RFP for Online Building Plan Scrutiny and Approval System Lucknow Development Authority Telephones:- 0522 - 2302586 Fax:- 0522 - 2304488 Website :-http://www.ldalucknow.co.in E-mail:- [email protected] m http://www.ldaonline.in Request for Proposal(RFP) For Supply, Customization& Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities and UP Housing Board. TECHNICAL BID Critical Dates SN Particulars Date Time 1 Corrigendum Publishing Date 30/07/2016 2 RFP Bid Submission Start Date 22/08/2016 3 RFP Bid Submission End Date 31/08/2016 3:00 P.M. 4 RFP Bid Opening Date 02/09/2016 4:00 P.M. Place of Opening RFP Bid:- Chief Engineer LDA Office. 1

Upload: others

Post on 03-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Lucknow Development Authority Telephones:- 0522 - 2302586 Fax:- 0522 - 2304488

Website :-http://www.ldalucknow.co.in E-mail:- [email protected] http://www.ldaonline.in

Request for Proposal(RFP)

For Supply, Customization& Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities and UP Housing Board.

TECHNICAL BID C ritical Dates

SN Particulars Date Time

1 Corrigendum Publishing Date 30/07/2016

2 RFP Bid Submission Start Date 22/08/2016

3 RFP Bid Submission End Date 31/08/2016 3:00 P.M.

4 RFP Bid Opening Date 02/09/2016 4:00 P.M. Place of Opening RFP Bid:- Chief Engineer LDA Office.

1

Page 2: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System T able of Contents  1  Section I: LETTER OF INVITATION.....................................................................................................................  6

 2  Section II: INSTRUCTIONS TO BIDDERS (ITB) ....................................................................................................  8

 2.1  DEFINITIONS ..............................................................................................................................................  8

 2.2  THE BIDDING DOCUMENT . .......................................................................................................................  8

 2.3  PREPARATION & SUBMISSION OF RFP bid . ...............................................................................................  9

 2.4  Format and Signing of RFP bid . ...............................................................................................................  10

 2.5  Submission of RFP bid . ........................................................................................................................... .  10

 2.6  Deadline for Submission of RFP bid . .......................................................................................................  10

 2.7  Late RFP bid .............................................................................................................................................  10

 2.8  Receipt and Opening of RFP bid by the Purchaser . ................................................................................  11

 3  SECTION III: TERMS OF REFERENCE (TOR) AND SCOPE OF WORK . ................................................................  12

 3.1  Project Scope . ........................................................................................................................................  12

 3.2  Delivery Schedule . ...................................................................................................................................  14

 4  SECTIONIV: ELIGIBILITY CRITERIA ...................................................................................................................  15

 5  Section V: TECHNICAL EVALUATION CRITERIA ...............................................................................................  17

 6  Section VI: FUNCTIONAL REQUIREMENT SPECIFICATION . .............................................................................  20

 6.1  CAD based scrutiny of the Building Plans . ..............................................................................................  20

 6.2  Work Flow Management System . ...........................................................................................................  21

 6.3  Reporting Functionality:. .........................................................................................................................  22

 6.4  Change requirement and modifications in the system. . .........................................................................  22

 7  SECTIONVII–STANDARD TERMS AND CONDITIONS .......................................................................................  23

 7.1  Prices . ....................................................................................................................................................  23

 7.2  Period of Validity of Offer ......................................................................................................................  23

 7.3  Scope of Work . ......................................................................................................................................  23

 7.4  Time Schedule/Delivery Period ..............................................................................................................  23 2

Page 3: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

 7.5    Submission of Offer . ......................................................................................................................  23

 7.6    Evaluation of Offers .......................................................................................................................  23

 7.7    Right to negotiate . ........................................................................................................................  23

 7.8    Award Criteria ...............................................................................................................................  24

 7.9    Acceptance of the Bid ....................................................................................................................  24

 7.10   Notification of Award . ..................................................................................................................  24

. ...................................................................................................................... 7.11   Signing of Contract   24

 7.12   Lucknow Development Authority’s right to vary Quantities at the Time of Award . ...........................  25

......................................................................................................................... 7.13   Payment Schedule  26

 7.14   Performance bank guarantee ........................................................................................................  27

 7.15   Assignment/Sub‐contracting . ........................................................................................................  27

 7.16   Termination for Default . ...............................................................................................................  28

. .......................................................................................................... 7.17   Termination for Insolvency   28

.............................................................................................................. 7.18   Service Provider Integrity   28

 7.19   Service Provider’s Obligations . ......................................................................................................  28

 7.20   Patent Right . ................................................................................................................................  29

. .................................................................................................. 7.21   Site Preparation and Installation   29

 7.22   Software and System Installation . .................................................................................................  29

 7.23   Use of Documents and Information For Software Projects . .............................................................  29

 7.24   Intellectual Property Rights(IPR) and Replication Rights . .................................................................  30

 7.25   Force Majeure ..............................................................................................................................  30

 7.26   Settlement of Disputes . ................................................................................................................  30

 7.27   Arbitration . ..................................................................................................................................  31

. .................................................................................................................... 7.28   Limitation of Liability  31

 7.29   Governing Language . ....................................................................................................................  31 3

Page 4: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

. ............................................................................................................................. 2  7.30   Applicable Law   3

 8  SECTION VIII ‐ TECHNICAL PROPOSAL SUBMISSION FORM . ..................................................................... 2  3

 8.1    BID FORM . ..................................................................................................................................... 2  3

 8.2    DETAILS OF BIDDER . ....................................................................................................................... 3  3

 8.3    MINIMUM SPECIFICATION FOR HOSTING THE APPLICATION FOR ONE DEVELOPMENT AUTHORITY ....  34

 8.4    MINIMUM REQUIREMENTS FOR HOSTING SERVICES . ....................................................................... 5  3

. ..................................................................................................... 7  8.5    CONNECTIVITY REQUIREMENTS   3

 8.6    LIST OF DEVELOPMENT AUTHORITIES OF UP . ................................................................................... 8  3

4

Page 5: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

RFP Bid Notice

For Supply, Customization & Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities and UP Housing Board. RFP bid are invited from experienced Service Providers, for “Supply, Customization & Implementation of Online Automated Building Plan Scrutiny and Approval System at various

Development Authorities and UP Housing Board ” from 17/7/2016 to 1/8/2016 till 3.00 P.M. and RFP bid

shall be opened on the 3/8/2016. The details of submission of RFP bid are available in the RFP Bid

document uploaded on the website http://www.ldalucknow.co.in . The Authority reserves the right to

cancel any or all the RFP bid or annul the Bidding process without assigning any reason thereof. Chief Engineer (LDA) RFP Bid Ref No :-

5

Page 6: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Request for Proposal For

Supply, Customization & Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities and UP Housing Board Lucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During the course of time Lucknow Development Authority has progressed with various landmarks in the field of housing. Besides normal housing projects board has diversified its activities to planning, designing, construction

and development of almost all types of urban development projects. Lucknow Development Authority

and U.P. Housing Board have planned and executed various projects for the development of health

and education. It is also handling new district headquarters projects with the execution of large number

of schemes. Lucknow Development Authority and U.P. Housing Board have attained capability of

executing large residential colonies and townships. 1  Section I: LETTER OF INVITATION Through this Request for Proposal (RFP), it is intended to invite RFP bid for the selection of appropriate Software Agency/firm for the work of “Supply, Customization & Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities

nd UP Housing Board” a

1. Bidders are advised to study the RFP Bid document carefully.

2. Submission of RFP bid against this tender shall be deemed to have been done after careful study and examination of the procedures, terms and conditions of the RFP Bid document with full understanding and its implications.

3. The Authority may at its own discretion extend the date for submission of RFP bid. In such case

all the rights and obligations of the Authority and Bidders previously subject to the deadline will thereafter be subject to the dead line as extended.

4. Lucknow Development Authority reserves the right to cancel any or all the RFP bid or annul the

RFP Bid process without assigning any reason thereof.

5. The RFP Bid document is available on LDA website http://www.ldalucknow.co.in Interested Bidders

may view, download the RFP Bid document ,seek clarification and submit these RFP bid 6

Page 7: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

at LDA office up to the date and time mentioned in the table below:-

RFP Bid Reference No:-

Purpose Request For Proposal (RFP) for selection of Software Company / Firm for “Supply, Customization & Implementation of Online Automated Building Plan Scrutiny and Approval System at various Development Authorities and UP Housing & Development Board”

Date of Publication of 17/7/2016 on website http://www.ldalucknow.co.in RFP Bid notice

Cost of BID Document Rs. 3,000/- (by DD From Nationalized / Scheduled Bank in favour of secretary, Lucknow Development Authority payable at Lucknow) (Non Refundable)

EMD Rs.50,00,000/- (Fifty Lacs ) in the form of Demand Draft / Pay order / FDR From Nationalized / Scheduled Bank only in favour of Chief Engineer Lucknow Development Authority payable at Lucknow ) , EMD

is not exempted for any SSI / NSIC registered or even a government organization.

Last date for submission 1st August 2016 till 3.00 P.M. of RFP Bid’s

Website address  http://www.ldalucknow.co.in

e-mail address [email protected]

RFP Bid Inviting Officer Chief Engineer LDA

Date of opening of RFP 3rd August 2016 at 4:00 P.M. Bids

Venue of Opening of Chief Engineer Office LDA RFP Bids

Contact numbers 0522 – 2302586

Fax number 0522 – 2304488

7

Page 8: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 2  Section II: INSTRUCTIONS TO BIDDERS (ITB) 2.1 DEFINITIONS I n this Contract, the following terms shall be interpreted:

a. “RFP Bid” means the Technical proposal and the financial proposal.

b. “Instructions to Bidders” means the document which provides interested Bidders with all information needed to prepare their Bids.

c. “Scope of work”(SOW) means Scope of work mentioned in Section III: Terms of Reference of the

RFP which explains the objectives, Scope of work, activities, tasks to be performed, and expected results and deliverables of the assignment, respective responsibilities of the Purchaser and the Bidder.

d. “The Contract” means the agreement entered into between the Lucknow Development

Authority as nodal agency

e. “The Contract rates” mean the charges for the various consultancy assignment payable to the Consultant under the Contract for the full and proper performance of its contractual obligations;

f. “Services” means the Supply, Customization & Implementation of Online Automated Building

Plan Scrutiny & Approval System at various Development Authorities and U.P. Housing Board covered under the Work Order/Contract.

g. “The Project Site”, where applicable, means the various Development Authorities and U.P.

Housing Board.

h. “Day” means a calendar day.

i. The “End-Customer/Client Department” means the Lucknow Development Authority and U.P. Housing Board.

2.2  THE BIDDING DOCUMENT  

1. Availability of RFP Bid Document This RFP Bid document is available on the website www.ldalucknow.co.in to enable the Bidders to view and download the RFP Bid document, submission of the RFP bid document has to be done at

ed in RFP Bid document LDA office before the last date and time mention

2. Contents of RFP Bid Document The nature and types of various consultancy services required, Bidding procedure, terms and conditions etc. are prescribed in the RFP Bid document. The RFP Bid document includes:

� SECTION I : LETTER OF INVITATION 8

Page 9: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

• SECTION II : INSTRUCTIONS TO BIDDERS (ITB)

• SECTION III : TERMS OF REFERENCE (TOR) AND SCOPE OF WORK

• SECTION IV : BIDDER'S ELIGIBILITY CRITERIA

• SECTION V : TECHNICAL EVALUATION CRITERIA

• SECTION VI : FUNCTIONAL REQUIREMENT SPECIFICATION

• SECTION VII – STANDARD TERMS AND CONDITIONS

• SECTION VIII - TECHNICAL PROPOSAL SUBMISSION FORM

• 8.4 PRICE SCHEDULE (FINANCIAL PROPOSAL SUBMISSION FORM) The Bidders are expected to examine all the instructions, forms, terms and conditions, requirements

and qualifications in the RFP Bid documents. Failure to furnish all the information required as per the

Bidding documents or submission of an RFP Bid not responsive to the RFP Bid document in every

espect will be at the Bidder’s risk and may result in the rejection of his RFP Bid. r

3. Clarifications of RFP Bid Documents A prospective Bidder who has purchased the tender document requiring any clarification of the RFP Bid documents may raise their point of clarification to Lucknow Development Authority’s e-mail

[email protected] m 4. Amendment of RFP Bid Document

At any time prior to the deadline for submission of RFP Bid the Lucknow Development Authority may,

for any reason, whether at its own initiative or in response to a clarification requested by a prospective

Bidder, modify the RFP Bid document by amendments. Such amendments shall be posted/ uploaded

on the RFP Bid website www.ldalucknow.co.in through corrigendum and shall form an integral part of

the RFP Bid documents. The relevant clauses of the RFP Bid documents shall be treated as

amended accordingly. It shall be the sole responsibility of the prospective Bidders to check the RFP Bid website www.ldalucknow.co.in from time to time for any amendment in the RFP Bid document. In case of failure to get the amendments, if any, then Lucknow Development Authority shall not be responsible for any negligence on part of the Bidder. In order to allow prospective Bidders a reasonable time to take the amendment into account in preparing their RFP bid, Lucknow Development Authority at its discretion, may extend the deadline for the submission of RFP bid. Such extensions shall be posted / up-loaded on the RFP Bid website www.ldalucknow.co.in

2.3 PREPARATION & SUBMISSION OF RFP bid

9

Page 10: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

1. Documents Constituting the RFP Bid The RFP bid prepared by the Bidder shall comprise the following omponents: RFP bid will comprise of: c

a. Technical proposal submission form

b. Financial proposal submission form

2. Documents Establishing Bidder’s Qualification The Bidder shall furnish, as part of Technical Proposal documents establishing the qualification to perform the Contract. The Bidder's eligibility criteria and selection procedure are defined in Section IV of RFP Bid document. 2.4 Format and Signing of RFP bid The Bidder shall prepare one soft copy of the RFP bid. Bidder or a person or persons duly authorized to bind the Bidder to the Contract. All the pages/ documents of the RFP Bid shall also be signed manually by the person authorized to sign the RFP bid before submitting them as bidding documents. 2.5 Submission of RFP bid

stThe bid documents needs to be submitted physically until Date: - 1 August 2016 before 3.00 P.M. Bid’s submitted later than the date and time will be not be accepted. 2.6 Deadline for Submission of RFP bid RFP bid must be submitted by the Bidders before the due date and time specified in this RFP Bid

ocument. d The Lucknow Development Authority may extend this deadline for submission of RFP bid by amending

the RFP Bid document, in which case all rights and obligations of the Lucknow Development Authority

and Bidders previously subject to the deadline will thereafter be subject to the deadline as extended. Lucknow Development Authority shall not consider any request for date-extension for RFP Bid-ubmission on account of late downloading of RFP Bid. RFP bid should be s u b m i t t e d on or before s

3.0 P.M. of 1/8/2016 at Chief Engineer LDA office. 2.7  Late RFP bid   The acceptance of the RFP Bid will be as per the due date and time mentioned in the RFP Bid Submission will only be allowed till the permissible date and time scheduled in the RFP Bid. Once the

10

Page 11: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System RFP bid submission date and time is over, the Bidder cannot submit his/ her Bid. Bidder has to submit the RFP Bid well in advance considering the above factors. The Bidder only, will be held responsible if his/ her RFP bid are not submitted in time due to any reasons. 2.8 Receipt and Opening of RFP bid by the Purchaser Bidders are advised to submit their RFP bid in `Two-Bid’ system with Technical and Financial bids separately. Please note that prices should not be quoted in the Technical Bid (if quoted the bid would be summarily rejected). The Prices should be quoted in the Financial Bid only. On receipt on RFP Bid, the technical proposals will be opened first by the Committee members in the office of Lucknow Development Authority

11

Page 12: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 3  SECTION III: TERMS OF REFERENCE (TOR) AND SCOPE OF WORK 3.1 Project Scope The primary scope of the project is

a. Supply, Customization and Implementation of Online Automated Building Plan Scrutiny and Approval System at 27 Development Authorities.

b. To send an SMS to mobile phones of citizens/ Architects/ employees etc., reminding them

about payment/ status/ alerts/reminders etc. Thus the system should have the facility to send SMSs wherever required e.g. site visit information, proposal status, payment reminders and any other updates

c. Hosting the Application at 3rd party secured Data Center. d. Provision of Manpower for operation of Project for a period of three year.

e. Maintenance of Application for a period of three year after Go-Live.

f. The system should have built in integration with and SMS gateway and the payment gateway

for payments of development charges and other demand generated by the system.

g. The bidder will be responsible for provision of Payment and SMS Gateway.

h. The system shall be integrated with digital signature.

Activity-I: Conduct Requirement Study and Prepare Software Requirement Specifications. Deliverable (s): Software Requirement Specifications (SRS) document

• Study the existing method for the approval of building plan proposals in 27 Development

Authorities including the method, software and formats being used currently for sanctioning the building plans.

• Preparation, submission and approval of the System Requirement Study (SRS) of proposed

solution for Automating the Building Plan Approval System for various Development Authorities.

• The Bidder will prepare an SRS and suggest a system to incorporate best methods and

practices to enhance/augment present of flow of data and mapping of the approval and occupancy process.

12

Page 13: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Activity-II: Customization & Deployment of Application

• Customization, Configuration, and Deployment of Automated Building Plan Scrutiny and Approval System for 27 Development Authorities and UP Housing Board.

• Provide 15 user license of the proposed software for each Category AS Development

Authority, 10 user license of the proposed software for each Category A Development

Authority, 7 user license of the proposed software for each Category B Development

Authority and 5 user license of the proposed software for each Category C Development

Authority (Total 226 Licenses) There are total development authorities under category AS

are 4, total development authorities under category A are 4, total development authorities

under category-B are 5, total development authorities under category C are 14.

• To train the officials and other stake holders of 27 Development Authorities for one week one time at their respective locations

• Providing one trained Technical Person with minimum qualification of Diploma in Civil

Architecture for support and Operation of application for a period of 3 year after award of

contract. Deliverable (s): Test and deploy Automated Building Plan Scrutiny & Approval System

Activity-III Implementation& Go-Live

Implementation & hosting of Application for 27 Development Authorities and run 5 live cases through system. The system will be considered Go-Live after running total 5 Live cases successfully through the system at the respective development authority.

Activity-IV: Manpower Deployment for operation of Project after deployment

The bidder shall provide Project management team for Successful operation of Project. The project

team shall consist of 1 Project Coordinator (Minimum B.E. with 5 years of experience in handling

Government Projects) at Lucknow Head Office and 1 Software Operator(Diploma in Civil

Architecture)each at 27 Development Authorities for 36 Months after deployment to assist and run

the solution.

The system should provide sufficient base to ensure security of the plan approved by 27 Development Authorities using the system. This will include storing approved files which will be non-

13

Page 14: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

editable, storing the approval information in database in secured manner. The system should also provide facility to print the approved drawings for the system and only those will be considered as approved drawings by the system.

Activity-IV: The bidder shall provide Maintenance support for three year after approval of SRS by the authority. Scope of annual maintenance will be as follows.

• Supporting in smooth functioning of the applications.

• Fixing Bugs reported

• Email based / Telephonic support on the usage / issues of the system.

• Maintain rule database and implementation of changes in the values of the existing DC

Regulations/ By-Laws.

3.2  Delivery Schedule   Software development, implementation, training & handing over should get over within 180 days from

the date of Purchase order/ Agreement and approval of SRS whichever is later along with soft copy of

user manual and system manual. Bidder should provide Operational support for 36 months from date

of Go-Live of Software as part of scope of work. The Bidder should provide annual maintenance

support for 3 Years after approval of SRS by the authority.

14

Page 15: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

4  SECTIONIV: ELIGIBILITY CRITERIA E ligibility Criteria for Bidder Criteria Required Eligibility Documents Required

Existence Valid copy of the Certificate of

Incorporation / Articles of

Association, documents

confirming the nature of

The Bidders eligible for participation in the tender shall be registered under the Indian Companies

Act or corporate body. The Bidder firm may be a Joint Venture or Consortium. The Bidder should be an Information Technology Solution provider.

business.

Turn Over The bidder shall have a total annual turnover of Copy of the audited profit and

Rupees 50 Crores of last three financial years (FY loss account of the company 2013-14, 14-15, 15-16). showing turnover of the

company for last three years. For 15-16 attach CA

Certificate if PL not available.

Certifications Bidder should have a Valid ISO 9001-2008 Valid copy of the Certificates certification.

Experience Bidder should have experience in implementing at Relevant work order /

least one e-Governance solution in any agreement to be attached. ULB/government organisation in India.

Others The Bidder should not have been Undertaking from the Bidder blacklisted/banned/ suspended by any Government organization in India in last 5 years Authorization The Bidder should be either manufacturer or The bidder should submit

Authorized dealer of the proposed COTS solution. MAF(Manufacturers Authorization Form) from

OEM

15

Page 16: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Eligibility for Proposed COTS product:-

The Proposed COTS solution should fulfil following criteria for eligibility (the credentials from bidder/ manufacturer should be enclosed) Please submit relevant documents/evidence in your technical proposal in response to the eligibility criteria mentioned above..

Eligibility Criteria for Proposed COTS ( Commercially Proof Document Required

Of the shelf ) Product

COTS product should have been successfully implemented and Declaration Letter from OEM with names of

running for last 2 years in at least 20 ULBs (Urban Local Bodies) clients(enclosed Certificates from the Client)

in India.

At least online 50000 building plans has been processed through Declaration Letter from OEM with names of

the proposed COTS solution implemented in various ULBs in clients and number of building plans

India processed through system.

COTS Product should have been deployed in more than 15 Declaration Letter from OEM with names of

Municipal Corporations in a single state order in India. clients (enclose Work Order Copies)

Minimum 5 Crore sq. ft area is processed through system using Declaration Letter from OEM and MIS reports

proposed COTS product. of various ULBs

The COTS OEM’s total turnover for the last 3 financial year i.e.

2013-14,2014-15& 2015-2016 should be minimum INR 50 (CA certificate to be submitted for the same),

crores from the software sales and Consulting.

For FY 2015-16, Management books would

be considered with self-certification.

The COTS OEM should have a minimum net worth of Rs 10

crores for the last Financial Year. (CA certification required).If last FY is not

audited then self-certification required

The COTS OEM should have a minimum team of 200 +

employees for development and support of the COTS solution.

Self-Certification required. Will have to

provide with more details when sought.

16

Page 17: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

5  Section V: TECHNICAL EVALUATION CRITERIA The Evaluation Committee shall evaluate the bid with following parameters and expects the bidder to provide accurate and precise information in their responses

Sr. Criteria Evaluation Marks Max

No bifurcation points

A Evaluation of Bidder 10

1 Experience in implementing Work Order and If ULBs or 5 5

e-Governance /IT solution Client Certificate Govt >= 2

in at least 1 ULBs shall be attached

If ULBs or 2

govt = 1

2 Operational Track record of Work Order/ If PO = 2 5 5

firm in executing IT projects agreement with and more

in the Govt. sector. (Of a Client shall be

Minimum Contract Value of attached

INR 0.5 Crore, excluding

If PO=1 2

hardware costs)

B Experience of Proposed COTS Product 70

1 COTS product successfully Client Certificates If ULBs= 26 30 30

Implemented in Urban Local for successful and above

Bodies in India in last 5 implementation of

If ULBs 10

years the work order

between 16

received on or

to 25

after 1st March

2011. If ULBs= 11 5

to 15

2 Self-certified MIS If number of 20 20

Reports and URL drawing

substantiating the scrutinized

17

Page 18: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System Experience of scrutinizing scrutiny reports more then

drawings through proposed shall be provided. 50000

COTS solution in single ULB

If number of 10

drawing

scrutinized

more then

25000

If number of 5

drawing

scrutinized

between

5000 to

25000

3 Implementation of proposed Work order shall If PO= 2 and 20 20

COTS solution in more than be attached more

30 ULBs in a single state

If PO= 1 10

wide order in India

C COTS Functionality 15

1 COTS Compliance to Compliance matrix 81% and 15

Functional Requirement in technical above

Specification of Proposed response and live

71% - 80% 8

Product. product demo to

verify the 61% - 70% 3

compliance matrix

50% -60% 0

to evaluation

committee

D Technical Presentation & Demonstration of COTS application 5

1 Presentation: Overall Live Demo of 5

understanding and Product along with

18

Page 19: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System functional demonstration state-wide delivery

(No slide presentation) of methodologies. COTS application with following modules

1. Scrutiny System 2. Document Management System 3. Web based approval flow 4. Online Payment integration & approval through digital signature 5. State-wide Approach

Total Marks 100 Only the bidders, who score a total Technical score of 70 (Seventy) or more, will qualify for the evaluation of their commercial bids. Consequent upon the evaluation, each Technical bid will be assigned a Technical Score out of a maximum of 100 points. The bidder with highest Technical Score (Tmax) will be awarded 100% score.

echnical Scores for other bidders will be evaluated using the following Formula: T Technical Score (TS) = (Total Technical Score of the Bidder /Tmax) X 100 The Commercial Bids of only the technically qualified consultants will be opened for evaluation. The onsultant with lowest Total Commercial Quote (L1) will be awarded 100% score. c

Commercial Scores for other consultants will be evaluated using the following Formula: Commercial Score (CS) = (Total Commercial Quote of L1/ Total Commercial Quote of the Consultant) X 100 In determination of the best value bid, the following weightage shall be given for the technical and commercial scores of the consultants in a Quality and Cost Based Selection methodology (QCBS):

echnical Score: 80% T Commercial Score: 20% For every Consultant the Final Total Score (FS) will be calculated using the formula

S = 0.8 X TS + 0.2 X CS F The consultant with the highest value of FS shall be selected as the successful consultant.

19

Page 20: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

6  Section VI: FUNCTIONAL REQUIREMENT SPECIFICATION The solution required for Lucknow Development Authority must be designed following open standards in order to provide for interoperability with multiple platforms and avoid any technology or technology provider lock-in. The proposed Application software should be commercially available Off-the-shelf product (COTS) and that has been developed for deployment in other Authorities/ Corporation/ Similar Organization having similar nature of work, which shall be configured and customize as per Lucknow Development Authority requirements and will have the following features: 6.1  CAD based scrutiny of the Building Plans   

• The architect / Client plan in soft copy in CAD drawing/ other widely accepted formats to be mapped and evaluated by directly reading the CAD drawings and mapping them to the prevailing building, bye laws and norms as applicable to Authorities. There should not be any manual entry of all DC rules & bye laws for each case.

• Architect/ client’s line drawing in CAD should be read and area calculation sheet is to be

generated by the system to eliminate the human errors. The required tables like area statement,

FSI (Floor Space Index) table per building, summary of FSI calculations, opening schedules,

water/parking calculations, triangulation area for plot, area block diagram to be generated by the

system and should be automatically updated in the drawing.

• A computerized /automated scrutiny report indicating the required/permissible parameters and the proposed parameters is to be tabled including status of each rule whether passed or failed.

• There should be system generated list highlighting the entities on which the plan is failing,

thereby enabling the Authorities to prepare objection list and inform the client to take necessary actions.

• System should be capable to make list of technical remarks provided by the Building

Inspector (BI). Relevant technical remarks will be discussed with the core group members and shall get incorporated in the software within mutually agreed time frame.

• The acknowledgment letters, approval letters, deviation or the rejection letters etc should be

system generated.

• System should have following features:

Should address automated building scrutiny of preformatted CAD drawings along with Building plan approval process management in an integrated manner.

20

Page 21: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Auto-Detection of structures in the drawing based on usage (e.g. Residential, Commercial or Residential- Commercial Mixed ) and also auto detection of high-rise buildings or low-

rise buildings

Auto generation of FAR, Area statement, plot area, plot area calculation and schedule of opening directly from drawing..

Auto hatching of particular objects as per building control rules.

Auto detection of site margins and verification of coverage area.

Auto-generation of Failed entity report and marking the same on the drawing

Plotting of drawing submitted by Architect and processed through software in non-editable format

6.2  Work Flow Management System   

• The system should have the inbuilt workflow for each service (transaction and workflow based services)

• The system should have the proper workflow management and should allow respective

authority of concerned department to take appropriate decisions.

• An interface Application form which the applicants can make electronic submissions of the supporting documents and drawings to the Development Authority.

• Using this interface either at the Development Authority Citizen Service Centers or through

Development Authority Licensed Architects, the applicants would be able to submit the necessary documentation and soft copy of the drawings in CAD format.

• The system must provide for proper user authentication and access control mechanisms so as

to ensure that only authorized users can access relevant information.

• The system must provide for all submissions to be acknowledged and site visit dates and further approval schedule is to be provided to the architects/ client instantly.

• The system should automatically generate an SMS which is sent to the Architect and

concerned Field staff if there are any cancellations of site visit, the system should intimate the key relevant people so as to avoid unnecessary wastage of time. Reasons for such cancellation should also be recorded in the system.

• The system should generate MIS to be sent to higher authorities for approval and to make the

approval status available online.

• The client/ Architect should be able to review the status of approval online.

21

Page 22: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

• The system should have the ability and flexibility to design suitable workflow for the approval process as per the requirements of the Development Authority. The approval workflow should be as per the work flow being followed by Development Authority’s hierarchy and workflow rules should be flexible enough to change as desired.

• System should generate automatically the fee memo/ demand notes based on the submitted

Building plan. System should have necessary interfaces for Fee collection and receipt generation. System will be integrated with Payment Gateway provided by bidder.

6.3  Reporting Functionality:  

System should provide various reports to Development Authority staff. External user should be able to view the application status using an application tracking number. Some other standard reports will include,

• Plans approved

• Pending proposals

• Delayed approvals

• Revenue generated, etc. as per the Development Authority requirement

6.4  Change requirement and modifications in the system.  

A central committee comprising of one technical person from Development Authorities, three from Lucknow Development Authority, Awasbandhu, UPAVP and one from bidder side would discuss and finalise the changes required in the system.

• All the required changes would be provided by this committee in writing to the bidder.

• Any development authority requiring any modification in the system need to represent

their case to the committee and only after approval of the committee the same would be implemented.

• The decision of the committee would be final and acceptable to bidder as well as the

development authority.

22

Page 23: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 7  SECTIONVII–STANDARD TERMS AND CONDITIONS 7.1 Prices The total Prices (F.O.R. destination) quoted by the Service Provider should be exclusive of all prevalent Taxes e.g. VAT, Service Tax, Duties, License fees, etc till delivery, installation and implementation of application software and all the services to the end-customer. 7.2 Period of Validity of Offer The offer shall remain valid for 90 days after the date of offer opening prescribed by Lucknow Development Authority. Any offer valid for a shorter period shall be rejected by Lucknow Development Authority as non-responsive. 7.3 Scope of Work The Scope of Work shall be as per requirement of the end-customer, as mentioned in Section–III(Terms of Reference (TOR) And Scope of Work. 7.4 Time Schedule/Delivery Period The supply or installation of Software and training as per schedule mentioned in Section-III and all other items and integrated Solution, if required in the project to the end-customer should be completed within the time (180 days) specified by the end-customer/as per requirement of the project. 7.5 Submission of Offer The Service Provider should submit their RFP Bid duly signed and stamped by the authorized Signatory on each and every page of the documents. 7.6 Evaluation of Offers The Service Providers will submit t h e i r RFP Bid within stipulated time. The selection will be based on the proven competence of technically qualified bidder. 7.7 Right to negotiate The negotiation, if required shall be carried out only with the technically qualified with the lowest Bidder by Lucknow Development Authority and / or end-customer /any other competent authority /high power purchase committee of the State Government as per the procedures /policy of the Government of UP,

revailing at that point of time. p If during negotiations some different technical model is finalized which reduces the price the bidder has

23

Page 24: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System to pass on the benefit to Lucknow Development Authority. 7 .8  Award Criteria  

• The Lucknow Development Authority will determine to its satisfaction whether the Service Provider that is selected as having submitted the lowest evaluated responsive offer, meets the criteria specified, and is qualified to perform the contract satisfactorily.

• The Lucknow Development Authority will award the contract /order to the lowest evaluated

successful Service Provider whose offer has been determined to be responsive to all the conditions of the contract and meeting the Technical specification and qualification requirement of the end-customer.

7.9  Acceptance of the Bid   Lucknow Development Authority do not bind itself to accept the lowest or any bid, and reserves the

right to: - (a) Reject any or all offers with/without any reason (b) Accept any offer of Service Provider without assigning any reason and also reduce or extend the period of contract without assigning any reason. (c) Accept any offer of Service Provider, who is capable to handle the project and/or whose offer is viable. 7.10 Notification of Award

• After receiving the firm Order from the end-customer, prior to the expiration of the validity period (i.e.90days), Lucknow Development Authority will notify the successful Service Provider in writing by letter/e-mail/fax, that its offer has been accepted.

• The notification of award will constitute the formation of the Contract.

7.11 Signing of Contract

• As soon as the Lucknow Development Authority notifies the successful Service Provider whose offer has been accepted, the Lucknow Development Authority will send the Service Provider the Contract Form, incorporating all the conditions of the contract between the parties i.e. Lucknow Development Authority and successful Service Provider, and if required with the end-customer also.

• Within 15 days of receipt of the Contract Form, the successful Service Provider shall execute,

sign and date the Contract and return it to the Lucknow Development Authority.

24

Page 25: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 7.12 Lucknow Development Authority’s right to vary Quantities at the Time 

of Award   The Lucknow Development Authority reserves the right at the time of Contract award to increase or decrease the quantity of goods and services originally specified in the Schedule of Requirements without any change in unit price or other terms and conditions. If any such change causes an increase or decrease in the cost, or the time required for, the Supplier’s

performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract

Price or delivery schedule, or both, and the Contract shall accordingly be amended. Any claims by the

justment under this clause must be asserted within seven (7)days from the date of the Supplier for ad Supplier’s receipt of the Purchaser’s change order.

25

Page 26: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 7 .13 Payment Schedule The payment schedule for each of the cost components are as follows:

S.No. Item Payment in %

1 Advance against Performance Guarantee 10% of Sr. No. A

2 Approval of SRS 10% of Sr. No. A

3 Supply and installation of State wide application at the 30% of Sr. No. A1 &A2

hosted Central Server

4 On Deploying State Wide Application and UAT as per 40% of Sr. No. A1 & A2

Specifications

Supply of User Licenses (Work Flow & CAD based) at 50% against delivery of Sr. 5

each development authority of Lucknow Development No. A3 & A4

Authority

Installation and Commissioning of Licenses at each 20% against installation (on 6

development authority of Lucknow Development Pro rata basis) of Sr. No. A3

Authority & A4

7 On Completion of Training 70% of Sr. No. A5

8 On Final Integrated Demonstration of Application @ 10% of Sr. No. A

State Level

Hosting of application for a period of Three year (Sr. No. B and b1 )

9 Hosting of the complete automated building The payment for the AMC

permission application as per the provided hardware shall be made on a

specification. Quarterly advance basis

within 15 days after raising

invoice

26

Page 27: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

Manpower & Maintenance for a period of Three year (Sr. No. C&D)

10 Manpower and Maintenance Cost The payment for the AMC

shall be made on a Quarterly

advance basis within 15

days after raising invoice

Change Request, digital signature component (Sr. No. E, F, G, H and I)

11 100% against delivery,

Change Request, digital signature, SMS , Email gate

within 15 days of submission

way component (Sr. No. E, F,G,H and I)

of invoices.

Payment Gateway Services component (Sr. No. J and K)

12 Directly deducted from the

Payment Gateway Services

transaction amount and

(Sr. No. J, and K)

balance transferred to

respective authority with

reconciliation reports.

7  .14 Performance bank guarantee  

a. The service provider will have to submit a bank guarantee (BG) of 5% of order value valid for 1

year. In case of delay in submitting the Bank Guarantee, corresponding amount will be withheld by the authority out of payment payable to the service provider for a period of one year. The performance bank guarantee shall be denominated in Indian rupees.

b. The proceeds of the performance Bank Guarantee shall be payable to the authority in favour of

whom the performance bank guarantee was prepared, as compensation for any loss resulting from the Service Provider’s failure to complete its obligations under the Contract.

c. The Performance Bank Guarantee will be discharged by the Lucknow Development

Authority/end-customer and returned to the Service Provider upon the written request within 15 days of expiry of its validity.

7 .15 Assignment/Sub‐contracting The Service Provider shall not assign / sub-contract, in whole or in parts its obligations to perform under

27

Page 28: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System the Contract to any other firm except with the Lucknow Development Authority’s prior written consent, but not absolving of Sub- Provider's ultimate responsibilities to successfully implement the project in totality in proper functional performance. 7.16Termination for Default

1. The Lucknow Development Authority may, without prejudice to any other remedy for breach

of contract, by written notice of default sent to the Service Provider, terminate the Contract in

whole or part:

(a) If the Service Provider fails to deliver any or all of the Goods or services within the period(s)specified in the Contract/Purchase Order, or within any extension thereof granted by the Lucknow Development Authority/ end-customer

(b) if the Service Provider fails to perform any other obligation(s) under the Contractor

Purchase Order.

2. In the event the Lucknow Development Authority terminates the Contract in whole or in part,

Lucknow Development Authority may procure, upon such terms and in such manner as it

deems appropriate Goods or Services similar to those undelivered, and the Service Provider

shall be liable to the Lucknow Development Authority for any excess costs for such similar

Goods or Services. However, the Service Provider shall continue the performance of the

Contract to the extent not terminated. 7.17Termination for Insolvency The Lucknow Development Authority may at any time terminate the Contract by giving written notice to

the Service Provider, if the Service Provider becomes bankrupt or otherwise insolvent. In this event

termination will be without compensation to the Service Provider, provided that such termination will not

prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the

Lucknow Development Authority/end-customer. 7.18Service Provider Integrity The Service Provider is responsible for and obliged to conduct all contracted activities in accordance with the contracts using state-of-the-art equipment’s /SW solutions, methods and economic principles and exercising all means available to achieve the performance specified in the contract. 7.19Service Provider’s Obligations The Service Provider is obliged to work closely with the Lucknow Development Authority/end-customer’s staff, act within its own authority and abide by directives issued by the Lucknow Development Authority

28

Page 29: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System /end-customer and implement all the activities. The Service Provider shall abide by the job safety

measures prevalent in the country and will indemnify the Lucknow Development Authority from all

demands or responsibilities arising from consequences, accidents or loss of life and property due to

negligence of the Service Provider. The Service Provider will pay all indemnities arising from such

incidents and will not hold the Lucknow Development Authority responsible or obligated. The Service

Provider is responsible for managing the activities of its personnel and will hold itself responsible for

any misdemeanors. The Service Provider will treat all data and information as confidential about the

Lucknow Development Authority and end-customer, obtained in the execution of his responsibilities, in

strict confidence and will not reveal such information to any other party without the prior written

approval of the Lucknow Development Authority/end-customer. 7.20 Patent Right In the event of any claim asserted by a third party of infringement of copyright, patent, trademark or

industrial design rights arising from the use of the services, Goods or any parts thereof in the country,

the Service Provider shall act expeditiously to extinguish such claim. If the Service Provider fails to

comply and the Lucknow Development Authority is required to pay compensation to a third party

resulting from such infringement, the Service Provider shall be responsible for the compensation

including all expenses (court costs and lawyer fees etc), without delay on getting demand notice from

Lucknow Development Authority. 7.21 Site Preparation and Installation In charge of the project site, deputed by the end-customer will be solely responsible for site preparation

incompliance with the technical and environmental specifications defined by the Service Provider. The

incharge of project site will identify the installation site before the scheduled installation date to allow

the Service Provider to perform a site inspection to verify the appropriateness of the sites before the

installation of the Software. 7.22 Software and System Installation The Service Provider is responsible for all the installations of required software. The Service Provider will test all required software operations and accomplish all adjustments necessary for successful and continuous operation of the software at all installation sites. 7.23 Use of Documents and Information For Software Projects The Service Providers shall not, without Lucknow Development Authority's prior written consent, disclose

any document containing specification, plan, drawing, pattern, sample or information furnished by or on

behalf of end-customer in connection there with to any person other than a person employed by the 29

Page 30: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System Service Providers in the performance of the allotted job. Disclosure to any such employed person shall be made in confidence and shall extend only as far as may be necessary for purpose of such performance. 7.24Intellectual Property Rights(IPR) and Replication Rights Application software plans, drawings, specifications, design, reports and other documents prepared by the Service Providers in the execution of the allotted Job order shall remain the exclusive property of the Service Provider. 7.25Force Majeure

1. Notwithstanding the provisions of conditions of contract, the Service Provider shall not be liable for forfeiture of its performance security, liquidated damages or termination for default, if and to the extent that, it’s delay in performance or other failure to perform its obligations under the Contract is the result of an event of Force Majeure.

2. For purpose of this Clause, “Force Majeure” means an event beyond the control of the Service

Provider and not involving the Service Provider’s fault or negligence and not foreseeable. Such

events may include, but are not limited to, acts of the Lucknow Development Authority either in

its sovereign or contractual capacity, wars or revolutions, fires, floods, epidemics, quarantine

restrictions and freight embargoes. If a Force Majeure situation arises the Service Provider shall

promptly notify the Lucknow Development Authority in writing of such conditions and the cause

thereof. Unless otherwise directed by the Lucknow Development Authority in writing, the Service

Provider shall continue to perform its obligations under the Contract as far as is reasonably

practical, and shall seek all reasonable alternative means for performance not prevented by the

Force Majeure event.

7.26Settlement of Disputes

1. If any dispute or difference of any kind whatsoever arises between the Lucknow Development

Authority and the Service Provider in connection with or arising out of the Contract both the parties

shall make every effort to resolve amicably such dispute or difference by mutual consultation.

2. If, the parties have failed to resolve their dispute or difference by such mutual consultation

within30 (thirty) days, then aggrieved party may give notice to other party of its intention to

commence arbitration, as herein after provided, as to the matter in dispute, and no arbitration in

respect of this matter may be commenced unless such notice is given.

3. Any dispute or difference in respect of which a notice of intention to commence arbitration has been given in accordance with this Clause shall be finally settled by arbitration. Arbitration may

30

Page 31: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

be commenced prior to or after delivery of the Goods and services under the Contract. 7  .27 Arbitration  

1. In case of dispute or difference arising between the Lucknow Development Authority and a

Service Provider relating to any matter arising out of or connected with the award of contract,

such dispute or difference shall be referred to Sole Arbitrator, the Principal Secretary/Secretary,

UP Housing Board, Govt of U.P., to decide the dispute both in case of foreign supply as well as

Indian supply. The provision of Arbitration and Conciliation Act, 1996 shall apply.

2. Arbitration proceedings shall be held at Lucknow and the language of the arbitration proceedings and that of all documents and communications between the parties shall be in English.

3. The decision of the Sole Arbitrator or its nominee shall be final and binding upon both parties.

The cost and expenses of arbitration proceedings will be paid as determined by the Arbitrator. However the expenses incurred by each party in connection with the preparation, presentation etc. of its proceedings shall be borne by each party itself.

a. The parties shall continue to perform their respective obligations under the Contract unless they

otherwise agree ; and

b. The Lucknow Development Authority shall pay the Service Provider any money due to the Service Provider.

All disputes shall be subject to the jurisdiction of the Courts at Lucknow only. 7 .28 Limitation of Liability Except in cases of criminal negligence or willful misconduct, and in the case of Infringement

1. The Service Provider shall not be liable to the Lucknow Development Authority/end-customer,

whether in contract, or otherwise, for any indirect or consequential loss of damage, loss of use,

loss of production, or loss of profits or interest costs, provided that this exclusion shall not apply

to any obligation of the Service Provider to pay liquidated damages to the Lucknow

Development Authority; and

2. The aggregate liability of the Service Provider to the Lucknow Development Authority/end-customer, whether under the Contract, into or otherwise, shall not exceed the total value of items ordered under this Contract provided that this limitation shall not apply to the cost of repairing or replacing defective equipment.

7.29 Governing Language The Contract shall be written in English language. Subject to condition of contract, English language version of the Contract shall govern its interpretation. All correspondence and other written in the same

31

Page 32: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System languages. 7 .30 Applicable Law The Contract shall be interpreted in accordance with the laws of the India.

8  SECTION VIII ‐ TECHNICAL PROPOSAL SUBMISSION FORM

8.1 BID FORM To: Date:

The Chief Engineer, Lucknow Development Authority,

Subject:-

Dear Sir,

Having examined the Bidding Documents, we, the undersigned, offer to <Name of Work>in accordance with the terms and conditions of the contract mentioned in the RFP

We undertake, if our bid is accepted, to commence work as per the schedule and to achieve the effectiveness of the contract within the respective time period stated in the Bidding Documents.

Construction of the Contract

• We have read the provisions of bid and confirm that these are acceptable to us.

• We further declare that bid is unconditional.

• We undertake, if our bid is accepted, to commence the work as per the schedule

immediately upon your Notification of Award to us, and to achieve Completion within the time stated in the Bidding Documents.

• If our bid is accepted, we undertake to provide Performance Security in the form and

amounts, and within the times specified in the Bidding Documents.

• We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in India

Dated this ____ day of 2016

Signature:

32

Page 33: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 8.2 DETAILS OF BIDDER

Description Details to be filled by Bidder Name of the Organization

Nature of the Organization

Government / Public / Private / Partnership /Proprietorship

Year of Establishment (Enclose any of

the following for proof of establishment)

• Certificate of Incorporation

• Audited balance sheets

•  Registered Partnership deed if any Regd. Office Postal Address with

Phone & Fax Number Name of Bidder: Signature of Bidder:

33

Page 34: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 8.3  MINIMUM SPECIFICATION FOR HOSTING THE APPLICATION FOR ONE 

DEVELOPMENT AUTHORITY AT DATA CENTER DURING THE CONTRACT.   For Category AS and A Development Authority

Item Quantity Specification

Database Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 512 Server 1 GB DDR3 RAM or higher and 2 x 500 GB SAS hot plug SFF drives.

Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 512 Web server 1 GB DDR3 RAM or higher and 2 x 300 GB SAS hot plug SFF drives.

Application Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 512 Server 1 GB DDR3 RAM or higher and 2 x 300 GB SAS hot plug SFF drives.

Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 512 Back Up Server 1 GB DDR3 RAM or higher and 2 x 300 GB SAS hot plug SFF drives.

Storage 1 10 TB of SAN Storage

Enterprise Edition RDBMS Database and Server software licenses Software ( MS SQL Enterprise Edition, Windows server Enterprise Edition, 50 Licenses 1 Terminal server Cal licenses)

For Category B and C Development Authority

Item Quantity Specification

Database Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 128 Server 1 GB DDR3 RAM or higher and 2 x 500 GB SAS hot plug SFF drives.

Web server / Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 128 Application GB DDR3 RAM or higher and 2 x 300 GB SAS hot plug SFF drives. Server 1

Latest generation x86-64 bit Hex Core processor, Intel® Xeon®, 128 Back Up Server 1 GB DDR3 RAM or higher and 2 x 300 GB SAS hot plug SFF drives.

Storage 1 5 TB of SAN Storage

Enterprise Edition RDBMS Database and Server software licenses ( MS SQL Enterprise Edition, Windows server Enterprise Edition, 50 Software Terminal server Cal licenses) MS SQL Enterprise Edition, Windows Licenses 1 server Enterprise Edition, 20 Terminal server Cal licenses)

If centralized Hosting for all the development authorities at single location is decided by the department, then the requirement of the servers and other computing capacity would be optimized by the department for further

cing the hosting and management cost of the proposed solution and bidder has to comply with same. redu 34

Page 35: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 8.4 MINIMUM REQUIREMENTS FOR HOSTING SERVICES

Sr.No. Item

Data Center(DC) and Disaster Recovery(DR) Compliance

1 DC infrastructure IPv6 Compliant

2 DC and DR should physically reside in India and all application, data, and all

its supporting infrastructure should reside within India only 3 DC and DR should be managed and monitored 24x7x365 days in the Cloud

Service Provider’s Network Operation Centre(NOC) 4 Firewall with IPS, IDS for both primary and DR servers should be provisioned

5 Hosting Service provider should ensure 24x7x365 security monitoring of OBPS solution to detect attacks and alert about suspicious events that may lead to breach of security

6 Should have dynamic load balancing capability

7 The Bidder should ensure OBPS application and all its related Information hosted

in the DC and DR should be under secured environment based on GoI regulatory requirements if any.

8 DR should be indifferent Seismic Zone with different fault line than the DC.

Business Continuity and Resiliency

9 DR drill is required to be conducted as per Business Continuity and Resiliency Plan once in every one year, and a detailed report of the same should be submitted by the bidder.

10 Cloud/ Hosting Service Provider should provide a detailed Business Continuity and Resiliency Plan for effective disaster management, to handle disaster situations. CSP should also provide periodic test reports to UVAVP as per the Business Continuity & Resiliency Plan

Governance Model The governance policies around OBPS application, all its related data, and storage

11 And retention policies adopted should be informed.

35

Page 36: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

1. Roles and responsibilities – Clear roles and responsibilities should be defined by Bidder for all users, Bidder’s team, that will have access to OBPS application and its related data

2. Control and access –to OBPS application and its related data 3. Infrastructure governance and control–that will host OBPS application and

its related data 4. Governance for data classification, backup, and retention 5. Data management policy for sensitive and personally Identifiable

Information (PII) data. 6. Audit trail for all access points to OBPS application and its data 7. Downtime–any down time should be planned and informed in advance.

Software Compliance

12 Bidder should procure, install, configure and maintain licensed software required for proper hosting of OBPS solution with latest anti-virus.

13 Bidder to ensure all antivirus software and programs are updated timely and Regularly in the Cloud / Hosted server and kept up-to-date

14 The bidder should test the patches for OBPS application compatibility

Information Security Management

15 All application security concerns like HTML/SQL Injections, application of Stored Procedures etc. should be quarterly tested for, and report for the same should be submitted quarterly.

16 Bidder should ensure appropriate information security, anonymity, and encryption for OBPS application over Cloud / Hosting to avoid any unauthorized access 17 Ensure there is no data or information leakage

18 Ensure secure disposal and complete removal of all unutilized data and information Related to OBPS application from all storage media

19 Ensure that data from live OBPS application(Production data)is not replicated or used in non-production instances without UVAVP permission Vulnerability and penetration testing should be performed on information security

20 Management on a quarterly basis. CHSP is responsible to submit a report for the same on a quarterly basis Creation & maintenance of the directory server integrated with security modules like Authentication, Authorization & Auditing capabilities, Web single sign on, OTP

21 management for critical components and the usage of Digital signature to ensure web based signage of documents. The SI should also employ the usage of a log co-relator system to ensure centralized collection and analysis of log files.

Data, Information and Backup Policy 22 Backup or redundancy mechanisms implemented to ensure compliance

with regulatory, statutory, contractual or business requirements

36

Page 37: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

23 Services provided should include appropriate data anonymity and encryption over Cloud

24 Data Disposal should be secure and mechanisms should be for complete removal Of data from all storage media, ensuring data is not recoverable by any computer forensic means

8.5  CONNECTIVITY REQUIREMENTS  

Following capacity MPLS connectivity with the hosting service location would be required by each development authority.

• For all AS and A class locations 10 Mbps MPLS connectivity required. • FOR all Band C class locations 4 Mbps MPLS Connectivity required.

37

Page 38: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System 8.6 LIST OF DEVELOPMENT AUTHORITIES OF UP

Sr.No. Name of Development Authority Category

1 Gaziabad AS

2 Awas Vikas Parishad AS

3 Kanpur AS

4 Lucknow AS

5 UP Housing Board UPHB

Total AS Category 5

1 Agra A

2 Allahabad A

3 Meerut A

4 Muradabad A

Total A Category 4

1 Aligardh B

2 Baraille B

3 Gorakhpur B

4 Mathura B

5 Varanasi B

Total B Category 5

1 Banda C

2 Bulandshar C

3 Faizabad C

4 Firozabad C

5 Hapud-Pilkua C

38

Page 39: Lucknow Development Authority - ldaonline.inLucknow Development Authority and U.P. Housing Board are nodal agencies with top ranking among all housing agencies of the state. During

RFP for Online Building Plan Scrutiny and Approval System

6 Zansi C 7 Muzaffarnaagar C

8 Raibareli C

9 Saharanpur C

10 Unnav C

11 Rampur C

12 Urai C

13 Khurja C

Total C Category 13

Total Development Authorities 27

39