WWW.SIEMAG-TECBERG.COM TECHNICAL INFORMATION SHAFT-HOISTING INSTALLATION (CMG, DRâA LASFAR III, MARRAKECH, MOROCCO)

Upload: buidung

Post on 04-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

WWW.SiemaG-TecBerG.comWWW.SiemaG-TecBerG.com

germany | HAIGER (HEADQUARTERS)SIEMAG TECBERG GmbHKalteiche-Ring 28-3235708 Haiger, GermanyPhone +49 2773 91610E-Mail [email protected]

polanD | KATOWICESIEMAG TECBERG POLSKA Sp. z o.o.ul. Mickiewicza 2940-085 Katowice, PolandPhone +48 32 2072086E-Mail [email protected]

swiTZerlanD | SEDRUNSIEMAG TECBERG GmbHPlant Operation7188 Sedrun, SwitzerlandPhone +41 81 9365280E-Mail [email protected]

locaTions:china | BEIJINGBeijing SIEMAG TECBERG Mining Equipment Co., Ltd. Room 21-03, Block A, CITIC Building19 Jianguomenwai Dajie,Beijing 100004, P.R. ChinaPhone + 86 10 8526 1713E-Mail [email protected]

china | TIANJINTianjin SIEMAG TECBERG Machinery Co., Ltd., Guangyuan Road South, Tianjin High-Tech Industrial Park, Third Phase Wuqing Development Area, Tianjin 301700, P. R. China

ausTralia | SYDNEYSIEMAG TECBERG Australia Pty Ltd.Unit 7, 2 Eden Park Drive (PO Box 1442) North Ryde NSW 2113, Australia Phone +61 2 9888 3900E-Mail [email protected]

souTh africa | JET PARKSIEMAG TECBERG (Pty) Ltd. Unit 15, Lakeview Business Park,Yaldwin RD, Jet Park, Johannesburg P.O. Box 2964, Edenvale 1610,South AfricaPhone +27 11 383 9300E-Mail [email protected]

souTh africa | GERMISTONWinder Controls (Pty) Ltd.56 Stanley Street, Germiston, Ext. 3, Gauteng,P.O. Box 383, Germiston 1400, South AfricaPhone +27 11 873 4650E-Mail [email protected]

usa | MILWAUKEESIEMAG TECBERG Inc.2969 South Chase AvenueMilwaukee, WI 53207, USAPhone +1 414 727 5725E-Mail [email protected]

Technical informaTion

Shaft-hoiSting inStallation (CMG, Drâa Lasfar III, MarrakeCh, MoroCCo)

Page 2: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

2

Technical informaTion

Shaft-hoiSting inStallationThe company CMG (Compagnie Minière de Guemassa) headquartered in Casablanca, Morocco, placed an order with SIEMAG TECBERG on the engineering, delivery, assembly and commissioning of a complete shaft-sinking and production hoist, consisting of the entire mechanical, hydraulic and electrical parts, including the automation for the new Shaft III of CMG’s Drâa Lasfar mine. SIEMAG TECBERG established the complete engineering for the shaft-sinking operations as well as for the later production phase. The hoisting tower was manufactured on the basis of SIEMAG TECBERG’s engineering and under its manufacturing supervision in Morocco.

One special particularity of this order is the fact that first this hoist was used as a 1-rope drum hoist with a drum diameter of 4 m for sinking the 1,080 m shaft. The excavation material was transported to the surface with a kibble of 4 m³ at a variable speed of 0 to 8 m/s. For this operation, SIEMAG TECBERG delivered a steel-wire rope, diameter 46 mm, coiled on a drum with a Lebus grooved sleeve.

Usually, for shaft-sinking purposes, a single-drum or double-drum hoist is installed. This hoist requires its own foundation which can only be used up to the end of the sinking operation. Hence, Drâa Lasfar III neither had expenses for an additional foundation nor for renting a sinking machine. Furthermore, there was no disassembly work at the end of the shaft-sinking process as the hoisting machine was only erected once at its final location. On completion of the shaft-sinking phase, the drum hoist was converted – mecanically only, with a minor technical effort - to a 4-rope Koepe hoist for production. In the same way, the electrical control used during the sinking period was also applied thereafter, with slight modifications, for the normal hoisting operation. Due to the fact that there was no traditional disassembly and modification work between the end of the sinking operations and the start of ore hoisting, CMG was in a position to reduce the construction period of its new shaft Drâa Lasfar III by several months.

1-Rope drum hoist during shaft-sinking phase Head frame with shaft-sinking kibble

Page 3: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

3

Ore hoisting is done from a depth of 1,080 m at a capacity of 250 t/h; the layout includes reserves for a later mine extension which is planned for a depth of 1,500 m with the same hoisting capacity. This skip/counterweight installation has a payload of 19.5 t with a volume of 12 m³ (density of hoisting material 1.65 t/m³). The hoisting speed is rated at 12 m/s in the production operation. The Drâa Lasfar mine mainly hoists copper and zinc ores.

In the hoisting installation of Shaft III, SIEMAG TECBERG incorporated its completely new developed speed

controller, type STB-SC01, which is authorized by the German mining authorities under number F-24/10/1 in accordance with the BVOS regulations. The speed controller function is an integral component of SIEMAG TECBERG’s control for hoists and sinking machines. This speed controller may equally be applied for Koepe and drum hoists. The only difference is in the control and monitoring software. The encoders, shaft switches as well as the hardware remain unchanged in case of refurbishments.

Control cabinet STB-SC0x Control desk with brake lever Control desk with drive lever

The conTrol sysTem mainly consisTs of The following componenTs: ▪ two programmable logic controllers, type Simatic S7-400, with different CPU types

▪ two freely programmable positioning controllers, type SIMOTION C240-2

▪ two PCs with LCD monitors and the visualization software WinCC-flexible

as well as the distributed and centralized I/O assigned to each control section and the redundant encoders. The controller programme was developed and checked to a very large extent on SIEMAG TECBERG’s own test unit. Therefore, it was possible to cut the commissioning period, including the test runs, for the sinking operation and monitoring of current CMG operations to a total of about two months.

Furthermore, a telemonitoring module was incorporated in the machine controller system which provides for a worldwide reading access into the controller system. Should any failures occur, this module serves to communicate fault analysis, modifications or complements to the operator at short notice.

Commissioning for the production operation is accomplished. At present, SIEMAG TECBERG experts are optimizing the production process.

Page 4: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

4Arrangement of the motors and gear

single-line DiagrammeThis diagramme shows the layout scheme of the Drâa Lasfar III hoisting installation. The shaft signalling system (SSA) was extended during the convertion of the speed controller STB-SC01 to STB-SC02. The brake required only some minor modifications of the parameters. The speed controller was equipped with a new, modified programme.

Page 5: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

5

Control cabinet “Loading level -1,030 m”

The shaft signalling system of the Drâa Lasfar III shaft was also realized by SIEMAG TECBERG. The signalling panels of the loading and unloading levels were equipped with stainless steel control cabinets to resist the unfavourable climatic conditions and the mechanical loads in and around the shaft. The signalling panels at the levels were made of plastics material. At the customer’s request, redundant shaft cables were provided to assure the operation of the plant even if one of the cables was interrupted. The shaft signalling system also serves to communicate the signals of the load cell and also the signals of the loading and unloading stations to the hoist control. The signalling panels are equipped with telephones for communication from the levels to the hoist operator. In addition, there are optical and acoustical signalling devices. The present operating mode of the hoist is indicated at the signalling panels, too. Furthermore, there is a voice communication to the levels by means of howl-call telephones.

layout of the Shaft Signalling SyStem (SSa)

Hoisting tower of Shaft III

Page 6: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

6

funcTional scheme of The speeD conTroller

▪ The complete engineering, calculation of all performances and capacities, single-line diagrammes, multi-line diagrammes, earthing diagrammes

▪ Development and programming ▪ Parameter assignment of the drive controller and speed controller

▪ Programming of the visualization and adaptation to customer’s needs

▪ Erection supervision ▪ Training of customer’s staff ▪ Commissioning

siemag TecBerg’s services wiThin The elecTrical parT anD auTomaTion incluDe among oThers:

converTion of The speeD conTroller from sinking To proDucTion operaTion

STB-SC01 STB-SC02

Page 7: locaTions - SIEMAG · PDF fileSIEMAG TECBERG POLSKA Sp. z o.o. ul. Mickiewicza 29 ... and unloading levels were equipped with stainless steel ... The siemag TecBerg supplies of equipmenT

7

▪ 2 DC motors, power 1200 kW (air-cooling) ▪ 2 DC power converters, 2700 A each ▪ 2 High-speed circuit breaker ▪ 1 cos Φ-Compensation system ▪ 1 Speed controller with integrated depth indicator ▪ Magnetic switches and magnets ▪ Positioning switches ▪ Tachometer generator and encoders ▪ Monitoring switches ▪ Electrical cabinets, control desks, complete control desk in the operator’s work station with visualization (two PCs)

▪ 2 Programmable logic controllers – Siemens S7-400 ▪ Software for control and monitoring ▪ Monitoring of the brake system ▪ Rope-slip control device (by means of software)

▪ Electric cabinet to operate and control the brake and hydraulic unit, respectively

▪ Redundant Profibus cable for communication, with integrated power cables

▪ Shaft signalling system with signalling panels (Non-Ex-area)

▪ Telephone system between the levels, to the surface, and to the machine operator

▪ Loading installation with weighing system, for a total weight of 50 t, integrated into the control and visualization systems

▪ Uninterrupted power supply for the shaft signalling system, visualization, and speed controller

▪ Telediagnostics by means of a VPN connection (broad-band connection required)

▪ Starting of the loading station in the automatic mode from the operator’s desk

The siemag TecBerg supplies of equipmenT anD maTerial for The elecTrical parT mainly cover The following componenTs:

Technical DaTa

Type of shaft-sinking machine 1-rope drum hoist with Lebus sleeve, drum diameter 4 mSubsequent convertion to a production hoist 4-Rope Koepe hoist, ground-mounted, friction pulley diameter 3.8 m

Shaft diameter 5 mShaft depth 1,080 mHoisting speed 12 m/sTravel distance 1,059 mHoisting arrangement Skip/counterweight installation Payload 19.5 t (volume 12 m³)2 Sets 4-rope head sheaves Diameter 3.5 mRope attachments 4 Attachments with resetting device for rope-length correction

4 Attachments for counterweight 4 Attachments for 2 balance ropes

Ropes 1 Hoisting rope for the kibble Ø 46 mm (shaft-sinking phase), 4 Hoisting ropes, Ø 38 mm 2 Flat balance ropes, 130 x 29 mm 6 Guide ropes, Ø 40 mm

Motors 2 DC motors, power 1,200 kW / 600-700 V DCHigh-speed circuit breaker 2 PiecesPower converter 2 DC power converters, 2,700 A eachSpeed controller 1 Speed controller with integrated depth indicator, developed by SIEMAG TECBERG,

authorized component acc. to BVOS under number F-24/10/1cos Φ -Compensation system Average value cos Φ 0,92 PLCs Siemens S7-4002 Positioning controllers Siemens C240-2