9-D

REFERENCE PNEUMATIC CONTROL SYSTEMS

P 101 INSTRUCTOR MANUAL HONEYWELL 1 7/1/1977 9-B

REFERENCE INDUSTRIAL ELECTRIC MOTORS

APPLICATION AND SPECIFICATIONS- VOL. I PLANT ENGINEERING LIBRARY

1 1/1/1981 4-C

REFERENCE SCIENCE OF PLANT UTILITIES CONTROL

ELECTRICAL VOL. II PLANT ENGINEERING LIBRARY

1 1/1/1981 4-C

REFERENCE ANDOVER CONTROLS USERS MANUAL ANDOVER CONTROLS 1 10/22/1985 4-D

REFERENCE RENEWAL PARTS PROPOSAL QUOTATION RELIANCE ELECTRIC 1 4/4/1991 4-C

REFERENCE CORRECTIVE MEASURES PROGRAM

CORRECTIVE MEASURES PROGRAM STEVENS & WILKINSON 1 5/19/1981 4-C

REFERENCE INDUSTRIAL APPLICATIONS INDUSTRIAL APPLICATIONS OF ADJUSTABLE SPEED DRIVES

P.E.A.C 1 3/24/1987 4-C

REFERENCE MIAMI INTL. AIRPORT TERMINAL BLDG

DESIGN GUIDELINES MANUAL VOL. I METRO-DADE COUNTY AVIATION DEPT.

1 3/1/1989 4-C

REFERENCE MIAMI INTL. AIRPORT TERMINAL BLDG

DESIGN GUIDELINES MANUAL VOL. II METRO-DADE COUNTY AVIATION DEPT.

1 3/1/1989 4-C

REFERENCE AC ADJUSTABLE FREQUENCY DRIVES

INSTRUCTION MANUAL FOR CENTRIFUGAL FAN AND PUMP APPLICATION

GRAHAM 2 7/1/1986 5-C

Page 91: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 91

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE ANDOVER CONTROLS ENGINEERING / APPLICATION MANUAL ANDOVER CONTROLS 1 6/1/1991 4-D

REFERENCE NONE ENERGY EVALUATION & MANAGEMENT MANUAL FOR AIRPORTS

HARLEY ELLINGTON PIERCE & YEE

1 4/18/1990 4-F

REFERENCE JET POWER JETWAY SYSTEMS REPLACEMENT PARTS MANUAL AVIATION SYSTEM INC. 1 11/1/1989 5-C

REFERENCE GE TOTAL LIGHTING CONTROLS

PART I UNDERSTANDING LIGHTING CONTROL FULL LINE CATALOG

GE 1 7/1/1994 6-E

REFERENCE NATURAL GAS MINI COURSE NATURAL GAS MINI COURSE SUNRISE ENERGY CO 1 2/16/1989 4-D

REFERENCE NAPCO SECURITY SYSTEMS TRAINING COURSE NAPCO SECURITY SYSTEMS

1 8/1/1988 4-D

REFERENCE AEE ENERGY PROGRAMS BOILER OPTIMIZATION AEE 1 2/13/1989 4-C

REFERENCE GA POWER RULES, REGULATIONS & RATE SCHEDULES FOR ELECTRIC SERVICE

GA POWER 1 11/2/1987 4-D

REFERENCE ANNUBAR FLOW MEASUREMENT

FLOW MEASUREMENT FOR DOMESTIC WATER SUPPLY MANUAL

DIETERICH STANDARD CO

1 9/29/1983 4-D

REFERENCE SERIES 250 SATT DIGITAL CLOCKS INSTALLED BY DOA 1986 O & M S & INSTRUCTION MANUAL

INTEGRATED SYSTEMS ENGINEERING

1 10/1/1985 4-D

REFERENCE SIMPLE GREEN ALL PURPOSE CLEANER

SUMMARY OF TOXICOLOGICAL DATA OF SIMPLE GREEN WITH LONZO BARDAC 205M

SUNSHINE MAKERS INC 1 8/20/1986 4-D

Page 92: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 92

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE ESCALATOR & MOVING WALK EQUIP EVALUATION

ESCALATOR & MOVING WALK EQUIPMENT EVALUATION

MILLICAN & ASSOC 1 1/25/1990 5-A

REFERENCE ADJUSTABLE FREQUENCY AC DRIVE

ADJUSTABLE FREQUENCY AC DRIVE EATON 1 1/1/1989 4-D

REFERENCE GA POWER ELEC SERVICE METER INSTALLATION

INSTALLATION BOOK GA POWER 1 4/1/1988 4-D

REFERENCE ENGINEERING ANALYSIS OF HEAT EXCHANGER

ANALYSIS OF HEAT EXCHANGER TUBE FAILURE DETERMINE CAUSE BY SEVERAL TESTS ON SAMPLE

LAW ENGINEERING TESTING CO

1 3/11/1987 4-D

REFERENCE BASIC BUFFER PLUS INSTRUCTION MANUAL BLACK BOX CORP 1 4-D

REFERENCE SCR / SCRF SERIES BATTERY CHARGER

SCR / SCRF SERIES BATTERY CHARGER SINGLE PHASE INPUT OPERATING & SERVICE INSTRUCTIONS

ALCAD INC 1 1/1/1992 4-D

REFERENCE RELIANCE FUSE HANDBOOK FUSE OVERCURRENT PROTECTION HANDBOOK RELIANCE ELECTRIC 1 1/1/1982 5-D

REFERENCE INTERNATIONAL WASTE INCINERATOR EMMISSION STUDY

INTERNATIONAL WASTE INCINERATOR EMISSIONS STUDY

CLAYTON ENVIRONMENT. CONSULTANT

1 7/22/1983 5-C

REFERENCE MANAGING YOUR ENERGY GUIDELINES FOR LIGHTING ENERGY CONSERVATION

I E S 1 6/10/1985 4-D

REFERENCE SYMBOL SIGNS 2 PASSENGER / PEDESTRIAN ORIENTED SYMBOLS FOR USE IN TRANSPORTATION RELATED FACILITIES

AMERICAN INSTITUTE OF GRAPHIC ARTS

1 3/1/1979 4-E

REFERENCE COMMERCIAL GAS WATER HEATER

INSTALLATION, SERVICE & MAINTENANCE MANUAL FOR GAS GLASS LINED TANK TYPE WATER HEATER

ASHMEL'S PLUMBING 1 10/29/1976 4-D

Page 93: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 93

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE MUFFIN MONSTER SUBMITTAL DATA D.W.S. 1 2/9/1989 4-E

REFERENCE MUFFIN MONSTER INSTALLATION, MAINTENANCE SERVICE MANUAL

D.W.S. 1 3/17/1989 4-E

REFERENCE JIM WALTER DOORS PARTS LIST MAINTENANCE MANUAL STEVENS & WILKINSON 1 4/1/1980 4-E

REFERENCE DYNAMIC ADJUSTABLE SPEED DRIVES & SYSTEMS

INSTRUCTION BOOK EATON 1 11/1/1986 4-E

REFERENCE MECHANICAL REFERENCE MANUAL

DUCT CONSTRUCTION STANDARDS S.M.A.C.N.A. 1 1/1/1975 4-E

REFERENCE DREW INDUSTRIAL DATA MATERIAL SAFETY DATA DREW INDUSTRIES 1 1/1/1986 2-C

REFERENCE LOCAL CLIMATOLOGICAL REPORTS

LOCAL CLIMATOGICAL DATA REPORTS NAT'L CLIMATIC DATA CENTER

1 7/21/1994 4-E

REFERENCE SIGNAGE SYMBOLS SIGNAGE SYMBOLS D.M.A. 1 8/13/1985 4-E

REFERENCE MODULAR CLIMATE CHANGER

INSTALLATION & MAINTENANCE DATA TRANE 1 12/19/1991 4-E

REFERENCE MONTGOMERY ELEVATORS MONTGOMERY ELEVATORS MONTGOMERY 1 6/3/1980 5-F

REFERENCE CENTRAL STATION A.H.U. CENTRAL STATION A.H.U. YORK 1 1/1/1981 4-E

Page 94: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 94

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE AC MOTOR EFFICIENCY GUIDE TO ENERGY CONSERVATION RELIANCE ELECTRIC 1 1/1/1979 4-E

REFERENCE POWER CAPACITORS ENERGY SAVINGS MYRON ZUCKER INC. 1 2/23/1978 4-E

REFERENCE ELECT. POWER MEASURE HANDBOOK

ELECTRICAL POWER MEASUREMENT HANDBOOK YOKOGAWA (YEW) 1 1/1/1979 4-E

REFERENCE PNEUMATIC CONTROL OF VAV CENTRAL FAN SYSTEM

PNEUMATIC CONTROL OF VARIABLE AIR VOLUME CENTRAL FAN SYSTEMS

BARBER COLEMAN CO 1 11/1/1980 4-E

REFERENCE GUIDE TO POWER FACTOR CORRECTION

GUIDE TO POWER FACTOR CORRECTION SPRAGUE 1 2/21/1983 4-E

REFERENCE ELECTRONICS DICTIONARY ELECTRONICS DICTIONARY RADIO SHACK 1 7/6/1983 4-E

REFERENCE SALVAJOR II COMMERCIAL DISPOSER

INSTRUCTION MANUAL SALVAJOR CO 1 8/4/1989 4-E

REFERENCE HOW TO CALCULATE FAULT CURRENTS

GRAPH AND FORMULA METHOD WESTINGHOUSE 1 4-E

REFERENCE CHILLER PLANT ADDITIONS TRANE CVHE CHILLERS TRANE 1 12/1/1989 4-E

REFERENCE KW CONTROL SYSTEMS KW CONTROL SYSTEMS KW CONTROLS 1 1/1/1986 4-E

REFERENCE ABS TRAINING MANUAL ABS TRAINING MANUAL GA POWER 1 1/1/1987 4-E

Page 95: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 95

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE SAFETY CODE FOR ELEV. & ESCALATORS

SAFETY CODE FOR ELEVATORS AND ESCALATORS ANSI & ASME 1 1/1/1981 2-C

REFERENCE RULES FOR SAFE DRINKING WATER

RULES FOR SAFE DRINKING WATER EPA 1 8/1/1983 2-A

REFERENCE RULES FOR AIR QUALITY CONTROL

RULES FOR AIR QUALITY CONTROL EPA 1 9/1/1995 5-D

REFERENCE BIOCLIMATIC PURIFICATION SYSTEMS

BIOCLIMATIC PURIFICATION SYSTEMS BIOCLIMATIC INC. 1 8/1/1989 2-A

REFERENCE NEVAMAR PLASTIC LAMINATE FABRICATION & INSTALLATION MANUAL

NEVAMAR CORP 1 1/1/1991 4-F

REFERENCE DURA-TRIM ALUMINUM ACCENTS, TRANSITIONS, FINISHINGS MM SYSTEMS CORP 1 1/1/1990 4-F

REFERENCE ANNUAL CPTC REVIEW ANNUAL BUILDING AND OPERATION REVIEW OF CPTC

ROSSER FABRAP 1 4/1/1990 8-F

REFERENCE LIGHTING FIXTURES SUBMITTAL DATA STEVENS & WILKINSON 1 12/29/1977 4-E

REFERENCE GE LIGHTING CATALOG GE LIGHTING CATALOG GE 1 3/1/1994 4-F

REFERENCE PEERLESS LIGHTING CATALOG PEERLESS LIGHTING CATALOG PEERLESS 1 1/1/1988 4-E

REFERENCE LINEAR LIGHTING CATALOG LINEAR LIGHTING CATALOG LINEAR 1 1/1/1989 4-F

Page 96: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 96

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE INSTALLATION & MAINTENANCE INSTRUCT

SAFETY INSTRUCTIONS FOR ESCALATOR INSTALLATION & MAINTENANCE MANUAL

MONTGOMERY 1 3/21/1975 2-C

REFERENCE AC DRIVES FLOW ECONOMIZER G

INSTALLATION MANUAL ABB INDUSTRIAL SYSTEMS INC.

1 6/1/1989 8-A

REFERENCE POWER MAKER MICRO UPS O & M MANUAL TOPAZ 1 4/1/1987 8-A

REFERENCE EMPLOYMENT PROVISIONS OF ADA

TECHNICAL ASSISTANCE MANUAL US EEOC 1 1/1/1991 4-D

REFERENCE ADA HANDBOOK EEOC 1 10/1/1991 4-D

REFERENCE DESIGNING FOR ACCESSIBILITY

OVERVIEW OF ADA BUILDING OPERATIONS MANAGEMENT

1 3/1/1992 4-D

REFERENCE ADA FEDERAL REGISTER PART III DEPT OF JUSTICE 1 8/16/1993 4-D

REFERENCE UNIFORM FEDERAL ACCESSIBILITY STANDARD

UNIFORM FEDERAL ACCESSIBILITY STANDARDS OF ADA

GENERAL SERVICES ADMINISTRATION

1 4/1/1988 4-D

REFERENCE GA DEPT OF NATURAL RESOURCES EPD

UNDERGROUND STORAGE TANK LITERATURE GA DEPT OF NATURAL RESOURCES

1 10/17/1995 4-F

REFERENCE GA DEPT OF NATURAL RESOURCES EPD

HAZARDOUS WASTE MANAGEMENT POLLUTION PREVENTION

GA DEPT OF NATURAL RESOURCES

1 3/25/1994 4-D

REFERENCE SHEET METAL & AC CONTRACTORS ASSOC.

SHEET METAL & AC (HVAC) CONTRACTORS NATIONAL ASSOCIATION STANDARDS

SMACNA 1 1/1/1975 4-F

Page 97: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 97

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE FIS DELTA SWITCHGEAR SUBMITTALS & DRAWINGS STEVENS & WILKINSON 1 5/8/1978 9-D

REFERENCE HOLDING TANKS APRON SEWER DIVERSION SYSTEMS AAE 1 8/16/1982 6-D

REFERENCE ENGINEER'S GUIDE TO PLANT OPERATIONS

ENGINEER'S GUIDE TO PLANT OPERATIONS NATIONAL ENGINEER 1 1/1/1980 8-C

REFERENCE TS1 OIL / WATER SEPARATOR INSTALLATION & SERVICE MANUAL ENQUIP INC. 1 6/1/1981 2-B

REFERENCE GATE PAK INJECTOR PRINCIPLE OF OPERATION

OPERATION & MAINTENANCE GATE CITY OIL EQUIPMENT CO. INC.

1 8-B

REFERENCE FACTS ABOUT KW220 TECHNICAL DATA QUESTIONS & ANSWERS TIF 1 6-D

REFERENCE DOORS UNLIMITED FOR EAL MAINTENANCE & INSTALLATION MANUAL NORTH AMERICAN ROLLING DOORS

DOORS UNLIMITED 1 9/27/1982 8-A

REFERENCE SERIES 808 ELECT POWER DEMAND ANALYZER

O & M MANUAL BOOKS #1, #2 & #3 DRANETZ 3 6/15/1983 5-D

REFERENCE ASCO SYNCHROPOWER SYSTEM

PROGRAM FOR AUTO SWITCH SYSTEM EMERGENCY BACK-UP POWER SYSTEM

ASCO 2 10/25/1993 5-C

REFERENCE GUIDELINES FOR AIRPORT SIGNAGE & GRAPHICS

ADA SIGNING AND GRAPHICS APPLE DESIGN 1 7/1/1994 5-D

REFERENCE FRY REGLET PRODUCT MANUALS

ALUMINUM ARCHITECTURAL MOLDINGS & FLASHING SYSTEMS

FRY REGLET 1 1/1/2002 4-F

Page 98: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 98

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE ADJUSTABLE FREQUENCY DRIVES 1703 SERIES

GRAHAM INSTALLATION O & M MANUAL OF 1703 SERIES 7.5 THROUGH 100 AMP

GRAHAM 1 7/1/1986 5-C

REFERENCE INITIAL PLACEMENT CORIAN DUPONT 1 5/1/1997 4-F

REFERENCE CONTROLS CATALOG REMOTE CONTROL SWITCH, AUTO TRANSFER SWITCH & POWER CONTROL SYSTEMS

ASCO 1 1/1/2000 4-F

REFERENCE OFFICE PRODUCTS PETER PEPPER PRODUCTS FIBERGLASS / COLUMN COVERS

PETER PEPPER PRODUCTS

1 6/5/1996 4-F

REFERENCE COSATRON AIR CLEANING SYSTEM PRODUCT INFORMATION, APPLICATION DATA & TECHNICAL

COSATRON 1 5/1/1992 5-C

REFERENCE ASHRAE STANDARD PROPOSED AMER STAND.

PUBLIC REVIEW DRAFT--ENERGY EFFICIENT DESIGN OF NEW NON-RESIDENTIAL BUILDINGS

ASHRAE 1 6/10/1985 5-D

REFERENCE PENTHOUSE CLIMATE CHANGER PCCB MODELS

O & M MANUAL AND INSTALLATION TRANE 1 8/1/1992 4-E

REFERENCE COMMERCIAL PRODUCTS ROOFING PRODUCTS

SPECIFICATIONS / DETAILS TAMKO ROOFING PRODUCTS

1 9/1/1997 4-B

REFERENCE TECHNICAL MANUAL E-POXY EXPANSION CONTRACTION JOINT SYSTEMS

E-POXY 1 2/27/1997 5-C

REFERENCE COMPUTER ACCESS CONTROL SYS - FAR 107.14

DISPATCH CENTER SECURITY IMPROVEMENTS-CONTACT DOCS & SPECS AND ADDENDA

ROBERT & CO, HNTB & WRJ

1 7/25/1994 8-C

REFERENCE ORIGINAL CONSTRUCT CONC E

DOOR HARDWARE CATALOG INFORMATION WALLER - DAVIS ASSOC.

1 2/17/1992 5-D

Page 99: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 99

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE POWERWARE SYSTEM 80 ES OPERATORS MANUAL EXIDE ELECTRONICS 2 1/1/1992 5-C

REFERENCE SIESERVE SIEMENS ACCESS SYSTEM SIEMENS 1 6-D

REFERENCE SMART BOARD USER'S MANUAL AJS TECH. 1 2/1/1986 6-B

REFERENCE CONSUL 980 MAINTENANCE MANUAL FOR THE CONSUL 980 ADDS INC 1 10/1/1976 9-D

REFERENCE AQUA-MATIC AQUA FOG/TAC-2000

FOG MIST SURFACE FIRE SUPPRESION SYSTEM SOLID STATE PROGRAMMABLE CONTROL PANEL

ATLANTA VENTILATOR WORKS

1 5/22/1997 1-B

REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR OPERATING PERMITS EXP. DATE 6/1/01

CITY OF ATLANTA 1 6/1/2000 5-D

REFERENCE ADTRANZ DELUXE SYSTEM/3 WATER COOLED MODEL INFORMATION MODEL#FH127W-ASM

LIEBERT CORP/JOE POWELL & ASSOC

1 11/3/1998 9-B

REFERENCE SURVEY ELEVATOR MAINTENANCE EVALUATION SURVEY/REPORT

G. ALAN NEWTON 2 10/26/1992 5-F

REFERENCE SURVEY MAINTENANCE EVALUATION SURVEY INSPECTION REPORT

EARLY & ASSOCIATES 1 3/2/1992 5-E

REFERENCE FIRE AND SECURITY SYSTEMS-PRODUCT DATA

FS-20A DATA GATHERING PANEL HONEYWELL 1 6/1/1982 1-C

REFERENCE DELTA 1000 SERVICE DATA FS 20A DATA GATHERING PANEL HONEYWELL 1 5/1/1981 9-C

Page 100: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 100

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE MONTGOMERY ELEVATOR COMPANY

MIPROM 21 CONTROL SYSTEM OPERATOR'S SERVICE MANUAL

MONTGOMERY ELEVATOR COMPANY

1 6/4/1991 5-F

REFERENCE PART 70 OPERATING PERMIT STATE OF GEORGIA-DEPARTMENT OF NATURAL RESOURCES

STATE OF GEORGIA 1 6/8/1998 5-C

REFERENCE UNDERGROUND STORAGE TANKS

STATE OFGEORGIA-ANNUAL UNDERGROUND STORAGE TANK REGISTRATION CERTIFICATE

ENVIRONMENTAL PROTECTION DIV

1 12/31/1999 5-C

REFERENCE ADA ACCESSIBILITY GUIDELINES TITLE II TECHNICAL ASST. MANUAL

U.S. DEPT. OF JUSTICE 1 11/1/1993 4-D

REFERENCE CROSS SYSTEM COMPONENTS

PRECISION INSTRUMENTATION COMPONENTS CROSS 1 1/1/2000 5-C

REFERENCE CONTROL SYSTEMS INSTRUMENT & CONTROL PRODUCTS YOKOGOWA 1 1/1/2000 5-C

REFERENCE LIQUID LEVEL GAGES CATALOG ISE-MAGTECH CROSS SYSTEM COMPONENTS

1 10/24/1995 8-C

REFERENCE NONE REFRIGERANT HANDBOOK CARRIER 1 12/1/1998 6-B

REFERENCE NONE MINIMUM STANDARDS FOR PUBLIC WATER SYSTEMS MANUAL

GEORGIA EPD 1 1/1/1998 6-D

REFERENCE NONE ENERGY EVALUATION AND MANAGEMENT MANUAL FOR AIRPORTS

AIR TRANSPORT ASSOC.

1 4/18/1980 4-D

REFERENCE DELTA AIRLINES DELTA NET GRAPHIC CENTRAL OVERVIEW OPERATOR MANUAL

HONEYWELL 1 5/1/1996 9-B

Page 101: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 101

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE FIRE ALARM SYSTEM FIRE ALARM SYSTEM O & M MANUAL CONC B & CONC E

HONEYWELL 1 1/1/1995 1-C

REFERENCE ROOFING SYSTEMS DIVISION 7 ROOFING & WATERPROOFING SYSTEMS

KOPPERS INDUSTRIES 1 12/1/1998 4-B

REFERENCE NONE MAINTENANCE MANUAL SIEMENS 1 7/1/1992 5-D

REFERENCE NONE SIEMENS ACCESS VERSION 4.0 USER'S MANUAL & INSTALLATION GUIDE

SIEMENS 1 1/1/1998 5-D

REFERENCE DELTA AIRLINES DELTA NET GRAPHIC CENTRAL OPERATOR MANUAL

HONEYWELL 1 10/1/1993 9-C

REFERENCE FIRE PERMITS PERMITS FOR ABS AREAS WITH COMBUSTIBLE MATERIALS

ATLANTA FIRE DEPT. 1 3/20/2006 1-B

REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR OPERATING PERMITS EXP. DATE 6/1/02

CITY OF ATLANTA 1 6/1/2001 5-D

REFERENCE NONE COMPOSITE STRENGTHENING - FIBER WRAP WATSON BOWMAN ACME

1 4/30/2002 4-E

REFERENCE CHILLERS PRODUCT DATA CARRIER 1 1/1/1998 4-F

REFERENCE ENVIRONMENTAL COMPLIANCE

TENANT ENVIRONMENTAL COMPLIANCE GUIDE DOA 1 7/1/1998 6-B

REFERENCE ELEVATORS/ESCALATORS OPERATING PERMITS - EXPIRATION 2003 CITY OF ATLANTA 1 5/22/2002 5-D

Page 102: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 102

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE TYPE O COMPRESSED GAS DRYER

SPECIFICATIONS GDI 1 12/10/1985 4-D

REFERENCE FIRE PERMITS PERMITS FOR ENRON AREAS WITH COMBUSTIBLE MATERIALS

ATLANTA FIRE DEPT 1 4/20/2000 1-B

REFERENCE FIRE PROTECTION SYSTEM GRUVLOK CHECK VALVES GROOVED ENDS SPECS GRUVLOK 1 4/1/1993 1-B

REFERENCE N/A RECOMMENDED PRACTICE FOR BACKFLOW PREVENTION AND CROSS-CONNECTION

AWWA 2 7/30/1992 4-E

REFERENCE N/A SIEMENS STATIC TRIP III INFO & INSTRUCTION GUIDE

SIEMENS 1 1/1/1992 5-C

REFERENCE ENVIRONMENTAL INTERIORS INC. CATALOG

SPECIALTY ARCHITECTURAL METALWORK ENVIRONMENTAL INTERIORS INC

1 6/1/2002 5-C

REFERENCE ELECTRIC GENERATORS AIR QUALITY PERMIT

DRAFT TITLE V PERMIT GA DEPT OF NAT. RESOURCES EPD

1 3/26/1998 6-B

REFERENCE FIRE ALARM, FIRE PROTECTION, & FIRE SAFETY ANALYSIS

FINAL - LIFE SAFETY ANALYSIS OF THE CPTC NEWCOMB & BOYD 1 4/16/2003 2-C

REFERENCE ADA TITLE III COMPLIANCE GEORGIA PACIFIC - COMPLIANCE GUIDE & GENERAL INFO ABOUT TITLE III ADA

GEORGIA PACIFIC 1 8/3/2004 4-D

REFERENCE ROOFING SYSTEMS ROOFING SYSTEMS TECHNICAL MANUAL FIRESTONE 1 8/20/2004 4-A

REFERENCE NONE BRIDGE & HIGHWAY EXPANSION CONTROL, CONCRETE REPAIR, COMPOSITE STRENGTH.

WATSON BOWMAN ACME

1 8/30/2004 4-D

Page 103: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 103

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE NONE MIGUA EURO DESIGNED EXP JOINTS FOR STADIUMS, AIRPORTS, ETC. CATALOG

EMSEAL 1 8/31/2004 4-C

REFERENCE NONE EXPANSION JOINT CATALOG FOR DECKS, WALLS, FLOORS

EMSEAL 1 8/31/2004 4-C

REFERENCE NONE LIGHTING AND CONTROLS INFORMATION ADDISON PARRISH LIGHTING SALES

1 2/19/2003 4-C

REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR/MOVING WALKS EXPIRATION 2007

CITY OF ATLANTA 1 3/8/2006 5-D

REFERENCE DESIGN GUIDELINES AIRFIELD ELEMENT CITY OF ATLANTA/DOA 1 6/1/2004 5-C

REFERENCE DESIGN GUIDELINES ROADWAY FACILITIES CITY OF ATLANTA/DOA 1 7/1/2004 2-E

REFERENCE DESIGN GUIDELINES PARKING CITY OF ATLANTA/DOA 1 6/1/2004 9-A

REFERENCE DESIGN GUIDELINES AIR CARGO AND SUPPORT FACILITIES CITY OF ATLANTA/DOA 1 6/1/2004 9-A

REFERENCE WINTER WEATHER OPERATIONS

MANUAL DOA OPERATIONS 1 11/1/2005 4-C

REFERENCE VEHICLE OPERATOR TRAINING

WAVE WORK ASSIST VEHICLE OPERATOR TRAINING PROGRAM

CROWN COMMERCIAL 1 11/1/2005 8-C

REFERENCE HMS ATL FIBER OPTIC INFRASTRUCTURE

O & M MANUAL SMART CONNECT 1 9/23/2005 4-D

Page 104: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 104

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE GLYCOL RELOCATION CGMPIC

WARRANTY MANUAL MHJIT 1 10/12/2006 7-D

REFERENCE CHILLLER REPLACEMENT CHILLER REPLACEMENT SUBMITTALS 04/10/07 F & S MECHANICAL 1 6/5/2007 1-F

REFERENCE NONE PASSENGER BOARDING BRIDGE APRON DRIVE O & M MANUAL

FMC TECHNOLOGIES 1 2/1/2006 4-D

REFERENCE NONE O & M MANUAL GENERAL EQUIPMENT SIEMENS 1 2/20/2006 4-D

REFERENCE ELEVATORS ELEVATORS WITH KCM831/RESOLVE LCE CONTROL OWNERS MANUAL

KONE 1 9/20/2006 8-B

REFERENCE NONE E7 DRIVE USER MANUAL YASKAWA YASKAWA 1 2/1/2004 4-E

REFERENCE NONE O & M MANUAL - WALL MOUNTED SPLIT AC UNIT EXHAUST FAN

CLEVELAND MECHANICAL

1 2/20/2006 3-E

REFERENCE JOHNSON CONTROL TRAINING AGENDA

TRAINING AGENDA MANUAL JOHNSON CONTROLS 1 3/16/2005 9-D

REFERENCE JETWAY - APRON DRIVE VOLUME 566 O & M MANUAL ABEX 1 8/1/1984 5-C

REFERENCE CENTRAL PLANT DESIGN GUIDELINES DOA 1 3/16/2005 9-C

REFERENCE FACILITIES STANDARDS FACILITY STANDARDS FOR THE PUBLIC BUILDINGS SERVICE

US GENERAL SERVICES ADMINISTRATION OFFIC

1 11/1/2000 9-D

Page 105: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 105

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE LIGHTNING PROTECTION EAST COAST LIGHTNING EQUIPMENT, INC. MANUAL

EAST COAST LIGHTNING EQUIPMENT

1 1/1/2000 9-C

REFERENCE LADDERS OF LEARNING TRAINING PROGRAM

TRAINING PROGRAM FUNDAMENTALS OF COMBUSTION, PRINCIPLES OF ELECTRICITY

LADDERS 1 1/1/2000 3-F

REFERENCE ROOFING SYSTEMS DIVISION 7 COMMERCIAL ROOFING SYSTEMS KOPPERS INDUSTRIES 1 12/1/1998 4-B

REFERENCE GA POWER TUNNEL GA POWER TUNNEL O & M MANUAL - EMBANKMENT & UTILITIES RELOCATION PHASE 2

WFI SUNTECH 1 10/30/2007 4-D

REFERENCE ROOF MANUAL ULTRAPLY TOP ROOFING SYSTEM MANUAL FIRESTONE BUILDING PRODUCTS

1 9/22/2009 4-A

REFERENCE POWER DISTRIBUTION & CONTROL

PRODUCT CATALOG SIEMENS 1 1/1/2008 7-E

REFERENCE ROOF SYSTEMS MAINTENANCE MANUAL BENCHMARK 1 1/1/2000 4-A

REFERENCE MARTA FARE COLLECTION SYSTEM UPGRADE FACILITIES MODS PROJECT MANUAL

MARTA 1 1/1/2004 1-A

REFERENCE TOP FREEZER REFRIGERATOR O & M MANUAL FOR MODEL 22 & 25 REFRIGERATORS

GE 1 9/29/2006 1-F

REFERENCE SOAP DISPENSER SENSOR OPERATED SOAP DISPENSER TOTO 1 4/6/2006 9-A

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL FOR VON DUPRIN DOOR HARDWARE

VON DUPRIN 1 9/29/2006 9-F

Page 106: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 106

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL FOR LUTRON DIMMING PANEL LUTRON 1 9/29/2006 9-F

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL FOR THT-100EA & THT-100ES TURNSTILES

TOMSED 1 9/26/2006 9-F

REFERENCE SCHINDLER ELEVATORS PARTS CATALOG NEW SOUTH / SCHINDLER

1 8/11/2005 5-E

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL FOR VOICE PAGING SYSTEM BAKER AUDIO 1 9/29/2006 9-F

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL FOR FIRE ALARM WFI / SUNTECH 1 9/29/2006 9-F

REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL & WARRANTY FOR MECHANICALS DIVISION 15

MECHANICAL ASSOC 1 9/29/2006 9-F

REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE

ATLANTA FIRE DEPT. 1 8/3/2007 1-B

REFERENCE HIGH-PRIORITY COMPOUNDS ASSOCIATED WITH AIRCRAFT EMISSIONS

HEALTH RISK PRIORITIZATION OF AIRCRAFT EMISSINS RELATED AIR POLLUTANTS

JOHNATHAN LEVY 1 10/1/2008 5-C

REFERENCE SIGNING AND GRAPHICS STANDARDS

GUIDELINES ACE 1 5/1/1997 5-D

REFERENCE EXTERIOR GRAPHIC DESIGN SYSTEMS ENHANCEMENTS

VOL. 1 SPECIFICATIONS AND BID FORMS ACE 1 7/17/1995 5-D

REFERENCE ACH550-UH HVAC DRIVE 550 HP USER'S MANUAL ABB INDUSTRIAL SYSTEM INC.

1 6/1/2010 8-A

Page 107: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 107

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

REFERENCE OMNI-MOVE SEISMIC & EXPANSION CONTROL SYSTEM MM SYSTEMS CORP 1 1/1/1990 4-F

REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE

ATLANTA FIRE DEPT. 1 9/9/2010 1-B

REFERENCE OPERATING PERMITS HIGH PRESSURE WATER TUBE BOILER ROOM #5 & MAIN PLANT - COMBINED

STATE OF GEORGIA 1 10/14/2010 5-D

REFERENCE BLUE BOOK 2011 BUILDING & CONSTRUCTION - GA CONTRACTOR'S REGISTER

1 1/1/2011 7-E

REFERENCE ADA ACCESSIBILITY GUIDELINES

CHECKLIST FOR BUILDINGS & FACILITIES US ATBCB 1 10/1/1992 4-D

REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE

ATLANTA FIRE DEPT. 1 4/2/2009 1-B

REFERENCE AAE ENERGY PROGRAMS NEW OPPORTUNITIES FOR PURCHASING NATURAL GAS

AAE ENERGY 1 2/17/1989 4-D

REFERENCE ELECTRICAL OPERATIONS OSHA ELECTRICAL STANDARDS AAVIM 1 2/12/1992 9-F

REFERENCE FIRE PERMITS PERMITS FOR T-SPINE ELEVATOR ATLANTA FIRE DEPT. 1 1/31/2012 1-B

REFRENCE CLA-VAL AUTO CONTROL PRESSURE REDUCING VALVES O & M MANUAL CLA-VAL COMPANY 1 3/1/1994 4-F

TERMINAL TERM & CONC T PAX CIRCULATION REVISIONS

DELTA CONSTRUCT STANDARDS MANUAL -- DESIGN

DERYCK MUEHLHAUSER

1 10/3/1994 7-F

Page 108: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 108

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL ORIGINAL CONSTRUCTION TERMINAL

ELECTRICAL EQUIPMENT ELEVATION DWGS GOULD 1 8/1/1979 8-A

TERMINAL ORIGINAL CONSTRUCT TERMINAL

O & M MANUAL - VOLUME I LIMBACH ECONOMY 1 1/1/1980 9-E

TERMINAL DOA SOUTH TERMINAL OFFICES

O & M MANUAL - CENTRAL STA. AHU'S, VARIABLE AIR VOL. UNITS, CIRCULATING PUMPS, CONTROLS

CARLETON MECHANICAL CONTRACTORS

1 1/17/1989 7-F

TERMINAL ORIGINAL CONSTRUCT TERMINAL

BACKUP SECURITY CHECKPOINT MANUAL DERYCK MUEHLHAUSER

1 4/19/1993 8-A

TERMINAL NORTH TERMINAL REDEVELOPMENT

PROJECT MANUAL FOR CONSTRUCT OF NORTH BAG INFILL BLDG - DRAFT / REVIEW RELEASE

TURNER ASSOC 1 10/24/1994 7-F

TERMINAL EAL BTS / BSS ENCLOSURE SPECIFICATIONS FRED TOGUCHI ASSOC 1 8/6/1981 3-A

TERMINAL SOUTH TERMINAL EXPANSION

FOUNDATION SPECIFICATIONS FOR CONSTRUCTION

PATE TURNER 1 1/20/1987 3-A

TERMINAL SOUTH TERMINAL EXPANSION - DELTA

SPECIFICATIONS PATE TURNER 1 3/6/1987 3-B

TERMINAL AIRPORT NEWS SPECIFICATIONS - INSIDE CONCESSION SPACES MARTIN ASSOC. 1 4/20/1982 3-B

TERMINAL DOA SOUTH TERMINAL OFFICES

CONTRACT FC-3855-88 DOA 1 1/27/1988 3-B

TERMINAL AATC/ABS RELOCATION AATC/ABS RELOCATION MCDEVITT STREET BOVIS PROJECT CLOSEOUT MANUAL - ELEC

MACK YOUNG 1 1/30/1997 3-C

Page 109: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 109

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL MAGNETEK MAGNETEK TECHNICAL MANUAL GPD 503 DRIVE MAGNETEK 1 1/1/1994 9-A

TERMINAL AATC / ABS SHOP RELOCATION

AATC / ABS SHOP RELOCATION PROJECT TRACKING MANUAL/CONTRACT

MS BOVIS / AATC 1 6/20/1996 2-E

TERMINAL AATC / ABS SHOP RELOCATION

SUBMITTALS MS BOVIS / AATC 1 10/1/1996 2-E

TERMINAL AATC / ABS SHOP RELOCATION

MECHANICAL SUBMITTALS PERFORMANCE MECH. 1 11/5/1996 1-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 7 GENERATOR SET BOOK 1 TO 3 (SECURITY IMPROVEMENTS)

LORAL DEFENSE SYSTEMS EAST

2 11/15/1995 6-C

TERMINAL COMMUNICA & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 6 FIRE & SAFETY FIRE SUPPRESSION SYSTEM BOOKS #1 & #2

LORAL DEFENSE SYSTEMS EAST

2 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 7 UPS GENERATOR SET

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 6 FIRE & SAFETY SYSTEM FIRE SUPPRESSION SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 5 WEATHER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 5 WEATHER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 5 WEATHER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

Page 110: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 110

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 4 RADIO DISPATCH SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 4 RADIO DISPATCH SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 1 FLINT RIVER MONITORING SYSTEM, CAD, NETWORK CLOCK, WORK STATION UPS

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

2 11/15/1995 6-C

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 2 CCTV, MOBILE CCTV

LORAL DEFENSE SYSTEMS EAST

3 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 2 CCTV, MOBILE CCTV

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 2 CLOSED CIRCUIT TELEVISION SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 4-F

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SOFTWARE MANUAL VOLUME 1 COMPUTER AIDED DISPATCH

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICATION & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 1 CAD, NETWORK CLOCK, WORK STATION UPS

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

SYSTEM OVERVIEW MANUAL LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

Page 111: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 111

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL REROOF & PART REROOF OF CONC B & TERMINAL

PROJECT MANUAL FOR TERMINAL REROOFING, PARTIAL REROOF OF CONC B & CONCOURSE REPAIRS

CONLEY DESIGN GROUP

1 9/1/1997 4-B

TERMINAL TERMINAL AND CONC T PAX CIRC REVISIONS

REFERENCE SPECS. -- COMPILED FROM CONC A TRANSFER POINT EXPAN & CONC E CONSTRUCTION

DERYCK MUEHLHAUSER

1 10/1/1989 2-A

TERMINAL AATC COMMUNICATION CENTER

PROPOSED DESIGN GA TECH FOR D. MUEHLHAUSER

1 12/1/1982 1-F

TERMINAL TERMINAL & CONC T PAX CIRCULATION REVISIONS

HARDWARE SCHEDULE CONTRACT HARDWARE 1 5/3/1996 8-C

TERMINAL TERMINAL & CONC T PAX CIRCULATION REVISIONS

DELTA AIRLINES - 15010 MECHANICAL GENERAL PROVISIONS O & M MANUAL

PERFORMANCE MECH. 1 5/6/1996 1-B

TERMINAL ABS SHOP RELOCATION PROJECT MANUAL EDMOND, SIMS, JUDGE ASSOC

1 6/20/1996 1-F

TERMINAL TERMINAL RE-ROOFING HIP '96 #57

PROJECT MANUAL CONTRACT FC - 6286-95 ACE 1 11/20/1995 4-B

TERMINAL TERMINAL REDEVELOPMENT PROGRAM

LANDSIDE TERMINAL FINISHES PROJECT MANUAL - FC 6295-95

PATE - MC DUFFIE GROUP

1 8/10/1995 3-B

TERMINAL TERMINAL REROOFING PROJECT MANUAL FOR ROOFING/WATERPROOFING REPAIRS

CONLEY DESIGN GROUP

2 2/1/1998 4-A

TERMINAL ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA

CONLEY DESIGN GROUP

1 2/19/1998 4-B

TERMINAL ATLANTA POLICE PRECINCT MAINTENANCE DATA CECIL MALONE COMPANY

1 1/22/1999 4-D

Page 112: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 112

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL BID DOCUMENTS & SPECIFICATIONS

NEW GROUND TRANSPORTATION & OPERATION OFFICE RENOVATIONS

CITY OF ATLANTA 1 1/1/1998 2-B

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

USER OPERATIONS MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-D

TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)

MAINTENANCE MANUAL VOLUME 4 RADIO DISPATCH SYSTEM

LORAL DEFENSE SYSTEMS EAST

1 11/15/1995 6-C

TERMINAL PEDESTRIAN TUNNEL RENOVATION

O & M MANUAL ROSSER/NEW SOUTH 1 4/1/2000 1-D

TERMINAL REPLACEMENT FAN AGT SECTION AHU-16

O & M MANUAL PERFORMANCE MECH. 1 5/1/2000 9-A

TERMINAL NORTH & SOUTH A/L ENTRY TUNNELS AHU

SUBMITTAL DATA PERFORMANCE MECH. 1 7/1/1999 3-B

TERMINAL VESTIBULE AIR CURTAIN PROJECT MANUAL STEVENS & WILKINSON 1 11/18/1998 2-A

TERMINAL AIR QUALITY - BAGGAGE AREA

AIR QUALITY STUDY DRESSER & MCKEE 1 10/20/1995 6-B

TERMINAL ROOF EVALUATION REPORT CONLEY DESIGN GROUP

1 9/9/1996 4-A

TERMINAL AUTOMATIC DOORS - REPLACEMENT

DESIGN MANUAL HORTON AUTOMATICS 1 12/1/2001 8-A

TERMINAL DELTA RF BAG SCANNING/FORWARDING

BID PACKAGE - SPECS & CONTRACT DOCS AVIATION FACILITIES GROUP

1 2/12/1997 3-A

Page 113: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 113

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL CEILING REPLACEMENT PROJECT MANUAL HARPER PARTNERS 1 9/7/2001 2-B

TERMINAL PEDESTRIAN TUNNELS LOWER LEVEL

PROJECT MANUAL - RENOVATION ROSSER FABRAP 1 7/6/1998 2-A

TERMINAL CEILING REPLACEMENT NORTH & SOUTH TERMINAL

BID DOCUMENTS FC-7387-01 CITYOF ATLANTA 1 3/25/2002 2-B

TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT

BID DOCUMENTS FC-7490-02 ACE 1 1/1/2002 2-E

TERMINAL CURBSIDE PAGING (CEILING REPLACEMENT PROJECT)

SUBMITTAL - SPECIFICATIONS ROBERT GOGAN & ASSOC./ NEW SOUTH

1 10/28/2002 2-D

TERMINAL CURBSIDE PAGING (CEILING REPLACEMENT PROJECT)

OPERATIONS MANUAL ROBERT GOGAN & ASSOC.

1 10/28/2002 8-A

TERMINAL AMERICA WEST AIRLINES FACILITY RELOCATION

PROJECT MANUAL - BID DOCUMENTS LEO A. DALY 1 6/6/2001 2-B

TERMINAL AMERICA WEST AIRLINES NEW BREAKROOM & OFFICE

PROJECT MANUAL - BID DOCUMENTS LEO A. DALY 1 7/3/2001 2-B

TERMINAL TSA SCREENING AREA SOUTH TERMINAL BELOW TICKETING

REPORT OF AIR QUALITY MONITORING SERVICES MACTEC ENGINEERING 1 7/31/2003 6-B

TERMINAL DOA CONCESSIONS OFFICE EXPANSION

PROJECT MANUAL DEPARTMENT OF AVIATION

1 9/27/2002 2-B

TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT

O & M MANUAL NEW SOUTH CONST. 1 9/12/2003 2-B

Page 114: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 114

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL MAIN SECURITY CHECKPOINT MODS

O & M MANUAL NEW SOUTH CONST. 1 12/30/2004 8-A

TERMINAL DESIGN GUIDELINES TERMINAL FACILITIES CITY OF ATLANTA/DOA 1 8/1/2004 5-C

TERMINAL EXPANSION JOINT REPLACEMENT

O & M MANUAL / PLANS NEW SOUTH CONST. 1 8/22/2005 6-E

TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 1

SIEMENS 2 9/29/2006 9-F

TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 3

SIEMENS 2 9/29/2006 9-F

TERMINAL NORTH TERMINAL BAGGAGE CLAIM

MAINTENANCE MANUAL TERMINAL NORTH BAGGAGE CLAIM REPLACEMENT

FKI LOGISTEX 1 3/2/2007 7-E

TERMINAL NONE JETPOWER PWM2 FMC TECHNOLOGIES 1 2/1/2006 7-E

TERMINAL NONE JETAIRE PRECONDITION AIR O & M MANUAL FMC TECHONOLOGIES 1 5/1/2005 7-E

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XII

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XI

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH II

JERVIS B WEBB CO. 1 1/26/2007 8-D

Page 115: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 115

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH X

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VIII

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XV

JERVIS B WEBB CO. 1 3/23/2007 8-E

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH III

JERVIS B WEBB CO. 1 1/26/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XIII

JERVIS B WEBB CO. 1 3/23/2007 8-E

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VI

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VII

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH V

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYTEM NORTH IX

JERVIS B WEBB CO. 1 3/23/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH IV

JERVIS B WEBB CO. 1 1/26/2007 8-D

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XIV

JERVIS B WEBB CO. 1 3/23/2007 8-E

Page 116: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 116

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL BAGGAGE HANDLING SYSTEM (BHS)

O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH I

JERVIS B WEBB CO. 1 1/26/2007 8-D

TERMINAL DELTA TICKET LOBBY RECONFIG

PACKAGE #1 TELECOMMUNICATIOM ROOMS WARRANTY MANUAL

NEW SOUTH 1 1/12/2007 5-E

TERMINAL DELTA TICKET LOBBY RECONFIG

PACKAGE #3 EARLY OFFICE RELOCATION WARRANTY MANUAL

NEW SOUTH 1 1/12/2007 5-E

TERMINAL NONE CF204 SERIES 4" CEILING SPEAKER SPEC ALTEC LANSING 1 7/1/2006 5-C

TERMINAL CONSTRUCTION PHASING NORTH BAGGAGE CLAIM MISC. COMPONENTS AND BIDS

DEPARTMENT OF AVIATION

1 5/1/2007 1-F

TERMINAL TERMINAL CENTRAL UTILITY PLANT EQUIPMENT REPLACEMENT

EQUIPMENT O & M MANUAL F&S MECHANICAL 2 7/17/2007 8-F

TERMINAL DELTA -SOUTH TERM LOBBY RECONFIG

PROJECT MANUAL - PACKAGE 7 ATO EXPANSION AND RENOVATION VOLUME 1

CORGAN ASSOC 1 4/21/2006 1-F

TERMINAL DELTA SOUTH TERM LOBBY RECONFIG

PROJECT MANUAL - PACKAGE 6 ADDENDUM 1 - L-COUNTERS & CURBSIDE

CORGAN ASSOC 1 12/8/2005 1-F

TERMINAL HARTSFIELD BAGGAGE CLAIM PACE Job # 04-83718-01-04

O & M MAINTENANCE MANUAL YORK INTERNATIONAL 1 5/11/2005 9-F

TERMINAL DAL RECONFIGURATION -BAGGAGE HANDLING SYSTEM EXPANSION (BHS)

REQUEST FOR PROPOSAL BNP ASSOCIATES 1 9/25/2005 9-F

TERMINAL PARKING STRUCTURE PROJECT MANUAL DESIGN DEVELOPMENT PHASE

CITY OF ATLANTA 1 2/2/2004 1-F

Page 117: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 117

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL CBP SECONDARY SCREENING AREA RECONF PROJECT

SPECIFICATIONS - 100% HADP 1 12/10/2007 6-E

TERMINAL CBP SECONDARY SCREENING AREA RECONF

SPECIFICATIONS HARPER, AIKEN, DONAHUE & PARTNERS

1 1/2/2008 6-E

TERMINAL COSMETIC UPGRADES O & M MANUAL-STAGE 5 NEW SOUTH 1 9/20/2007 5-B

TERMINAL DELTA TICKET LOBBY RECONFIG

PACKAGE #7 TICKET HALL RENOV ATIONS WARRANTY MANUAL

NEW SOUTH 1 4/10/2007 5-F

TERMINAL DELTA - SOUTH TERMINAL LOBBY RECONFIG

O & M MANUAL - PACKAGE 6 - L COUNTERS & CURBSIDE

CORGAN 1 3/18/2007 1-F

TERMINAL FIRE ALARM SYSTEM FIRE ALARM CALCULATIONS NEWCOMB & BOYD 1 1/16/2004 1-C

TERMINAL BAGGAGE HALL EXPANSION FOR EDS/ETD

SPECIFICATION FOR GENERAL CONSTRUCTION CORGAN ASSOCIATES 1 6/30/2004 9-C

TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT

PROJECT MANUAL HARPER PARTNERS /CDG

1 8/2/2001 2-B

TERMINAL AATC/ABS RENOVATION AATC/ABS RENOVATION LIGHTING SUBMITTAL YUKON ELECTRIC 1 10/3/1996 4-E

TERMINAL PAGING REPLACMENET -TERMINAL T-022

MINI-MATE SPLIT SYSTEM O & M MANUAL for AGT PAGING COMM ROOMS

JOE POWELL and ASSOCIATES, INC

1 3/20/2006 5-C

TERMINAL AIRTRAN BYEPASS PASSENGER SELF-SERVICE CHECK-IN KIOSK APPROVAL PROPOSAL

AIR TRAN AIRWAYS 1 1/31/2003 5-C

Page 118: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 118

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL TERMINAL KALWAL GLASS REPLACEMENT

VISTA WALL, VIRACON AND DOW CORNING LETTER OF WARRANTY

THE VISTAWALL GROUP

1 11/27/2006 5-C

TERMINAL BAGGAGE SECURITY SCREENING SYSTEM

NORTH TERMINAL 100% HOLD BAGGAGE SECURITY SCREENING SYSTEM O & M MANUAL

JERVIS B. WEBB COMPANY

1 1/20/2007 5-C

TERMINAL BAGGAGE SECURITY SCREENING SYSTM

NORTH TERM 100% HOLD BAGGAGE SECURITY SCREENING SYSTEM MANUFACTURER'S LITERATURE

JERVIS B. WEBB COMPANY

1 1/20/2007 5-C

TERMINAL COUNTERFLOW COOLING TOWER - PHOENIX

O & M MANUAL - FIBERGLASS STRUCTURED COUNTERFLOW COOLING TOWER PHOENIX

CCS 1 8/13/2008 8-F

TERMINAL TERMINAL CENTRAL UTILITY PLANT

AATC - MAIN TERMINAL CUP O & M MANUAL CED 2 4/29/2009 8-F

TERMINAL TERMINAL CENTRAL UTILITY PLANT

4160 V ELECTRICAL PROTECTION & COORDINATION STUDY

MB&R ENGINEERING 1 4/3/2009 8-F

TERMINAL SOUTH TERMINAL TICKET LOBBY RECONFIG PRO

BP-8 HVAC O & M MANUAL REED, WELLS, BENSON & COMPANY

1 6/15/2009 6-E

TERMINAL TERMINAL RESTROOM UPGRADES #2832

O & M MANUAL NEW SOUTH 1 7/15/2009 1-E

TERMINAL MAIN TERMINAL RESTROOM UPGRADES

SPECIFICATION HSST 1 7/15/2009 1-E

TERMINAL NORTH TERM LL AA BAGGAGE CLAIM AREA

SPECIFICATION SCOTT ASSOCIATES 1 6/10/2009 1-E

TERMINAL COSMETIC UPGRADES STAGE 5 FLOOR TILE REPLACEMENT, COLUMN RECLADDING, ESCALATOR WELLS, TUNNEL RENOVATION SPECS

SCOTT ASSOCIATES 1 11/18/2005 5-B

Page 119: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 119

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL COSMETIC UPGRADES STAGE 5 FLOOR TILE REPLACEMENT, COLUMN RECLADDING, ESCALATOR WELLS, TUNNEL RENOVATION SPECS

SCOTT ASSOCIATES 1 10/26/2005 5-B

TERMINAL TERMINAL RESTROOM UPGRADES

CONTRACT - PROJECT #4162 CITY OF ATLANTA 1 8/1/2008 1-E

TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)

O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 2

SIEMENS 1 9/29/2006 9-F

TERMINAL ATL BAGGAGE HANDLING EXP PHASE 2 ENABLING WORKS (BHS)

PROJECT MANUAL NEWCOMB & BOYD 1 2/23/2010 8-E

TERMINAL LANDSIDE OPS BUILD OUT O & M MANUAL GOULD PUMPS GOULD 1 1/15/2008 8-A

TERMINAL LANDSIDE OPS BUILT OUT O & M MANUAL NETWORK & ELECTRICAL SOLUTIONS BILL OF MATERIALS

PANDUIT 1 1/15/2008 8-A

TERMINAL NORTH SECURITY SCREENING CHECKPOINT EXPANSION PROJECT

SPECIFICATIONS - PROJECT MANUAL VOLUME 1 ADDENDUM 26

CORGAN 1 11/11/2008 8-A

TERMINAL PAX CIRCULATION REVISIONS PRODUCT DATA FOR AHU-1,2,3,4 DYNALECTRIC 1 6/9/1993 8-B

TERMINAL ABS / AATC SHOP RELOCATION

O & M MANUAL ROLLING DOORS OVERHEAD DOOR 1 1/31/1997 4-F

TERMINAL PASSENGER CIRCULATION REVISION

09680 CARPET CARE & MAINTENANCE INSTRUCTIONS

MILLIKEN 1 5/6/1996 4-F

TERMINAL SOUTH SECURITY CHECK POINT EXPANSION 2008

OVERHEAD DOOR, MILLWORK, ROOF, FLOORING, SIGNAGE, PLUMBING & ELECTRICAL

WG YATES 1 11/5/2008 3-C

Page 120: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 120

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL SOUTH SECURITY CHECKPOINT EXPANSION

AHU O & M MANUAL FOR RTU-T2 BUFFALO AIR HANDLING

1 11/5/2008 9-A

TERMINAL NORTH BAGGAGE SYSTEM MEGA MERGE PROJECT

CONVEYOR SYSTEM O & M MANUAL G&T COMPANY, INC. 1 8/25/2010 7-A

TERMINAL NORTH & SOUTH TERMINAL SECURITY CHECKPOINT PROJECT

COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC

1 4/27/2010 1-A

TERMINAL DELTA AIRLINES AIRPORT 21 POWER ENHANCEMENT PROJECT

SPECS AND CONTRACT DOCUMENTS DELTA AIRLINES 1 3/17/1997 9-B

TERMINAL AMERICAN AIRLINES WALL FINISH UPGRADES - SPECIFICATIONS SCOTT GROUP 1 8/20/2010 5-F

TERMINAL TERMINAL CENTRAL UTILITY PLANT

TCUP & EAST CHILLER PLANT COOLING TOWER WATER RECOVERY O & M MANUAL & SCHEMATIC DESGIN NARRATIVE

F & S MECHANICAL 1 3/15/2011 7-A

TERMINAL AMERICAN AIRLINES PUNCH LIST, WAIVER, CONTRACTOR WARRANTY & SPECIFICATIONS

SCOTT ASSOCIATES 1 3/11/2011 5-F

TERMINAL DUCTWORK RELOCATION NORTH & SOUTH TERMINAL CROSS-OVER SOFFITS O & M MANUAL

F & S MECHANICAL 2 8/1/2008 7-F

TERMINAL TERMINAL CENTRAL UTILITY PLANT & COOLING TOWER REPLACEMENT

CONTROLS SUBMITTALS F & S MECHANICAL 1 12/1/2008 8-F

TERMINAL DOA SECURITY TRAINING OFFICE

CLOSEOUT MANUAL - 3 OF 3 TURNER CONSTRUCTION

1 5/11/2011 7-A

TERMINAL DELTA AIRLINES TEMPORARY MILLWORK INSTALLATION DELTA AIRLINES 1 11/2/1999 3-C

Page 121: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 121

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL DOA SECURITY TRAINING OFFICE

CLOSEOUT MANUAL - 2 OF 3 TURNER CONSTRUCTION

1 5/11/2011 7-A

TERMINAL DOA SECURITY TRAINING OFFICE

CLOSEOUT MANUAL - 1 OF 3 TURNER CONSTRUCTION

1 5/11/2011 7-A

TERMINAL VESTIBULE AIR CURTAIN PROJECT MANUAL STEVENS & WILKINSON 1 1/25/1998 2-A

TERMINAL GA POWER TRANSFORMER VAULT

O & M MANUAL, BILL OF MATERIAL, SWITBOARD, BUSWAY & WARRANTY

SIEMENS/CLEVELAND 1 7/25/2011 7-B

TERMINAL GA POWER TRANSFORMER VAULT

PROJECT CLOSE OUT DOCUMENTS - LETTER OF WARRANTY

CPS 1 7/15/2011 7-B

TERMINAL GA POWER TRANSFORMER VAULT

GENERAL EMERGENCY CONTROL CABINET SPECIFICATIONS O & M MANUAL

EMERSON 1 9/1/2011 7-B

TERMINAL DOA SECURITY BUILDING AUTOMATION SYSTEM O & M MANUAL

JOHNSON CONTROLS 1 10/28/2011 7-A

TERMINAL DOA SECURITY TRAINING OFFICE RECONFIGURATION

COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC

1 11/14/2011 1-A

TERMINAL DELTA AIRLINES BSO "ATLANTA ROOM" BAGGAGE INTERIOR UPGRADE, CLOSE OUT & WARRANTY

DELTA AIRLINES 1 6/21/2011 7-A

TERMINAL FRONTAGE IMPROVEMENTS WARRANTIES & CLOSE OUT DOCUMENTS DOA/COA 1 3/13/2012 9-E

TERMINAL COSMETIC UPGRADES AMERICAN AIRLINES BAGGAGE CLAIM COSMETIC UPGRADES CLOSE OUT DOCUMENTS

YATES CONSTRUCTION 1 2/8/2012 5-B

Page 122: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 122

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

TERMINAL HVAC UPGRADES NORTH AND SOUTH TERMINAL HSST 1 11/25/2010 6-E

UTILITIES BOILERS CLEAVER BROOKS TRAINING CENTER MANUAL CLEAVER BROOKS 1 9/1/1979 4-E

UTILITIES FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS - QUARTER POINT TUNNEL

NEWCOMB & BOYD 1 4/1/2004 1-C

UTILITIES WATER COOLED CENTRAVAC WATER COOLED CENTRACVAC WITH CH530 O & M MANUAL

TRANE 1 12/1/2005 5-C

UTILITIES FIRE SUPPRESSION BACK OF HOUSE

FS TEST PAPERS CON A, B, C, D, and T; O & M MANUALS

GWINNETT SPRINKLER 1 4/29/2008 1-B

UTILITIES FIRE SPRINKLER SYSTEM O & M MANUAL - SPRINKLER SYSTEM GWINNETT SPRINKLER 1 1/1/2002 6-B

UTILITIES AHU O & M MANUAL - AHU GOVERNAIR CORPORATION

1 5-C

UTILITIES AUXILIARY HEAT WEST END LUGGAGE COUNTERS DELTA AIR LINES

O & M MANUAL W. B. WALLIS & COMPANY

1 1/8/2008 8-B

UTILITIES COOLING OPERATOR TRAINING

COOLING OPERATOR TRAINING WORKBOOK BETZ DEARBORN 1 1/1/1997 3-F

UTILITIES CONC C NORTH RENOVATION PROJECT

O & M MANUALS -SWGR, SWBRD, BUSWAY,PANELS, TRANSFORMERS & LETTERS OF WARRANTY

SIEMENS 2 4/2/2009 8-B

UTILITIES ENVIROFLEX RETRACTABLE PIPING SYSTEM - PRESSURE

UNDERGROUND STORAGE TANK FUEL TRANSFER AND CONTAINMENT SYSTEM O & M MANUAL

OPW 1 2/2/2001 6-B

Page 123: LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY … · atrium pass-through turner assoc 1 2/10/1995 2-c atrium doa admin offices o & m manuals piu's, vav's, valves & plumbing equip

10/23/2012SUPPORT DOCUMENTS

Page 123

LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE

UTILITIES APM AHU RENOVATION O & M MANUAL W. B. WALLIS 1 9/1/2009 5-C

UTILITIES JETAIRE PRE-CONDITIONED AIR UNIT 75-120 TON DISCHARGE O & M MANUAL

JBT AEROTECH 1 3/1/2008 1-D

UTILITIES JETAIRE PRE-CONDITIONED AIR UNIT 30-60 TON DISCHARGE O & M MANUAL

JBT AEROTECH 1 3/1/2008 1-D

UTILITIES APM AHU REPLACEMENT PLACEMENT

APM AHU HVAC UPGRADES - FINAL REPORT NEWCOMB & BOYD 1 3/8/2010 5-C

UTILITIES APM AHU REPLACEMENT PLACEMENT

APM AHU HVAC UPGRADES -SPECIFICATIONS NEWCOMB & BOYD 1 12/17/2008 5-C