machinery arrangement for 3rd party utility station

36
MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION TRANSOCEAN ENCORUAGE

Upload: others

Post on 23-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

MACHINERY ARRANGEMENT FOR

3RD PARTY UTILITY STATION

TRANSOCEAN ENCORUAGE

Page 2: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:36

8

12

3

14

1

9

(L)

420

MM

X(B

)297

MM

CHECK

REV NO.DATE DWG.NO.SCALE

DEPT

TITLE :

Offshore Mechanical

PROJ. NO.

Design Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(DRILL FLOOR)

5

2

4

6

7

남상호(S.H.NAM)

MACHINERY ARRANGEMENT FOR

1/450

3RD PARTY UTILITY STATION

FILE NAME : 3034DAB77M010-002-Z0

3034DAB77M010

3034

30.11.15

정우석(W.S.JUNG)

Z

PAGE 02

1. DETAIL INFORMATION OF UTILITY (PAGE 34,35,36)

※NOTE※

PORT

FWD

13

TAG NO. DESCRIPTIONNO. PAGE

10

11

DRILLFLOOR

1 375-XX-003

11

03

11

05

07

11

07

11

03

09

UTILITY STATION NO.3

14

05

09

14

2 375-XX-013 UTILITY STATION NO.13

3 375-XX-015 UTILITY STATION NO.15

4 375-XX-011 UTILITY STATION NO.11

5 375-XX-016 UTILITY STATION NO.16

6 375-XX-008 UTILITY STATION NO.8

7 375-XX-004 UTILITY STATION NO.4

8 375-XX-003-E UTILITY STATION NO.3 ELECTRICAL UTILITIES

9 375-XX-004-E UTILITY STATION NO.13 ELECTRICAL UTILITIES

10 375-XX-015-E UTILITY STATION NO.15 ELECTRICAL UTILITIES

11 375-XX-011-E UTILITY STATION NO.11 ELECTRICAL UTILITIES

12 375-XX-016-E UTILITY STATION NO.16 ELECTRICAL UTILITIES

13 375-XX-008-E UTILITY STATION NO.8 ELECTRICAL UTILITIES

14 375-XX-004-E UTILITY STATION NO.4 ELECTRICAL UTILITIES

PLAN VIEW(EL.55250 A/B)

Page 3: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:36

(L)

420

MM

X(B

)297

MM

DESCRIPTIONTAG NO.NO.

ITEM LIST

KEY PLAN(DRILL FLOOR)

FWD

PORT

(S.H.NAM)남상호

CHECK

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR

TITLE :

DATE REV NO.

PROJ. NO.

DWG.NO.

1/100SCALE

DEPT

Offshore MechanicalDesign Department 3 30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-003-Z0

3034

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 03

1 375-XX-003 UTILITY STATION NO.3

2 375-XX-003-E UTILITY STATION NO.3 ELECTRICAL UTILITIES

2

1

UTILITY STATION NO.3

4

4

A

B

THIS AREA

PLAN VIEW(EL.55400 A/B)

Page 4: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

KEY PLAN(DRILL FLOOR)

(L)

420

MM

X(B

)297

MM

(S.H.NAM)남상호

CHECK

DWG.NO.DATE SCALE

3RD PARTY UTILITY STATION

PROJ. NO.

DEPT

TITLE :

REV NO.

MACHINERY ARRANGEMENT FOR

1/30Offshore MechanicalDesign Department 3 3034DAB77M01030.11.15

3034

FILE NAME : 3034DAB77M010-004-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 04

TAG NO. DESCRIPTIONNO.

ITEM LIST

1 375-XX-003 UTILITY STATION NO.3 SERVICE WATER

2 375-XX-003 UTILITY STATION NO.3 HP WASHING

3 375-XX-003 UTILITY STATION NO.3 PLANT AIR

4 INSTRUMENT AIR

5 VACUUM CONNECTION

6 DIESEL OIL

9 375-JB-603 690V POWER JUNCTION BOX

10 375-JB-403 440V POWER JUNCTION BOX

375-JB-003 INSTRUMENT JUNCTION BOX11

375-JB-223 230V UPS JUNCTION BOX12

375-JB-203 230V NORMAL JUNCTION BOX13

375-JB-703 TELECOM JUNCTION BOX14

7 HYDRAULIC OIL (SUPPLY)

8 HYDRAULIC OIL (SUPPLY)

464

1000

FR35 FR37FR33 FR36FR34

222 608 615548

300

300

720

1320

2165

11109

12 13 14

744

923

1667

837

761

1598

2105 60

FR22FR23 FR21FR24 FR20

375

600

600

1

3

16

5

1464 6

4

2

7 8SUPPLY

(HF385507)SUPPLY

(HF385504)

(HF385508)

RETURN

(HF385505)RETURN

(HF385509)

DRAIN

(HF385506)DRAIN

AI734165

VC444255

OF700327

HF385507

HF385504

3

SECTION A

3BSECTION ISO VIEW FOR UTILITY STATION NO.3 (ELECTRICAL UTILITIES)

ISO VIEW FOR UTILITY STATION NO.3S=1:30

S=1:30 S=1:40

S=1:30

(EL.55400 A/B)

AFT SERVICE DECK

THIS AREA

AFT SERVICE DECK

(EL.55400 A/B)

PROTECTION BAR

Page 5: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

(L)

420

MM

X(B

)297

MM

(S.H.NAM)

CHECK

남상호DEPT 3RD PARTY UTILITY STATION

DATE REV NO.

TITLE :

1/100

MACHINERY ARRANGEMENT FOR

SCALE DWG.NO.

PROJ. NO.

Offshore MechanicalDesign Department 3

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-005-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 05

DESCRIPTIONTAG NO.NO.

ITEM LIST

1 375-XX-013 UTILITY STATION NO.13

2 375-XX-013-E UTILITY STATION NO.13 ELECTRICAL UTILITIES

2

1

UTILITY STATION NO.13

KEY PLAN(DRILL FLOOR)

6A

PLAN VIEW(EL.55400 A/B)

THIS AREA

PORT

FWD

Page 6: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

(L)

420

MM

X(B

)297

MM

CHECK

(S.H.NAM)남상호 DATE

MACHINERY ARRANGEMENT FOR

REV NO.

3RD PARTY UTILITY STATIONDEPT

PROJ. NO.

1/25SCALE

TITLE :

DWG.NO.Offshore MechanicalDesign Department 3 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-006-Z0

정우석(W.S.JUNG)

DWN BY (TEL.735-4537)

Z

PAGE 06

ITEM LIST

119 10

12 1314

69

86

348

KEY PLAN(DRILL FLOOR)

6

778

820

1667

580 600 550 3622345

375

600

600

1575

L-1L-2

26

DESCRIPTIONTAG NO.NO.

1 375-XX-013 UTILITY STATION NO.13 SERVICE WATER

2 375-XX-013 UTILITY STATION NO.13 HP WASHING

3 375-XX-013 UTILITY STATION NO.13 PLANT AIR

4 DIESEL OIL

5 VACUUM CONNECTION

6 HYDRAULIC OIL (SUPPLY)

9 375-JB-613 690V POWER JUNCTION BOX

10 375-JB-413 440V POWER JUNCTION BOX

375-JB-013 INSTRUMENT JUNCTION BOX11

375-JB-233 230V UPS JUNCTION BOX12

375-JB-213 230V NORMAL JUNCTION BOX13

375-JB-713 TELECOM JUNCTION BOX14

7 HYDRAULIC OIL (SUPPLY)

8 INSTRUMENT AIR

3

254

52

294

8

1

7SUPPLY(HF385513)

SUPPLY

(HF385510)

(HF385514)RETURN

(HF385511)RETURN

(HF385515)

DRAIN

(HF385512)DRAIN

OF700330

VC444253

HF385513

HF385510

AI734126

5ASECTION

ISO VIEW FOR UTILITY STATION NO.13 (ELECTRICAL UTILITIES)

THIS AREA

S=1:30

S=1:50(EL.55400 A/B)

AFT SERVICE DECK

PROTECTION BAR

Page 7: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

FR56 FR60 FR65 FR70 FR75 FR84FR80

(L)

420

MM

X(B

)297

MM

CHECK

남상호(S.H.NAM)

1/100

TITLE :

MACHINERY ARRANGEMENT FOR

SCALE DWG.NO. REV NO.DATE

PROJ. NO.

DEPT 3RD PARTY UTILITY STATION

Offshore MechanicalDesign Department 3 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-007-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 07

DESCRIPTIONTAG NO.NO.

ITEM LIST

1 375-XX-011 UTILITY STATION NO.11

2 375-XX-011-E UTILITY STATION NO.11 ELECTRICAL UTILITIES

KEY PLAN(DRILL FLOOR)

UTILITY STATION NO.11

88BC

PLAN VIEW(EL.55250 A/B)

THIS AREA

PORT

FWD

2

2342 3851 1682

221

L0L0

L-1

L-2

L-3

L-4

8403

1837

775

1

1887

8A

WELL CENTER

WELLCENTER

Page 8: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

CHECK

남상호(S.H.NAM)

1/30

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

DATE

PROJ. NO.

REV NO.

DEPT

SCALE

TITLE :

DWG.NO.Offshore MechanicalDesign Department 3

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-008-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 08

TAG NO. DESCRIPTIONNO.

ITEM LIST

1 375-XX-011 UTILITY STATION NO.11 SERVICE WATER

2 375-XX-011 UTILITY STATION NO.11 HP WASHING

KEY PLAN(DRILL FLOOR)

3 375-XX-011 UTILITY STATION NO.11 PLANT AIR

4 INSTRUMENT AIR

5 VACUUM CONNECTION

6 HYDRAULIC OIL (SUPPLY)

7 375-JB-711 TELECOM JUNCTION BOX

(L)

420

MM

X(B

)297

MM

8 375-JB-011 INSTRUMENT JUNCTION BOX

9 375-JB-211 230V NORMAL JUNCTION BOX

10 375-JB-611 690V POWER JUNCTION BOX

11 375-JB-411 440V POWER JUNCTION BOX

12 375-JB-231 230V UPS JUNCTION BOX

1631

525

600

600

1725

FR68FR69FR70FR71FR72FR73 FR67

1567660

57

210 450

150

1481

795

305

1100

L-4 L-3

1360260

6

7 8 9

10 11

12

1

3

24

5

FR68 FR69FR67

200

579

1150

(HG385498)

RETURN

(HG385499)(HG385500)

DRAIN

SUPPLY

AI734166

VC444122

HG385498

ISO VIEW FOR UTILITY STATION NO.11 (ELECTRICAL UTILITIES)

ISO VIEW FOR UTILITY LINE(HG)

7ASECTION

BSECTION

7C7

SECTION

ISO VIEW FOR UTILITY LINE(VC)

S=1:30

S=1:30

THIS AREA

S=1:30

OPEN GRATING

(EL.55250 A/B)

DRILL FLOOR

S=1:30

(EL.55250 A/B)

DRILL FLOOR

(EL.55250 A/B)

DRILL FLOOR

S=1:30

S=1:30

Page 9: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

(L)

420

MM

X(B

)297

MM

남상호(S.H.NAM)

CHECK

DWG.NO.DATE

TITLE :

DEPT

REV NO.

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

SCALE

1/100

PROJ. NO.

Design Department 3Offshore Mechanical

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-009-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 09

DESCRIPTIONTAG NO.NO.

ITEM LIST

1 375-XX-004 UTILITY STATION NO.4

2 375-XX-004-E UTILITY STATION NO.4 ELECTRICAL UTILITIES

KEY PLAN(DRILL FLOOR)

L0

L1

L2

L3

L4

L0

FR75 FR80 FR85 FR90 FR95 FR100 FR103

3169 696

10A

FWD

PORT

2

10630

236

1

UTILITY STATION NO.4PLAN VIEW(EL.55250 A/B)

THIS AREA

WELL CENTER

WELLCENTER

Page 10: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

CHECK

남상호(S.H.NAM)

DEPT

1/30

TITLE :

MACHINERY ARRANGEMENT FOR

SCALE

PROJ. NO.

DATE

3RD PARTY UTILITY STATION

REV NO.DWG.NO.Offshore Mechanical3034DAB77M010

3034

Design Department 3 30.11.15

FILE NAME : 3034DAB77M010-010-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 10

TAG NO. DESCRIPTIONNO.

ITEM LIST

1 375-XX-004 UTILITY STATION NO.4 SERVICE WATER

4

2 375-XX-004 UTILITY STATION NO.4 HP WASHING

KEY PLAN(DRILL FLOOR)

3 375-XX-004 UTILITY STATION NO.4 PLANT AIR

4 HYDRAULIC OIL (SUPPLY)

5 VACUUM CONNECTION

6 INSTRUMENT AIR

7 375-JB-004 INSTRUMENT JUNCTION BOX

(L)

420

MM

X(B

)297

MM

8 375-JB-704 TELECOM JUNCTION BOX

9 375-JB-604 690V POWER JUNCTION BOX

10 375-JB-224 230V UPS JUNCTION BOX

11 375-JB-204 230V NORMAL JUNCTION BOX

12 342-IB-3510 CASING TONG REMOTE IO BOX

771

836

93

78

100

1607

375

600

600

1575

FR82 FR86 FR87 FR90FR88FR83 FR84 FR89FR85

50 1172 600 178 1320

87

9 10 11

12

1

3

2

5

6DRAIN

(HF385067)

SUPPLY

RETURN

(HF385066)

(HF385065)

HF385065

VC444124

AI734168

ISO VIEW FOR UTILITY STATION NO.4 (ELECTRICAL UTILITIES)

SECTION A9

S=1:30

THIS AREA

S=1:30

(EL.55250 A/B)

DRILL FLOOR

Page 11: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

1864 1276 3466

770

24048

6866

18566

(L)

420

MM

X(B

)297

MM

CHECK

남상호(S.H.NAM)

TITLE :PROJ. NO.

DEPT

SCALE

MACHINERY ARRANGEMENT FOR

DWG.NO.DATE

3RD PARTY UTILITY STATION

1/100REV NO.Offshore Mechanical

Design Department 3 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-011-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 11

TAG NO. DESCRIPTIONNO.

ITEM LIST

1 375-XX-015 UTILITY STATION NO.15

2 375-XX-015-E UTILITY STATION NO.15 ELECTRICAL UTILITIES

3 375-XX-016 UTILITY STATION NO.16

4 375-XX-016-E UTILITY STATION NO.16 ELECTRICAL UTILITIES

KEY PLAN(DRILL FLOOR)

UTILITY STATION NO.15,16

2

441

1

4

3

12

13

13

12

A

C

D

B

THIS AREA

PLAN VIEW(EL.55410 A/B)

FWD

PORT

Page 12: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:37

(L)

420

MM

X(B

)297

MM

남상호

CHECK

(S.H.NAM)

3RD PARTY UTILITY STATION

TITLE :

MACHINERY ARRANGEMENT FOR

DATE DWG.NO.

1/30

DEPT

PROJ. NO.

SCALE REV NO.Offshore Mechanical3034DAB77M010

3034

Design Department 3 30.11.15

FILE NAME : 3034DAB77M010-012-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 12

ITEM LIST

KEY PLAN(DRILL FLOOR)

TAG NO. DESCRIPTIONNO.

1 375-XX-015 UTILITY STATION NO.15 SERVICE WATER

2 375-XX-015 UTILITY STATION NO.15 HP WASHING

3 375-XX-015 UTILITY STATION NO.15 PLANT AIR

4 VACUUM CONNECTION

6

5 HYDRAULIC OIL (SUPPLY)

7 375-JB-715 TELECOM JUNCTION BOX

8 375-JB-015 INSTRUMENT JUNCTION BOX

375-JB-215 230V NORMAL JUNCTION BOX9

375-JB-415 440V POWER JUNCTION BOX10

12

375-JB-615 690V POWER JUNCTION BOX11

375-JB-235 230V UPS JUNCTION BOX

INSTRUMENT AIR

772

859

733

L-8L-10L-11L-12L-13 L-9

1079638188600

5

1632

24

93

8 9

5

800

FR69FR70 FR68 FR67

190 278

7 8 9

10 11 12

1

3

2

6

4

DRAIN

RETURN

SUPPLY

(HF385493)

(HF385492)

(HF385494)

VC444242

HF385492

AI734121

ISO VIEW FOR UTILITY STATION NO.15 (ELECTRICAL UTILITIES)

SECTION A11

SECTION B11

THIS AREA

S=1:30

STBD SERVICE DECK

(EL.55400 A/B)

S=1:30

STBD SERVICE DECK

(EL.55400 A/B)

S=1:30

Page 13: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:38

(L)

420

MM

X(B

)297

MM

CHECK

남상호(S.H.NAM)

3RD PARTY UTILITY STATION

DATE

TITLE :

SCALE

PROJ. NO.

1/30REV NO.

MACHINERY ARRANGEMENT FOR

DWG.NO.

DEPT

Offshore Mechanical

3034

Design Department 3 30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-013-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 13

ITEM LIST

KEY PLAN(DRILL FLOOR)

TAG NO. DESCRIPTIONNO.

1 375-XX-016 UTILITY STATION NO.16 SERVICE WATER

2 375-XX-016 UTILITY STATION NO.16 HP WASHING

3 375-XX-016 UTILITY STATION NO.16 PLANT AIR

4 HYDRAULIC OIL (SUPPLY)

5 INSTRUMENT AIR

6 VACUUM CONNECTION

7 375-JB-716 TELECOM JUNCTION BOX

8 375-JB-016 INSTRUMENT JUNCTION BOX

375-JB-216 230V NORMAL JUNCTION BOX9

375-JB-416 440V POWER JUNCTION BOX10

375-JB-616 690V POWER JUNCTION BOX11

375-JB-236 230V UPS JUNCTION BOX12

1575

1321

L-6 L-7

380631600

766

864

1630

673

933

FR83FR84FR86FR87FR88 FR85

685 1717

7 8 9

10 11 12

1606

69

600

600

375

3

740

6

5

1

2

4

RETURN

DRAIN

SUPPLY

(HF3854891)

(HF3854901)

(HF3854911)

HF3854891

AI734120

VC444241

ISO VIEW FOR UTILITY STATION NO.16

ISO VIEW FOR UTILITY STATION NO.16 (ELECTRICAL UTILITIES)

CSECTION

11

D11

SECTION

S=1:30

S=1:30

(EL.55410 A/B)

STBD SERVICE DECK

(EL.55410 A/B)

STBD SERVICE DECK

THIS AREA

S=1:30

S=1:30

Page 14: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:38

1

2

(L)

420

MM

X(B

)297

MM

남상호(S.H.NAM)

CHECK

DWG.NO.

PROJ. NO.

DEPT

SCALE REV NO.DATE

TITLE :

MACHINERY ARRANGEMENT FOR

1/150

3RD PARTY UTILITY STATION

Offshore Mechanical3034DAB77M010

3034

Design Department 3 30.11.15

FILE NAME : 3034DAB77M010-014-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 14

TAG NO. DESCRIPTIONNO.

ITEM LIST

1 375-XX-008 UTILITY STATION NO.8

2 375-XX-008-E UTILITY STATION NO.8 ELECTRICAL UTILITIES

KEY PLAN(DRILL FLOOR)

UTILITY STATION NO.8

15

15

A

BTHIS AREA

PLAN VIEW(EL.55250 A/B)

PORT

FWD

Page 15: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:38

(L)

420

MM

X(B

)297

MM

남상호(S.H.NAM)

CHECKPROJ. NO.

REV NO.

TITLE :

SCALE

1/30

DEPT

DWG.NO.DATE

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR

Offshore MechanicalDesign Department 3

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-015-Z0

DWN BY (TEL.735-4537)

정우석(W.S.JUNG)

Z

PAGE 15

ITEM LIST

KEY PLAN(DRILL FLOOR)

DESCRIPTIONTAG NO.NO.

1 375-XX-008 UTILITY STATION NO.8 SERVICE WATER

2 375-XX-008 UTILITY STATION NO.8 HP WASHING

3 375-XX-008 UTILITY STATION NO.8 PLANT AIR

4 DIESEL OIL

5 INSTRUMENT AIR

6 VACUUM CONNECTION

7 375-JB-708 TELECOM JUNCTION BOX

8 375-JB-008 INSTRUMENT JUNCTION BOX

10

375-JB-608 690V POWER JUNCTION BOX9

375-JB-228 230V UPS JUNCTION BOX

230V NORMAL JUNCTION BOX11 375-JB-208

1575

1

3

51

2

4

5

L-2L-1

467 1399164 600

11

87

910

934

673

1607

600

375

600

12

FR100 FR102FR101

250

940 1075

778

6

135

FRESH/CLYCOL-COOLING MEDIUM SYSTEM

OF700328

AI734116

VC444206

12 375-JB-408 440V POWER JUNCTION BOX

ISO VIEW FOR UTILITY STATION NO.8 (ELECTRICAL UTILITIES)

SECTION

14A

ISO VIEW FOR UTILITY LINE(VC)SECTION

14B

THIS AREA

S=1:30

S=1:30

FWD SERVICE DECK

(EL.55410 A/B)

S=1:30S=1:30

FWD SERVICE DECK

(EL.55410 A/B)

PROTECTION BAR

Page 16: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:38

(L)

420

MM

X(B

)297

MM

CHECK

REV NO.

DEPT

TITLE :

DATE

PROJ. NO.

DWG.NO.SCALEOffshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

DESCRIPTIONTAG NO.NO.

ITEM LIST

KEY PLAN(MAIN DECK)

FWD

STBD

PORT

AFT

남상호(S.H.NAM)

1/450

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-016-Z0

정우석(W.S.JUNG)

Z

PAGE 16

1 375-XX-001 UTILITY STATION NO.1

10 375-XX-001-E UTILITY STATION NO.1 ELECTRICAL UTILITIES

2 375-XX-006 UTILITY STATION NO.6

3 375-XX-006 UTILITY STATION NO.6(HP WASHING HOSE)

4 375-XX-005 UTILITY STATION NO.5

5 375-XX-005 UTILITY STATION NO.5(HP WASHING HOSE)

6 375-XX-002 UTILITY STATION NO.2

7 375-XX-009 UTILITY STATION NO.9

8 375-XX-007 UTILITY STATION NO.7

9 375-XX-014 UTILITY STATION NO.14

11 375-XX-006-E UTILITY STATION NO.6 ELECTRICAL UTILITIES

12

27

375-XX-005-E

25

UTILITY STATION NO.5 ELECTRICAL UTILITIES

13 375-XX-002-E UTILITY STATION NO.2 ELECTRICAL UTILITIES

14 375-XX-009-E UTILITY STATION NO.9 ELECTRICAL UTILITIES

15 375-XX-007-E UTILITY STATION NO.7 ELECTRICAL UTILITIES

16 375-XX-014-E UTILITY STATION NO.14 ELECTRICAL UTILITIES

MAIN DECKPLAN VIEW(EL.44250 A/B)

※NOTE※1. DETAIL INFORMATION OF UTILITY (PAGE 34,35,36)

PORT

FWD

161

6

2

87

5

3

12

11

13

1514

10

PAGE

9

4

US#9

US#2

US#7

US#5

US#6

US#1

US#14

17

27

22

25

19

22

19

19

19

17

19

22

19

22

Page 17: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:39

(L)

420

MM

X(B

)297

MM

CHECK

REV NO.SCALE DWG.NO.

TITLE :

DATE

PROJ. NO.

DEPT

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN(MAIN DECK)

2

1

STBD

PORT

FWDAFT

(S.H.NAM)남상호

1/100

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-017-Z0

정우석(W.S.JUNG)

Z

PAGE 17

1 375-XX-001 UTILITY STATION NO.1

2 375-XX-001-E UTILITY STATION NO.1 ELECTRICAL UTILITIESUTILITY STATION NO.1

18A

THIS AREA

PLAN VIEW(EL.44250 A/B)

PORT

FWD

Page 18: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:39

ITEM LIST

(L)

420

MM

X(B

)297

MM

CHECKPROJ. NO.

REV NO.

TITLE :

DATE

DEPT

DWG.NO.SCALEOffshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

KEY PLAN(MAIN DECK)757

831

723

303

294

1320

L10L11L12L13L14L15L16L18 L9L17

74

TAG NO. DESCRIPTIONNO.

1 375-XX-001 UTILITY STATION NO.1 SERVICE WATER

2 375-XX-001 UTILITY STATION NO.1 HP WASHING

3 375-XX-001 UTILITY STATION NO.1 PLANT AIR

4

5

VACUUM CONNECTION

6 HYDRAULIC OIL (SUPPLY)

7 375-JB-601 690V POWER JUNCTION BOX

8 375-JB-221 230V UPS JUNCTION BOX

375-JB-201 230V NORMAL JUNCTION BOX9

375-JB-001 INSTRUMENT JUNCTION BOX10

375-JB-701 TELECOM JUNCTION BOX11

6

INSTRUMENT AIR

688

993

1681

19

10 11

9871

3

60030571450

1575

600

600

375

2

4

5

AFT

PORT

FWD

STBD

SUPPLY(HF385524)

RETURN(HF385525)

DRAIN(HF385526)

남상호(S.H.NAM)

MACHINERY ARRANGEMENT FOR

1/100

3RD PARTY UTILITY STATION

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-018-Z0

정우석(W.S.JUNG)

Z

PAGE 18

VC444219

AI734164

HF385524

ISO VIEW FOR UTILITY STATION NO.1 (ELECTRICAL UTILITIES) ISO VIEW FOR UTILITY STATION NO.1

17ASECTION

THIS AREA

(EL.44250 A/B)

MAIN DECK

S=1:30 S=1:30

S=1:30

Page 19: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:39

610

563

35217551484

2

2993845

3838

4

2601

1254

328

2681

1

14

5

(L)

420

MM

X(B

)297

MM

CHECK

DEPT

DATE SCALE REV NO.

PROJ. NO.

DWG.NO.

TITLE :

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN(MAIN DECK)

6

STBD

AFT

PORT

FWD

UTILITY STATION NO.5,6

(S.H.NAM)남상호

MACHINERY ARRANGEMENT FOR

1/100

3RD PARTY UTILITY STATION

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-019-Z0

정우석(W.S.JUNG)

Z

PAGE 19

1 375-XX-006 UTILITY STATION NO.6

2 375-XX-006 UTILITY STATION NO.6 (HP WASHING HOSE)

3 375-XX-005 UTILITY STATION NO.5

4 375-XX-005 UTILITY STATION NO.5 (HP WASHING HOSE)

5 375-XX-006-E UTILITY STATION NO.6 ELECTRICAL UTILITIES

6 375-XX-005-E UTILITY STATION NO.5 ELECTRICAL UTILITIES

20

20

21

20

21

A

B

D

C

E

PLAN VIEW(EL.44250 A/B)

THIS AREA

FWD

PORT

3

Page 20: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

SCALE DWG.NO.

PROJ. NO. TITLE :

REV NO.DATE

DEPT

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

975

600

1575

740

581

1321

FR0 FR1FR-1

875 600

1083

627

801

1497

L0L0 L1

2

1575

FR-2FR-1FR0

627 500

DESCRIPTIONTAG NO.NO.

1 375-XX-005 UTILITY STATION NO.5 SERVICE WATER

2 375-XX-005 UTILITY STATION NO.5 HP WASHING

3 375-XX-005 UTILITY STATION NO.5 PLANT AIR

4 VACUUM CONNECTION

7 375-JB-605 690V POWER JUNCTION BOX

8 375-JB-005 INSTRUMENT JUNCTION BOX

375-JB-705 TELECOM JUNCTION BOX9

375-JB-225 230V UPS JUNCTION BOX10

375-JB-205 230V NORMAL JUNCTION BOX11

5 INSTRUMENT AIR

6 COOLING FRESH WATER

3

6

4

5

1

2486 441

9 8

11 10

69

7

AFT

PORT

STBD

FWD

DRILL WATER SYSTEM

남상호(S.H.NAM)

1/30

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-020-Z0

정우석(W.S.JUNG)

Z

PAGE 20

VC444229

AI734130

WD584942

19

SECTION A SECTION C19

19

SECTION BISO VIEW FOR UTILITY STATION NO.5 (ELECTRICAL UTILITIES)

ISO VIEW FOR UTILITY STATION NO.5

(EL.44250 A/B)

MAIN DECK MAIN DECK

(EL.44250 A/B)

(EL.44250 A/B)

MAIN DECK

S=1:30 S=1:30

S=1:30

S=1:30

S=1:30

THIS AREA

Page 21: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

DEPT

DATE SCALE DWG.NO.

TITLE :PROJ. NO.

REV NO.Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

TAG NO. DESCRIPTIONNO.

1 375-XX-006 UTILITY STATION NO.6 SERVICE WATER

2 375-XX-006 UTILITY STATION NO.6 HP WASHING

3 375-XX-006 UTILITY STATION NO.6 PLANT AIR

4 VACUUM CONNECTION

7 375-JB-606 690V POWER JUNCTION BOX

8 375-JB-006 INSTRUMENT JUNCTION BOX

375-JB-706 TELECOM JUNCTION BOX9

375-JB-226 230V UPS JUNCTION BOX10

375-JB-206 230V NORMAL JUNCTION BOX11

5 INSTRUMENT AIR

6 COOLING FRESH WATER

2

975

600

785

465

414

1664

FR-8FR-7FR-6FR-5FR-4FR-3FR-2FR-1

800 600 122 2486

1575

FR-1 FR0FR-2

210 500

7 8 9

10

11

69

1

3

6

4

5

FWD

STBD

PORT

AFT

DRILL WATER SYSTEM

남상호(S.H.NAM)

1/30

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-021-Z0

정우석(W.S.JUNG)

Z

PAGE 21

VC444259

AI734155

WD584879

SECTION D19

E19

SECTION

ISO VIEW FOR UTILITY STATION NO.6 (ELECTRICAL UTILITIES)

THIS AREA

(EL.44250 A/B)

MAIN DECK

S=1:30

MAIN DECK

(EL.44250 A/B)

S=1:30

S=1:30

Page 22: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

DATE REV NO.SCALE

DEPT

DWG.NO.

TITLE :PROJ. NO.

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

DESCRIPTIONTAG NO.NO.

ITEM LIST

KEY PLAN(MAIN DECK)

1

2

AFT FWD

PORT

STBD

(S.H.NAM)남상호

1/100

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-022-Z0

정우석(W.S.JUNG)

Z

PAGE 22

1 375-XX-002 UTILITY STATION NO.2

2 375-XX-009 UTILITY STATION NO.9

3 375-XX-002-E UTILITY STATION NO.2 ELECTRICAL UTILITIES

4 375-XX-009-E UTILITY STATION NO.9 ELECTRICAL UTILITIES

FWD

PORT

4

3

UTILITY STATION NO.2,9

-

-

-

A

B

C

PLAN VIEW(EL.44250 A/B)

THIS AREA

Page 23: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

REV NO.DWG.NO.

PROJ. NO.

DATE SCALE

DEPT

TITLE :

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

8

4

5

7

1426

6

3

2

1

375

600

600

119 10 12

812

783

1200

1413

TAG NO. DESCRIPTIONNO.

1 375-XX-002 UTILITY STATION NO.2 SERVICE WATER

2 375-XX-002 UTILITY STATION NO.2 HP WASHING

3 375-XX-002 UTILITY STATION NO.2 PLANT AIR

4 VACUUM CONNECTION

5 DIESEL OIL

6 INSTRUMENT AIR

9 375-JB-602 690V POWER JUNCTION BOX

10 375-JB-402 440V POWER JUNCTION BOX

375-JB-002 INSTRUMENT JUNCTION BOX11

375-JB-202 230V NORMAL JUNCTION BOX13

375-JB-222 230V UPS JUNCTION BOX14

375-JB-702 TELECOM JUNCTION BOX12

7 HYDRAULIC OIL (SUPPLY)

8 COOLING SEA WATER

AFT FWD

PORT

STBD

DRAIN(HF385543)

RETURN(HF385542)

SUPPLY(HF385541)

남상호(S.H.NAM)

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

1/30 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-023-Z0

정우석(W.S.JUNG)

Z

PAGE 23

VC4441128

OF700326

AI734127

HF385541

WU721027

SECTION A22

ISO VIEW FOR UTILITY STATION NO.2 (ELECTRICAL UTILITIES)

THIS AREA

S=1:30

(EL.44250 A/B)

MAIN DECK

S=1:30

PROTECTION BAR

PROTECTION BAR

Page 24: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

DWG.NO.DATE

DEPT

PROJ. NO. TITLE :

SCALE REV NO.Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

DESCRIPTIONTAG NO.NO.

1 375-XX-009 UTILITY STATION NO.9 SERVICE WATER

2 375-XX-009 UTILITY STATION NO.9 HP WASHING

3 375-XX-009 UTILITY STATION NO.9 PLANT AIR

4 VACUUM CONNECTION

5 DIESEL OIL

6 HYDRAULIC OIL (SUPPLY)

13 375-JB-609B 690V POWER JUNCTION BOX

12 375-JB-609A 690V POWER JUNCTION BOX

375-JB-009 INSTRUMENT JUNCTION BOX11

375-JB-229 230V UPS JUNCTION BOX14

375-JB-709 TELECOM JUNCTION BOX10

7 HYDRAULIC OIL (SUPPLY)

8 INSTRUMENT AIR

375-JB-209 230V NORMAL JUNCTION BOX15

9 COOLING SEA WATER

375

600

600

609

725

1814

1575

FR52 FR53 FR54 FR55 FR56

1170

812

852

L-30 L-27L-28L-29

10 11 12 13

14 15

9

5

8

1

6 7

3

1756 533262

56

600 1184

2

4

AFT FWD

PORT

STBD

DRAIN

RETURN

SUPPLY

(S.H.NAM)남상호

1/30

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-024-Z0

정우석(W.S.JUNG)

Z

PAGE 24

VC4442448

OF700329

HF385550

HF385547

AI734125

WU721010

SECTION

22B

22

SECTION C

ISO VIEW FOR UTILITY STATION NO.9 (ELECTRICAL UTILITIES)

THIS AREA

S=1:30

S=1:30

(EL.44250 A/B)

MAIN DECK

(EL.44250 A/B)

MAIN DECK

S=1:30

PROTECTION BAR

PROTECTION BAR

HF385548

HF385551

HF385552

HF385549

HF385550

HF385547

Page 25: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

DWG.NO.

DEPT

DATE

PROJ. NO.

SCALE

TITLE :

REV NO.Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

DESCRIPTIONTAG NO.NO.

ITEM LIST

KEY PLAN(MAIN DECK)

1

STBD

FWD

PORT

AFT

US#7

남상호(S.H.NAM)

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

1/100 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-025-Z0

정우석(W.S.JUNG)

Z

PAGE 25

1 375-XX-007 UTILITY STATION NO.7

2 375-XX-007-E UTILITY STATION NO.7 ELECTRICAL UTILITIES

THIS AREA

FWD

PORT

2

UTILITY STATION NO.7

26

26

26

A

B

C

PLAN VIEW(EL.44250 A/B)

Page 26: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

4

(L)

420

MM

X(B

)297

MM

CHECK

DATE REV NO.

PROJ. NO. TITLE :

DWG.NO.

DEPT

SCALEOffshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

782

850

375

600

600

1575

L-24L-25L-27L-28L-29L-30 L-23L-26

6009759341714

6

723

303

294

L-20 L-22L-21

506

TAG NO. DESCRIPTIONNO.

1 375-XX-007 UTILITY STATION NO.7 SERVICE WATER

2 375-XX-007 UTILITY STATION NO.7 HP WASHING

3 375-XX-007 UTILITY STATION NO.7 PLANT AIR

4 INSTRUMENT AIR

5 COOLING SEA WATER

6 HYDRAULIC OIL (SUPPLY)

8 375-JB-607 690V POWER JUNCTION BOX

9 375-JB-227 230V UPS JUNCTION BOX

375-JB-207 230V NORMAL JUNCTION BOX10

375-JB-007 INSTRUMENT JUNCTION BOX11

375-JB-707 TELECOM JUNCTION BOX12

7 VACUUM CONNECTION

1216

L-27 L-29L-28

150

7

1321

100

1421

1

2

3

851

874

8 9 10

12 11

13

5

193

1320

AFT FWD

PORT

STBD

DRAIN(HF385121)

RETURN(HF385120)

SUPPLY(HF385119)

남상호(S.H.NAM)

MACHINERY ARRANGEMENT FOR

1/30

3RD PARTY UTILITY STATION3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-026-Z0

정우석(W.S.JUNG)

Z

PAGE 26

AI734118

WU721028

HF385119

VC444237

375-JB-407 440V POWER JUNCTION BOX13

25

SECTION A

ISO VIEW FOR UTILITY STATION NO.7 ISO VIEW FOR UTILITY LINE(WU,HF) ISO VIEW FOR UTILITY LINE(VC)

SECTION

25B

SECTION C25

ISO VIEW FOR UTILITY STATION NO.7 (ELECTRICAL UTILITIES)

THIS AREA

(EL.44250 A/B)

MAIN DECK

S=1:30

S=1:30 S=1:30 S=1:30

MAIN DECK

(EL.44250 A/B)

S=1:30

S=1:30

(EL.44250 A/B)

MAIN DECK

S=1:30

PROTECTION BAR

Page 27: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

2

(L)

420

MM

X(B

)297

MM

CHECK

SCALE REV NO.

PROJ. NO.

DWG.NO.

DEPT

DATE

TITLE :

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN(MAIN DECK)

STBD

PORT

FWDAFT

(S.H.NAM)남상호

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

1/100

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-027-Z0

정우석(W.S.JUNG)

Z

PAGE 27

1 375-XX-014 UTILITY STATION NO.14

2 375-XX-014-E UTILITY STATION NO.14 ELECTRICAL UTILITIES

THIS AREA

PORT

FWD

1

UTILITY STATION NO.14

28

28

A

B

PLAN VIEW(EL.44250 A/B)

Page 28: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

4

CHECKTITLE :

DWG.NO.DATE REV NO.

PROJ. NO.

SCALE

DEPT

Design Department 3Offshore Mechanical

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN(MAIN DECK)

DESCRIPTIONTAG NO.NO.

1 375-XX-014 UTILITY STATION NO.14 SERVICE WATER

2 375-XX-014 UTILITY STATION NO.14 HP WASHING

3 375-XX-014 UTILITY STATION NO.14 PLANT AIR

4 HYDRAULIC OIL (SUPPLY)

7 375-JB-614 690V POWER JUNCTION BOX

375-JB-014 INSTRUMENT JUNCTION BOX10

(L)

420

MM

X(B

)297

MM

375-JB-214 230V NORMAL JUNCTION BOX9

375-JB-714 TELECOM JUNCTION BOX11

5 INSTRUMENT AIR

375-JB-234 230V UPS JUNCTION BOX8

6 VACUUM CONNECTION

20

375

600

600

1575

768

919

1688

L28 L29 L30 L31L27

652 1310 1260 600

5

10

8 97

93

11

6

1200

L27L29 L28

121

823

250

250

1323

1

2

3

PORT

STBD

FWDAFT

DRAIN

RETURN

SUPPLY

(HF385156)

(HF385157)

(HF385155)

(S.H.NAM)남상호

3RD PARTY UTILITY STATION

1/30

MACHINERY ARRANGEMENT FOR

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-028-Z0

정우석(W.S.JUNG)

Z

PAGE 28

HF385155

AI734104

VC444216

SECTION A27

BSECTION

27

ISO VIEW FOR UTILITY STATION NO.14 (ELECTRICAL UTILITIES) ISO VIEW FOR UTILITY LINE(VC)

THIS AREA

MAIN DECK

(EL.44250 A/B)

S=1:30

S=1:30

(EL.44250 A/B)

MAIN DECK

S=1:30 S=1:30

PROTECTION BAR

PROTECTION BAR

Page 29: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:40

(L)

420

MM

X(B

)297

MM

CHECK

SCALE

DEPT

REV NO.DWG.NO.

PROJ. NO. TITLE :

DATEOffshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN

PORT

FWD

STBD

AFT

남상호(S.H.NAM)

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR

1/350 3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-029-Z0

정우석(W.S.JUNG)

Z

PAGE 29

1 375-XX-012 UTILITY STATION NO.12

2 375-XX-010 UTILITY STATION NO.10

3 375-XX-012-E UTILITY STATION NO.12 ELECTRICAL UTILITIES

4 375-XX-010-E UTILITY STATION NO.10 ELECTRICAL UTILITIES

LOWER DECK

1. DETAIL INFORMATION OF UTILITY (PAGE 34,35,36)

※NOTE※

PLAN VIEW(EL.37250 A/B)

PORT

FWD

3

2

4

1

PAGE

32

30

32

30

Page 30: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:42

2

1

(L)

420

MM

X(B

)297

MM

CHECK

REV NO.SCALE

DEPT

DATE

PROJ. NO. TITLE :

DWG.NO.Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN

FWDAFT

PORT

STBD

(S.H.NAM)남상호

3RD PARTY UTILITY STATION

1/100

MACHINERY ARRANGEMENT FOR3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-030-Z0

정우석(W.S.JUNG)

Z

PAGE 30

1 375-XX-012 UTILITY STATION NO.12

2 375-XX-012-E UTILITY STATION NO.12 ELECTRICAL UTILITIES

UTILITY STATION NO.12

3131BA

THIS AREA

PLAN VIEW(EL.37250 A/B)

PORT

FWD

Page 31: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:42

339

1

3

2

6

5

316

716

303

294

1313

475

600

600

1675

FR89 FR90 FR92 FR93FR91

328

245

4

272

83

(L)

420

MM

X(B

)297

MM

375-JB-712 TELECOM JUNCTION BOX7

375-JB-012 INSTRUMENT JUNCTION BOX9

375-JB-232 230V UPS JUNCTION BOX10

375-JB-212 230V NORMAL JUNCTION BOX11

6 VACUUM CONNECTION

DESCRIPTIONTAG NO.NO.

ITEM LIST

DEPT

SCALE REV NO.

PROJ. NO.

DWG.NO.

TITLE :

DATEOffshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)CHECK

8 375-JB-612 690V POWER JUNCTION BOX

5 INSTRUMENT AIR

4 GREEN HYDRAULIC OIL (SUPPLY)

3 375-XX-012 UTILITY STATION NO.12 PLANT AIR

2 375-XX-012 UTILITY STATION NO.12 HP WASHING

1 375-XX-012 UTILITY STATION NO.12 SERVICE WATER

KEY PLAN

9

7

696

897

1593

FR89FR91 FR90

581699

10

720

11

8

SUPPLY(HG385559)

RETURN(HG385560)

DRAIN(HG385561)

FWD

STBD

PORT

AFT

VC444118

1/30

3RD PARTY UTILITY STATIONMACHINERY ARRANGEMENT FOR3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-031-Z0

정우석(W.S.JUNG)

PAGE 31

(S.H.NAM)남상호

AI734167

HG385559

Z

ASECTION

30 30

SECTION B

ISO VIEW FOR UTILITY STATION NO.12 (ELECTRICAL UTILITIES)

THIS AREA

LOWER DECK

(EL.37268 A/B)

S=1:30 S=1:30

LOWER DECK

(EL.37268 A/B)

S=1:30

Page 32: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:42

(L)

420

MM

X(B

)297

MM

CHECKTITLE :

DEPT

REV NO.SCALEDATE

PROJ. NO.

DWG.NO.Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

TAG NO. DESCRIPTIONNO.

ITEM LIST

KEY PLAN

1

AFT FWD

STBD

PORT

남상호(S.H.NAM)

1/100

MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

3034

30.11.15 3034DAB77M010

FILE NAME : 3034DAB77M010-032-Z0

정우석(W.S.JUNG)

Z

PAGE 32

1 375-XX-010 UTILITY STATION NO.10

2 375-XX-010-E UTILITY STATION NO.10 ELECTRICAL UTILITIES

UTILITY STATION NO.10

THIS AREA

PLAN VIEW(EL.37250 A/B)

FWD

PORT

2

664

3333AB

FR66 FR70 FR75 FR80 FR85 FR90 FR94

676 12059

1074

5309

3960

33C

Page 33: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

APCPCWM_4828539:WP_0000045WP_0000045A

PC

PC

WM

_482

8539

:WP

_000

0045

WP

_000

0045

Printed by DSME (주)오션디자인이충현2015-11-05 11:42

(L)

420

MM

X(B

)297

MM

CHECK

SCALEDATE DWG.NO.

PROJ. NO.

DEPT

REV NO.

TITLE :

Offshore MechanicalDesign Department 3

DWN BY (TEL.735-4537)

ITEM LIST

KEY PLAN

TAG NO. DESCRIPTIONNO.

1 375-XX-010 UTILITY STATION NO.10 SERVICE WATER

2 375-XX-010 UTILITY STATION NO.10 HP WASHING

3 375-XX-010 UTILITY STATION NO.10 PLANT AIR

4 VACUUM CONNECTION

5 INSTRUMENT AIR

6 GREEN HYDRAULIC OIL (SUPPLY)

7 375-JB-610 690V POWER JUNCTION BOX

375-JB-010 INSTRUMENT JUNCTION BOX

440V JUNCTION BOX

11

12

375-JB-230 230V UPS JUNCTION BOX9

375-JB-210 230V NORMAL JUNCTION BOX10

375-JB-710 TELECOM JUNCTION BOX811

700

209

269

1178

375

600

600

1575

FR90 FR91FR89

387 600

726

873

1599

702

FR71 FR72 FR73 FR74FR70

697 1310

7 8

9 10

1

3

2

5

6

4

5200 off CL

109

980

L-2

L-1

260

12

FWD

PORT

AFT

STBD

SUPPLY(HG385260)

RETURN(HG385261)

DRAIN(HG385262)

(S.H.NAM)남상호

MACHINERY ARRANGEMENT FOR

1/30

3RD PARTY UTILITY STATION

3034DAB77M010

3034

30.11.15

FILE NAME : 3034DAB77M010-033-Z0

정우석(W.S.JUNG)

Z

PAGE 33

VC444119

AI734122

HG385260

375-JB-410

SECTION A32

SECTION B32

ISO VIEW FOR UTILITY STATION NO.10 (ELECTRICAL UTILITIES)

ISO VIEW FOR UTILITY STATION NO.10

SECTION

32C

S=1:30

S=1:30

THIS AREA

LOWER DECK

(EL.37262 A/B)

LOWER DECK

(EL.37250 A/B)

S=1:30

S=1:30

S=1:30

LOWER DECK

(EL.37266 A/B)

Page 34: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

Statoil - Cat D Drill Semi - FEED PHASE

Report Date: 30-July-2013 Page: 11 of

130 Third Party Drilling Interfaces Doc ID: 302468702 Rev: 06 AMH Original GVA Doc No

Statoil Doc.no:

J0131-DR-RP-700-0001

Ext. Doc No: SFI GROUP: 101 Responsible: Jan Magne Gilje

Utility Station (Notes 1)Utility Station 1 Utility Station 2 Utility Station 3 Utility Station 4 Utility Station 5 Utility Station 6 Utility Station 7 Utility Station 8 Additional information

Location Main Deck Aft Port. Main Deck Aft Stb(Well testing)

Aft Service Deck Port (Wireline) Drillfloor ROV main (Notes 3) ROV aux (Notes 3) Pipe Deck Fwd Stb Pipe Deck Fwd

Port(WOCS 3)

230V/ 60Hz

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

4 EA 1 ph UPS 16A 3 EA 1 ph 16A

4 EA 1 ph UPS 16A 3 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

690V / 60Hz

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 400A Note 21 EA 3ph 100A1 EA 3ph 63A Note 10

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 400A (Note 13)1 EA 3 ph 250 A (Note 14)1 EA 3ph 100A

1 EA 3ph 400A (Note 13)1 EA 3 ph 250 A (Note 14)1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

440V / 60Hz

1 EA 3ph 250A1 EA 3ph 125A 1 EA 3ph 63A 2 EA 3ph 63A Note 8

1 EA 3ph 63A 1 EA 3 ph 125A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

Fire (Smoke) X X X X X X X XGas X X X X X X X XESD X X X X X X X XPA/A X X X X X X X XPA/B X X X X X X X XAlarms Overpressure etc. X X X X X X X X

2 Phone lines Analog Ex X X X X X X X X

2 X Cat 6 LAN X X X X X X X XFiber Optic Single Mode connection G12 X X X X X X X X

Emergency stop interface Note 6 X X X X X X X X

WLAN Ex coverage in all areas X X X X X X X X

Vacuum Cleaner Coverage from central unit. At least 25 m hose on reel. Note 4

X X X X X X X X

Service Water FW at least 40 m hose on reel.

X X X X X X X X

HP Washing with pressure gun and min 40 m hose on reel.

X X X X X X X X

Plant Air at least 40 m hose on reel.

X X X X X X X X

Instrument Air X X X X X X X X

Hydraulic Oil connected to ringline min 210 bar.

X X 2 ea X X

Diesel Oil X X XCooling fresh Water from rig Ringline (Note 12) X XCooling Sea Water from Ringline X X

PA

GE

34

PAGE 34

Page 35: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

Statoil - Cat D Drill Semi - FEED PHASE

Report Date: 30-July-2013 Page: 12 of

130 Third Party Drilling Interfaces Doc ID: 302468702 Rev: 06 AMH Original GVA Doc No

Statoil Doc.no:

J0131-DR-RP-700-0001

Ext. Doc No: SFI GROUP: 101 Responsible: Jan Magne Gilje

Utility Stations (Note 1)

Utility Station 9 Utility Station 10 Utility Station 11 Utility Station 12 Utility Station 13 Utility Station 14 Utility Station 15 Utility Station 16 Additional information

Location Main Deck StbCTS / RMR

Moonpool XT Stack-up Area Drill floor Stb Aft Moonpool Bop

AreaService Deck Aft

(Stb)Pipe Deck Fwd

Port WOCS 1 Service

deck (stbd)WOCS 2 Service deck

(stb)

230V/ 60Hz 2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

2 EA 1 ph UPS 16A 2 EA 1 ph 16A

1 EA 1 ph UPS A 16A1 EA 1 ph UPS B 16A1 EA 1ph UPS A 32A(Note 15) 2 EA 1 ph 16A

1 EA 1 ph UPS A 16A1 EA 1 ph UPS B 16A1 EA 1ph UPS B 32A(Note 15) 2 EA 1 ph 16A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

690V / 60Hz1 EA 3ph 800A(Note7)1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

1 EA 3ph 250A 1 EA 3ph 100A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

440V / 60Hz 1 EA 3ph 125A 1 EA 3ph 63A

1 EA 3ph 125A 1 EA 3ph 63A

1 EA 3ph 125A 1 EA 3ph 63A

1 EA 3ph 125A 1 EA 3ph 63A

The circuits breakers shall be individually controlled from the control system, and each utility station shall have common Esd trip.

11 Kv / 60Hz 1 EA (600 kW) Note 7Fire (Smoke) X X X X X X X XGas X X X X X X X XESD X X X X X X X XPA/A X X X X X X X XPA/B X X X X X X X X

Alarms miscellaneous, overpressure etc.

X X X X X X

2 Phone lines Analog Ex X X X X X X X X2 X Cat 6 LAN X X X X X X X XFiber Optic Single Mode connection G12 X X X X X X X X

Emergency stop interface Note 6 X X X X X X X X

MWD Tool comm. Outlet (Note 11) X X

WLAN Ex coverange X X X X X X X XVacuum Cleaner Coverage form central unit. At least 25 m hose on reel. Note 4

X X X X X X X X

Service Water FW at least 40 m hose on reel.

X X X X X X X X

HP Washing with pressure gun and min 40 m hose on reel.

X X X X X X X X

Plant Air at least 40 m hose on reel. X X X X X X X X

Instrument Air X X X X X X X XHydraulic Oil connected to ringline min 210 bar. 2 ea 2 ea X X X

GREEN Hydraulic Oil min 210 bar. X X X

Diesel Oil X XCooling Sea Water from Ringline X Note 9

PA

GE

35

PAGE 35

Page 36: MACHINERY ARRANGEMENT FOR 3RD PARTY UTILITY STATION

Error! Reference source not found.

Statoil - Cat D Drill Semi - FEED PHASE

Report Date: 30-July-2013 Page: 13 of 130 Third Party Drilling Interfaces Doc ID: 302468702 Rev: 06 AMH Original GVA Doc No

Statoil Doc.no:

J0131-DR-RP-700-0001

Ext. Doc No: SFI GROUP: 101 Responsible: Jan Magne Gilje

Note 1 Utility station utilities shall be gathered as a unit, placed at a central rack and marked.

Note 2 For Cuttings Slurrification (400A)

Note 3 TBA by ROV vendor.

Note 4 Capacity for 3 outlets at the same time.Note 5 Capacity for 3 outlets at the same time.

Note 6 Emergency stop interfaces to be terminated in dedicated Junction box in Drillers Cabin. 8x2x0,75(i) BFOU

Note 7 Requirement is 800A @ 690V. 11KV shall be treated as an alternative.

Note 8 1 Ea 440V oulet on each side of the x-tree hangar door. (Supply for WOCS Umilical reel)

Note 9 Requirement is 2600 l/min @4 bar, 4"/6" interface from rig. For water supply to subsea pump

Note 10 Supply for steam generatorNote 11 See chapter 8 MWD & ML for details regarding TCS outletsNote 12 Cooling water to be supplied to winch brake resistor locations.Note 13 400A to be routed to ROV winch VFD cabinet

Note 14 250A to be routed to ROV power distribution unit PDU

Note 15 UPS A and UPS B to be redundant

4.2 Utility Stations Locations

The utility stations (16 off) are located as shown on General Arrangement drawings below. Note! Final location to be defined in the detail phase.

PAGE 36 STM