![Page 1: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/1.jpg)
2004-10-28http://www.younil.co.kr
Management Innovation through Information System Build
![Page 2: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/2.jpg)
2004-10-282http://www.younil.co.kr
▣ Corporate Overview ▣
The first chapter Corporate Overview
1.1 Company History1.2 Product Instruction1.3 Product Line Instruction
![Page 3: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/3.jpg)
2004-10-283http://www.younil.co.kr
Company History (Since 1976-1999)
- 1976. 07 Established Younil Metal Plate at Sung-Su Dong
- 1988. 07 Renamed to Younil Industry Co. Ltd.
- 1989. 04 Acquired the first grade on trading (License 227821)
-1989. 10 PC CHASSIS OEM to Computer Marketing Department at
Hyundai
- 1991. 01 PC CHASSIS OEM to TriGem Ltd.
- 1993. 11 Licensed Gas Articles Manufacturing
- 1994. 02 Registered at SK Gas Co. Ltd.
- 1994. 12 Started to export Cabinet Heater to English
- 1996. 12 Acquired ISO9001
- 1997. 02 Acquired registration of design for 4 items and Utility Model
such as the Gas heater bottom board.
- 1997. 02 Selected a s a rosy prospect Company by Kyoung-gi
- 1997. 05 Acquired 100PPM for Qualification of goods
- 1997. 12 Awarded “the Copper Metal” at demonstration of Private &
Government management
- 1998. 09 Awarded 100PPM for the Quality improvement Action
- 1999. 07 Renamed to Younil Electronics Co. Ltd.
- 1999. 09 Acquired K.S for Portable Gas Heater
Since Since 19761976--19991999
![Page 4: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/4.jpg)
2004-10-284http://www.younil.co.kr
Company History (Since 2000-Now)
- 2000. 10 PC OEM to COMPAQ KOREA
- 2001. 03 PC OEM to HYUN JU COMPUTER
- 2001. 10 PC Camera, wireless LAN, NIM, AP, LMB OEM to Samsung
Electro-mechanics
- 2002. 01 PC OEM to SAFER COMPUTER
- 2003. 10 RC OEM to SAMSUNG ELECTRONICS CO., LTD.
- 2004. 01 AIR CLEANER OEM to CHUNGPOUNG CO., LTD
- 2004. 04 DVR OEM to ELSTONE CO., LTD
Since Since 20002000--NowNow
![Page 5: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/5.jpg)
2004-10-285http://www.younil.co.kr
Product Instruction
Air CleanerAir Cleaner
HP NOTEBOOKHP NOTEBOOK
-CHUNGPOUNG CO., LTD
Personal ComputerPersonal Computer -COMPAQ KOREA
-HYUN JU COMPUTER
-SAFER COMPUTER
-SAMSUNG ELECTRONICS CO., LTD.
60,000 EA/month
Digital Video Digital Video RecorderRecorder -ELSTONE CO., LTD
-IDIS
-UJUTELECOM
8000 EA/month
3,000 EA/month
HP 1,000 EA/month
![Page 6: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/6.jpg)
2004-10-286http://www.younil.co.kr
Product Instruction
Server Server AssyAssy
LCD Monitor LCD Monitor AssyAssy
UNIWIDETECHNIQUES CO., LTD. 1,000 EA/month
DVD Player DVD Player AssyAssy
NEXTFEEL CO., LTD.ALPHACASET CO., LTD. 30,000 EA/month
BCT CO., LTD.
SAMSUNG CO., LTD. 30,000 EA/month
![Page 7: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/7.jpg)
2004-10-287http://www.younil.co.kr
Product Line Instruction
CONVEYOR LINE (2 Line)
-CAPA: 900 EA/day(1 Line, 1 Shift)22,500 EA/month
- WORKING DAY: 25days
Product - DESK-TOP- NOTE-BOOK- LCD MONITOR
• L I N E : Auto 6Line. Manual 3Line, Paint 1Line• CAPA : 2,500 SET (p/d)
(57K ~ 60K p/m) for 23 days8Hr p/d, PC SET (Press finished good)
• Press : 80 TON ~ 300 TON total 63NC FEEDER 2
PC Assembly LinePC Assembly Line
Press LinePress Line
• NC Process, Gun Drill Process• Facilities :
Machining Center 2ea, Copy Milling, Milling 2eaBench Grinder 2ea, Tool Grinder 2ea, LatheRadial Drilling M/C 2ea, Upright Drilling 2eaWire Cutting 2ea, 3-Dimension Measuring M/C
Mold LineMold Line
![Page 8: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/8.jpg)
2004-10-288http://www.younil.co.kr
▣ Driving process of information system build ▣
The second chapterDriving process of information system build
1.1 Introduction to Background1.2 Scenario1.3 System budget1.4 Build contents
![Page 9: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/9.jpg)
2004-10-289http://www.younil.co.kr
Introduction to Background (Change of Environment)
We had policy and necessity of
management reform that correspond
in market environment.
We had policy and necessity of
management reform that correspond
in market environment.
We need quick and correct
information for new market strategy
about stagnation of market
economy
We need quick and correct
information for new market strategy
about stagnation of market
economy
Change of market environment
Change of market environment
We had quality mend for customer
satisfaction and the importance of
process control and necessity of
real time production management.
We had quality mend for customer
satisfaction and the importance of
process control and necessity of
real time production management.
Change of business environment
Change of business environment
E R P
+
POP
E R P
+
POP
Change of information environment
Change of information environment
![Page 10: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/10.jpg)
2004-10-2810http://www.younil.co.kr
Introduction to Background (Importance of system management)
1. Productivity improve by product
history management
2. Efficiency of production management
improve by real time data management
3. Maximization of Quality improvement
4. Systematization of process control
POPPOP
1. Improvement of Overload work
by manual processing document
arrangement
2. Consistency of work processing grant
3. Accuracy of data improve by
Standardization business
4. Intention and optimization of policy
decision by integral of data and
connection
ERPERP
System integral management
![Page 11: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/11.jpg)
2004-10-2811http://www.younil.co.kr
Scenario
Government fund application ERP(20M KW)/POP(48M KW)Select IT partner ERP(New soft techniques )/POP(e-sol)
a preliminary investigation. Interview, a field research, research datadirection Make work flow
Select Department manager, remake work processingKICK OFF
Loss improve, Design a work, make a system The first evaluation meeting
System monitoring
Take complementary listThe secondary evaluation
meeting
Make Weekly, monthly scheduleDevelopment schedule
System evaluation Completed report
System cost 12%Contract maintenance
Research, test systemsupervision
Self-development / ERP additional connectionPQS addition development
![Page 12: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/12.jpg)
2004-10-2812http://www.younil.co.kr
System budget
* Total budget : 170M KW
ERP POP
Self-budget 70M KW 100M KW20M KW 48M KWGovernment fund
New soft techniques Co.,Ltd E-sol Co., LtdCorporation
6 month 6 monthDevelopment period
System cost 12% Self- maintenancemaintenance cost
1. the reference of information system build
2. The stability of Development Corporation
3. Price
4. Skill
5. extendable system
6. Developer (project manager)
The point of Selection
![Page 13: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/13.jpg)
2004-10-2813http://www.younil.co.kr
Build contents (Improvement of work loss)
Section Loss item
Loss of Sales1. Difficulty of acceptance an order
2. Difficulty of Sale data management
1. The necessary time waste of material requirement planning
2. The accuracy lack of Material receiving
3. The accuracy lack of Material delivery
4. The stock present condition by noteLoss of Quality
Assurance1. The data lack for quality control
2. The data lack for quality improvement
Loss of Purchasing
/Material
1. Difficulty of product history management2. The data lack for Loss goods control 3. Difficulty of productivity management4. The data lack for improvement process
Loss of Production
Inefficient work happed by duplicated work for various documentreportedIssue Point
![Page 14: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/14.jpg)
2004-10-2814http://www.younil.co.kr
▣ Information system build story▣
The third chapterInformation system build story
1.1 System configuration1.2 System flow1.3 Operating situation
![Page 15: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/15.jpg)
2004-10-2815http://www.younil.co.kr
System configuration
Sales
Preparatory work
Purchasing / Material
Quality assurance
production
Account
assembly parts
Loss /repair
Final test
packaging
ERP Server
POP Server
Job order
Actual production
Connection
(Internet)T1(1.44m)
![Page 16: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/16.jpg)
2004-10-2816http://www.younil.co.kr
System flow (integration )
Purchasing /Material
Quality assuranceCustomer Sales Production
3 month
1 weekdemand
forecast Record
demand record
MRP output
MRP request
order
Material orderMaterial delivery
Materialreceive
Material delivery
check
assembly parts
packaging
Actual uploadActual production
record
Check of shipment
Goods receive
Goods deliveryshipment
reservation
Loss/repair
manufacturing planning
Job order
Basic data
MRP Planning
Production Planning
Preparatory work
![Page 17: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/17.jpg)
2004-10-2817http://www.younil.co.kr
System flow (ERP)
Production Planning
manufacturing planning
Job order
POP SYSTEM
Point Of Production management
Actual production
Receive order
POP system directly Reflect that connect POP system and ERP system if work order through production
schedule.
ERP↔POP
We can manage POP actual Production by work indication and
do results registration to ERP system, automatic upload during time
Check of shipment
![Page 18: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/18.jpg)
2004-10-2818http://www.younil.co.kr
System flow (POP)
Job order
Preparatory work
assembly parts
packaging
POP data ERPdata
Goods receive
ERP↔POP
We can manage POP actual Production by work indication and
do results registration to ERP system, automatic upload during time
Using wireless scanner that receive
PALLET part shipment
![Page 19: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/19.jpg)
2004-10-2819http://www.younil.co.kr
Operating situation (POP Process)
Preparatory work
Material ready
Label printing
assembly parts(3POINT)Parts SN
scanning
Process checkGoods SN
scanningJob
order
shipment
Receive PALLET part
Input scanner data
packaging
Parts check
BOX label printing
Loss repair
Loss parts repair
Loss list printing
SHIPMENT
![Page 20: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/20.jpg)
2004-10-2820http://www.younil.co.kr
Operating situation (Production field 1)
<Barcode label printing> <Preparatory work>
Image that display bar code label that work direction is attached to production based on ERP
we need in ready work that based on ERP work direction before production injection
![Page 21: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/21.jpg)
2004-10-2821http://www.younil.co.kr
Operating situation (Production field 2)
< Assembly parts scanning> <Production monitoring>
it is that BOM product and parts serial number scanner for product parts history management
Production progress management is monitoring to model injection provision results.
![Page 22: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/22.jpg)
2004-10-2822http://www.younil.co.kr
Operating situation (Production field 3)
<Loss repair> <Final test & check>
LOT sample test
PALLET sample test
![Page 23: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/23.jpg)
2004-10-2823http://www.younil.co.kr
Operating situation (Production field 4)
<Packaging>
It is wrap various manuals and accessory parts with product.
We execute history management by fixing scan in POP system.
After parts check, We print BOX label by last scan process.
![Page 24: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/24.jpg)
2004-10-2824http://www.younil.co.kr
Operating situation (Production field 5)
<Shipment>
Using data to PALLET Shipment, car history management
Using Wireless scanner
Receive PALLET part
Input scanner data
![Page 25: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/25.jpg)
2004-10-2825http://www.younil.co.kr
Operating situation (Production field 6)
<Loss management>
< Production management>
<Shipping management>
< Productivity management>
![Page 26: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/26.jpg)
2004-10-2826http://www.younil.co.kr
▣ The Result and expansion direction ▣
The fourth chapterThe Result and expansion direction
4.1 The Result of iThe Result of information system build
4.2 The expansion direction of The expansion direction of Information system build
![Page 27: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/27.jpg)
2004-10-2827http://www.younil.co.kr
The Result of iThe Result of information system build (Chart)
2001 2003
Productivity600 EA/day
(8 hour working time)900 EA/day
(8 hour working time)
Input persons 42 persons 53 persons
Productivity/worker 14.3 17.0
Parts loss rate 1% 0.02%
Process Improvement rate 10% 80%
Correct shipment 80% 94%
Documentation of data 4 hour 20 minute
Communication call phone use system
Standard of Documention user's letter system's letter
![Page 28: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/28.jpg)
2004-10-2828http://www.younil.co.kr
The Result of iThe Result of information system build (Graph)
Productivity/worker Parts loss rate Process improvement rate
Correct shipment Documentation of data
14.3
17.0
before
after
Result
2001 2003 2001 2003
1.0%0.02%
2001 2003 2001 2003 2001 2003
10%
80% 81%96%
240M
20M
2.7%
0.98%
220M70%
15%
![Page 29: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/29.jpg)
2004-10-2829http://www.younil.co.kr
The expansion direction of The expansion direction of Information system build(Master Plan)
The first step (Introduction)
ERP / POPSystem build
Work improvement
Productivity growth
standard ofDocumentation
knowledge management
The third step (Integration)
Groupware
Integration
management innovation
Originalmanagement
The second step (stabilization )
ERP / POPConnection
Qualityimprovement
Correct information
The standard of Production
management
The standard of Quality
management
![Page 30: Management Innovation through Information System Buildppt).pdf 2004-10-28 Management Innovation through Information System Build](https://reader035.vdocument.in/reader035/viewer/2022071106/60283febf94a1e4e1754a7ab/html5/thumbnails/30.jpg)
2004-10-2830http://www.younil.co.kr
The expansion direction of The expansion direction of Information system build(Investment Budget)
The first step (Introduction)
2002.06 ~2003.12
Initial investment cost
ERP SW: 70M KW
HW:25M KW
POP SW: 100M KW
HW: 20M KW
The second step (stabilization )
2004.01~2004.12
investment cost
ERP SW:12M KW
POP SW: 10M KW
HW: 35M KW
The third step (Integration)
2005.01~2005.12
investment cost
Groupware
SW:50M KW