Mailing list for 67th CCM 1. Executive Director (Finance), Gujarat Urja Vikas Nigam Ltd., Vadodara-390 007 2. Chief Engineer (LD), Gujarat Energy Transmission Corpn. Ltd., Vadodara- 390 021 3. Chief General Manager (Comml), MP Power Management Co.Ltd., Jabalpur-482 008 4. Chief Engineer (LD), M P Power Transmission Company Ltd.,SLDC, Jabalpur 482 008. 5. Chief Engineer (Comml), Chhattisgarh State Power Distribution Co. Ltd., Raipur – 492 013 6. Chief Engineer (LD), Chhattisgarh State Power Transmission Co. Ltd., Bhilai-490 024. 7. Chief Engineer (PP), Maharashtra State Electricity Distribution Co. Ltd., Mumbai-400 051 8. Chief Engineer (LD), State Load Despatch Centre, MSETCL, New Mumbai - 400 708 9. Chief Electrical Engineer, Panjim, Goa-403 001 10. Executive Engineer, Electricity Department, Daman-396 210 11. Executive Engineer (Elect),Electricity Department, Silvassa-396 230 12. Addl. General Manager (Comml), Nuclear Power Corpn. of India Ltd., Mumbai-400 094 13. General Manager (Comml), NTPC Ltd., New Delhi-110 003 14. Regional Executive Director (West), NTPC Ltd., Mumbai-400 093 15. General Manager (Com. & CP), NTPC SAIL Power Co. Pvt. Ltd., New Delhi -110 066 16. Executive Director (Comml), PGCIL, Gurgaon, Haryana-122 001 17. General Manager, WRTS-I, PGCIL, Nagpur-440 026 18. Addl. General Manager (Comml), WRTS-I, PGCIL, Nagpur-440 026 19. Executive Director, POSOCO,WRLDC, Mumbai-400 093 20. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., Mumbai-400 093 21. Vice President, Adani Power Limited, Ahmedabad – 380015 22. Addl. Chief Engineer (R & C), Gujarat Energy Trans. Corpn. Ltd., Vadodara-390 007 23. Chief Engineer (Trans. O&M), MSETCL, Mumbai-400 051 24. General Manager (Comml), LANCO Amarkantak Power Private Ltd., Gurgaon – 122 016 25. Member(Power), Narmada Control Authority, Indore.-452 010 26. Vice President, Jindal Power Ltd., Tamnar, Raigarh, Chhattisgarh – 496 001 27. Executive Director (Comml), Torrent Power Ltd., Ahmedabad- 380 009 28. DGM(PS), SAIL, Bhilai Plant, Bhilai-490 001. 29. AVP(Power Trading),GMR Energy Trading Ltd., Bangalore-560 029. 30. DGM Finance, CGPL, UMPP Mundra, Kutch-370 435. 31. Member Secretary, Northern Regional Power Committee, New Delhi 110 016 32. Member Secretary, Southern Regional Power Committee, Bangalore 560 009 33. Member Secretary, Eastern Regional Power Committee, Kolkata-700 033 34. Member Secretary, North Eastern Regional Power Committee, Shillong 793 303 35. Chief Engineer (GM), Central Electricity Authority, New Delhi –110 066.
Supplementary Agenda Notes for the 67th CCM meeting to be held on 21.05.2014 at
NTPC Mumbai.
SA1: STOA charges applied for the FY-2014-15 by RLDCs for STU systems in WR
WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that the following
charges have been applied to STOA transactions wrt STU system in WR
Sl.No STU Rate in Rs/Mwh Wef Remarks
1 GETCO Rs.123.75 /MWh 03.04.2014 As per letter dated
1/4/2014, received at
WRLDC on 02/04/14
Rs. 113.38/MWh 08.05.2014 As per letter dated 07/05/14
2 MSETCL Rs. 360 /MWh 24/04/14 As per letter dt.23rd April
2014 & received at
WRLDC on 23/04/14
3 MPPTCL Rs.68.95 / MWh 01/04/2014 As per letter dt.25/03/14
,received at WRLDC on –
25//3/2014. Internalized
wef 03/04/14 for MPSLDC
& MP Transco charges for
MPPMCL transactions as
per letter dt.01/04/14
received at WRLDC on
02/04/14.
4 CSPTCL Rs. 233/MWh 31..07.2013 As per letter dt 26/07/13
&29/04/14
5 D&D Rs. 80/MWh Since OA
implementation
Since no separate
declaration by D&D,DNH
& GOA for its STU system
as per CERC Regulation
Rs.80/MWh has been
considered
6 DNH Rs. 80 /MWh
7 GOA Rs. 80/MWh
All the respective agencies are requested to confirm the same and the above charges will be applied till
further declaration by respective STUs.
Committee may like to note.
SA-2 : Disbursal of STOA charges collected by WRLDC during scheduling of Korba-7 under
STOA during the period March’12 to July’12
WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), as regards to Item No.6 of main
agenda, have intimated the status of disbursal of STOA charges collected by WRLDC during scheduling
of Korba-7 under STOA. POWERGRID vide letter dated 19th Macrh’14 had informed WRLDC to
deduct an amount of Rs.6,05,73,460/- from the STOA disbursals from the current disbursal STOA
charges . Accordingly WRLDC will be disbursing the amount to the following agencies by 15th of
May’2014.
The details of amount to be collected from various agencies ( Table-1) and to be disbursed to various
agencies ( Table-2) on account of Korba-& STOA is tabled below.
Table-1
TOTAL
CTU Amount (RS) LT Customers(RS) Amount (RS) STU Amount (RS) SLDC Amount (RS) RLDCAmount (RS) Amount (RS)
WRTS 16,076,296 GUVNL 9,087,745 CSPTCL 18,396,072 CSPTCL SLDC 92,000 WRLDC 2,059,000MP Tradeco 10,200,694 MPPTCL 9,012,630 MP SLDC 226,000CSPDCL 2,154,331 MSETCL 12,358,756 MSETCL SLDC 356,000MSEDCL 12,989,122GOA 1,323,394DD 994,868DNH 2,122,381HVDC Bhad 9,834HVDC Vind 2,982MPAKVNL 50,503H.W.Board 67,012Jindal Power Limited 1,948,485Torrent Power Limited 1,597,327Adani Power Limited 779,412PTC (Lanco) 1,169,074
16,076,296 44,497,164 39,767,458 674,000 2,059,000 103,073,918
TOTAL CTU 60,573,460
Amount to be collected from different utilities (CTU/STU/SLDC/Discom?WRLDC etc.) against the disbursal made during the period March'12 to July'12 wrt Korba‐7 STOA transactions
SLDC CHARGES RLDC CHARGESCTU CHARGES STU CHARGES
Table-2
Amount to be reimbursed back to the STOA applicants wrt Korba‐7 scheduling from APR'14 STOA disbursal
Entities Amount ( in Rs) CSPDCL 3,71,93,470 GUVNL 1,24,02,587
MP Tradeco 1,89,38,274 MSEDCL 2,95,33,286 DNH 29,15,411 D&D 8,68,264 GOA 12,22,626 TOTAL 10,30,73,918
The exact disbursal details will be submitted to CCM after the disbursal on 15/5/14.
Committee may like to note.
SA-3: Entitlement and schedule data issues of MP
3.1 Entitlement of MP wrt LTA from Torrent & LANCO:
WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that entitlements
are not reflected in case of LTA transactions and are only reflecting in case of 100% allocation in
percentage by MoP in case of CGS or UMPP. LTA transactions are scheduled as per mutually agreed
schedules and no DC/ entitlements are reflected neither in schedules issued by WRLDC nor in REA
issued by WRPC.
3.2 Schedules of MP wrt LTA from Torrent & LANCO:
As discussed in the 66th CCM, WRLDC has provided both sending end and ex-periphery schedules of
LTA transaction for MP from LANCO & Torrent. The sending end schedules for the above LTAs are
shown in the REA of WRPC.
Committee may like to note.
SA-4: Opening of New account ‘POSOCO WR Deviation Pool Account Fund’ as per DSM regulations : WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that in accordance with following provisions 9(2) of the “Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014” of the Hon’ble CERC a new bank account has been opened by POSOCO in IDBI bank.
Quote
“All payments on account of Charges for Deviation including Additional Charges for Deviation levied under these regulations and interest, if any, received for late payment shall be credited to the funds called the “Regional Deviation Pool Account Fund”, which shall be maintained and operated by the concerned Regional Load Despatch Centre in each region in accordance with provisions of these regulations.” Unquote
The details of the bank account are given below:
Account Name : POSOCO WR Deviation Pool Account Fund
Account No : 0386103000003896
IFSC/RTGC Code : IBKL0000386
Bank Name & Add. : IDBI Bank, MIDC, Mumbai-400093
WRLDC vide letter No.WRLDC/MO-III/1541/592 dt 30.4.14 informed all regional entities of Western Region about the new account details. Pool members are requested to make all payments towards deviation charges to this new account with immediate effect. Committee may like to note. SA-5: Opening of Letter of credit(LC) against Deviation charges liability. WRLDC vide letter dated 06.05.2014 (copy enclosed at Annex.-SA-1), have intimated that as per the provision of the CERC Deviation Settlement Mechanism Regulations clause 10 (4),
Quote All regional entities which had at any time during the previous financial year failed to make payment charges of Deviation including Additional charges for Deviation within the time specified in this regulations shall be required to open a Letter of Credit (LC) equal to 110% of its average payable weekly liability for Deviations in the previous financial year, in favour of the concerned RLDC within a fortnight from the date these Regulations come into force. Unquote
WRLDC vide letter no. WRLDC/MO-III/1676/2014 dt 5.5.2014 has issued letter to the concerned to open LC for the amount which is calculated as per above clause. The details of entities and amount of LC to be opened are given in Annex-I. All concerned are requested to open LC in favour of ‘Power System Operation Corporation Ltd.’ Western Regional Load Despatch Centre, Mumbai , at the earliest. If any entity has opened LC which is valid at present, they can open the LC for new amount after the expiry of earlier LC.
Committee may like to note. SA- 6: Status of Deviation charges Payable/Receivable by WR entities to WR Deviation pool account fund maintained by WRLDC: WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that the Status of Deviation charges Payable/Receivable by WR entities to WR Deviation pool account fund maintained by WRLDC as on 5th May14 is enclosed at Annex-II.
Major Default by Entities towards Deviation charges -Payable 1. Elect.Dept Daman&Diu: Rs 7.67crs 2. JPL : Rs 4.50 crs 3. Essar Power MP Ltd: Rs 1.31crs 4. Vandana Vidyut Ltd: Rs 1.24crs
Committee may like to note/discuss.
SA- 7: Status of Reactive Energy charges Payable/Receivable by WR entities to Reactive pool account fund maintained by WRLDC : WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that the Status of Reactive Energy charges Payable/Receivable by WR entities to Reactive pool account fund maintained by WRLDC as on 1st May14 is enclosed at Annex-III.
Major Default by Entities towards Reactive Energy charges -Payable 1. Elect.Dept DNH: Rs 41.27lakh 2. MSEDCL: Rs 15.36lakh 3. Elect.Dept Daman&Diu: Rs 13.99lakh
Committee may like to note/discuss.
SA-8: Reconciliation of UI and REC pool account for the period Oct’13- Dec’13.
WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that WRLDC has
sent the signed reconciliation statement for the period Oct’13 to Dec’13 to all UI/REC pool members on
6th Jan ‘2014 . Also all the details of payments/receipts of UI and REC during Oct’13 to Dec’13 are also
uploaded on WRLDC website (www.wrldc.com/commercial/Pool Reconciliation). The following
members are yet to send back the signed reconciled statement to WRLDC for the period mentioned
above..
UI Pool Members REC Pool mmbers
1. MP Power Management Co.Ltd. 1. CSPDCL
2. Maharashtra SLDC 2. MP Power Management Co.Ltd.
3. GOA 3. MSEDCL
4. D&D 4.SLDC,GETCO
5. DNH 5. GOA
6. NTPC 6.D&D
7. POWERGRID(HVDC Vind & Bha) 7.DNH
8. LANCO
9. BALCO
10. CGPL
11. ESSAR Power
12. SASAN Power
13. KSK Mahanadhi
14. Korba(W) Power
15. DB Power
16. Jaypee Nigri TPP
17. ESSAR Steel
18. DGEN
Since there is a serious audit objection on non-signing of UI & REC reconciliation statement it is once
again requested that all UI pool members may sign the statement sent by WRLDC.
WRLDC has also sent the signed reconciliation statement for the period Jan’14 to Mar’14 to all UI pool
members on 7th April ‘2014 and all the details of payments/receipts of UI and REC during Jan’14to
Mar’14 are also uploaded on WRLDC website (www.wrldc.com/commercial/Pool Reconciliation).All
the UI/REC Pool members are requested to send the signed reconciliation statement for Jan’14 to
Mar’14 to WRLDC at the earliest.
Committee may like to note/discuss.
SA-9: Erroneous /less recoding of energy by SEMs in the following locations WRLDC vide letter dated 06.05.2014(copy enclosed at Annex.-SA-1), have intimated that the data from the following meters received at WRLDC are found to be erroneous. Location wise details are tabled below.
Description Meter No Meter Type Remarks
400KV SIDE OF GT‐1 AT VANDANA VL NP‐2857‐A Stand‐by 1. Erroneous recoding by all SEMs.
2. Even when GT is not in service meter is showing energy export.
3. Line meters are recoding inconsistent value at all time when compared with other end SEM data.
4. The matter has already been taken up with VVL and PGCIL. VVL so far could not establish any reason for the erroneous data recording. It is requested that POWERGRID may depute an officer to VVL for resolving the issue at the earliest.
400KV SIDE OF ST‐1 AT VANDANA VIDHUT NP‐2653‐A Stand‐by 400KV KORBA LINE AT VANDANA VL NP‐2652‐A Main 400KV KORBA LINE AT VANDANA VL NP‐2656‐A Check 400KV BIRSINGPUR LINE AT VANDANA VL NP‐2655‐A Main
400KV BIRSINGPUR LINE AT VANDANA VL NP‐2654‐A Check
220kV Kotmikala line‐I at Anuppur NP‐2163‐A
Main( Secure make)
1. SEM at Anupur is recording less energy continuously. The matter has been reported to SLDC< Jabalpur. It is requested to resolve the issue at the earliest.
Committee may like to discuss.
SA-10.:Requirement of the Special energy meters( SEMs) & DCDs for the year 2015&16.
WRLDC vide letter dated 09.05.2014(copy enclosed at Annex-SA-10) have intimated that they have
calculated requirement of SEMs for the years 2015 & 2016 for western Region. Consolidated
requirement of SEMs and DCD is as follows. Detailed SEM and DCD requirement sheet is enclosed at
Annex-I.
TOTAL SEM meter Requirement for 2015 &20 16 : 213 Nos
20 % Spare SEMs : 43Nos.
Total Requirement of SEMs including spares : 256Nos.
TOTAL DCD Requirement for 2015 & 16 : 21 Nos
20 % Spare DCD : 4 Nos
Total Requirement of DCD including spares : 25 Nos
Committee may like to note.
***************