Page 1: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

1

LPV Mitigation at Manchac

Wildlife Management Area

Page 2: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

22

LPV Pre-Katrina

(Manchac Shoreline Protection)

Page 3: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

3

Authority

• 1965 Lake Pontchartrain and Vicinity

• 1988 LPV Mitigation Study and EIS

• 2006 Public Law 109-148 (3rd

Supplemental)

Page 4: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

4

Page 5: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

5

Manchac WMA Shoreline

Page 6: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

6

Project ComponentsShoreline Protection

• The non-continuous rock breakwaters will be raised and linked to provide continuous rock breakwaters.

• Approx. 5 miles of rock breakwater shoreline protection

Marsh Creation

• Containment dike on Lake Pontchartrain shoreline will remain in place.

• Hydraulic dredging for marsh creation fill. Two lake borrow areas, located ~2,400 feet from breakwaters. The project will dredge 806,000 cubic yards of material to create 110 acres of marsh.

Page 7: LPV Mitigation at Manchac Wildlife Management Area... · 2019-09-12 · Wildlife Management Area. BUILDING STRONG SM 2 2 LPV Pre-Katrina (Manchac Shoreline Protection) ... SAR" US

BUILDING STRONG SM

7

Status and Schedule

• NEPA Document Public Review October 15, 2010

• NEPA Document Approval November 15, 2010

• PIR Completion* November 15, 2010

• Design Completion November 15, 2010

• Construction Start July 2011

• Construction Completion August 2012

*PIR will be signed to MVD for approval after the EA is signed by the Commander