london southend airport - extension

2
Terminal extension that will create local employment boost gets the go-ahead A proposed extension to the new terminal at London Southend Airport that will result in more than 300 hundred additional new jobs being created has been given the go-ahead by Rochford Council. Phase 1 of the light and airy, fly-through terminal became operational on 28 February and is less than 100 paces from the new railway station. Passengers flying out from the airport will wait for a maximum of four-minutes for security, whilst those arriving with just hand luggage can expect to travel from plane to train within 15 minutes of leaving the aircraft. This Phase 2 extension is to ensure those high standards of service are not compromised as passenger numbers grow towards 2 million per year by 2020. The terminal building will now become 90 metres longer. The number of check in desks / baggage drop off points will increase, as will the amount of security screening channels. The Departure Lounge will grow in size to enhance the experience for passengers relaxing and awaiting boarding after security. A larger Arrivals area will have enhanced baggage reclaim facilities and a larger immigration area. Retail and catering facilities will be expanded throughout the terminal in order to provide a much wider range of shops and services available to passengers. The 300 new jobs will arise from the increase in Southend based aircraft which will result in a variety of additional operational and service roles such as passenger service, security, retail, catering, baggage handling, engineering and maintenance, plus airline crew from London Southend based airline operations. London Southend Airport Managing Director Alastair Welch says “We are very pleased that Rochford Council has indicated they support this extension, which will ensure that we are able to maintain the high levels of customer service we intend to be the hallmark of London Southend Airport as our passenger numbers grow. This is also further evidence of the role the redeveloped airport is playing in supporting the regeneration of the wider economy.” Construction work on the extension is planned to get underway later this year. NOTES TO EDITORS London Southend Airport will become a fully operational international gateway during 2012. A new Control Tower, extended runway, airport railway station

Upload: emma-dean

Post on 23-Mar-2016

217 views

Category:

Documents


3 download

DESCRIPTION

Press release about the extension planned for London Southend Airport

TRANSCRIPT

Page 1: London Southend Airport - Extension

Terminal extension that will create local employment boost gets the go-ahead

A proposed extension to the new terminal at London Southend Airport that will result in more than 300 hundred additional new jobs being created has been given the go-ahead by Rochford Council.

Phase 1 of the light and airy, fly-through terminal became operational on 28 February and is less than 100 paces from the new railway station. Passengers flying out from the airport will wait for a maximum of four-minutes for security, whilst those arriving with just hand luggage can expect to travel from plane to train within 15 minutes of leaving the aircraft.

This Phase 2 extension is to ensure those high standards of service are not compromised as passenger numbers grow towards 2 million per year by 2020.

The terminal building will now become 90 metres longer. The number of check in desks / baggage drop off points will increase, as will the amount of security screening channels. The Departure Lounge will grow in size to enhance the experience for passengers relaxing and awaiting boarding after security. A larger Arrivals area will have enhanced baggage reclaim facilities and a larger immigration area. Retail and catering facilities will be expanded throughout the terminal in order to provide a much wider range of shops and services available to passengers.

The 300 new jobs will arise from the increase in Southend based aircraft which will result in a variety of additional operational and service roles such as passenger service, security, retail, catering, baggage handling, engineering and maintenance, plus airline crew from London Southend based airline operations.

London Southend Airport Managing Director Alastair Welch says “We are very pleased that Rochford Council has indicated they support this extension, which will ensure that we are able to maintain the high levels of customer service we intend to be the hallmark of London Southend Airport as our passenger numbers grow. This is also further evidence of the role the redeveloped airport is playing in supporting the regeneration of the wider economy.”

Construction work on the extension is planned to get underway later this year.

NOTES TO EDITORSLondon Southend Airport will become a fully operational international gateway during 2012. A new Control Tower, extended runway, airport railway station providing fast and frequent train services direct to Stratford (site of the 2012 Olympic Games) and London Liverpool Street, a new passenger terminal and Holiday Inn hotel make up the development highlights under Stobart Group’s ownership. easyJet now has 70 departures each week to Amsterdam, Alicante, Barcelona, Belfast, Faro, Ibiza, Jersey, Malaga and Mallorca, with flights to Geneva (starting December 2012) and Venice (starting February 2013) now on sale. Aer Arann operates 10 weekly departures from London Southend to Waterford. From 10 May, Aer Lingus Regional, operated by Aer Arann will fly three daily return services between London Southend and Dublin, with transatlantic connectivity to Boston, Chicago, New York and Orlando.

More information at www.southendairport.com

FOR MORE INFORMATION, INTERVIEWS & IMAGESPlease contact Tracy Jones at Brera – 01702 390348 / 07887 514984 / [email protected] / www.brera-london.com

24 April 2012