maintenance activities
TRANSCRIPT
Maintenance Activities carried out on 06/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Chemical skid#2 Soda ash pump inspection for no flow2 BOP Lube Oil Pump strainer cleaning3 BOP Lakos filter cleaning
GT GT#2 Assembly work 4 BOP Raw water Tank#1 repair works by Raheem Contractor5 I&C GT GT#2 JB cable terminal tightness check & cleaning6 GT GT#1,3,4 Water Wash Online/Off line SOV checking7 Elec BOP Cable laying for Raw water Pressure Switch to Panel
8 BOP Chiller Inspection by Trane
Maintenance Activities carried out on 06/05/14 Day & Night ShiftWork Status Remarks
Done Air Lock releasedDoneDoneIn PrgIn PrgDoneIn PrgDone
In PrgAfter receiving the Oil Analysis report , Pending Maintenance activities will be performed by Trane.
Maintenance Activities carried out on 07/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 GT GT#2 Assembly work 3 BOP Old Valve Maintenance4 BOP Raw water Tank#1 repair works by Raheem Contractor5 I&C GT GT#2 Pressure Guage/Switch Calibration6 GT GT#5,6 Water Wash Online/Off line SOV checking7 Elec BOP BSDG- Cabling work for Battery Charger (Defect no :-590)
Maintenance Activities carried out on 07/05/14 Day & Night ShiftWork Status Remarks
DoneIn PrgIn PrgIn PrgIn PrgDoneIn Prg
Maintenance Activities carried out on 08/05/14-10/5/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 GT GT#2 Assembly work 3 BOP Old Valve Maintenance4 BOP Raw water Tank#1 repair works by Raheem Contractor
5 I&C GT GT#2 Pressure Guage/Switch Calibration & Calibration Report preparation6 GT All GT(Except GT#2) Instrument Panel cleaning7
ElecAnnual Outage Report Preparation
8 BOP Diesel/Electric Fire Pump & Jockey Pump Electrical PM9 GT All GT GLO/TLO Hydraulc Oil Tank Heater Monthly PM
Maintenance Activities carried out on 08/05/14-10/5/14 Day & Night ShiftWork Status Remarks
DoneIn PrgIn PrgIn Prg 8/5/2014
In Prg6405/64060 PSH Switch found faulty.Will be replaced on 11.5.14
DoneIn Prg GT Battery Charger report is pending - 8/5/14Done 9/5/2014Done 10/5/2014
Maintenance Activities carried out on 11/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 GT GT#2 Assembly work 3 BOP Preparation of flexible hose to fix in the Raw water pump return line 4 BOP5 BOP Lube Oil Pump strainer cleaning6
I&C
GT GT#2 Pressure Guage/Switch Calibration & Calibration Report preparation
7 BOP
8 GT9
ElecGT GT Package Ligthing Inspection
10 BOP
CT#1 Make up line "T" Joint leak arresting work(Defect no : 679)
GSU#1 Deluge Pressure switch-1 No response alarm Troubleshooting(Defect no :680)
GT#3 Gas Chromotograph inspection for Power Supply Failure(Defect no :681)
BSDG- Cabling work for Battery Charger (Defect no :-590)
Maintenance Activities carried out on 11/05/14 Day & Night ShiftWork Status Remarks
DoneIn PrgIn PrgDoneDoneIn Prg 6405/64060 PSH Switch replaced.
In Prg
In PrgDone 2 Lights replacedIn Prg
Maintenance Activities carried out on 12/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 GT GT#2 Assembly work 3 BOP Raw water Tank#1 repair works by Raheem Contractor4 BOP Chiller #1 Pump 430 Greasing work5 BOP Lube Oil Pump strainer cleaning6
I&C
BOP GSU #1 Pressure Switch No Response Alarm(Defect no : 681)
7 GT8 GT GT#2 Instrument Cable connections work9
ElecBOP Gas Compressor area Ligthing Inspection
10 BOP
GT#3 Gas Chromotograph inspection for Power Supply Failure(Defect no :681)
BSDG- Cabling work for Battery Charger (Defect no :-590)
Maintenance Activities carried out on 12/05/14 Day & Night ShiftWork Status Remarks
DoneIn PrgIn PrgDoneDoneIn Prg Suspected CIM800 card is faulty.
DoneIn Prg Acoustic Sensor #1 Cable insulation found damage near JB.Done 1 Lamp Replaced In Prg Charger will be installed today
Suspected Field Termination Board is Faulty. But now its working good.
Maintenance Activities carried out on 13/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning
2 GT GT#2 Assembly work3 BOP Raw water Tank#1 repair works by Raheem Contractor4
I&C
BOP GSU #1 Pressure Switch No Response Alarm(Defect no : 681)
5 GTGT#2 Instrument Cable connections work/Cable dressing
6Elec
BOP All GT Generator /Gas Compressor Space Heater Inspection Monthly PM7 BOP8 BOP Store Area Ligthing Inspection9 BOP BSDG- Cabling work for Battery Charger
Demin Plant/3000 Container AC Inspection(Defect no :-684)
Maintenance Activities carried out on 13/05/14 Day & Night ShiftWork Status Remarks
Done
In PrgIn PrgIn Prg CIM 800 Card is faulty. Ordered new one.
In Prg
In PrgDone Gas Refilled in 3000 Container AC.DoneDone
CDP/TBV/Stage8 Valve Fixing work/Piping Work/Diffuser Insulation/Gearbox Coupling Guard fixing work completed
PS3 & TBV Impulse tubing connections yet to be done.Repaired Acoustic Sensor #1 cable for insulation damage
Generator SH Inspection Completed.Gas Compressor SH found not working.Will be checked today
Maintenance Activities carried out on 14/05/14 Day & Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 BOP Lube Oil Pump B Strainer Cleaning 3 GT CO2 Cylinder Removal from GT#1 and fixing in GT#2
4 BOP
5 GT GT#2 Assembly work6 BOP Raw water Tank#1 repair works by Raheem Contractor7
I&C
GT GT#2 Instrument Cable connections work/Cable dressing
8 GTGT#2 24VDC Neg Ground Trouble shooting
9 GT All GT Condensate Pump Level Switch Inspection PM10 GT GT#2 Pressure Transmitter Calibration11
ElecBOP Battery Bank Room/Chiller Enclosure Exhaust Fans Inpection PM
12 GT All GT Generator Shaft Earthing Brush Inspection PM
Raw water pump discharge line (cooling tower makeup header) leak arresting work (Defect no: 679)
Maintenance Activities carried out on 14/05/14 Day & Night ShiftWork Status Remarks
DoneDoneDone 2 CO2 Cylinders replaced.
Done
DoneIn PrgDone
Done
DoneIn PrgDoneDone
Filter House cleaning,Cover Fixing,Replacement of AGB Link Assembly, Final Inspection by GE
Found negative ground in 24+11 circuit -- SOV 62501 cable insulation damage. Cable insulated with tape and alarm cleared.
Found water inside GT# 1 & GT#3 Condensate pump level switch,cleaned well & then closed the cover
Maintenance Activities carried out on 15/05/14 Day -17/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 BOP Lube Oil Pump B & C Strainer Cleaning 3 BOP Old Valve Maintenance4 BOP Chemical Skid #2 Cleaning(Defect no :686)5 GT Sump Flow Test By GE in GT#4,56 GT GT#3 Alignment Check by GE7 BOP Raw water Tank#1 repair works by Raheem Contractor8
I&C
BOP Modification of Raw Water Pump Panel connections for New Pressure Switch
9 GTGT#2 Electrical Cable inspection & Rectification
10 GTGT#6 Gaschromatograph Manual LHV selection alarm
11 GT GT#2 Gen/Turbine Vent Fan Flow Switch Inspection12 GT TCP/PLC/GCP Panel Air Filter inspection and cleaning
13 GTGT#2 Gas Sensor Inspection
14
Elec
BOP Trail Run of GT#2 Generator Vent Fan B(No Load)
15 BOP Inspection of Gas Compressors Space Heaters16 GT MCC Lighting Inspection17 CCTV Camera Inspection by Contractor
Maintenance Activities carried out on 15/05/14 Day -17/05/14 Night ShiftWork Status Remarks
DoneDoneDone 10 Valves serviced and kept in storesDoneDoneDoneIn PrgDone Trail Taken and found Ok.
DoneT 25 Cable insulation found damage near the sensor.Rectified it
DoneDone Except Gen Vent Fan BDone
DoneDone No Load Current is R-48.5/ Y-48.4/ B-45.8.
In PrgDone 16 lamps repalced in MCCDone Replaced 1 camera(Camera no 5)
Checked all parameters.Found Good.Manual calibration initaited.Now its working good.
Gas sensor B, C & E Calibration done.All other sensor calibration is planned for today(18/5/14).
Found Space Heater supply is not connected in GC's.Need to arrange 220VAC from LDP Panel.Found GC#4 Space Heater resistance is 2 ohms,so motor side will be checked today
Maintenance Activities carried out on 18/05/14 Day -18/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 BOP Lube Oil Pump A Strainer Cleaning 3 BOP Old Valve Maintenance
4 GT GT#2 Generator Vent Fan B Maintenance5 BOP Raw water Tank#1 repair works by Raheem Contractor6
I&C
GT GT#2 Gen Vent Fan B Flow switch inspection & Functional checking7 GT GT#2 Vibration System Functional Check 8 GT Inline Sample Gas Line Filter Fixing in GT#19 GT GT#2 Online/Offline SOV Inspection
10 GTGT#2 Gas Sensor Inspection
11Elec
BOP Air Conditioners Weekly InspectionGIS Refilling of SF6 Gas in Bay#1
12 GT Ethernet Cable Pulling work
Maintenance Activities carried out on 18/05/14 Day -18/05/14 Night ShiftWork Status Remarks
DoneDoneIn Prg
In PrgIn PrgDoneDoneIn Prg Fixed.Not Checked due to non availability of Gas in GT#1Done
DoneDoneDone HP:-15.4 Bar,LP-3.9 BarDone For Maximo Training
Load Trail taken and current found normal.R-108.9. Y-101.6. B-105.2. and Inrush Current is: 853.2.
Turbine Gas sensor A, D & E and Generator Gas Sensor Calibration done.
Maintenance Activities carried out on 19/05/14 Day -19/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 BOP Chiller #1 & 2 Cleaning3 BOP 200 B Inspection by Trane for Low Oil Temperature(Defect no:687)4 BOP Raw water Tank#1 repair works by Raheem Contractor
5
I&C
GTGT#2 SOV Stroke checking(6249/6204)
6 GT GT#2 Chilled Water Flow Meter Inspection7 GT GT#2 Gas Chromotograph Power Supply Installation
GT GT#2 Oil Leak arrest work insideWet Panel8 GT GT#2 Gas Sensor E Calibration(Defect no:692)9
ElecMr.Mike Belly Room/3000 Container Air Conditioners Inspection by Al Ahlia
10 BOP Lakos Motor Greasing
Maintenance Activities carried out on 19/05/14 Day -19/05/14 Night ShiftWork Status Remarks
DoneDoneIn Prg Topped up 8 ltrs of Oil.Under ObservationIn Prg
DoneIn PrgDoneDone Found Tubing was loose in PDI 6149.Tightened itIn PrgIn PrgDone
SOV 6204 not opened.Found Cable was loose.Rectified and Functional check done
Maintenance Activities carried out on 20/05/14 Day -20/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 GT GT#2 Package Inspection done by Mr.Tansel3 BOP Lube Oil Pump B Strainer Cleaning 4 BOP Raw water Tank#1 repair works 5
I&C
GT GT#2 Gas Sensor E Inspection and Calibration6 GT GT#1 Gas sensor#A, D & E inspection
7
GT8 GT GT#2 Condesate Pump9 BOP Chiller #1 not communicating with SCS
10GT
11 ElecGT GT#1 TLO Heater Inspection
GT#2 XE 6877 WIDE BAND INPUT NORMALIZED XE 6876 WIDE BAND INPUT NORMALIZED XE6897 READOUT Alarm
GT#6 XE 6877 WIDE BAND INPUT NORMALIZED XE 6876 WIDE BAND INPUT NORMALIZED XE6897 READOUT
Maintenance Activities carried out on 20/05/14 Day -20/05/14 Night ShiftWork Status Remarks
DoneDoneDoneDoneDone Replaced Gas sensor.Sensitivity =52mvDone Zero calibration done
In prgDone Needle valve found chocked.Cleaned itDone Replaced the Ntron Switch
In PrgRestarted the Ifix-Startup in HMI.Alarm got reset
Done
Checked in Bently Nevada monitoring system, found normal.Recycled the Power for Bently Nevada system & not got reset.Further recyled the Micronet power & the alarm got reset.
Removed the Jumper from TCP and modified the setting in thermostat
Maintenance Activities carried out on 21/05/14 Day -21/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
BOP Lakos filter cleaning2 BOP Lube Oil Pump B Strainer Cleaning 3 BOP Chiller #1 & 2 Cleaning4 BOP GC#1,2,3,4 Skid cleaning
5 BOPRaw water Tank#1 repair works
6I&C
GT GT#1 Gas Sensor A Inspection and Calibration7 GT GT#2 SOV 6204 Stroke checking(Defect no :696)8 GT GT#2 Inspection of SIO communication module interface in Vibration Rack
9 Elec BOP GC#4 Space heater Inspection
Maintenance Activities carried out on 21/05/14 Day -21/05/14 Night ShiftWork Status Remarks
DoneDoneDoneDone
DoneDone Sensitivity = 32mvDone Found goodDone Cleaned the card and fixed back.Done H1-H2 ,H2-H3 is 54.6 Ω
Modifed supply line inside the tank and leak arrested in level gauge
Maintenance Activities carried out on 22/05/14 Day -24/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#2 GLO Demister leak arrested by replacing "O" ring with new one2 GT GT#1 Filter House Cleaning with Mr.Tansel3 GT GT#5 Gen Vent Fan B Impeller Fixing and Alignment 4 GT GT#1,2,5,6 Package Inspection and cleaning5 BOP Lube Oil Pump A Strainer Cleaning 6 GT All GT TLO cooler A/B Cleaning7 GT All GT TLO/GLO Skid Cleaning8 BOP Lakos filter cleaning9
I & C
Annual Outage report preparation work10 GT GT#1 Pressure Transmitters tubings leak check11 GT GT#5 Gas Sensor A & GT#6 Gas sensor B,C,D inspection(Defect no:707,711)
12 GT GT#1 Gas sensor A Inspection and calibration(Defect no:706)13 GT GT#2 Gas chromotograph analog output high alarm(Defect no:701)14 Elec GT MCC AC Inspection (Near GT#2 Generator Breaker)
Maintenance Activities carried out on 22/05/14 Day -24/05/14 Night ShiftWork Status Remarks
DoneDoneDoneDone Found Oil Leak near GT#1 Generator couplingDoneDoneDoneDoneIn PrgDone Found no leak.Done Zero calibration done
In PrgHelium cylinder & pressure gauge repalced with new
In Prg Found ICM 40 relay is faulty.
Sensor and card found good and readings are stable after calibration.Kept under observation
Maintenance Activities carried out on 25/05/14 Day -25/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
GTGT#6 Turbine vent fan "A" and Generator vent fan"B" Checking for low Flow Alarm
2 GT GT#5 Gen Vent Fan B Belt Fixing and Alignment 3 GT GT#1,2,5,6 Package Inspection and cleaning4 BOP Lube Oil Pump A Strainer Cleaning 5 BOP Lakos filter cleaning6
I & C
Annual Outage report preparation work
7 GTGT#2 Chilled Water Flow Transmitter Inspection
8 GT GT#3 Gas Sensor C,GT#6 Gas sensor B,GT#1 Gas sensor A,C,E Inspection9 GT GT#6 Turbine vent fan "A" and Generator vent fan"B" Flow switch inspection
10 Elec GT MCC AC Inspection
Maintenance Activities carried out on 25/05/14 Day -25/05/14 Night ShiftWork Status Remarks
DoneFound belt was loose.So tightened it
DoneDoneDoneDoneIn Prg
DoneDone Zero calibration doneDone Found working properlyIn Prg
Found Rectifier is faulty.Checked with 24VDC and found working.110VAC/24VDC Power supply converter required.
Maintenance Activities carried out on 26/05/14 Day -26/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#6 TLO Scavange line strainer Inspection2 GT GT#5 Turning Gear Oil level low
3 GT GT#2,3,4,5 Package Inspection and cleaning
4 BOP Gas Compressor #1,2,3,4 skid cleaning5 BOP Lube Oil Pump A Strainer Cleaning 6 BOP Lakos filter cleaning7
I & C
Annual Outage report preparation work8 GT GT#3 IR Gas sensor inspection for Airflow
9 GT GT#3 Gas Sensor C,D Inspection for UR
10 GT Cooling Tower Fan 610A Inspection for Vibration Alarm11
Elec
GT GSU#2 Alarm Troubleshooting
12 GT GT#4 24VDC Battery Charger DC output failure Alarm troubleshooting
13 BOP Installation of Battery for BSDG
Maintenance Activities carried out on 26/05/14 Day -26/05/14 Night ShiftWork Status Remarks
Done Found coke particles.Replaced with new oneDone Topped up with 1/2ltr of Oil
Done
DoneDoneDoneIn PrgDone
Done C Sensor Calbration done 29 mv,D sensor zero calibration done
Done Reset the alarm and taken trail.Found normalDone Found Motor Saver relay faulty.Repalced with new one
In Prg
Done
Found GT#3 Lock Wire Damaged Near VBV, So Replaced with new one.GT#4 Found Blanket Not Fix Properly so Fixed it properly.
Found COM10 Modular Back Side Connecter Loose in 125VDC battery charger.Tightened it.Under observation
Maintenance Activities carried out on 27/05/14 Day -27/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#6 TLO Scavange line Boroscope Inspection2 GT GT#2,3,4,5 TLO Scavange strainer inspection3 GT GT#1.2,3,4,5,6 Package Inspection and cleaning4 BOP Chiller #1 100A/B Inspection by Trane5 BOP Lube Oil Pump A,B,C Strainer Cleaning 6 BOP Lakos filter cleaning7
I & C
Annual Outage report preparation work8 GT GT#5 Generator Vent Fan B Flow Switch inspection9 GT GT#2 PT 62234 Sprint Supply PT Inspection
10 BOP CT Fan 610A,620A Inspection for Vibration Alarm11 GT GT#3 Gas sensor A & C ,GT#5 Gas sensor A Inspection
12 GT GT#6 PSLL 6116 Inspection for GT Trip -TLO pressure Low low Alarm
Maintenance Activities carried out on 27/05/14 Day -27/05/14 Night ShiftWork Status Remarks
Done Found coke particles.Replaced scavange hose with new oneDone Found good.DoneDone IGV Actuator pins (2 nos) found broken same replaced with newDoneDoneIn PrgDone Installed new switch and functional check done.Done Normalised the PTDone Checked along with mechanical and adjusted the sensitivityDone Zero calibration done
Done Functional test for the switch done and found air trapped in the line.So vented it
Maintenance Activities carried out on 28/05/14 Day -31/05/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#6 Turbine Vent Fan A Belt Inspection2 BOP GC#4 Oil Leak from Lube pump3 GT GT#1.2,3,4,5,6 Package Inspection and cleaning4 BOP Chiller# 2 Make up Water Line Isolation Valve Connecting Flange leak 5 BOP Lube Oil Pump A,B,C Strainer Cleaning 6 BOP Lakos filter cleaning7
I & C
GT GT#6 Generator Vent Fan B Flow Switch Inspection 8 GT GT#1,2,3,4,5,6 I&C Package Inspection9 GT GT#3 Gas Sensor A,B,C Inspection
10 BOP GT#3 24VDC Neg Ground Fault11 GT GT#1,4 Gas Sensor A& 5 Gas Sensor A,C Inspection12 GT GT#2 Calorific Summary Alarm Trouble shooting13 GT GT#2 Gen Breaker was not closing14 GT GT#5 125VDC Battery Charger Failure Alarm
15 GT Gas Chromotograph #1,2,3,6 Inspection
16Elec
BOP Chiller #2 Enclosure Lighting Inspection17 BOP Chiller Starter Lamp repalcement18 GT GT#6 Turbine Vent Fan A Inspection for Low Flow
Maintenance Activities carried out on 28/05/14 Day -31/05/14 Night ShiftWork Status
DoneDoneDoneDoneDoneDoneDoneDoneDoneIn PrgDoneDoneDoneDone
Done
DoneDoneDone
Maintenance Activities carried out on 28/05/14 Day -31/05/14 Night ShiftRemarks
No abnormalities foundFound rupture disc broken in Force Feed Lubricator.Replaced the same
Replaced the same
Found working good
A sensor calibrated.Sensitivity 20.9mvFound Sprint SOV-62330 24+12com cable faulty between MTTB to SOV Zero calibration doneFound Cable loose in Gas Chromotograph #2Found Spring Charge Motor was faulty.Replaced the same from Spare BreakerFound Alarms in all module.so recycled the power.Now Ok
Replaced 6 LampsIndication Lamps replaced 4 nosBreaker Found Trip.Checked the Motor and normalised
Found Gas chromotograph#3 was not working.So checked and replaced the Field Terminal Board.Kept under observation
Maintenance Activities carried out on 1/06/14 Day -1/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Lakos filter cleaning2 GT GT#2,3,4,5 Package inspection and cleaning3 GT GT#1,2,3 Filter house cleaning
4 BOP Chiller #1 100B/300B Inspection by Trane
5 BOP Lube Oil Pump A,B,C Strainer Cleaning
6 BOP Air Compressor #2 Mechanical Maintenance
7 BOP Gas compressor #1 Oil leak arresting
8 BOP Gas compressor #1 Oil Top up
9 GT Vibration Measurement
10 BOP GT#2 TLO Secondary Air/Oil Separator Return line checked for air lock
11
I & C
GT GT#2 MW Control not Enable
12 GT GT#3,5 Gas sensor A inspection13 GT GT#2,3 VG DP Tubing/Guage Inspection14 BOP CT Fan 620A Inspection for Vibration Alarm15
ElecBOP Chiller Pumps & CT Fan Motor OLR Set Value Adjust
16 BOP Transformer weekly checks
Maintenance Activities carried out on 1/06/14 Day -1/06/14 Night ShiftWork Status Remarks
DoneDoneDone
Done
Done
Done
Done
Done Day tank oil level found less and same topped up.
Done
Done No Abnormalities found
Done
DoneDoneDoneDone Set as per name plate dataDone
100B Oil Replaced,300B is under observation for Condensor Pressure High
Air inlet filter cleaned,general inspection done found good and package cleaned
GC#1 Cross head oil line check valve leak arrested and Discharge Bottles on both sides supports loosened.
All Chillers,Raw water Pump,CHW & CW Pump and GT#2,5,6 Gen Vent Fans
Found Cable was loose in K231 Relay and not getting utility breaker closed feedback.Rectified it
Maintenance Activities carried out on 2/06/14 Day -2/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Lakos filter cleaning
2 GT
3 BOP Chiller #1,2 Package cleaning4 BOP Lube Oil Pump A,B,C Strainer Cleaning 5 BOP Cooling tower # 1 Corrosion coupan line isolating valve replaced with new one.6 BOP GT#1,2,3,4,5 Package inspection and cleaning7 GT Blue Wraps cleaning8 BOP GT#4,5,6 Filter house cleaning9
I & CGT GT#3 & GT#5 Gas sensor A replacement
10 BOP All Gas Compressor Panel Inspection11
Elec
GT GT#3 Cable laying and Termination work for SOV62330
12 GTGT#3 GVF#B Trip while Starting
13Inspection of Spare Generator Vent Fan Motor
GT#3,4,5,6 TLO Scavange line,Cooler outlet and Air/oil separator return line strainers inspection
Maintenance Activities carried out on 2/06/14 Day -2/06/14 Night ShiftWork Status Remarks
Done
Done Found coke particles,so replaced all strainers.
DoneDoneDone Valve was not operating.So replaced it.DoneDoneDoneDone Sensitivty 55.3 mv & 49.2mv respectivelyDone No Abnormalities foundDone Functional Check done.Found Good
In prg Found Motor R Phase winding is grounded.Need to Replace Motor
Done Found one motor is new and healthy.Other one need to be overhauled
Maintenance Activities carried out on 3/06/14 Day -3/06/14 Night ShiftS.no Dept Area
1
Mech
GT
2 GT
3 BOP4 BOP
5 GT
6 BOP7 GT
8 BOP
9 I & C GT10
Elec
GT
11 GT
Kindly update the Defect List
754 26-May-14
744 30.05.14 GT# 3
745 31.05.14 GT# 6
746 1-Jun-14 GT#3
748 1-Jun-14 GT#5
751 GT#5
752 GT#3
710 24-May-14 GT# 6
712 24-May-14 GT# 6
Cooling tower#
1
721 26-May-14 MANLIFT
Maintenance Activities carried out on 3/06/14 Day -3/06/14 Night ShiftJob Description Work Status
Lakos filter cleaning Done
Done
Chiller #1,2 outside cleaning DoneLube Oil Pump A,B,C Strainer Cleaning Done
GT#5 Generator Vent Fan A Inspection Done
GT#1,2,4,5 Package inspection and cleaning DoneMan Lift Oil leak Inspection (Defect no :-721) Done
TLO Temporary storage drum Cleaning Done
GT#2 & GT#4 Gen Enclousure Gas sensor Inspection DoneCable Laying for Gas compressor space heater Done
Lakos Filter#851 Trip Done
Kindly update the Defect List
Fan breaker 610A not able to put in manual selection
Manual LHV/SG alarm appeared and persisting
Turbine vent fan # A breaker in trip condition.
Gas sensor-A ,Cand E reads negative. Completed on 2.6.14
Gas sensor-A reads negative. Completed on 2.6.14
Gas sensor-A and B read negative. Completed on 2.6.14
Gas sensor-C and E read negative. Completed on 2.6.14
GT#1,2 TLO Scavange line,Cooler outlet and Air/oil separator return line strainers inspection
Completed on 27.5.14
Completed on 31.05.14
Completed on 31.5.14
Generator vent fan B flow alarm received when fan is running and standby fan was kicked on.
Completed on 25.5.14
Turbine vent fan A flow low alarm appereared and standby fan started while GT running.
Completed on 25.5.14
FUEL LEAKAGE FOUND IN ENGINE. SHOULD NOT USE UNTIL FIX THE ISSUE Completed on 3.06.14
Maintenance Activities carried out on 3/06/14 Day -3/06/14 Night ShiftRemarks
Zero adjustedTermination not done.
Kindly update the Defect List
Working in Auto /Manual
Breaker normalised.no abnormalities found
A Sensor Replaced
A Sensor Replaced
Zero Adjusted
Zero Adjusted
Found Normal
Found Normal
Found Motor NDE Sound Abnormal.So kept as Emergency Standby.Motor Will be repalced with Spare Overhauled Motor(Sent out for Overhauling)
Turbine lube oil Temporary storage drum cleaned and kept container for New TLO oil flushing.
Winding Resistance checked, and Megger Value checked found all normal, then started and Checked Load Current.Found normal
Field termination module replaced with new one , voltages measured and put in service. Now it working normal.
Found Hydraulic oil leak from the boom lifting fitting same o-ring replaced,operated and checked found good.
Maintenance Activities carried out on 9/06/14 Day -9/06/14 Night ShiftS.no Dept Area Job Description
1Mech
GT Lakos filter cleaning2 GT ALL GT HLO Oil sampling3 GT GT#4,5,6 Generator/Turbine Vent Fan greasing4
I & C
GT GT#4 Gas sensor G Inspection5 GT GT#2 VG Filter DP Guage tubing leak arrest
6 Bop AUX Transformer(3.3KV/415V) Alarm Trouble shooting
7 GT GT#1 PS3 Tubing Leak check
8 3000 Container AC Replacement
9 Elec GTGT#4 24VDC Battery Charger gorund fault
Maintenance Activities carried out on 9/06/14 Day -9/06/14 Night ShiftWork Status Remarks
DoneDoneDoneDone Zero Calibration doneDone
Done
Done Found Leak in PS3 A tubing.Will be replaced
Done
Done
Found Liquid Temp High alarm.Suspected Guage is faulty(Liquid Temp 80 c and Winding was 60 c)
Replaced with old one by Al Ahlia. All other AC in stores were found faulty.
Found Surge suppressor was faulty across sov 6249.so replaced with new one
Maintenance Activities carried out on 11/06/14 Day -12/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT ALL GT Turbine/Generator Vent Fan Belt Tightness Check2 GT ALL GT TLO Oil sampling3 GT GT#3 Filter House Blanket media replacement4 Bop Chiller #2 PVC Leak Arrest5 Bop Raw Water Pump Discharge Line Leak6 GT All GT Post Shutdown Inspection7 I & C GT GT#6 Turbine Vent Fan A Flow Switch Inspection8
ElecBop Indication Lamp Fixing in Raw Water Pump Panel
9 GT MCC AC #3,5 Inspection
Maintenance Activities carried out on 11/06/14 Day -12/06/14 Night ShiftWork Status Remarks
DoneDoneDoneDone Cooling Tower # 2 PVC Make up line leak arrested.Now OkDoneDoneDoneDone Lamp is fixed.Connections will be given todayDone Both AC's are working now.Replaced Thermostat in AC#5
Maintenance Activities carried out on 12/06/14 Day -14/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT All GT TLO,HLO,GLO Sampling
2 GTALL GT TLO Top Up
3 BOP Lakos Filter Cleaning4 BOP Lube Oil Pump A,B,C Strainer Cleaning 5 GT GT #1,2,3,4 Blue wraps replacement6 BOP GT #4,5 Blanket replacement7 Blue wraps &Blanket replacement8 GT All GT Post Shutdown Inspection9
I & C
GT GT#1 Gas Sensor A, #3 C,#56 D sensor Inspection10 BOP CT Fan 620 A Inspection11 BOP Instrument Air leak arrest in GC#4 Inlet scrubber level controller12 BOP Air Compressor #2 K21,K22,K23 Aux Contacts replacement
13 GT Inspection of T2 Sensor Connection in GT# 6 for Temp Difference
14
GT All GT I&C Inspection15
16
17 GT Fixing of 6404 A Filter House Ventillation DP Guage in GT#118 BOP CT#1,2 Level Switch Inspection
Maintenance Activities carried out on 12/06/14 Day -14/06/14 Night ShiftWork Status Remarks
Done
Done
DoneDoneDoneDoneDoneDoneDone Zero Calibration doneDone Checked with mechanical and adjusted the sensitivityDone Found Pressure guage faulty.Repalced and arrested the leakDone Under Observation.
Done
Done
In GT#5 Sensor dust cover was missing in Gas sensor#E.In GT#6 Found XN25 sensor-A cable was loose, then tightened it.
DoneDone
GT-1=11.6,GAL,GT-2-22.36,GT-3-13.98:GT-4-13.33:GT-5-2.15:GT-6-10.32-US.GALON
Found Resisitance difference between A & B=0.2 Ohms in MTTB.Resistance found same in Engine Panel. Nomalised and tightened the connection.Now its ok
In GT#2 ,Found Oil drop in return line CDP to Stage8 valve Tee fitting connection.Tightened it.
Maintenance Activities carried out on 15/06/14 Day -16/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Cooling Tower #2 Water line leak arrest
2 GTGT#2,4,5 Package inspection and cleaning
3 GT GT#6 Blanket media replacement4 Bop Lakos filter cleaning5 Bop Lube oil Cooling water pump strainer cleaning6
I&C
Bop Installation of Indication Lamp for Raw Water Pump panel7 GT All GT Pressure Transmitter Inspection8 Bop Inspection and Calibration of PH Sensor(DM Water)9 GT GT#1 GLO O/L Cooling Water Pressure Gauge Not Working (Defect no :698)
10 Elec GT CT Fan 610 A Start Stop Alarm Troubleshooting
Maintenance Activities carried out on 15/06/14 Day -16/06/14 Night ShiftWork Status Remarks
Done
Done
DoneDoneDoneDoneIn Prg GT # 1 PTB- B, GT # 5 PTB- A, GT # 6 PTB- A zero calibration doneDoneDone Replaced with new one.In prg Found Over Load Relay is Faulty
Found Oil drop in return line Tee fitting from CDP to Stage8 valve connection.Tube will be replaced today.
Maintenance Activities carried out on 16/06/14 Day -16/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GTGT#5 Offline WW Strainer Inspection
2 GT GT#2,4,5 Package inspection and cleaning3 GT GT#6 Canister replacement4 Bop Lakos filter cleaning5 Bop Lube oil Cooling water pump strainer cleaning6
I&CGT All GT Pressure Transmitter Inspection
7 GT GT#2 Gear Box Vibration Sensor Inspection8 Elec Control Room Lighting Inspection
Maintenance Activities carried out on 16/06/14 Day -16/06/14 Night ShiftWork Status Remarks
Done Inspected and found block on the seal area .So cleaned and fixed back.
DoneDoneDoneDoneIn Prg GT#1 PS3 A/B Caibration doneDone Found goodDone
Maintenance Activities carried out on 16/06/14 Day -16/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GTGT#4 Offline/Online WW Strainer Inspection
2 GT Blue wraps cleanig3 GT GT#5 Inlet Volute Inspection4 GE Tools loading for despatch5 GT GT#2 Turbine and generator Platform installation work6 Bop Lakos filter cleaning7 Bop Lube oil Cooling water pump strainer cleaning6
I&CGT GT#1 PS3 Calibration
7 GT GT#4 Water Wash Preparation/Normalisation8 Elec Bop Cabling work for Space heater in all GC's
Maintenance Activities carried out on 16/06/14 Day -16/06/14 Night ShiftWork Status Remarks
Done
DoneDoneDoneDoneDoneDoneDoneDoneDone Completed in GC Starter.Need to terminate in LDP
Inspected and found offline strainer block and crack and online strainer was not avaialble.So replaced with new strainer.
Maintenance Activities carried out on 18/06/14 Day -18/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
Bop Blue wraps,Blanket cleaning2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning4 GT All GT Filter House Inspection & Cleaning5 GT GT#5 Blue wraps replacement6 GT GT#4 Inlet Volute and WW Strainer Inspection7 GT GT# 4 TLO Primary Air/oil seperator return line union leak arresting work8
I&CGT GT#5 PTBA,GT#2 PTBA/B Calibration
9 GT All PLC Panel Inspection10
Elec BopRemoval of spares from old scrap items
11 All GT Enclosure/Filter house lighting inspection
Maintenance Activities carried out on 18/06/14 Day -18/06/14 Night ShiftWork Status Remarks
DoneDoneDoneDoneDoneDoneDoneDoneDoneDone Handed over to JeyanthiDone 4 nos of light repalced
Maintenance Activities carried out on 19/06/14 Day -21/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
Bop Blue wraps,Blanket cleaning2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning4 GT GT#4 Fuel Nozzle 1-11,11-20 Swapping5 GT Loading Scraps in trailer6 Bop Chiller Area cleaning7 Bop Gas cooler fan greasing8 Bop Gas Compressor #1,2,3,4 cleaning9 GT GT#1,2,3 TLO,GLO Skid cleaning
10 Bop Chemical Dosing Pump inspection in Chiller #111 GT GT#1 WW Strainer Inspection12
I&C
GT GT#4 SOV 6249 Pressure Regulator Tubing Gas leakage
13 GTGas Chromotograph #1,2,3,4 Monthly Inspection
14 GTGT#4 TSH 1602 Temp Switch Inspection
15 GT GT#1 Water Wash Preparation/Normalisation16 GT GT#1 WW Pump Pressure gauge was not working17 GT GT#1 Gas sensor Inspection for High Alarm18
Elec BopPower Washer Pump trouble shooting
19 GC/Chiller Area Lighting Inspection
Maintenance Activities carried out on 19/06/14 Day -21/06/14 Night ShiftWork Status Remarks
DoneDoneDoneDone For T48 Spread HighDoneDoneDoneDoneDoneDoneDone Found rust, so cleaned and fixed backDone Repalced the tubing
Done
In Prg
DoneDone Swapped from GT#5.Need to order new oneDone Calibrated the sensor.Sensitivity 48.5 mvDone Found Switch was faulty.Replaced itDone 6 lights replaced
Found Sample Gas Pressure Guage is not working properly.Need to repalce
Temp Set Point Found 170 f,so changed to 180 f as per manual.Need to check the Oil Temperature in the next cranking.
Maintenance Activities carried out on 22/06/14 Day -22/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#2,3 Gen and Turbine Vent Fan Greasing2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning4 GT GT#2 WW Strainer Inspection5
I&CGT GT#1 C,GT#2 E Gas sensor Inspection
6 Bop Chiller #1 PLC Battery Fault Indication7 GT GT#1 Water Wash Preparation/Normalisation8
Elec BopChiller #2 MCC Inspection
9 Admin Bldg lighting inspection
Maintenance Activities carried out on 22/06/14 Day -22/06/14 Night ShiftWork Status Work Order No
DoneDoneDoneDoneDoneDoneDoneDone 1887Done
Maintenance Activities carried out on 22/06/14 Day -22/06/14 Night ShiftRemarks
Found rust, so cleaned and fixed backCalibrated GT#2 E Sensor,Sensitivity 47mvReplaced the battery with new one
5 Indication Lamps replaced10 nos of lights,5 Starters were repalced
Maintenance Activities carried out on 23/06/14 Day -23/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Scrap Loading 2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning4 Bop GT#1 GLO Skid Cleaning5
I&CGT GT#2 E Gas sensor Inspection
6 Bop GT#2 TSH 1602 Inspection7 GT CCTV Camera Inspection8 Elec Bop Electrical Fire Pump Supply not available
Maintenance Activities carried out on 23/06/14 Day -23/06/14 Night ShiftWork Status Work Order No
In PrgDoneDoneDoneDoneDoneIn Prg 1885Done 2392
Maintenance Activities carried out on 23/06/14 Day -23/06/14 Night ShiftRemarks
Found Temp set point was 165f, So changed to 180 f
Found Breaker handle broken.So replaced with new one
Maintenance Activities carried out on 24/06/14 Day -25/06/14 Night ShiftS.no Dept Area Job Description Work Status
1
Mech
GT Scrap Loading In Prg
2 GTGT#4 Filter House Inspection
Done
3 GT GT#4 Inlet Volute/FOD Screen Inspection Done4 GT GT#4 Exhaust Stack Inspection Done5 GT GT#4 Chip Detector Inspection Done6 GT GT#4 VBV Duct Inspection Done7 GT GT#4 Lube Oil/Scavange line Inspection Done8 GT GT#6 WW Strainer Inspection Done
9 GTGT#5 Filter House Inspection
Done
10 GT GT#5 Inlet Volute/FOD Screen Inspection Done11 GT GT#5 Exhaust Stack Inspection Done12 GT GT#5 Chip Detector Inspection Done13 GT GT#5 VBV Duct Inspection Done14 GT GT#5 Lube Oil/Scavange line Inspection Done
15 GT GT#3 Inlet Volute Inspection Done
16 GT GT#4 Inlet Volute Inspection Done
17 Bop Lakos filter cleaning Done18 Bop Lube Oil Cooling water pump strainer cleaning Done19 Bop GT#1 GLO Skid Cleaning Done20
I&C
GT GT#3,4 Water Wash Preparation/Normalisation Done
21 BopGT#6 Chip Detector A/Comm Alarm
In Prg
22 GT CCTV Camera Inspection In Prg
23Elec
Control Room SCS #5 UPS Inspection Done
24 GT GT#3 WW SOV Inspection for not functioning Done
Maintenance Activities carried out on 24/06/14 Day -25/06/14 Night ShiftWork Order No
242624833065275731142820
242624833065275731142820
2302
1885
Maintenance Activities carried out on 24/06/14 Day -25/06/14 Night ShiftRemarks
Pipes and AC's were shifted
Found some small amount of coke hence cleaned and fixed back.Found chocked.So cleaned it
Found some small amount of coke hence cleaned and fixed back.
Cable found grounded due to water ingress.Cable will be replaced if faulty after FSNL.
Found Camera 15 Power supply adapter was faulty.Ordered new one.
Checked the cables and stroke check done.Found working as per Logic
Found some clamps loose same double gasket applied and 2 no's Canister clamps replaced,Dark room test done found good.
Found some clamps loose same,hence double gasket applied .Dark room test done found good.
Inlet volute,6 O'clock Drain screen and offline water wash filter inspected after Turbine offline water wash.Combustor drain line connected and package cleaned.
Found Battery was faulty.Swapped with Standby UPS.New Battery Ordered for the same
Maintenance Activities carried out on 26/06/14 Day -28/06/14 Night ShiftS.no Dept Area Job Description Work Status
1
Mech
Scrap Loading In Prg2 GT GT#2 Filter House Inspection Done3 GT GT#2 Inlet Volute/FOD Screen Inspection Done4 GT GT#2 Exhaust Stack Inspection Done5 GT GT#2 Chip Detector Inspection Done6 GT GT#2 VBV Duct Inspection Done7 GT GT#2 Lube Oil/Scavange line Inspection Done8 GT GT#3 Filter House Inspection Done9 GT GT#3 Inlet Volute/FOD Screen Inspection Done
10 GT GT#3 Exhaust Stack Inspection Done
11 GTGT#3 Chip Detector Inspection
Done
12 GT GT#3 VBV Duct Inspection Done13 GT GT#3 Lube Oil/Scavange line Inspection Done14 GT GT#6 Filter House Inspection Done15 GT GT#6 Inlet Volute/FOD Screen Inspection Done16 GT GT#6 Exhaust Stack Inspection Done17 GT GT#6 Chip Detector Inspection Done18 GT GT#6 VBV Duct Inspection Done19 GT GT#6 Lube Oil/Scavange line Inspection Done20 GT GT#1 Filter House Inspection Done21 GT GT#1 Inlet Volute/FOD Screen Inspection Done22 GT GT#1 Exhaust Stack Inspection Done23 GT GT#1 Chip Detector Inspection Done24 GT GT#1 VBV Duct Inspection Done25 GT GT#1 Lube Oil/Scavange line Inspection Done26 GT GT#5,6 Generator/Turbine Fan Greasing Done27 Bop Lakos filter cleaning Done28 Bop Lube Oil Cooling water pump strainer cleaning Done29
I&C
Bop All GT Fire System Monthly Inspection Done30 GT GT#2 Pressure Transmitter Calibration In Prg31 GT GT#1 Gen Vent Fan B Fire Damper found close Done32 GT GT#6 Chip Detector Calbe Inspection Done
33 GT Done
34Elec
Bop Done
35 GT Filter House Light not Glowing Done
All GT ,TSH 1602 Hyd Pan High Temp Switch InspectionAll Chilled water/Cooling Water Pump Motor Greasing
Maintenance Activities carried out on 26/06/14 Day -28/06/14 Night ShiftWork Order No
242624833065275731142820242624833065
275731142820242624833065275731142820242624833065275731142820
3156
Maintenance Activities carried out on 26/06/14 Day -28/06/14 Night ShiftRemarks
Replaced 1 Canister Clamp and 30 Double Gaskets.
Replaced 1 Canister Clamp
Found 1 Canister support rod broken.Need to Weld itFound RHS(ALF) side damage.Need to Change the Screen
Found RHS(ALF) side teared lightly.Need to Change the Screen
Found some non metal materials in Sump C.Cleaned and Fixed back.
Opened it with Instrument Air.Cable found Ok after FSNL.Need to monitor the values of Chip Detector
Adjusted Set Point from 170 to 180 F in GT#1,6.All other GT Set Point is 180 F
Found CWP#410 Both side Grease relief plug Missing.Need to be fixed.
Replaced 1 light
Found some non metal materials in Sump C.Cleaned and Fixed back. Changed one O ring for the same.Lube Oil Supply Screen was not checked.
Maintenance Activities carried out on 29/06/14 Day -29/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Cooling tower #1 Fan Greasing2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning4 Bop Chiller #1 CW Pump 410 Inspection for Vibration5
I&CGT GT#3 SOV 6249 (Gas Upstream Shutoff Valve Inspection)
7 GT GT#2 Pressure Transmitter Calibration8 Elec Bop MCC AC Inspection
Maintenance Activities carried out on 29/06/14 Day -29/06/14 Night ShiftWork Status Work Order No
DoneDoneDoneIn PrgDone 3225DoneIn Prg
Maintenance Activities carried out on 29/06/14 Day -29/06/14 Night ShiftRemarks
Uncoupled the Pump for inspectionFound working good without any delay
Maintenance Activities carried out on 30/06/14 Day -30/06/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Blanket Media cleaning2 Bop Lakos filter cleaning3 GT Lube Oil Cooling water pump strainer cleaning
4 Bop
Chiller #1 CW Pump 410 Inspection for Vibration
5I&C
GT
All GT TCV Valve Inspection6 GT GT#1 Gas sensor C Inspection
7 Elec BopMCC AC Inspection
Maintenance Activities carried out on 30/06/14 Day -30/06/14 Night ShiftWork Status Work Order No Remarks
DoneDoneDone
In Prg
Done
Done Calibrated and found Sensitivity 38.9mv
In Prg
Uncoupled the Pump and taken trail run.Found ok.Found vibration when connected with load(Pump).Hence need to check the vibration with Instrument
Pressure gauge was not available in GT#3 TCV Air regulator & fixed with new one.All Gauges on Positioner found not working, need to replace with new one.
AC#6 Fan Motor Contactor is faulty.Need to replace it.Ordered spare
Maintenance Activities carried out on 1/07/14 Day -1/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Blanket Media cleaning2 Bop Lakos filter cleaning
3 BopGT#1 FOD Screen Replacement
4
I&C
GTGT#3 GLO,TLO Temperature Gauge Inspection
5 GTGT#6 TLO Temperature Gauge Inspection
6 GT GT#2 Gas sensor Calibration Annual Outage 7
Elec
New Battery Installation for BSDG
8 Bop Chiller AC Inspection
Maintenance Activities carried out on 1/07/14 Day -1/07/14 Night ShiftWork Status Work Order No Remarks
DoneDone
Done
Done
Done
DoneDone
Done
Manhole kept open for inspection and Inlet volute need to be inspection
GLO cooling water inlet and outlet temperature gauge replaced with new one.TLO cooling water inlet temperature gauge replaced with new one
TLO cooling water inlet/Outlet temperature gauge replaced with new one
Chiller # 2 found one A/C #725 phase loss & Reversal Protection Switch found faulty .So replaced with new one.
Maintenance Activities carried out on 2/07/14 Day -3/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#4 Blanket media replacement2 Bop Lakos filter cleaning3 GT GT#4 GLO Demister Inspection
GT#1 FOD Screen Inspection
4 BopDM Water Leak Arresting work
5I&C
GT GT#4 Chilled Water Flow Meter Fixing6 SCS Server UPS Battery removal work7 Elec GT GT Area Lighting Inspection
Maintenance Activities carried out on 2/07/14 Day -3/07/14 Night ShiftWork Status Work Order No Remarks
DoneDoneDone
Done
Done
In prgIn prg Ordered new BatteryDone
Found some rust in silencer area.cleaned it.Found one loose washer from silencer.removed it
Water leak from DM plant suction side flange, so tighten well now no leak.
Maintenance Activities carried out on 3/07/14 Day -6/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
Bop Scrap area cleaning work2 Bop Blanket media cleaning3 GT Removal of Scafolding from GT#1 TLO Skid4 Bop Chiller area cleaning5 Bop Gas Compressor area cleaning6 GT All GT Filter House Inspection7 Bop Lakos filter cleaning8 GT Lube Oil Cooling water pump strainer cleaning9
I&C
GT SCS Server UPS battery replacement
10 GTGT#2,4 Chilled water flow inspection
11 Bop Camera no 15 Power supply adapter replacement12
ElecBop Gas cooler fan greasing
13 Bop Fire Skid Inspection weekly14 GT GT Filter House Lighting Inspection and cable dressing
Maintenance Activities carried out on 3/07/14 Day -6/07/14 Night ShiftWork Status Work Order No
In PrgDoneDoneDoneDoneDoneDoneDoneDone
Done
DoneDoneDoneDone
Maintenance Activities carried out on 3/07/14 Day -6/07/14 Night ShiftRemarks
Replaced and fixed it for the New server
GT#4 Chilled water Flow meter fixed back.GT#2 110Ac/24Vdc converter fixed for power supply.
Maintenance Activities carried out on 6/07/14 Day -6/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
Bop Scrap area cleaning work2 GT Lakos filter cleaning3 BOP Chiller #1 Chilled waterWater Pump Monthly Inspection and greasing4 BOP Chiller #1 Condensor Cooling Water Pump Monthly Inspection and greasing5 GT Lube Oil Cooling water pump strainer cleaning
6I&C
GT
GT#2 Fire System Annual Inspection & Functional Check
7 GT GT#2 RTD Inspection Annual Outage work8
ElecBop Transformer Weekly Checks
9 Bop Security room AC Inspection
Maintenance Activities carried out on 6/07/14 Day -6/07/14 Night ShiftWork Status Work Order No
In PrgDone 3931Done 3574Done 3628Done 4026
In Prg
In PrgDoneDone
Maintenance Activities carried out on 6/07/14 Day -6/07/14 Night ShiftRemarks
Found Abnormal sound in Pump # 310Found Abnormal sound in Pump # 410
Found Reserve Bank SOV In Disabled condition.Timer for Main/Reserve Bank were 90/132 secs instead of 30/90 secs,Found Strobe only activating of 1 Flame sensor instead of Strobe& Horn,Main Bank SOV not working due to cable damage, hence normalized all as per the logic.Need to repalce diode for Primary Bank Solenoid( 1 no)
Maintenance Activities carried out on 7/07/14 Day -7/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT Gas Compressor Motor #1 Oil Replacement2 BOP Gas Compressor Motor #3 Oil Replacement3 BOP Lakos filter cleaning4 BOP Lube Oil Cooling water pump strainer cleaning5 BOP Gas Compressor #2 Alignment6 GT GT#3 Gen Vent Fan B Motor removal work7
I&C
GT GT#2 Fire System Inspection8 GT GT#1 Fire System Logic Checks
9GT
GT#1,3,6 Combustor Drain Valve Actuator Fixing
10 Elec BOP Replcement of Battery in UPS
Maintenance Activities carried out on 7/07/14 Day -7/07/14 Night ShiftWork Status Work Order No Remarks
Done 3530Done 3548Done 3891Done 4026In PrgDoneIn Prg Replaced Strobe and Functional Checks doneIn Prg
In Prg
Done
GT#1 Actuator repalced with new one.Found SOV is faulty.GT#3/6 Actuator and SOV is faulty.
Maintenance Activities carried out on 7/07/14 Day -7/07/14 Night ShiftS.no Dept Area Job Description
1
Mech
GT GT#3 Gen Vent Fan B Motor Removal /Fixing work3 BOP Lakos filter cleaning4 BOP Lube Oil Cooling water pump strainer cleaning5 BOP Gas Compressor #2 Alignment6 Trench Closing work 7 GT GT#5 Gen Vent Fan A Motor removal work7 I&C GT GT#3,6 Combustor Drain valve Inspection
10 Elec BOP GT33,4,5,6 24VDC,125VDC Battery Charger Inspection
Maintenance Activities carried out on 7/07/14 Day -7/07/14 Night ShiftWork Status Work Order No
In PrgDoneDoneIn PrgIn PrgDoneIn PrgIn Prg
Maintenance Activities carried out on 7/07/14 Day -7/07/14 Night ShiftRemarks
Load Trail will be taken today
Maintenance Activities carried out on 10/7/14 Night Shift-13/7/14 Day ShiftS.no Dept Area
1
Mech
BOP2 BOP
3 BOP4 GT5
I&C GT
6 GT7 BOP
8Elec
GT
9 BOP
Maintenance Activities carried out on 10/7/14 Night Shift-13/7/14 Day ShiftJob Description Work Status
Fire Skid Cleaning DoneLakos filter cleaning Done
Lube Oil Cooling water pump strainer cleaningDone
GT#1,2,3,4,5 TLO Cooler/Skid Cleaning DoneInspection of GT#3 Chilled Water Flow Meter DoneGT#6 Gas Sensor D Calibration DoneSCS PC UPS Inspection Done
GT#1 Condensate Pump InspectionDone
MCC Lighting Inspection In Prg
Maintenance Activities carried out on 10/7/14 Night Shift-13/7/14 Day ShiftWork Order No Remarks
2399 24 VDC adapter need to be fixedZero calibration done
4854 SCS 3 UPS battery need to be replaced
4576
4911
All Lube Oil Pumps Strainer Gasket replaced with new one
Found Fan in damaged condition.Repalced with new one.
Maintenance Activities carried out on 13/7/14 S.no Dept Area
1 BOP2 BOP3 GT45 GT
6I&C
GT
7 GT
8 Elec GT
Maintenance Activities carried out on 13/7/14 Job Description Work Status
Lakos filter cleaning DoneLube Oil Cooling water pump A&C strainer cleaning DoneGT#1 GLO Cooler/Skid Cleaning DoneControl Room Lock Reparing DoneGT#6 TLO Cooler/Skid Cleaning Done
GT#4,5,6 Electrical/Instrumentation Cable InspectionDone
Installation of New SCS Server/Systems In Prg
GT#6 Turbine Vent Fan A Breaker Inspection Done
Maintenance Activities carried out on 13/7/14 Work Order No Remarks
10904111447793
4862Zero calibration done
4938
GT-1 T48 A&G cable insulated with varnish and T25 cable insulated with rubber. And GT-2 & 3 found normal
Breaker Mechanism found Faulty.Need to replace with new one.Now its in ON Condition
Maintenance Activities carried out on 14/7/14 S.no Dept Area
1
Mech
BOP2 BOP3 GT
4 BOP
5GT
6 I&C GT
7 Elec GT
Maintenance Activities carried out on 14/7/14 Job Description Work Status
Lakos filter/Strainer cleaning DoneLube Oil Cooling water pump B strainer cleaning DoneGT#2 GLO Cooler/Skid Cleaning Done
PM 410 Condensor Cooling Water Pump decouple in Chiller #1 Done
GT#4,5 TLO Scavange,Air Oil Seperator Line Inspection Done
GT#4,5,6 Electrical/Instrumentation Cable InspectionDone
GT#6 Turbine Vent Fan A Breaker Inspection Done
Maintenance Activities carried out on 14/7/14 Work Order No Remarks
10904 Strainer cleaned for Lakos 850 Chiller #1111447793
11669,11673
4862
4938
Found Vibration from Motor NDE Bearing.Bearings will be replaced
Found some coke in scavange line and debris in air oil seperator line,same replaced with new strainer.
GT#4 T48,GT#5 TE 6232upper harness cable insulated with varnish & T-25 cable insulated with rubber.
Breaker Mechanism found Faulty.Need to replace with new one.Now its in ON Condition
Maintenance Activities carried out on 15/7/14 S.no Dept Area
1
Mech
BOP2 BOP3 GT4 GT5 Elec GT
6 I&C Bop
Maintenance Activities carried out on 15/7/14 Job Description Work Status
Lakos filter cleaning DoneLube Oil Cooling water pump A &C strainer cleaning DoneGT#3,4 GLO Cooler/Skid Cleaning DoneGT#1,GT#2 Inlet Filter House Inspection & Cleaning DoneMCC AC Inspection In PrgCooling Tower Level Switch Inspection In Prg
Maintenance Activities carried out on 15/7/14 Work Order No Remarks
10934 Strainer cleaned for Lakos 850 Chiller #1111447793
9873
6526 Chiller #1 Level Switch Inspection done
Maintenance Activities carried out on 16/7/14 S.no Dept Area
1
Mech
BOP2 GT3 BOP
4 GT
5 Elec GT
6
I&C
GT
7 Bop
Maintenance Activities carried out on 16/7/14 Job Description Work Status
Lakos filter cleaning DoneGT#5,6 GLO Cooler/Skid Cleaning DoneChiller #2 Cooling Tower Fan Greasing Done
All GT Package Inspection In Prg
MCC AC Inspection In Prg
GT#1,2 Gas Chromotograph Inspection Done
Cooling Tower Level Switch Inspection In Prg
Maintenance Activities carried out on 16/7/14 Work Order No Remarks
109347793
7200
9873
6117
6526
GT#1,2,6 Completed.Found Oil leak from TE 6802 RTD Thermowell in RGB.
Contactor Changed in AC#6.Found Temperature Switch for Condensor is faulty.So bypassed and Changed Fan logic in the Panel.
Found in Chiller #2 650,660 switch connections were swapped.Normalised it as per the Dwg
Maintenance Activities carried out on 17/7/14-26/7/14 S.no Dept Area
1
2345
6
7
89
10 Bop
11 GT
12 Bop
13 GT
14 Bop
15 Bop16 GT
17 Bop
18 GT19 Bop
20 Bop
21 Bop22 Bop23 Bop24
I&C
GT25 GT26 GT27 GT28 Bop29 GT30 Bop31 GT32 Bop33 Bop34 GT
35
I&C
Bop
36 Bop37 Bop38 GT
Maintenance Activities carried out on 17/7/14-26/7/14 Job Description Work Status
GT#4 GVF A&B Inspection Done
Lube oil Cooling water pump A,B,C Monthly inspection DoneElectrical & Diesel Fire Pump PM DoneAll GT Auxiliary Package inspection and cleaning DoneALL GC Skid Cleaning Done
All GT External inspection PM Done
Cooling tower#1 semi annual InspectionIn Prg
Cooling tower#1 semi annual Inspection on drift eliminator In PrgCooling tower#1 Tower fans semi annual Inspection In PrgAll Lakos Pump Motor Quarterly inspection Done
All GT TLO,GLO,HLO,Generator Space Heaters monthly Inspection Done
BSDG Weekly electrical Inspection Done
GSU#2 132 KV B Phase Heavy Oil leak In Prg
Raw Water Pump Off load Isolator terminal Carbonisation Done
Chemical skid Gengard Pump#B, not working DoneDone
Done
DoneDone
Done
DoneDoneDone
GT#3,6 Gas Chromotograph Inspection DoneGT#3 T25 Cable Re routing DoneGT#6 Gas Sensor D Inspection DoneGT#1 RTD TE 6079 Inspection for Oil leak Done
DoneDoneDoneDoneDoneDone
GT#1 Gas Sensor C Inspection Done
GT MCC Module Monthly InspectionAIR CONDITIONERS INSPECTION
TRANSFORMERS WEEKLY INSPECTIONCHEMICAL DOSING PUMP MOTOR QUARTELY/ANNUAL INSPECTIONCHECMICAL MIXER MOTOR QUARTELY/ANNUAL INSPECTION
CHILLER OIL HEATER MONTHLY INSPECTIONAIR COMPRESSOR QUARTERLY/ANNUAL INSPECTIONBLACK START DG ELECTRICAL INSPECTION
GAS COMPRESSOR I&C MONTHLY INSPECTIONGT TCP/GCP/EMD #1,2,3 PANEL CLEANING CHEMICAL SKID PLC PANEL CLEANING AND TIGHTNESS CHECKINGGT TCP/GCP/EMD #1,2,3 PANEL CLEANING GAS COOLER FAN VIBRATION SWITCH QUARTERLY INSPECTIONCT #1 FAN VIB SWITCH FUNCTIONAL CHECK /QUARTERLY INSPECTION
Done
DoneDoneDone
CT PH SENSOR CALIBRATION
CT CONDUCTIVITY SENSOR CALIBRATIONDM PH SENSOR INSPECTIONGT LEVEL SWITCH INSPECTION
Maintenance Activities carried out on 17/7/14-26/7/14 Work Order No Remarks
97405372,5382
9812
11896117975610
5001,5217,4941,4962
11233 Found Stress cone damaged.ABB is working to replace it
13258
Control Wire found loose.Same was tightened 5421 4 no's lamp replaced9890
103755720 Need to replace Carbon Brush of Chiller #1 Pump D5753
Chiller #1 Pump #3 Fuse was not available. Installed fuse
57981082512722
6117 GT#6 Primary helium cylinder replaced with new one
Sensitivty 38.711691 Applied Tread sealant.need to check after startup631760756649607564476547
Zero Calibration done
Abnormal sound from GVF B NDE Bearing.need to replace the bearing
Found no lock wire in GT#4 CRF UV detector sight glass.Fixed new one.Combustor boroscope plug 1 no and fuel nozzle 2 no's found lock wire wrong direction same removed and fixed with new lock wire.GT#5 XNSD Sensor (LHS) found loose and touching the support.
PVC Pipe leak found in Cooling Tower Inlet from lakos inside the Basin
GT#5 GLO Heater B Cable Insulation found damage in the terminal box.Same was repaired
Removed Off Load Isolator and Directed it with Terminal conenctor.need to replace it.Spare Ordered
Found A/C # 730 ICM 401 relay faulty.need to replace.Spare Ordered
6613
6631112246703
Alarm displaying "Glass value too high" . Need to replace the sensor.
Maintenance Activities carried out on 27/7/14-30.7.14 S.no Dept Area
1
ELEC
2345
6
78
I&C
910111213141516
Mech
17
18192021222324
Maintenance Activities carried out on 27/7/14-30.7.14 Job Description Work Status
DoneDoneDoneDoneDone
Demin plant AC unit is not working
In Prg
In PrgDoneIn PrgDoneDoneDoneDoneDoneDoneDoneDone
DonePre lube oil cooler annual inspection Done
DoneDoneDone
Lakos Filter Cleaning DoneLube Oil Cooling water pump A &C strainer cleaning Done
JOCKEY PUMP MOTOR WEEKLY INSPECTIONDIESEL FIRE PUMP ELECTRICAL WEEKLY INSPECTIONELECTRIC FIRE PUMP MOTOR INSPECTIONTRANSFORMERS WEEKLY INSPECTIONGT SHAFT EARTHING CARBON BRUSH BIMONTHLY/ANNUAL INSPECTION
GT CONDENSATE PUMP MOTOR QUARTELY/ANNUAL INSPECTION
GT BOP PLC PANEL INSPECTIONCHILLER CONTROL PANEL/PURGE UNIT CLEANING & TIGHTNESS CHECKCHILLER PLC PANEL CLEANING AND TIGHTNESS CHECKINGGT FIRE SYSTEM MONTHLY INSPECTIONGT PACKAGE I&C BIWEEKLY INSPECTIONGT MTTB/WET PANEL INSPECTIONGC FILTER CONDENSATE LEVEL CONTROL SYSTEM MONTHSLY/ANNUAL INSPECTIONGT CONDENSATE PUMP INSPECTION
Cooling tower drift eliminator Quarterly InspectionCooling tower fans Quarterly/Annual InspectionCooling tower's Semi Annual/Annual Inspection
Chemical Dosing Tank Semi Annual InspectionChemical Dosing Pumps Monthly/Annual InspectionRO/E Cell Feed Pump Inspection
Maintenance Activities carried out on 27/7/14-30.7.14 Work Order No Remarks
585658725834
10615,98955435
145375022
62376565 Purge Unit Cleaning to be done6583587659746202
117906023
11896117979812
9535117531171411239
Condensor Motor Bush need to be replaced and cable to be re insulated.Evaporator Fan motor winding found short w.r.t gnd.Will be sent out for repair
GT#2,3,5 Pump B Cooling fan found damage.Need to replace it.GT5 Pump B Bearing need to be replaced.
PVC Pipe leak found in Cooling Tower Inlet from lakos inside the Basin.Will be Arrested during Annual outage
Maintenance Activities carried out on 31/7/14-2.8.14 S.no Dept Job Description Work Order No
2 13131
3 9535
5 GT Water Wash Pump Inspection 9257
7 12492Air Compressor #1,2 & Drier inspection
8 GT Hydraulic Starter Pump Inspection 8374
10
Elec
13565
11 13669
12 9905CCWP # 410 Motor Bearing Replacement
15 11922
16
I&C
6679
63526417
17
6521
LUBE OIL COOLING WATER PUMP C STRAINER CLEANINGGas coolers Monthly Inspection
LAKOS FILTER CLEANING
GT 24VDC BATTERY MONTHLY INSPECTIONGT 125VDC BATTERY MONTHLY INSPECTION
MOTOR GREASING QUARTERLY PM
TRANSFORMERS WEEKLY INSPECTIONDRYER INSTRUMENT PANEL CLEANING AND Inspection
GC NO FLOW SWITCH MONTHLY/ANNUAL INSPECTIONGC VIBRATION SWITCH INSPECTION & FUNCTIONAL CHECKGC GAS DETECTION PANEL MONTHLY INSPECTION
Maintenance Activities carried out on 31/7/14-2.8.14 Work Status Remarks
DoneDoneDoneDone
Done Found after dryer filter in damaged condition. same replaced with new one.DoneIn PrgIn PrgIn Prg All GT GVF,TVF Motors completedIn Prg Found traces of stator mislocation.Will be sent out for repairDone
Done
DoneDone
Done
Warning persisting for Dryer Inlet air temperature. Warn max set point =122 f and actual was 127.R
Channel#6 shown erratic readings,so calibrated, Now ok.Channel# 4 & 10 found faulty, Gas Sensors need to be replaced.
Maintenance Activities carried out on 3/8/14S.no Dept Job Description Work Order No
1
Mech
Lakos filter cleaning 125522 Generator Fan Quarterly Inspection 73723 Generator Fan Monthly greasing 72424 CHWP #315 Mechanical seal leak 16186
5I&C
HMI/SCS System Inspection & cleaning 6313
6 60757
Electrical
13565
8 13669
9Chilled water pump #315 Electrical Connection removal work
16187
GT TCP/GCP/EMD #4,5,6 PANEL CLEANING
GT 24VDC BATTERY MONTHLY INSPECTIONGT 125VDC BATTERY MONTHLY INSPECTION
Maintenance Activities carried out on 3/8/14Work Status Remarks
DoneDone Found GT-5 & 3 GVF-A belt found little loose the same was tightenedDoneIn Prg Pump and Motor were dismandled for inspectionDoneDoneIn PrgIn Prg
Done For inspecting Mechanical Seal.
Maintenance Activities carried out on 4/8/14S.no Dept Job Description Work Order No
1
Mech
Lakos filter cleaning 140312 GT Hydraulic Starter Pump Quarterly inspection 83743 Turbine Fan Quarterly Inspection 74634 Lube Oil Pump A Strainer Cleaning5 Turbine Fan Monthly greasing 73076 I&C 9869
7
Electrical
11771
8 11775
9 11781
10 12725
11
11922
CCTV INSPECTION
ELECTRIC FIRE PUMP MOTOR INSPECTIONJOCKEY PUMP MOTOR WEEKLY INSPECTIONDIESEL FIRE PUMP ELECTRICAL WEEKLY INSPECTIONBLACK START DG ELECTRICAL INSPECTIONTRANSFORMERS WEEKLY INSPECTION
Maintenance Activities carried out on 4/8/14Work Status Remarks
DoneDoneDoneDoneIn PrgIn PrgDoneDoneDoneDone
Done GT Aux transformer #3 cooling fan #1 abnormal sound noticed ,Found Clamp was loose same was tightened .Now Ok
Maintenance Activities carried out on 4/8/14S.no Dept Job Description Work Order No
1
Mech
CHWP #315 Mechanical seal leak 16186
2 Lakos filter cleaning 83743 Chilled Water Pump Monthly inspection 132894 Fabrication of Coupling cover for GT#3 Hydraulic Starter Pump 83745 Turbine Fan Quarterly Inspection 74636 Turbine Fan Monthly greasing 73077 Portable AC Shifting work 162498 I&C GC#1 Suction Valve Pressure Guage replacement 16248
9 Electrical PSM Module replacement in Bay #5 Protection Relay 16236
Maintenance Activities carried out on 4/8/14WO type Work Status Remarks
CM In prg Motor fixing work is pendingPM DonePM In prgPM DonePM DonePM DoneEM DoneCM Done Found Leak near regulator side.Tightened the tubings.Now OK
CM Done Trip Test performed after replacement and found relay is working good
Maintenance Activities carried out on 6/8/14 - 9/8/14S.no Dept Job Description Work Order No
1
Mech
CHWP #315 Mechanical seal leak 16186
2 Chilled Water Pump Monthly inspection 132893 Hydraulic Starter Filter Inspection 80804 Gas Compressor all valve greasing 95855 All GT GLO Filter Inspection 80246 All GT TLO Filter Inspection 8318
7 Lube Oil Pump Strainer cleaning 126028 Raw Water Pump B Discharge Line T leak arresting work 162689 Air Dryer vessel A air leak from bottom flange
10 GLO Filter Inspection and cleaning 802411 TLO Filter Inspection and cleaning 831812 HLO Filter Inspection and cleaning 808013 JOP Filter Inspection and cleaning 813614 GT TLO Air Oil Seperator Inspection and cleaning 789815 GT TLO Coolers Inspection and cleaning 768816 GLO Demister Inspection and cleaning 7954
17
I&C
Chemical skid#1 gengard pump#A discharge pressure not showing.4577
18 GT Aux Fan Skid Fan settings revision 13251
19GC#1 No Flwo Trip 16262
20 GT#2 Gas Sensor E Inspection 1627021 GT#1 Gas Sensor C Inspection 1687122 GT#6 Gas Sensor D Inspection 16269
23
Electrical
13669
24GT-5 condensate pump-B motor fan found in damaged condition 14545
25 GT-3 Auxiliary skid light not glowing 13286
26 13911
275720
GT 125VDC BATTERY MONTHLY INSPECTION
TRANSFORMERS WEEKLY INSPECTIONCHEMICAL DOSING PUMP MOTOR QUARTELY/ANNUAL INSPECTION
Maintenance Activities carried out on 6/8/14 - 9/8/14WO type Work Status Remarks
CM DonePM DonePM DonePM DonePM DonePM DonePM DoneEM Done Drained the system and Devcon plastic welder applied
In prgPM DonePM DonePM DonePM DonePM DonePM DonePM Done
CM DoneCM Done
EMDone
EM Done Zero Calibration doneEM Done Zero Calibration doneEM Done Calibration done.Sensitivity 36.7 mvPM DoneCM
Done Replaced NDE Bearing and Cooling FanCM DonePM Done
PM Done Carbon Brush replaced in Chemical Skid #1 Pump D
Swapped DNFT From GC#2 and taken trail for 2 hrs.Now GC#1 is OK. But GC#2 Tripped while taking trail.Hence replaced DNFT with new one.
Maintenance Activities carried out on 4/8/14S.no Dept Job Description Work Order No
1
Mech
JOP Filter Inspection and cleaning 81362 Lakos filter cleaning 142113 GT VG Pump Filter Inspection 81924 GT Generator DE/NDE Side bearing Oil line Inspection 76395 Raw Water Pump Leak arresting work 176446 Lube Oil Pump Strainer cleaning7 Air Dryer Leak arresting work8 I&C 13737
9 Elec Control Room AC Inspection and cleaning 14546
GT PACKAGE I&C BIWEEKLY INSPECTION
Maintenance Activities carried out on 4/8/14WO type Work Status Remarks
PM DonePM DonePM DonePM Done Found Little oil in GT#1, 4 NDE lineEM Done
Done Pump A & C Strainer cleaning doneEM DonePM In prg GT#5,6 CompletedCM Done Now all AC's are working good
Maintenance Activities carried out on 4/8/14S.no Dept Job Description Work Order No
1
Mech
Lakos filter cleaning 15976
2 Demin Plant Heat Exchanger monthly inspection 112993 Demin Water Fine Filter A/B monthly inspection 112724 Lube Oil Pump Strainer cleaning 159045 GT#1 to 6 GLO AC/DC Lube Oil Pump Monthly Inspection 151116 Air Dryer Leak arresting work
7Elec
11917,9895
8 Demin Plant Condensor Motor Fixing work9 I&C 13737
AIR CONDITIONERS INSPECTION
GT PACKAGE I&C BIWEEKLY INSPECTION
Maintenance Activities carried out on 4/8/14WO type Work Status Remarks
PM DonePM DonePM DonePM DonePM DoneEM Done
PM Done
EM Done Motor become faulty after 2 hrs running.Will be sent to same shop for repairPM Done
AC # 7,8,9 LOW COOL.NEED TO CHECK.AC #730 UNDER LOTO(WAITING FOR SPARE)
Maintenance Activities carried out on 12/8/14S.no Dept Job Description Work Order No
1
Elec
137252 137303 137334 137915 143216 GT#2 to 6 IR Gas Sensor Hose Replacement 4343,4345,4349,4352,43557 I&C GT#6 Node 246 Inspection for Communication 8
Mech
GT External cleaining 150139 Lakos filter cleaning 15724
10 Control Room AC Drain Piping work 1454611 Lakos filter cleaning 1600612 1474913 Electric Fire Pump Monthly Inspection 1475914 Air Dryer Upstream Filter Replacement 1764915 Gas Compressor Wipe Test 9490
ELECTRIC FIRE PUMP MOTOR INSPECTIONJOCKEY PUMP MOTOR WEEKLY INSPECTIONDIESEL FIRE PUMP ELECTRICAL WEEKLY INSPECTIONTRANSFORMERS WEEKLY INSPECTIONBLACK START DG ELECTRICAL INSPECTION
DIESEL FIRE PUMP Monthly Inspection
Maintenance Activities carried out on 12/8/14WO type Work Status Remarks
PM DonePM DonePM DonePM DonePM DoneCM DoneCM Done Under observationPM DonePM DonePM DonePM DonePM DonePM DoneEM DonePM Done
Maintenance Activities carried out on 14/8/14 - 17/8/14
S.no Dept Job Description Work Order No WO type Work Status Remarks1
Mech
Gas Compressor Skid Cleaning and all valves greasing/ cleaning 9585 Done2 Lakos Filter cleaning 16066 Done3 GT Fuel Gas last Chance Filter Inspection 8493 Done4 GT#4 GVF Motor B Bearing Replacement 17692 In prg5 Lakos Pump & Strainer Monthly Inspection 14704,15844 Done6 Lube Oil Pump Strainer cleaning 15944 Done7 Chiller Monthly Inspection 15415 PM Done
8 Fire Water Pump house door repairing work Done
9 Chiller # 1 soda dosh pump inspection 17698 CM Done10
Elec
13541 PM In prg11 GT#3 Condensate Pump #2 Fan replacement 5022 PM Done12 9900 PM Done13 10894 PM Done14 Chiller AC 730 Inspection 13786 PM Done Thermostat replaced15 Control Room UPS Battery replacement work 4854 CM Done16 GT#4 GVF Motor B Bearing Replacement 17692 CM In prg17
I&C
14940 PM Done18 Gas chromotograph Inspection in GT# 3,6 14855 PM Done19 14940 PM Done20 Chilled Water Flow Meter Inspection in GT#2,GT#3 2399 CM In prg GT#3 Power Adapter need to be fixed
21 GT#1 Gas Sensor C Inspection 17701 EM Done
Chiller # 1 soda dosh pump suction line removed,cleaned,primed and air lock released.
LIGHTING MONTHLY INSPECTION
EXTENSION CABLE INSPECTIONE CELL SEMI ANNUAL/ANNUAL INSPECTION
GT MTTB/WET PANEL INSPECTION & CLEANING
GT MTTB/WET PANEL INSPECTION & CLEANING
Zero Calibration.Next time if it repeats,Transmitter will be replaced
Maintenance Activities carried out on 18/8/14S.no Dept Job Description Work Order No
1
Elec & IC
14784
2 14788
3 14794
4 15970
5 AC Inspection and Gas Filling 15449
6 Transformer Inspection PM 15574
7 GT#3,4 Chilled Water Flow meter Inspection 23998 Chiller #2 TT302 Inspection for wrong reading 188679
Mech
400 B Chiller inspection for Oil DP High 1885010 GT#5 Filter house Inspection 1890311 GT#2,5 Gas Last Chance filter Inspection 18919,1892112 Lube Oil Pump Strainer Cleaning 1726113 Lakos filter cleaning 17051
14 Demin Plant Heat Exchanger monthly inspection 1740415 Demin Water Fine Filter A/B monthly inspection 17377
ELECTRIC FIRE PUMP MOTOR INSPECTIONJOCKEY PUMP MOTOR WEEKLY INSPECTIONDIESEL FIRE PUMP ELECTRICAL WEEKLY INSPECTIONBLACK START DG ELECTRICAL INSPECTION
Maintenance Activities carried out on 18/8/14WO type Work Status Remarks
PM DonePM DonePM DonePM DonePM DonePM DoneCM DoneCM DoneCM Done Oil Pressure adjusted by Trane representativeCM DoneCM DonePM DonePM DonePM DonePM Done
Maintenance Activities carried out on 19/8/14S.no Dept Job Description Work Order No
1
ELEC & IC
TLO,GLO,HLO & Space Heaters Inspection
2
GT#6 Node Fault troublehooting 17702
3 14803
4 GT#6 gas sensor B Inspection 18922
5Mech
GT#2 Filter house cleaning and blanket replacement 164566 Lakos filter cleaning 17081
7 Gas Cooler Monthly Inspection 17261
14548,14569,14608,14629,14650,14683
GT CONDENSATE PUMP INSPECTION
Maintenance Activities carried out on 19/8/14WO type Work Status Remarks
PM In Prg
CM DonePM In PrgEM Done Zero calibration donePM DonePM DonePM DONE
Found Linknet Termination module connected in series with Node 248.normalised as per dwg
Maintenance Activities carried out on 19/8/14S.no Dept Job Description Work Order No
1
ELEC & IC
TLO,GLO,HLO & Space Heaters Inspection
2 GT#5 Condensate Pump Removal work for bearing change
3 14803
4 GT#1 gas sensor B Inspection 18940
5 163606 Old Server Rack Cleaning 18930
7 GT#1 gas sensor E, GT#5 gas sensor D Inspection 18945
8
Mech
164569 Lakos filter cleaning 17111
10 Chiller Area cleaning work11 Lube Oil Pump Strainer Cleaning 1728112 Gas Compressor #3 Inspection 16614
14548,14569,14608,14629,14650,14683
GT CONDENSATE PUMP INSPECTION
GAS COMPRESSOR I&C MONTHLY INSPECTION
GT#1,2,3,4,6 Filter house cleaning and removed blanket cleaning blanket replacement
Maintenance Activities carried out on 19/8/14WO type Work Status Remarks
PM In PrgIn Prg
PM Done Except GT#5EM Done Gas Calibration done.Sensitivty 53.4mv.PM In Prg Found Air leak in Discharge Block Valve SOVCM DoneEM Done Zero calibration done
PM DonePM Done
DonePM DonePM Done
Maintenance Activities carried out on21/8/14 - 23/8/14
S.no Dept Job Description1
Mech
GT Generator Fan Greasing2 Lakos Filter Cleaning3 Demin Plant AC Motor Alignment and fixing work4 Lube Oil Pump Strainer Cleaning56 Raw Water Line(Discharge Line ) Leak arresting work7
I&C
8 Fabrication of Ins Air tubing for Solenoid GC#1
910 GC DNFT Switch Inspection
1112 GT#1 Gas Sensor A calibration13
Elec
Demin Plant AC Motor Alignment and fixing work
14 Control Room Lighting Inspection
1516
17TLO,GLO,HLO & Space Heaters Inspection
GAS COMPRESSOR MONTHLY INSPECTION
CCTV INSPECTION
CT CONDUCTIVITY SENSOR CALIBRATION
CHILLER PLC PANEL CLEANING AND TIGHTNESS CHECKING
GT MCC Module Monthly InspectionTRANSFORMERS WEEKLY INSPECTION
Maintenance Activities carried out on21/8/14 - 23/8/14
Work Order No WO type Work Status
16484 PM Done17548 PM Done14537 EM Done17301 PM Done16614 PM Done18967 CM Done15445 PM Done16360 PM Done16438 PM Done16405 PM Done14983 PM Done18965 EM Done14537 EM In Prg13541 PM In Prg14770 PM Done15574 PM Done
PMIn Prg
14548,14569,14608,14629,14650,14683
Maintenance Activities carried out on21/8/14 - 23/8/14
Remarks
Drained the line and arrested the leak
Zero Calibration done
All MTTB,MGTB Heaters are not conencted
Maintenance Activities carried out on 24/8/14S.no Dept Job Description Work Order No
1Elec & IC
GT#1 Gas Sensor A calibration 189652 163213 GT#4 Generator Motor Fixing Work 17692
4Mech
5 Lakos Filter Cleaning 176088 GT#4 Generator Motor Fixing Work 17692
GT PACKAGE I&C BIWEEKLY INSPECTION
Transformer Sheet unloading and GT Shipping container relocation
Maintenance Activities carried out on 24/8/14WO type Work Status Remarks
EM Done Zero Calibration done.Transmitter will be changed todayPM DoneCM In Prg
DonePM DoneCM In Prg
Maintenance Activities carried out on 25/8/14S.no Dept Job Description Work Order No
1
Elec & IC
149782 Chiller #1 Flow Meter not Working 202173 GC # 2 suction block valve not opening 202204 DM Plant Electrical distribution panel main MCB trip troubleshooting5 CT fan 650 B breaker trip troubleshooting 202216 169317 GT#4 Generator Motor Fixing Work 176928
Mech
Lube Oil Cooling Water pump monthly inspection 167349 Lakos Fitler Cleaning 18633
10 Lube Oil Pump Strainer Cleaning 1732111 GT#5 Post Shutdown Inspection 2022312 Chemical Dosing Pump monthly Inspection 1773813 Lakos Fitler Cleaning 18257
GC GAS DETECTION PANEL MONTHLY/ANNUAL INSPECTION
TRANSFORMERS WEEKLY INSPECTION
Maintenance Activities carried out on 25/8/14WO type Work Status Remarks
PM Done Channel#2 & 11 sensors Zero calibrated. Channel #4 ,10 is faulty.spare orderedCM DoneEM In Prg
Done Found Media Filter SOV cable was short.Cleared itEM Done Checked with Mechanical team and started it.Found NormalPM DoneCM In PrgPM DonePM DonePM DoneEM DonePM DonePM Done
Maintenance Activities carried out on 26/8/14S.no Dept Job Description
1
Elec & IC
2345 Demin Plant AC Inspection
6 MEW Area Welding Machine troubleshooting
7 Control Room Lighting Inspection
8 GC#2 Suction Valve SOV Leak arresting work
9 DM,CT PH Sensor Calibration
10 620 B Vibration Switch Inspection11
Mech
GC#2 Valve Exercising12 Lakos Fitler Cleaning13 Lube Oil Pump Strainer Cleaning14 GT#2,5 Post Shutdown Inspection15 Raw water Maku up valve and discharge line leak at two joints16 Oil Replacement in 400 A/B Circuit
ELECTRIC FIRE PUMP MOTOR INSPECTIONJOCKEY PUMP MOTOR WEEKLY INSPECTIONDIESEL FIRE PUMP ELECTRICAL WEEKLY INSPECTIONBLACK START DG ELECTRICAL INSPECTION
Maintenance Activities carried out on 26/8/14Work Order No WO type Work Status
16309 PM Done16314 PM Done16317 PM Done17341 PM Done14537 EM In prg
Done13541 PM In prg20225 EM Done16420 PM Done20224 EM Done16734 Done18287 PM Done17321 PM Done
20240,20258 EM Done20280 CM Done
20226,20227 EM Done
Maintenance Activities carried out on 26/8/14Remarks
Replaced the Carbon Brush and now working good
Repalced the O ring.Now working good
Cleaned the Mechanism.Now working good
Pump B & C Strainers cleaned
400 A- 45 ltrs and 400 B- 40 ltrs Oil replaced,
Maintenance Activities carried out on 27/8/14-30/8/14S.no Dept
1
Elec & IC
23456789
10111213141516
Maintenance Activities carried out on 27/8/14-30/8/14Job Description Work Order No
GT F&G Monthly Inspection 17796GT#1 Gas Sensor A Inspection 20281GT#6 Gas Sensor D Inspection 20301GT#1 Gas Sensor E Inspection
Gas Compressor Area condensate level controller Monthly inspection 178451628216806
Transformer Weekly Inspection 18137BOP Grey Aux Transformer inspection for Alarm
Black Start DG Mechanical Monthly Inspection 20290Gas Compressor Area cleaning 17738GT Package inspection(GT#1,5,6) 20228Lakos Filter and Strainer Inspection 17703Lakos Fitler Cleaning 18723Chiller area cleaning 18467Lube OilWater Pump strainer cleaning 18487
CHILLER OIL HEATER MONTHLY INSPECTIONAIR CONDITIONERS INSPECTION
Maintenance Activities carried out on 27/8/14-30/8/14WO type Work Status Remarks
PM DoneEM Done Replaced Transmitter,Interface card and Sensor.Now OkEM Done Zero Calibration done.
Done Zero Calibration done.PM DonePM Done Except 200B.PM In PrgPM DoneCM In PrgPMPMPMPMPMPMPM
Maintenance Activities carried out on 31/8/14S.no Dept Job Description
1Elec & IC
GT#6 BOP PLC connecting with SCS2 GT#1 E sensor and GT#6 B Sensor Calibration3 GT#4 Generator Vent Fan Motor Fixing work
4
Mech
Air Compressor #1 Monthly Inspection 5 Raw water Line leak arresting work (Pump1 Discharge line)6 GT#1,6 Package Inspection7 Lakos Filter cleaning8 GT#4 Generator Vent Fan Motor Fixing work
Maintenance Activities carried out on 31/8/14Work Order No WO type Work Status
18935 CM In Prg22037,22038 EM Done
17692 CM In Prg17985 PM Done20280 CM Done20228 PM Done18437 PM Done17692 CM In Prg
Maintenance Activities carried out on 31/8/14Remarks
Sensitivity E sensor : 48.3mv,D Sensor :17.2mvNo load Current : 46 A,48 A,49.6 A
Maintenance Activities carried out on 2/9/14S.no Dept Job Description
1
Elec & IC
GT#5 Generator Vent Fan B Motor installation work23 Cooling tower Basin Level Switch Inspection
4 Cooling tower Pump Bag DP switch Inspection
5
Mech
Cooling tower #2 Return line flow distribution inspection6 Diesel Fire Pump Inspection and cleaning7 Lube Oil Cooling Water Pump strainer cleaning8 Lakos Filter cleaning9 GT#4 Generator Vent Fan Motor Fixing work
AIR CONDITIONERS INSPECTION
Maintenance Activities carried out on 2/9/14Work Order No WO type Work Status
4600 CM In Prg18012 PM In Prg20803 PM Done22075 PM Done22100 PM Done20458 PM Done19929 PM Done19729 PM Done17692 CM In Prg
Maintenance Activities carried out on 2/9/14Remarks
Lakos 851 Pressure switch need to be replaced.
Maintenance Activities carried out on 3/9/14S.no Dept Job Description Work Order No
1
Elec & IC
GT#3 Micronet Shutdown for Welding works
2
3 Cable laying work from Control room to server room 22095
4 18012
5
Mech
GT#3 PB 303(Modification of Sump Drain Line Tubings) Imple 221376 Electric Fire Pump Inspection and cleaning 204687 Lakos Filter cleaning 200528 Chiller Area cleaning
ALL GT PDHH 6226 (Supply Gas Pressure Pressure Switch) calibration as per PB292
22101,22107,22113,22119,22125,22131
AIR CONDITIONERS INSPECTION
Maintenance Activities carried out on 3/9/14WO type Work Status Remarks
CM Done
CMDone
CM In PrgPM In PrgCM In PrgPM DonePM Done
Done
Maintenance Activities carried out on 4/9/14-7/9/14S.no Dept
123456789
101112
Mech13141516
Electrical/C&I
Maintenance Activities carried out on 4/9/14-7/9/14Job Description Work Order No
18012Transformer Weekly Inspection 19579Cooling tower fan #650A MCC Breaker Replacement 22157Demin plant AC unit is not working 14537All GT Line & Neutral Cubicle Space heaters Inspection 14683Electrical Fire Pump& Jockey Pump Motor 19381&19386Diesel fire pump weekly Inspection 19389GT#3 MCC Micronet system Normalisation with all cards 22137GT#6 Gas Sensor-D calibration 22314All GT MTTB & WET panel inspection and checking all NODE card on MTTB 20693BOP PLC Panel inspection for GT#1 ,2, 3 & 4 20728GT#3 DE Sump PB 303 -Modification of Sump Drain Line Tubings 22137Server Room AC Drain Modification WorksChiller # 1 & 2 Lakos filter cleaned 20082GT#1,2,3,4,5& 6 GLO/TLO/Sprint skid cleaned 22199Lube oil cooling water pump # A&B suction strainer cleaned 19969
AIR CONDITIONERS INSPECTION in External Area
Maintenance Activities carried out on 4/9/14-7/9/14WO type Work Status
PM DonePM DoneEM DoneEM DonePM In PrgPM DonePM DoneCM DoneEM DonePM DonePM DoneCM Done
DonePM DonePM DonePM Done
Maintenance Activities carried out on 4/9/14-7/9/14Remarks
A / C # 5 thermostat to be replaced
Gas Leak arrested by Al Ahlia CompanyGT#2 Neutral Cubicle heater need to check
Battery terminal voltage is 12.83V/12.88V- Normal Range
Zero Calibration Done
Checked the Processor status, DI/O and AI/O module status Common sump drain line tubing replaced with new one as per PB-303
Maintenance Activities carried out on 7/9/14S.no Dept Job Description
1 BSDG Weekly Inpection2 MEW BAY#5 (G S U#2) Earth Resistance measurement
3 GT#1 TO 6 (BOP) Chilled water temperature transmitter’s inspection4 GT#5&6 BOP PLC panel inspection for all I/O cards 5
Mech
GT#4 PB 303(Modification of Sump Drain Line Tubings) 6 Chiller # 1 & 2 Lakos filter cleaning7 Condensor cooling water pump monthly inspection8 Lube oil cooling water pump # A & B suction strainer maintenance
Electrical/C&I
Maintenance Activities carried out on 7/9/14Work Order No WO type Work Status
19989 PM DoneEM Done
PM Done20728 PM Done22196 CM In Prg20082 PM Done19095 PM Done19879 PM Done
22160/ 22164/ 22165/22166/ 22167 /22168
Maintenance Activities carried out on 7/9/14Remarks
Battery terminal voltage- 24.73VSwitch gear side-0.087Ω, GSU side 0.056Ω
mAmp simulated from transmitter.
Common sump drain line tubing replaced with new one as per PB-303