m oraga h illsides and r idgelines p roject t own c ouncil m eeting, m arch 11, 2015

13
MORAGA HILLSIDES AND RIDGELINES PROJECT TOWN COUNCIL MEETING, MARCH 11, 2015

Upload: madlyn-bradley

Post on 18-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

MORAGA HILLSIDESAND RIDGELINES PROJECTTOWN COUNCIL MEETING, MARCH 11, 2015

Page 2: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Objective

Clarify and improve Town’s hillside and ridgeline policies and regulations

Process

Background Analysis (Completed)

Hillside Regulation Options (Mid 2015)

Draft Regulations (Late 2015)

Review and Adoption (Early 2016)

Project Background

Page 3: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Draft published in June, 2014

Clear, understandable summary of existing regulations, physical conditions, and technical background

Revised document incorporates comments solicited from public

Final report will be published after acceptance by Town Council

Final Background Report

Page 4: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Draft Landslide Hazard Maps Two maps

Landslide inventory Map (detailed)

Landslide Hazard Areas (simplified)

Provide planning-level data for particular areas of interest in the town

Steering Committee, Planning Commission, and Town Council will provide direction on future use of maps

Page 5: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Draft Landslide Inventory Map

DetailedLandslidesInventory

Page 6: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Draft Landslide Hazard Map

LandslideHazard

Potential

Page 7: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Steering Committee Recommendation for Further Study:

1. Ridgeline Protection – How is “protect” defined? What is the breadth/applicability of protections?

2. Definition of Development – Do grading and limited surface facilities qualify as “development?”

3. Development on Steep Slopes – How do slope limitations address slope variability within parcels and the potential for re-grading?

Key Project Issues

Page 8: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

4. Calculation of Slope – Should slope calculation methods be revised? If so, how?

5. Remediation in High Risk Areas – Can “high risk” areas be remediated to become lower risk areas in which greater development is permitted?

6. View Protection – What methodologies and standards should be adopted to protect views?

7. Hillside Development Permit (HDP) – Are HDPs redundant? What projects should require HDPs?

8. High Risk Area Map – Should the High Risk Area Map be updated? How will it be used in the future?

Key Project Issues

Page 9: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Project is now at an important decision point:

Move forward as currently scoped

Take a different approach

Public input suggested desire for more comprehensive General Plan amendments

Staff, Steering Committee, and Planning Commission recommend continuing with the current approach

Project Approach Moving Forward

Page 10: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Public Outreach

Public Meetings in Original Scope: Stakeholder Meetings Steering Committee Meetings (7) Public Workshops (3) Join Planning Town Council/Planning Commission Meetings (3) Review and Adoption Hearings (4)

Recommended Additional Outreach Steering Committee meetings (3) Community workshop to receive input on draft regulations (1) Presentations to community organizations (6) Focus groups coordinated with town surveys (4) Increased use of on-line tools

With Council direction, staff will return with revised project scope containing additional outreach

Page 11: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Steering Committee

The terms of three Steering Committee members on the bodies that appointed them expire this year

The Steering Committee charter requires these members to step down from the Steering Committee

Staff is concerned about loss of continuity and project delays if three Steering Committee members step down

Staff recommends amending the charter to allow members to continue on the Steering Committee

Amended charter and draft resolution for Council consideration is attached to staff report

Page 12: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

Steering Committee and Planning Commission Recommendations:

Accept the Background Report as complete

Continue with the original project approach (focused amendments to improve existing regulations)

Focus on the eight issues recommended by the Steering Committee and Planning Commission

Town Staff Recommendations

Augment the original public outreach program and return to Council with revised scope

Amend the Steering Committee charter to allow existing members to continue

Requested Council Direction

Page 13: M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015

MORAGA HILLSIDESAND RIDGELINES PROJECTTOWN COUNCIL MEETING, MARCH 11, 2015