Page 1: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 1/11

 Version 11.5

Module 13

Isometric Production

Training Manual 

Page 2: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 2/11

 

PLEASE NOTE:

AVEVA has a policy of continuing product development: therefore, the information contained

in this document may be subject to change without notice.AVEVA MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS DOCUMENT,INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OFMERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.

While every effort has been made to verify the accuracy of this document, AVEVA shall notbe liable for errors contained herein or direct, indirect, special, incidental or consequentialdamages in connection with the furnishing, performance or use of this material.

This manual provides documentation relating to products that you may not have access to or which may not be licensed to you. For further information on which products are licensed toyou please refer to your licence conditions.

Copyright 2003 AVEVA Limited

All rights reserved. No part of this document may be reproduced, stored in a retrieval systemor transmitted, in any form or by any means, electronic, mechanical, photocopying, recordingor otherwise, without prior written permission of AVEVA.

The software programs described in this document are confidential information andproprietary products of AVEVA Ltd or its licensors.

Visit our website at http://www.aveva.com 

AVEVA Ltd, High Cross, Madingley Road, Cambridge CB3 0HB, UK

Page 3: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 3/11

Page 4: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 4/11

Page 5: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 5/11

 

Session 1 

Isometric Production

Objectives

From the pipe routes produced in design we can produce fabrication, erection,

system and trim isometrics. Isodraft, the Isometric drawing production module uses a

series of Option Files to produce these differing isometrics.

At the end of this session you will be able to:

• Produce a simple Isometric from standard option files.

Must Know Points

It is important to understand the following points about Isometric Production

• The principles relating to Isometric Option Files. 

Module 13 Isometric Production 1-1 

Page 6: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 6/11

Isometric Production  

Isometric Production

Detail Isometric production is the subject other courses, however, since arequirement of all piping designers is the production of check or stress isometrics,the basic techniques of what is a simple operation are covered here.

Accessing Isodraft

Before you can produce an isometric, you must ensure that pipe(s) or branch(es)have been check through the Datacon utility. The isometric will fail if componentshave lost their Spref (specification reference), are poorly aligned or overlap. A visualcheck, ensuring that no dashed line appears is not sufficient.

From design, you can access Isodraft using Design>modules>Isodraft> macrofiles.

Once in the Isodraft module, you will be presented with a members list, showing thecontents of the Design DB and a graphical view, similar to that in Design.

1-2 Module 13 Isometric Production

Page 7: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 7/11

Isometric Production  

Default Isodr aft forms

Isodraft has a number of options to control the appearance, content and type of isometric.

2 alternatives are supplied each with an option to produce metric or imperial outputdata, thus giving 4 option files altogether.

Before accessing 1 of these option files, using the members form, navigate to asuitable pipe or branch as you would in Design.

From the top menu bar on the viewing form, select Isometric>Standard 

Module 13 Isometric Production 1-3 

Page 8: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 8/11

Isometric Production  

The current element is that of the pipe in the hierarchy. The 4 option files are listedand BASIC.MET has been selected.

Clicking the Apply button will generate an isometric in the graphical viewing area.

1-4 Module 13 Isometric Production

Page 9: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 9/11

Isometric Production  

CE

The member in the hierarchy becomes the current element. Navigating to another pipe or branch and then clicking the CE button will update the form and re-clickingapply will generate an isometric of the new pipe or branch

DetailThis can be changed to ’Detail List’ and several pipes or branches can be selectedand multiple isometrics generated.

Produce

This can be changed to generate:

Transfer files Used to interface with other systems.

Batch macro Useful when large quantities of isometrics are required. Anysuch macro is usually run overnight.

Bolt Report Bolts are only generated in Isodraft, so this function generate areport of bolts for pipes and branches identified in the detail list.

The ADVANCED options will not work on the pipes you have created, since itrequires part-numbers to be generated in the Design DB. This option is used inconjunction with the Spooler module of PDMS. 

Module 13 Isometric Production 1-5 

Page 10: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 10/11

Isometric Production  

Default Isometric

Option files

Within differing companies and the projects they undertake, there will be specificisometric requirements. Backing sheet details, dimensioning, material list contents

etc.. It is the responsibility on the project administrator to create the option filesrequired and inform designers of there significance.

1-6 Module 13 Isometric Production

Page 11: M13 Isometric Production

8/6/2019 M13 Isometric Production

http://slidepdf.com/reader/full/m13-isometric-production 11/11

Isometric Production  

Module 13 Isometric Production 1-7 

Exercise 1

Try producing isometrics of the pipes you have designed. Ensure you have Dataconchecked them and amended any significant errors before running Isodraft.