Page 1: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

1

LSM733-PRODUCTION OPERATIONS MANAGEMENT

By: OSMAN BIN SAIF

LECTURE 5

Page 2: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

2

Summary of last Session

• Case Study– Hard Rock Cafe• Projects Why?• Characteristics and Activities• Work Break down structure• Project Scheduling techniques• Cost time trade offs• Project Control reports

Page 3: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

3

Agenda for this Session• What Is Forecasting?• Forecasting Time Horizons• The Strategic Importance of Forecasting• Forecasting Approaches– Qualitative Methods– Quantitative Methods

• Associative Forecasting Methods: Regression and Correlation Analysis

• Monitoring and Controlling Forecasts• Focus Forecasting• Forecasting in the Service Sector

Page 4: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

4

What is Forecasting? Process of predicting a

future event Underlying basis

of all business decisions Production Inventory Personnel Facilities

??

Page 5: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

5

The Realities!

Forecasts are seldom perfect Most techniques assume an

underlying stability in the system Product family and aggregated

forecasts are more accurate than individual product forecasts

Page 6: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

6

Short-range forecast Up to 1 year, generally less than 3 months Purchasing, job scheduling, workforce levels, job

assignments, production levels Medium-range forecast

3 months to 3 years Sales and production planning, budgeting

Long-range forecast 3+ years New product planning, facility location, research

and development

Forecasting Time Horizons

Page 7: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

7

Influence of Product Life Cycle

Introduction and growth require longer forecasts than maturity and decline

As product passes through life cycle, forecasts are useful in projecting Staffing levels Inventory levels Factory capacity

Introduction – Growth – Maturity – Decline

Page 8: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

8

Product Life Cycle

Product design and development criticalFrequent product and process design changesShort production runsHigh production costsLimited modelsAttention to quality

Introduction Growth Maturity Decline

OM

Str

ateg

y/Is

sues

Forecasting criticalProduct and process reliabilityCompetitive product improvements and optionsIncrease capacityShift toward product focusEnhance distribution

StandardizationFewer product changes, more minor changesOptimum capacityIncreasing stability of processLong production runsProduct improvement and cost cutting

Little product differentiationCost minimizationOvercapacity in the industryPrune line to eliminate items not returning good marginReduce capacity

Figure 2.5

Page 9: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

9

Forecasting Approaches

Used when little data exist New products New technology

Involves intuition, experience e.g., forecasting sales on Internet

Qualitative Methods

Page 10: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

10

Qualitative Methods

1. Jury of executive opinion (Pool opinions of high-level experts, sometimes augment by statistical models)

2. Delphi method (Panel of experts, queried iteratively until consensus is reached)

3. Sales force composite (Estimates from individual salespersons are reviewed for reasonableness, then aggregated)

4. Consumer Market Survey (Ask the customer)

Page 11: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

11

Quantitative Approaches

Used when situation is ‘stable’ and historical data exist Existing products Current technology

Involves mathematical techniques e.g., forecasting sales of LCD televisions

Page 12: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

12

Quantitative Approaches

1. Naive approach2. Moving averages3. Exponential

smoothing4. Trend projection5. Linear regression

time-series models

associative model

Page 13: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

13

Set of evenly spaced numerical data Obtained by observing response variable at

regular time periods Forecast based only on past values, no

other variables important Assumes that factors influencing past and

present will continue influence in future

Time Series Forecasting

Page 14: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

14

Trend

Seasonal

Cyclical

Random

Time Series Components

Page 15: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

15

Components of DemandD

eman

d fo

r pro

duct

or s

ervi

ce

| | | |1 2 3 4

Time (years)

Average demand over 4 years

Trend component

Actual demand line

Random variation

Figure 4.1

Seasonal peaks

Page 16: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

16

Persistent, overall upward or downward pattern

Changes due to population, technology, age, culture, etc.

Typically several years duration

Trend Component

Page 17: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

17

Regular pattern of up and down fluctuations

Due to weather, customs, etc. Occurs within a single year

Seasonal Component

Number ofPeriod Length Seasons

Week Day 7Month Week 4-4.5Month Day 28-31Year Quarter 4Year Month 12Year Week 52

Page 18: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

18

Repeating up and down movements Affected by business cycle, political, and

economic factors Multiple years duration

Cyclical Component

0 5 10 15 20

Page 19: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

19

Erratic, unsystematic, ‘residual’ fluctuations Due to random variation or unforeseen

events Short duration

and nonrepeating

Random Component

M T W T F

Page 20: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

20

Naive Approach Assumes demand in next

period is the same as demand in most recent period e.g., If January sales were 68, then

February sales will be 68 Sometimes cost effective and efficient Can be good starting point

Page 21: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

21

MA is a series of arithmetic means Used if little or no trend

Used often for smoothing Provides overall impression of data over

time

Moving Average Method

Moving average =∑ demand in previous n periods

n

Page 22: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

22

January 10February 12March 13April 16May 19June 23July 26

Actual 3-MonthMonth Shed Sales Moving Average

(12 + 13 + 16)/3 = 13 2/3

(13 + 16 + 19)/3 = 16(16 + 19 + 23)/3 = 19 1/3

Moving Average Example

101213

(10 + 12 + 13)/3 = 11 2/3

Page 23: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

Graph of Moving Average

| | | | | | | | | | | |J F M A M J J A S O N D

Shed

Sal

es

30 –28 –26 –24 –22 –20 –18 –16 –14 –12 –10 –

Actual Sales

Moving Average Forecast

Page 24: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

24

Used when some trend might be present Older data usually less important

Weights based on experience and intuition

Weighted Moving Average

Weightedmoving average =

∑ (weight for period n) x (demand in period n) ∑ weights

Page 25: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

25

January 10February 12March 13April 16May 19June 23July 26

Actual 3-Month WeightedMonth Shed Sales Moving Average

[(3 x 16) + (2 x 13) + (12)]/6 = 141/3

[(3 x 19) + (2 x 16) + (13)]/6 = 17[(3 x 23) + (2 x 19) + (16)]/6 = 201/2

Weighted Moving Average

101213

[(3 x 13) + (2 x 12) + (10)]/6 = 121/6

Weights Applied Period3 Last month2 Two months ago1 Three months ago6 Sum of weights

Page 26: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

26

Increasing n smooths the forecast but makes it less sensitive to changes

Do not forecast trends well Require extensive historical data

Potential Problems With Moving Average

Page 27: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

Moving Average And Weighted Moving Average

30 –

25 –

20 –

15 –

10 –

5 –

Sale

s de

man

d

| | | | | | | | | | | |J F M A M J J A S O N D

Actual sales

Moving average

Weighted moving average

Figure 4.2

Page 28: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

28

Seasonal Variations In Data

The multiplicative seasonal model can adjust trend data for seasonal variations in demand (jet skis, snow mobiles)

Page 29: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

29

Seasonal Variations In Data

1. Find average historical demand for each season 2. Compute the average demand over all seasons 3. Compute a seasonal index for each season 4. Estimate next year’s total demand5. Divide this estimate of total demand by the number of seasons, then

multiply it by the seasonal index for that season

Steps in the process:

Page 30: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

30

Seasonal Index Example

Jan 80 85 105 90 94Feb 70 85 85 80 94Mar 80 93 82 85 94Apr 90 95 115 100 94May 113 125 131 123 94Jun 110 115 120 115 94Jul 100 102 113 105 94Aug 88 102 110 100 94Sept 85 90 95 90 94Oct 77 78 85 80 94Nov 75 72 83 80 94Dec 82 78 80 80 94

Demand Average Average Seasonal Month 2010 2011 2012 2010-2012 Monthly Index

Page 31: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

31

Seasonal Index Example

Jan 80 85 105 90 94Feb 70 85 85 80 94Mar 80 93 82 85 94Apr 90 95 115 100 94May 113 125 131 123 94Jun 110 115 120 115 94Jul 100 102 113 105 94Aug 88 102 110 100 94Sept 85 90 95 90 94Oct 77 78 85 80 94Nov 75 72 83 80 94Dec 82 78 80 80 94

Demand Average Average Seasonal Month 2010 2011 2012 2010-2012 Monthly Index

0.957

Seasonal index = Average 2010-2012 monthly demandAverage monthly demand

= 90/94 = .957

Page 32: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

32

Seasonal Index Example

Jan 80 85 105 90 94 0.957Feb 70 85 85 80 94 0.851Mar 80 93 82 85 94 0.904Apr 90 95 115 100 94 1.064May 113 125 131 123 94 1.309Jun 110 115 120 115 94 1.223Jul 100 102 113 105 94 1.117Aug 88 102 110 100 94 1.064Sept 85 90 95 90 94 0.957Oct 77 78 85 80 94 0.851Nov 75 72 83 80 94 0.851Dec 82 78 80 80 94 0.851

Demand Average Average Seasonal Month 2010 2011 2012 2010-2012 Monthly Index

Page 33: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

33

Seasonal Index Example

Jan 80 85 105 90 94 0.957Feb 70 85 85 80 94 0.851Mar 80 93 82 85 94 0.904Apr 90 95 115 100 94 1.064May 113 125 131 123 94 1.309Jun 110 115 120 115 94 1.223Jul 100 102 113 105 94 1.117Aug 88 102 110 100 94 1.064Sept 85 90 95 90 94 0.957Oct 77 78 85 80 94 0.851Nov 75 72 83 80 94 0.851Dec 82 78 80 80 94 0.851

Demand Average Average Seasonal Month 2010 2011 2012 2010-2012Monthly Index

Expected annual demand = 1,200

Jan x .957 = 961,20012

Feb x .851 = 851,20012

Forecast for 2013

Page 34: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

34

Seasonal Index Example

140 –

130 –

120 –

110 –

100 –

90 –

80 –

70 –| | | | | | | | | | | |J F M A M J J A S O N D

Time

Dem

and

2013 Forecast2012 Demand 2011 Demand2010 Demand

Page 35: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

35

Associative Forecasting

Used when changes in one or more independent variables can be used to predict the changes in the dependent variable

Most common technique is linear regression analysis

Page 36: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

36

Associative ForecastingForecasting an outcome based on predictor variables using the least squares technique

y = a + bx^

where y = computed value of the variable to be predicted (dependent variable)a = y-axis interceptb = slope of the regression linex = the independent variable though to predict the value of the dependent variable

^

Page 37: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

37

Associative Forecasting ExampleSales Area Payroll

($ millions), y ($ billions), x2.0 13.0 32.5 42.0 22.0 13.5 7

4.0 –

3.0 –

2.0 –

1.0 –

| | | | | | |0 1 2 3 4 5 6 7

Sale

s

Area payroll

Page 38: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

38

Associative Forecasting Example

Sales, y Payroll, x x2 xy

2.0 1 1 2.03.0 3 9 9.02.5 4 16 10.02.0 2 4 4.02.0 1 1 2.03.5 7 49 24.5

∑y = 15.0 ∑x = 18 ∑x2 = 80 ∑xy = 51.5

x = ∑x/6 = 18/6 = 3

y = ∑y/6 = 15/6 = 2.5

b = = = .25∑xy - nxy∑x2 - nx2

51.5 - (6)(3)(2.5)80 - (6)(32)

a = y - bx = 2.5 - (.25)(3) = 1.75

Page 39: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

39

Associative Forecasting Example

y = 1.75 + .25x^ Sales = 1.75 + .25(payroll)

If payroll next year is estimated to be $6 billion, then:

Sales = 1.75 + .25(6)Sales = $3,250,000

4.0 –

3.0 –

2.0 –

1.0 –

| | | | | | |0 1 2 3 4 5 6 7

Nod

el’s

sale

s

Area payroll

3.25

Page 40: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

40

How strong is the linear relationship between the variables?

Correlation does not necessarily imply causality!

Coefficient of correlation, r, measures degree of association Values range from -1 to +1

Correlation

Page 41: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

41

Correlation Coefficient

r = nSxy - SxSy

[nSx2 - (Sx)2][nSy2 - (Sy)2]

Page 42: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

42

Correlation Coefficient

r = nSxy - SxSy

[nSx2 - (Sx)2][nSy2 - (Sy)2]

y

x(a) Perfect positive correlation: r = +1

y

x(b) Positive correlation: 0 < r < 1

y

x(c) No correlation: r = 0

y

x(d) Perfect negative correlation: r = -1

Page 43: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

43

Coefficient of Determination, r2, measures the percent of change in y predicted by the change in x Values range from 0 to 1 Easy to interpret

Correlation

For the Nodel Construction example:r = .901r2 = .81

Page 44: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

44

Multiple Regression Analysis

If more than one independent variable is to be used in the model, linear regression can be extended to multiple regression to accommodate several independent variables

y = a + b1x1 + b2x2 …^

Computationally, this is quite complex and generally done on the computer

Page 45: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

45

Multiple Regression Analysis

y = 1.80 + .30x1 - 5.0x2

^

In the Nodel example, including interest rates in the model gives the new equation:

An improved correlation coefficient of r = .96 means this model does a better job of predicting the change in construction sales

Sales = 1.80 + .30(6) - 5.0(.12) = 3.00Sales = $3,000,000

Page 46: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

46

Measures how well the forecast is predicting actual values

Ratio of cumulative forecast errors to MEAN ABSOLUTE DEVIATION (MAD) Good tracking signal has low values If forecasts are continually high or low, the forecast

has a bias error

Monitoring and Controlling Forecasts

Tracking Signal

Page 47: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

47

Monitoring and Controlling Forecasts

Tracking signal

Cumulative errorMAD=

Tracking signal =

∑(Actual demand in period i - Forecast demand in period i)(∑|Actual - Forecast|/n)

Page 48: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

48

Tracking Signal

Tracking signal

+

0 MADs

Upper control limit

Lower control limit

Time

Signal exceeding limit

Acceptable range

Page 49: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

49

Tracking Signal ExampleCumulative

Absolute AbsoluteActual Forecast Cumm Forecast Forecast

Qtr Demand Demand Error Error Error Error MAD

1 90 100 -10 -10 10 10 10.02 95 100 -5 -15 5 15 7.53 115 100 +15 0 15 30 10.04 100 110 -10 -10 10 40 10.05 125 110 +15 +5 15 55 11.06 140 110 +30 +35 30 85 14.2

Page 50: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

50

CumulativeAbsolute Absolute

Actual Forecast Cumm Forecast ForecastQtr Demand Demand Error Error Error Error MAD

1 90 100 -10 -10 10 10 10.02 95 100 -5 -15 5 15 7.53 115 100 +15 0 15 30 10.04 100 110 -10 -10 10 40 10.05 125 110 +15 +5 15 55 11.06 140 110 +30 +35 30 85 14.2

Tracking Signal Example

TrackingSignal(Cumm Error/MAD)

-10/10 = -1-15/7.5 = -20/10 = 0-10/10 = -1+5/11 = +0.5+35/14.2 = +2.5

The variation of the tracking signal between -2.0 and +2.5 is within acceptable limits

Page 51: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

51

Forecasting in the Service Sector

Presents unusual challenges Special need for short term records Needs differ greatly as function of

industry and product Holidays and other calendar events Unusual events

Page 52: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

52

Summary of this Session• What Is Forecasting?• Forecasting Time Horizons• The Strategic Importance of Forecasting• Forecasting Approaches– Qualitative Methods– Quantitative Methods

• Associative Forecasting Methods: Regression and Correlation Analysis

• Monitoring and Controlling Forecasts• Focus Forecasting• Forecasting in the Service Sector

Page 53: LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 5 1

53

THANK YOU