  • 8/14/2019 Lovosice Rail Bridge Retrofit

    1/6

    Ocenn Dopravn stavba roku 2007Nov tv na spolenosti

    Vizualizace

    Aspe

    Infratruture Bridge

    Lovoie Rail Bridge Retrot

    Bridge length

    362 m

    DeignValbek, pol. r.o.

    Owner

    sDc, .o. Praha

    contrator

    chldek a tintra, a..

    start of ontrution

    Marh 2004

    completion of ontrution

    Otober 2004

    LovoieRail Bridge

    Retrot

  • 8/14/2019 Lovosice Rail Bridge Retrofit

    2/6

  • 8/14/2019 Lovosice Rail Bridge Retrofit

    3/6

    Ocenn Dopravn stavba roku 2007

    Nov tv na spolenosti

    Vizualizace

    Aspe

    Pedetrian Bridgeskoda Auto - Indutrial Zone

    Bridge Length

    226 m

    Deign

    Valbek, pol. r.o.

    Owner

    skoda Auto, a

    start of ontrution

    July 2002

    completion of ontrution

    Deember 2005

    cot

    15.6 mil cZK

    Infratruture Bridge

    Pedestrian BridgeSkoda Auto

    Indutrial Zone

  • 8/14/2019 Lovosice Rail Bridge Retrofit

    4/6

    Technically clean, yet unusual modern structure was designed in

    order to represent a technologically advanced company and toresolve a need or spanning an industrial area including highway

    connector, rail line and additional industrial rail tracks.

    Pedestrian BridgeSkoda AutoIndutrial Zone

  • 8/14/2019 Lovosice Rail Bridge Retrofit

    5/6

    Ocenn Dopravn stavba roku 2007

    Nov tv na spolenosti

    Vizualizace

    Aspe

    Pedetrian and biyle bridgeover Jizera river in Beneov u semil

    Deign

    Valbek, pol. r.o.

    Owner

    Muniipality union of Beneov u semil,

    Kotalov, slana

    contrator

    Hutni montaze In.

    Infratruture Bridge

    Pedestrianand bicycle bridge

    over Jizera riverin Beneov u semil

    General informaon

    The ontruon of the new footbridge wa alled for by a demo-lion of the original ve-pan bridge, whoe abutment were at

    on the edge of the river weir and in onit with the ood-pro-teon requirement. A replaement truture i a wooden tru

    bridge upended on teel able, whoe elevaon prole waeleted on the bai of alulated 100-year ood water level. In

    addion, thi type of truture wa eleted to omply with theaethe requirement for the loaon.

  • 8/14/2019 Lovosice Rail Bridge Retrofit

    6/6

    Brief Description of structure

    The ree width o the deck is 2.0m. The structure is suspended on parabol-

    ic steel cables with vertical steel hangers, which serve as exible supports

    or wooden girders spanning 48.2m. Pairs o pylons anchored by braces

    into the gravity abutments provide a support or the cable arches. The

    longitudinal distance between the consecutive pairs o pylons is 50.5m.The bridge girders are parabolically cambered to 30cm upward vertical

    ofset o the deck in the midspan. Gravity abutments are cast o concrete

    C 20/25-2bb while or the stressed suraces it is concrete C 20/25-3b.

    The timber used or all wooden members o the bridge superstructure is

    grown spruce o class SI. The steel cables and hangers are system Detan

    system rom company DEHA. Steel S 235 is used or all other steel con-

    struction.