magnet design and construction schedule

9
Dipole review, 20-21 January 2011 1 Magnet design and construction schedule Gijs de Rijk CERN

Upload: maj

Post on 22-Jan-2016

48 views

Category:

Documents


0 download

DESCRIPTION

Magnet design and construction schedule. Gijs de Rijk CERN. Budget and personnel. CERN particularities The EuCARD person months are essentially only the non-staff The staff is counted in addition on the CERN core budget Conductor qualification contracts are on the CERN core budget - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Magnet design and construction  schedule

Dip

ole

revie

w,

20-2

1 Janu

ary

2011

1

Magnet design and construction schedule

Gijs de Rijk

CERN

Page 2: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

2

Budget and personnel

• CERN particularities– The EuCARD person months are essentially only the non-staff– The staff is counted in addition on the CERN core budget– Conductor qualification contracts are on the CERN core budget

• CEA particularities– Special in-kind contribution by Fr used for conductor procurement

by CEA

EuCARD Person-months

EuCARD Material(k€)

Conductor(k€)

CEA 47 215 Special. Contr. 700

CERN 49 477 200

Page 3: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

3

Design and construction schedule

Full planning (July 2010)

Page 4: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

4

Design and construction schedule

Design phase

3D magnetic design

2D magnetic design

3D mechanical design

SMC 1SMC 3

3D echanical design and assemble concept

Quench model

Quench protection design

20112010

Page 5: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

5

Design and construction schedule

Structure and manufacturing preparation

Coil reaction study

Thermal design

Instrumentation and connection design

Dipole – insert interaction

Materials choice /quality control

Sample tests

Structure manufacturing

Structure LN2 test

20112010

Page 6: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

6

Design and construction schedule

Conductor + coil components

Coil component and tooling design

Coil component and tooling construction

Conductor procurement & qualification2x10km

Conductor procurement & Qualification 45km

Cabling for 1 coil set

20112010 2012

Page 7: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

7

Design and construction schedule

Coil manufacturing and magnet assembly

Vertical test station constructionCu Coil manuf.1st SC double pancake manuf.

2nd SC double pancake manuf.Test 1st SC double pancake in structure

3rd-4th SC double pancake manuf.Assembly first coil set in structure1st cold test

20122011 2013

Page 8: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

8

Design and construction decision points

• Magnet design approval Febr 2011• Reaction mould design April 2011• Choice between the 2 conductor providers July 2011• OK for cabling parameters July 2011• Structure approval after dummy coil tests July 2011• Glass fibre type choice (tape, sock, braided) August 2011• Impregnation resin choice August 2011• Tooling approval Sept 2011• Ok for first coil winding with SC Nov 2011• Ok for second coil winding with SC April 2012

Page 9: Magnet design and construction  schedule

Dip

ole

revie

w,

Sch

edu

le-G

dR

, 20-2

1 Janu

ary

2011

9

Potential bottlenecks and problems

• Conductor deliveries• Conductor production quality

– Jc variations– RRR variations (tin leaks)

• Coil manufacturing– Reaction – Impregnation– Short circuits – Splices– Conductor damage during coil handling

• Competition with other projects for CERN workshop availability