location project name description prepared by qty … · atrium pass-through turner assoc 1...
TRANSCRIPT
10/23/2012SUPPORT DOCUMENTS
Page 1
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AGT TRAIN STATION RENOVATION AGT TRAIN STATION RENOVATION PROTOTYPE SPECS
MILTON/PATE ASSOC 1 10/1/1993 1-E
AGT ORIGINAL CONSTRUCTION AGT STAIRWELL ALARM SYSTEM SHAW COMMUNICATIONS
1 10/1/1989 8-B
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 1 WESTINGHOUSE 1 4/1/1978 3-F
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN CRITERIA WESTINGHOUSE 1 12/1/1977 3-F
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - BOOK 2 WESTINGHOUSE 1 4/1/1978 3-F
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW - STATION DOORS
WESTINGHOUSE 1 6/1/1978 1-E
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW STATION DOORS
WESTINGHOUSE 1 8/7/1978 3-F
AGT PROJECT T-2 AGT SUB-SYSTEM DESIGN REVIEW APPENDIX 6-A CONTINUED
WESTINGHOUSE 1 12/1/1977 3-F
AGT GA POWER METERS APPARATUS SERVICE REPORTS / CPTC WESTINGHOUSE 1 5/2/1983 8-A
AGT INDUSTRY SERVICES DIVISION WESTINGHOUSE TRAINING MANUAL AC/DC ROTATING MACHINES
WESTINGHOUSE 1 6/24/1982 8-A
AGT POWER SYSTEMS ANALYSIS SEMINAR
WESTINGHOUSE TRAINING MANUAL WESTINGHOUSE 1 11/13/1981 8-A
10/23/2012SUPPORT DOCUMENTS
Page 2
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AGT POWER SYSTEMS ANALYSIS SEMINAR C/E-23
WESTINGHOUSE TRAINING MANUAL WESTINGHOUSE 1 6/14/1983 8-A
AGT FIS EXPANSION PHASE I TRAINING MANUAL, O & M OF ACCUFLOW INSTALLATION & START UP
WESTINGHOUSE 1 1/1/1986 8-A
AGT ORIGINAL CONSTRUCTION ON SITE CONSTRUCTION LOGIC DIAGRAMS WESTINGHOUSE 2 5/24/1978 3-F
AGT ORIGINAL CONSTRUCTION ON SITE CONSTRUCTION COMPUTER PRINTOUTS WESTINGHOUSE 1 5/24/1978 3-F
AGT ORIGINAL CONSTRUCTION BOILER CONTROLS INSTALLATION SCHEDULE WESTINGHOUSE 1 6/15/1977 9-A
AGT PROJECT T-2 CONTRACT DOCUMENTS STEVENS & WILKINSON 1 1/1/1977 1-F
AGT TRAIN STATION RENOVATION CONCOURSE B AGT TRAIN STATION RENOVATION PROTOTYPE SPECS APPENDIX A
MILTON PATE ASSOC 1 12/10/1993 1-D
AGT CONC E/AGT ADTRANZ TRAIN MAINTENANCE AREA
PRE-ACTION SPRINKLER--DELIVERY & ACCEPTANCE CERTIFICATE
HONEYWELL 1 3/13/1998 6-B
AGT T-2 CONTRACT MOTOROLA SPECIFICATIONS MOTOROLA 1 12/7/1977 1-D
AGT TUBE SMOKE REMOVAL SYSTEM MODS
AXIAL FLOW FANS INSTALLATION AND O & M MANUAL
CLARAGE 1 3/15/2004 2-A
AGT TUBE SMOKE REMOVAL SYSTEM MODS
CONTROLS O & M MANUAL JOHNSON CONTROLS 1 7/7/2004 3-E
10/23/2012SUPPORT DOCUMENTS
Page 3
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AGT TUBE SMOKE REMOVAL SYSTEM MODS
ELECTRIC O & M MANUAL WHITEHEAD ELECTRIC 1 3/16/2004 2-A
AGT TUBE SMOKE REMOVAL SYSTEM MODS
DAMPERS, ACTUATORS, V.S.D. & EXHAUST FANS O & M MANUAL
W. B. WALLIS 1 3/16/2004 3-E
AGT COSMETIC UPGRADES CPTC APM MALL PROECT MANUAL - 95% OWNER REVIEW
HSST 2 5/11/2005 5-B
AGT REPLACEMENT OF AUTOMATIC CONTROL EQUIPMENT
REQUEST FOR PROPOSAL - PEOPLE MOVERS DOA 1 10/29/2004 7-E
AGT COSMETIC UPGRADES CPTC APM MALL O & M MANUAL NEW SOUTH CONSTRUCTION
1 9/20/2007 5-B
AGT SMOKE REMOVAL SYSTEM MODS
WARRANTY & CLOSE OUT DOCUMENTS CITY OF ATLANTA 1 9/22/2004 2-A
AGT AHU-16-1 SUBMITTAL FOR FAN REPLACEMENT PERFORMANCE MECH/YORK
1 1/11/2000 4-F
AGT ZIMBABWE SCULPTURE PROJECT
LIGHTING, SIGNAGE, DIPSLAY CASES & PHOTOMURALS
CHATHAM ART SERVICES
1 4/14/2000 3-F
AGT COSMETIC UPGRADES CPTC APM MALL O & M MANUAL FOR CONSTRUCTION
NEW SOUTH CONSTRUCTION
1 1/16/2006 5-B
AGT SMOKE REMOVAL SYSTEM MODS
BID DOCUMENTS CITY OF ATLANTA 1 8/19/2002 2-A
AOA MAINTENANCE COMPLEX PH I VEHICLE STORAGE GLYCOL FACILITY
CONTRACT DOCUMENTS & SPECIFICATIONS AAE 1 6/26/1989 8-C
10/23/2012SUPPORT DOCUMENTS
Page 4
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AOA AATC PARKING LOT CONTRACT DOCUMENTS & SPECS AAE 1 8/5/1993 3-A
AOA AATC PARKING LOT O & M MANUAL INGLETT & STUBBS 1 3/1/1987 3-A
AOA ALAMO RENT-A-CAR SERVICE PLAZA FACILITY TRACT VI SPECIFICATIONS CONSTRUCT ASSOC & MAKUTA/CROPSEY
1 11/12/1981 2-E
AOA SNOW REMOVAL EQUIP BUILDING
PROJECT INFORMATION MANUAL CONLAN CO 1 3/11/1991 3-B
AOA SNOW REMOVAL EQUIP BUILDING
ADDENDUM #3 TO CONTRACT DOCUMENTS-SPECIFICATIONS
DERYCK MUEHLHAUSER ARCH
1 6/20/1990 3-B
AOA CONTRACT M5 PAVING, GRADING, & DRAINAGE FOR CPTC COMPLEX
CONTRACT DOCS & SPECS FOR APRONS & ASSOCIATED TAXIWAYS
AAE 1 6/3/1977 3-C
AOA SNOW REMOVAL EQUIP BUILDING
SPECIFICATIONS DERYK MUEHLHAUSER ARCH
1 6/20/1990 3-B
AOA DELTA DASH FACILITY OTIS ELEVATOR O & M MANUAL UNITED TECHNOLOGIES OTIS
1 11/23/1987 5-F
AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATIONS
PROJECT MANUAL / SPECIFICATIONS LAW ENGINEER. & ENVIRON. SERVICES
1 3/16/1996 3-B
AOA ADA REST ROOM RENOVATION PROJECT
SPECS, BID DOCS, CONTRACT DOCS, ADDENDUM 1, ATTACHMENTS 1 & 2, CLARIFI & MODS TO CONTRACT DOCS
AATC 1 2/18/1994 3-B
AOA STORM WATER DIVERSION PUMPING SYSTEM
O & M MANUALS PERFORMANCE MECHANICAL CO
1 11/2/1996 3-B
10/23/2012SUPPORT DOCUMENTS
Page 5
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AOA STORM WATER DIVERSION PUMPING SYSTEM NEW SOUTH CONSTRUCTION
O & M MANUAL BOOK #2 FOXBORO COMPONENT
PERFORM. MECH CO & NEW SOUTH CONSTR
1 7/1/1996 3-B
AOA DELTA AIRLINES (OLD EASTERN HANGAR) VOL II
DELTA NORTH TECHNICAL CENTER PROJECT MANUAL
ROSSER FABRAP 1 7/18/1997 2-D
AOA B & B ELECTROMATIC ALUM. & CANTILEV. GATES
AOA ACCESS PREMIUM ALUMINUM GATES & CANTILEVER GATES & GATE CONTROLLERS
B & B ELECTROMATIC 1 5/1/1992 8-A
AOA AIRFIELD PAVEMENT REPAIRS & MISC. IMPROV.
BID DOCUMENTS / CITY OF ATLANTA FC-6840-97 DOA 1 6/16/1997 3-C
AOA SITE PREP FOR AIRPORT PROJECTS
BID DOCUMENTS FC-7277-00 PLACEMENT REVISION #1
DOA 1 8/1/2001 3-C
AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATION
PROJECT MANUAL LAW ENGINEERING 1 1/25/1999 3-B
AOA STORM WATER DIVERSION O & M MANUAL NSC JOB #9664 NEW SOUTH CONST. 2 10/25/1996 3-B
AOA STORMWATER DETENTION BASIN MAINTENANCE
BID DOCUMENTS FC-7446-02 ACE 1 5/28/2002 2-E
AOA NORTH & SOUTH PK DECK IMPROVEMENTS/REPAIRS
BID DOCUMENTS FC-7361-01 ACE 1 5/23/2002 2-D
AOA AIRFIELD EROSION CONTROL & REVEG.
BID DOCUMENTS FC-7480-02 ACE 1 5/29/2002 2-D
AOA RAMP WASTEWATER SCHEMATIC DESIGN - PROJECT MANUAL ACE 1 8/1/2002 2-A
10/23/2012SUPPORT DOCUMENTS
Page 6
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AOA WATER MAINS-MAINTENANCE / UPGRADES
PLANNING REPORT - ACTIVITY FORECAST - FACILITY PROGRAMMING
ACE 1 10/25/2002 3-F
AOA SITE PREP FOR AIRPORT PROJECTS PLACEMENT
HIGH VOLTAGE TEST REPORTS - GENERATORS HOOD-PATTERSON & DEWAR/UPTIME ELECTRIC
1 8/28/2002 3-C
AOA BID DOCS SITE PREP FOR AIRPORT PROJECTS FC-7277-00 PLACEMENT REV. #1-DOA
DOA 1 12/15/2001 3-C
AOA GLYCOL DRAINAGE TANKS O & M MANUAL AIRCRAFT DEICING SOLUTIONS INC.
1 12/4/2002 7-D
AOA WEST CURB GROUND TRANSP. CANOPY UPGRADES
BID DOCUMENT DEPARTMENT OF AVIATION
1 8/29/2003 2-B
AOA NORTH & SOUTH DEICING FACILITIES PROJECT
PUMP O & M MANUALS PLAYER & CO. 1 1/12/2004 6-E
AOA DEICING CONTAINMENT & STORM WATER MANAGEMENT
O & M MANUAL F & S MECHANICAL 1 11/12/2004 6-E
AOA DELTA - TEST CELL CONTROL STATIONS
O & M MANUAL TELEMETRY & PROCESS CONTROLS
1 6/15/2005 9-D
AOA CONRAC ACCESS ROADWAY BID DOCUMENTS CITY OF ATLANTA 1 3/19/2007 2-E
AOA DEICING CONTAINMENT SYSTEM
PROJECT BOOK AATC 1 10/15/2004 6-E
AOA AIRPORT ADDRESSING SYSTEM METHODOLOGY
PROJECT MANUAL ACE 1 2/1/2000 7-E
10/23/2012SUPPORT DOCUMENTS
Page 7
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
AOA DELTA DASH FACILITY O & M MANUAL NRG VISION, INC. 1 10/8/2009 5-F
AOA STORM WATER DIVERSION PUMPING SYSTEM IMPROVEMENT PROPOSAL LAW ENGINEERING 1 9/12/1994 3-B
AOA STORM WATER DIVERSION PUMPING SYSTEM
CLOSE OUT DOCUMENTS CPS 1 2/26/2010 3-B
AOA GATEWAY INTERNATIONAL CONVENTIONAL CENTER
APM STATION CITY OF ATLANTA 1 6/4/2007 2-E
AOA SNOW REMOVAL EQUIP BUILDING
ADDENDUM #2 TO CONTRACT DOCUMENTS-SPECIFICATIONS
DERYCK MUEHLHAUSER ARCH
1 6/20/1990 3-B
AOA STORM WATER & SANITARY SEWER PLAN
AIRFIELD UTILITIES INVENTORY ACE 1 2/28/1997 3-B
AOA RAMP WASTEWATER DISPOSAL FACILITIES PLANNING REPORT ACE 1 5/1/2002 2-A
AOA SWITCH BOARD TESTING GATE 59 JOB #10-172, #10-198 & #10-147 UPTIME / ETI ELECTRICAL TESTING
1 6/29/2010 6-B
AOA SOUTH GLYCOL DISPENSING STATION
NEXGEN O & M MANUAL ACTARIS 1 7/28/2005 7-D
AOA STORM WATER DIVERSION PUMPING SYSTEM MODIFICATION
PROJECT MANUAL LAW ENGINEERING 1 8/16/1996 3-B
AOA WATER MAINS - MAINTENANCE / UPGRADES
ACTIVITY FORECAST - FACILITY PROGRAMMING FINAL REPORT
ACE 1 2/27/2003 3-F
10/23/2012SUPPORT DOCUMENTS
Page 8
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
ATRIUM ORIGINAL CONSTRUCTION PROJECT SPECIFICATIONS MCDEVITT STREET BOVIS
1 1/7/1993 1-A
ATRIUM ORIGINAL CONSTRUCTION SUPPLEMENTAL DWG LIST MCDEVITT STREET BOVIS
1 2/17/1995 1-A
ATRIUM ORIGINAL CONSTRUCTION ESCALATORS - MONTGOMERY O & M DATA BOOK #1
MONTGOMERY 1 2/10/1983 5-F
ATRIUM ORIGINAL CONSTRUCTION ELEVATORS - MONTGOMERY O & M MANUAL BOOK #2
MONTGOMERY 1 9/1/1985 5-F
ATRIUM ORIGINAL CONSTRUCTION MECHANICAL O & M MANUAL BOOK #4 PERFORMANCE MECHANICAL
1 11/16/1993 1-A
ATRIUM ORIGINAL CONSTRUCTION PAGING SYSTEM BOOK #5 MCDEVITT STREET BOVIS
1 11/28/1994 1-A
ATRIUM ORIGINAL CONSTRUCTION CLOCK TOWER O & M MANUAL & WARRANTY BOOK #6
MCDEVITT STREET BOVIS
1 8/11/1994 4-A
ATRIUM ORIGINAL CONSTRUCTION ELECTRICAL MAINTENANCE MANUAL BOOK #7 SIEMENS ENERGY & AUTOMATION
1 2/23/1994 1-A
ATRIUM ORIGINAL CONSTRUCTION MAINTENANCE MANUAL - SWITCHGEAR BOOK #8
SIEMENS 1 6/1/1988 1-D
ATRIUM ORIGINAL CONSTRUCTION O & M MANUAL MISCELLANEOUS BOOK #9 MCDEVITT STREET BOVIS
1 7/26/1994 1-A
ATRIUM ORIGINAL CONSTRUCTION WARRANTY MCDEVITT STREET BOVIS
1 12/16/1994 4-A
10/23/2012SUPPORT DOCUMENTS
Page 9
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
ATRIUM ORIGINAL CONSTRUCTION ADDENDUM #1 TURNER ASSOC 1 12/18/1992 1-F
ATRIUM ORIGINAL CONSTRUCTION RFI'S MCDEVITT STREET BOVIS
1 2/23/1993 7-F
ATRIUM TERMINAL REDEVELOPMENT PROGRAM PHASE I
SHORT CIRCUIT & COORDINATION STUDY BARNETT CONSULTING ENGINEERS
1 2/3/1995 6-A
ATRIUM VERTICAL TRANSPORTATION ZONE 3 ADDENDUM #1 - 7 TURNER ASSOC 1 2/1/1995 5-A
ATRIUM VERTICAL TRANSPORTATION ZONE 3 PROJECT MANUAL FOR FC-5999-94 TURNER ASSOC 1 1/20/1995 5-A
ATRIUM TERMINAL REDEVELOPMENT ATRIUM PASS-THROUGH
PHASE II TERM REDEVELOPMENT LIFE SAFETY & CEILING UPGRADE, TOILET RELOCATION, ATRIUM PASS-THROUGH
TURNER ASSOC 1 2/10/1995 2-C
ATRIUM DOA ADMIN OFFICES O & M MANUALS PIU'S, VAV'S, VALVES & PLUMBING EQUIP
WINTER 1 2/1/1994 2-F
ATRIUM DOA ADMIN & EXEC OFFICES FASHER PAINTING & DECORATING O & M MANUAL
WINTER 1 1/1/1995 2-F
ATRIUM DOA ADMIN OFFICES PHASE 2
O & M - MECHANICAL SYSTEM TOC/ELLIS-DON CONST. 1 5/1/2000 1-D
ATRIUM DOA ADMIN OFFICES PHASE 2
O & M - ELECTRICAL SYSTEM TOC/ELLIS-DON CONST. 1 5/1/2000 1-D
ATRIUM HVAC RETROFIT ATRIUM HVAC RETROFIT - CONCESSIONS HONEYWELL 1 9/1/1999 9-B
10/23/2012SUPPORT DOCUMENTS
Page 10
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
ATRIUM HVAC RETROFIT ATRIUM HVAC RETROFIT - CONCESSIONS ROOF TOP AIR HANDLER
P. W. HEARD INC. 1 7/1/1999 2-B
ATRIUM ATRIUM RETROFIT SCOPE OF WORK & TECH. SPECS. CITY OF ATLANTA 1 6/1/1999 2-B
ATRIUM ATRIUM RETROFIT SUBMITTALS - TECH. SPECS. ACE 1 9/1/1999 2-B
ATRIUM DOA ADMIN OFFICE IMPROVEMENTS-PH 2
PROJECT MANUAL MCDUFFIE GROUP 1 3/10/1999 3-A
ATRIUM HVAC CONTROLS O & M MANUAL HONEYWELL 1 1/2/1996 9-C
ATRIUM LIGHTING PROJECT SPECIFICATIONS FOR ACCENT LIGHTING MALTESE SIGNS 1 1/29/2000 2-A
ATRIUM LIGHTING PROJECT O & M MANUAL MALTESE SIGNS 1 1/29/2000 2-A
ATRIUM CONTRACT DOCUMENTS FOR ATRIUM SECURITY UPGRADES-LEVELS 3&4 FC-7280-00
DOA 1 6/5/2002 2-E
ATRIUM HAIA MEDICAL CENTER GRADY HEALTH SYSTEM PROJECT MANUAL BID DOCUMENT
A. VINCENT POPE & ASSOC.
1 3/1/2002 2-A
ATRIUM RETROFIT - BUILDING AUTOMATION SYSTEM
DOA 3RD & 4TH FLOOR O & M MANUAL JOHNSON CONTROLS 1 9/28/2009 9-B
ATRIUM ELEVATORS & ADJACENT WALLS
WALL FINISH UPGRADES CLOSE OUT DOCUMENTS
CPS 1 6/9/2010 5-F
10/23/2012SUPPORT DOCUMENTS
Page 11
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
ATRIUM CLOCK SYSTEM - THE SINGING TOWER
INSTRUCTION MANUAL - MUSIC CHIPS VERDIN 1 12/5/1996 4-D
BOILER PLANT BOILER PLANT EXPANSION UTILITY SUMMARY 1988 ABS 1 7/18/1993 1-B
BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION
PROJECT MANUAL FOR CONSTRUCTION-MECHANICAL PLANT EXPANSION 1991
STEVENS & WILKINSON 1 7/15/1991 6-A
BOILER PLANT BOILER PLANT EXPANSION ELECTRICAL EQUIPMENT WIRING DIAGRAMS COORDINATION STUDY
GOULD 1 4/9/1979 1-B
BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION
O & M MANUAL HOT & COLD WATER SYSTEM, CHILLERS & STARTERS - O & M MANUAL
PAUL W. HEARD CO 1 1/1/1992 6-A
BOILER PLANT CENTRAL PHYSICAL PLANT EXPANSION
OWNER'S MANUAL ASCO VOLUME I SYNCHROPOWER CONTROL SYSTEM
ASCO 1 10/1/1991 8-C
BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION
SHORT CIRCUIT & COORDINATION STUDY JEFFERS BARNETT & ASSOC
1 2/7/1992 6-A
BOILER PLANT WATER TREATMENT WATER TREATMENT NEWSLETTERS & HVAC UNIT LOCATION DRAWINGS
VARIOUS & DWGS BY HONEYWELL
1 2/11/1980 1-E
BOILER PLANT TEST REPORT FOR YORK CHILLER SYSTEM
PRODUCT DATA & TRAINING BOOKLETS YORK 1 6/7/1982 6-B
BOILER PLANT BOILER PLANT MOTOR CONTROL CENTER - O & M MANUAL GENERAL ELECTRIC 1 12/10/1993 2-E
BOILER PLANT BOILER PLANT DREW CHEMICAL CORP QUARTERLY REPORTS '81, '82, '83, '84, '85, '86, '89
DREW CHEMICAL 3 12/31/1989 6-C
10/23/2012SUPPORT DOCUMENTS
Page 12
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
BOILER PLANT BETZ ENTEC WATER ANALYSIS REPORT E CONC W/ PROPOSAL TO FURNISH WATER TREATMENT
BETZ ENTEC 1 12/30/1993 2-B
BOILER PLANT PLANT INTERCONNECTION JOB #92050.02
PROJECT MANUAL FOR CONSTRUCTION OF PLANT INTERCONNECTION
STEVENS & WILKINSON 1 9/15/1993 2-B
BOILER PLANT WATER & PROCESS TREATMENT
BETZ DEARBORN FOURTH QUARTER 1996 REVIEW
BETZ DEARBORN MICHAEL A. HUTTON
1 12/20/1996 3-F
BOILER PLANT CENTRAL POWER PLANT 1990 MAINTENANCE AUDIT EQUIPMENT, SYSTEM, OPERATIONS
INTEC SERVICE INC 1 1/1/1990 4-F
BOILER PLANT GRAHAM VFD TERMINAL, BOILER PLANT, CON T & D
GRAHAM VARIABLE FREQUENCY DRIVE SUBMITTALS & O & M MANUALS
GRAHAM 1 11/7/1997 4-E
BOILER PLANT BOILER PLANT EQUIPMENT OPERATING PROCEDURES FOR PUMPS, COMPRESSORS, SOFTNERS & CONVERTERS
ABSA 1 5/2/1988 1-B
BOILER PLANT BOILER PLANT BOILER PLANT UTILITY SUMMARIES - 1980 TO 1987
NONE 1 1/1/1980 8-F
BOILER PLANT ABSORPTION CHILLER REPLACEMENT
PERFORMANCE BASED CONTRACTING PROFESSIONAL SERVICES
JOHNSON CONTROLS 1 5/7/2001 1-B
BOILER PLANT LITHIUM BROMIDE CLEAN-UP CHILLERS
STATUS REPORT YORK 1 9/19/1995 1-B
BOILER PLANT SWITCH BOARD O & M MANUAL SIEMENS 1 1/1/1986 6-B
BOILER PLANT VOLUME 1 MOTOR CONTROL MOTOR CONTROL CENTER G.E. EQUIP. SUBMITTAL DATA VOLUME 1
DIXIE ELECTRIC 1 11/22/1993 2-E
10/23/2012SUPPORT DOCUMENTS
Page 13
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
BOILER PLANT CHILLER REPLACEMENT WARRANTY - CENTRAVAC TRANE 1 4/28/2003 4-A
BOILER PLANT CHILLER REPLACEMENT O & M MANUAL FOR CHILLER CONTROLS F & S MECHANICAL 1 12/2/2003 6-E
BOILER PLANT EQUIPMENT & DESIGN EVALUATION
PROJECT EVALUATION REPORT JOHN T. DENNING 1 10/1/1981 6-B
BOILER PLANT MECHANICAL SYSTEMS PRELIMINARY REPORT ON BLDG & OPERATING PROCEDURE
GUPTON ENGR 1 2/2/1982 6-B
BOILER PLANT BOILER REPLACEMENT BOILERS 4, 5, 6 O & M MANUAL VOLUMES 1 - 6 BABCOCK & WILCOX 6 3/24/2004 9-D
BOILER PLANT BOILER REPLACEMENT BOILERS 4, 5, 6 OPERATING INSTRUCTIONS - AS BUILT DOCUMENTATION
BABCOCK & WILCOX 1 2/25/2005 9-D
BOILER PLANT BOILER REPLACEMENT HEATED HOT WATER SYSTEMS OPERATIONS MANUAL
PRIME ENGINEERING 1 6/25/2004 3-F
BOILER PLANT BOILER REPLACEMENT O & M MANUAL CLEVELAND MECHANICAL
1 5/20/2004 3-F
BOILER PLANT BOILER REPLACEMENT SEPT 2004 EMISSIONS TESTING OF BOILERS SB04 AND SB05
GENERAL ENGINEERING
1 1/5/2005 3-F
BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB04 GENERAL ENGINEERING
1 1/5/2005 3-F
BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB05 GENERAL ENGINEERING
1 1/5/2005 3-F
10/23/2012SUPPORT DOCUMENTS
Page 14
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
BOILER PLANT BOILER REPLACEMENT NOV 2004 EMISSIONS TESTING OF BOILER SB06 GENERAL ENGINEERING
1 1/5/2005 3-F
BOILER PLANT FUEL SYSTEM LUBRICANT INJECTION SYSTEM
O & M FOR CATERPILLAR MODULES (2) SUNBELT 1 11/12/1996 8-B
BOILER PLANT BOILER PLANT TANK MONITOR/200 O & M MANUAL RONAN ENGINEERING 1 1/1/1996 7-D
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
ELECTRIC CHILLER REPLACEMENT PROJECT FINAL COMMISSIONING REPORT
TOTAL SYSTEMS COMMISSIONING, INC
1 8/24/2007 1-A
BOILER PLANT BOILER SYSTEMS PLUS SEMINAR
BOILER SYTEMS PLUS SEMINAR - TRAINING CLEAVER BROOKS 1 1/16/1996 3-F
BOILER PLANT BOILER OPERATOR TRAINING BOILER OPERATOR TRAINING WORKBOOK BETZ DEARBORN 1 1/1/1997 3-F
BOILER PLANT HEATING HOT WATER SYSTEM REVIEW
LANDSIDE TERMINAL BUILDING BOILER PLANT NEWCOMB & BOYD 1 7/27/2007 7-E
BOILER PLANT 3456 GENERATOR SETS O & M MANUAL FOR CATERPILLAR 3456 GENERATOR
SUNBELT 1 3/1/2006 4-E
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT CHILLER & COOLER TOWER
100% DESIGN SPECS HSST 1 7/25/2008 8-F
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT CHILLER & COOLER TOWER
100 % DESIGN NARRATIVE HSST 1 7/25/2008 8-F
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT & EAST PLANT COOLING TOWER
WATER SAVINGS PROJECT FINAL CONSTRUCTION BID DOCUMENT SUBMITTAL
HSST 1 9/4/2009 8-F
10/23/2012SUPPORT DOCUMENTS
Page 15
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
CHILLER & COOLING TOWER REPLACEMENT SUBMITTALS
F & S MECHANICAL 1 10/8/2008 8-F
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
CHILLER & COOLING TOWER REPLACMENT O & M MANUAL PART 1 OF 2
F & S MECHANICAL 1 11/1/2009 8-F
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
CHILLER & COOLING TOWER REPLACEMENT JCI O & M MANUAL
JOHNSON CONTROLS 2 11/15/2009 8-F
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
CHILLER & COOLING TOWER REPLACEMENT O & M MANUAL
F & S MECHANICAL 2 10/31/2008 8-F
BOILER PLANT CHILLER REPLACEMENT CENTRAVAC CUSTOMER WITNESS TEST TRANE 1 4/28/2003 5-C
BOILER PLANT LITHONIA FLUORESCENT LIGHTING
ELECTRICAL SPECIFICATIONS GRAYBAR 1 12/7/1993 2-E
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT UPGRADE
COMMISSIONING REPORT HEERY 2 5/19/2010 1-A
BOILER PLANT PERFORMANCE TEST ORIGINAL CONSTRUCTION LIMBACH 1 6/1/1979 4-F
BOILER PLANT BOILER PLANT CONTROL COMPONENTS & EQUIPMENT GRAYBAR ELECTRIC COMPANY
1 12/2/1993 4-F
BOILER PLANT YORK AIR CONDITIONING IREPORT OF EDDY CURRENT NSPECTION YORK 1 2/24/1988 6-B
BOILER PLANT CENTRAL MECHANICAL PLANT EXPANSION
MOTOR CONTROL CENTER SPECIFICATIONS & DRAWING TRANSMITTAL RECORD (LEAD SHEET)
SIEMENS 1 2/17/1992 1-E
10/23/2012SUPPORT DOCUMENTS
Page 16
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
BOILER PLANT CENTRAL PHYSICAL PLANT EXPANSION
OWNER'S MANUAL ASCO VOLUME 2 SYNCHROPOWER CONTROL SYSTEM
ASCO 1 10/1/1991 8-C
BOILER PLANT TERMINAL CENTRAL UTILITY PLANT
CHILLER & COOLING TOWER REPLACEMENT O & M MANUAL PART 2 OF 2
F & S MECHANICAL 1 11/1/2009 8-F
CONC A TRANSFER POINT EXPANSION O & M MANUAL JOB #935-20006 HONEYWELL 1 5/8/1991 9-B
CONC A TRANSFER POINT EXPANSION AS BUILT, O & M MANUAL HONEYWELL 1 5/1/1991 9-B
CONC A TRANSFER POINT EXPANSION EQUIPMENT DATA HONEYWELL 1 4/4/1990 9-C
CONC A CONTROL TOWER MODIFICATIONS
CONCOURSE A AUTO. CONTROL INSTALLATION HONEYWELL 1 3/6/1991 9-C
CONC A DELTA CONC A & CONC B SOUTH RR EXPANSION
PROJECT MANUAL FOR A & B PUBLIC REST ROOM EXPANSION
DERYCK MUEHLHAUSER
1 11/28/1984 1-F
CONC A DELTA CONTROL TOWER TRANSFER MODIFICATIONS
SUBMITTALS FOR DELTA CONTROL TOWER PERFORMANCE MECHANICAL
1 2/5/1991 1-F
CONC A TRANSFER POINT EXPANSION CONC A - O & M MANUAL - VOLUME I GEORGIA SPECIALTY CONSTRUCTORS
1 4/1/1991 1-F
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS - OWNERS MANUAL DELTA TOWER #5 CC3388
DOVER ELEVATOR CO 1 8/1/1982 5-F
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS OWNERS MANUAL DELTA TOWER #6 EC3389
DOVER ELEVATOR CO 1 11/1/1982 5-F
10/23/2012SUPPORT DOCUMENTS
Page 17
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS -- OWNERS MANUAL EB8786 DOVER ELEVATOR CO 1 3/1/1979 5-F
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS -- OWNERS MANUAL EB8784 DOVER ELEVATOR CO 1 3/1/1979 5-F
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS -- OWNERS MANUAL EB8785 DOVER ELEVATOR CO 1 3/1/1979 5-F
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS - OWNERS MANUAL -- DELTA TOWER 009E-C3389
DOVER ELEVATOR CO. 1 11/1/1982 5-F
CONC A TRANSFER POINT MODIFICATIONS
CONC A - O & M MANUAL CONTRACT #FC4483-89
MECHANICAL ASSOC. 1 4/11/1991 2-A
CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS
O & M MANUAL MECHANICAL ASSOC 1 2/12/1992 2-A
CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS
PROJECT MANUAL DERYCK MUEHLHAUSER
1 11/1/1990 2-A
CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS
SUBMITTAL DATA MECHANICAL ASSOC 1 2/14/1991 2-B
CONC A TRANSFER POINT MODS CONC A - PROJECT SUBMITTAL MECHANICAL ASSOC 1 4/30/1990 2-B
CONC A ORIGINAL CONSTRUCTION CONC A
ELEVATORS -- OWNERS MANUAL EB8787 DOVER ELEVATOR CO 1 8/1/1983 5-F
CONC A TRANSFER POINT MODS CONC A - ELEVATOR INSTRUCTION MANUAL #60222A
MONTGOMERY ELEVATOR
1 1/2/1984 5-F
10/23/2012SUPPORT DOCUMENTS
Page 18
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A TRANSFER POINT MODS CONC A - ELEVATOR INSTRUCTION MANUAL #60223A
MONTGOMERY ELEVATOR
1 9/1/1985 5-F
CONC A DELTA SPEEDLINE O & M MANUAL PERFORMANCE MECH 1 8/13/1992 2-B
CONC A TRANSFER POINT MODS CONC A - O & M MANUAL -- RMU'S STRAND 1 4/11/1991 2-B
CONC A TRANSFER POINT EXPANSION CONC A - PROJECT MANUAL -- RMU'S STRAND 1 7/25/1990 2-B
CONC A TRANSFER POINT EXPANSION CONC A - CONTRACT DOCUMENTS DOA 1 2/28/1990 2-B
CONC A DELTA SPEEDLINE PROJECT MANUAL DERYCK MUEHLHAUSER
1 8/19/1992 2-B
CONC A DELTA STATION ADMINISTRATION OFFICE
O & M MANUAL MALLORY & EVANS 1 9/23/1981 2-D
CONC A DELTA CROWN ROOM O & M MANUAL MALLORY & EVANS 1 12/23/1981 2-D
CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS
O & M MANUAL ALL SOUTH SPRINKLER CO
1 8/29/1991 9-B
CONC A DELTA TOWER MODIFICATIONS
GENERAL CONSTRUCTION CLOSE OUT MANUAL DERYCK MUEHLHAUSER
1 8/23/1991 2-D
CONC A TRANSFER POINT EXPANSION CONC A - SPECIFICATIONS FC4483-89 DOA 1 10/16/1989 9-B
10/23/2012SUPPORT DOCUMENTS
Page 19
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A DELTA CROWN ROOM EXPANSION
PROJECT SPECIFICATIONS DERYCK MUEHLHAUSER
1 12/11/1981 2-C
CONC A DELTA STATIONS ADMIN PHASE III
DELTA STATIONS ADMINISTRATION AREA ALTERATIONS & ADDITIONS PHASE III SPECIFICATIONS
FRED TOGUCHI ASSOC 1 9/24/1981 2-C
CONC A DELTA TOWER ELEVATORS DRAWINGS FOR ELEVATORS AT DELTA TOWER DOVER ELEVATORS 1 4/15/1991 5-F
CONC A ORIGINAL CONSTRUCTION CONC A PARTS & MAINTENANCE MANUAL PEELLE CONTRACT # 90-1283
PEELE COMPANY 1 12/1/1989 8-A
CONC A DELTA CONC A FACILITIES SUBMITTALS FOR REST ROOM EQUIPMENT HOLDER CONSTRUCTION CO
1 6/1/1981 2-C
CONC A DELTA CONTROL TOWER & TRANSFER POINT MODS
RESUBMITTAL MECHANICAL ASSOC 1 3/1/1991 2-A
CONC A DELTA RESTROOM SURVEY SURVEY TO DETERMINE ADEQUACY OF FACILITIES & TO DEFINE EXISTING PROBLEMS
FRED TOGUCHI ASSOC 1 4/3/1981 6-B
CONC A VARIABLE TORQUE DRIVE 3 PHASE INPUT/OUTPUT
O & M AND INSTRUCTION MANUAL RELIANCE ELECTRIC 1 5/1/1984 8-A
CONC A DELTA STATIONS TRAINING & INFLIGHT REV
PROJECT MANUAL DERYCK MUEHLHAUSER
1 6/15/1988 3-B
CONC A SUPPLEMENTAL AIR HANDLING UNITS
SERVICE INSTRUCTIONS YORK 1 9/16/1981 8-A
CONC A DELTA STATIONS TRAINING O & M & INSTRUCTION MANUAL J. S. THOMAS CO. 1 6/5/1989 2-B
10/23/2012SUPPORT DOCUMENTS
Page 20
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A DELTA CONTROL TOWER SUBMITTALS PERFORMANCE MECH 1 3/1/1991 1-F
CONC A DELTA CENTRALIZED LOAD PLANNING CENTER
EMERSON INDUSTRIAL CONTROLS EMERSON 1 12/15/1982 6-E
CONC A AATC MAINTENANCE FACILITY RELOCATION
PROJECT MANUAL & SPECIFICATIONS TRIMBLE ARCHITECTS 1 1/27/1995 2-A
CONC A HITACHI INVERTER J300 SERIES INSTRUCTION MANUAL HITACHI, LTD 1 4-D
CONC A DELTA PRECONDITIONED AIR UPGRADE & MODS
SPECIFICATIONS VOL. I - DIVISIONS 00 TO 13 AERO SYSTEMS ENGINEERING
1 1/30/1998 3-C
CONC A DELTA PRECONDITIONED AIR UPGRADE & MODS
SPECIFICATIONS VOL. II - DIVISIONS 15 & 16 AERO SYSTEMS ENGINEERING
1 1/30/1998 3-C
CONC A ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
CONC A HOULIHAN'S-TO-GO A-F3; MAGNOLIA GRILLE B-F12; HOULIHAN'S
WARRANTY PERFORMANCE MECHANICAL
1 7/8/1996 4-A
CONC A SPEEDLINE CAFETERIA SUBMITTAL DATA BROADWATER CONTROLS
1 8/12/1992 2-B
CONC A PLANE DELICIOUS PROJECT MANUAL RICHARD & WITTSCHIEBE
1 12/3/1999 3-A
CONC A DELTA B767-400 PROJECT PHASE 2
PROJECT SPECIFICATIONS AERO SYSTEMS ENGINEERING
1 6/23/2000 3-A
10/23/2012SUPPORT DOCUMENTS
Page 21
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A DELTA A-17 CROWN ROOM LAVATORY FAUCET INFORMATION TABORET 1 1/26/1998 2-B
CONC A CHILI'S TOO RENOVATION SPECIFICATIONS - FOODSERVICE EQUIP. & FURNISHINGS
HOSPITALITY SERVICES 1 10/8/2001 2-B
CONC A COMMUNICATIONS CABLE RACEWAYS
EVALUATION OF CONDUIT VERSUS CABLE TRAY - CONC A & B
HNTB 1 2/7/2003 7-D
CONC A FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 2/12/2004 1-C
CONC A FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 2 OF 5 - CONCOURSE A
BUFFALO 1 2/28/2005 6-F
CONC A HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C
CONCOURSE A VOLUME 2 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F
CONC A HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C
CONCOURSE C VOLUME 2 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F
CONC A ESCALATOR UPGRADES COST PROPOSAL KONE 1 5/3/2006 5-F
CONC A ROOFING PROJECT CONCOURSE A & B ROOF REPLACEMENT CLOSE OUT DOCUMENTS
AATC 1 2/19/1998 4-A
CONC A DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION PROJECT
LETTER OF CERTIFICATION, WARRANTY LETTER, O & M MANUAL
JOHNSON CONTROLS 2 6/24/2009 4-A
CONC A RE-ROOFING PROJECT CONCOURSE A & B RE-ROOFING SPECS RAYMOND ENGINEERING
1 8/26/2006 4-A
10/23/2012SUPPORT DOCUMENTS
Page 22
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC A SMOKING LOUNGE CON A SMOKING LOUNGE MECH, ELEC & FP SPECS
APADANA 1 12/22/2008 3-E
CONC A SMOKING ROOM WARRANTY AND O & M MANUAL FOR DOOR BESAM UNISLIDE 1 6/15/2009 4-A
CONC A TRANSFER POINT EXPANSION CONC A - O & M MANUAL - VOLUME II GEORGIA SPECIALTY CONSTRUCTORS
1 4/1/1991 1-F
CONC A DELTA AIRLINES A17 SKY CLUB CLOSEOUT MANUAL BRYSON 1 6/21/2011 7-A
CONC A VERTICAL TRANSPORTATION ESCALATOR A2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018981
KONE 1 7/30/2012 5-B
CONC A VERTICAL TRANSPORTATION ESCALATOR A1 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018981
KONE 1 7/30/2012 5-B
CONC B CENTER POINT EXPANSION CONC B - O & M MANUAL FOR SWITCHBOARD, PANELBOARDS, BUSWAY & TRANSFORMERS
SIEMENS ENERGY & AUTOMATION
1 5/11/1993 6-B
CONC B DELTA RESERVATION CROWN ROOM
PROJECT SPECIFICATIONS PERFORMANCE MECH 1 9/9/1991 2-C
CONC B TRANSFER POINT EXPANSION CONC B - SUBMITTAL DATA & HYDRAULIC CALCULATIONS
ALL SOUTH SPRINKLER CO
1 10/15/1993 5-E
CONC B DELTA MAIL SORTATION FACILITY
O & M MANUAL HONEYWELL 1 3/14/1995 9-B
CONC B DELTA MAIL SORTATION FACILITY
O & M MANUAL NEW SOUTH CONSTRUCTION
1 3/28/1994 2-D
10/23/2012SUPPORT DOCUMENTS
Page 23
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC B TRANSFER POINT EXPANSION CONC B - SOUND SYSTEM & P.A. SYSTEM SUBMITTALS
BAKER AUDIO 1 8/24/1993 9-B
CONC B TRANSFER POINT EXPANSION CONC B - O & M MANUAL MECHANICAL ASSOC 1 2/28/1995 2-D
CONC B TRANSFER POINT EXPANSION CONC B - TECHNICAL SPECIFICATIONS ( REVISIONS)
MILTON PATE ASSOC 1 4/23/1993 2-D
CONC B TRANSFER POINT EXPANSION CONC B - DESIGN / CONSTRUCTION STANDARDS MANUAL
D.O.A. 1 10/19/1992 2-D
CONC B DELTA MAIL SORTATION @ CONC B NORTH
PROJECT MANUAL STANG & NEWDOW 1 4/15/1994 3-A
CONC B DELTA MAIL SORTATION FACILITY @ B NORTH
SHORT CIRCUIT & COORDINATION STUDY JEFFERS, BARNETT & ASSOC
1 5/6/1994 6-A
CONC B ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
CONC B ADTRANZ COMPUTER ROOM-MEZZ LEVEL
O & M MANUAL (WARRANTY INCLUDED) PERFORMANCE MECHANICAL
1 3/23/1999 9-B
CONC B DELTA B-SPINE COMM RM RENOV. PROJECT PHASE I
SPECS AND CONTRACT DOCUMENTS MACK YOUNG 1 4/3/1998 3-C
CONC B DELTA B18R COMM. RM. RENOV. PH. III
BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 6/11/1997 3-A
CONC B TRANSFER POINT EXPANSION O & M MANUAL JOB #936-23013 HONEYWELL 1 7/25/1994 9-B
10/23/2012SUPPORT DOCUMENTS
Page 24
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC B FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 2/20/2004 1-C
CONC B FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 3 OF 5 - CONCOURSE B
BUFFALO 1 2/28/2005 6-F
CONC B DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
LOGISTICS PLAN NEW SOUTH 1 6/5/2007 9-F
CONC B UNDERGROUND STORAGE TANK SYSTEM
UNDERGROUND STORAGE TANK SYSTEM CATHODIC PROTECTION SYSTEM EVALUATION REPORT
CORRPRO 1 11/3/2008 1-B
CONC B BAGGAGE HANDLING SYSTEM EXP PROJECT (BHS)
CLOSEOUT DOCUMENTS NEW SOUTH 1 6/5/2007 6-E
CONC B ELECTRICAL EQUIPMENT RENOVATION
SCOPE OF WORK & SPECIFICATIONS CITY OF ATLANTA 1 10/7/2009 6-D
CONC B DELTA BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
FIRE ALARM O & M MANUAL KRATOS 1 10/26/2009 9-F
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
AUDIO / VISUAL O & M MANUAL BAKER AUDIO 1 9/18/2009 9-F
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
SPRINKLER O & M MANUAL GWINNETT SPRINKLER 1 10/27/2009 6-B
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
SWITCHGEAR O& M MANUAL SIEMENS 1 10/8/2009 9-F
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
MECH / PLUMBING O & M MANUAL 1 OF 2 W. B. WALLIS 1 9/22/2009 9-F
10/23/2012SUPPORT DOCUMENTS
Page 25
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
MECH / PLUMBING O & M MANUAL 2 OF 2 W. B. WALLIS 1 9/22/2009 9-F
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
ELECTRICAL O & M MANUAL SIEMENS 1 9/18/2009 9-F
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
BID PACKAGE #4 - ADDENDUM #1 RECORDS SPECIFICATIONS
PGAL 1 9/10/2007 6-E
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
WARRANTY MANUAL VOL 1 NEW SOUTH 1 12/14/2009 4-C
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
WARRANTY MANUAL VOL 2 NEW SOUTH 1 12/14/2009 4-C
CONC B DAL BAGGAGE HANDLING SYSTEM (BHS) EXPANSION
WARRANTY MANUAL VOL 3 NEW SOUTH 1 12/14/2009 4-C
CONC B ELECTRICAL EQUIPMENT RENOVATION
DESIGN NARRATIVE CITY OF ATLANTA 1 10/7/2009 6-D
CONC B HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C
CONCOURSE B VOLUME 2 PERFORMANCE MECH 1 11/7/2005 6-F
CONC B VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR B1 KONE 1 9/14/2010 5-A
CONC B VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR B2 KONE 1 9/14/2010 5-A
CONC B B SWITCHGEAR, BUS-DUCT PROJECT
GENERATOR O & M MANUAL CUMMINS 1 9/24/2010 7-B
10/23/2012SUPPORT DOCUMENTS
Page 26
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC B ELECTRICAL EQUIPMENT RENOVATION
EQUIPMENT O & M MANUAL CLEVELAND ELECTRIC 1 12/3/2010 7-A
CONC B SWITCHGEAR RENOVATION / ELECTRICAL EQUIPMENT RENOVATION
ACCEPTANCE TESTING DATA CLEVELAND ELECTRICAL TESTING SERVICE
2 12/1/2010 8-E
CONC B DELTA AIRLINES B10 SKY CLUB PROJECT PHASE 2
WARRANTY MANUAL NEW SOUTH CONSTRUCTION
1 3/9/2011 7-A
CONC B SWITCHGEAR EQUIPMENT RENOVATION
TERMOGRAPHIC SURVEY REPORT CLEVELAND ELECTRICAL TERSTING SERVICES
1 11/3/2011 7-B
CONC B BOMBARDIER CONTROL ROOM HVAC UPGRADES CLOSE OUT DOCUMENTS
CPS 1 2/28/2012 5-C
CONC C DOBBS CONCESSION EXPANSION CN-1
SPECIFICATIONS MAKUTA CROPSEY 1 3/28/1983 2-D
CONC C CONC C RENOVATIONS HIP 96
TECHNICAL SPECIFICATIONS DIV. 01-16 STEVENS & WILKINSON 1 7/26/1995 2-D
CONC C RENOVATION HIP-38A PROJECT MANUAL--SPECIFICATIONS PATE / MC DUFFIE 1 7/26/1995 1-F
CONC C ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
CONC C SOUTH RENOVATION TECHNICAL SPECIFICATIONS FOR CONC C SOUTH RENOVATIONS
ACE 1 9/30/1999 3-C
CONC C RE-ROOF ROOF SYSTEMS SPECIFICATIONS MAINTENANCE MANUAL
BENCHMARK 1 3/22/2000 4-A
10/23/2012SUPPORT DOCUMENTS
Page 27
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC C ASA C-NORTH RENOVATIONS ELEVATOR & WARRANTY MONTGOMERY KONE 1 10/1/1999 5-F
CONC C AIRTRAN RENOVATIONS SPECIFICATIONS ROBERT & CO. 1 9/30/1999 3-C
CONC C RE-ROOFING PROJECT AS-BUILT DRAWINGS & WARRANTY PREMIUM ROOFING 1 11/17/2003 4-A
CONC C PASCHALS' RESTAURANT / LA CAROUSEL LOUNGE
PROJECT MANUAL - C-F4 DENNIS MAKUTA 1 12/1/2003 1-A
CONC C CONTROL TOWER RENOV LIGHTING, RACEWAY, WIRING DEVICES MANUAL NEWCOMB & BOYD 1 7/11/2005 3-C
CONC C CONTROL TOWER RENOV HVAC SUBMITTALS ACTION ELECTRIC 1 5/12/2005 3-C
CONC C CROWN ROOM RENOV SAFETY MANUAL HOLDER CONST. 1 9/9/2005 2-C
CONC C SHORT CIRCUIT COORDINATION STUDY
STUDY DATA FOR CONC C HOOD-PATTERSON & DEWAR
1 6/28/2005 6-A
CONC C AIRTRAN O & M MANUAL SIEMENS 1 5/24/2006 7-E
CONC C COSMETIC UPGRADES O & M MANUALS - VOLUME 1 NEW SOUTH CONSTRUCTION
1 10/1/2007 5-B
CONC C COSMETIC UPGRADES O & M MANUALS - VOLUME 2 NEW SOUTH CONSTRUCTION
1 10/1/2007 5-B
10/23/2012SUPPORT DOCUMENTS
Page 28
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC C C NORTH RENOVATION PROJECT MANUAL - 50% ROSSER INT'L 1 6/27/2005 7-D
CONC C FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 3/8/2004 1-C
CONC C FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 4 OF 5 - CONCOURSE C
BUFFALO 1 2/28/2005 6-F
CONC C CONTROL TOWER RENOV CONTROL TOWER SPECIFICATIONS NEWCOMB & BOYD 1 2/8/2005 3-C
CONC C EXPANSION - DELTA PASSENGER BOARDING BRIDGE INSTALLATION CONCOURSE C NORTH
ROBERT AND COMPANY
1 12/21/2007 5-C
CONC C C NORTH RENOVATION C NORTH RENOVATIONS LOGISTICS PLAN NEW SOUTH CONSTURCTION
1 1/30/2009 7-E
CONC C RE-ROOF PROJECT 2002 - 2003
WEEKLY PROGRESS SUMMARY & SCHEDULE RAYMOND ENGINEERING
1 6/21/2002 4-B
CONC C C NORTH EXPANSION PROJECT
O & M MANUAL VOL 1 NEW SOUTH CONSTRUCTION
2 8/13/2008 9-E
CONC C C NORTH EXPANSION PROJECT
O & M MANUAL VOL 2 NEW SOUTH CONSTRUCTION
2 8/13/2008 9-E
CONC C C NORTH EXPANSION PROJECT
O & M MANUAL VOL 3 NEW SOUTH CONSTRUCTION
2 8/13/2008 9-E
CONC C C NORTH EXPANSION PROJECT
JCI O & M MANUAL & PRODUCT DATA - PASSENGER BOARDING BRIDGES PHASE 3
JOHNSON CONTROLS 2 3/31/2009 9-E
10/23/2012SUPPORT DOCUMENTS
Page 29
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC C ASA C-NORTH RENOVATION ROSSER 1 9/15/2006 4-F
CONC C HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C
CONCOURSE A VOLUME 1 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F
CONC C HVAC SYSTEMS UPGRADES - CONCOURSES A, B, & C
CONCOURSE C VOLUME 1 OF 2 PERFORMANCE MECH 1 11/7/2005 6-F
CONC C FIBER BOARD DUCT REPLACEMENT PROJECT
CLOSE OUT DOCUMENTS PAUL W. HEARD 1 6/11/2010 4-F
CONC C C NORTH RENOVATION OIL/WATER SEPARATOR - FUELIING OWNERS MANUAL
ENQUIP, INC 1 10/21/1999 4-F
CONC C C NORTH ASA RENOVATION RATIO SYSTEM MODEL 10 BATH CONTROLLER
RANKIN AUTO. 1 10/21/1999 4-F
CONC C ASA RENOVATION O & M MANUALS ROOF TOP UNIT AND EXHAUST FAN
ROBERT & COMPANY 1 10/21/1991 3-E
CONC C VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR C4 KONE 1 12/16/2010 5-A
CONC C WATER HEATER GATE C45 LRR APRON LEVEL, O & M MANUAL AND WARRANTY INFORMATION
SIERRA CONSTRUCTION 1 3/31/2011 4-E
CONC C ASA CARPET INSTALLATION CLOSE OUT; WARRANTY AND O & M MANUAL J&J INVISION 1 5/16/2011 4-E
CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II
O & M MANUAL ESCALATOR C1 KONE 1 2/14/2012 5-A
10/23/2012SUPPORT DOCUMENTS
Page 30
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II
O & M MANUAL ESCALATOR C3 KONE 1 2/14/2012 5-A
CONC C VERTICAL TRANSPORTATION UPGRADE PHASE II
O & M MANUAL ELEVATOR C1 NEW SOUTH 1 5/11/2012 5-A
CONC C PARTIAL ROOF REPLACEMENT
CLOSE-OUT DOCUMENTS GATES C14 - C18 TIP TOP ROOFERS 1 5/6/2012 4-B
CONC C VERTICAL TRANSPORTATION ESCALATOR C2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018962
KONE 1 7/30/2012 5-A
CONC C PARTIAL ROOF REPLACEMENT PROJECT
GATES C14 - C18 CLOSE OUT DOCUMENTS TIP TOP ROOFERS 1 6/19/2012 4-B
CONC C DELTA AIRLINES SKY CLUB B25 & C37 SEAT DENSITY WARRANTY ONE SOURCE ELECTRIC 1 3/12/2012 4-E
CONC D AGT WALKWAY CONTRACT FC5814-94
AGT WALKWAY PROJECT MANUAL TURNER ASSOC 1 6/6/1994 2-D
CONC D ORIGINAL CONSTRUCTION T-1 CONTRACT
ELECTRICAL EQUIPMENT & LOAD CENTER DRAWINGS
GOULD 1 11/29/1977 8-A
CONC D AGT WALKWAY O & M MANUAL CONMAC CORPORATION
1 12/19/1994 2-D
CONC D ORIGINAL CONSTRUCT. ( GATE D-16 )
OWNERS MANUAL AIR CONDITIONING CARRIER 1 1/1/1989 6-E
CONC D NORTHWEST AIRLINES SPECIFICATIONS - COMPUTERIZED TICKETING SYS. TICKET COUNTER
HOAG-WISMAR PARTNERSHIP
1 11/1/1984 2-D
10/23/2012SUPPORT DOCUMENTS
Page 31
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC D RESTROOM RENOVATIONS PROJECT MANUAL SIZEMORE FLOYD 1 9/25/1995 2-D
CONC D COND D RENOVATIONS PROJECT CLOSEOUT MANUAL - PROJECT 910-5112
MC DEVITT STREET BOVIS
1 11/26/1996 3-C
CONC D CONC D RENOVATIONS PROJECT MANUAL MC DEVITT STREET BOVIS
1 1/29/1997 3-C
CONC D NORTHWEST AIRLINES GATE SWAP
PROJECT MANUAL FOR PROJECT #ATL - 95-02 ROSSER 1 5/30/1997 2-D
CONC D ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
CONC D CONTINENTAL PRESIDENT'S CLUB
O & M MANUAL P.W. HEARD INC. 1 9/10/1999 2-A
CONC D CONTINENTAL PRESIDENT'S CLUB
AS-BUILT RECORD DWGS. UPTIME ELECTRIC 1 9/10/1999 2-A
CONC D NORTHWEST AIRLINES OFFICE CONSOLIDATION
PROJECT MANUAL KRA 1 5/3/1999 3-C
CONC D NORTHWEST AIRLINES GLYCOL TANKS REMOVAL
PROCEDURES DAMES & MOORE 1 5/5/1997 7-D
CONC D CONTINENTAL PRESIDENT'S CLUB
PROJECT MANUAL & ADDENDUM #1 GENSLER 1 5/3/1999 2-A
CONC D DELTA AIRLINES GATE D31, RAMP OFFICES - TECH. & SERVICE MANUAL FOR HEAT PUMP AIR CONDITIONERS
MITSUBISHI 1 4/13/2000 9-A
10/23/2012SUPPORT DOCUMENTS
Page 32
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC D US AIRWAYS IMAGE UPGRADE JOB #9819
O & M MANUAL NEW SOUTH 1 10/22/1998 1-D
CONC D DELTA AIRLINES O & M MANUAL NEW SOUTH CONST. 1 4/24/2003 7-F
CONC D DELTA AIRLINES O & M MANUAL AND WARRANTY LETTER - ELEVATOR @ D27
SCHINDLER 1 6/3/2003 5-E
CONC D HVAC SYSTEMS UPGRADE O & M MANUAL W. B. WALLIS 1 12/22/2004 2-B
CONC D LOAD STUDY POWER SURVEY WINTER-SPRING 2005 PATTERSON & DEWAR 1 1/17/2006 7-D
CONC D SHORT CIRCUIT COORDINATION STUDY
STUDY DATA FOR CONC D HOOD-PATTERSON & DEWAR
1 6/15/2005 6-A
CONC D GATE ADDITIONS SL870 USER MANUAL LANDERS ENTERPRISES 1 2/1/2005 7-E
CONC D GATE ADDITIONS O & M MANUAL MECHANICAL ASST 1 2/28/2006 7-D
CONC D GATE ADDITIONS O & M MANUAL 10 HYDRANTS TO JET FUEL SYSTEM
ARCHER WESTERN 1 10/31/2008 7-E
CONC D GATE ADDITIONS O & M MANUAL FIRE ALARM SYSTEM WFI 1 9/4/2007 1-B
CONC D GATE ADDITIONS O & M MANUALS - VOLUME 1 SIEMENS 1 8/18/2006 7-E
10/23/2012SUPPORT DOCUMENTS
Page 33
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC D GATE & HOLDROOMS O & M MANUALS JOHNSON CONTROLS 2 11/1/2006 7-D
CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 1 SP GROUP 1 3/14/2008 7-D
CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 2 SP GROUP 1 3/14/2008 7-D
CONC D MIDPOINT EXPANSION SPECIFICATIONS - VOLUME 3 SP GROUP 1 3/14/2008 7-D
CONC D MIDPOINT EXPANSION BASIS OF DESIGN REPORT SP GROUP 1 3/14/2008 7-D
CONC D GATE ADDITIONS O & M MANUALS - VOLUME 2 SIEMENS 1 8/18/2006 7-E
CONC D FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 5 OF 5 - CONCOURSE D
BUFFALO 1 2/28/2005 6-F
CONC D MIDPOINT EXPANSION CONCEPT DEVELOPMENT - FINAL REPORT DOA 1 12/1/2006 7-D
CONC D COSMETIC UPGRADES O & M MANUAL-FANS, DDC CONTROLS, SOAP DISPENSER
W. B. WALLIS & COMPANY
1 8/1/2007 5-B
CONC D MIDPOINT EXPANSION PROJECT OPERATIONS PLAN SP GROUP 1 3/14/2008 7-D
CONC D GATE D35 ELEVATOR ENCLOSURE
CLOSE OUT DOCUMENTS DOBBS RAKER 1 12/17/2009 5-F
10/23/2012SUPPORT DOCUMENTS
Page 34
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC D ROOF REPLACEMENT ROOF WARRANTY JOHNS MANVILLE 1 11/2/2009 4-A
CONC D ROOF REPLACEMENT CONCOURSE D ROOF REPLACEMENT CLOSE OUT DOCUMENTS
AATC 1 1/12/2010 4-A
CONC D ROOF SPECS CONCOURSE D ROOF REPLACEMENT SPECS AATC 1 2/1/2010 4-A
CONC D GATE ADDITIONS O & M MANUAL FOR EQUIPMENT SIEMENS 1 8/18/2006 7-D
CONC D COSMETIC UPGRADES RESTROOM O & M MANUAL - PARTITION, GRAB BAR, SEAT COVER DISP, NAPKIN DISPOSAL & DISP & COAT HOOK
BRYSON / ACCESSORIES UNLIMITED
1 4/3/2006 5-B
CONC D ROOF REPLACEMENT CONCOURSE D ROOF REPLACEMENT JOHN MANVILLE 1 11/2/2009 4-A
CONC D VERTICAL TRANSPORTATION ESCALATOR D2 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20019039
KONE 1 7/9/2010 5-A
CONC D SENSOR OPERATED URINALS SPEC & INSTRUCT.
OPTIMA SYS ES-5 FLUSHOMETERS/ SLOAN
1 2/1/2001 4-F
CONC D PC AIR CONDITIONERS PCA START UP & COMMISSIONING FORMS AERO BRIDGEWORKS 1 7/11/2008 1-A
CONC D MIDPOINT EXPANSION O & M MANUAL NEW SOUTH 1 10/15/2010 7-A
CONC D JETBRIDGE SWITCHGEAR COMMISSIONING REPORT D&N ELECTRIC 1 9/22/2010 1-A
10/23/2012SUPPORT DOCUMENTS
Page 35
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC D DELTA AIRLINES BREAKROOM EXPANSION - WARRANTY & CLOSE OUT DOCUMENTS
YATES CONSTRUCTION 1 11/22/2010 2-A
CONC D VERTICAL TRANSPORTATION O & M MANUAL ESCALATOR D1 KONE 1 12/16/2010 5-A
CONC D COSMETIC UPGRADES D-CUP LIGHT FIXTURE WHITEHEAD ELECTRIC 1 3/8/2006 5-B
CONC D MIDPOINT EXPANSION AVANCED PACKAGE
SPECIFICATIONS SP GROUP 1 5/9/2011 7-D
CONC D COSMETIC UPGRADES SPECIFICATIONS SCOTT ASSOCIATES 1 11/18/2005 5-B
CONC D RENOVATION MAINTENANCE MANUAL KONE 1 9/5/2007 7-E
CONC D DELTA AIRLINES GATE D39 EXPANSION - INFILL PROJECT - CLOSE OUT
DELTA AIRLINES 1 11/9/2011 9-A
CONC D FIRE PUMP TESTING ANNUAL FIRE PUMP INSPECTION REPORT CINTAS 1 10/7/2011 6-B
CONC D VERTICAL TRANSPORTATION UPGRADE PHASE II
O & M MANUAL ESCALATOR D4 KONE 1 2/14/2012 5-A
CONC D VERTICAL TRANSPORTATION UPGRADES PHASE II
O & M MANUAL ESCALATOR D3 KONE 1 2/14/2012 5-A
CONC D DELTA AIRLINES D27 CLOSEOUT MANUAL BRYSON 1 6/21/2011 7-A
10/23/2012SUPPORT DOCUMENTS
Page 36
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E AGT EXTENSION PHASE I & PHASE II
CENTRAL BASEMENT SHELL MECHANICAL GENERAL PROVISIONS
DOA 1 1-F
CONC E ORIGINAL CONSTRUCTION CPTC
SMOKING LOUNGE - SPECIFICATIONS ROSSER 1 7/27/1994 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
BUILDING AUTOMATION SYSTEMS TEMPERATURE CONTROLS
HONEYWELL 1 1/5/1993 9-B
CONC E YORK AIR MODULATOR IV AC MOTOR SPEED CONTROL
VARIABLE SPEED DRIVE YORK INSTALLATION & START UP
YORK 1 1/1/1996 4-D
CONC E FIRE COMMAND SYSTEM SYSTEMS POINT LIST HONEYWELL 1 2/14/1995 1-C
CONC E ORIGINAL CONSTRUCTION PHASE I
HYDRAULIC ELEVATORS RENEWAL PARTS CATALOG
SCHINDLER ELEVATOR 1 1/1/1990 5-E
CONC E ORIGINAL CONSTRUCTION PHASE I
ESCALATORS RENEWAL PARTS CATALOG SCHINDLER ELEVATOR 1 1/1/1990 5-E
CONC E ORIGINAL CONSTRUCTION PHASE I
GEARED ELEVATORS WITH SOLID STATE DRIVE RENEWAL PARTS CATALOG
SCHINDLER ELEVATOR 1 1/1/1990 5-E
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME I MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME II MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME III MC KENNEY 1 12/29/1993 3-D
10/23/2012SUPPORT DOCUMENTS
Page 37
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME IV MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME V MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME VI MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC SUBMITTAL DATA VOLUME VII MC KENNEY 1 12/29/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE I
GRINNELL FIRE PROTECT. SYSTEMS OPERATION & MAINT. MANUAL SPEC. SECTION 01700 1.02B
TURNER/ GRINNELL FP 1 3/4/1994 1-B
CONC E ORIGINAL CONSTRUCTION PHASE I
CLOSE OUT DOCUMENTATION WARRANTY AND BONDS
ATLANTA CONSTRUCTION TEAM
1 5/30/1995 4-C
CONC E ORIGINAL CONSTRUCTION PHASE I
ELECTRICAL PANEL SCHEDULES DYNA ELECTRIC / STEVENS & WILKINSON
1 2/17/1993 3-C
CONC E ORIGINAL CONSTRUCTION PHASE I
TOTAL LIGHTING CONTROLS O & M MANUAL GENERAL ELECTRIC TECHNICAL SUPPORT
1 12/19/1994 6-E
CONC E ORIGINAL CONSTRUCTION PHASE I
LIGHTING / POWER PANELBOARDS SPECIFICATION SECTION 16050-2.11
DYNA ELECTRIC / TURNER ASSOC
1 7/31/1992 6-B
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. I JOB #561 MC KENNEY 1 11/16/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. II JOB #561 MC KENNEY 1 11/16/1993 3-E
10/23/2012SUPPORT DOCUMENTS
Page 38
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. III JOB #561 MC KENNEY 1 11/16/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. IV JOB #561 MC KENNEY 1 11/16/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. V JOB #561 MC KENNEY 1 11/16/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
ELECTRICAL (DIVISION 16) SUBMITTAL DATA BOOK 1
DYNA ELECTRIC / TURNER ASSOC.
1 4/23/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE I
BOILER & BOILER STACK SUBMITTAL DATA MC KENNEY 1 11/16/1992 3-F
CONC E ORIGINAL CONSTRUCTION PHASE I
MECHANICAL REVIEW MC KENNY 1 10/22/1992 2-B
CONC E DELTA BUSINESS & FIRST CLASS LOUNGES
O & M MANUAL - ELECTRICAL DIVISION EQUITY / WHITEHEAD ELECTRICAL
1 11/3/1994 9-B
CONC E ORIGINAL CONSTRUCTION HUFCOR SERIES 5510 PARTITION DOORS - OWNERS MANUAL HMC #131236
ACOUSTI INC. 1 8/21/1992 8-A
CONC E EXPANSION ROLLING ATLAS DOORS WARRANTY & MAINTENANCE
ATLAS / ATL CONSTRUCT. TEAM
1 4/26/1993 6-E
CONC E ORIGINAL CONSTRUCTION PHASE II
RENEWAL PARTS CATALOG GENERAL ORDER #83557
SCHINDLER 1 12/5/1994 5-E
CONC E ORIGINAL CONSTRUCTION PHASE II
RENEWAL PARTS CATALOG GENERAL ORDER #85270
SCHINDLER 1 1/1/1990 5-E
10/23/2012SUPPORT DOCUMENTS
Page 39
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE II
CLOSE OUT DOCUMENTATION SUBCONTRACTOR WARRANTY MANUAL
MC DEVITT STREET BOVIS
1 5/15/1995 1-D
CONC E ORIGINAL CONSTRUCTION PHASE II
TELECOMMUNICATIONS, HVAC ROOM O & M MANUAL
PERFORMANCE MECHANICAL
1 12/5/1994 8-A
CONC E ORIGINAL CONSTRUCTION PHASE II
MISC MECHANICAL SUBMITTALS FOR CPTC & CONC E
PERFORMANCE MECH. 1 11/16/1993 3-E
CONC E ORIGINAL CONSTRUCTION PHASE II
R.F.I. MANUAL - 400 TO 699 MC DEVITT STREET BOVIS
1 8/17/1994 1-E
CONC E ORIGINAL CONSTRUCTION PHASE II
R.F.I. MANUAL - 225 TO 399 MC DEVITT STREET BOVIS
1 6/7/1994 1-E
CONC E ORIGINAL CONSTRUCTION PHASE II
R.F.I. MANUAL - 3 TO 224 MC DEVITT STREET BOVIS
1 2/28/1994 1-E
CONC E ORIGINAL CONSTRUCTION PHASE II
A.S.I. MANUAL 1-98 MC DEVITT STREET BOVIS
1 5/15/1995 1-E
CONC E ORIGINAL CONSTRUCTION PHASE II
CLOSE OUT DOCUMENTS OPERATION & MAINT MANUAL DELTA NET GRAPHIC CENTRAL
HONEYWELL / MC DEVITT STREET BOVIS
1 5/15/1995 9-C
CONC E ORIGINAL CONSTRUCTION PHASE II
CLOSE OUT DOCUMENTS FIRE ALARM POINT & DETAILS
HONEYWELL 1 5/15/1995 9-C
CONC E ORIGINAL CONSTRUCTION PHASE II
HONEYWELL FIRE COMMAND SYSTEM POINTS LIST
HONEYWELL 1 2/14/1995 9-C
CONC E CONC E-ATRIUM-MER 8 ELECTRICAL SWITCHGEAR TESTING FOR AATC HOOD-PATTERSON DEWAR
1 10/1/1997 6-D
10/23/2012SUPPORT DOCUMENTS
Page 40
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE II
EMERGENCY / PEAK SHAVE GENERATOR SYSTEM SITE TEST REPORT
CUMMINS / ONAN SOUTH
1 5/20/1994 1-E
CONC E ORIGINAL CONSTRUCTION PHASE II
ELECTRICAL CLOSE OUT DOCUMENTS: PANEL SCHEDULE MANUALS, LETTERS OF VERIFICATION
YUKON ELECTRIC 1 5/15/1995 2-B
CONC E ORIGINAL CONSTRUCTION PHASE II
HVAC O & M MANUAL VOL. I 1-5 PERFORMANCE MECH. 1 4/29/1994 2-F
CONC E ORIGINAL CONSTRUCTION PHASE II
ELECTRICAL PANEL SCHEDULES YUKON ELECTRIC 1 2/14/1994 8-A
CONC E ORIGINAL CONSTRUCTION PHASE II
HVAC O & M MANUAL VOL. II 6-12 PERFORMANCE MECH. 1 1/31/1994 3-B
CONC E ORIGINAL CONSTRUCTION PHASE II
SPECIFICATIONS & ADDENDUM #1 TURNER ASSOC 1 4/5/1993 3-C
CONC E ORIGINAL CONSTRUCTION PHASE II
VARIABLE SPEED DRIVES RESUBMITTALS RELIANCE ELECTRIC 1 12/8/1993 4-D
CONC E ORIGINAL CONSTRUCTION PHASE II
PANEL SCHEDULES DYNA ELECTRIC 1 11/2/1994 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
FIRESTONE ULTRA PLY ROOFING SUBMITTALS FIRST CHOICE ROOFING 1 8/28/1992 4-B
CONC E ORIGINAL CONSTRUCTION PHASE II
FIRE ALARM SYSTEM HONEYWELL 1 10/27/1992 1-C
CONC E ORIGINAL CONSTRUCTION PHASE II
OPERATION & MAINTENANCE INSTRUCTIONS MEDIUM VOLTAGE SWITCHGEAR
SIEMENS 1 5/30/1995 9-A
10/23/2012SUPPORT DOCUMENTS
Page 41
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE II
DYNALECTRIC - SHORT CIRCUIT & COORD STUDY AGT PHASE II & CENTRAL BASE SHELL
DYNALECTRIC / JEFFERS BARNETT & ASSOC
1 3/31/1993 6-A
CONC E ORIGINAL CONSTRUCTION PHASE II
CATHODIC PROTECTION SYSTEM - POST INSTALL. REPORT - FOUR ELEVATOR SYSTEM - DYNALECTRIC
HARCO TECHNOLOGIES CORP.
1 2/22/1994 5-E
CONC E ORIGINAL CONSTRUCTION PHASE II
AUTOMATIC SPRINKLER PRODUCT DATA - GRINNELL
GRINNELL 1 10/12/1992 6-B
CONC E ORIGINAL CONSTRUCTION PHASE II
FIRE ALARM STROBE ZONE POWER SUPPLIES SUBMITTAL
HONEYWELL 1 10/12/1992 1-C
CONC E ORIGINAL CONSTRUCTION PHASE II
P.I.U. / V.A.V. BOX CONTROLLER SUBMITTAL B, C & D STATUS
HONEYWELL 1 8/21/1992 9-C
CONC E ORIGINAL CONSTRUCTION PHASE II
B.A.S. TEMPERATURE CONTROL PRODUCT DATA SUBMITTAL
HONEYWELL 1 9/10/1992 9-C
CONC E ORIGINAL CONSTRUCTION PHASE II
CLEANING AND MAINTENANCE MANUAL 10 YEAR SKYLIGHT WARRANTY
SUPER SKY PRODUCTS INC.
1 2/22/1994 4-A
CONC E ORIGINAL CONSTRUCTION PHASE II
CHILLER STARTERS AND ACCESSORIES RESUBMITTAL
STEVENS & WILKINSON 1 12/3/1992 4-D
CONC E ORIGINAL CONSTRUCTION PHASE II
CEN TRA VAC LIQUID CHILLERS (CTV-DS-1) TRANE 1 9/1/1992 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
OPERATION & MANUAL WATER - COOLED HERMETIC CEN TRA VAC (CVHB-M-5A)
TRANE 1 9/1/1992 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
INSTALLATION MANUAL - CONTROL PANEL HERMETIC CEN TRA VAC (CVHB-1N-5A)
TRANE 1 9/1/1992 8-B
10/23/2012SUPPORT DOCUMENTS
Page 42
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE II
OPERATOR'S GUIDE CONTROL PANEL (CVMA-OG-1B)
TRANE 1 9/1/1992 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
SHORT CIRCUIT & COORD. STUDY VOL. I JEFFERS BARNETT & ASSOC. INC.
1 12/14/1992 6-A
CONC E ORIGINAL CONSTRUCTION PHASE II
AS-BUILT WIRING TABLES - PEAK SHAVING EMERGENCY GENERATOR SYSTEM
ENERGY ERECTORS INC. 1 7/18/1994 3-C
CONC E ORIGINAL CONSTRUCTION PHASE II
TECHNICAL SPECIFICATIONS - PEAK SHAVING EMERGENCY POWER SYSTEM
STEVENS & WILKINSON 1 7/17/1994 3-C
CONC E ORIGINAL CONSTRUCTION PHASE II
RECORD AND INFORMATION MANUAL HENRY SIGN CO. 1 12/2/1993 4-F
CONC E ORIGINAL CONSTRUCTION PHASE II
MUFFIN MONSTER O & M MANUAL JWC ENVIRONMENTAL 1 7/14/1994 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL - SIEMENS - DRY TYPE TRANSFORMERS - 6--V & BELOW
DYNALECTRIC 1 5/21/1993 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL - SIEMENS - MOTOR CONTROL CENTERS
DYNALECTRIC 1 6/9/1993 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL - ZENITH CONTROLS - AUTOMATIC TRANSFER SWITCH
DYNALECTRIC 1 6/11/1993 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL - POWER SIFTOR SYSTEM DYNALECTRIC 1 5/21/1993 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL - AUTOMATIC SWITCH CO. - LIGHTING CONTROLS
DYNALECTRIC 1 6/9/1993 8-B
10/23/2012SUPPORT DOCUMENTS
Page 43
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION PHASE II
PROJECT MANUAL - INSTALLATION OF VOICE & DATA CABLING PART 2
TURNER ASSOC. 1 3/30/1994 1-F
CONC E ORIGINAL CONSTRUCTION PHASE II
PROJECT MANUAL - MUFIDS / BIDS EQUIPMENT & CABLING PART 3
MC DEVITT STREET BOVIS
1 5/25/1994 3-B
CONC E ORIGINAL CONSTRUCTION PHASE II
ELECTRIC SECURITY TURNSTILE INSTALLATION MANUAL
MC DEVITT STREET BOVIS
1 2/27/1995 8-A
CONC E DELTA TENANT WORK O & M MANUAL PAUL W. HEARD 1 8/1/1987 3-A
CONC E DELTA FIRST CLASS LOUNGES O & M MANUAL PAUL W. HEARD 1 5/2/1994 3-A
CONC E DELTA - BUSINESS CLASS LOUNGES & GROUP ROOMS
O & M MANUAL PAUL W. HEARD 1 5/18/1994 3-A
CONC E DELTA - BUSINESS CLASS LOUNGES & GROUP ROOMS
CHILL & HEATING HOT WATER - DOMESTIC WATER & SANITARY - TESTS/INSPECTIONS/FLUSHING REPORTS
PAUL W. HEARD 1 6/20/1994 6-B
CONC E ORIGINAL CONSTRUCTION MECHANICAL EQUIPMENT START-UP CHECK LIST MC KENNEY MECH 1 11/4/1993 3-C
CONC E AGT EXTENTION PHASE I & II AND CENTRAL BASEMENT
AGT EXT PH I & II AND CENTRAL BASEMENT SHELL TECH SPECS
A.A.E. 1 11/8/1991 3-A
CONC E DELTA FIRST CLASS LOUNGES CHILL & HEATING HOT WATER - DOMESTIC WATER & SANITARY - TESTS/INSPECTIONS/FLUSHING REPORTS
PAUL W. HEARD 1 8/11/1994 6-B
CONC E ORIGINAL CONSTRUCTION PROJECT MANUAL, SPECS VOL. I - BID & CONTRACT REQUIRE. & VOL. II MECHANICAL, ELEC, & CONTROLS
TURNER ASSOC 1 2/12/1992 3-A
10/23/2012SUPPORT DOCUMENTS
Page 44
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E TELECOM RM HVAC UNITS - PHASE 2
O & M MANUAL PERFORMANCE MECHANICAL
1 3/14/1994 8-A
CONC E ORIGINAL CONSTRUCTION O & M MANUAL HONEYWELL 1 7/12/1994 9-B
CONC E ORIGINAL CONSTRUCTION O & M MANUAL TENANT MODIFICATIONS NEW SOUTH CONSTRUCT
1 2/24/1995 3-A
CONC E ORIGINAL CONSTRUCTION INSTALLATION & MAINTENANCE SERVICE MANUAL FOR COMMERCIAL STEEL DOORS
ATLAS ROLL - LITE DOOR CORP.
1 3/23/1993 8-A
CONC E ORIGINAL CONSTRUCTION INSTALLATION & MAINTENANCE SERVICE MANUAL FOR ROLL-LITE DOORS
ATLAS ROLL - LITE DOOR CORP.
1 3/1/1991 8-A
CONC E ORIGINAL CONSTRUCTION PHASE II
SUBMITTAL DATA MECHANICAL B & W MECHANICAL CO.
1 10/21/1992 4-E
CONC E DELTA BUSINESS LOUNGE O & M MANUAL HONEYWELL 1 1/1/1993 9-B
CONC E DELTA TENANT WORK O & M MANUAL HONEYWELL 1 1/1/1993 9-B
CONC E DELTA FIRST CLASS LOUNGE O & M MANUAL HONEYWELL 1 1/1/1993 9-B
CONC E ORIGINAL CONSTRUCTION TOTAL LIGHT
LIGHTING CONTROLS O & M MANUAL - SERIES 90-30 CONTROLLER
GENERAL ELECTRIC 1 1/1/1992 6-E
CONC E ORIGINAL CONSTRUCTION MECH, ELECT & CONTROLS
PROJECT MANUAL VOLUME II - FC5179-91 TURNER ASSOC 1 2/12/1992 3-B
10/23/2012SUPPORT DOCUMENTS
Page 45
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION ELECTRICAL PANELBOARD SCHEDULE
PROJECT MANUAL VOLUME III - FC5179-91 TURNER ASSOC 1 2/12/1992 6-B
CONC E ORIGINAL CONSTRUCTION ADDENDUM NUMBER ONE FC5170-91 TURNER ASSOC 1 3/4/1992 3-B
CONC E ORIGINAL CONSTRUCTION REVISION NUMBER ONE FC5179-91 TURNER ASSOC 1 5/22/1992 3-B
CONC E UNOCCUPIED SMOKING ROOMS
PROJECT MANUAL TURNER ASSOC 1 12/19/1994 3-B
CONC E DIVISION 15 & 16 - PHASE II PROJECT MANUAL VOLUME II FC5529-93 TURNER ASSOC 1 4/5/1993 3-B
CONC E ORIGINAL CONSTRUCTION PHASE II ADDEND. #1
PROJECT MANUAL FC5529-93-ADDENDUM #1 TURNER ASSOC 1 4/26/1993 3-B
CONC E COMMUNICATIONS ADDEND #1
PROJECT MANUAL FOR INSTALLATION OF VOICE & DATA CABLING PART 2
STEVENS & WILKINSON 1 4/20/1994 1-F
CONC E VOICE & DATA CABLING PROJECT MANUAL PART 2 - BID & CONTRACT REQUIREMENTS DIV 01 -16
STEVENS & WILKINSON 1 3/30/1994 1-F
CONC E MUFIDS / BIDS EQUIP & CABLING
PROJECT MANUAL PART 3 - BID & CONTRACT REQUIREMENTS SPECIAL INSTRUCTIONS
STEVENS & WILKINSON 1 5/25/1994 3-B
CONC E TELEPHONE INSTRUMENT PROJECT MANUAL PART 4 STEVENS & WILKINSON 1 8/15/1994 3-B
CONC E ORIGINAL CONSTRUCTION SIGN SCHEDULE JONES WORLEY DESIGN 1 4/30/1992 3-B
10/23/2012SUPPORT DOCUMENTS
Page 46
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION ADDENDUM #1 - EMERGENCY / PEAK SHAVING STEVENS & WILKINSON 1 8/19/1992 3-B
CONC E PEAK SHAVING / EMERG. POWER SYSTEM
BID MANUAL ATLANTA CONSTRUCTION TEAM
1 7/31/1992 3-B
CONC E DELTA - CONC E CONSTRUCTION - PHASE 1
CONTRACT SPECS. FOR SITE WORK FOR BAGG. TUNNELS, AGT EXTENS & CENTRAL BASEMENT SHELL
ASSOC ARCH & ENGIN. 1 10/24/1991 3-B
CONC E ORIGINAL CONSTRUCTION HVAC SUBMITTAL DRAWINGS MC KENNEY'S MECH. 28 DWGS
6/7/1993 3-D
CONC E ORIGINAL CONSTRUCTION PHASE II
O & M MANUAL VOLUME I PERFORMANCE MECH. 1 5/6/1994 3-B
CONC E CHILLER PLANT INTERCONNECT
O & M MANUAL & DRAWINGS MANN MECHANICAL CO.
1 2/15/1995 3-B
CONC E TRADE- AGREEMNT #9146-0145005
RENEWAL PARTS CATALOG SCHINDLER 1 12/1/1992 5-E
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUME 1
CUMMINS / ONAN 1 5/1/1994 8-C
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUME 2
CUMMINS / ONAN 1 5/1/1994 8-C
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUME 3
CUMMINS / ONAN 1 5/1/1994 8-C
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUME 4
CUMMINS / ONAN 1 5/1/1994 8-C
10/23/2012SUPPORT DOCUMENTS
Page 47
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUME 5
CUMMINS / ONAN 1 5/1/1994 8-C
CONC E EMERGENCY STANDBY POWER / PEAK SHAVE SYS
OPERATION & MAINTENANCE INSTRUCTION VOLUMC 6
CUMMINS / ONAN 1 5/1/1994 8-C
CONC E EMERSON VARIABLE FREQUENCY DRIVES
EMERSON VARIABLE FREQUENCY DRIVES TRI-TECH. 1 9/4/1992 4-F
CONC E GENERATORS GENERATORS CUMMINS / ONAN 1 11/29/1993 3-E
CONC E EMERSON INDUSTRIAL CONTROLS
APPROVAL SUBMITTALS CONTROL TECH GROUP 1 4/1/1992 4-F
CONC E E-MON D-MON METERS E-MON D-MON METERS E-MON CORP. 1 5/19/1995 8-B
CONC E COMMUNICATION PART 4 INSTALL OF TELEPHONES
PROJECT MANUAL - COMMUNICATION PART 4 INSTALLATION OF TELEPHONE INSTRUMENTS
M. A. B. 1 8/15/1994 8-B
CONC E ORIGINAL CONSTRUCTION PHASE II
CONTRACT #FC5179-91 PROJECT MANUAL VOLUMES 1 & 2
TURNER 1 2/12/1992 7-F
CONC E ELECTRICAL SWITCHGEAR TESTING
LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR
1 9/1/1994 6-D
CONC E DUTY FREE CORRIDOR / SOLID WASTE
PROJECT MANUAL TURNER ASSOC. 1 5/30/1995 2-A
CONC E ORIGINAL CONSTRUCTION PHASE II
SHORT CIRCUIT AND TIME-CURRENT COORDINATION STUDY VOLUME II
JEFFERS BARNETT & ASSOC.
1 12/14/1992 6-A
10/23/2012SUPPORT DOCUMENTS
Page 48
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ORIGINAL CONSTRUCTION SUPERSTRUCT PHASE I
DIVISION 16 ELECTRICAL SUBMITTAL DATA BOOK II
TURNER / DYNAELEC. 1 4/23/1993 3-E
CONC E KLM AIRLINES @ CONC E KLM AIRLINES CONCOURSE E TENANT WORK DERYCK MUEHLHAUSER
1 8/17/1994 3-E
CONC E COOLING TOWER / BOILER WATER TREATMENT
COOLING TOWER WATER TREATMENT BOILER WATER TREATMENT PROGRAM & SERVICES (SONY DISK)
ANCO CHEMICAL CO. 1 2/12/1992 6-E
CONC E ESCALATORS, HYDRAULIC & GEARED ELEVATORS
RENEWAL PARTS CATALOG FOR HYDRAULIC & GEARED ELEV & ESCALATORS
SCHINDLER ELEVATOR 1 1/1/1989 5-E
CONC E TENANT WORK PROJECT #90-33 TENANT WORK BAKER AUDIO 1 11/30/1993 9-A
CONC E MULTI-USER FIDS / BIDS SYSTEM
SPECIFICATIONS FOR MULTI-USER FLIGHT & BAGGAGE INFORMATION DISPLAY SYSTEM
M. A. B. ENGINEERING 1 4/25/1994 3-F
CONC E AC DRIVES FOR 3-65 AMP SERVICE MANUAL FOR AC DRIVES FOR USE IN SERVICING 3-65 AMP
ABB SERVICE 1 8/1/1990 8-A
CONC E ORIGINAL CONSTRUCTION PROJECT MANUAL FOR CONTRACT FC5179-91 CPTC / VOL #3 ADDENDUM #1-REV #1
TURNER ASSOC 1 2/12/1992 7-F
CONC E SCHINDLER GEARED ELEVATORS
WIRING DIAGRAMS FOR GENERAL ORDER GEARED ELEVATORS PRINTS FOR SERVICING EQUIPMENT
SCHINDLER 1 11/12/1991 5-E
CONC E TENANT MODIFICATIONS PROJECT MANUALS, BIDDING REQUIREMENTS VOLUME 1 & VOLUME 2 WITH DWGS INCLUDED
DERYCK MUEHLHAUSER
2 8/15/1994 7-F
CONC E ORIGINAL CONSTRUCTION PHASE I SUPERSTRUCT
AUTOMATIC FIRE SPRINKLER SYSTEMSUBMITTAL MANUAL - GRINNELL
GRINNELL, S & W, TURNER
1 3/7/1994 6-B
10/23/2012SUPPORT DOCUMENTS
Page 49
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E FIRESTONE ROOFING WARRANTY
ROOFING SYSTEM LIMITED WARRANTY - CONC E OUT BUILDING NORTH WITH STICKERS
PEACH STATE ROOFING, INC.
1 4/10/1998 4-A
CONC E ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
CONC E ELECTRICAL PANEL DIRECTORIES
AS BUILTS DOA 1 12/1/1998 8-B
CONC E DELTA IN-TRANSIT LOUNGE DELTA IN-TRANSIT LOUNGE-3RD FLOOR O & M MANUAL
MC DEVITT STREET BOVIS
1 3/2/1999 1-D
CONC E AIR FRANCE AIR FRANCE BUILD-OUT CONCOURSE E GATE 15 LINKS CONSTRUCTION 1 3/1/1999 2-D
CONC E TENANT WORK JAPAN AIRLINES-CONCOURSE E TENANT WORK DERYCK MUEHLHAUSER
1 7/25/1994 6-E
CONC E ORIGINAL CONSTRUCTION PHASE I
HVAC O & M MANUAL VOL. IV JOB #561 MC KENNEY 1 11/16/1993 3-E
CONC E UNOCCUPIED SPACES & SMOKING ROOMS
O & M MANUAL CONTRACT FC-6066-95 MECHANICAL ASSOC 1 1/1/1995 3-F
CONC E UNOCCUPIED SPACES/SMOKING ROOMS
OPERATION & MAINTENANCE INSTRUCTIONS INTERNATIONAL FIRE PROTECTION
1 2/7/1994 8-A
CONC E UNOCCUPIED SPACES & SMOKING ROOMS
O & M MANUAL YUKON ELECTRIC 1 2/27/1996 8-B
CONC E UNOCCUPIED SPACES & SMOKING ROOMS
ELECT AS-BUILTS-WARRANTY INFO, LIGHT FIXTURES, EMT CONDUIT, PANEL DIRECTORS
YUKON ELECTRIC 1 4/15/1996 8-B
10/23/2012SUPPORT DOCUMENTS
Page 50
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E SPRINKLERS-FIRE PROTECTION SYSTEMS
O & M MANUALS INTERNATIONAL FIRE PROTECTION
1 1/1/1998 6-B
CONC E UNOCCUPIED SPACES FIRE ALARM, HVAC AND AUTOMATIC TEMPERATURE CONTROL WARRANTY
HONEYWELL 1 2/22/1996 9-C
CONC E OPERATOR MANUALS & INSTRUCTIONS
EXCEL CCT2190M-CEL, DELTANET MICROCEL REPEATER, TEMP SENSOR, EXCEL + CNTRLR
HONEYWELL 1 1/1/1994 9-C
CONC E BAGGAGE CLAIM EQUIPMENT
PROPOSAL - HIP '96 JERVIS B. WEBB CO. 1 8/22/1995 1-F
CONC E EXPANSION OF SECURITY SYSTEM
TECHNICAL SPECS - CONC E EXPANSION DOA 1 7/13/2000 3-C
CONC E EXPANSION CONTRACT DOCUMENTS FC-7129-99 DOA 1 1/24/2000 2-A
CONC E HVAC EXPANSION O & M MANUAL - MECHANICAL MCI ENTERPRISES 1 8/30/2001 2-B
CONC E EXPANSION - SWITCHBOARD FACTORY TEST CERTIFICATION SIEMENS 1 6/28/2001 6-B
CONC E EXPANSION - CATHODIC PROTECTION ELEV. CASINGS
TEST REPORTS CORRPRO 1 6/1/2000 1-B
CONC E BRITISH AIRWAYS TERRACES LOUNGE
PROJECT MANUAL - SPECIFICATIONS BEAME ARCH. 1 3/3/2000 9-B
CONC E BRITISH AIRWAYS TERRACES LOUNGE
PROJECT MANUAL APPENDICES BEAME ARCH. 1 3/3/2000 9-B
10/23/2012SUPPORT DOCUMENTS
Page 51
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ROOF WARRANTY CAR WASH FACILITY - 10 YEAR WARRANTY FIRESTONE 1 4/1/1993 4-A
CONC E EXPANSION PRE-CONDITIONED AIR MODS. - BID DOCUMENTS
CITY OF ATLANTA 1 5/21/2001 3-A
CONC E EXPANSION ELEVATOR O & M MANUAL & WARRANTY LETTER
SCHINDLER 1 11/5/2001 5-E
CONC E EXPANSION ESCALATOR O & M MANUAL & WARRANTY LETTER
SCHINDLER 1 11/5/2001 5-E
CONC E EXPANSION ELECTRICAL O & M MANUAL GRIFFIN ELECTRIC 1 8/21/2001 6-E
CONC E CHILLER PLANT UPGRADE ABSORPTION CHILLERS O & M MANUAL JOHNSON CONTROLS 1 6/16/2001 3-A
CONC E HARDWARE - PHASE 1 CATALOG, SCHEDULE, O & M MANUAL A.G. MAURO CO. 1 3/15/1994 6-E
CONC E EXPANSION BID DOCUMENTS - 1ST DRAFT DOA 1 10/1/1999 2-A
CONC E ORIGINAL CONSTRUCTION PHASE II
R.F.I. MANUAL - 700 TO 794 MC DEVITT STREET BOVIS
1 10/6/1994 1-E
CONC E AATC/ABS OPERATIONS RELOCATION
RELOCATION PROJECT MANUAL (PROJECT ABANDONED)
ARCHTYPE SERVICES 1 1/3/1996 2-E
CONC E COOLING TOWER OPERATING MANUAL MARLEY COOLING TOWER
1 10/6/1994 8-B
10/23/2012SUPPORT DOCUMENTS
Page 52
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E ANALYSIS OF CHILLER REFRIGERATION OIL ANALYSIS REPORT FOR TRANE CHILLER
GEORGIA TRANE SERVICE CO.
1 12/10/2002 1-B
CONC E REMOTE RECEIVER FACILITY RELOCATION
BID DOCUMENT FC-7556-03 CITY OF ATLANTA 1 4/14/2003 2-B
CONC E EXPANSION - FIRE ALARM SYSTEM
O & M MANUAL HONEYWELL 1 6/19/2001 9-C
CONC E MOVING WALKWAYS CONTRACT DOCUMENTS CITY OF ATLANTA 1 3/22/2004 2-E
CONC E GENERATOR RELOCATION SCHEMATIC DESIGN DOCS STANLEY, LOVE-STANLEY/NEWCOMB-BOYD
1 3/1/2004 1-D
CONC E GENERATOR RELOCATION FACILITY SYSTEMS ANALYSIS STANLEY, LOVE-STANLEY/NEWCOMB-BOYD
1 3/1/2004 1-D
CONC E PRECOND AIR MODIFICATIONS - PHASE III
PROJECT MANUAL CONTRACT FC-7428-02 CITY OF ATLANTA 1 10/7/2003 1-A
CONC E EXTERIOR EXPANSION JOINT REPLACEMENT
CLOSE OUT DOCUMENTS J.M.WILKERSON CONST. CO.
1 5/1/2006 9-C
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 1 CUMMINS SOUTH 1 12/2/2005 8-E
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 2 CUMMINS SOUTH 1 12/2/2005 8-E
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 3 CUMMINS SOUTH 1 12/2/2005 8-E
10/23/2012SUPPORT DOCUMENTS
Page 53
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 4 CUMMINS SOUTH 1 12/2/2005 8-E
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 5 CUMMINS SOUTH 1 12/2/2005 8-E
CONC E EMERGENCY POWER SYSTEM RELOCATION
O & M MANUAL VOLUME 6 CUMMINS SOUTH 1 12/2/2005 8-E
CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 1/3 MANN MECHANICAL 1 12/5/2005 8-E
CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 2/3 MANN MECHANICAL 1 12/5/2005 8-E
CONC E PLANT EXPANSION O & M ACCEPTANCE TESTING DATA 3/3 MANN MECHANICAL 1 12/5/2005 8-E
CONC E UNIT SUBSTATION #10 O & M MANUAL SIEMANS 1 12/11/2007 1-D
CONC E GENERATOR RELOCATION SPECIFICATION MANUAL STANLEY, LOVE-STANLEY/NEWCOMB & BOYD
1 7/15/2004 7-D
CONC E GENERATOR RELOCATION O & M MANUAL JOHNSON CONTROLS 1 10/1/2005 7-E
CONC E FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 1/30/2004 1-C
CONC E DELTA BREAK ROOM MECHANICAL O & M MANUAL PAUL HEARD 1 11/28/2007 5-D
10/23/2012SUPPORT DOCUMENTS
Page 54
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E CENTRAL PLANT TECHNICAL SPECS - EARLY MEP PACKAGE H-JDP 1 12/5/2003 9-C
CONC E 480V GENERATORS FACILITY SYSTEMS ANALYSIS STANLEY, LOVE-STANLEY
1 10/3/2003 7-E
CONC E TICKET COUNTER REPLACEMENT PROJECT
O & M MANUAL NEW SOUTH CONSTRUCTION
1 11/10/2008 5-C
CONC E CENTRAL PLANT EXPANSION CECPE-CW PUMP REPLACEMENT O & M MANUAL, LETTER OF WARRANTY
BELL & GOSSETT 1 4/25/2008 5-C
CONC E UNIT SUBSTATION CON E UNIT SUBSTATION #10 & SOUTH AIRFIELD LIGHTING VAULT GENERATOR O & M MANUAL
CLEVELAND ELEC 1 1/10/2008 4-F
CONC E COSMETIC UPGRADES CONC E COSMETIC UPGRADES PHASE 1/BOARDING LEVEL 2 BID PACKAGE NO.3 - CORRIDOR & HOLDROOM WALL UPGRAD
SCOTT ASSOCIATES 1 12/18/2008 5-B
CONC E SOJOURNER'S SMOKING LOUNGE
O & M MANUAL PAUL W. HEARD AND COMPANY
1 8/28/2008 3-E
CONC E MHJIT APM ENABLING & MEP RELOCATION
O & M MANUAL FOR CONC E MEP RELOCATION F & S MECHANICAL & PLUMBING
1 2/1/2009 6-E
CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 2 BID PACKAGE NO 8 WALL UPGRADES & CEILING REPAIRS
SCOTT ASSOCIATES 1 4/9/2009 5-B
CONC E COSMETIC UPGRADES PHASE 1 - LEVEL 2 BID PKG NO 1 - COLUMN CLADDING
SCOTT ASSOCIATES 1 12/10/2008 5-B
CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 6 - CORRIDOR & WALL UPGRADES
SCOTT ASSOCIATES 1 12/30/2008 5-B
10/23/2012SUPPORT DOCUMENTS
Page 55
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 5 - CEILING REPAIRS
SCOTT ASSOCIATES 1 12/30/2008 5-B
CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 4 - COLUMN CLADDING
SCOTT ASSOCIATES 1 12/30/2008 5-B
CONC E COSMETIC UPGRADES PHASE 2 - LEVELS 1 & 3 BID PKG NO 7 - COLUMN CLADDING
SCOTT ASSOCIATES 1 4/9/2009 5-B
CONC E ORIGINAL CONSTRUCTION SPECS - DIVISIONS 13 & 15 TURNER ASSOC 1 2/12/1992 3-A
CONC E CUSTOMS & BORDER PATROL - EMERSON
LIEBERT MINI-MATE 2 - O & M MANUAL WG YATES 1 1/12/2009 6-E
CONC E CUSTOMS & BORDER PATROL WARRANTY & CLOSE OUT DOCS WG YATES 2 1/12/2009 4-A
CONC E UNIT SUBSTATION 10 DOOR CLOSURE & HARDWARE O & M MANUAL CLEVELAND 1 1/10/2008 5-C
CONC E WON-DOOR INSTALLION MANUAL WON-DOOR CORP 1 12/23/1994 8-C
CONC E LIGHTING VAULT SPECS FOR DIESEL GENERATORS CUMMINS-ONAN 1 11/18/1991 4-F
CONC E CEILING & LIGHTING REPLACEMENT
APM STATION SEPCIFICATIONS SCOTT ASSOCIATES 1 1/31/2011 5-F
CONC E CEILING & LIGHTING REPLACEMENT
APM STATION CLOSE OUT SCOTT ASSOCIATES 1 1/31/2011 5-F
10/23/2012SUPPORT DOCUMENTS
Page 56
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC E COSMETIC UPGRADES CEILING & WAINSCOT CPS 1 3/15/2011 5-B
CONC E CHILLER REPLACEMENT WARRANTY - ECUP CHILLER INSTALLATION MANN MECHANICAL 1 4/26/2007 4-A
CONC E SPRINKLER SYSTEM HYDRAULIC CALCULATIONS - AGT LEVEL GRINNELL CORPORATON
1 8/9/1994 6-B
CONC E COSMETIC UPGRADES CARPET REPLACEMENT LEVELS 1, 2 & 3 BID PACKAGE 8 SPECIFICATIONS
DOA 1 3/31/2011 5-B
CONC E CARPET REPLACEMENT PROJECT
O & M MANUAL MAINTENANCE SPECIFICATION GUIDE
INTERFACE FLOORING SYSTEM
1 9/26/2011 5-B
CONC E COSMETIC UPGRADES LEVELS 1 & 3 PHASE 2 O & M MANUAL NEW SOUTH 1 4/28/2011 5-B
CONC E POWER POLES- ELECTRICAL O & M MANUAL NEW SOUTH 1 3/6/2012 3-C
CONC E DELTA AIRLINES E14 & E15 SKY CLUB CONSOLIDATION JCI O & M MANUAL
JOHNSON CONTROLS 1 4/13/2012 7-E
CONC E DELTA AIRLINES E14 & E15 SKY CLUB CONSOLIDATION O & M MANUAL
NEW SOUTH CONSTRUCTION
1 4/17/2012 7-E
CONC F MHJIT - CENTRAL PLANT EXPANSION
BID DOCUMENTS CITY OF ATLANTA 1 1/7/2004 7-F
CONC F MHJIT - CENTRAL PLANT EXPANSION
CONSTRUCTION DOCUMENTS ESTIMATE CITY OF ATLANTA 1 1/7/2004 7-F
10/23/2012SUPPORT DOCUMENTS
Page 57
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04
CD PHASE SPECIFICATIONS - VOLUME 2 (DIVISIONS 7 - 9)
CITY OF ATLANTA 1 1/17/2005 9-D
CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04
CD PHASE SPECIFICATIONS - VOLUME 5A (DIVISIONS 16 - 17)
CITY OF ATLANTA 1 1/17/2005 9-D
CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04
CD PHASE SPECIFICATIONS - VOLUME 3 (DIVISIONS 10 - 13)
CITY OF ATLANTA 1 1/17/2005 9-D
CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04
CD PHASE SPECIFICATIONS - VOLUME 4 (DIVISIONS 14 - 15)
CITY OF ATLANTA 1 1/17/2005 9-D
CONC F MHJIT - TERMINAL AND CONCOURSE - FC-7689-04
CD PHASE SPECIFICATIONS - VOLUME 1 (DIVISIONS 1 - 6)
CITY OF ATLANTA 1 1/17/2005 9-D
CONC F MHJIT DESIGN DEVELOPMENT PHASE-FOUNDATIONS, CIVIL, & UTILITIES
DOA 1 2/2/2004 4-E
CONC F MHJIT - TERMINAL AND CONCOURSE
ROOM NUMBERING / DOOR SCHEDULE ATLANTA GATEWAY DESIGNERS
1 2/1/2011 9-D
CONC F MHJIT - LIFE SAFETY CODE ISSUES COA BUREAU OF BUILDINGS & FIRE MARSHAL
1 7/8/2011 7-F
CONC F DELTA AIRLINES SKY CLUB LOUNGE
CLOSE OUT DOCUMENTS - MILLWORK AS BUILTS, FANS, PLUMBING FIXTURES, WATER HEATER & VAV BOXES
CRESTON 1 5/10/2012 7-B
CONC F DELTA AIRLINES SKY CLUB LOUNGE
CRESTRON LIGHTING SYSTEM MANUALS CRESTON 1 5/10/2012 7-B
CONC T NORTH ORIGINAL CONSTRUCTION
OWNER'S MANUAL ELEVATORS EA4789 DOVER ELEVATOR CO. 1 3/1/1979 5-F
10/23/2012SUPPORT DOCUMENTS
Page 58
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T NORTH ORIGINAL CONSTRUCTION
OWNER'S MANUAL ELEVATORS EA4790-91 DOVER ELEVATOR CO. 1 3/1/1979 5-F
CONC T NORTH ORIGINAL CONSTRUCTION
OWNER'S MANUAL ELEVATORS E-89435 DOVER ELEVATOR CO. 1 11/1/1982 5-F
CONC T MIDFIELD PROJECT ORIGINAL CONSTRUCTION
PAGING SYSTEMS BAKER AUDIO 1 7/23/1979 2-D
CONC T PUBLIC PAGING AND HOLDROOM SOUND SYS
O & M MANUAL - UPGRADE BAKER AUDIO 1 7/9/1987 8-B
CONC T EXPANSION SUBMITTAL-DISTRIBUTION EQUIPMENT INGLETT & STUBBS / G & B
1 10/14/1988 2-D
CONC T DELTA INTERNATIONAL CABIN SERVICE
PROJECT MANUAL & SPECIFICATIONS MILTON PATE ASSOC 1 2/11/1987 2-D
CONC T SOUTH - EXPANSION PHASE II O & M MANUAL PERFORMANCE MECH. 1 12/12/1988 2-E
CONC T SOUTH - EXPANSION PHASE II PROJECT MANUAL PERFORMANCE MECH. 1 1/1/1988 2-E
CONC T SOUTH - EXPANSION PHASE II OWNER'S MANUAL WARRANTY INFORMATION MC DEVITT STREET BOVIS
1 4/28/1989 4-A
CONC T NORTH ORIGINAL CONSTRUCTION
WARRANTY INFORMATION HOLDER / RUSSELL CONSTRUCTION CO
1 6/2/1980 4-A
CONC T SOUTH - PHASE II ELECTRICAL ELECTRICAL OWNER'S MANUALS INGLETT & STUBBS / G & B
1 3/27/1989 2-E
10/23/2012SUPPORT DOCUMENTS
Page 59
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T FIS EXPANSION JOB CLOSE OUT BOOK - AS BUILTS HOLDER / RUSSELL CONSTRUCTION CO
1 2/16/1987 2-F
CONC T FIS FACILITY STANLEY MAGIC DOOR
MAINTENANCE & REPAIR MANUAL STANLEY 1 6/2/1975 6-E
CONC T NORTH ORIGINAL CONSTRUCTION
SUBMITTAL DATA DIXIE ELECTRIC 1 9/9/1979 2-F
CONC T FIS EXPANSION HVAC O & M MANUAL J. S. THOMAS 1 8/1/1986 6-E
CONC T DELTA CROWN ROOM RENOVATION
PROJECT MANUAL #9430 THOMPSON HANCOCK WITT ASSOC.
1 1/30/1995 2-D
CONC T FIS BAGGAGE CLAIM EXPANSION
PROJECT MANUAL DERYCK MUEHLHAUSER
1 9/16/1991 2-D
CONC T DELTA CROWN ROOM PROJECT CLOSEOUT MANUAL MC DEVITT STREET BOVIS
1 1/30/1995 2-C
CONC T FIS EXPANSION ELEC. ONELINE DIAG. & PROGRESS PRINT OUTS FOR VOLTAGE DROP, SHORT CIRCUIT & LOAD SUMMARY
STEVENS & WILKINSON 1 5/21/1986 6-A
CONC T FIS EXPANSION PHASE II ADDENDUM #1
SPECIFICATIONS TURNER / PATE 1 5/5/1988 2-F
CONC T FIS EXPANSION PHASE II SPECIFICATIONS- T SOUTH TURNER / PATE 1 4/18/1988 2-F
CONC T FIS EXPANSION PLUMBING SPECIFICATIONS DOA 1 4/16/1986 2-F
10/23/2012SUPPORT DOCUMENTS
Page 60
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T FIS EXPANSION HVAC SPECIFICATIONS DOA 1 4/9/1986 2-F
CONC T FIS EXPANSION PHASE I SPECIFICATIONS TURNER / PATE 1 1 4/30/1986 2-F
CONC T FIS FACILITY INTERIM EXPANSION
BID DOCUMENTS - RENOVATION & EXP.PUBLIC WAITING AREA & BAG CLAIM
DOA 1 8/22/1985 2-F
CONC T FIS TENANT SPACE SPECIFICATIONS PATE / TURNER 1 1/30/1980 2-F
CONC T CLOCK SYSTEM INSTRUCTION MANUAL DIXIE ELECTRIC 1 8/20/1979 4-D
CONC T ORIGINAL CONSTRUCTION - NORTH FIS
ONAN GENERATOR: AUTO-LOAD TRANS-CONTROL SUBMITTAL
BLALOCK MACHINERY & EQUIPMENT
1 9/13/1979 4-E
CONC T FIS EXPANSION MAINTENANCE MANUAL AUTO SPRINKLER CO. 1 7/13/1987 6-E
CONC T LOCKHEED - MOBILE LOUNGE FACILITIES
MOBILE LOUNGE FACILITIES PROVISIONS - PROJECT MANUAL
DERYCK MUEHLHAUSER
1 3/4/1991 3-C
CONC T FIS COUNTER FIRE DOOR MAINTENANCE MANUAL COOKSON ROLLING DOORS
1 5/22/1980 8-A
CONC T LOCKHEED AIR TERMINAL - U.S. CUSTOMS KENNEL UNIT ADDITION
PROJECT MANUAL DERYCK MUEHLHAUSER
1 6/5/1992 3-C
CONC T FIS FACILITY SUBMITTAL DATA - OPERATIONS & MAINTENANCE & HVAC INSTRUCTIONS BOOK #3
MALLORY EVANS 1 7/9/1979 2-F
10/23/2012SUPPORT DOCUMENTS
Page 61
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T AMERICAN AIRLINES NORTH RENOVATION
MECHANICAL & PLUMBING PACKAGE SPECIFICATIONS
CORGAN ASSOC. ARCHITECTS
1 12/2/1994 2-E
CONC T EXPANSION MAINTENANCE DATA & HYDRAULIC CALCULATIONS
ALLSOUTH SPRINKLER CO
1 3/29/1989 8-A
CONC T GSE OIL / WATER SEPARATOR ANALYSIS
FAW OIL / WATER SEPARATOR MANUAL ENQUIP INC 1 12/2/1983 8-A
CONC T SMOKING LOUNGE - CONC T, A, B & C
O & M MANUAL NEW SOUTH 1 3/17/1995 3-E
CONC T PAX CIRCULATION REVISIONS FIRE ALARM & BLDG. AUTOMATION SYSTEM O & M MANUAL
HONEYWELL 1 2/22/1996 1-C
CONC T PAX CIRCULATION REVISIONS 14310/14311 MONTGOMERY KONE ESCALATOR O & M MANUAL
MONTGOMERY 1 5/3/1996 5-F
CONC T PAX CIRCULATION REVISIONS 16010 ELECTRICAL GENERAL PROVISIONS O & M MANUAL
YUKON 1 5/6/1996 8-C
CONC T PAX CIRCULATION REVISIONS 13810, 13845 GENERAL PROJECT-WIDE FIRE ALARM & BLDG. AUTO. SYSTEMOPERATION & MAINTENANCE MANUAL
HONEYWELL 1 5/6/1996 1-C
CONC T AMERICAN AIRLINES T-GATE RENOVATION
O & M MANUAL -- ARCHITECTURAL -- BK 1/ 2 CORGAN / NEW SOUTH 1 5/1/1995 1-F
CONC T AMERICAN AIRLINES T-GATE RENOVATION
O & M MANUAL - MECH./ELEC./PLUMB. - BK 2/2 CORGAN / NEW SOUTH 1 5/1/1995 1-F
CONC T AMERICAN AIRLINES T-GATE RENOVATION
SCHINDLER RENEWAL PARTS CATALOG FOR ELEVATORS
SCHINDLER 1 5/1/1995 5-E
10/23/2012SUPPORT DOCUMENTS
Page 62
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T SOUTH - DELTA OPERATIONS EXPANSION
PROJECT SPECIFICATIONS MILTON / PATE 1 6/20/1996 2-F
CONC T TERMINAL REDEVELOPMENT VERTICAL TRANSPORTATION
PROJECT MANUAL ZONE 3 TURNER ASSOC 1 1/20/1995 5-A
CONC T AMERICAN AIRLINES T-GATE RENOVATION
REVOLVING SECURITY DOORS -- ADJUSTMENT & TROUBLESHOOTING MANUAL
HORTON AUTOMATICS 1 5/30/1995 8-A
CONC T DOA EXECUTIVE OFFICES OPERATION & MAINT MANUAL FOR POWERED INDUCT, UNITS & VAV'S,FANS, VALVES & PLUMBING EQUIPMENT
WINTER 1 2/4/1994 2-F
CONC T DOA EXECTIVE OFFICE PRODUCT DATA/FINISH
OFFICE RELOCATION PRODUCT DATA & FINISHES MANUAL
WINTER 1 7/10/1996 2-F
CONC T DOA ADMIN & EXEC OFFICE GRINNELL FIRE PROTECT.
FOURTH FLOOR ADMIN & THIRD FLOOR EXECUTIVE OFFICE O & M MANUAL
TURNER & ASSOC 1 10/4/1996 1-F
CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS
WARRANTY MANUAL FOR MILLWORK, WATERPROOFING, SINGLE PLY ROOF & HARDWARE
ACI 1 5/22/1996 4-A
CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS
SPECIFICATIONS ADDENDUM #1 BOOK 1 OF 2 ROBERT & CO 1 11/22/1994 2-D
CONC T GATE RELOCATION- PHASE II UNITED AIRLINES-T NORTH GATES T-13, T-14, T-15
ROSSER INTERNATIONAL
1 11/7/1997 2-A
CONC T AMERICAN AIRLINES T-GATE RENOVATION
SPECIFICATIONS, BID DOCUMENTS, & CONTRACT CONDITIONS
CORGAN 1 10/28/1994 2-E
CONC T UNITED AIRLINES RED CARPET ROOM
O & M MANUALS ROSSER INTL 1 11/1/1998 2-E
10/23/2012SUPPORT DOCUMENTS
Page 63
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T DELTA LINE GSE ROOF TOP UNITS 1 & 2
O & M MANUALS P. W. HEARD 1 1/2/1999 9-A
CONC T DELTA TRAINING RMS 3RD FLOOR
BIDS INFORMATION AND SPECS GRANT WEILAND 1 10/28/1996 3-C
CONC T ADMIRAL'S CLUB - WIRELESS INTERNET
PROJECT MANUAL FOR INSTALLATION OF SYSTEM
MOBILE STAR NETWORK
1 5/1/2000 3-A
CONC T SECURITY OFFICES DISPATCH CENTER
O & M MANUAL PERFORMANCE MECHANICAL
1 11/15/1995 8-A
CONC T AMERICAN AIRLINES ELEVATOR
O & M MANUAL - ELEVATOR SCHINDLER 1 6/1/1995 5-E
CONC T LINE GSE BOILER REPLACEMENT (DELTA)
O & M MANUAL HENDERSON MECHANICAL
1 2/28/2003 2-B
CONC T PUBLIC PAGING AND HOLDROOM SOUND SYSTEM UPGRADE
O & M MANUAL BAKER 1 7/9/1987 2-D
CONC T RED BRICK TAVERN/PIZZA HUT RENOVATION
SPECIFICATIONS - FOODSERVICE EQUIP. & FURNISHINGS
HOSPITALITY SERVICES 1 9/4/2001 2-B
CONC T CONCESSIONS FIT-OUT & RELOCATIONS
CONTRACT DOCUMENTS CITY OF ATLANTA 1 11/25/2003 1-F
CONC T CONCESSIONAIRES' OFFICE RELOCATION
CONSTRUCTION DOCUMENTS & SPECIFICATIONS CITY OF ATLANTA 1 10/3/2003 2-D
CONC T CONCESSIONAIRES OFFICES RELOCATION
O & M MANUAL MECHANICAL PERFORMANCE MECHANICAL
1 8/26/2004 2-D
10/23/2012SUPPORT DOCUMENTS
Page 64
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T CONCESSIONAIRES OFFICES RELOCATION
O & M MANUAL BRYSON CONSTRUCTORS
1 8/27/2004 2-D
CONC T CONCESSIONAIRES OFFICES RELOCATION
O & MANUAL - SPRINKLER SYSTEM BRYSON CONSTRUCTION
1 8/27/2004 6-B
CONC T VISUAL OBSTRUCTION (T-SOUTH-3RD FL)
CONTRACT CITY OF ATLANTA 1 8/30/2005 2-B
CONC T ISD EXPANSION CONCESS FIT-OUT RELOCATION
O & M MANUAL BRYSON CONSTRUCTORS
1 9/6/2005 3-F
CONC T AIRPORT SAFETY / CENTRALIZED COMMAND & CONTROL CENTER
CONCEPT DEVELOPMENT FINAL REPORT HPC 1 9/1/2004 2-C
CONC T HVAC SYSTEMS UPGRADE RECORD SUBMITTAL - ACU-9, ACU-10, ACU-11, ACU-12
BUFFALO AIR HANDLING
1 9/19/2005 1-F
CONC T CONCESSIONAIRE'S OFFICE RELOCATION
CONTROLS SUBMITTAL WAYPOINT SYSTEMS 1 1/14/2004 1-F
CONC T CONCESSIONAIRE'S OFFICE RELOCATION
GE SWITCHGEAR SUBMITTALS UPTIME ELECTRIC 1 1/14/2004 1-F
CONC T SHORT CIRCUIT COORDINATION STUDY
STUDY DATA FOR CONC T HOOD-PATTERSON & DEWAR
1 6/15/2005 6-A
CONC T HVAC SYSTEMS UPGRADES O & M MANUAL FOR HVAC UPGRADES W. B. WALLIS 1 2/15/2007 7-F
CONC T HVAC SYSTEMS UPGRADES HVAC O & M MANUAL #6508 GWINNETT SPRINKER 1 12/1/2006 1-F
10/23/2012SUPPORT DOCUMENTS
Page 65
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL BUFFALO 1 2/28/2006 6-F
CONC T PARTIAL DEMOLITION OF CONCOURSE T
SPECIFICATIONS - 95% CONSTRUCTION DOCUMENTS
HSST 1 11/5/2004 1-F
CONC T FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS NEWCOMB & BOYD 1 1/15/2004 1-C
CONC T HARMONIC STUDY STUDY REPORT WHITEHEAD ELECTRIC 1 3/30/2006 1-A
CONC T HVAC SYSTEMS UPGRADES FIRE ALARM SYSTEM HJAIA CONCOURSE T HVAC UPGRADES - NOTIFIER - O & M MANUAL FIRE ALARM SYSTEM
WFI GEORGIA, INC 1 1/1/2001 1-B
CONC T COSMETIC UPGRADES O & M MANUAL BRYSON CONSTRUCTION
2 12/29/2008 5-B
CONC T TRANSFORMER VAULT & ELECTRICAL ROOM ADDITION PROJECT
O & M MANUAL AND WARRANTY BRYSON CONSTRUCTORS
2 7/28/2009 4-F
CONC T NORTH RETROFIT - BUILDING AUTOMATION SYSTEM
O & M MANUAL HVAC 3RD FLOOR AATC / LEGAL JOHNSON CONTROLS 1 9/28/2009 9-B
CONC T VERTICAL TRANSPORTATION ESCALATOR T7 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20019028
KONE 1 7/9/2010 5-A
CONC T VARIABLE SPEED DRIVES SUBMITTAL
HVAC BHI/YASHAWA 1 3/10/2006 4-B
CONC T PRODUCT DATA WALLCOVERING SAMPLE SUBMITTALS SPECIALTY FINISHES 1 11/1/1995 4-F
10/23/2012SUPPORT DOCUMENTS
Page 66
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T LAPTOP CARRIER SPLIT SYSTEM A / C
O & M MANUAL & SPECIFICATIONS WEDGEFIELD ASSOCIATES, INC
1 11/1/1998 4-F
CONC T FIRE SPRINKLER TEST & INSPECTION
T CON NORTH GSE DELTA DASH LINC GSE CINTAS 1 7/8/2010 6-B
CONC T COSMETIC UPGRADES HVAC UPGRADES - CONSTRUCION DOC DOA/ COA 1 1/20/2006 5-B
CONC T COSMETIC UPGRADES RELEASE FOR CONSTRUCION DOA/ COA 1 10/17/2006 5-B
CONC T ATL LTB & CONC T PAX CIRCULATION REVISIONS
SPECIFICATIONS ADDENDUM #1 BOOK 2 OF 2 ROBERT & CO 1 11/22/1994 2-C
CONC T VERTICAL TRANSPORTATION UPGRADE PHASE II
O & M MANUAL ESCALATOR T-5B KONE 1 2/14/2012 5-A
CONC T ISD T3 TELECOM ROOM EXPANSION
COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC
1 12/7/2011 1-A
CONC T ISD T3 TELECOM ROOM EXPANSION
O & M MANUAL, SPECIFICATIONS & WARRANTIES
RDH MECHANICAL 1 12/7/2011 3-F
CONC T FIS FACILITY SUBMITTAL DATA- OPERATIONS & MAINTENANCE MAUNAL & HVAC INSTRUCTIONS BOOK # 1
MALLORY EVANS 1 7/9/1979 2-F
CONC T VERTICAL TRANSPORTATION ESCALATOR T6 CONTRACT MAINTENANCE MANUAL EQUIPMENT #20018954
KONE 1 7/30/2012 5-A
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECIFICATION 262416 - PANELBOARDS OPERATION & MAINTENANCE MANUAL
CLEVELAND ELECTRIC 1 6/28/2012 7-B
10/23/2012SUPPORT DOCUMENTS
Page 67
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS M0.1- SPLIT SYSTEMS O & M MANUAL, WARRANTY; TERMINAL UNITS O & M MANUAL, FANS O & M MANUAL
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 260511- SHORT CIRCUIT/ COORDINATION STUDY
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 262500- ENCLOSED BUS OPERATION & MANUAL
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 262300 SWITCHGEAR, 26241 SWITCHBOARDS, 262416 PANELBOARDS, & 262500 ENCLOSED BUS FIELD REPORTS
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 263213 GENERATOR & 263600 TRANSFER SWITCH O & M MANUALS INCLUDING WARRANTIES
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 262300- SWITCHGEAR O & M MANUAL INCLUDING WARRANTY
CLEVELAND ELECTRIC 1 6/28/2012 7-B
CONC T & TERM CONC T & MAIN TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECS 262413- SWITCHBOARDS O & M MANUAL INCLUDING WARRANTY
CLEVELAND ELECTRIC 1 7/18/2012 7-B
CPTC ORIGINAL CONSTRUCTION T-1 CONTRACT
PLUMBING EQUIPMENT MANUALS AMC HEARD 1 10/9/1980 1-D
CPTC ORIGINAL CONSTRUCTION CPTC
GENERATOR SET SERVICE MANUAL SPECIFICATIONS
CUMMINS 1 4/1/1978 8-B
CPTC GENERAL MANUAL - CONC A & CPTC
GENERATOR SET SERVICE MANUAL GENERATOR # KTA-1150-GS
CUMMINS 1 3/1/1977 8-B
CPTC ORIGINAL CONSTRUCTION CPTC
GENERATOR SET SERVICE MANUAL SPECIFICATIONS OPERATIONS/INSTRUC.
CUMMINS 1 11/13/1985 8-B
10/23/2012SUPPORT DOCUMENTS
Page 68
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC ORIGINAL CONSTRUCTION REST ROOM RENOVATIONS
REST ROOM EQUIPMENT DATA CONTRACTOR WARRANTY
CONLAN CO 1 10/7/1992 4-A
CPTC ORIGINAL CONSTRUCTION SPECS FOR CONTRACT PURCHASE OF ROTARY LOBE CONTROL AIR COMPRESSOR & DESICANT AIR DRYER
ATLAS COPCO 1 12/10/1985 1-D
CPTC ORIGINAL CONSTRUCTION CPTC
SPECIFICATIONS FOR T-1 CONTRACT VOL III STEVENS & WILKINSON 1 11/20/1978 3-A
CPTC ORIGINAL CONSTRUCTION ESCALATOR ADDITIONS
BID DOCUMENTS FOR ESCALATOR ADDITIONS DOA 1 6/25/1984 5-F
CPTC ORIGINAL CONSTRUCTION OWNER'S MANUAL FOR POWER MODULE CATERPILLAR 1 5/1/1987 8-B
CPTC ELEVATOR EQUIPMENT EVALUATION
ORIGINAL CONSTRUCTION MILLICAN ASSOC 1 1/16/1990 5-A
CPTC ORIGINAL CONSTRUCTION CPTC
T-1 SPECIFICATIONS VOLUMES 1 & II STEVENS & WILKINSON 1 3/21/1979 3-A
CPTC ORIGINAL CONSTRUCTION CPTC
T-1 CONTRACT DRAWING LIST STEVENS & WILKINSON 1 5/23/1979 1-F
CPTC ORIGINAL CONSTRUCTION CPTC
AIR CONDITIONING SYSTEM DESIGN CARRIER 1 1/1/1972 1-D
CPTC DISPATCH CENTER & MISC SECURITY IMPROVEMENTS
CONTRACT DOCS & SPECS FOR FAR 107.14 DISPATCH CENTER & MISC SECURITY IMPROVEMENTS
ROBERT & CO 1 4/3/1995 7-F
CPTC ORIGINAL CONSTRUCTION CPTC
MOTOROLA REPEATER MOTOROLA 1 9/30/1977 8-B
10/23/2012SUPPORT DOCUMENTS
Page 69
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC ORIGINAL CONSTRUCTION CPTC
TELEPHONE GROUPS EMERGENCY TELEPHONES BAKER AUDIO 1 3/26/1992 8-B
CPTC ORIGINAL CONSTRUCTION CPTC
PLUMBING, AC & FIRE DAMPER TAG CHARTS LIMBACH ECONOMY 1 1/1/1979 9-D
CPTC MONTGOMERY ESCALATOR MAINTENANCE MANUAL MONTGOMERY 1 5/15/1975 5-F
CPTC ELECTRICAL ELECTRICAL TEST REPORT HOOD-PATTERSON DEWAR
1 3/1/1986 6-B
CPTC JETWAY MODEL 54-107 O & M MANUAL P. I. STEEL CORP 1 6/5/1980 5-D
CPTC JETWAY EQUIPMENT O & M MANUAL ABEX 1 8/1/1979 5-D
CPTC SURVEY YORK WATER CHILLER SYSTEM-EQUIPMENT & TESTING
STEVENS & WILKINSON 1 5/24/1982 2-A
CPTC ADJUSTABLE FREQUENCY AC CONTROLLERS 15-60 HP
INSTALLATION STARTUP, 0PERATION & MAINTENANCE OF ACCUTROL 200
WESTINGHOUSE 1 7/1/1984 6-E
CPTC HONEYWELL DELTA 1000 HVAC CONTROL AND MONITORING SYSTEM
ENERGY MANAGEMENT HONEYWELL 1 11/20/1980 9-C
CPTC MECH, PLUMB, OUTSIDE AIR PIPING ANALYSES
DATA MANUAL-PIPING ANALYSIS STEVENS & WILKINSON 1 6/26/1996 1-E
CPTC INTERIOR SIGN SPEC & FID FORMS DESIGN DOCS
INTERIOR GRAPHIC DESIGN SYSTEMS ACE & OSGOOD & ASSOC
1 7/17/1995 5-D
10/23/2012SUPPORT DOCUMENTS
Page 70
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC PROJECT DESIGN FOR RETAIL & FOOD CONCESS
CONCESSIONS DESIGN CRITERIA MANUAL HCM 1 7/28/1995 2-D
CPTC ELECTRICAL SWITCHGEAR TESTING
LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR
1 11/1/1991 6-D
CPTC HAIA SHORT TERM SIGNAGE RETROFIT
SPECS HAIA 1 8/1/1994 2-D
CPTC ASBESTOS REMOVAL & DISPOSAL POST JOB
SUBMITTAL INFORMATION TRANSITE SHEETING REMOVAL
NEW SOUTH 1 1/7/1997 4-E
CPTC WIRELESS SERVICE MOTOROLA HDII C.I.T.E. CELL PRELIMINARY PROPOSAL
AIR TOUCH CELLULAR 1 10/1/1995 8-A
CPTC LIFE SAFETY & ENVIRONMENTAL
PROPOSAL FOR UPGRADE OF EXISTING COMPUTER INTERFACE FOR BUILDING MANAGEMENT SYSTEM
HONEYWELL 1 12/24/1991 2-C
CPTC PNEUMATIC & ELECTRONIC EQUIPMENT
SPECIFICATIONS & PRICE REFERENCE GUIDE HONEYWELL 1 8/1/1991 9-C
CPTC YORK 1995 T. M. MEETING NOTEBOOK
HEATING AND AIR CONDITIONING TRAINING YORK 1 7/6/1995 6-E
CPTC YORK AIR CONDITIONING & REFRIGERATION
REPORTS OF EDDY CURRENT INSPECTION YORK 1 1/1/1996 6-B
CPTC NATL INSTITUTE FOR CERTIF IN ENG. TECH.
PROGRAM DETAIL MANUAL FOR CERT IN FIRE PROT, SPEC HAZARDS, LAYOUT, SPRINKLER & FIRE ALARMS
NICET 1 5/1/1996 6-B
CPTC FOXBORO COMPANY PRODUCT SPECIFICATION SHEETS
PRODUCT CATALOG INSTRUMENTATION SPEC FOXBORO 1 3/1/1997 9-C
10/23/2012SUPPORT DOCUMENTS
Page 71
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC LEASE OUTLINE DWGS HCM LEASE OUTLINE DRAWINGS ALL LOCATIONS HCM 1 9/14/1995 2-E
CPTC TEXT OF PRERECORDED MESSAGES
BAKER AUDIO TELECOM BAKER AUDIO 1 9/14/1995 9-A
CPTC FOXBORO INSTRUCTION BOOK 3473
743CB FIELD STATION MICRO CONTROLLER FOXBORO 1 2/1/1996 9-A
CPTC ILLUMILES CORPORATION A LIGHTING RETROFIT FOR HARTSFIELD- PROPOSAL
ILLUMELEX CORP 1 8/16/1994 4-F
CPTC ELEVATOR MAINTENANCE EVAL SURVEY REPORT
ELEVATOR EQUIPMENT-EVALUATION SURVEY REPORT
G. ALAN NEWTON INC 1 5/31/1996 5-F
CPTC PTL EQUIPMENT MANUFACTURING
ELEVATOR FIXTURES PTL EQUIP MANUF CO 1 1/1/1992 5-E
CPTC CRISIS ALERT SYSTEM SUPERVISED COMMUNICATIONS SYSTEM PROPOSAL FOR HAIA
RING COMM INC 1 4/1/1992 8-A
CPTC FOXBORO INSTRUCTION BOOK 3435 1/A SERIES
INTELLIGENT MAGNETIC FLOW TRANSMITTER MODEL IMT20
FOXBORO 1 7/1/1996 8-A
CPTC PROJECT MANUAL TERMINAL REROOFING
TERMINAL ADMINISTRATIVE AREA & BOILER PLANT CONTRACT #01-5440.1
CONLEY DESIGN GROUP
1 9/1/1997 4-B
CPTC DELTA CARPETING PROJECT - CONC A, B & T
PROJECT MANUAL FOR DELTA JOB #41227.00 GENERAL CONSTRUCTION PHASE II A, B & T
ROSSER 1 12/16/1994 2-F
CPTC OIL-WATER SEPARATORS & ACCESSORIES
TECHNICAL ENGINEERING MANUAL FOR OIL-WATER SEPARATORS & ACCESSORIES
MC TIGHE INDUSTRIES 1 1/1/1993 8-B
10/23/2012SUPPORT DOCUMENTS
Page 72
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC DELTA RENOVATION PROJECT - CONC A, B & T
PROJECT MANUAL & ADDENDUM #1 JOB NO. 41227.00 RENOV. PUBLIC AREAS/GROUP RMS
ROSSER 1 1/19/1995 2-F
CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES I (ALL CONCOURSES)
LIMBACH ECONOMY 1 10/12/1978 9-E
CPTC ELECTRICAL SYSTEM ANALYSIS - CONC A, B, C, D &T
ELECTRICAL SYSTEM ANALYSIS ROSSER FABRAP 1 3/1/1987 6-B
CPTC SMOKING LOUNGE EXHAUST DUCT CLEANING
POST PROJECT REPORT - CONCOURSE T, A, B & C A.R.M. ENVIRONMENTAL INC (ALAMEDA CRUZ)
1 3/8/1997 3-E
CPTC ROOFING STANDARDS & MAINTENANCE MANUAL
ROOFING STANDARDS & MAINTENANCE MANUAL
CONLEY DESIGN GROUP
1 2/1/1998 4-B
CPTC ROOFING PROJECT - CONC T & "L" SECTION
CENTIMARK ROOF SYSTEMS - REPORT & PROPOSAL (3 BOOKS)
CENTIMARK 3 11/16/1995 4-B
CPTC DELTA STATIONS TRAINING & INFLIGHT REVS
PROJECT MANUAL - CONCOURSE A & T DERYCK MUEHLHAUSER
1 6/15/1988 3-C
CPTC CENTRAL PLANT, ATRIUM, CONC B & CONC E PHASE II
HVAC SOFTWARE DOCUMENTATION CENTRAL PLANT, TERMINAL ATRIUM, B & E
HONEYWELL / MC DEVITT STREET BOVIS
1 5/15/1995 9-C
CPTC CONC E PH. II - DELTA TENANT ADDS @ CONC E & CONC B
O & M MANUAL DAL LOUNGES & GROUP RM, BAG LEVEL COND. UNITS, CONCESS & BRITISH AIRWAYS
HONEYWELL 1 1/1/1995 9-B
CPTC SPRINKLER SYSTEM INFO FOR TERM,T,A,B,E
TRIPPING RECORD OF DRY-PIPE VALVE FACTORY MUTUAL SYSTEM
1 7/3/1997 6-B
CPTC UNITED AIRLINES RED CARPET ROOM
ROOF PENETRATIONS PATTON CONSTRUCTION
1 9/18/1998 4-A
10/23/2012SUPPORT DOCUMENTS
Page 73
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC ANTENNA PLATFORMS (SATELLITE)
CRITERIA FOR PLACEMENT OF ANTENNA STRUCTURES
ACE 1 8/1/1998 1-B
CPTC FIRE SPRINKLER INSPECTION INSPECTION LOG, DISCREPANCY REPORT, PROPOSED SOLUTIONS-ZON T2,B23,B29,T8,B3
GWINNETT SPRINKLER CO
8 9/24/1998 6-B
CPTC ROOFING PROJECT ROOFING MANAGEMENT PROGRAM CONLEY DESIGN GROUP
1 2/1/1998 4-B
CPTC BREAKER TEST RESULTS LOW VOLTAGE BREAKER TESTS HOOD-PATTERSON DEWAR
1 2/1/1996 6-D
CPTC ELECTRICAL SWITCHGEAR TESTING
LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR
1 3/1/1994 6-D
CPTC ELECTRICAL SWITCHGEAR TESTING
CONCOURSES A,B,C,D, E & ATRIUM, MER-8 HOOD-PATTERSON DEWAR
1 5/1/1999 6-D
CPTC SIGN & GRAPHICS STANDARDS
GUIDELINES ACE 1 7/1/1997 5-D
CPTC ELEVATOR / ESCALATOR SURVEY & INVENTORY
EVALUATION OF CONDITION LERCH, BATES & ASSOC.
1 11/22/1999 5-E
CPTC WASTE MANAGEMENT DISPOSAL STUDY
ECONOMICAL VIABILITY FOR INCINERATOR DOUCET & MAINKA 1 7/17/1990 6-B
CPTC FIRE PROTECTION ANNUAL FIRE PUMP INSPECTION REPORT - 2000, 2002, 2003
ALLIANCE FIRE PROTECTION
1 12/31/2003 1-B
CPTC MIC STATION INTERFACE CARD
UPGRADE TO IEO 500 ACS FROM 500C-B INNOVATIVE ELEC. DESIGNS/BAKER AUDIO
1 10/1/1997 9-A
10/23/2012SUPPORT DOCUMENTS
Page 74
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 1/10/1996 6-B
CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 5/1/1998 6-B
CPTC ENERGY CONSERVATION PROGRAM
ANALYSIS & OPPORTUNITIES SOUTHERN COMPANY 1 12/22/1997 6-B
CPTC DELTA COOLING TOWER DRAINS
INSTALLATION DRAWINGS - CONCOURSE A & T PERFORMANCE MECHANICAL
1 8/2/2000 8-F
CPTC AATC WALL FINISH ENHANCEMENTS
PROJECT MANUAL SIZEMORE FLOYD 1 2/26/1999 5-F
CPTC FACILITY ASSESSMENT & CONDITION SURVEY
SPECIALIZED BUILDING SYSTEMS LAW GIBB GROUP 1 3/3/2000 6-A
CPTC FACILITY ASSESSMENT & CONDITION SURVEY
ELECTRICAL SYSTEMS LAW GIBB GROUP 1 3/3/2000 6-A
CPTC FACILITY ASSESSMENT & CONDITION SURVEY
UTILITY SYSTEMS LAW GIBB GROUP 1 4/10/2000 6-A
CPTC FACILITY ASSESSMENT & CONDITION SURVEY
MECHANICAL SYSTEMS LAW GIBB GROUP 1 4/10/2000 6-A
CPTC FIRE PROTECTION ANNUAL FIRE PROTECTION INSPECTION REPORT - 2001, 2002, 2003
ALLIANCE FIRE PROTECTION
1 12/31/2003 1-B
CPTC CONC A & B REST ROOMS PRODUCT DATA - EXHAUST FANS, DAMPERS, DUCT
SHUMATE MECHANICAL
1 9/26/1991 3-E
10/23/2012SUPPORT DOCUMENTS
Page 75
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC FAUCET & TOILET REPLACEMENT
SPECIFICATIONS TOTO U.S.A. INC. 1 11/10/2000 2-B
CPTC DISPATCH CTR IMPROVEMENTS PHASE 2
SPECIFICATIONS ACE 1 6/5/1998 3-C
CPTC DELTA COMM. RM. RENEWAL PHASE I
BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 10/16/1998 3-A
CPTC DELTA CRITICAL INFRASTRUCTURE PH III
BID PACKAGE - APPENDIX #1 FIBER OPTIC CABLE REV.
MACK A. YOUNG 1 2/4/1998 3-A
CPTC DELTA COMM. RM. RENOV. PH. III CONC.B,C,D
BID PACKAGE - SPECS & CONTRACT DOCS MACK A. YOUNG 1 2/16/1999 3-A
CPTC DELTA FIDS RENEWAL BID PACKAGE - SPECS & CONTRACT DOCS PROJECT MANAGEMET SVCS.
1 12/22/2000 3-A
CPTC DELTA AIRLINES DELTA COMMUNICATION ROOM RENO PHASE IV TO53, GSE, DELTA DASH -BID PACKAGE - SPECS & CONTRACT DOCS
AVIATION FACILITIES GROUP
1 3/19/1999 3-A
CPTC DELTA CRITICAL INFRASTRUC. PHASE II
BID PACKAGE - SPECS & CONTACT DOCS CONC. A & B
AVIATION FACILITIES GROUP
1 9/16/1997 3-A
CPTC DELTA PH II NEW COMM. RM ON A, B, D
BID PACKAGE - SPECS & CONTRACT DOCS AVIATION FACILITIES GROUP
1 1/19/1999 3-A
CPTC FIRE RISK ANALYSIS VALIDATION REVIEW REPORT (DRAFT) ACE 1 8/20/2000 1-B
CPTC N/A PRODUCT REFERENCE MANUAL OVERHEAD DOOR CO. OF ATLANTA
1 2/1/2002 4-E
10/23/2012SUPPORT DOCUMENTS
Page 76
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC RMU REPORTS TIME & EVENT PROGRAM REPORTS AATC 1 8/30/1984 6-B
CPTC COSMETIC UPGRADES CONTRACT DOCUMENTS FC-7258-00 - PHASE 1A DOA 1 2/1/2002 5-B
CPTC SIGNAGE SURVEY ORIENTATION TO THE HIP '96 SIGNING & WAYFINDING PROGRAM
ACE / OSGOOD & ASSOCIATES
1 6/29/1995 5-D
CPTC ELEVATOR / ESCALATOR CONDITION AUDIT
MAINTENANCE & EQUIPMENT CONDITION LERCH, BATES & ASSOC.
1 11/22/1999 5-E
CPTC FIBER OPTIC EQUIP. ROOMS & RACEWAY
BID DOCUMENTS FC-7437-02 ACE 1 1/1/2002 2-E
CPTC AUTOMATED EXTERNAL DEFIBRILLATORS PH I
BID DOCUMENTS FC-7405-02 ACE 1 1/1/2002 2-D
CPTC REST ROOMS UPGRADE - PROTOTYPES
BID DOCUMENTS - FC-7495-02 CITY OF ATLANTA 1 9/17/2002 2-A
CPTC FIRE RISK ANALYSIS REPORT FIRE & LIFE SAFETY TVA 1 1/20/1999 2-C
CPTC COSMETIC UPGRADES BID DOCUMENTS - FC-7258-00 - PHASE 1A DOA 1 2/1/2001 5-B
CPTC ELECTRICAL SYSTEM ASSESSMENT
SURVEY OF EXISTING ELECTRICAL SYSTEMS & EVALUATION PHASES FINAL REPORT
ACE 1 8/1/2002 8-C
CPTC ELEVATOR EQUIPMENT EVALUATION
EVALUATION FOR ELEVATOR EQUIPMENT MILLICAN & ASSOC. 1 1/15/1990 5-E
10/23/2012SUPPORT DOCUMENTS
Page 77
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC ELECTRICAL SYSTEMS ELECTRICAL SYSTEMS MAINTENANCE EVALUATION
MACK YOUNG 1 3/15/1990 4-F
CPTC INTERIOR ROOM/DOOR NUMBERING SYSTEM SIGNS
BID DOCUMENTS - ISSUED FOR REVIEW CITY OF ATLANTA 1 9/23/2002 2-A
CPTC REST ROOMS UPGRADES - PROTOTYPES
BID DOCUMENTS CITY OF ATLANTA 1 7/1/2002 2-A
CPTC AIRPORT SAFETY/CENTRALIZED COMMAND & CONTROL
FINDINGS AND RECOMMENDATIONS ROSS & BARUZZINI AND GLOVER/RESNICK
1 7/30/2002 2-C
CPTC FIRE DETECTION ALARM SYSTEM & FIRE SPRINKLER SYSTEM
REPORT NEWCOMB & BOYD 1 2/14/2003 6-B
CPTC HDP'S AIRPORT PROJECTS PROGRAM STATUS REPORT FOR 9/03 HDP 1 9/30/2003 1-A
CPTC HVAC SYSTEMS UPGRADE SCHEMATIC DESIGN DOCUMENTS STANLEY, LOVE-STANLEY & NEWCOMB & BOYD
1 10/8/2003 5-C
CPTC FIBER OPTIC ROOMS & RACEWAYS #FC-7437-02
WARRANTY, CLOSE OUT INFO, O & M NEW SOUTH 1 6/3/2003 4-B
CPTC CATHODIC PROTECTION RESURVEY
EVALUATION OF CATHODIC PROT SYSTEM FOR METALLIC UNDERGROUND FUEL TANKS
CORRPRO 1 12/5/2003 1-B
CPTC UTILITIES MASTER PLAN PHASE I
UTILITY SYSTEMS REPORT - VOLUME 1 & VOLUME 2
HPC 2 1/31/2004 8-B
CPTC UTILITIES MASTER PLAN PHASE I
UTILITY SYSTEMS REPORT - VOLUME 2 - APPENDICES
HPC 1 1/31/2004 8-B
10/23/2012SUPPORT DOCUMENTS
Page 78
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC PROPERTY RISK ANALYSIS REPORT / SURVEY ALLIANZ GLOBAL RISKS 1 10/10/2003 4-F
CPTC AUTO EXTERNAL DEFIBRILLATORS PH 2
SPECIFICATIONS ACE 1 12/16/2004 2-E
CPTC FIRE ALARM CONTROL SYSTEM
O & M MANUAL SUNTECH SYSTEMS 1 6/23/2005 1-C
CPTC FIRE SUPPRESSION SYSTEM O & M MANUAL GWINNETT SPRINKLER 1 11/18/2004 1-B
CPTC HVAC SYSTEMS UPGRADE APPROVED SUBMITTALS FOR CONCOURSES A, B, C
PERFORMANCE MECHANICAL
1 6/23/2005 2-F
CPTC FIRE ALARM FIRE SUPPRESSION
O & M MANUAL PERFORMANCE MECHANICAL
1 6/23/2005 1-C
CPTC HVAC SYSTEMS UPGRADE COMMISSIONING REPORTS MANUAL FOR CONC A,B,C, - RMU UNITS & TERMINAL UNITS
PERFORMANCE MECHANICAL
1 6/23/2005 1-A
CPTC FIRE ALARM/FIRE SUPPRESSION
NFPA 72 CERTIFICATIONS FOR LANDSIDE, CONC T, A, B, C, D & E & FIRE PUMP TESTING
NEW SOUTH/H/B JV 1 8/19/2005 1-C
CPTC FIRE ALARM FIRE SUPPRESSION-HVAC
FIRE ALARM FIRE SUPPRESSION ABOVE GROUND TEST (SIGNED) CERTIFICATES
GWINNETT SPRINKLER 1 12/13/2004 1-C
CPTC FIRE ALARM FIRE SUPPRESSION-HVAC
CLOSE OUT DOCUMENTS/O & M MANUALS LIGHT FIXTURES/LIGHTING CONTROL SYSTEM
INGLETT & STUBBS 1 11/17/2004 1-C
CPTC FIRE ALARM FIRE SUPPRESSION-HVAC
CLOSE OUT DOCS/ O &M MANUALS FIRE ALARM SYSTEM ROUGH-IN, PA SYSTEM SPEAKERS, MODULAR WIRING SYSTEM
INGLETT & STUBBS 1 11/17/2004 1-C
10/23/2012SUPPORT DOCUMENTS
Page 79
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC WATER TREATMENT AUDIT WATER BASED SYSTEMS ANALLYSIS H2O MEYER 1 9/14/2005 2-A
CPTC UTILITIES MASTER PLAN PHASE I
ENERGY COST REDUCTION EVALUATION FINAL DRAFT SUBMITTAL
HPC 1 2/17/2003 7-E
CPTC FIRE PROTECTION 2005 ANNUAL FIRE SPRINKLER INSPECTION REPORT
LIFE SAFETY SYSTEMS 1 7/27/2005 6-B
CPTC CATHODIC PROTECTION UNDERGROUND TANKS
RESURVEY UNDERGROUND STORAGE TANK SYS EVALUATION REPORT
CORRPRO 1 11/24/2006 1-B
CPTC ELECTRICAL STUDY AUTO CAD DRAWINGS OF TERMINAL, A, B, C, D, & T
HOOD-PATTERSON & DEWAR
1 4/1/2005 7-F
CPTC SHORT CIRCUIT COORDINATION STUDY
STUDY DATA FOR MAIN TERMINAL HOOD-PATTERSON & DEWAR
1 6/13/2005 6-A
CPTC FIRE ALARM - FIRE SUPPRESSION
SUBMITTALS & BULLETINS NEWCOMB & BOYD 1 12/16/2003 1-C
CPTC CONSTRUCTION LOGISTIC 2008 FIRST QUARTER REVIEW DOA 1 1/23/2008 7-D
CPTC CONSTRUCTION LOGISTICS 2008 THIRD QUARTER REVIEW DEPT OF AVIATION 1 1/1/2008 7-D
CPTC DELTA AIRLINE ENABLING WORK BAGGAGE HANDLING SYSTEM EXP(BHS)
BID PACKAGE #4 - ADDENDUM No. 1 - CONFORMED DOCUMENTS
PGAL 1 9/10/2007 9-F
CPTC FACILITY ASSESSMENT & CONDITION SURVEY
REQUEST FOR PROPOSAL EMC ENGINEERS 1 6/18/1999 6-A
10/23/2012SUPPORT DOCUMENTS
Page 80
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC AUTOMATED EXTERNAL DEFIBRILLATOR
TRANSITION PLAN DOA 1 11/1/2006 7-D
CPTC LIGHTING SURVEY LIFE SAFETY ANALYSIS SURVEY - VOL 1 NEWCOMB & BOYD 1 2/14/2003 2-C
CPTC LIGHTING SURVEY LIFE SAFETY ANALYSIS SURVEY - VOL 2 NEWCOMB & BOYD 1 2/14/2003 2-C
CPTC FIRE ALARM SYSTEM FIRE ALARM BACKBONE NEWCOMB & BOYD 1 1/9/2004 1-C
CPTC FA/FP/LS/HVAC UPGRADES CONTROL SYSTEM RESUBMITTAL CONCOURSES A, B, C, & D
NEWCOMB & BOYD 1 1/13/2005 9-D
CPTC FIRE ALARM SYSTEM EQUIPMENT DATA SHEET NEWCOMB & BOYD 1 11/5/2003 1-C
CPTC FIRE ALARM SYSTEM REVISED PRODUCT DATA NEWCOMB & BOYD 1 12/1/2003 1-C
CPTC FA/FS/HVAC UPGRADES CONCOURSES A, B, C, & D - CONTROL SYSTEM O & M MANUAL
JOHNSON CONTROLS 1 11/21/2005 9-D
CPTC FA/HVAC REPLACEMENT BUFFALO AIR HANDLING O & M MANUAL PART 1 OF 5 - CPTC
BUFFALO 1 2/28/2005 6-F
CPTC SECURITY ACCESS CONTROL RFP DOA 1 7/1/2004 9-C
CPTC FIRE PROTECTION 2002 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION
1 12/31/2002 1-C
10/23/2012SUPPORT DOCUMENTS
Page 81
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC FIRE PROTECTION 2002 ANNUAL FIRE PUMP INSPECTION REPORT ALLIANCE FIRE PROTECTION
1 12/31/2002 1-C
CPTC FIRE PROTECTION 2001 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION
1 12/31/2001 1-C
CPTC FIRE PROTECTION 2000 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION
1 12/31/2000 1-C
CPTC CENTRALIZED PAGING SYSTEM
CONCEPT DEVELOPMENT/SCHEMATIC DESIGN REPORT
HARTSFIELD PLANNING COLLABORATIVE
1 10/18/2004 7-F
CPTC INTERIOR ROOM/DOOR NUMBERING SYSTEM
SIGN SCHEDULES - REVISION 1 & PROJECT MANUAL
DOA 1 3/30/2004 2-A
CPTC REMOTE RECEIVER FACILITY RELOCATION
PROJECT SPECIFICATIONS DOA 1 12/5/2003 8-B
CPTC FIRE DETECTION AND ALARM SYSTEM MODIFICATIONS
LIFE SAFETY UPGRADES - REVISED SCHEMATIC DESIGN REPORT
ACE 1 6/1/2002 2-C
CPTC HVAC SYSTEMS UPGRADES CONC A, B, C, & D CONTRACT DOCUMENTS STANLEY, LOVE-STANLEY, NEWCOMB & BOYD
1 1/14/2004 7-F
CPTC DOA SOUTH SECURITY CHECKPOINT
SECURITY REVOLVING DOOR O & M MANUAL W G YATES & SONS CONSTRUCTION
1 11/14/2008 8-A
CPTC E-CONCOURSE TICKET COUNTER REPLACEMENT PROJECT
O & M MANUAL NEW SOUTH CONSTRUCTION
1 1/30/2009 7-E
CPTC BLAST FILM INSTALLATION PROJECT - CONC T AND BADGING OFFICE
AEGIS FILMS WARRANTY - MADICO SAFETYSHIELD WARRANTY - AEGIS FILMS - WINDOW CLEANING INSTRUCTIONS
AEGIS FILMS 1 2/19/2009 2-C
10/23/2012SUPPORT DOCUMENTS
Page 82
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC BAKER AUDIO WARRANTY AND SERVICE PROCEDURES BAKER AUDIO 1 12/15/2006 4-B
CPTC FIRESTOP GEORGIA FIRESTOP INC. PROPOSAL GFI 1 2/10/2000 4-B
CPTC PASSPORT CONTROL LCD REPLACEMENT
SUBMITTALS INFAX, INC 2 7/6/2009 9-C
CPTC SKYLIGHT REPLACEMENT PHASE 1 - PROGRAM VALIDATIN & DEFINITION - REPORTS - TERM, CONC T, A & B FINAL
AVIATION CONSULTANTS
1 9/1/2009 4-C
CPTC LIFE SAFETY LIFE SAFETY REPORT - TERMINAL & CONCOURSES - PHASE I DWG & EVAC PLANS
R. L. BROWN & ASSOCIATES
1 7/14/2009 2-C
CPTC APM TUNNEL STRUCTURAL SURVEY
PROJECT DEFINITION FINAL REPORT - REVISED HSST 1 8/21/2009 9-A
CPTC APM TUNNEL STRUCTURAL SURVEY
PROJECT DEFINITION FINAL REPORT HSST 1 6/29/2009 9-A
CPTC DAL BAGGAGE HANDLING SYSTEM (BHS) PROJECT - PHASE 2
SITE SAFETY PLAN & HAZARDOUS COMMUNICATION PLAN
VANDERLANDE INDUSTRIES
1 12/1/2009 2-C
CPTC VERTICAL TRANSPORTATION UPGRADE PHASE 1
CODE COMPLIANT SAFETY UPGRADES PHASE 1 CLOSE OUT DOCUMENTS
KONE 1 1/12/2010 5-A
CPTC DOA SECURITY CHECKPOINT SECURITY REVOLVING DOOR O & M MANUAL / PARTS LIST
HORTON 1 2/6/2010 8-A
CPTC HVAC SYSTEMS UPGRADES CONC A, B, C, & D CONTRACT DOCUMENTS STANLEY, LOVE-STANLEY, NEWCOMB & BOYD
1 3/25/2004 8-B
10/23/2012SUPPORT DOCUMENTS
Page 83
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC UPGRADES - CONC A & B SPECIFICATION - 7369 HSST 1 8/21/2008 1-F
CPTC TSA BAGGAGE HANDLING SYSTEM (BHS)
TRANSITION PLAN DOCUMENT DOA 1 9/1/2006 6-B
CPTC CARPET REPLACEMENT - CONC T, A, B, C, & D
CLOSEOUT DOCUMENTS CPS 1 2/26/2010 2-F
CPTC PASSPORT CONTROL SIGNAGE REPLACEMENT
CLOSE OUT DOCUMENTS INFAX 1 2/26/2010 9-C
CPTC FIRE RISK ANALYSIS EXECUTIVE BRIEF - FIRE AND LIFE SAFETY MANUAL & DRAWINGS
TVA 1 3/17/1999 2-C
CPTC CONRAC CPTC APM STATION CITY OF ATLANTA 1 5/14/2007 2-E
CPTC ATL AIRPORT LIFE SAFETY UPGRADES
FA /FP SYSTEMS UPGRADES ACE 1 3/20/2001 2-C
CPTC COSMETIC UPGRADES O & M MANUAL VOLUME 1 - CONCOURSE A & B NEW SOUTH CONSTRUCTION
1 8/1/2007 5-B
CPTC COSMETIC UPGRADES O & M MANUAL VOLUME 2 - CONCOURSE A & B NEW SOUTH CONSTRUCTION
1 8/1/2007 5-B
CPTC RE-ROOF PROJECT CONCOURSES A & B RE-ROOFING SPECIFICATIONS
RAYMOND ENGINEERING
2 10/5/2006 4-A
CPTC FIRE SAFETY PROGRAM POLICY & PROCEDURES CITY OF ATLANTA 1 5/17/2002 2-C
10/23/2012SUPPORT DOCUMENTS
Page 84
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC TSA WBI REPOSITIONING WBI REPOSITIONING - ISSUE FOR CONSTRUCTION
CARTER BURGESS 1 2/9/2010 6-B
CPTC HJAIA FA/FS PROJECT CLOSE OUT DOCUMENTS / O & M MANUAL - LIGHT FIXTURES & LIGHTING CONTROL SYSTEM (A - D)
NEW SOUTH 1 11/17/2004 1-B
CPTC SKYLIGHT REPLACEMENT PHASE 2 - 95% CONSTRUCTION DOCUMENT REPORT - FINAL
DOA / CITY OF ATLANTA
1 4/30/2010 4-C
CPTC SKYLIGHT REPLACEMNT PHASE 2 - 95% CONSTRUCTION DOCUMENT SPECS
DOA / CITY OF ATLANTA
1 4/30/2010 4-C
CPTC HVAC INFORMATION MANUAL ABS 1 2/1/1998 4-F
CPTC LIGHTING ENERGY CONSERVATION
ORIGINAL CONSTRUCTION SPECS ENERTRON 1 9/1/1984 4-F
CPTC CHROMALOX HOT WATER CIRCULATION SYSTEMS
ORIGINAL CONSTRUCTION CHROMALOX 1 4/6/1984 4-F
CPTC SWITCHGEAR SWITCHGEAR AIR MAGNETIC CIRCULATION BREAKER WITH SOLENOID INSTRUCTION
ABB SERVICE 1 12/1/1973 4-F
CPTC BOARDING BRIDGES TROUBLESHOOTING PROCEDURES & DIAGRAMS STEARNS AIRPORT EQUIPMENT
1 5/1/1986 4-F
CPTC BRIGHTNESS CONTROL CONSTANT CURRENT REGULATION
INSTRUCTION MANUAL HEVI-DUTY ELECTRIC COMPANY
1 10/1/1997 4-F
CPTC ROOF REPAIRS CONC A, B, C & D, FIS INTERNATIONAL & BOILER ROOM
LANCE ROOF INSPECTION SERVICE
1 10/23/1989 4-A
10/23/2012SUPPORT DOCUMENTS
Page 85
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC ELECTRICAL SYSTEM ASSESSMENT
SURVEY OF EXISTING ELECTRICAL SYSTEMS & EVALUATION, FINDINGS & RECOMMENDATIONS
ACE 1 5/1/2002 6-E
CPTC ELECTRICAL SWITCHGEAR TESTING
LOW VOLTAGE SWITCHGEAR TEST REPORT HOOD-PATTERSON DEWAR
1 12/1/1987 6-D
CPTC INDOOR AIR QUALITY SURVEY REPORT LAW ENGINEERING 1 1/10/1996 6-B
CPTC MASTER PLAN TECHNICAL REPORT
VOLUME 1 - PUBLIC INVOLVEMENT, SUMMARY OF SCOPING SESSION, VISION & POLICY DOC & EXISITNG CONDITION
CITY OF ATLANTA / DOA
1 9/1/1996 6-C
CPTC MASTER PLAN TECHINICAL REPORT
VOLUME 2 - EVAL OF LONG TERM ALTERNATIVES, OPS & ECONOMIC ANALYSIS & FUNCTIONAL ANALYSIS
CITY OF ATLANTA / DOA
1 11/1/1998 6-C
CPTC MASTER PLAN TECHINICAL REPORT
VOLUME 3 - ENVIRONMENTAL EVAL, FINANCIAL PLAN, COMMUNITY DEVELOPMENT OPPORTUNITIES & RECOMMENDED PLA
CITY OF ATLANTA / DOA
1 9/1/1999 6-C
CPTC LIGHTING CONTROL SOLUTIONS
HSOFT-CM1 OPERATING SOFTWARE USER'S MANUAL
HORTON CONTROLS 1 1/1/2000 8-A
CPTC LLIGHTING CONTROL PROGRAMMING, MONITORING & CONTROL; WIN CONTROL FOR WIN 95/98 & NT
HORTON CONTROLS 1 2/15/2000 8-A
CPTC FIRE PUMP TESTING 2010 ANNUAL SPRINKLER REPORT - CONC A, B & E
CINTAS 1 11/18/2010 6-B
CPTC DELTA FIDS RENEWAL - PLASMA SCREENS
SPECS. - PIONEER 40" PANEL PDP-V401 PIONEER 1 9/1/1998 9-A
CPTC WIFI MUFIDS EQUIPMENT ROOMS
HVAC UPGRADE - MECHANICAL O & M MANUAL F & S MECHANICAL 1 10/28/2010 7-A
10/23/2012SUPPORT DOCUMENTS
Page 86
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC WIFI MUFIDS EQUIPMENT ROOMS
HVAC UPGRADE -ELECTRICAL O & M MANUAL NEW SOUTH 1 10/28/2010 7-A
CPTC FIRE PROTECTION 2010 ANNUAL INSPECTION REPORT ALLIANCE FIRE PROTECTION
1 12/31/2010 1-C
CPTC FIRE ALARM SYSTEM TRAINING
INTRODUCTION TO NETWORK LAYOUT AND MAJOR COMPONENTS
AATC 1 1/1/2011 1-B
CPTC SKYLIGHT REPLACEMENT SUBMITTALS - TERM, CONC T, A & B AVIATION CONSULTANTS
1 7/2/2010 4-C
CPTC FIRE ALARM/FIRE SUPPRESSION/HVAC
WARRNTY MANUAL - LANDSIDE, CONC T, A, B, C, D & E
NEW SOUTH/H/B JV 1 8/19/2005 1-C
CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES II (ALL CONCOURSES)
LIMBACH ECONOMY 1 10/12/1978 9-E
CPTC ORIGINAL CONSTRUCTION O & M MANUAL - VOLUMES III (ALL CONCOURSES)
LIMBACH ECONOMY 1 10/12/1978 9-E
CPTC DELTA AIRLINES SKY CLUBS T7, A17, A-SPINE, B25 & E15 CLOSE OUT MANUAL
BRYSON 1 3/15/2011 7-A
CPTC DELTA AIRLINES - BAGGAGE HANDLING SYSTEM (BHS) EXP ENABLING
CLOSEOUT MANUAL NEWCOMB & BOYD 1 3/14/2011 2-F
CPTC ROOF WARRANTY WARRANTY - MAIN TERMINAL, CONC T - E MISC COMPANIES 1 3/13/2007 4-A
CPTC T-MOBILE HOT SPOT INSTALLATION T-MOBILE 1 3/7/2003 8-A
10/23/2012SUPPORT DOCUMENTS
Page 87
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC SMOKING LOUNGE SPECIFICATIONS STANLEY LOVE-STANLEY
1 7/30/2004 3-E
CPTC DELTA AIRLINES SKY CLUB PROJECT PHASE 2
CLOSE OUT DOCUMENTS - A17, A-SPINE, B25, E15 & T7
BRYSON 1 2/1/2011 7-A
CPTC COSMETIC UPGRADES CONCOURSE A & B SPECIFICATIONS 100% CONSTRUCTION DOC
HSST 1 11/29/2005 5-B
CPTC COSMETIC UPGRADE HOLDROOM WAINSCOT & CARPET TRIM CONCOURSES T, A, B, C, & D
SCOTT ASSOCIATES 1 1/28/2008 5-B
CPTC DOA CONCRETE REPAIR SPECIFICTIONS
HIGH EARLY STRENGTH CEMENT CONCRETE PAVEMENT - SPECIFICATIONS
DOA 1 7/13/2011 4-E
CPTC ELEVATOR INTERCOM SYSTEM UPGRADE - 2011
CLOSE OUT DOCUMENTS BAKER AUDIO 2 7/25/2011 9-A
CPTC UNDERGROUND STORAGE TANK SYSTEM
CATHODIC PROTECTION SYSTEM EVALUATION REPORTS - N & S TERM, CONC A-D
CORRPRO 1 8/12/2009 1-B
CPTC DELTA AIRLINES TENANT RELOCATION C33, D13 & D27 OWNERS MANUAL
BYRSON CONSTRUCTORS
1 9/7/2011 7-B
CPTC FIRE PUMP TESTING ANNUAL FIRE PUMP INSPECTION REPORT - TERM, CONC T - E
CINTAS 1 9/30/2011 6-B
CPTC DELTA AIRLINES CONCOURSES T, A & B ACS BREAKROOM INTERIOR UPGRADES APRON LEVEL
DELTA AIRLINES 1 11/1/2011 2-A
CPTC PAGING SYSTEM REPLACEMENT & UPGRADES
EQUIPMENT SUBMITTAL PEAVEY BAKER 1 7/20/2005 7-F
10/23/2012SUPPORT DOCUMENTS
Page 88
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC STATIC UNINTERRUPTIBLE POWER SUPPLY
O & M MANUAL CLEVELAND ELECTRIC 1 8/30/2011 7-B
CPTC FIRE PROTECTION 2009 ANNUAL FIRE ALARM INSPECTION KRATOS 1 12/31/2009 1-B
CPTC FIRE PROTECTION 2007 ANNUAL SPRINKLER REPORT BROWN FIRE PROTECTION
1 7/30/2007 1-B
CPTC FIRE PROTECTION 2007 ANNUAL FIRE ALARM INSPECTION WFI 1 2/1/2007 1-B
CPTC ABOVE GROUND PIPING CONTRACT'S MATERIAL & TEST CERTIFICATE GWINNETT SPRINKLER 1 8/4/2004 6-B
CPTC FIRE PROTECTION 2008 ANNUAL FIRE ALARM INSPECTION KRATOS 1 12/30/2008 1-A
CPTC HVAC LOAD CALCULATIONS CONCOURSES A & B FOR YEAR 2015 - DRAFT COPY
NEWCOMB & BOYD 1 4/1/2003 5-C
CPTC NOTI-FIRE-NET NOTIFIER SYSTEM TRAINING MANUAL NOTIFIER 1 8/12/2004 1-B
CPTC ELECTRICAL EQUIPMENT RENOVATIONS
CONC C & D LOW VOLTAGE ELECTRICAL DISTRIBUTION STUDY
CITY OF ATLANTA 1 10/7/2011 8-A
CPTC NOTIFIER TRAINING MANUAL NOTIFER/HONEYWELL 1 3/24/2005 1-B
CPTC LIGHTING CONTROL SHOP DRAWINGS, CONTROL, MODULAR WIRING SYSTEM
NEWCOMB & BOYD 1 12/19/2003 8-A
10/23/2012SUPPORT DOCUMENTS
Page 89
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
CPTC TERMINAL & CONCOURSE LIFE SAFETY UPGRADES & UPDATES PHASE II
SPECIFICATIONS SCOTT & ASSOCIATES 1 10/12/2011 2-C
CPTC CONCOURSE T & TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
LETTER OF WARRANTY - DEFICIENCY LIST CLEVELAND ELECTRIC 1 7/18/2012 5-E
CPTC CONCOURSE T & TERMINAL ELECTRICAL EQUIPMENT RENOVATIONS
SPECIFICATIONS - CONCESSIONS SWITCHBOARDS, PANELS & ENCLOSED BUS O & MANUAL
CLEVELAND ELECTRIC 1 6/28/2012 5-D
CPTC VERTICAL TRANSPORTATION PHASE II
ECO MODS WARRANTY KONE 1 9/14/2012 5-A
CPTC FIRE ALARM/ FIRE SUPRESSION PROJECT
MODULAR WIRE SYSTEM RESUBMITTALS FOR APPROVAL
INGLETT & STUBS 1 2/1/2004 7-B
MHJIT GLYCOL RELOCATION O & M MANUAL PLAYER AN COMPANY 1 2/13/2006 7-D
REFERENCE EXPANSION JT COMPRESSION SEALS ARCHITECTURAL JOINTS
ARCHITECTURAL CATALOG - ALSO FIRE BARRIERS, CONCRETE REPAIR
WATSON BOWMAN ACME
1 8/24/2004 4-E
REFERENCE PROGRAMMING DATA FOR FIS AIR UNITS
PROGRAMMING DATA FOR FIS AIR UNITS HONEYWELL 1 9/2/1986 9-C
REFERENCE ENGINEERING DATA FOR FIS ENGINEERING DATA FOR FIS HONEYWELL 1 4/1/1978 9-C
REFERENCE MAINTENANCE MANUAL MAINTENANCE MANUAL RP920A-D MODULAR PNEUMATIC CONTROLLER
HONEYWELL 1 2/1/1984 9-C
REFERENCE ASSET MANAGEMENT PROGRAMMING DATA
ASSET MANAGEMENT PROGRAMMING DATA HONEYWELL 1 7/21/1977 9-D
10/23/2012SUPPORT DOCUMENTS
Page 90
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE ASSET MANAGEMENT ENGINEERING DATA
ASSET MANAGEMENT ENGINEERING DATA HONEYWELL 1 1/22/1982 9-D
REFERENCE PNEUMATIC CONTROL SYSTEMS
P 101 INSTRUCTOR MANUAL HONEYWELL 1 7/1/1977 9-B
REFERENCE INDUSTRIAL ELECTRIC MOTORS
APPLICATION AND SPECIFICATIONS- VOL. I PLANT ENGINEERING LIBRARY
1 1/1/1981 4-C
REFERENCE SCIENCE OF PLANT UTILITIES CONTROL
ELECTRICAL VOL. II PLANT ENGINEERING LIBRARY
1 1/1/1981 4-C
REFERENCE ANDOVER CONTROLS USERS MANUAL ANDOVER CONTROLS 1 10/22/1985 4-D
REFERENCE RENEWAL PARTS PROPOSAL QUOTATION RELIANCE ELECTRIC 1 4/4/1991 4-C
REFERENCE CORRECTIVE MEASURES PROGRAM
CORRECTIVE MEASURES PROGRAM STEVENS & WILKINSON 1 5/19/1981 4-C
REFERENCE INDUSTRIAL APPLICATIONS INDUSTRIAL APPLICATIONS OF ADJUSTABLE SPEED DRIVES
P.E.A.C 1 3/24/1987 4-C
REFERENCE MIAMI INTL. AIRPORT TERMINAL BLDG
DESIGN GUIDELINES MANUAL VOL. I METRO-DADE COUNTY AVIATION DEPT.
1 3/1/1989 4-C
REFERENCE MIAMI INTL. AIRPORT TERMINAL BLDG
DESIGN GUIDELINES MANUAL VOL. II METRO-DADE COUNTY AVIATION DEPT.
1 3/1/1989 4-C
REFERENCE AC ADJUSTABLE FREQUENCY DRIVES
INSTRUCTION MANUAL FOR CENTRIFUGAL FAN AND PUMP APPLICATION
GRAHAM 2 7/1/1986 5-C
10/23/2012SUPPORT DOCUMENTS
Page 91
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE ANDOVER CONTROLS ENGINEERING / APPLICATION MANUAL ANDOVER CONTROLS 1 6/1/1991 4-D
REFERENCE NONE ENERGY EVALUATION & MANAGEMENT MANUAL FOR AIRPORTS
HARLEY ELLINGTON PIERCE & YEE
1 4/18/1990 4-F
REFERENCE JET POWER JETWAY SYSTEMS REPLACEMENT PARTS MANUAL AVIATION SYSTEM INC. 1 11/1/1989 5-C
REFERENCE GE TOTAL LIGHTING CONTROLS
PART I UNDERSTANDING LIGHTING CONTROL FULL LINE CATALOG
GE 1 7/1/1994 6-E
REFERENCE NATURAL GAS MINI COURSE NATURAL GAS MINI COURSE SUNRISE ENERGY CO 1 2/16/1989 4-D
REFERENCE NAPCO SECURITY SYSTEMS TRAINING COURSE NAPCO SECURITY SYSTEMS
1 8/1/1988 4-D
REFERENCE AEE ENERGY PROGRAMS BOILER OPTIMIZATION AEE 1 2/13/1989 4-C
REFERENCE GA POWER RULES, REGULATIONS & RATE SCHEDULES FOR ELECTRIC SERVICE
GA POWER 1 11/2/1987 4-D
REFERENCE ANNUBAR FLOW MEASUREMENT
FLOW MEASUREMENT FOR DOMESTIC WATER SUPPLY MANUAL
DIETERICH STANDARD CO
1 9/29/1983 4-D
REFERENCE SERIES 250 SATT DIGITAL CLOCKS INSTALLED BY DOA 1986 O & M S & INSTRUCTION MANUAL
INTEGRATED SYSTEMS ENGINEERING
1 10/1/1985 4-D
REFERENCE SIMPLE GREEN ALL PURPOSE CLEANER
SUMMARY OF TOXICOLOGICAL DATA OF SIMPLE GREEN WITH LONZO BARDAC 205M
SUNSHINE MAKERS INC 1 8/20/1986 4-D
10/23/2012SUPPORT DOCUMENTS
Page 92
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE ESCALATOR & MOVING WALK EQUIP EVALUATION
ESCALATOR & MOVING WALK EQUIPMENT EVALUATION
MILLICAN & ASSOC 1 1/25/1990 5-A
REFERENCE ADJUSTABLE FREQUENCY AC DRIVE
ADJUSTABLE FREQUENCY AC DRIVE EATON 1 1/1/1989 4-D
REFERENCE GA POWER ELEC SERVICE METER INSTALLATION
INSTALLATION BOOK GA POWER 1 4/1/1988 4-D
REFERENCE ENGINEERING ANALYSIS OF HEAT EXCHANGER
ANALYSIS OF HEAT EXCHANGER TUBE FAILURE DETERMINE CAUSE BY SEVERAL TESTS ON SAMPLE
LAW ENGINEERING TESTING CO
1 3/11/1987 4-D
REFERENCE BASIC BUFFER PLUS INSTRUCTION MANUAL BLACK BOX CORP 1 4-D
REFERENCE SCR / SCRF SERIES BATTERY CHARGER
SCR / SCRF SERIES BATTERY CHARGER SINGLE PHASE INPUT OPERATING & SERVICE INSTRUCTIONS
ALCAD INC 1 1/1/1992 4-D
REFERENCE RELIANCE FUSE HANDBOOK FUSE OVERCURRENT PROTECTION HANDBOOK RELIANCE ELECTRIC 1 1/1/1982 5-D
REFERENCE INTERNATIONAL WASTE INCINERATOR EMMISSION STUDY
INTERNATIONAL WASTE INCINERATOR EMISSIONS STUDY
CLAYTON ENVIRONMENT. CONSULTANT
1 7/22/1983 5-C
REFERENCE MANAGING YOUR ENERGY GUIDELINES FOR LIGHTING ENERGY CONSERVATION
I E S 1 6/10/1985 4-D
REFERENCE SYMBOL SIGNS 2 PASSENGER / PEDESTRIAN ORIENTED SYMBOLS FOR USE IN TRANSPORTATION RELATED FACILITIES
AMERICAN INSTITUTE OF GRAPHIC ARTS
1 3/1/1979 4-E
REFERENCE COMMERCIAL GAS WATER HEATER
INSTALLATION, SERVICE & MAINTENANCE MANUAL FOR GAS GLASS LINED TANK TYPE WATER HEATER
ASHMEL'S PLUMBING 1 10/29/1976 4-D
10/23/2012SUPPORT DOCUMENTS
Page 93
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE MUFFIN MONSTER SUBMITTAL DATA D.W.S. 1 2/9/1989 4-E
REFERENCE MUFFIN MONSTER INSTALLATION, MAINTENANCE SERVICE MANUAL
D.W.S. 1 3/17/1989 4-E
REFERENCE JIM WALTER DOORS PARTS LIST MAINTENANCE MANUAL STEVENS & WILKINSON 1 4/1/1980 4-E
REFERENCE DYNAMIC ADJUSTABLE SPEED DRIVES & SYSTEMS
INSTRUCTION BOOK EATON 1 11/1/1986 4-E
REFERENCE MECHANICAL REFERENCE MANUAL
DUCT CONSTRUCTION STANDARDS S.M.A.C.N.A. 1 1/1/1975 4-E
REFERENCE DREW INDUSTRIAL DATA MATERIAL SAFETY DATA DREW INDUSTRIES 1 1/1/1986 2-C
REFERENCE LOCAL CLIMATOLOGICAL REPORTS
LOCAL CLIMATOGICAL DATA REPORTS NAT'L CLIMATIC DATA CENTER
1 7/21/1994 4-E
REFERENCE SIGNAGE SYMBOLS SIGNAGE SYMBOLS D.M.A. 1 8/13/1985 4-E
REFERENCE MODULAR CLIMATE CHANGER
INSTALLATION & MAINTENANCE DATA TRANE 1 12/19/1991 4-E
REFERENCE MONTGOMERY ELEVATORS MONTGOMERY ELEVATORS MONTGOMERY 1 6/3/1980 5-F
REFERENCE CENTRAL STATION A.H.U. CENTRAL STATION A.H.U. YORK 1 1/1/1981 4-E
10/23/2012SUPPORT DOCUMENTS
Page 94
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE AC MOTOR EFFICIENCY GUIDE TO ENERGY CONSERVATION RELIANCE ELECTRIC 1 1/1/1979 4-E
REFERENCE POWER CAPACITORS ENERGY SAVINGS MYRON ZUCKER INC. 1 2/23/1978 4-E
REFERENCE ELECT. POWER MEASURE HANDBOOK
ELECTRICAL POWER MEASUREMENT HANDBOOK YOKOGAWA (YEW) 1 1/1/1979 4-E
REFERENCE PNEUMATIC CONTROL OF VAV CENTRAL FAN SYSTEM
PNEUMATIC CONTROL OF VARIABLE AIR VOLUME CENTRAL FAN SYSTEMS
BARBER COLEMAN CO 1 11/1/1980 4-E
REFERENCE GUIDE TO POWER FACTOR CORRECTION
GUIDE TO POWER FACTOR CORRECTION SPRAGUE 1 2/21/1983 4-E
REFERENCE ELECTRONICS DICTIONARY ELECTRONICS DICTIONARY RADIO SHACK 1 7/6/1983 4-E
REFERENCE SALVAJOR II COMMERCIAL DISPOSER
INSTRUCTION MANUAL SALVAJOR CO 1 8/4/1989 4-E
REFERENCE HOW TO CALCULATE FAULT CURRENTS
GRAPH AND FORMULA METHOD WESTINGHOUSE 1 4-E
REFERENCE CHILLER PLANT ADDITIONS TRANE CVHE CHILLERS TRANE 1 12/1/1989 4-E
REFERENCE KW CONTROL SYSTEMS KW CONTROL SYSTEMS KW CONTROLS 1 1/1/1986 4-E
REFERENCE ABS TRAINING MANUAL ABS TRAINING MANUAL GA POWER 1 1/1/1987 4-E
10/23/2012SUPPORT DOCUMENTS
Page 95
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE SAFETY CODE FOR ELEV. & ESCALATORS
SAFETY CODE FOR ELEVATORS AND ESCALATORS ANSI & ASME 1 1/1/1981 2-C
REFERENCE RULES FOR SAFE DRINKING WATER
RULES FOR SAFE DRINKING WATER EPA 1 8/1/1983 2-A
REFERENCE RULES FOR AIR QUALITY CONTROL
RULES FOR AIR QUALITY CONTROL EPA 1 9/1/1995 5-D
REFERENCE BIOCLIMATIC PURIFICATION SYSTEMS
BIOCLIMATIC PURIFICATION SYSTEMS BIOCLIMATIC INC. 1 8/1/1989 2-A
REFERENCE NEVAMAR PLASTIC LAMINATE FABRICATION & INSTALLATION MANUAL
NEVAMAR CORP 1 1/1/1991 4-F
REFERENCE DURA-TRIM ALUMINUM ACCENTS, TRANSITIONS, FINISHINGS MM SYSTEMS CORP 1 1/1/1990 4-F
REFERENCE ANNUAL CPTC REVIEW ANNUAL BUILDING AND OPERATION REVIEW OF CPTC
ROSSER FABRAP 1 4/1/1990 8-F
REFERENCE LIGHTING FIXTURES SUBMITTAL DATA STEVENS & WILKINSON 1 12/29/1977 4-E
REFERENCE GE LIGHTING CATALOG GE LIGHTING CATALOG GE 1 3/1/1994 4-F
REFERENCE PEERLESS LIGHTING CATALOG PEERLESS LIGHTING CATALOG PEERLESS 1 1/1/1988 4-E
REFERENCE LINEAR LIGHTING CATALOG LINEAR LIGHTING CATALOG LINEAR 1 1/1/1989 4-F
10/23/2012SUPPORT DOCUMENTS
Page 96
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE INSTALLATION & MAINTENANCE INSTRUCT
SAFETY INSTRUCTIONS FOR ESCALATOR INSTALLATION & MAINTENANCE MANUAL
MONTGOMERY 1 3/21/1975 2-C
REFERENCE AC DRIVES FLOW ECONOMIZER G
INSTALLATION MANUAL ABB INDUSTRIAL SYSTEMS INC.
1 6/1/1989 8-A
REFERENCE POWER MAKER MICRO UPS O & M MANUAL TOPAZ 1 4/1/1987 8-A
REFERENCE EMPLOYMENT PROVISIONS OF ADA
TECHNICAL ASSISTANCE MANUAL US EEOC 1 1/1/1991 4-D
REFERENCE ADA HANDBOOK EEOC 1 10/1/1991 4-D
REFERENCE DESIGNING FOR ACCESSIBILITY
OVERVIEW OF ADA BUILDING OPERATIONS MANAGEMENT
1 3/1/1992 4-D
REFERENCE ADA FEDERAL REGISTER PART III DEPT OF JUSTICE 1 8/16/1993 4-D
REFERENCE UNIFORM FEDERAL ACCESSIBILITY STANDARD
UNIFORM FEDERAL ACCESSIBILITY STANDARDS OF ADA
GENERAL SERVICES ADMINISTRATION
1 4/1/1988 4-D
REFERENCE GA DEPT OF NATURAL RESOURCES EPD
UNDERGROUND STORAGE TANK LITERATURE GA DEPT OF NATURAL RESOURCES
1 10/17/1995 4-F
REFERENCE GA DEPT OF NATURAL RESOURCES EPD
HAZARDOUS WASTE MANAGEMENT POLLUTION PREVENTION
GA DEPT OF NATURAL RESOURCES
1 3/25/1994 4-D
REFERENCE SHEET METAL & AC CONTRACTORS ASSOC.
SHEET METAL & AC (HVAC) CONTRACTORS NATIONAL ASSOCIATION STANDARDS
SMACNA 1 1/1/1975 4-F
10/23/2012SUPPORT DOCUMENTS
Page 97
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE FIS DELTA SWITCHGEAR SUBMITTALS & DRAWINGS STEVENS & WILKINSON 1 5/8/1978 9-D
REFERENCE HOLDING TANKS APRON SEWER DIVERSION SYSTEMS AAE 1 8/16/1982 6-D
REFERENCE ENGINEER'S GUIDE TO PLANT OPERATIONS
ENGINEER'S GUIDE TO PLANT OPERATIONS NATIONAL ENGINEER 1 1/1/1980 8-C
REFERENCE TS1 OIL / WATER SEPARATOR INSTALLATION & SERVICE MANUAL ENQUIP INC. 1 6/1/1981 2-B
REFERENCE GATE PAK INJECTOR PRINCIPLE OF OPERATION
OPERATION & MAINTENANCE GATE CITY OIL EQUIPMENT CO. INC.
1 8-B
REFERENCE FACTS ABOUT KW220 TECHNICAL DATA QUESTIONS & ANSWERS TIF 1 6-D
REFERENCE DOORS UNLIMITED FOR EAL MAINTENANCE & INSTALLATION MANUAL NORTH AMERICAN ROLLING DOORS
DOORS UNLIMITED 1 9/27/1982 8-A
REFERENCE SERIES 808 ELECT POWER DEMAND ANALYZER
O & M MANUAL BOOKS #1, #2 & #3 DRANETZ 3 6/15/1983 5-D
REFERENCE ASCO SYNCHROPOWER SYSTEM
PROGRAM FOR AUTO SWITCH SYSTEM EMERGENCY BACK-UP POWER SYSTEM
ASCO 2 10/25/1993 5-C
REFERENCE GUIDELINES FOR AIRPORT SIGNAGE & GRAPHICS
ADA SIGNING AND GRAPHICS APPLE DESIGN 1 7/1/1994 5-D
REFERENCE FRY REGLET PRODUCT MANUALS
ALUMINUM ARCHITECTURAL MOLDINGS & FLASHING SYSTEMS
FRY REGLET 1 1/1/2002 4-F
10/23/2012SUPPORT DOCUMENTS
Page 98
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE ADJUSTABLE FREQUENCY DRIVES 1703 SERIES
GRAHAM INSTALLATION O & M MANUAL OF 1703 SERIES 7.5 THROUGH 100 AMP
GRAHAM 1 7/1/1986 5-C
REFERENCE INITIAL PLACEMENT CORIAN DUPONT 1 5/1/1997 4-F
REFERENCE CONTROLS CATALOG REMOTE CONTROL SWITCH, AUTO TRANSFER SWITCH & POWER CONTROL SYSTEMS
ASCO 1 1/1/2000 4-F
REFERENCE OFFICE PRODUCTS PETER PEPPER PRODUCTS FIBERGLASS / COLUMN COVERS
PETER PEPPER PRODUCTS
1 6/5/1996 4-F
REFERENCE COSATRON AIR CLEANING SYSTEM PRODUCT INFORMATION, APPLICATION DATA & TECHNICAL
COSATRON 1 5/1/1992 5-C
REFERENCE ASHRAE STANDARD PROPOSED AMER STAND.
PUBLIC REVIEW DRAFT--ENERGY EFFICIENT DESIGN OF NEW NON-RESIDENTIAL BUILDINGS
ASHRAE 1 6/10/1985 5-D
REFERENCE PENTHOUSE CLIMATE CHANGER PCCB MODELS
O & M MANUAL AND INSTALLATION TRANE 1 8/1/1992 4-E
REFERENCE COMMERCIAL PRODUCTS ROOFING PRODUCTS
SPECIFICATIONS / DETAILS TAMKO ROOFING PRODUCTS
1 9/1/1997 4-B
REFERENCE TECHNICAL MANUAL E-POXY EXPANSION CONTRACTION JOINT SYSTEMS
E-POXY 1 2/27/1997 5-C
REFERENCE COMPUTER ACCESS CONTROL SYS - FAR 107.14
DISPATCH CENTER SECURITY IMPROVEMENTS-CONTACT DOCS & SPECS AND ADDENDA
ROBERT & CO, HNTB & WRJ
1 7/25/1994 8-C
REFERENCE ORIGINAL CONSTRUCT CONC E
DOOR HARDWARE CATALOG INFORMATION WALLER - DAVIS ASSOC.
1 2/17/1992 5-D
10/23/2012SUPPORT DOCUMENTS
Page 99
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE POWERWARE SYSTEM 80 ES OPERATORS MANUAL EXIDE ELECTRONICS 2 1/1/1992 5-C
REFERENCE SIESERVE SIEMENS ACCESS SYSTEM SIEMENS 1 6-D
REFERENCE SMART BOARD USER'S MANUAL AJS TECH. 1 2/1/1986 6-B
REFERENCE CONSUL 980 MAINTENANCE MANUAL FOR THE CONSUL 980 ADDS INC 1 10/1/1976 9-D
REFERENCE AQUA-MATIC AQUA FOG/TAC-2000
FOG MIST SURFACE FIRE SUPPRESION SYSTEM SOLID STATE PROGRAMMABLE CONTROL PANEL
ATLANTA VENTILATOR WORKS
1 5/22/1997 1-B
REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR OPERATING PERMITS EXP. DATE 6/1/01
CITY OF ATLANTA 1 6/1/2000 5-D
REFERENCE ADTRANZ DELUXE SYSTEM/3 WATER COOLED MODEL INFORMATION MODEL#FH127W-ASM
LIEBERT CORP/JOE POWELL & ASSOC
1 11/3/1998 9-B
REFERENCE SURVEY ELEVATOR MAINTENANCE EVALUATION SURVEY/REPORT
G. ALAN NEWTON 2 10/26/1992 5-F
REFERENCE SURVEY MAINTENANCE EVALUATION SURVEY INSPECTION REPORT
EARLY & ASSOCIATES 1 3/2/1992 5-E
REFERENCE FIRE AND SECURITY SYSTEMS-PRODUCT DATA
FS-20A DATA GATHERING PANEL HONEYWELL 1 6/1/1982 1-C
REFERENCE DELTA 1000 SERVICE DATA FS 20A DATA GATHERING PANEL HONEYWELL 1 5/1/1981 9-C
10/23/2012SUPPORT DOCUMENTS
Page 100
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE MONTGOMERY ELEVATOR COMPANY
MIPROM 21 CONTROL SYSTEM OPERATOR'S SERVICE MANUAL
MONTGOMERY ELEVATOR COMPANY
1 6/4/1991 5-F
REFERENCE PART 70 OPERATING PERMIT STATE OF GEORGIA-DEPARTMENT OF NATURAL RESOURCES
STATE OF GEORGIA 1 6/8/1998 5-C
REFERENCE UNDERGROUND STORAGE TANKS
STATE OFGEORGIA-ANNUAL UNDERGROUND STORAGE TANK REGISTRATION CERTIFICATE
ENVIRONMENTAL PROTECTION DIV
1 12/31/1999 5-C
REFERENCE ADA ACCESSIBILITY GUIDELINES TITLE II TECHNICAL ASST. MANUAL
U.S. DEPT. OF JUSTICE 1 11/1/1993 4-D
REFERENCE CROSS SYSTEM COMPONENTS
PRECISION INSTRUMENTATION COMPONENTS CROSS 1 1/1/2000 5-C
REFERENCE CONTROL SYSTEMS INSTRUMENT & CONTROL PRODUCTS YOKOGOWA 1 1/1/2000 5-C
REFERENCE LIQUID LEVEL GAGES CATALOG ISE-MAGTECH CROSS SYSTEM COMPONENTS
1 10/24/1995 8-C
REFERENCE NONE REFRIGERANT HANDBOOK CARRIER 1 12/1/1998 6-B
REFERENCE NONE MINIMUM STANDARDS FOR PUBLIC WATER SYSTEMS MANUAL
GEORGIA EPD 1 1/1/1998 6-D
REFERENCE NONE ENERGY EVALUATION AND MANAGEMENT MANUAL FOR AIRPORTS
AIR TRANSPORT ASSOC.
1 4/18/1980 4-D
REFERENCE DELTA AIRLINES DELTA NET GRAPHIC CENTRAL OVERVIEW OPERATOR MANUAL
HONEYWELL 1 5/1/1996 9-B
10/23/2012SUPPORT DOCUMENTS
Page 101
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE FIRE ALARM SYSTEM FIRE ALARM SYSTEM O & M MANUAL CONC B & CONC E
HONEYWELL 1 1/1/1995 1-C
REFERENCE ROOFING SYSTEMS DIVISION 7 ROOFING & WATERPROOFING SYSTEMS
KOPPERS INDUSTRIES 1 12/1/1998 4-B
REFERENCE NONE MAINTENANCE MANUAL SIEMENS 1 7/1/1992 5-D
REFERENCE NONE SIEMENS ACCESS VERSION 4.0 USER'S MANUAL & INSTALLATION GUIDE
SIEMENS 1 1/1/1998 5-D
REFERENCE DELTA AIRLINES DELTA NET GRAPHIC CENTRAL OPERATOR MANUAL
HONEYWELL 1 10/1/1993 9-C
REFERENCE FIRE PERMITS PERMITS FOR ABS AREAS WITH COMBUSTIBLE MATERIALS
ATLANTA FIRE DEPT. 1 3/20/2006 1-B
REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR OPERATING PERMITS EXP. DATE 6/1/02
CITY OF ATLANTA 1 6/1/2001 5-D
REFERENCE NONE COMPOSITE STRENGTHENING - FIBER WRAP WATSON BOWMAN ACME
1 4/30/2002 4-E
REFERENCE CHILLERS PRODUCT DATA CARRIER 1 1/1/1998 4-F
REFERENCE ENVIRONMENTAL COMPLIANCE
TENANT ENVIRONMENTAL COMPLIANCE GUIDE DOA 1 7/1/1998 6-B
REFERENCE ELEVATORS/ESCALATORS OPERATING PERMITS - EXPIRATION 2003 CITY OF ATLANTA 1 5/22/2002 5-D
10/23/2012SUPPORT DOCUMENTS
Page 102
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE TYPE O COMPRESSED GAS DRYER
SPECIFICATIONS GDI 1 12/10/1985 4-D
REFERENCE FIRE PERMITS PERMITS FOR ENRON AREAS WITH COMBUSTIBLE MATERIALS
ATLANTA FIRE DEPT 1 4/20/2000 1-B
REFERENCE FIRE PROTECTION SYSTEM GRUVLOK CHECK VALVES GROOVED ENDS SPECS GRUVLOK 1 4/1/1993 1-B
REFERENCE N/A RECOMMENDED PRACTICE FOR BACKFLOW PREVENTION AND CROSS-CONNECTION
AWWA 2 7/30/1992 4-E
REFERENCE N/A SIEMENS STATIC TRIP III INFO & INSTRUCTION GUIDE
SIEMENS 1 1/1/1992 5-C
REFERENCE ENVIRONMENTAL INTERIORS INC. CATALOG
SPECIALTY ARCHITECTURAL METALWORK ENVIRONMENTAL INTERIORS INC
1 6/1/2002 5-C
REFERENCE ELECTRIC GENERATORS AIR QUALITY PERMIT
DRAFT TITLE V PERMIT GA DEPT OF NAT. RESOURCES EPD
1 3/26/1998 6-B
REFERENCE FIRE ALARM, FIRE PROTECTION, & FIRE SAFETY ANALYSIS
FINAL - LIFE SAFETY ANALYSIS OF THE CPTC NEWCOMB & BOYD 1 4/16/2003 2-C
REFERENCE ADA TITLE III COMPLIANCE GEORGIA PACIFIC - COMPLIANCE GUIDE & GENERAL INFO ABOUT TITLE III ADA
GEORGIA PACIFIC 1 8/3/2004 4-D
REFERENCE ROOFING SYSTEMS ROOFING SYSTEMS TECHNICAL MANUAL FIRESTONE 1 8/20/2004 4-A
REFERENCE NONE BRIDGE & HIGHWAY EXPANSION CONTROL, CONCRETE REPAIR, COMPOSITE STRENGTH.
WATSON BOWMAN ACME
1 8/30/2004 4-D
10/23/2012SUPPORT DOCUMENTS
Page 103
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE NONE MIGUA EURO DESIGNED EXP JOINTS FOR STADIUMS, AIRPORTS, ETC. CATALOG
EMSEAL 1 8/31/2004 4-C
REFERENCE NONE EXPANSION JOINT CATALOG FOR DECKS, WALLS, FLOORS
EMSEAL 1 8/31/2004 4-C
REFERENCE NONE LIGHTING AND CONTROLS INFORMATION ADDISON PARRISH LIGHTING SALES
1 2/19/2003 4-C
REFERENCE OPERATING PERMITS ELEVATOR/ESCALATOR/MOVING WALKS EXPIRATION 2007
CITY OF ATLANTA 1 3/8/2006 5-D
REFERENCE DESIGN GUIDELINES AIRFIELD ELEMENT CITY OF ATLANTA/DOA 1 6/1/2004 5-C
REFERENCE DESIGN GUIDELINES ROADWAY FACILITIES CITY OF ATLANTA/DOA 1 7/1/2004 2-E
REFERENCE DESIGN GUIDELINES PARKING CITY OF ATLANTA/DOA 1 6/1/2004 9-A
REFERENCE DESIGN GUIDELINES AIR CARGO AND SUPPORT FACILITIES CITY OF ATLANTA/DOA 1 6/1/2004 9-A
REFERENCE WINTER WEATHER OPERATIONS
MANUAL DOA OPERATIONS 1 11/1/2005 4-C
REFERENCE VEHICLE OPERATOR TRAINING
WAVE WORK ASSIST VEHICLE OPERATOR TRAINING PROGRAM
CROWN COMMERCIAL 1 11/1/2005 8-C
REFERENCE HMS ATL FIBER OPTIC INFRASTRUCTURE
O & M MANUAL SMART CONNECT 1 9/23/2005 4-D
10/23/2012SUPPORT DOCUMENTS
Page 104
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE GLYCOL RELOCATION CGMPIC
WARRANTY MANUAL MHJIT 1 10/12/2006 7-D
REFERENCE CHILLLER REPLACEMENT CHILLER REPLACEMENT SUBMITTALS 04/10/07 F & S MECHANICAL 1 6/5/2007 1-F
REFERENCE NONE PASSENGER BOARDING BRIDGE APRON DRIVE O & M MANUAL
FMC TECHNOLOGIES 1 2/1/2006 4-D
REFERENCE NONE O & M MANUAL GENERAL EQUIPMENT SIEMENS 1 2/20/2006 4-D
REFERENCE ELEVATORS ELEVATORS WITH KCM831/RESOLVE LCE CONTROL OWNERS MANUAL
KONE 1 9/20/2006 8-B
REFERENCE NONE E7 DRIVE USER MANUAL YASKAWA YASKAWA 1 2/1/2004 4-E
REFERENCE NONE O & M MANUAL - WALL MOUNTED SPLIT AC UNIT EXHAUST FAN
CLEVELAND MECHANICAL
1 2/20/2006 3-E
REFERENCE JOHNSON CONTROL TRAINING AGENDA
TRAINING AGENDA MANUAL JOHNSON CONTROLS 1 3/16/2005 9-D
REFERENCE JETWAY - APRON DRIVE VOLUME 566 O & M MANUAL ABEX 1 8/1/1984 5-C
REFERENCE CENTRAL PLANT DESIGN GUIDELINES DOA 1 3/16/2005 9-C
REFERENCE FACILITIES STANDARDS FACILITY STANDARDS FOR THE PUBLIC BUILDINGS SERVICE
US GENERAL SERVICES ADMINISTRATION OFFIC
1 11/1/2000 9-D
10/23/2012SUPPORT DOCUMENTS
Page 105
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE LIGHTNING PROTECTION EAST COAST LIGHTNING EQUIPMENT, INC. MANUAL
EAST COAST LIGHTNING EQUIPMENT
1 1/1/2000 9-C
REFERENCE LADDERS OF LEARNING TRAINING PROGRAM
TRAINING PROGRAM FUNDAMENTALS OF COMBUSTION, PRINCIPLES OF ELECTRICITY
LADDERS 1 1/1/2000 3-F
REFERENCE ROOFING SYSTEMS DIVISION 7 COMMERCIAL ROOFING SYSTEMS KOPPERS INDUSTRIES 1 12/1/1998 4-B
REFERENCE GA POWER TUNNEL GA POWER TUNNEL O & M MANUAL - EMBANKMENT & UTILITIES RELOCATION PHASE 2
WFI SUNTECH 1 10/30/2007 4-D
REFERENCE ROOF MANUAL ULTRAPLY TOP ROOFING SYSTEM MANUAL FIRESTONE BUILDING PRODUCTS
1 9/22/2009 4-A
REFERENCE POWER DISTRIBUTION & CONTROL
PRODUCT CATALOG SIEMENS 1 1/1/2008 7-E
REFERENCE ROOF SYSTEMS MAINTENANCE MANUAL BENCHMARK 1 1/1/2000 4-A
REFERENCE MARTA FARE COLLECTION SYSTEM UPGRADE FACILITIES MODS PROJECT MANUAL
MARTA 1 1/1/2004 1-A
REFERENCE TOP FREEZER REFRIGERATOR O & M MANUAL FOR MODEL 22 & 25 REFRIGERATORS
GE 1 9/29/2006 1-F
REFERENCE SOAP DISPENSER SENSOR OPERATED SOAP DISPENSER TOTO 1 4/6/2006 9-A
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL FOR VON DUPRIN DOOR HARDWARE
VON DUPRIN 1 9/29/2006 9-F
10/23/2012SUPPORT DOCUMENTS
Page 106
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL FOR LUTRON DIMMING PANEL LUTRON 1 9/29/2006 9-F
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL FOR THT-100EA & THT-100ES TURNSTILES
TOMSED 1 9/26/2006 9-F
REFERENCE SCHINDLER ELEVATORS PARTS CATALOG NEW SOUTH / SCHINDLER
1 8/11/2005 5-E
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL FOR VOICE PAGING SYSTEM BAKER AUDIO 1 9/29/2006 9-F
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL FOR FIRE ALARM WFI / SUNTECH 1 9/29/2006 9-F
REFERENCE AUTOMATED BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL & WARRANTY FOR MECHANICALS DIVISION 15
MECHANICAL ASSOC 1 9/29/2006 9-F
REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE
ATLANTA FIRE DEPT. 1 8/3/2007 1-B
REFERENCE HIGH-PRIORITY COMPOUNDS ASSOCIATED WITH AIRCRAFT EMISSIONS
HEALTH RISK PRIORITIZATION OF AIRCRAFT EMISSINS RELATED AIR POLLUTANTS
JOHNATHAN LEVY 1 10/1/2008 5-C
REFERENCE SIGNING AND GRAPHICS STANDARDS
GUIDELINES ACE 1 5/1/1997 5-D
REFERENCE EXTERIOR GRAPHIC DESIGN SYSTEMS ENHANCEMENTS
VOL. 1 SPECIFICATIONS AND BID FORMS ACE 1 7/17/1995 5-D
REFERENCE ACH550-UH HVAC DRIVE 550 HP USER'S MANUAL ABB INDUSTRIAL SYSTEM INC.
1 6/1/2010 8-A
10/23/2012SUPPORT DOCUMENTS
Page 107
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
REFERENCE OMNI-MOVE SEISMIC & EXPANSION CONTROL SYSTEM MM SYSTEMS CORP 1 1/1/1990 4-F
REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE
ATLANTA FIRE DEPT. 1 9/9/2010 1-B
REFERENCE OPERATING PERMITS HIGH PRESSURE WATER TUBE BOILER ROOM #5 & MAIN PLANT - COMBINED
STATE OF GEORGIA 1 10/14/2010 5-D
REFERENCE BLUE BOOK 2011 BUILDING & CONSTRUCTION - GA CONTRACTOR'S REGISTER
1 1/1/2011 7-E
REFERENCE ADA ACCESSIBILITY GUIDELINES
CHECKLIST FOR BUILDINGS & FACILITIES US ATBCB 1 10/1/1992 4-D
REFERENCE FIRE PERMITS PERMITS FOR HEAVY MACHINE EQUIPMENT STORAGE
ATLANTA FIRE DEPT. 1 4/2/2009 1-B
REFERENCE AAE ENERGY PROGRAMS NEW OPPORTUNITIES FOR PURCHASING NATURAL GAS
AAE ENERGY 1 2/17/1989 4-D
REFERENCE ELECTRICAL OPERATIONS OSHA ELECTRICAL STANDARDS AAVIM 1 2/12/1992 9-F
REFERENCE FIRE PERMITS PERMITS FOR T-SPINE ELEVATOR ATLANTA FIRE DEPT. 1 1/31/2012 1-B
REFRENCE CLA-VAL AUTO CONTROL PRESSURE REDUCING VALVES O & M MANUAL CLA-VAL COMPANY 1 3/1/1994 4-F
TERMINAL TERM & CONC T PAX CIRCULATION REVISIONS
DELTA CONSTRUCT STANDARDS MANUAL -- DESIGN
DERYCK MUEHLHAUSER
1 10/3/1994 7-F
10/23/2012SUPPORT DOCUMENTS
Page 108
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL ORIGINAL CONSTRUCTION TERMINAL
ELECTRICAL EQUIPMENT ELEVATION DWGS GOULD 1 8/1/1979 8-A
TERMINAL ORIGINAL CONSTRUCT TERMINAL
O & M MANUAL - VOLUME I LIMBACH ECONOMY 1 1/1/1980 9-E
TERMINAL DOA SOUTH TERMINAL OFFICES
O & M MANUAL - CENTRAL STA. AHU'S, VARIABLE AIR VOL. UNITS, CIRCULATING PUMPS, CONTROLS
CARLETON MECHANICAL CONTRACTORS
1 1/17/1989 7-F
TERMINAL ORIGINAL CONSTRUCT TERMINAL
BACKUP SECURITY CHECKPOINT MANUAL DERYCK MUEHLHAUSER
1 4/19/1993 8-A
TERMINAL NORTH TERMINAL REDEVELOPMENT
PROJECT MANUAL FOR CONSTRUCT OF NORTH BAG INFILL BLDG - DRAFT / REVIEW RELEASE
TURNER ASSOC 1 10/24/1994 7-F
TERMINAL EAL BTS / BSS ENCLOSURE SPECIFICATIONS FRED TOGUCHI ASSOC 1 8/6/1981 3-A
TERMINAL SOUTH TERMINAL EXPANSION
FOUNDATION SPECIFICATIONS FOR CONSTRUCTION
PATE TURNER 1 1/20/1987 3-A
TERMINAL SOUTH TERMINAL EXPANSION - DELTA
SPECIFICATIONS PATE TURNER 1 3/6/1987 3-B
TERMINAL AIRPORT NEWS SPECIFICATIONS - INSIDE CONCESSION SPACES MARTIN ASSOC. 1 4/20/1982 3-B
TERMINAL DOA SOUTH TERMINAL OFFICES
CONTRACT FC-3855-88 DOA 1 1/27/1988 3-B
TERMINAL AATC/ABS RELOCATION AATC/ABS RELOCATION MCDEVITT STREET BOVIS PROJECT CLOSEOUT MANUAL - ELEC
MACK YOUNG 1 1/30/1997 3-C
10/23/2012SUPPORT DOCUMENTS
Page 109
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL MAGNETEK MAGNETEK TECHNICAL MANUAL GPD 503 DRIVE MAGNETEK 1 1/1/1994 9-A
TERMINAL AATC / ABS SHOP RELOCATION
AATC / ABS SHOP RELOCATION PROJECT TRACKING MANUAL/CONTRACT
MS BOVIS / AATC 1 6/20/1996 2-E
TERMINAL AATC / ABS SHOP RELOCATION
SUBMITTALS MS BOVIS / AATC 1 10/1/1996 2-E
TERMINAL AATC / ABS SHOP RELOCATION
MECHANICAL SUBMITTALS PERFORMANCE MECH. 1 11/5/1996 1-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 7 GENERATOR SET BOOK 1 TO 3 (SECURITY IMPROVEMENTS)
LORAL DEFENSE SYSTEMS EAST
2 11/15/1995 6-C
TERMINAL COMMUNICA & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 6 FIRE & SAFETY FIRE SUPPRESSION SYSTEM BOOKS #1 & #2
LORAL DEFENSE SYSTEMS EAST
2 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 7 UPS GENERATOR SET
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 6 FIRE & SAFETY SYSTEM FIRE SUPPRESSION SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 5 WEATHER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 5 WEATHER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 5 WEATHER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
10/23/2012SUPPORT DOCUMENTS
Page 110
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 4 RADIO DISPATCH SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 4 RADIO DISPATCH SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 1 FLINT RIVER MONITORING SYSTEM, CAD, NETWORK CLOCK, WORK STATION UPS
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
2 11/15/1995 6-C
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 2 CCTV, MOBILE CCTV
LORAL DEFENSE SYSTEMS EAST
3 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 2 CCTV, MOBILE CCTV
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 2 CLOSED CIRCUIT TELEVISION SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 4-F
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SOFTWARE MANUAL VOLUME 1 COMPUTER AIDED DISPATCH
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICATION & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 1 CAD, NETWORK CLOCK, WORK STATION UPS
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
SYSTEM OVERVIEW MANUAL LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
10/23/2012SUPPORT DOCUMENTS
Page 111
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL REROOF & PART REROOF OF CONC B & TERMINAL
PROJECT MANUAL FOR TERMINAL REROOFING, PARTIAL REROOF OF CONC B & CONCOURSE REPAIRS
CONLEY DESIGN GROUP
1 9/1/1997 4-B
TERMINAL TERMINAL AND CONC T PAX CIRC REVISIONS
REFERENCE SPECS. -- COMPILED FROM CONC A TRANSFER POINT EXPAN & CONC E CONSTRUCTION
DERYCK MUEHLHAUSER
1 10/1/1989 2-A
TERMINAL AATC COMMUNICATION CENTER
PROPOSED DESIGN GA TECH FOR D. MUEHLHAUSER
1 12/1/1982 1-F
TERMINAL TERMINAL & CONC T PAX CIRCULATION REVISIONS
HARDWARE SCHEDULE CONTRACT HARDWARE 1 5/3/1996 8-C
TERMINAL TERMINAL & CONC T PAX CIRCULATION REVISIONS
DELTA AIRLINES - 15010 MECHANICAL GENERAL PROVISIONS O & M MANUAL
PERFORMANCE MECH. 1 5/6/1996 1-B
TERMINAL ABS SHOP RELOCATION PROJECT MANUAL EDMOND, SIMS, JUDGE ASSOC
1 6/20/1996 1-F
TERMINAL TERMINAL RE-ROOFING HIP '96 #57
PROJECT MANUAL CONTRACT FC - 6286-95 ACE 1 11/20/1995 4-B
TERMINAL TERMINAL REDEVELOPMENT PROGRAM
LANDSIDE TERMINAL FINISHES PROJECT MANUAL - FC 6295-95
PATE - MC DUFFIE GROUP
1 8/10/1995 3-B
TERMINAL TERMINAL REROOFING PROJECT MANUAL FOR ROOFING/WATERPROOFING REPAIRS
CONLEY DESIGN GROUP
2 2/1/1998 4-A
TERMINAL ROOFING PROJECT SUMMARY OF EXISTING CONDITIONS & CONSTRUCTION OF EACH ROOF AREA
CONLEY DESIGN GROUP
1 2/19/1998 4-B
TERMINAL ATLANTA POLICE PRECINCT MAINTENANCE DATA CECIL MALONE COMPANY
1 1/22/1999 4-D
10/23/2012SUPPORT DOCUMENTS
Page 112
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL BID DOCUMENTS & SPECIFICATIONS
NEW GROUND TRANSPORTATION & OPERATION OFFICE RENOVATIONS
CITY OF ATLANTA 1 1/1/1998 2-B
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
USER OPERATIONS MANUAL VOLUME 3 FLINT RIVER MONITORING SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-D
TERMINAL COMMUNICA. & DISPATCH CENTER FC5878-94 (DOA)
MAINTENANCE MANUAL VOLUME 4 RADIO DISPATCH SYSTEM
LORAL DEFENSE SYSTEMS EAST
1 11/15/1995 6-C
TERMINAL PEDESTRIAN TUNNEL RENOVATION
O & M MANUAL ROSSER/NEW SOUTH 1 4/1/2000 1-D
TERMINAL REPLACEMENT FAN AGT SECTION AHU-16
O & M MANUAL PERFORMANCE MECH. 1 5/1/2000 9-A
TERMINAL NORTH & SOUTH A/L ENTRY TUNNELS AHU
SUBMITTAL DATA PERFORMANCE MECH. 1 7/1/1999 3-B
TERMINAL VESTIBULE AIR CURTAIN PROJECT MANUAL STEVENS & WILKINSON 1 11/18/1998 2-A
TERMINAL AIR QUALITY - BAGGAGE AREA
AIR QUALITY STUDY DRESSER & MCKEE 1 10/20/1995 6-B
TERMINAL ROOF EVALUATION REPORT CONLEY DESIGN GROUP
1 9/9/1996 4-A
TERMINAL AUTOMATIC DOORS - REPLACEMENT
DESIGN MANUAL HORTON AUTOMATICS 1 12/1/2001 8-A
TERMINAL DELTA RF BAG SCANNING/FORWARDING
BID PACKAGE - SPECS & CONTRACT DOCS AVIATION FACILITIES GROUP
1 2/12/1997 3-A
10/23/2012SUPPORT DOCUMENTS
Page 113
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL CEILING REPLACEMENT PROJECT MANUAL HARPER PARTNERS 1 9/7/2001 2-B
TERMINAL PEDESTRIAN TUNNELS LOWER LEVEL
PROJECT MANUAL - RENOVATION ROSSER FABRAP 1 7/6/1998 2-A
TERMINAL CEILING REPLACEMENT NORTH & SOUTH TERMINAL
BID DOCUMENTS FC-7387-01 CITYOF ATLANTA 1 3/25/2002 2-B
TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT
BID DOCUMENTS FC-7490-02 ACE 1 1/1/2002 2-E
TERMINAL CURBSIDE PAGING (CEILING REPLACEMENT PROJECT)
SUBMITTAL - SPECIFICATIONS ROBERT GOGAN & ASSOC./ NEW SOUTH
1 10/28/2002 2-D
TERMINAL CURBSIDE PAGING (CEILING REPLACEMENT PROJECT)
OPERATIONS MANUAL ROBERT GOGAN & ASSOC.
1 10/28/2002 8-A
TERMINAL AMERICA WEST AIRLINES FACILITY RELOCATION
PROJECT MANUAL - BID DOCUMENTS LEO A. DALY 1 6/6/2001 2-B
TERMINAL AMERICA WEST AIRLINES NEW BREAKROOM & OFFICE
PROJECT MANUAL - BID DOCUMENTS LEO A. DALY 1 7/3/2001 2-B
TERMINAL TSA SCREENING AREA SOUTH TERMINAL BELOW TICKETING
REPORT OF AIR QUALITY MONITORING SERVICES MACTEC ENGINEERING 1 7/31/2003 6-B
TERMINAL DOA CONCESSIONS OFFICE EXPANSION
PROJECT MANUAL DEPARTMENT OF AVIATION
1 9/27/2002 2-B
TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT
O & M MANUAL NEW SOUTH CONST. 1 9/12/2003 2-B
10/23/2012SUPPORT DOCUMENTS
Page 114
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL MAIN SECURITY CHECKPOINT MODS
O & M MANUAL NEW SOUTH CONST. 1 12/30/2004 8-A
TERMINAL DESIGN GUIDELINES TERMINAL FACILITIES CITY OF ATLANTA/DOA 1 8/1/2004 5-C
TERMINAL EXPANSION JOINT REPLACEMENT
O & M MANUAL / PLANS NEW SOUTH CONST. 1 8/22/2005 6-E
TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 1
SIEMENS 2 9/29/2006 9-F
TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 3
SIEMENS 2 9/29/2006 9-F
TERMINAL NORTH TERMINAL BAGGAGE CLAIM
MAINTENANCE MANUAL TERMINAL NORTH BAGGAGE CLAIM REPLACEMENT
FKI LOGISTEX 1 3/2/2007 7-E
TERMINAL NONE JETPOWER PWM2 FMC TECHNOLOGIES 1 2/1/2006 7-E
TERMINAL NONE JETAIRE PRECONDITION AIR O & M MANUAL FMC TECHONOLOGIES 1 5/1/2005 7-E
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XII
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XI
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH II
JERVIS B WEBB CO. 1 1/26/2007 8-D
10/23/2012SUPPORT DOCUMENTS
Page 115
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH X
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VIII
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XV
JERVIS B WEBB CO. 1 3/23/2007 8-E
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH III
JERVIS B WEBB CO. 1 1/26/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XIII
JERVIS B WEBB CO. 1 3/23/2007 8-E
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VI
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH VII
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH V
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYTEM NORTH IX
JERVIS B WEBB CO. 1 3/23/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH IV
JERVIS B WEBB CO. 1 1/26/2007 8-D
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH XIV
JERVIS B WEBB CO. 1 3/23/2007 8-E
10/23/2012SUPPORT DOCUMENTS
Page 116
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL BAGGAGE HANDLING SYSTEM (BHS)
O & M MANUAL FOR OUTBOUND BAGGAGE HANDLING SYSTEM NORTH I
JERVIS B WEBB CO. 1 1/26/2007 8-D
TERMINAL DELTA TICKET LOBBY RECONFIG
PACKAGE #1 TELECOMMUNICATIOM ROOMS WARRANTY MANUAL
NEW SOUTH 1 1/12/2007 5-E
TERMINAL DELTA TICKET LOBBY RECONFIG
PACKAGE #3 EARLY OFFICE RELOCATION WARRANTY MANUAL
NEW SOUTH 1 1/12/2007 5-E
TERMINAL NONE CF204 SERIES 4" CEILING SPEAKER SPEC ALTEC LANSING 1 7/1/2006 5-C
TERMINAL CONSTRUCTION PHASING NORTH BAGGAGE CLAIM MISC. COMPONENTS AND BIDS
DEPARTMENT OF AVIATION
1 5/1/2007 1-F
TERMINAL TERMINAL CENTRAL UTILITY PLANT EQUIPMENT REPLACEMENT
EQUIPMENT O & M MANUAL F&S MECHANICAL 2 7/17/2007 8-F
TERMINAL DELTA -SOUTH TERM LOBBY RECONFIG
PROJECT MANUAL - PACKAGE 7 ATO EXPANSION AND RENOVATION VOLUME 1
CORGAN ASSOC 1 4/21/2006 1-F
TERMINAL DELTA SOUTH TERM LOBBY RECONFIG
PROJECT MANUAL - PACKAGE 6 ADDENDUM 1 - L-COUNTERS & CURBSIDE
CORGAN ASSOC 1 12/8/2005 1-F
TERMINAL HARTSFIELD BAGGAGE CLAIM PACE Job # 04-83718-01-04
O & M MAINTENANCE MANUAL YORK INTERNATIONAL 1 5/11/2005 9-F
TERMINAL DAL RECONFIGURATION -BAGGAGE HANDLING SYSTEM EXPANSION (BHS)
REQUEST FOR PROPOSAL BNP ASSOCIATES 1 9/25/2005 9-F
TERMINAL PARKING STRUCTURE PROJECT MANUAL DESIGN DEVELOPMENT PHASE
CITY OF ATLANTA 1 2/2/2004 1-F
10/23/2012SUPPORT DOCUMENTS
Page 117
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL CBP SECONDARY SCREENING AREA RECONF PROJECT
SPECIFICATIONS - 100% HADP 1 12/10/2007 6-E
TERMINAL CBP SECONDARY SCREENING AREA RECONF
SPECIFICATIONS HARPER, AIKEN, DONAHUE & PARTNERS
1 1/2/2008 6-E
TERMINAL COSMETIC UPGRADES O & M MANUAL-STAGE 5 NEW SOUTH 1 9/20/2007 5-B
TERMINAL DELTA TICKET LOBBY RECONFIG
PACKAGE #7 TICKET HALL RENOV ATIONS WARRANTY MANUAL
NEW SOUTH 1 4/10/2007 5-F
TERMINAL DELTA - SOUTH TERMINAL LOBBY RECONFIG
O & M MANUAL - PACKAGE 6 - L COUNTERS & CURBSIDE
CORGAN 1 3/18/2007 1-F
TERMINAL FIRE ALARM SYSTEM FIRE ALARM CALCULATIONS NEWCOMB & BOYD 1 1/16/2004 1-C
TERMINAL BAGGAGE HALL EXPANSION FOR EDS/ETD
SPECIFICATION FOR GENERAL CONSTRUCTION CORGAN ASSOCIATES 1 6/30/2004 9-C
TERMINAL NORTH & SOUTH TERMINAL CEILING REPLACEMENT
PROJECT MANUAL HARPER PARTNERS /CDG
1 8/2/2001 2-B
TERMINAL AATC/ABS RENOVATION AATC/ABS RENOVATION LIGHTING SUBMITTAL YUKON ELECTRIC 1 10/3/1996 4-E
TERMINAL PAGING REPLACMENET -TERMINAL T-022
MINI-MATE SPLIT SYSTEM O & M MANUAL for AGT PAGING COMM ROOMS
JOE POWELL and ASSOCIATES, INC
1 3/20/2006 5-C
TERMINAL AIRTRAN BYEPASS PASSENGER SELF-SERVICE CHECK-IN KIOSK APPROVAL PROPOSAL
AIR TRAN AIRWAYS 1 1/31/2003 5-C
10/23/2012SUPPORT DOCUMENTS
Page 118
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL TERMINAL KALWAL GLASS REPLACEMENT
VISTA WALL, VIRACON AND DOW CORNING LETTER OF WARRANTY
THE VISTAWALL GROUP
1 11/27/2006 5-C
TERMINAL BAGGAGE SECURITY SCREENING SYSTEM
NORTH TERMINAL 100% HOLD BAGGAGE SECURITY SCREENING SYSTEM O & M MANUAL
JERVIS B. WEBB COMPANY
1 1/20/2007 5-C
TERMINAL BAGGAGE SECURITY SCREENING SYSTM
NORTH TERM 100% HOLD BAGGAGE SECURITY SCREENING SYSTEM MANUFACTURER'S LITERATURE
JERVIS B. WEBB COMPANY
1 1/20/2007 5-C
TERMINAL COUNTERFLOW COOLING TOWER - PHOENIX
O & M MANUAL - FIBERGLASS STRUCTURED COUNTERFLOW COOLING TOWER PHOENIX
CCS 1 8/13/2008 8-F
TERMINAL TERMINAL CENTRAL UTILITY PLANT
AATC - MAIN TERMINAL CUP O & M MANUAL CED 2 4/29/2009 8-F
TERMINAL TERMINAL CENTRAL UTILITY PLANT
4160 V ELECTRICAL PROTECTION & COORDINATION STUDY
MB&R ENGINEERING 1 4/3/2009 8-F
TERMINAL SOUTH TERMINAL TICKET LOBBY RECONFIG PRO
BP-8 HVAC O & M MANUAL REED, WELLS, BENSON & COMPANY
1 6/15/2009 6-E
TERMINAL TERMINAL RESTROOM UPGRADES #2832
O & M MANUAL NEW SOUTH 1 7/15/2009 1-E
TERMINAL MAIN TERMINAL RESTROOM UPGRADES
SPECIFICATION HSST 1 7/15/2009 1-E
TERMINAL NORTH TERM LL AA BAGGAGE CLAIM AREA
SPECIFICATION SCOTT ASSOCIATES 1 6/10/2009 1-E
TERMINAL COSMETIC UPGRADES STAGE 5 FLOOR TILE REPLACEMENT, COLUMN RECLADDING, ESCALATOR WELLS, TUNNEL RENOVATION SPECS
SCOTT ASSOCIATES 1 11/18/2005 5-B
10/23/2012SUPPORT DOCUMENTS
Page 119
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL COSMETIC UPGRADES STAGE 5 FLOOR TILE REPLACEMENT, COLUMN RECLADDING, ESCALATOR WELLS, TUNNEL RENOVATION SPECS
SCOTT ASSOCIATES 1 10/26/2005 5-B
TERMINAL TERMINAL RESTROOM UPGRADES
CONTRACT - PROJECT #4162 CITY OF ATLANTA 1 8/1/2008 1-E
TERMINAL 100% BAGGAGE HANDLING SCREENING (BHS)
O & M MANUAL - ELECTRICAL EQUIPMENT VOL. 2
SIEMENS 1 9/29/2006 9-F
TERMINAL ATL BAGGAGE HANDLING EXP PHASE 2 ENABLING WORKS (BHS)
PROJECT MANUAL NEWCOMB & BOYD 1 2/23/2010 8-E
TERMINAL LANDSIDE OPS BUILD OUT O & M MANUAL GOULD PUMPS GOULD 1 1/15/2008 8-A
TERMINAL LANDSIDE OPS BUILT OUT O & M MANUAL NETWORK & ELECTRICAL SOLUTIONS BILL OF MATERIALS
PANDUIT 1 1/15/2008 8-A
TERMINAL NORTH SECURITY SCREENING CHECKPOINT EXPANSION PROJECT
SPECIFICATIONS - PROJECT MANUAL VOLUME 1 ADDENDUM 26
CORGAN 1 11/11/2008 8-A
TERMINAL PAX CIRCULATION REVISIONS PRODUCT DATA FOR AHU-1,2,3,4 DYNALECTRIC 1 6/9/1993 8-B
TERMINAL ABS / AATC SHOP RELOCATION
O & M MANUAL ROLLING DOORS OVERHEAD DOOR 1 1/31/1997 4-F
TERMINAL PASSENGER CIRCULATION REVISION
09680 CARPET CARE & MAINTENANCE INSTRUCTIONS
MILLIKEN 1 5/6/1996 4-F
TERMINAL SOUTH SECURITY CHECK POINT EXPANSION 2008
OVERHEAD DOOR, MILLWORK, ROOF, FLOORING, SIGNAGE, PLUMBING & ELECTRICAL
WG YATES 1 11/5/2008 3-C
10/23/2012SUPPORT DOCUMENTS
Page 120
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL SOUTH SECURITY CHECKPOINT EXPANSION
AHU O & M MANUAL FOR RTU-T2 BUFFALO AIR HANDLING
1 11/5/2008 9-A
TERMINAL NORTH BAGGAGE SYSTEM MEGA MERGE PROJECT
CONVEYOR SYSTEM O & M MANUAL G&T COMPANY, INC. 1 8/25/2010 7-A
TERMINAL NORTH & SOUTH TERMINAL SECURITY CHECKPOINT PROJECT
COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC
1 4/27/2010 1-A
TERMINAL DELTA AIRLINES AIRPORT 21 POWER ENHANCEMENT PROJECT
SPECS AND CONTRACT DOCUMENTS DELTA AIRLINES 1 3/17/1997 9-B
TERMINAL AMERICAN AIRLINES WALL FINISH UPGRADES - SPECIFICATIONS SCOTT GROUP 1 8/20/2010 5-F
TERMINAL TERMINAL CENTRAL UTILITY PLANT
TCUP & EAST CHILLER PLANT COOLING TOWER WATER RECOVERY O & M MANUAL & SCHEMATIC DESGIN NARRATIVE
F & S MECHANICAL 1 3/15/2011 7-A
TERMINAL AMERICAN AIRLINES PUNCH LIST, WAIVER, CONTRACTOR WARRANTY & SPECIFICATIONS
SCOTT ASSOCIATES 1 3/11/2011 5-F
TERMINAL DUCTWORK RELOCATION NORTH & SOUTH TERMINAL CROSS-OVER SOFFITS O & M MANUAL
F & S MECHANICAL 2 8/1/2008 7-F
TERMINAL TERMINAL CENTRAL UTILITY PLANT & COOLING TOWER REPLACEMENT
CONTROLS SUBMITTALS F & S MECHANICAL 1 12/1/2008 8-F
TERMINAL DOA SECURITY TRAINING OFFICE
CLOSEOUT MANUAL - 3 OF 3 TURNER CONSTRUCTION
1 5/11/2011 7-A
TERMINAL DELTA AIRLINES TEMPORARY MILLWORK INSTALLATION DELTA AIRLINES 1 11/2/1999 3-C
10/23/2012SUPPORT DOCUMENTS
Page 121
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL DOA SECURITY TRAINING OFFICE
CLOSEOUT MANUAL - 2 OF 3 TURNER CONSTRUCTION
1 5/11/2011 7-A
TERMINAL DOA SECURITY TRAINING OFFICE
CLOSEOUT MANUAL - 1 OF 3 TURNER CONSTRUCTION
1 5/11/2011 7-A
TERMINAL VESTIBULE AIR CURTAIN PROJECT MANUAL STEVENS & WILKINSON 1 1/25/1998 2-A
TERMINAL GA POWER TRANSFORMER VAULT
O & M MANUAL, BILL OF MATERIAL, SWITBOARD, BUSWAY & WARRANTY
SIEMENS/CLEVELAND 1 7/25/2011 7-B
TERMINAL GA POWER TRANSFORMER VAULT
PROJECT CLOSE OUT DOCUMENTS - LETTER OF WARRANTY
CPS 1 7/15/2011 7-B
TERMINAL GA POWER TRANSFORMER VAULT
GENERAL EMERGENCY CONTROL CABINET SPECIFICATIONS O & M MANUAL
EMERSON 1 9/1/2011 7-B
TERMINAL DOA SECURITY BUILDING AUTOMATION SYSTEM O & M MANUAL
JOHNSON CONTROLS 1 10/28/2011 7-A
TERMINAL DOA SECURITY TRAINING OFFICE RECONFIGURATION
COMMISSIONING REPORT TOTAL SYSTEMS COMMISSIONING, INC
1 11/14/2011 1-A
TERMINAL DELTA AIRLINES BSO "ATLANTA ROOM" BAGGAGE INTERIOR UPGRADE, CLOSE OUT & WARRANTY
DELTA AIRLINES 1 6/21/2011 7-A
TERMINAL FRONTAGE IMPROVEMENTS WARRANTIES & CLOSE OUT DOCUMENTS DOA/COA 1 3/13/2012 9-E
TERMINAL COSMETIC UPGRADES AMERICAN AIRLINES BAGGAGE CLAIM COSMETIC UPGRADES CLOSE OUT DOCUMENTS
YATES CONSTRUCTION 1 2/8/2012 5-B
10/23/2012SUPPORT DOCUMENTS
Page 122
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
TERMINAL HVAC UPGRADES NORTH AND SOUTH TERMINAL HSST 1 11/25/2010 6-E
UTILITIES BOILERS CLEAVER BROOKS TRAINING CENTER MANUAL CLEAVER BROOKS 1 9/1/1979 4-E
UTILITIES FIRE ALARM SYSTEM FIRE ALARM SYSTEM CALCULATIONS - QUARTER POINT TUNNEL
NEWCOMB & BOYD 1 4/1/2004 1-C
UTILITIES WATER COOLED CENTRAVAC WATER COOLED CENTRACVAC WITH CH530 O & M MANUAL
TRANE 1 12/1/2005 5-C
UTILITIES FIRE SUPPRESSION BACK OF HOUSE
FS TEST PAPERS CON A, B, C, D, and T; O & M MANUALS
GWINNETT SPRINKLER 1 4/29/2008 1-B
UTILITIES FIRE SPRINKLER SYSTEM O & M MANUAL - SPRINKLER SYSTEM GWINNETT SPRINKLER 1 1/1/2002 6-B
UTILITIES AHU O & M MANUAL - AHU GOVERNAIR CORPORATION
1 5-C
UTILITIES AUXILIARY HEAT WEST END LUGGAGE COUNTERS DELTA AIR LINES
O & M MANUAL W. B. WALLIS & COMPANY
1 1/8/2008 8-B
UTILITIES COOLING OPERATOR TRAINING
COOLING OPERATOR TRAINING WORKBOOK BETZ DEARBORN 1 1/1/1997 3-F
UTILITIES CONC C NORTH RENOVATION PROJECT
O & M MANUALS -SWGR, SWBRD, BUSWAY,PANELS, TRANSFORMERS & LETTERS OF WARRANTY
SIEMENS 2 4/2/2009 8-B
UTILITIES ENVIROFLEX RETRACTABLE PIPING SYSTEM - PRESSURE
UNDERGROUND STORAGE TANK FUEL TRANSFER AND CONTAINMENT SYSTEM O & M MANUAL
OPW 1 2/2/2001 6-B
10/23/2012SUPPORT DOCUMENTS
Page 123
LOCATION PROJECT NAME DESCRIPTION PREPARED BY QTY DATE STORAGE
UTILITIES APM AHU RENOVATION O & M MANUAL W. B. WALLIS 1 9/1/2009 5-C
UTILITIES JETAIRE PRE-CONDITIONED AIR UNIT 75-120 TON DISCHARGE O & M MANUAL
JBT AEROTECH 1 3/1/2008 1-D
UTILITIES JETAIRE PRE-CONDITIONED AIR UNIT 30-60 TON DISCHARGE O & M MANUAL
JBT AEROTECH 1 3/1/2008 1-D
UTILITIES APM AHU REPLACEMENT PLACEMENT
APM AHU HVAC UPGRADES - FINAL REPORT NEWCOMB & BOYD 1 3/8/2010 5-C
UTILITIES APM AHU REPLACEMENT PLACEMENT
APM AHU HVAC UPGRADES -SPECIFICATIONS NEWCOMB & BOYD 1 12/17/2008 5-C