mango hill infrastructure - moreton bay regional council · 2.4.3 approval of sector plan prior to...

152
Mango Hill Infrastructure Development Control Plan No 14 Pine Rivers

Upload: dokiet

Post on 28-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill InfrastructureDevelopment Control Plan No 14

Pine Rivers

Page 2: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

.

Page 3: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure

Development Control Plan

PINE RIVERS SHIRE COUNCIL

GAZETTED 27 NOVEMBER 1998

AMENDED 23 DECEMBER 2011

Page 4: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure
Page 5: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

TABLE OF CONTENTS

1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 Preamble . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.2 Description of the DCP Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.3 Previous Studies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.4 Planning Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.5 Strategic Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.6 Development Vision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.7 DCP Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.8 Provision of Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.9 Structure of the Document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41.10 Legislative Framework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51.11 Relationship to Pine Rivers Shire Council Planning Scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51.12 Special Development Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72.1 Plan Making Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72.2 Structure Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

2.2.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112.3 Precinct Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

2.3.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132.3.2 Contents of Precinct Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132.3.3 Requirements for Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142.3.4 Approval of Precinct Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152.3.5 Amendment of Precinct Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152.3.6 Development Co-ordination Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

2.4 Sector Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.4.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.4.2 Contents of Sector Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.4.3 Approval of Sector Plan Prior to Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.4.4 Requirements for Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.4.5 Approval of Sector Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.4.6 Management Lots . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.4.7 Amendment and Revocation of Approval of a Sector Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.4.8 Sector Plans to Indicate Adjacent Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.4.9 Final Specification of Land Use Rights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

2.5 Lodgement of Plans and Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.6 Development Master Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.7 Information for Prospective Purchasers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

3 Mango Hill Development Strategy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

3.1.1 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223.1.2 Development Character . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233.1.3 Integrated Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

3.2 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243.2.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243.2.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

3.3 Key Instrument of the DCP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253.3.1 Town Centre Core . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253.3.2 Town Centre Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.3.3 Mixed Industry and Business Area (MIBA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.3.4 Major Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.3.5 Local Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.3.6 Urban Residential Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.3.7 Major Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.3.8 Proposed North-South Arterial Road . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283.3.9 Major Roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283.3.10 Possible Boundary Road Deviation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283.3.11 Highway Corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283.3.12 Possible Public Transport Corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Page 6: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

4 Town Centre Core . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

4.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

4.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

4.3.1 Development Character . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 314.3.2 Retail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324.3.3 Administrative and Commercial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334.3.4 Recreation, Entertainment and Leisure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334.3.5 Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 334.3.6 Public Transport Corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

4.4 Design and Siting Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 344.5 Supplementary Table of Development - Town Centre Core Element . . . . . . . . . . . . . . . . . . . . . . . . . 37

5 Town Centre Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 385.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

5.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 385.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

5.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 385.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

5.3.1 Development Character . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 395.3.2 Town Centre Frame (Mixed Use Areas) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 395.3.3 Town Centre Frame (Transition Areas) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 415.3.4 Public Transport Corridor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

5.4 Design and Siting Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 425.5 Supplementary Table of Development - Town Centre Frame Element . . . . . . . . . . . . . . . . . . . . . . . 46

6 Urban Residential Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 486.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

6.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 486.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

6.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 486.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

6.3.1 Intent of Village . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 496.3.2 Range of Housing Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 496.3.3 Village Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

6.3.3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.3.3.2 Environmental Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.3.3.3 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.3.3.4 Local Parks and Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 526.3.3.5 Low Density Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 526.3.3.6 Standard Density Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 526.3.3.7 Medium Density Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 536.3.3.8 Other Residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

6.4 Design and Siting Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 536.5 Supplementary Table of Development - Urban Residential Areas Element . . . . . . . . . . . . . . . . . . . . 54

7 Mixed Industry and Business Area (MIBA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

7.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56

7.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

7.3.1 Infrastructure and Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 577.3.2 Development Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

7.3.2.1 Character . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 577.3.2.2 Office Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 587.3.2.3 Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 587.3.2.4 Recreation, Leisure and Tourism . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 597.3.2.5 Industry and Service Trades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 597.3.2.6 Education and Health Care . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

Page 7: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

7.3.2.7 Other MIBA Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 607.3.3 Development Intensity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

7.3.3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 617.3.3.2 Office Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

7.4 Design and Siting Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 617.5 Supplementary Table of Development - Mixed Industry and Business Area Element . . . . . . . . . . . . . 64

8 Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 658.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65

8.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 658.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65

8.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 658.2.1 Major Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 658.2.2 Local Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66

8.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 678.3.1 Range and Mix of Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 678.3.2 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 678.3.3 Integration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

8.4 Supplementary Table of Development - Major Community Facilities Element . . . . . . . . . . . . . . . . . . 698.5 Supplementary Table of Development - Local Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . 71

9 Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 739.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73

9.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 739.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73

9.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 739.2.1 Environmental Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 749.2.2 Linear Park System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 749.2.3 Town Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 759.2.4 Village and Local Parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 759.2.5 District and Local Playing Fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 759.2.6 Buffers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 759.2.7 Open Space Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 769.2.8 Landscape Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

9.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 769.3.1 Extent of Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

9.4 Design of Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 779.5 Supplementary Table of Development - Open Space Element . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

10 Transport & Circulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8310.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83

10.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8310.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83

10.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8310.2.1 Overall Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8310.2.2 External Transport Network Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8410.2.3 Internal Transport Network Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84

10.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8410.3.1 Public Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8410.3.2 External Roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8510.3.3 Internal Roads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8610.3.4 Path Network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

10.4 Permeability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

11 Environmental Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8911.1 Desired Environmental Outcomes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

11.1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8911.1.2 Specific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

11.2 Planning Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8911.3 Development Intent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

12 Infrastructure Agreements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9412.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

Page 8: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

12.2 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9412.3 Water and Sewerage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9412.4 Stormwater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9612.5 Roads and Transport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9712.6 Open Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9712.7 Community Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98

13 Miscellaneous Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10113.1 Existing and Interim Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101

13.1.2 Interim Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10113.1.2.1 Management and Development Interim Uses . . . . . . . . . . . . . . . . . . . . . . . . . . 10113.1.2.2 Other Interim Uses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10213.1.2.3 Conditions of Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

13.2 Mango Hill Village . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10213.3 Car Parking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10313.4 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104

13.4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10413.4.2 Administrative Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10413.4.3 Purpose Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110

Page 9: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

MAPS

Map 1 Development Control Plan Area

Map 2 Regional Context

Map 3 Structure Plan

Map 4 Major Roads

FIGURES

Figure 1 Plan Making ProcessFigure 2 Diagram on Plan Making Process and its Relationship to Development Approval

Process

TABLES

Table 6.1 Lot Types

Table 9.1 Open Space Characteristics

Table 11.1 Environmental Performance Criteria

Table 13.1 Commercial Services Purposes

Table 13.2 Contractors Depot Purposes

Table 13.3 Service Industry Purposes

Page 10: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

.

Page 11: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 1

1 INTRODUCTION

1.1 Preamble

The DCP area contains approximately 1023hectares and is situated along the Bruce Highway,some 25 kilometres north of the city centre ofBrisbane.

It is a large parcel of contiguous land titlespresently held in one ownership, situated in acorridor identified as suitable for urban residentialgrowth and a major employment centre. The DCParea is strategically well placed at the centre ofthe northern, Pine Rivers-Caboolture urban growthcorridor. It is also close to the major Statecontrolled Narangba Industrial Estate, and linkedby major roads to the adjacent local governmentareas of Caboolture and Redcliffe.

Some 30 years ago, the DCP area was largelycleared of its native vegetation, and planted withexotic pine species primarily intended for use inthe production of cardboard from the paper mill atPetrie. The pine plantation was substantiallyharvested primarily for woodchip use in the early1990s and, more recently, stumps were removed.The DCP area is now used for grazing purposes.

The potential suitability of the DCP area for urbandevelopment purposes was recognised by Councilin its 1988 strategic plan. During 1995/96, as partof a wider scale planning exercise, Councilundertook a range of studies which investigatedthe long term development potential of the DCParea in more detail.

In December 1995, a rezoning application waslodged by Lend Lease Development Pty Ltd (LendLease) on behalf of the owner, Mango HillDevelopment Pty Ltd, for approval to develop theland for urban purposes, including a town centreand significant employment areas. Lend Lease, insupport of its application, undertook,independently of Council, substantialinvestigations into the DCP area and its suitabilityfor development. More recently, detailedinvestigations have been undertaken into thesuitability and development feasibility of thesouthern corner of the DCP area for a sub-regionalcentre. This location generally satisfies theCouncil's long range conceptual planning in itsstrategic plan. Discussions in late 1997 betweenState Government representatives (principally theDepartments of Transport and Main Roads),Council and the principal developer further refined

the preferred development strategy for the DCParea.

These factors combined offer a unique opportunityto create a master planned community providingan exceptionally high standard of residentialamenity, employment opportunities andcommunity facilities.

This DCP has been prepared by Council inconsultation with the principal developer. Councilproposes to amend the planning scheme toinclude the DCP area in the Special Developmentzone.

Development of the master planned community isexpected to extend over approximately a 20 yeartime period. It is therefore necessary to preparethis DCP to guide planning and development overthis period and to provide the basis for agreementsto be entered into for the provision of infrastructureto meet the needs of the master plannedcommunity.

1.2 Description of theDCP Area

The DCP area is identified on Map 1. The DCParea lies within the Shire of Pine Rivers and abutsthe common boundary with the Shire ofCaboolture. Some distance to the east is the Cityof Redcliffe.

The DCP area is bounded by the Bruce Highwayfor much of its western boundary, and along itssouth-eastern boundary by Anzac Avenue.Boundary Road truncates the north-western cornerand Saltwater Creek truncates the north-easterncorner of the DCP area. The existing village ofMango Hill abuts the eastern boundary.

In the regional context, the DCP area is locatedcentrally in South East Queensland's northerngrowth corridor identified in the 1998 RegionalFramework for Growth Management (RFGM ). Itsregional context is shown on Map 2.

Page 12: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

2 Mango Hill Infrastructure Development Control PlanImplementation Provisions

1.3 Previous Studies

In April 1996 Council completed the preparation ofa draft North Pine Area Development Control Planwhich originally incorporated the localities of LakeKurwongbah, Dakabin, Kallangur, Petrie (Part),Murrumba Downs, Griffin and Mango Hill. TheDCP area formed part of the draft North Pine AreaDevelopment Control Plan.

Page 13: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure
Page 14: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

4 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Page 15: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 5

Extensive studies were undertaken in support of infrastructure necessary to provide, maintain andthe draft North Pine Area Development Control sustain a high standard of living for residents in thePlan and these studies identified the unique DCP area, and a vibrant, competitive, wellopportunity for development of the DCP area for a serviced, major employment centre for the Shiremaster planned community. The Draft North Pine and the region.Area Development Control Plan was publiclyadvertised in 1996. Following consideration ofsubmissions received, Council reconsidered itsstrategy, and resolved to prepare three separateDCPs for the northern area, namely:

(a) Mango Hill Infrastructure DCP,(b) Lake Kurwongbah DCP, and(c) North Pine DCP (Balance Area).

The principal developer has also undertakenextensive planning studies of the DCP area. Thesestudies have been made available to the Councilas part of the 1995 rezoning application made bythe principal developer, to exclude the DCP areafrom the rural zone and include it in the SpecialFacilities zone. Other studies carried out by theprincipal developer subsequent to that rezoningapplication have also been made available toCouncil.

The RFGM and the Integrated Regional TransportPlan 1997 have been considered by Council in thepreparation of this DCP.

1.4 Planning Study The main planning study report which forms PartB of this DCP draws on material prepared byCouncil and the principal developer in their variousinvestigations concerning development of the DCParea. The planning study contains supportinginformation on which this DCP is based. It drawson information contained within existing reports,updated where necessary, and collates thatinformation into an easily assimilated form.

1.5 Strategic Plan

Council’s strategic plan designates the DCP areapartly as a Major Employment Centre, partly asUrban Areas and partly as Rural Areas.

1.6 Development Vision

The overriding vision for the Mango Hilldevelopment planned in this DCP is to providethrough the processes of integrated andcomprehensive master planning, an attractive,safe, convenient, efficient and sustainable newtown. It will house approximately 25,000 residentstogether with a major shopping centre and a widerange of employment opportunities andcommunity, education and recreation facilities. Akey aspect of the integrated and comprehensivemaster planning approach to this new town is thetimely and co-ordinated provision of all

1.7 DCP PurposeFundamental to the development of the DCP areais achievement of ecological sustainability by:

(a) co-ordinating and integratingplanning of the DCP area havingregard to matters of local, regionaland state interest;

(b) managing the process by whichdevelopment occurs; and

(c) managing the effects of developmenton the environment.

1.8 Provision ofInfrastructure

An essential element of the implementation of thisDCP is the provision of infrastructure for:

(a) water supply and sewerage;(b) stormwater management;(c) roads and transport;(d) open space; and(e) community facilities.

In addition to the requirements of this DCP theprovision of infrastructure is to be governed byinfrastructure agreements which will be enteredinto between the principal developer, the Counciland/or the State Government. This DCP will notcommence to operate until the legally bindingagreements for the provision of infrastructure havebeen entered into.

1.9 Structure of theDocument

Section 1 contains the introductory materialrelating to the DCP area and the developmentvision. Section 2 provides the plan makingprocess to allow the implementation of thedevelopment strategies and achievement of thedesired environmental outcomes. Section 3outlines the development strategy, the desiredenvironmental outcomes flowing from the

Page 16: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

6 Mango Hill Infrastructure Development Control PlanImplementation Provisions

development vision stated in Section 1.6, as well terms used in IPA and these terms should beas identifying the key land use elements and other given the same meaning as in IPA, where themajor structural elements. context permits.

The key land use elements shown on the structureplan are described in Sections 4-10. They providethe desired environmental outcomes and theplanning and development intents, andsupplementary tables of development for each ofthe town centre core, town centre frame, themixed industry and business area (MIBA),community facilities, the urban residential areas,the major open space and major transportnetworks.

Section 11 provides an overview of the planningand development intentions in relation toenvironmental protection measures. Section 12deals with infrastructure agreements. Finally,Section 13 contains miscellaneous provisionsregarding matters such as interim uses, carparking and definitions.

The DCP has been structured, as much aspracticable, so that each land use element sectioncan largely stand alone to facilitate reference tocomponents of particular relevance to each reader.However, it is essential that all readers refer tosections 2 and 3 in order to appreciate the planmaking process applicable to development withinthe DCP area and the overall development strategyrespectively. Those reading the DCP in its entiretywill be aware of some repetition of phrases,concepts and principles which provide consistencyand a degree of autonomy to individual land useelement sections. Readers who require a detailedunderstanding of all planning and developmentaspects of the Mango Hill development shouldread the whole of this document and the PlanningStudy.

1.10 LegislativeFramework

Although this DCP has been prepared inaccordance with the provisions of the LocalGovernment (Planning and Environment) Act 1990(PEA) in early 1998, nevertheless it has wherepossible taken into account the introduction of theIntegrated Planning Act 1997 (IPA) under which itwill fall to be implemented and administered.Accordingly, the DCP recognises, to the extentpossible, the concepts within IPA and, inparticular, that of the integrated developmentassessment system (IDAS). It has adopted some

1.11 Relationship to PineRivers Shire Council Planning Scheme

This DCP has been prepared by the Council unders.2.18(2)(c) of the PEA. It forms part of theplanning scheme for the Shire and has applicationto the DCP area.

Because of the particular nature of thedevelopment envisaged for this DCP area, its longterm integrated construction and the plan makingprocesses detailed in section 2, some provisionsin this DCP differ from those in the planningscheme. It is intended as sector plans areprogressively approved over the life of thedevelopment that Council will determine at thetime of the approval of each sector plan theparticular planning, design and developmentcontrol criteria to apply to development in thatsector. To the extent a sector plan does notprovide planning, design and development controlcriteria, then the provisions of the planning schemerelevant to the particular form of development willapply.

Accordingly the DCP, approved precinct plans andapproved sector plans are to be read inconjunction with the planning scheme andCouncil’s local laws, policies and codes and to theextent the DCP, precinct plans and sector plansdo not modify provisions of the Council's planningscheme, local laws, policies and codes they willapply to the DCP area. To the extent theprovisions of the Council's planning scheme, locallaws, policies or codes are modified by the DCPprecinct plans or sector plans, then the provisionsof this DCP, the precinct plans or sector plans willprevail.

Page 17: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 7

1.12 Special DevelopmentZone

In conjunction with the introduction of this DCP,the DCP area will be included in the specialdevelopment zone. This zone is provided in theplanning scheme for use in conjunction with aDCP in this manner, as Council desires to makespecial provisions for the integrated developmentof this large and strategically positioned site.Although the DCP area consists of many separateallotments it has the advantage of being in the oneownership. Further, there are aspects of thedevelopment which can work well in the integratedenvironment offered by the development proposalbut which might not work satisfactorily in isolationin other areas of the Shire. The SpecialDevelopment zone is intended to enable particularareas of the Shire, such as the DCP area, to bedeveloped in a comprehensive and co-ordinatedmanner, and to make provision for particular formsof development appropriate to the DCP area.

Page 18: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

8 Mango Hill Infrastructure Development Control PlanImplementation Provisions

2 IMPLEMENTATION

2.1 Plan Making Process

This DCP provides a mechanism for planning andmanaging development by the use of a hierarchicalplan making process having three levels. Eachplanning level contains progressively more detailedinformation, consistent with preceding plans, forprogressively smaller areas of the DCP area.

Planning of this large DCP area needs to takeaccount of the broad range of land uses proposed,the dynamics of the market, the economy,community preferences, changes in technology,and other factors over the life of such a majordevelopment. Of necessity, therefore, the planningprocess must commence with flexible and broadlybased locations of preferred land use designations.This inherent flexibility is essential to allow for thelong term development program (anticipated to beabout 20 years) and the future detailed planning ofthe DCP area. Detailed planning will have regardto:

(a) the incidence and impact of featuressuch as topography, soils, overlandflow paths, and other physicalcharacteristics of the DCP area;

(b) existing planning constraints such ashighways, roads, trunk mains, andopen space systems;

(c) the long term development program;and

(d) market expectations and demand.

The plan making process must also permit aflexible approach to facilitate innovativedevelopment and enable modifications to be madeto current planning and development standardswhich take account of technological developmentsand changing patterns in society.

With progressively refined planning at increasinglevels of detail for smaller sections of the DCParea, the final plan in the process provides detailed

and specific land use statements, developmentrequirements, built form and landscape designcriteria and the location of land uses. This finalplan will be prepared at or about the time ofsubdivision and just prior to physical developmentof the land. It is both unnecessary andundesirable to bring forward this final stage of planmaking until closer to the actual development ofthe DCP area when detailed planning iscompleted.

The plans in the hierarchical plan making processare the:

(a) structure plan;(b) precinct plans; and(c) sector plans.

The following diagram summarises the planmaking process as a means of assisting in theunderstanding of the relationship between thevisionary concepts and intentions shown in thestructure plan and the process by which this visionwill be translated and implemented into reality atthe detailed phase of planning and development.

The relationship between the plan making processand the development approval process isillustrated in Figure 2. It is important to recognisethat these two processes serve separate anddistinct functions. The plan making process mustprecede approval of development applications andthe commencement of development because theprecinct plans and sector plans provide the codeagainst which development applications will beassessed. Nevertheless, this does not preventconcurrent preparation, lodgement andconsideration of a plan or application envisaged inthese two processes. For example, early stagesof development in the town centre core may followparallel processes. Detailed descriptions of thecontents and purpose of each plan and therequirements for making, approving and amendingthese plans are contained in subsequent clauses.

The separate development approval processes aregoverned by law.

Page 19: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 9

PLAN MAKING PROCESS

PLAN TYPE DEFINING PURPOSE DESCRIPTION DEFINITION OF LAND PROCESSBOUNDARIES USES

STRUCTURE PLAN

C Cadastral boundaries for Shows in indicative forms the Contains broad statements of Supplementary Table of GENERALDCP area overall project vision and intent supported by planning Development

C Notional boundaries for structural elements that are and siting parameters.land use elements intended to be enduring

those key land use and objectives and general design

throughout the developmentphase.

PRECINCT PLAN

C Notional boundaries Provides an indicative plan Contains more detailed Generic use descriptionsshowing more detail for each statements of planning,precinct within the DCP area. development, urban designPrecincts are planning areas and landscape principles andwithin one land use element objectives to guide finalor across a number of detailed land use planning.elements which are created to Includes a preliminaryallow for a more detailed program of infrastructureinterpretation of the structure provision.plan.

SECTOR PLAN

C Cadastral boundaries for The final plan in the plan Specifies in detailed form Specific land uses drawnthe Sector making process bringing land use rights, development from the relevant

C Indicative internal lot and integrated manner all siting guidelines or controls. Development.boundaries for areas of requirements for development Includes plans showingconsistent land use (or and use of land in the sector. building envelopes, setbacks,may include a proposed landscape, areas, accessplan of subdivision). points and such like as well

C Cadastral internal provision.boundaries to definespecific land use

together in a final cohesive requirements and design and Supplementary Table of

as details of infrastructure SPECIFIC

Page 20: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

10 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Page 21: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 11

Page 22: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

STRUCTUREPLAN

PRECINCT PLAN

SECTOR PLAN

BUILDINGWORKS

PLUMBING ORDRAINAGE

WORKS

OPERATIONALWORK

PLAN MAKINGPROCESS

DEVELOPMENTAPPLICATIONPROCESSES

DEVELOPMENTCO-

ORDINATIONPLAN

RECONFIGURINGA LOT

MATERIALCHANGEOF USE

FIGURE 2 DIAGRAM ON PLAN MAKING PROCESS AND ITS RELATIONSHIPTO DEVELOPMENT APPROVAL PROCESS

12 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Page 23: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 13

2.2 Structure Plan

2.2.1 Purpose

The structure plan is the fundamental planningguide for development. It shows land use andstructural elements in a notional way. The landuse and structural elements are described insection 3.

The structure plan is not intended to prescribe theprecise boundary of those land use elementswhich are shown in a notional way. Also, it is notintended the structure plan prescribe withaccuracy the final location of uses but rather thenotional layout of uses within the broad conceptualland use elements.

The structural elements shown on the structureplan are the proposed overall framework oftransport and open space networks. The proposedstructural elements are shown in a conceptual waybased on the present level of planning andknowledge of constraints, and for these reasonsthe locations must not be regarded as in any wayfinal. With further land use planning, engineeringand environmental assessments, the final locationof the structural elements will be determined toachieve the function and purpose for which theyare intended. In other words, it is not their locationon the structure plan but the indication of theirfunction to be provided which is important.

The structure plan is intended to serve four mainpurposes:

(a) to express overall development intent,concepts and strategies;

(b) to show those elements of thedevelopment which are intended to beenduring;

(c) to provide the broad conceptual basisfor assessing the suitability ofdevelopment proposals in a continuingprocess;

(d) to provide a reference plan for theultimate general form and nature ofdevelopment of the DCP area.

The planning and development principles andobjectives pivotal in preparing the structure planinclude:

(a) to create an integrated community toaccommodate about 25,000 residentstogether with a wide range of

community facilities and servicesrequired for a development of thisscale;

(b) to create a major employment centre,including a major shopping centre,other town centre facilities and aMIBA;

(c) to protect conservation values andcultural heritage;

(d) to protect waterways and estuarinesystems; and

(e) to provide a major transport corridor.

The structure plan purposely has inherent flexibilityto accommodate land use variations anddevelopment needs which cannot be preciselyforeseen. Specifically, given the nature and scaleof the development, it is acknowledged that theform and detail of land use in areas such as theMIBA will evolve over time. For example, it is bothlikely and desirable that compatible land uses willevolve around key pioneer land uses in the MIBA.Providing the desired environmental outcomes areachieved, this approach is endorsed by the DCP.

A physical constraint on ultimate development isthe infrastructure to be provided which is designedto serve the expected residential population of25,000 and the projected workforce ofapproximately 13,000.

In terms of water and sewerage infrastructuredemand and design these figures convert to:

- Sewerage an “equivalent population” ofapproximately 26,000 personsmore or less residing in theDCP are plus an additional6,000 “equivalent persons”employed in the DCP area.

- Water 9,729 “equivalent tenements”

Planning for each precinct and sector must takethis constraint into account. Precinct or sectorplans may apportion these levels of “equivalentpopulation and tenements”. Development whichgenerates an “equivalent population or tenement”significantly exceeding the figure listed above orthat “equivalent population or tenement”apportioned to a precinct or a sector will beconsidered inappropriate.

Page 24: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

14 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Page 25: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 15

2.2.2 Amendment of Structure Plan

It is inherent in the plan making process that thefinal location or boundaries of land use elements orlocations of structural elements shown on thestructure plan may be different to their originalnotional location indicated on the structure plan.If a land use or structural element is located in adifferent position, for example, community facilitiesare positioned within the general proximity of thosesymbols shown on the structure plan, orboundaries of land use elements are generallyrealigned, or transport networks are realignedwithout undermining the intention of the overallpattern of development across the DCP area, suchchanges should not be considered to require oramount to an amendment of the structure plan.These changes should be regarded as a naturaland expected outcome of the function of the planmaking process.

Amendments of the structure plan are likely to beinfrequent. This is because the location of finalforms of development, as shown on subsequentplans consistent with the structure plan and theplanning intents, will be an expression of thestructure plan rather than an amendment of it.

An amendment of the structure plan will berequired only if the general location of a land useelement is moved substantially from one part ofthe DCP area to another or if a substantiallydifferent form of land use is proposed, for example,a residential village is proposed to be developed forindustrial purposes or a structural element beingthe road or open space networks changes inoverall terms.

Where required, an amendment of the structureplan may be instigated by the principal developerbecause of more detailed planning or marketdemands, or by the Council in the public interest.

Either the Council or the principal developer maypropose amendments to the structure plan.

If either the Council or the principal developerproposes an amendment the proponent maysubmit an amended structure plan to the othertogether with consequential amendments to thisDCP . The proposed structure plan amendment isto be supported by such information and studiesas are necessary to demonstrate the basis andthe need for the amendment.

If within twenty-eight (28) days or such longerperiod as agreed between Council and theprincipal developer, the Council and the principaldeveloper agree on the proposed structure planamendment the Council must immediately initiate

the procedures required by law to amend itsplanning scheme to give effect to the proposedstructure plan amendment. If the proposal for thestructure plan amendment was initiated by theprincipal developer, then the principal developermust pay the costs of advertising the amendment.

For the avoidance of doubt, the Council in agreeingwith the principal developer to propose anamendment to the structure plan, is not to betaken to have exercised its discretion as a localgovernment about the proposed amendment.

2.3 Precinct Plans

2.3.1 Purpose

At the time of preparation of this DCP significantplanning of a broad and strategic nature had beenundertaken. However, planning had not beensufficiently detailed to permit the creation of a sitespecific land use plan nor to specify detaileddesign and development controls, principles andobjectives.

Because of the long term nature of thedevelopment of the DCP area it is desirable andindeed necessary to provide guidance and ensurea sound basis for preparation of plans by theprincipal developer and for assessment of suchplans and development.

The preparation of precinct plans for precinctswithin the DCP area is the first step in thisprocess. Each precinct plan must be prepared bythe principal developer in accordance with thissection. To the extent relevant, having regard tosubsequent sector plans, development in theprecinct must comply with the provisions of aprecinct plan

2.3.2 Contents of PrecinctPlan

A precinct plan must provide for the precinct:

(a) a more detailed interpretation of thestructure plan, the desiredenvironmental outcomes and theplanning intents of this DCP;

(b) statements of development, planningand design principles to guide finaldetailed planning and developmentsuch as the general form ofcommercial development;

(c) a landscape concept plan showing thebroad strategies and themes for major

Page 26: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

16 Mango Hill Infrastructure Development Control PlanImplementation Provisions

public places, major roads and the public to determine with sufficient certaintydevelopment sites;

(d) where relevant, the broad strategies ofthe open space system for theprecinct;

(e) environmental management objectivesfor development and performanceindicators used to measureachievement of these objectives.

(f) statements of intended desirable andundesirable generic land uses in theprecinct

(g) statements concerning:

(1) the infrastructure to be providedin the precinct;

(2) infrastructure affected by orrequired as a result of thedevelopment of the precinct; and

(3) how these items ofinfrastructure relate to theinfrastructure agreements madefor the DCP area;

(h) provide a preliminary program showingfor the various items of infrastructure:

(1) a preliminary program forinfrastructure provision;

(2) the items to be provided;

(3) the intended provider;

(4) other works dependent on itsprovision;

(5) estimates of when they willneed to be provided; and

(6) any other relevant information

(i) any other relevant information.

The precinct plan is intended to show with somecertainty the way in which the precinct will bedeveloped. The precinct plan will not necessarilydefine the final nature or location of specific landuses nor will it show the final location and extentof road and open space networks. However, it willlocate them in a way which enables Council and

that the development of the precinct will beconsistent with the planning intents of this DCPand the structure plan. A precinct plan need notinclude land for the provision of infrastructure whichis located outside the precinct.

The precinct plan or any supporting plans andillustrations must also provide information (whererelevant) about the indicative location of:

(a) major road corridors and trunk collectorstreets;

(b) major access points to road networks;

(c) major recreational paths;

(d) community services and educationfacilities;

(e) access to community services andeducation facilities;

(f) major open space provisions includingthe town park if applicable;

(g) village and local parks and other localopen space (indicated symbolically);

(h) medium density housing;

(i) prime mixed use areas in the towncentre frame;

(j) character areas in the MIBA;

(k) possible high rise development sites;

(l) items of infrastructure relevant to theprecinct.

2.3.3 Requirements forApplication

An application for approval of a precinct plan must:

(a) not be made until a pre-lodgementmeeting has been held with relevantCouncil officers;

(b) be in the form approved by Council;

Page 27: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 17

(c) be accompanied by the application fee (1) the structure plan; applicable at the date of submission ofthe application, and sufficient (2) the desired environmentalsupporting information to reasonably outcomes or the planning orallow Council to properly consider the development intents if relevant;application; or

(d) include the proposed precinct plan; (3) Council’s town planning andand development design provisions,

(e) if it makes provision for State they have not been modified by,Government infrastructure, be or pursuant to, this DCP;accompanied by evidence acceptableto Council that the relevant State (4) An approved DevelopmentGovernment department(s) have Coordination Planapproved that infrastructure.

2.3.4 Approval of PrecinctPlan

A precinct plan must be approved by Council priorto approval of a sector plan and beforedevelopment is approved.

The principal developer may at any time lodge withCouncil for approval a precinct plan for a precinctwithin any part of the DCP area chosen by theprincipal developer which area will then be knownby the name of the precinct designated on theprecinct plan.

The Council must decide to:

(a) approve the precinct plan;

(b) approve the precinct plan subject toconditions; or

(c) refuse to approve the precinct plan.

The Council must not refuse to approve theprecinct plan except where:

(a) the State Government’s agreement torelevant infrastructure shown on the At any time the principal developer, by lodging withprecinct plan has not been obtained, or Council an amended precinct plan, may amend:

(b) insufficient information has been (a) a precinct plan; or provided with the application toreasonably allow Council to approve (b) that part of a precinct plan not subjectthe application, or to an approved sector plan; or

(c) the precinct plan or some feature of it (c) that part of a precinct plan subject toconflicts with any agreements for the an approved sector plan but in whichprovision of infrastructure; or sector no land has been sold.

(d) the precinct plan or some feature of itconflicts with:

policies and codes to the extent

and there are not sufficient planninggrounds to otherwise justify approvingthe plan.

The Council must decide the application within 40days of the plan being lodged for approval andnotify the principal developer within seven days ofits decision.

If Council fails to decide the application within theperiod mentioned above, the precinct plan is takento have been approved without conditions

For the avoidance of doubt, if Council refuses anapplication to approve a precinct plan, then theprincipal developer may appeal to the Planning andEnvironment Court as though it were an applicationunder section 7.1(1)(b) of the PEA.

Conditions may only be imposed by Council to theextent they are relevant to or reasonably requiredby the approval of the precinct plan and if they arerequired to give effect to a provision of this DCP ora term of an infrastructure agreement.

2.3.5 Amendment of PrecinctPlan

Page 28: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

18 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The provisions of Clauses 2.3.2, 2.3.3 and 2.3.4 A sector plan is the final plan in the plan makingapply to the preparation and approval of an process and gives effect to the overall planning ofamended precinct plan. In addition, where a sector the DCP area. A sector plan brings together in aplan has been approved in the precinct to which final, cohesive, integrated manner all componentsthe amendment application relates, the Council required to determine development and use of landmust have regard to the impact of the proposed in the sector. A sector plan is the code ofamendment on matters flowing from the prior development for land in the sector and forms theapproval of the sector plan. basis for assessment of development applications

For the avoidance of doubt, sector plan may set particular development

(a) an amended precinct plan may vary sector which may be different from and notthe area of the precinct by adding to or necessarily consistent with Council's planningdeleting land from it, and scheme, local laws, policies and codes as

(b) Council must not approve an sector plan will be considered on its merits andamendment to a precinct plan which is approval of particular development standards in aat variance with an approved sector previous sector plan will not necessarily beplan within that precinct in which sales grounds for approval in a subsequent sector plan.of land have been made. Unless an In this regard, Council will have regard to theapplication, which shall be treated as if outcome of implementing special developmentthe application is an application for a standards in the Mango Hill development to ensuredevelopment permit requiring impact a high quality of amenity is maintained. assessment, is made and theprovisions of Chapter 3 Part 4, Part 5and Chapter 4 Part 1 Division 8 of IPAshall apply.

2.3.6 Development Co-ordination Plan

A development co-ordination plan may be preparedby the principal developer and submitted forCouncil’s approval to provide detailed planning of (b) the relationship of the sector to theone or more major elements of the proposeddevelopment in order to provide a process forapproval by Council of those major elements of thedevelopment in advance of more detailed land useplanning. A development co-ordination plan maybe utilised where an element crosses from oneprecinct to another. For example, a developmentco-ordination plan may relate only to location ofmajor open space within the DCP area or thelocation of pathways, bikeways or road networks,or for environmental management purposes.

The provisions of clauses 2.3.2, 2.3.3, 2.3.4 and2.3.5 apply to the preparation, approval andamendment of a development co-ordination plan.

2.4 Sector Plans

2.4.1 Purpose

and self assessable development. The approved

standards and provisions for development in the

envisaged by clause 1.11 of this DCP. Each

2.4.2 Contents of Sector Plan

A sector plan must contain provisions for thecontrol of development in the sector which are toinclude:

Plans showing :

(a) the cadastral boundaries of the sector;

relevant precinct;

(c) the location of infrastructure existingand proposed;

(d) the boundaries of all land use elementscontained within the sector plan area.Upon the approval of the Sector Plan,the boundaries of the land useelements shown on that Sector Planshall be fixed.

(e) an indicative subdivision of the landincluding the road layout (which theapproval of the final subdivision will beassessed against);

(f) staging of the subdivision proposed forthe sector (if required);

(g) access points to the sector and toeach proposed lot (if required);

Page 29: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 19

(h) location of recreational paths andpedestrian thoroughfares; (i) location of community facilities;

(j) location and nature of all proposeduses including building envelope(s);

(k) landscape design (the landscape plan,developing the detail of landscapingshown in the landscape concept planat the precinct plan stage);

(l) areas to be provided for park and openspace and details of the open spacesystem including the type, location,extent and the key open spacecomponents to be provided at the timeof development; and

(m) intended type of development and anyspecific planning or developmentcontrols which apply to the varioustypes of development and which aremore simply shown on plans, forexample, intensity of development inMIBA character areas.

Specify for land in the sector:

(a) land use rights;

(b) development requirements;

(c) design and siting guidelines;

(d) landscaping guidelines;

(e) signage guidelines;

(f) car parking requirements;

(g) development densities;

(h) that part of any environmentalmanagement plan which must beconstructed in conjunction withdevelopment in the sector;

(i) any matters required by this DCP to beincluded in a sector plan;

(j) requirements for subdivision includingminimum lot areas and frontagewidths.

The sector plan must :

(a) contain statements about:

Page 30: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

20 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(1) the infrastructure to be provided (d) include the proposed sector plan; andin the sector ; and

(2) infrastructure affected by orrequired as a result of thedevelopment of the sector; and

(3) how these items ofinfrastructure relate to theInfrastructure Agreements madefor the DCP area;

(b) provide a detailed program showing foreach item of infrastructure:

(1) the estimated date on which theparticular infrastructure item isto be provided;

(2) the intended provider;

(3) other works dependent on itsprovision; and

(4) any other relevant information.

2.4.3 Approval of SectorPlan Prior toDevelopment

Before development is carried out on land withinthe DCP area or before an application fordevelopment approval is made, a sector plan whichincludes that land must be approved by Council asprovided by this section.

A sector plan may only be for any part of the DCParea included on a precinct plan, must be preparedby the principal developer and must include theinformation required by this DCP. A sector planneed not include land for the provision ofinfrastructure which is located outside the sector

2.4.4 Requirements forApplication

An application for approval of a sector plan must:

(a) not be made until a pre-lodgementmeeting has been held with relevantCouncil officers;

(b) be in the form approved by Council;

(c) be accompanied by the application feeapplicable at the date of submission ofthe application, and sufficientsupporting information to reasonablyallow Council to properly consider theapplication;

(e) be accompanied by the informationrequired by law for developmentapplications if such an application isalso being made in conjunction.

2.4.5 Approval of SectorPlan

In relation to each application made for theapproval of a sector plan, the Council must decideto:

(a) approve the sector plan;

(b) approve the sector plan subject toconditions; or

(c) refuse to approve the sector plan.

The Council must not refuse to approve a sectorplan except where:

(a) insufficient information has beenprovided with the application toreasonably allow Council to approvethe application; or

(b) the sector plan or some feature of itconflicts with any infrastructureagreements; or

(c) the State Government’s agreement torelevant infrastructure shown on thesector plan has not been obtained; or

(d) the sector plan or some feature of itconflicts with:

(1) the precinct plan;

(2) the desired environmentaloutcomes or the planning ordevelopment intents if relevant;or

(3) Council’s planning scheme,local laws, policies and codesto the extent they have not beenmodified by, or pursuant to, thisDCP,

(4) An approved DevelopmentCoordination Plan

Page 31: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 21

and there are not sufficient planninggrounds to otherwise justify approvingthe plan.

The Council must decide the application withinforty (40) days of:

(a) the application having been made to it;or

(b) the receipt of further particulars as itmay have requested

and notify the principal developer within seven (7)days of its decision.

If the Council fails to decide an application withinthe period referred to above, the sector plan is tobe taken to have been approved withoutconditions.

For the avoidance of doubt, if Council refuses anapplication for approval of a sector plan, then theprincipal developer may appeal to the Planning andEnvironment Court as though it were an applicationunder section 7.1(1)(b) of the PEA.

Conditions may only be imposed to the extentthey are relevant to, or reasonably required by, theapproval of the sector plan and if they are requiredto give effect to a provision of this DCP or a term ofan infrastructure agreement.

Conditions imposed under the provisions of thisDCP attach to the land in the sector to which theyrelate and are binding on successors in title to thatland.

2.4.6 Management Lots

Despite the provisions of clause 2.4.1 a sectorplan containing lots marked “Management Lotsonly” may be approved to allow creation ofallotments for management purposes only. WhereCouncil approves of the creation of “managementlots”, it may require appropriate security to ensurethese allotments are not sold, used or developed.A management lot may not be sold, used ordeveloped for any purpose, other than an existinglawful use or an approved interim use, until asector plan which provides for its use anddevelopment has been approved as required bythis section. Despite the provisions of this clausea management lot may be transferred to Council orthe Crown without first having a sector planapproved which provides for its use anddevelopment.

Page 32: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

22 Mango Hill Infrastructure Development Control PlanImplementation Provisions

2.4.7 Amendment andRevocation of Approvalof a Sector Plan

An approved sector plan may be:

(a) amended by the approval of asubsequent plan; or

(b) revoked by Council at the request ofthe principal developer.

If:

(a) the amendment to the plan is minorand in the opinion of the Council theamendment would not adversely affectany person; or

(b) revocation of the plan would not, in theopinion of the Council, adversely affectany person;

then the Council must approve the subsequentplan or the revocation of the plan.

Council must decide an application under thisclause within forty (40) days of the applicationhaving been made to it and must notify theprincipal developer within seven (7) days of itsdecision.

If the Council refuses an application made to itunder this clause or if the proposed amendment toa plan is not minor, then the principal developermay make application to the Council forconsideration and determination of the sector planamendment or revocation as if the application werean application for a development permit for impactassessment and the provisions of Chapter 3 Part4, Part 5 and Chapter 4 Part 1 Division 8 of IPAapply.

Upon amendment, the amended plan supersedesthe previous plan.

2.4.8 Sector Plans toIndicate AdjacentDevelopment

It is the Council’s intention that within the urbanresidential areas purchasers of land ordevelopment within a sector for which an approvalhas been given by Council will have a clearimpression of the nature of development which willoccur on land in the vicinity of the land in whichthey are interested. Within the urban residentialareas, therefore, a sector plan must show

indicatively the nature of intended development forland in the DCP area within 100 metres of thesector boundaries, except for that part of a sectorthat abuts a major road or major open space whichadjoins land in the Urban Residential area.

It will be sufficient reason for Council to refuse toapprove any subsequent adjacent sector plan if itdoes not substantially conform with the clearimpression of the nature of development indicatedon an approved sector plan, unless that sectorplan has been amended in accordance with clause2.4.7 of this DCP.

2.4.9 Final Specification ofLand Use Rights

A function of the plan making process is to allowfor the final specification of land use rights for landin a sector.

Final land use rights in each sector are to bespecified from the supplementary tables ofdevelopment for the relevant land use element. Asector plan may for land in the sector limit ColumnB purposes for which that land may be usedsubject to conditions. If a sector plan nominatesone or more but not all of the Column B purposesset out in the supplementary table of developmentfor the relevant land use element, then thosepurposes not so nominated become permissibledevelopment.

The supplementary table of development for eachland use element contains the permitted (subjectto limitation by a sector plan), permissible andprohibited development in that element.

For each land use element:

(a) the purposes for which developmentmay be carried out without the consentor approval of the Council and withoutconditions being able to be imposedare the purposes under the heading‘permitted development’ (Column A);

(b) the purposes for which developmentmay be carried out (subject tolimitation by a sector plan) without theconsent of the Council but in respect ofwhich conditions may be imposed bythe Council under section 4.1(5) of theAct are the purposes under theheading ‘permitted developmentsubject to conditions’ (Column B);

(c) the purposes for which developmentmay be carried out only with theconsent of the Council are the

Page 33: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 23

purposes under the heading‘permissible development’ (Column C);and

(d) the purposes for which developmentmay not be carried out are thepurposes under the heading ‘prohibiteddevelopment’ (Column D).

2.5 Lodgement of Plansand Applications

A plan or application may be lodged andconsidered:

(a) concurrently with another plan orapplication; or

(b) following another plan or application,

although its approval is dependent on approval ofthat other plan or application. Council must not approve a plan or applicationuntil a preceding plan or application on which it isdependent has been approved and the time forapproval of that plan or application is to becalculated from the date of approval of thepreceding plan or application. To remove any doubtthe IDAS processes and time frames fordevelopment applications do not commence untilthe preceding plan, upon which the application isdependent, has been approved by Council.However, this does not limit the concurrentconsideration and approval of plans andapplications by Council should all of the relevantprovisions of the DCP and IPA have been compliedwith and the Council is in a position to undertakesuch consideration and issue an approval.However, and to remove doubt, at no time is thereto be more than one precinct plan and one sectorplan in existence for each part of the DCP Area.

Despite any provision of this DCP, wherecombined or dependent applications are lodged,the times for approving plans and applications willbe the sum of the periods for their approval asprovided either in this DCP or by law.

In assessing an application which was dependenton approval of a prior plan or application theCouncil must have regard to that prior plan orapplication.

2.6 Development MasterPlan

The principal developer must, from time to time,lodge with Council a development master plan.

A development master plan must show to theextent possible the consolidation of informationshown on the structure plan, each precinct planand sector plan, and sealed plans of subdivision.When a plan of subdivision has been sealed, thesector plan is to be updated to show the actualsubdivision boundaries. It may also be updated inregard to other relevant information. The intentionis that the development master plan is to be anaccurate record of the extent of subdivisionactually completed and the location and extent ofprecinct plans, sector plans or sealed plans ofsubdivision approvals current at any time, all setagainst the background of the current structureplan.

The principal developer must deliver to Council thefirst development master plan within fourteen (14)days of Council approving the first precinct plan.Further versions of the development master planmust be delivered by the principal developer toCouncil within fourteen (14) days of Councilapproving further precinct plans and sector plans,provided that the principal developer is not requiredto provide updated versions more frequently thanonce every three (3) months. The principaldeveloper may deliver more up to date versions ofthe plan at any time.

The latest version of the development master planlodged with Council supersedes formerdevelopment master plans.

The development master plan is a plan of recordonly. It does not form part of this DCP and is notto be taken to be a regulatory map.

Page 34: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

24 Mango Hill Infrastructure Development Control PlanImplementation Provisions

2.7 Information forProspectivePurchasers

The principal developer must until the DCP area isfully developed provide in a prominent locationwithin the DCP area a substantial informationdisplay, housed within an appropriate building, forpotential purchasers of land or improvementswithin the DCP area. The display, amongst otherthings, must be open to the public during normalbusiness hours generally seven days per week. Itmust prominently display:

(a) the Planning Study and this DCP;

(b) a copy of the current developmentmaster plan, together with any currentprecinct, sector, or subdivision planapprovals not shown on thedevelopment master plan; and

(c) appropriate supporting information toreflect the overall planning intents ofthe DCP, as they will be implementedin practice in the development of theDCP area.

Page 35: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 25

3 MANGO HILLDEVELOPMENTSTRATEGY

3.1 Introduction

3.1.1 Background

As described in sections 1 and 2 it is intendedthat the DCP area be developed as a masterplanned community, particularly given itsadvantage of strategic location, size and singleownership. The town planning approach will becomprehensive in that it will encompass a widerange of physical, social and economic needs of acommunity. The subsequent development will beco-ordinated so that the required facilities andservices will be planned in relation to one anotherand will be provided in an integrated and timelyfashion. The basic objective, therefore, is not onlyto produce a fully serviced development but also toengender an enduring sense of community on thepart of residents which gives them strongcollective feelings of identity and ownership.

Prior to its preparation for development, the DCParea was used over a long period of time as acommercial pine plantation which wassubsequently cleared of plantation timbers in1993-94. This previous activity has meant that fewareas of environmental value remain undisturbed.The current condition of the DCP area togetherwith the fact that it is a large site in singleownership, offers the potential for development tooccur in a cohesive manner to create a town ofabout 25,000 inhabitants (approximately 9,500households) with clearly marked boundaries andentry points coupled with a distinctive identityrelative to surrounding land use patterns. Whenfully developed the DCP area will be comparable insize to a provincial Queensland town, such asMaryborough, and will strive to establish itsindividual identity in much the same way, that is,by virtue of its layout, building design, landscapecharacter and mix of social and economicactivities.

The development of the DCP area will draw on'best practice' experience from comprehensivelyplanned urban development projects inQueensland, such as Robina, Forest Lake andKawana Waters, as well as from other Australianand overseas 'new towns' and master plannedcommunities. There is agreement betweenCouncil and the principal developer that acomprehensive and co-ordinated planning and

development approach will be more efficient andproduce a better quality living environment thanthe more conventional 'piecemeal' approachassociated with small sites and fragmented landownership which inevitably gives rise toinfrastructure inefficiencies.

Apart from its large size and single ownership, theDCP area has a highly strategic location in termsof being bounded on one side by the BruceHighway, which is the main national highwaylinking Brisbane to North Queensland. It is alsowithin 30 minutes travel time to the InternationalAirport, the Port of Brisbane and the BrisbaneCBD, and is an integral part of the fastesturbanising region in Australia.

In the light of these favourable attributes the DCParea has good prospects for attractingemployment-generating activities particularly in therapidly growing tertiary sector of the nationaleconomy. It is intended that one of the two MajorEmployment Centres proposed in the Shire will bedeveloped progressively within the DCP area, inaccordance with provisions of the strategic plan.This will take the form of a town centre and anassociated mixed industry and business area bothwith close connections to the Bruce Highway, theregional arterial road network and to metropolitanarea public transport systems. It is estimated thatat full development, the DCP area will provide up to13,000 employment opportunities.

The development of the DCP area will recogniseecologically sustainable development (ESD)principles. In practice this means two mainenvironmental objectives will be pursued. One isthe regeneration of vegetation along naturaldrainage lines and in conservation and open spaceareas in order to re-establish native habitat. Theother is the management of water quality so thatstormwater and urban run-off discharges from theDCP area into the Saltwater Creek catchment willmeet specified environmental standards. In thelonger term, and depending on the availability ofviable technology and levels of communityacceptance, various resource conservationmeasures could be introduced progressively inpursuit of sustainability objectives.

The co-ordinated planning and developmentapproach intrinsic in a master planned communityoffers good prospects for achieving practical ESDobjectives.

Page 36: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

26 Mango Hill Infrastructure Development Control PlanImplementation Provisions

3.1.2 DevelopmentCharacter

The urban development pattern envisaged in theDCP area will incorporate a number of townplanning ideas which, in general, have thecommon aim of balancing human needs with theneeds of the natural environment. For example,attitude surveys of Shire residents by Councilindicate an appreciation of the semi- ruralcharacter of the Shire. An urban-rural balance ofthis kind can be achieved by the application ofplanning principles in which residential areas aregenerously landscaped and linked to one anotherby a continuous open space system includingparks and playing fields. The detailed planning ofresidential villages will apply modified‘neighbourhood unit’ concepts in which the layoutof housing, streets and pathways will focus onlocal open space. Within the urban residentialareas, a number of villages will focus oncommunity centres typically containing a primaryschool, convenience shops, community services,community parks and playing fields all of whichtend to draw residents together in commoninterest activities.

Other key town planning concepts have applicationin relation to transport and circulation systems,and public open space provisions. The DCPaccordingly makes provision for a hierarchical roadnetwork in which the physical character of thestreet is a reflection of its traffic function, forexample, with narrower pavements and closer-knitlandscaping being relied upon in residential streetsto slow traffic down but with multiple lanes, nofrontage access and large scale landscaping onmajor roads catering predominantly for throughtraffic.

The major focus of the intended urban pattern forthe DCP area is the proposed town centre whichbecause of its development intensity, land use mixand location at the hub of the internal road andpublic transport network, will draw residents fromwithin the Mango Hill development, as well as fromthe Pine Rivers-Caboolture-Redcliffe sub-region, byvirtue of its role as a supply source of goods andservices as well as being part of a majoremployment centre. In a complementary fashionthe DCP also makes provision for a mixed industryand business area (MIBA), as part of the MajorEmployment Centre, which will contain a widerange of service industry, research anddevelopment and institutional uses normallyrequiring larger sites at lower rents than are likelyto be found in the town centre.

The DCP does not require conformity withspecified architectural styles. It relies instead onthe use of guidelines to influence and, where

appropriate, to control such things as buildingdesigns, subdivision layouts, landscaping,signage, street lighting and engineering structures.These guidelines might typically define adopteddesign objectives and how these might best beachieved quantitatively, through the use of buildingsetbacks and height limits, for example, andqualitatively by means of specified ranges ofmaterials, colours and textures coupled with theuse of landscape and urban design elements,such as paving materials, street furniture, publiclighting and the like.

There is evidence to suggest that harmonious builtenvironments set within a leafy background ofstreet trees, private gardens and landscapedpublic open space, help to engender a strongsense of community ownership and pride. Attractive living areas together with easy access toboth local and regional open space enhance theability of an area to attract businesses which cangenerate skilled employment opportunities. Thereis an inter-dependence between the environmentalobjectives of the DCP, on the one hand, and itssocial and economic objectives on the other.

3.1.3 IntegratedDevelopment

The DCP area will be subject to a comprehensiveplanning and co-ordinated development processwith the aim of producing a master plannedcommunity with all of the physical, social,environmental and economic advantages whichthis brings. Such an approach is not just confinedto subdivision, land servicing and the sale of lots tohouse builders in the conventional manner. It isalso concerned with achieving a desirable outcomewhere the families who choose to live in the MangoHill development benefit from a broad planningapproach in which environmental, social andemployment advantages are obtained.

The master planning approach will enable:-

(a) the development of a MajorEmployment Centre in the form of atown centre which provides a widerange of retail and commercial servicesand a mixed industry and businessarea (MIBA) which providescomplementary employment andbusiness activities. Both the towncentre with its major shopping centreand the MIBA will make significantcontributions towards meeting theneeds of Mango Hill residents as wellas inhabitants and businesses locatedin the Pine Rivers-Caboolture-Redcliffesub-region. A mix of land use andemployment opportunities, such asrecreation, entertainment, professional,technical and commercial support,

Page 37: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 27

storage and distribution, and education uses and employment opportunitiesare to be provided in the DCP area. within the DCP area will be monitoredThe mix of land by Council to ensure satisfactory

progress is made by the principaldeveloper in using its best endeavoursto capture a share of higher orderexport oriented jobs;

(b) the provision of high qualityconnections to the regional road andpublic transport networks to maximisetheir accessibility to key locations inthe Brisbane metropolitan area and inthe northern corridor;

(c) the efficient and timely provision ofengineering infrastructure andcommunity facilities and services ;and

(d) a wide range of housing choices of

both traditional and contemporarynature, coupled with steady growth inthe number and diversity of local jobopportunities, sufficient to matchworkforce increases. The developmentof the DCP area will cater for thevariety of lifestyle and employmentneeds which demographic forecastsindicate will be necessary.

In summary, the desired outcome is toprogressively bring into being, over a twenty yeardevelopment period, a balanced community whichis more than just houses and developed land. Thebest attributes of the traditional 'town' are to berealised in the Mango Hill development. That is tosay, the development of the DCP area willcomprise a Major Employment Centre in the formof a mixed-use town centre and MIBA, and safeand attractive living areas serviced with thenecessary physical and social infrastructure, setwithin a landscaped and regenerated naturalenvironment with high levels of accessibility interms of roads, public transport, cyclepaths andlinked pedestrian networks.

3.2 Desired EnvironmentalOutcomes

3.2.1 General

The overall development goal for the DCP area isto create an integrated community living andworking in an environment which:

(a) is ecologically sustainable;

(b) provides competitive and distinctiveemployment opportunities for thecommunity, the Shire and the region;

(c) provides high standards of amenity,lifestyle opportunities and safety inaccordance with basic physical, socialand economic needs;

Page 38: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

28 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(d) is efficient and equitable in the provision of and adoption of best managementcommunity services; and

(e) is accessible and convenient to all wholive and work there.

3.2.2 Specific

The specific desired environmental outcomes forthe DCP area are:

(a) to achieve efficient urban developmentthrough the adoption of comprehensiveand integrated planning and a co-ordinated approach with developmentcarried out in an orderly manner havingparticular regard to the timely, efficientand economic provision of engineeringand social infrastructure;

(b) to develop an environmentally sustainablecommunity of about 25,000 people in anumber of residential villages convenientlylocated to a range of community facilitiesand to the transport network;

(c) to establish a sense of community anddevelopment identity which is coherentand identifiable within the local area andthe region;

(d) to facilitate and encourage a diversity ofappropriate employment opportunities inthe DCP area and the region through theestablishment of a Major EmploymentCentre comprised of the town centre coreand frame, and the MIBA;

(e) to provide for major shopping,entertainment and leisure, and communityneeds of a regional population and theDCP area population through the provisionof a major shopping centre within the sub-regional centre. (The term “sub-regional”has the same meaning as in the StrategicPlan);

(f) to produce an urban environment whichconforms with the principles ofecologically sustainable developmentthrough protection and enhancement ofareas of conservation value linked throughthe open space network to providepotential fauna corridors, management ofstormwater drainage and water quality,acknowledgement of air quality andacoustic impacts from adjoining features,

practices during the design andconstruction phase of development;

(g) to provide a diverse range of housingchoice in terms of type, density, layoutand affordability;

(h) to provide a full range of communityfacilities and services in accordance withthe needs of residents;

(i) to produce a development which isintegrated with existing and intendedfuture road networks and public transportservices;

(j) to provide medium density and some highdensity residential development within thetown centre, and possibly mediumdensity residential development atlocations within close proximity to localcommunity facilities;

(k) to recognise significant natural featuresand remnant native vegetation on the DCParea as a basis for defining the openspace network and enhancement throughsensitive landscape planning;

(l) to provide conservation and rehabilitationmeasures for that part of the DCP areaadjacent to the Saltwater Creekenvironmental park and the most northernopen space corridor extending from theBruce highway to the northern boundaryof the DCP area in recognition of itsenvironmental significance; and

(m) to incorporate advanced communicationstechnology in the development of the DCParea, where feasible.

Measures that facilitate the desired environmentaloutcomes to be achieved are expressed throughthe design and siting principles and otherdevelopment control measures established insections 4 - 10 inclusive, in any infrastructureagreement and in any approved sector plan.

3.3 Key Instrument of theDCP

The key instrument of this DCP is the structureplan which is intended to show those keyelements of development which are enduring. Thisis the fundamental planning guide for the DCParea, providing a reliable long term basis for on-

Page 39: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 29

going, detailed land use planning and urbandesign.

Through the structure plan, the DCP area isbroadly divided into a number of land use andstructural elements upon which the developmentwill be based. These elements are:

C Town Centre Core;C Town Centre Frame;C Mixed Industry and Business Area

(MIBA);C Major Community Facilities;C Local Community Facilities;C Urban Residential Areas; C Major Open Space;C Proposed North-South Arterial Road;C Major Roads;C Possible Boundary Road Deviation;C Highway Corridor; C Possible Public Transport Corridor.

The planning intent for each of these elements isset out in the following sub-sections.

3.3.1 Town Centre Core

Land in the town centre core is shaded blue on thestructure plan.

The town centre core is intended to provide thefocus for major retail, commercial, cultural,entertainment, leisure, and related development,possibly integrated with high density residentialaccommodation in either stand-alone buildings oras part of mixed use developments.

The town centre core will become the focus for aMajor Employment Centre in the northern growthcorridor. The intentions for the Major EmploymentCentre are:

(a) to attract and consolidate a variety ofhigher order local and regionalemployment at a highly accessiblelocation in the regional transport network;

(b) to encourage a diversity of appropriateemployment opportunities through a mixof public and private sector activities.

Implementation of the Major Employment Centreintentions will be achieved through acomprehensive process of integrated masterplanning.

The town centre core is intended to meet the needfor provision of higher order goods and services inthe northern growth corridor in addition to meetingthe needs of the DCP area. An integralcomponent of the town centre core is a singlemajor shopping centre, which will provide highlydeveloped shopping, entertainment and leisurefacilities. A bulky goods centre also is to beestablished in a town centre core location adjacentto the major shopping centre.

The town centre core is intended to include highlydeveloped community facilities including recreationfacilities. A community, recreation and leisurecentre and a public transit centre will be located ineither the town centre core or frame. High densityresidential development will also be appropriate inthis land use element.

The town centre core will be accessible to theDCP area and to the region through a highlydeveloped road transport system.

3.3.2 Town Centre Frame

Land in the town centre frame is shaded dark pinkon the structure plan.

The town centre frame is intended to provide for awide range of support activities and services to thetown centre core together with various forms ofmedium and high density residential. A primaryfocus of development in the town centre frame, likethe town centre core, is to support the creation ofa Major Employment Centre in the northern growthcorridor of the Shire. The range of employmentopportunities in the town centre frame is morelikely to be oriented towards service and supportactivities rather than the higher order retailing andbusiness activities found in the town centre core.

Page 40: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

30 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The predominant activities and services likely to be within a landscaped garden setting. The MIBA,found in the town centre frame include: through its role and proximity to the

(a) medium to high density residential;

(b) areas of open space including the townpark;

(c) further business and commercial supportservices;

(d) lower-order retail to serve the needs ofresidents and the workforce in the coreand frame areas;

(e) education, health and communityservices;

(f) service trades;

(g) entertainment and recreation facilities;

(h) possibly emergency services facilities;

(i) specialist retailing and business services,particularly those linked to personalservices, product maintenance ordistribution, and the like; and

(j) other appropriate uses.

3.3.3 Mixed Industry andBusiness Area(MIBA)

Land in the mixed industry and business area(MIBA) is shaded purple on the structure plan.

The MIBA is intended to provide a broad range ofcommercial and professional services, officeservices and service trades, technologymanufacturing and servicing, tertiary level andother educational facilities, tourist and recreationalfacilities, and institutional and community uses, allin a managed landscaped environment enjoyinghigh exposure and accessibility to the BruceHighway. It is intended that this area bedeveloped in an integrated manner, maintaining ahigh standard of siting, design and internallandscaping. Development of sites fronting theBruce Highway will incorporate a landscapedbuilding set-back area to present an integrated andattractive frontage and to ameliorate highwayimpacts.

The form and intensity of MIBA developmentcharacteristically will be low to medium rise withthe potential for occasional high rise, all developed

Page 41: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 31

town centre, will reinforce the creation of a major also may be provided within major communityemployment centre in the DCP area. facilities, the MIBA and the town centre.

The MIBA will be highly accessible to the DCP Local community facilities within the urbanarea, the town centre, and to the region through a residential areas are intended to offer anhighly developed road transport system. appropriate range of shopping and commercial

3.3.4 Major CommunityFacilities

Land for major community facilities is shadedyellow on the structure plan.

The major community facilities designation isintended to identify the preferred location in theDCP area for secondary education facilities, aswell as possible social and community services,and health, recreational and entertainmentfacilities. Government and private secondary Land in the urban residential area is shaded paleeducation facilities are intended to be linked pink on the structure plan.through shared campuses with the potential forsharing of certain facilities (e.g. ovals and libraries) The urban residential area is intended to provide forwith the wider community. Where practicable a wide range of housing types in residentialmajor community facilities are to be accessible villages, groups of which are to be served byfrom the transit centre and linked to the major road convenient local community facilities and/or thenetwork and possibly the town centre. Other range of facilities within the town centre. Theconnections with the open space network and the intended choice in housing will include detachedpath network are also intended. houses on a range of small and traditional lot

In addition, a range of local community facilities density multiple dwellings. Each dwelling unit ismay be provided to serve the needs of residents in intended to be located conveniently to communitynearby residential villages. facilities, the public transport system and public

The timing for the development of these facilities isto be in accordance with agreements with the Low density residential development of fullyrelevant service providers. serviced lots with a median size of 1250m² is

3.3.5 Local CommunityFacilities

Land for local community facilities is notionallyindicated with a star over urban residential areason the structure plan.

The local community facilities element is intendedto provide a wide range of community andeducation facilities for the delivery of primaryeducation, local shopping, sporting andrecreational services, and social and communityservices to the growing population of the DCP areaand adjacent areas (eg Mango Hill village). Theseare to be provided in accordance with agreementswhich must be entered into to ensure theappropriate and timely provision of a range ofcommunity facilities. These facilities are to belocated conveniently to the community they areintended to serve and will be provided within theurban residential areas. Local community facilities

services integrated with the open space areas andthe road transport networks. The role and functionof each centre is intended to be limited to theprovision of convenience services with higher orderservices being provided by the town centre and theMIBA. It is intended the local community facilitiesbe highly accessible from a network of paths,roads and open space connections.

3.3.6 Urban ResidentialArea

sizes, townhouses and various forms of medium

open space.

intended where it is desirable to provide a buffer ortransition between areas of closer urban residentialdevelopment and areas of ecological value orexternal areas designated for industrial purposes.

Local community facilities may be provided withinthe urban residential areas as notionally indicatedon the structure plan.

3.3.7 Major Open Space

Areas of major open space are shaded green onthe structure plan. Other areas of open spaceprimarily within the urban residential areas will beshown on the precinct and sector plans. Some ofthese open space areas will form the primaryenvironmental corridors through the DCP area.However, the previous land management regimesof the DCP area, particularly the pine planation,has resulted in a highly modified environment. Toaccommodate an urban community of some25,000 people, a high degree of transformation is

Page 42: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

32 Mango Hill Infrastructure Development Control PlanImplementation Provisions

anticipated in the open space areas to provide for active recreation, environmental corridors,a multitude of purposes including passive and environmental management areas and pedestrian

and cycle networks. Wherever possible andrelevant, the maintenance of these areas in asnear to natural condition as possible will be animportant consideration in the establishment ofother uses which will have a detrimental impact ontheir primary value.

Major open space areas are intended to provide awide range of recreational and sportingopportunities within the DCP area in addition toconserving areas of known cultural orenvironmental value. Major open space is to beprovided in the form of an environmental parkincorporating the Saltwater Creek wetlands as partof the regional open space system, and districtparks including linear parks. A hierarchy ofcommunity parks which are not shown on thestructure plan will also be provided. Open spaceis intended to be developed progressively with theurban residential area to a high level withamenities and furnishings, physical infrastructure,and landscaping.

Apart from providing landscape enhancement,“breathing space” and recreation opportunities forthe residential villages, open space also isintended to accommodate, conserve and protectareas of environmental value.

Because important ecosystems occurdownstream from the DCP area, there is a need toameliorate the potential for adverse impacts topass from the DCP area. The Saltwater Creeksystem and its associated ecosystems need to beconserved and protected against the possibleconsequential impacts of site development. Anappropriate area on the structure plan has beenincluded as open space for this purpose.

3.3.8 Proposed North-South Arterial Road

The proposed north-south arterial road is notionallyindicated by a heavy black line on the structureplan.

The proposed north-south arterial road passingthrough the DCP area will fulfill a regional transportfunction identified by the Department of MainRoads. The designation is intended to illustrategenerally the preferred alignment and connectionpoints to Boundary Road and Anzac Avenue to thenorth and south respectively. Actual road locationand design is subject to route location planningand detailed design to be undertaken with the

Page 43: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 33

preparation of the relevant precinct and sector the form of building design and siting, andplans. landscaping. Development within the corridor will

3.3.9 Major Roads

Major roads are notionally indicated by dottedheavy black lines on the structure plan.

The structure plan designation indicates a possiblenetwork of major roads throughout the DCP area,linking the town centre core and the town centreframe with the urban residential areas, the mixedindustry and business areas, the major and localcommunity facilities and to external urban areas.The major road network is broadly intended torepresent a modified grid arrangement providingnorth-south and east-west road connectionsacross the DCP area. As highlighted by thedotted line of the major roads the designations arehighly notional, with the number of major roads,the actual road locations and the overall design ofthe network being subject to topographicconsiderations, route location planning anddetailed design.

3.3.10 Possible BoundaryRoad Deviation

The possible Boundary Road deviation connectingBoundary Road to Anzac Avenue in Rothwell isnotionally indicated by an unshaded dash line onthe Structure Plan.

The Council, Department of Main Roads andprincipal developer are undertaking traffic andtransport studies to determine the need for theroad link. As the need for this link has not beenestablished, the designation is indicative only andmay be deleted from the Structure Plan map as aminor amendment should the studies indicate thisdeviation is not warranted. The studies will finallydetermine the need for the road link byapproximately September 1998.

3.3.11 Highway Corridor

The highway corridor is notionally indicated bylarge black dots on the structure plan.

The highway corridor abutting the Bruce Highwayhighlights land that may be impacted upon bytraffic noise and emissions, and which has a visualimpact upon the highway. It is intended thatdevelopment within the designated corridormaintain a high standard of visual presentation in

require appropriate screening and buffering fromtraffic noise.

Page 44: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

34 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The designated corridor does not signify specific The option of a rail connection to the town centreland requirements of the Department of Main has been provided, on the understanding theRoads, nor does it necessarily reflect any Transport Department will undertake a detailedunpublished future State regional transport study to commence in 1998/99 financial year tointentions. determine the public transport requirements and

3.3.12 Possible PublicTransport Corridor

The possible public transport corridor is notionallyindicated by small black dots on the structureplan.The notional location for a possible futurepublic transport corridor is a variation of theproposed Petrie to Kippa Ring rail corridor.Because the need, location and timing for theprovision of this public transport corridor has notbeen determined, the designation is indicative onlyand may be deleted from the structure plan, as aminor amendment, should the Department ofTransport not adopt an implementation program forthe corridor by the 30 June 2000.

indicative programs for this part of the northerncorridor. In the event the study confirms theviability of the railway or some variant of it,“appropriate measures” to protect the corridor andfuture transit centre will be undertaken. For theavoidance of doubt it is Council’s intention thatappropriate measures include adoption of animplementation program for the corridor by 30 June2000. If constructed, it is intended to incorporatea station (if feasible) as part of a transit centre inthe town centre. Town centre uses may beintegrated into the construction of a transit centre.

Page 45: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 35

4 TOWN CENTRE CORE

4.1 Desired EnvironmentalOutcomes

4.1.1 General

(a) To provide a commercial and socialcentre for the new town and itssurrounding area, containing majorretailing, administrative, commercial,entertainment, community and leisurefacilities and a mix of medium and highdensity housing.

(b) To encourage the development ofemployment opportunities within thetown centre core as a focus of theShire’s northern Major EmploymentCentre.

4.1.2 Specific

(a) To encourage vitality, viability andefficiency of the town centre corethrough a combination of a singlemajor shopping centre ofapproximately 60,000m gross lettable2

area (GLA), bulky goods retailing,other major commercial andcommunity land uses and possiblyhigh density residential development.

(b) To provide opportunities for a widerange of employment for the local andwider community in the broadcategories of commerce, retailing,entertainment and leisure, andcommunity services.

(c) To promote the establishment of thetown centre core as a key componentof a major employment centre which isintegrated functionally and physicallywith other employment areas in theKallangur/Mango Hill area, with thetransit centre and regional transportsystem, and with the local and regionalinfrastructure system.

(d) To encourage the provision of retailing,business services, entertainment andleisure, and community services instep with the

needs of the Mango Hill developmentand surrounding populations.

(e) To promote the development of thetown centre core in a managed, orderlyand efficient manner, with infrastructureprovided in accordance withinfrastructure agreements between theState Government, the Council and theprincipal developer.

(f) To promote the establishment of atown centre which is physicallyattractive and functionally convenientthrough the spatial arrangement,design and construction of itscomponent parts.

(g) To enable the progressive developmentof the town centre core by includingprovision for redevelopment andintensification of premises used forcore functions and associated carparking areas at the time ofdevelopment/preparation of sectorplans.

4.2 Planning Intent

The town centre is intended to be developed as thephysical, social, commercial and functional focusfor the DCP area and the surrounding areas.

Within the town centre the core will include acombination of buildings, landscaped spaces andstreets which provide for major social, cultural andeconomic needs of the population. The physicalform of the town centre core will reflect thesignificance of its role and function in the regionand will include major retail services and high orderadministrative and commercial services to thewider community.

The town centre core also provides a foundation forthe Major Employment Centre in the northern areaof the Shire. Over 5,000 jobs may be provided inthe town centre (core and frame).

Establishing new business activities within thetown centre will require an integrated planningapproach in a mixed and flexible environment ableto meet future employment needs and to respondto changing community needs and commercialtrends.

Within the DCP area the town centre core isintended to accommodate the most intensive and

Page 46: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

36 Mango Hill Infrastructure Development Control PlanImplementation Provisions

highest order activities in terms of retailing, this major facility. The proposed staging of thecommercial and professional services, community major shopping centre is approximate only and willservices, and entertainment and leisure services. be subject to the commercial viability of the centreIn this regard, the town centre core and its and ability of the market to support such a centre.surrounds will provide an alternative to other The intended strategy described above may bemetropolitan employment centres for the location varied by the Council upon the submission of aof tertiary services, including commercial offices. report to the satisfaction of Council which

The town centre core is expected to include: effects of the proposed modified staging.

(a) a single major shopping centre of The major shopping centre, integrated with highapproximately 60,000m GLA: order administrative, commercial, entertainment2

(b) a bulky goods centre and retail pedestrian links, will provide the catalyst for growthshowrooms up to a maximum of the town centre and the attraction of high order20,000m²; employment opportunities in the administrative and

(c) supporting small scale incidentalretailing in a main street environment; Service and commercial activities supporting the

(d) high order business and commercial employment centre are more appropriately locatedservices; within the designated town centre frame.

(e) high order administrative and The town centre core may also include highcommunity services; density residential development, most likely to

(f) high order entertainment and leisure commercial rather than a retail bias. Suchactivities including a cinema complex development would provide a suitable transitiondeveloped in conjunction with the major from the high intensity town centre core to theshopping centre; moderate intensity, mixed uses in the frame area.

(g) a transit centre; The landscaped open space and other public

(h) public spaces, plazas and landscaped provide further transition from the high intensityopen space; and commercial character to the medium and high

(i) possibly high density residential centre frame. These open spaces will includedevelopment. highly developed pedestrian areas linking with the

The development of the major shopping centre willbe staged and will evolve in step with changing The town centre core will be highly accessibletrends in retailing, entertainment and other within the regional transport network through thecommunity services to be provided. Stage one provision of a transit centre and connections withRetail Floorspace (approximately 16,000 m² GLA) the road and possible future rail systems. is intended to open in the year 2000 (first full yearof trading 2001), the second stage RetailFloorspace (approximately 30,000m² GLA or notmore than approximately 46,000m² GLA total instages one and two combined) is intended to openin the year 2005 (first full year of trading 2006) andthe third stage Retail Floorspace (approximately8,500m² GLA or not more than approximately54,000m² GLA in stages one, two and threecombined) is intended to open in the year 2010(first full year of trading 2011). Council recognisesthe need to retain a high degree of flexibility inplanning for the development and redevelopment of

assesses the market potential and economic

and community uses via effective and efficient

commercial sectors.

town centre core and associated with the major

occur in mixed use development with a

spaces situated within the town centre core also

intensity housing and mixed uses of the town

wider open space and pathway network.

4.3 Development Intent

4.3.1 Development Character

The character of the town centre core is to beestablished principally through the precinct plansand implemented through sector plans containingspecific design and siting guidelines fordevelopment.

Page 47: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 37

Guiding principles in the planning, design and grid as a starting point until the influences ofdevelopment of the town centre core include the topography and other considerations becomeintegration of retail and non-retail core activities paramount.and an emphasis on pedestrian friendlyenvironments. Car parking is intended to be provided in a

Building forms are to reflect the functional and the early stages of development, public car parkinglocational significance of the town centre core. A in the town centre core will be provided in surfacevariety of building forms within generally low to car parks. These car parks ultimately may bemedium rise envelopes are envisaged. In certain converted to development sites with car parkinglocations to be determined by the precinct plan, then accommodated in structures. Specialhigh rise buildings or structural elements may be consideration is to be given to the pedestrian andappropriate within the townscape. The vehicle circulation systems surrounding the majorarchitecture preferably will reinforce the open shopping centre, particularly where drive throughfacades which respond to the climate of South facilities are proposed, to ensure a legible, safe,East Queensland. To avoid the adverse effects of pedestrian priority network is established.extensive or lengthy facades, buildings and civicspaces will incorporate a range of architectural Building services such as plant rooms, loadingtreatments, such as articulation on external walls, docks, and service bays must be readilyroof treatments, and the innovative use of building accessible from the street system but must bematerials, colours and finishes. While a range of screened from the pedestrian environment (fromarchitectural and landscape treatments is both safety and amenity aspects), with potentialencouraged for visual variety and interest, it is conflict points minimised.essential to achieve overall continuity and unity inthe development of the town centre core. Ofparticular importance are the views of the majorshopping centre from Anzac Avenue and the BruceHighway.

In accordance with detailed design and sitingguidelines to be established in the sector plansthe town centre core will be developed so that thelandscaped pedestrian environment is fullyintegrated with buildings. At ground level, thepedestrian environment is intended to provideextensive opportunities for social interaction,entertainment and leisure activities. In this regard,a high level of urban design is required to ensurevisual interest and public safety.

Well designed pedestrian linkages throughout thetown centre core are required to ensure theintegration of the retail, commercial, administrativeand entertainment functions with each other andpublic spaces and landscaped outdoor spaces,the transit centre and car parking facilities. Thispedestrian environment may extend beyond thestreet system to include pathways, small parcelsof open space and possibly a town square ormajor public space as the focal point. Landscapinggenerally will provide areas of shade for rest andshelter, visual interest throughout and visualthemes linking different activity areas within thetown centre core. Street treatments will provideactive, safe and vibrant pedestrian environments.

The emphasis in development of the street systemwill give priority to pedestrians through thesegregation of pedestrian thoroughfares fromtraffic. The street pattern generally will adopt a

combination of surface and structured facilities. In

4.3.2 Retail

The major shopping centre is to provide the activityfocus for the town centre core and should bedeveloped in a manner which is complementary toand supportive of other core and frame uses.

The major shopping centre, when completed, isintended to include high order comparisonshopping through a full line department store,discount department stores, large supermarkets,a wide range of specialty shops, a cinemacomplex, other forms of entertainment, restaurantsand a food court. The major shopping centre isexpected to consist ultimately of approximately60,000m gross lettable area excluding cinemas,2

entertainment and leisure activities, commercialareas, shared loading docks, malls and publicamenities (e.g. libraries, community areas, toiletsand change rooms).

It is also expected that other forms of retailing willbe necessary to support the role and function ofthe major shopping centre. These will generally belimited to a bulky goods centre and smallincidental shopping. The bulky goods retail centre(up to a maximum 20,000m²) is intended toaccommodate large, open plan, showroom stylebuildings with single floor display areas generallyin excess if 1000m² and potentially as large as10,000m² or more. The centre will caterprincipally, but not exclusively, to the ‘homemaker’ market. A typical development within thebulky goods centre will sell generally bulky items

Page 48: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

38 Mango Hill Infrastructure Development Control PlanImplementation Provisions

of a similar nature, such as home furnishings, developed gardens for unstructured leisureelectrical goods, sporting goods, hardware or activities and for visual relief to the built form.building supplies. Retail development such as Access to these spaces will be provided throughstand alone shopping centres, department stores, the integrated network of pedestrian thoroughfares,discount department stores, supermarkets and paths and streets of the town centre core. Theother major retail facilities which would public spaces should be integrated with a towncompromise or diminish the role or function of park extending into the town centre frame whichmajor shopping centre are not intended in the may also include an ornamental water body. Thisbulky goods centre. water body, if provided may also perform an

The town centre core is intended to function overextended hours to ensure the vibrance and vitality Commercial entertainment and leisure facilities,of the town centre core for town centre workers such as cinemas, restaurants, night clubs, artand residents of the DCP area and surrounding galleries and the like must be located convenientlyareas. All buildings, open spaces, pathways, civic to the pedestrian network, to the public transportspaces and public accessible car parking facilities interchange and to public car parks.must be designed to ensure public safety andconvenience in order to achieve this objective. The composition of the community recreation and

4.3.3 Administrative andCommercial

The provision of administrative and commercialservices within the town centre is integral to theachievement of a major employment centre in thenorthern growth corridor. The inclusion ofsignificant high order employment within the towncentre is intended to reinforce its overall vitality.While the greater proportion of administrative andcommercial services will be provided within thetown centre frame, high order activities willgenerally be included in the town centre core.

The opportunity for mixed use developmentconsisting of retail, commercial, administrative,entertainment and leisure, and high densityresidential is to be retained to ensure the towncentre core is able to evolve with the community itis intended to serve.

The siting of such development also must beflexible to respond to the changing marketpressures which influence the development of thetown centre core.

4.3.4 Recreation,Entertainment andLeisure

The town centre core is intended to provide highlydeveloped recreation, entertainment and leisurefacilities including public spaces such as a townsquare, cinemas, cafes and restaurants. Acommunity recreation and leisure centre will besited either within the town centre core or the towncentre frame.

Public spaces and landscaped open space withinthe town centre core are to provide highly

environmental management function.

leisure centre is to be determined in negotiationsbetween the Council and the principal developer inthe context of the infrastructure agreement. Thesepublic recreation facilities must be highlyaccessible to the public transport system via thetransit centre, as well as to the road network andpath system within the DCP area.

4.3.5 Residential

The town centre core may provide some highdensity housing. The maximum density for highdensity residential is 80 units per hectare. Thedensity is calculated by dividing the number ofexisting or proposed dwelling units or lots by thesite area.

4.3.6 Public TransportCorridor

Preliminary planning by the Department ofTransport indicates that a possible public transportcorridor might pass through the DCP area, andspecifically through the town centre core andframe. No detailed planning has been undertakenby the Department of Transport to refine thelocation or timing of the possible route. Thefeasibility of this corridor and station will be thesubject of a State Government public transportstudy to commence in the 1998/99 financial year.However, if the Department of Transport has notadopted an implementation program for thecorridor by the 30 June 2000 the accommodationof the possible route notionally shown on thestructure plan will no longer be required in theplanning and development of the town centre.

The Department of Transport (DOT) agrees thatconstruction of the first stage of the shoppingcentre will not be delayed due to requirements of

Page 49: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 39

DOT if sufficient land to accommodate the (4) open space is provided inpossible future public transport corridor and transitcentre in the town centre core is preserved untilthe outcome of the Department’s Public TransportStudy in 30 June 2000.

4.4 Design and SitingMeasures

Design and siting measures will ensure acomprehensive and integrated approach todevelopment and so achieve the characterintention for the town centre core. Design andsiting measures will be provided in the sectorplans. Design and siting issues to be addressedin the sector plans include:

(a) Building set backs:

(1) Other than the major shoppingcentre, where practicable, smallscale building shop fronts are tobe developed up to the alignmentof a pedestrian thoroughfare,except where outdoor dining orother leisure activities areproposed;

(2) Buildings may be developed upto a road frontage within the towncentre core providing that buildingservices are adequately screenedfrom the street and all otherareas are landscaped in acomprehensive and integratedmanner.

(b) Site coverage

Buildings may occupy a total site withinthe town centre core, providing that:

(1) any required pedestrianthoroughfares are accommodatedwithin the site;

(2) adequate pedestrian shelter isprovided to a pedestrianthoroughfare at ground level;

(3) adequate pedestrian facilities areprovided at ground level;

accordance with theinfrastructure agreement; and

(5) sufficient on-site car parking isprovided.

(6) appropriate landscaping isprovided in accordance with theprovisions of clause 4.4 (d) -Landscaping/Townscaping.

(c) Building design

(1) Preferred building forms willinclude:

C continuous pedestrian shelter forthe frontage to a pedestrianthoroughfare whether provided asa free-standing shelter or as partof a building shop front;

C open framed appearancepossibly with layered facadetreatments;

C recessed windows in externalwalls;

C where practical, outwardorientation of some shop fronts ofthe major shopping centre toprovide integration of the majorshopping centre with other coreand frame uses; and

C articulation in lengthy facades;

(2) The primary facade of a buildingpreferably will address apedestrian thoroughfare whetheror not the thoroughfare is locatedwithin a street. The facade of abuilding addressing a streetwhich does not contain apedestrian thoroughfare, muststill present an attractive andvariable facade in keeping withadjacent development;

(3) Preferred building forms willcomplement and integrate withthose of adjacent buildings interms of their architecture, heightand bulk;

Page 50: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

40 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(4) Building heights generally will be impacts as unsightlylow to medium rise with appearance, noise, headlightoccasional high rise development glare and unpleasant odours;on identified sites;

(5) Orientation to reduce energy is to be designed to reducerequirements. potential conflict points;

(d) Landscaping/Townscaping (4) Appropriate lighting is provided

(1) Adequate landscaped areas are purposes;to be provided to create alandscape landmark and setting (5) Circulation system for transportfor the town centre core, provide vehicles such as taxis and busespassive recreation space and is designed to be convenient andbreak up the scale of the reduce potential conflicts withbuildings and car parking areas; pedestrians and other vehicles.

(2) Landscaping/townscaping in (f) Signage, colours and materialspedestrian thoroughfares, streetsand public spaces is to provide (1) The form, scale, materials andvisual themes linking different colour selection of signage mustactivity areas within the town be in keeping with the charactercentre core; of the town centre core and

(3) Highly visible areas, such as ordinated and distinctive urbanthose fronting pedestrian landscape;thoroughfares and streets in thetown centre core, are to be (2) Roof-top and pylon signage maylandscaped to provide a high be permitted where it lends to thedegree of visual interest. town centre core image of a high

(4) Landscaping for surface carparking areas is to include (3) Signage may provide foradvanced shade trees planted at materials and colours related toa rate not less than 1 tree per 6 potential end users’ commercialvehicle spaces, and screening requirements modified astrees and shrubs planted so as to necessary to ensure a degree ofscreen car parking areas from harmony between developmentroads and other areas readily sites and the overall visualaccessible to the public; character of the town centre core;

(e) Car parking, service areas and (4) Colours for external walls andloading docks surfaces of buildings in the town

(1) Large expansive car parking with the overall visual character ofareas generally are to be the town centre core;screened with landscaping tosoften the visual impact upon (5) Highly reflective finishes maypedestrian thoroughfares, the only be used to a limited extentstreet frontage of the site and and are not to provide the majorfrom other areas readil building materials foraccessible to the public; development in the town centre

(2) Loading docks and servicevehicle storage areas are to bescreened to ameliorate such

(3) Pedestrian and vehicle circulation

for after hours safety and security

contribute to a vibrant, co-

intensity activity centre;

centre core must be compatible

core.

Page 51: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 41

(g) Environmental management terms of noise, vibration, fumes,

(1) Building services, plant rooms identity, by responding to non-and equipment rooms located on residential developmentroofs or externally around characteristics such as:buildings are to be sited, C hours of operation;designed and constructed inorder to: C location of loading bays, delivery

C form an integral part of the overall storage and disposal facilities,development on an allotment; flues, air conditioners and the

C generally not be visible frompedestrian thoroughfares, streets C access arrangements.or other areas readily accessibleto the public; and (2) High density residential

C protect the amenity of the area and sited generally Infrom noise, vibration, smells, accordance with AMCORD andfumes, electrical interference or Queensland Residential Designotherwise. Guidelines for such development

(2) Environmental management sector plans.structures or control devices,such as gross pollutant traps, “Council will have regard to the outcomes achievedwaste disposal bins, flues and in the application of these design and sitingthe like, are to be designed so as measures and sector plan development standardsnot to detract from the overall to determine the suitability for their continuedvisual character of the town application in subsequent Sector Plans forcentre or the immediate locality. achieving a high quality of amenity.”

(h) Transit centre pedestrian access

While provision for the possible future raillink to the town centre referred to in sub-section 10.3.1 of this DCP remains, thepedestrian system within the town centrecore and frame is to remain sufficientlyflexible to include a high standard safeand direct connection from the possiblerail station to facilities within the towncentre core. In particular, the planningand construction of the major shoppingcentre will fully address this requirement.The major shopping centre will reasonablyallow for pedestrian traffic to pass throughits site area, along clearly defined andlegible pathways external to the buildingrather than diverting pedestrians toindirect paths.

(i) Mixed use residential development

(1) Residential components of mixeduse developments are to bedesigned to offer a reasonablelevel of residential amenity, in

glare, privacy, security and

docks, service areas, waste

like; and

development is to be designed

where not otherwise stated in

Page 52: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan Implementation Provisions Effective from 23 December 2011

4.5 Supplementary Table of Development - Town Centre Core Element

Purposes for which premises may be erected or used without the consent of Council (Permitted Development) COLUMN A

Purposes for which premises may be erected or used without the consent of Council subject to conditions (Permitted Development subject to conditions) COLUMN B

Purposes for which premises may be erected or used only with the consent of Council (Permissible Development) COLUMN C

Purposes for which premises may not be erected or used (Prohibited Development) COLUMN D

Caretaker’s residence Local utilities Park

Any one or more of the following purposes on land nominated for that purpose or purposes on an approved sector plan.

Accommodation units Amusement premises Apartments Bulky Goods Centre - 20,000m2 GLA (one only) Car park Car wash Catering premises Child care centre Commercial services Communication station Community dwelling Community premises Convention centre Cultural facility Display home Educational establishment Entertainment library Estate sales office Hardware centre Hotel Indoor recreation Licenced club Motel Occasional market Office Passenger terminal Place of worship Public utilities Recycling depot Restaurant Retail nursery Retail showroom Sales and information centre Service station Shop Shopping Centre (one only) <60,000 m² GLA where not structurally integrated with the development of a bulky goods centre or retail showroom in the Bulky Goods Retail and Related Uses Development Area; or <80,000 m² GLA where so integrated with a retail showroom. Special use

Any purpose in this column not nominated for land by the sector plan becomes for that land a permissible development

For land in a sector any purpose not listed in Column A, D or included in Column B but not nominated for that land in an approved sector plan

Adult product shop Agriculture Air strip Animal husbandry Aquaculture Associated unit Bulk garden supplies Camping grounds Caravan park Cattery Cemetery Concrete batching plant Contractor’s depot Correctional institution Crematorium Dairy Detached house Domestic storage and recreation structures Duplex dwelling Extractive industry Family day care centre Fuel depot Funeral parlour General industry Hazardous industry Heavy vehicle parking Heavy vehicle sales Host farm Institution Junk yard Kennels Lot feeding Motor sport or shooting Piggery Poultry farm Retirement village Rural industry Showground Simulated conflict Stable Stock sales yard Townhouse units Transport terminal Transportable home village Turf farming Vehicle hire depot Vehicle sales yard Warehouse

The provisions of the Supplementary Table of Development are subject to section 2.4.9 of this DCP.

Page 53: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure
Page 54: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

44 Mango Hill Infrastructure Development Control PlanImplementation Provisions

5 TOWN CENTRE FRAME

5.1 Desired EnvironmentalOutcomes

5.1.1 General

(a) To reinforce the role of the town centrecore by providing a range ofcomplementary employmentopportunities, facilities and servicestypically not provided in the core.

(b) To provide opportunities for mixed usedevelopment and employment as partof the Major Employment Centre inlocations highly accessible to the towncentre core, the MIBA and the existingand planned regional transportnetwork.

(c) To expand the choices in housingstyles available in the DCP area byproviding a range of medium and highdensity residential development.

5.1.2 Specific

(a) To reinforce and complement the roleand function of the town centre core asa key component of the MajorEmployment Centre in the northerngrowth corridor.

(b) To provide opportunities for a widerange of high order employment,entertainment and tourism, servicesand housing for local and regionalresidents which may not beappropriate to a town centre corelocation having regard to their particularcharacter.

(c) To provide small scale incidental retailfacilities generally intended to servicethe town centre workforce andresidents or as part of a mixed usedevelopment.

(d) To establish and maintain a highstandard of urban amenity in thedevelopment of medium and highdensity accommodation within thetown centre frame.

(e) To provide for the possible extension ofa public transport corridor and

associated transit centre through theDCP area.

(f) To maintain a high level of flexibility inplanning for future development for arange of activities which are expectedto change.

(g) To retain opportunities for specialityretailing and business services, whichdo not require a town centre corelocation, without compromising the roleand function of the town centre core.

(h) To ensure retail development such asstand alone shopping centresdepartment stores, discountdepartment stores, supermarkets andother major retail facilities which wouldcompromise or diminish the role orfunction of the major shopping centrein the town centre core are notestablished in the town centre frame.

5.2 Planning Intent

The town centre frame is intended to providesupport facilities and services to the town centrecore, and to provide a transition between the towncentre core and the MIBA and urban residentialareas. The town centre frame will accommodatehigher levels of activity than the surrounding landuse elements but a slightly lower level of activitythan the town centre core. This differentiation willbe reflected in the spatial arrangement, type andintensity of land uses and the physical form ofdevelopment.

The range of activities likely to be established inthe town centre frame is greater than in the towncentre core, with most functioning at the regionalor town scale. Certain activities will also respondto the daily or convenience needs of the towncentre workforce and town centre residents.Some of the major activities include:

(a) administrative office and commercialpremises;

(b) community infrastructure, such asemergency services facilities, civic andcultural uses including a library andCouncil offices, convention facilities,educational facilities, and possibly aprivate hospital;

Page 55: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 45

(c) major recreation and leisure facilities within proximity to the urban residential areas andsuch as licensed clubs, art galleriesindoor recreation facilities and liveperformance theatres;

(d) areas of medium and high densityresidential development; and

(e) public transit centre (if not located inthe town centre core).

The town centre frame is intended to broaden thediversity of housing in the DCP area by includingmedium and high density residential with someoccurring as mixed use development within abuilding also used for other purposes.

The local or convenience facilities and services tobe established in the town centre frame are likelyto include among others:

(a) cafes, fast food stores and restaurants;

(b) child care centres;

(c) service stations and service trades;and

(d) local surgeries, medical centres andwelfare premises.

The overall emphasis in the development of thetown centre frame is to be upon flexibility,accessibility and integration of activity and thebuilt form with the town centre core, transportsystem, open space and the path network.

5.3 Development Intent

5.3.1 DevelopmentCharacter

Development within the town centre frame isintended principally to be of a mixed usecharacter, with the only development likely tooccur in discrete areas being medium and highdensity housing. There is scope for mixed usedevelopment which includes some medium or highdensity residential in other locations within thetown centre frame.

In broad terms, town centre frame developmentadjacent to the town centre core and along majorroads in the town centre will be more intense,more diverse and more urbanised than in outerparts of the town centre frame, with the transitionto less intense, more open development occurring

the linear park open space system. Generally,medium density housing will occur in the transitionarea of the town centre frame. There will not be asharp distinction between activities or the intensityof development across the town centre frame, butrather a gradual transition will become apparent.

Adjacent to the town centre core, developmentwithin the town centre frame generally will addressthe street to establish a formal edge, with streetfurniture, paving and landscaping integrated withbuilding design. This more intense form ofdevelopment will relate physically and functionallywith the town centre core.

Development of moderate intensity, includingmedium density housing, may be arranged aroundsmall parcels of landscaped open space, linked tothe town centre core by the street system and apath system within a network of landscaped publicspaces. Development of moderate intensity alsowill be situated on sites with areas of landscapedprivate open space around buildings so that thebuilt form merges with maturing vegetation.

The relationship between the town centre frameand the open space network is intended tostrengthen with proximity to the linear park.

A high level of accessibility within the town centreframe is intended to be achieved through theintegration of the street pattern, public car parking,public transport and the transit centre, and thepath system within landscaped open space. Animportant consideration in the development of thetown centre frame will be the connectivity betweendevelopment sites, public transport, public carparking and the town centre core. Building sitingand design must reinforce desirable or establishedfunctional or visual linkages within the town centrecore and town centre frame.

5.3.2 Town Centre Frame(Mixed Use Areas)

Within the town centre frame most of the majoractivities are expected to be located in closeproximity to the town centre core, unless forfunctional reasons, less central sites are required.In particular, development should address streetfrontages at the interface between the town centrecore and the town centre frame in order to form anurban “main street”. There is a further opportunityto extend this mixed use urban main street alongthe major road (running generally south-west tonorth-east through the town centre frame)connecting the town centre core to the major openspace element north of the frame.

Page 56: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

46 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Major activities are to be situated in mixed usepremises where appropriate. This development will Residential Developmentprincipally be low to medium rise, with thepossible opportunity for high rise buildings in Opportunities exist for medium and high densityappropriate locations. Development in the mixed residential development to a maximum site densityuse area will encourage activity at the street level, of 80 units per hectare within the town centresuch as eateries, cafes, tourist shops, small frame (mixed use areas), including integration ofoffices, speciality retailing and the like. these residential uses with other activities in

Within the major mixed use areas, there will be an the town centre beyond normal business hours.emphasis upon public transport, pedestrian Residential development within these locations willmovements and convenient access to public car need to reinforce the urban form and streetscapeparks. Car parking will be provided initially in of the area by addressing the street frontage andsurface facilities, converting to either underground providing a formal edge to important streets.or above-ground structures as developmentintensifies and surface sites are used for other Tourism Developmentpurposes.

Administrative & Commercial Development motels, serviced apartments and townhouse units,

The town centre frame will accommodate a centre frame. Such accommodation might besignificant proportion of the administrative and provided within a mixed use development or mightcommercial office development in the town centre be provided as a stand-alone facility, possiblyand the DCP area. A wide range of administrative, supported by entertainment and leisure activities.commercial, professional and other businessoffices will be incorporated, with opportunities for Typically tourism development will be of aresidential development preferably on the upper moderate to high intensity, preferably mixed withfloors, or in separate parts of buildings. It is a range of facilities and services accessible to theintended that much of the office space be used for public. It is intended that tourism development behead office or regional office functions appropriate highly accessible from the public transportto a town centre location. system, the regional road network and the internal

Retail Development accessibility to the facilities and services offered in

The retail development intended for the town centre entertainment, restaurants, shopping and personalframe is generally limited to small scale incidental services, is to be provided particularly through theretail facilities. However, opportunities are retained network of pedestrian thoroughfares andfor some speciality retailing and business landscaped open spaces in the town centre frame.services, particularly those linked to personalservices, product maintenance and distribution Recreation, Entertainment & Leisurewhich, while not requiring a town centre core Developmentlocation, will not compromise the role and functionof the town centre core. Retail development such While the most highly developed recreation,as stand alone shopping centres, department entertainment and leisure development is intendedstores, discount department stores, supermarkets to occur in the town centre core, someand other major retail facilities which would development requiring larger sites or possiblycompromise or diminish the role or function of the stand-alone sites may be appropriate to the townmajor shopping centre in the town centre core are centre frame. Without limiting the opportunities,not intended in the town centre frame. Retail such development might include convention centredevelopment in the town centre frame may include facilities, licensed clubs and certain forms ofsmall scale retailing and personal services, in a indoor and outdoor recreation facilities. Cinemamain street environment, intended to meet the complexes are not intended within the town centreneeds of the workforce and the residents of the frame as this type of entertainment facility is moretown centre frame. A character sketch of a typical appropriately located in conjunction with the majormain street development is contained in the shopping centre.Planning Study, Figure 5.4.

mixed use development lending to the vitality of

Tourist accommodation, in the form of hotels,

is anticipated in the mixed use areas of the town

road network of the DCP area. Furthermore,

the town centre core, such as a range of

Page 57: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 47

In providing for entertainment and leisure more permeable to traffic and less reliant upondevelopment in the town centre frame, the public transport and public car parking. Theemphasis must be upon integration with the pedestrian path system is intended to provide ancomplete transport system comprising public important connection with the town centre core.transport, private vehicles, public car parking, andpedestrian and bicycle movement. Residential Development

Community & Emergency Services The town centre frame (transition areas) are

The town centre frame, as a mixed use area, may density residential development in the DCP area.also accommodate a range of community services Dwelling units are to be designed and sited so asnot typically represented in the town centre core to minimise energy requirements and provide aor any of the community facilities situated within high standard of residential amenity.the urban residential areas. Such communityservices are intended to be of a high order and The maximum site density for high densitymight include: residential development is 80 units per hectare

(a) post-secondary education and training; proposed dwelling units or lots by the site area of

(b) specialised health care and possibly aprivate hospital; Within the town centre frame, the preferred

(c) aged care and senior citizens facilities; mixed use areas and in those parts of the

(d) art galleries and concert facilities; and When developed on its own, high density

(e) religious establishments. only a minimal set-back so as to extend the urban

In addition to community services, it is intended the town centre core and town centre frame (mixedthat emergency services (ambulance, fire and use) area. police) could be established either in the towncentre frame or the MIBA. The preferred form of development will be buildings

The basis for providing some of these community areas of landscaped private open space. Inservices will be established and implemented in appropriate locations, some development might bethe relevant infrastructure agreements. in the form of medium to high rise buildings. The

5.3.3 Town Centre Frame(Transition Areas)

The transition areas within the town centre frametypically will reflect a moderate or less intenseform of development than that of the major mixeduse areas. Generally, buildings will be of low tomedium rise surrounded by areas of landscapedprivate open space.

The transition areas will draw landscaped openspace into the town centre through interconnectedformal and informal public spaces. These spaceswill incorporate paths and landscape featuresproviding visual relief to the urban form. Whereverpracticable it is intended to link areas of privateopen space with public open space. The built formwill not dominate the urban landscape to theextent it does in the mixed use areas of the towncentre core and frame.

Having a more residential land use character thanthe mixed use areas, the transition areas will be

intended to provide most of the medium and high

calculated by dividing the number of existing or

the land to be occupied by the dwelling units/lots.

locations for high density housing will be in the

transition areas closest to the town centre core.

residential typically will address the street with

character and formality of the streetscape found in

with low to moderate site coverage, optimising

preferred form of high density residentialdevelopment will retain a human scale andintimacy at the street level within the character ofthe town centre frame. Except for visitors, carparking generally must be provided under coverand within the main building envelope.

Medium density residential primarily is intended toreinforce the transition from the town centre frameto the urban residential areas and the open space.This form of housing is not intended to exceed 40dwelling units per hectare. Within the town centreframe, the preferred location for medium densityresidential development is in close proximity topublic open space. Inter-connected areas of localopen space are intended to provide a focus formedium density residential development in thetown centre frame.

Page 58: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

48 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Most medium density residential development will (1) Buildings in the town centrebe in low to medium rise buildings set in generous frame (mixed use area) are to beareas of landscaped private open space. The developed generally up to thedesign and siting of this development, while alignment of a pedestrianreflecting the town centre location, will have a thoroughfare, except to permithuman scale and offer visual interest to the street. the integration of streetCar parking generally is to be provided under cover landscaping with areas of privatewithin the building envelope, except for visitor car open space;parking.

Residential development occurring as part of to a road frontage within the townmixed use development will provide an acceptable centre frame (mixed use area)standard of residential amenity with separate and providing that building servicessecure vehicle and pedestrian access, car parking are adequately screened from theand areas of private open space. The location and street and all other areas aredesign of such development must also respond to landscaped in a comprehensivethe proximity of uses or activity which may conflict and integrated manner;with or impose adverse impacts upon theresidential amenity. Impacts might include (3) Buildings in the town centreintrusive night lighting, noise, loss of privacy, frame (transition area) are to beovershadowing, or the loss of breezes or aspect. developed in accordance with

5.3.4 Public TransportCorridor

Preliminary planning by the Department ofTransport indicates that a possible public transportcorridor might pass through the DCP area, andspecifically through the town centre core andframe. No detailed planning has been undertakenby the Department of Transport to refine thelocation or timing of the possible route. Thefeasibility of this corridor and station will be thesubject of a State Government public transportstudy to commence in the 1998/99 financial year.However, if the Department of Transport has notadopted an implementation program for thecorridor by the 30 June 2000 the accommodationof the possible route notionally shown on thestructure plan will no longer be required in theplanning and development of the town centre.

5.4 Design and SitingMeasures

Design and siting measures will ensure acomprehensive and integrated approach todevelopment and so achieve the characterintention for the town centre frame. Design andsiting measures will be provided in the sectorplans. Design and siting issues to be addressedin the sector plans include:

(a) Building set backs

(2) Buildings may be developed up

standard residential set-backsunless otherwise provided for inan approved sector plan.

(b) Site Coverage

(1) Buildings may occupy a total sitewithin the town centre frame(mixed use area), providing that:

C development is in context with,and visually compatible with theappearance of, any neighbouringbuildings;

C any planned pedestrianthoroughfare is accommodatedwithin the site;

C adequate pedestrian facilitiesincluding pedestrian shelters areprovided at ground level;

C open space is provided inaccordance with theinfrastructure agreement; and

C sufficient on-site car parking isprovided.

(2) Buildings within the town centreframe (transition area) mayoccupy only that proportion of thesite permitted by a sector plan.

(c) Building design

Page 59: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 49

(1) Preferred building forms will of, the town centre core, as wellinclude: as to provide passive recreation

space and to break up the scaleC open framed appearance of the buildings and car parking

possibly with layered facade areas;treatments;

C recessed windows in external pedestrian thoroughfares, streetswalls; and public spaces is to provide

C outward orientation of shop fronts activity areas within the townto provide integration with the centre frame;major shopping centre and othercore and frame uses; (3) Highly visible areas, such as

C articulation in lengthy facades; thoroughfares and streets in theand town centre frame, are to be

C continuous landscaping for the degree of visual interest;frontage to a pedestrianthoroughfare; (4) Landscaping for surface car

(2) The primary facade of a building advanced shade trees planted atpreferably will address the street. a rate not less than 1 tree per 6The facade of a building vehicle spaces, and screeningaddressing a street must be trees and shrubs planted so as toattractive and varied in keeping screen car parking areas fromwith adjacent development; roads and other areas readily

(3) Preferred building forms willcomplement and integrate with (5) High quality urban art, includingthose of adjacent buildings in paving patterns, water featuresterms of their architecture, height and sculptures, are encouragedand bulk, and generally will avoid to enhance the architecture andthe use of heavy mass building landscape of the town centreforms, particularly on sites frame.fronting a pedestrianthoroughfare; (e) Car parking, service areas and

(4) Building heights generally will below to medium rise with (1) Car parking and loading docksoccasional high rise development are to be sited so as to beon sites identified on a sector screened from either a pedestrianplan as being suitable for such thoroughfare, the street frontagedevelopment; of the site or from other areas

(5) Orientation to reduce energyrequirements so that the long (2) Loading docks and serviceside of buildings align wherever vehicle storage areas are to bepossible on an east-west axis. screened to ameliorate such

(d) Landscaping /Townscaping appearance, noise, headlight

(1) Adequate landscaped areas areto be provided to create a (3) Pedestrian and vehicle circulationlandscape theme consistent is to be designed to reducewith, and extending the setting potential conflict points;

(2) Landscaping/townscaping in

visual themes linking different

those fronting pedestrian

landscaped to provide a high

parking areas is to include

accessible to the public;

loading docks

readily accessible to the public;

impacts as unsightly

glare and unpleasant odours;

Page 60: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

50 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(4) Appropriate lighting is to beprovided for after hours safety C generally not be visible fromand security purposes; pedestrian thoroughfares, streets

(5) Circulation systems for transport to the public; andvehicles such as taxis and busesare to be designed to be C protect the amenity of the areaconvenient and reduce potential from noise, vibration, smells,conflicts with pedestrians and fumes, electrical interference orother vehicles. otherwise.

(f) Signage, colours and materials (2) Environmental management

(1) The form, scale, materials and such as gross pollutant traps,colour selection of signage must waste disposal bins, flues andbe in keeping with the character the like, are to be designed so asof the town centre frame and not to detract from the overallmust not dominate the urban visual character of the townlandscape at ground level; centre frame or the immediate

(2) Roof-top and pylon signage maybe permitted where it lends to the (h) Transit centre pedestrian accesstown centre frame image of anintensive activity centre; While provision for the possible future rail

(3) Signage may provide for section 10.3.1 of this DCP remains, thematerials and colours related to pedestrian system within the town centrepotential end users’ commercial core and frame must also remainrequirements modified as sufficiently flexible to include a highnecessary to ensure a degree of standard safe and direct connection fromharmony between development the possible rail station to the heart of thesites and the overall visual town centre area. In particular,character of the town centre development will reasonably allow forframe; pedestrian traffic to pass through its site

(4) Colours for external walls and pathways external to the buildings rathersurfaces of buildings in the town than diverting pedestrians to indirectcentre frame must be compatible paths. with the overall visual character ofthe town centre frame; (i) Residential development

(5) Highly reflective finishes are not (1) Residential components of mixedencouraged as the major building use developments are to bematerials for development in the designed to offer an acceptabletown centre frame. level of residential amenity, in

(g) Environmental management glare, privacy, security and

(1) Building services, plant rooms residential developmentand equipment rooms located on characteristics such as:roofs or externally aroundbuildings are to be sited, C hours of operation;designed and constructed inorder to: C location of loading bays, delivery

C form an integral part of the overall storage and disposal facilities,development on an allotment;

or other areas readily accessible

structures or control devices,

locality.

link to the town centre referred to in sub-

area, along clearly defined and legible

terms of noise, vibration, fumes,

identity, by responding to non-

docks, service areas, waste

Page 61: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 51

flues, air conditioners and thelike; and (2) In general the performance

C access arrangements; housing types in Queenslandcriteria specified for the range of

Residential Design Guidelinesand AMCORD provide the designand siting principles and criteriato be addressed in medium andhigh density residentialdevelopment. While theacceptable solutions provided inthese publications may generallysatisfy the performance criteriafor development in the towncentre frame they do not precludeother solutions and may also bemodified by an approved sectorplan.

“Council will have regard to the outcomes achievedin the application of these design and sitingmeasures and sector plan development standardsand codes to determine the suitability for theircontinued application in subsequent Sector Plansfor achieving a high quality of amenity.”

Page 62: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

52 Mango Hill Infrastructure Development Control PlanImplementation Provisions

5.5 Supplementary Table of Development - Town Centre FrameElement

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be premises may be erected premises may be premises may not beerected or used or used without the erected or used only erected or usedwithout the consent consent of Council subject with the consent of (Prohibitedof Council (Permitted to conditions (Permitted Council (Permissible Development)Development) Development subject to Development) conditions)COLUMN A COLUMN C

COLUMN B COLUMN D

Caretaker’s residence Any one or more of the For land in a sector Adult product shopLocal utilities following purposes on any purpose not AgriculturePark land nominated for that listed in Column A, D Air strip

purpose or purposes on or included in Animal husbandryan approved sector plan. Column B but not Aquaculture

Accommodation units land in an approved Camping groundsAmusement premises sector plan Caravan parkApartments CatteryAssociated unit CemeteryCar park Concrete batching plantCar wash Contractor’s depotCatering premises Correctional institutionChild care centre CrematoriumCommercial services DairyCommunication station Extractive industryCommunity dwelling Fuel depotCommunity premises General industryConvention centre Hazardous industryCultural facility Heavy vehicle parkingDetached house Heavy vehicle sales Display home Host farmDomestic storage and Junk yardrecreation structures where Kennels<8% of the site area Lot feedingDuplex dwelling Motor sport or shootingEducational establishment PiggeryEntertainment library Poultry farmEstate sales office Rural industryFamily day care centre Shopping centre >1,500m²Hardware centre GLAHotel ShowgroundIndoor recreation Simulated conflictInstitution StableLicenced club Stock sales yardMotel Transport terminalOccasional market Transportable home Office villageOutdoor recreation Turf farmingOutdoor salesPassenger terminalPlace of worshipPublic utilities

nominated for that Bulk garden supplies

Page 63: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be premises may be erected premises may be premises may not beerected or used or used without the erected or used only erected or usedwithout the consent consent of Council subject with the consent of (Prohibitedof Council (Permitted to conditions (Permitted Council (Permissible Development)Development) Development subject to Development) conditions)COLUMN A COLUMN C

COLUMN B COLUMN D

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 53

Re-cycling depotRestaurantRetail nurseryRetirement villageSales and information centreService stationShop <300m² GFAShopping centre <1,500m²GLASpecial useTechnology industryTourist facilityTownhouse unitsVehicle hire depotVehicle sales yardVeterinary clinic

Any purpose in thiscolumn not nominated forland by the sector planbecomes for that land apermissible development

The provisions of the Supplementary Table of Development are subject to section 2.4.9 of this DCP.

Page 64: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

54 Mango Hill Infrastructure Development Control PlanImplementation Provisions

6 URBAN RESIDENTIAL AREA

6.1 Desired EnvironmentalOutcomes

6.1.1 General

(a) To establish residential villages that develop sequentially and efficiently inhave a high level of amenity and sense residential villages, serviced with theof community. community and engineering

(b) To establish residential villages that high standard of residential amenityare appropriately designed in the and quality of life for residents.context of ecological sustainability andoffer a range of dwelling types that areconveniently located with respect tocommunity facilities, open spaces andpublic transport.

6.1.2 Specific

(a) To promote a diverse, innovative andhighly flexible choice in low, standardand medium density housing inaccordance with communityaspirations, needs and affordability.

(b) To promote residential villages whichare linked to the major road network,public transport services andcommunity facilities through safe,convenient, legible local street andpath networks.

(c) To provide residential villages which arefocused on local open space andsituated conveniently to localcommunity facilities, includingeducation and recreation facilities,convenience shopping and openspace.

(d) To promote a community with a highstandard of residential amenitycharacterised by convenience,accessibility, safety, privacy, highquality design and integrated planning.

(e) To ensure visual integration ofresidential development with thenatural environment, includingdevelopment responsiveness to thetopography, drainage patterns andremnant stands of significantvegetation.

(f) To ensure the development of urbanresidential areas includes appropriate

environmental protection measures andthe potential effects of incompatibleland uses or transport corridors aremitigated.

(g) To ensure urban residential areas

infrastructure necessary for achieving a

6.2 Planning Intent

Generally the distribution of housing throughoutthe DCP area is intended to provide up toapproximately 9,500 dwelling unitsaccommodating an ultimate population ofapproximately 25,000 people. Up to 1200 of thesedwelling units will be provided as medium and highdensity accommodation in the town centre whilethe remainder will be accommodated in a variety ofdwelling types in the urban residential area. Thedevelopment pattern of the urban residential areawill be monitored to ensure the distribution andpattern of development is proportional to, andsupportive of, the ultimate population for the DCParea.

The urban residential area is intended to provide fora wide range of housing needs in a variety offorms, styles and densities to reflect the prevailingmarket demands. Residential development willoccur in a collection of residential villagesreflecting a range of densities being low, standardand medium density. Each village will focus on acentrally located village park. Villages are to beprogressively developed having particular regard tothe timely, efficient and economic provision ofengineering and social infrastructure. Groupings of villages will be focused uponcommunity and education facilities located in thesouthern, central and north-western parts of theDCP area. The desired environmental outcomes,intent and implementation provisions for thecommunity facilities are described in section 8 ofthis DCP.

District, village and local parks and open spacewill be established throughout the urban residentialarea in conveniently accessible locations and inaccordance with the needs of the community.

Development within the urban residential area willaccommodate the major road network notionally

Page 65: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 55

indicated on the structure plan and provide for a The planning intent for the villages and the housinghigh level of connectivity between communityfacilities and the residential areas they serve.

A more detailed description of housing types andvillage composition is set out in the following sub-sections which also describe the desiredenvironmental outcomes to be achieved.

High density housing will not be located withinvillage areas, as this form of housing is generallycharacterised by a different scale of built form,intensity, lifestyle and household composition tothat planned for the urban residential areas.Services, including water, sewerage, stormwatermanagement, road networks and park and openspace have been planned to accommodate highdensity residential housing in the town centrearea. A town centre location offers an alternativelifestyle choice being highly accessible to avibrant, diverse mix of facilities and services. Thelifestyle offered by the urban residential area isdistinct from the town centre in being a morehomogenous and dispersed mix of generally lowerintensity activities where residential amenity is theforemost consideration.

The north-south arterial road forms a borderbetween the urban residential area and the MIBAfor a significant length. It may be desirable toprovide for a residential/business transitional areain this area to assist in the protection of residentialamenity , maximise opportunities for working fromhome and reduce limitations on the developmentof the MIBA. In this regard, at the time sectorplans are prepared along the north-south arterialroad an assessment of the desirability ofdesignating a “residential/business transitionalarea” may be undertaken with a view to Councildesignating such an area on the relevant SectorPlans. The Supplementary Table of Developmentlists home occupation as a Column B userequiring code assessment within designatedresidential/business transitional areas on sectorplans. Elsewhere in urban residential areas homeoccupation is a Column C use. Therefore, homeoccupation will be encouraged to locate indesignated residential/business transitional areas.At Council's discretion, this designation may alsobe used in other appropriate locations.

6.3 Development Intent

Housing in the DCP area is intended to cater for awide range of housing needs in residential villages.

types within them is set out below.

6.3.1 Intent of Village

A village is an identifiable urban planning unittypically defined by major structuring elementssuch as topography, the road network or the openspace network. This basic residential planningunit is a manageable area which will beestablished on an approximate 400m or 5 minutewalking distance from a centrally located villagepark. Villages will be developed so that residentscan conveniently satisfy most of their immediateneeds with respect to housing and communityfacilities, including recreation, shopping, educationand human services. Development is intended toengender a “sense of place” and communityidentity through establishing and then protectingan identifiable character and incorporating anyenvironmental features of local significance.

The housing types to be provided in villages will bedrawn from the range set out in sub-section 6.3.2

Villages and groupings of villages are to bedesigned in accordance with the provisions of thevillage criteria set out in sub-section 6.3.3.

6.3.2 Range of HousingTypes

General

Housing in the DCP area is intended to beprovided in residential villages offering a wide rangeof housing choice responding to the needs ofdifferent age groups, household income levels,household formations and family sizes.

The key determinants in community housingchoice are household type, lifestyle aspirationsand housing affordability. Another contributingfactor influencing community housing needs is theincreasing trend towards decentralisedemployment opportunities away from themetropolitan centres. The creation of a majoremployment centre in the DCP area reinforces theneed for a diversity of housing types.

Housing needs are expected to vary considerablyover the life of the development of the DCP area,demanding that a high level of flexibility bemaintained in the approach to providing housing

Page 66: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

56 Mango Hill Infrastructure Development Control PlanImplementation Provisions

which responds to and satisfies the community’sneeds. At the same time, both local community

expectations and the strategic plan characterisethe Shire as an area not developed to a highdensity. The open character given to the Shire byits river and wetlands, dam catchments andfringing mountain ranges reflects in its housingstyles. Accordingly, the dominant form of housingin the DCP area will be single family dwellings,either in traditional forms, or expressed in morecontemporary styles such as courtyard and villahousing.

Forms of housing envisaged in the DCP areainclude:

(a) Low densitydetached housing on a median lot sizeof 1250m²;

(b) Standard densitydetached housing on 320m² - 1000m²lots, duplex dwellings, townhouse units(17 units/ha);

(c) Medium densitydetached housing, duplex dwellings,townhouse units and apartments;

(d) High densitytown house units, apartments, andaccommodation units (includingserviced apartments) in the towncentre;

(e) Other residentialretirement villages, communitydwellings and other special forms ofhousing.

Within the residential villages, it is intended thatsome medium density development will locatewithin convenient distances of communityfacilities.

The development intentions for low, standard andmedium density residential areas and other typesof residential accommodation are set out insection 6.3.3 village criteria.

Standard Density Residential

While the most common form of housing will bethe detached house on a single lot, it will take awide range of forms over the life of thedevelopment. Current (1998) expectations for

Page 67: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 57

standard density housing are indicated in Table distinctness and differentiation from standard small6.1 lot housing and remove residents’ cars and

Lot Types

LOT TYPE MIN LOT TYPICALSIZE (m²) AV. LOT

WIDTH (m)*

1. Dress Circle 830 22.5

2. Traditional 640 20

3. Economy 575 18 Traditional

4. Courtyard 450 14

5. Premium Villa 400 12.5

6. Villa 320 10

7. Rear Lane 320 10 Villa

Table 6.1

*Lots at the blind end of a cul-de-sac or on thecurve of a road must have a minimum frontage of6m

The mix in housing types and residential uses isnot stated in this DCP but will be evident onapproved sector plans. To enable prospectivepurchasers of a particular lot/s to obtain a clearimpression of the type of development which islikely to occur adjacent to the sector whichcontains the particular lot/s, sector plans mustshow indicatively the nature of intendeddevelopment within 100m of the sector planboundary. As provided for in section 2.4.8 of thisDCP it will be sufficient reason for Council torefuse to approve subsequent adjacent sectorplans if they do not conform to the clearimpression provided on the preceding adjacentsector plan.

Rear Lane Villas

It is intended to introduce a range of small lothousing types, including rear lane housing. Thisinnovative housing product will achieve

garbage collection to a rear lane. The minimumreserve width of the rear laneway will be 6.5msubject to the manoeuvring requirements of servicevehicles.

Page 68: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

58 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The special planning and development (d) be characterised by attractive gardenrequirements for rear lane housing maynecessitate variations to Council's standard roaddesign manual (eg minimum intersectionspacings).

Small Lot Subdivision:Relaxation of Floor Slab Requirements

At the time of preparing this DCP, the planningscheme required construction of foundations andother works on each house and land integrated lotbefore the relevant plan of subdivision was sealed.However, relaxation could be granted in terms ofthe provisions contained in Council's LocalPlanning Policy LP40.

A sector plan prepared by the principal developerand approved by Council which contains thequality control measures generally required byLP40 is taken to be an approved house and landintegrated development plan within the meaning ofLP40 and that the Council is satisfied the principaldeveloper has demonstrated an ability to create aquality subdivision incorporating house and landintegrated development of lots not less than 320m²in area.

6.3.3 Village Criteria

The development of each village is intended tocomply with the provisions set out in sub-sections6.3.3.1 to 6.3.3.4 The various forms of residentialdevelopment within the villages must comply withthe relevant provisions in sub-sections 6.3.3.5 to6.3.3.8.

6.3.3.1 General

Residential villages within the urban residentialareas will:

(a) focus on a centrally located villagepark typically 0.5 to 1.0 hectares inarea, serving a catchment ofhouseholds within approximately 400metres or a five minute walkingdistance;

(b) consist of approximately 300 - 500dwellings;

(c) provide for most dwellings to belocated within approximately 800m or10 minutes walking time of major orlocal community facilities or the towncentre;

settings established by district andlocal open spaces, private gardens andstreetscape treatments;

(e) be limited to the low, standard andmedium density forms of housingdefined in this DCP; and

(f) exclude high density housing.

6.3.3.2 Environmental Areas

Development is not intended to occur in areashaving unique or high environmental significance.These areas are shown on the structure planwithin the major open space element.

Land required to be set aside for drainagecorridors, flood plain areas, areas containingvegetation identified for protection and areasrequired for transport, buffers, environmentalmanagement, stormwater management, park andother purposes must be integrated into the designof each village or group of villages

6.3.3.3 Accessibility

Residential villages are to:

(a) be readily accessible from the majorroad system via a system of collectorand local streets;

(b) be linked to pedestrian and cyclenetworks with paths permeating eachvillage;

(c) be interconnected with other residentialvillages and the town centre by themajor road system, and the openspace, pedestrian and cycle networks;

(d) contain a clear hierarchy of local andcollector roads, arranged to facilitatean efficient a bicycle and pedestriannetwork and local bus service withinapproximately 400m of most dwellings;

(e) provide an appropriate level ofconnectivity by pedestrian, cycle andor local street connections to theexisting 'Mango Hill Village'. It isintended that the character and identityof the existing 'Mango Hill Village'residential area be suitably protected.There is no intention to link Mango Hill

Page 69: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 59

village by additional roads directly into through traffic routes unless and untilthe DCP area creating the village community indicates clearly

this is desirable. Section 13.2 of theDCP requires the establishment of aprotocol for consultation with residentsof the Mango Hill village.

6.3.3.4 Local Parks and Open Space

Local parks and other local open space areas are: (a) to be established in the residential

villages as part of the overall openspace system and are to be linked tothe major open space, shown on thestructure plan, by roads and paths;

(b) to be provided as part of the sequenceof development of each village. Localparks will generally be provided inparcels of not less than 0.2 hectares inarea within the sequence of residentialand infrastructure development;

(c) to fulfil functions such as unstructuredrecreation, visual enhancement ofresidential areas and conservation offeatures of environmental significanceor value; and

(d) to be provided with an appropriaterange of facilities and landscaping toachieve a high level of safety, comfortand amenity;

6.3.3.5 Low Density Residential

(a) Low density residential development offully serviced lots with a median lotsize of 1250m² is primarily intendedwhere it is desirable to provide a bufferor transition between areas of closerurban residential development(standard and medium densityresidential) and areas of ecologicalsignificance or adjacent areasdesignated for industrial purposes.The area of ecological significancewithin the DCP area forms part of theSaltwater Creek environs.

(b) The intention of these larger lots is to

maximize opportunities for privategarden areas to soften the interface ofthe urban area with the environmentalpark and to allow space for privategarden plantings to continue theindigenous plant theme into the urbanresidential area. Larger lots will notgenerally be required where a road

Page 70: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

60 Mango Hill Infrastructure Development Control PlanImplementation Provisions

frontage is provided to areas of path network and local communityecological significance. facilities and ready access to major

(c) The northern area of the DCP contains centre. Where townhouse units arelocations where housing comes close proposed the site density is to be ato external industrial areas (existing maximum of 17 units per hectareand proposed). Specific studies must calculated on a site area basis.be undertaken by the principaldeveloper to the Council’s satisfactionbefore any precinct plan is approved forland in this area. The studies mustexamine the potential impact ofindustrial development on theresidential amenity of housingproposed in the DCP area. Practicalimplementation provisions are to berecommended which, subject toapproval by Council, are to be used inthe development of subdivision andhouse construction in these areas. Ifthis objective cannot be practicallyachieved, then only development whichin Council’s opinion is compatible withthe adjacent industrial and businessactivities will be permitted in this area.

(d) Council may at the time ofdevelopment of these areas consideralternative methods proposed by theprincipal developer for providingeffective buffer and transition areas(e.g. special landscape andconstruction within lots, or inclusion ofother forms of compatible land use)which demonstrate, to Council’ssatisfaction, that the desired protectioncan be achieved and maintained.

(e) High density forms of urbandevelopment will not be approved in lowdensity residential areas because ofthe divergent amenity standards,lifestyle characteristics, developmentforms, resident aspirations andservicing implications discussed insection 6.2 of this DCP.

6.3.3.6 Standard Density Residential

(a) Standard density residential areas willbe characterised by low-rise detachedhousing, some duplex dwellings andpossibly townhouse units inappropriate locations with a highstandard of residential amenity. Theseareas will also offer convenient accessto village and local parks, the

community facilities and the town

(b) High density forms of urbandevelopment will not be approved instandard density residential areasbecause of the divergent amenitystandards, lifestyle characteristics,development forms, residentaspirations and servicing implicationsdiscussed in section 6.2 of this DCP.

6.3.3.7 Medium Density Residential

(a) The maximum site density for mediumdensity residential development is 40dwellings per hectare calculated on asite area basis.

(b) Medium density residentialdevelopment is to be located adjacentto community facilities, district openspace or other major amenities with ahigh level of accessibility provided tothe open space, path, bicycle, majorroad and public transport networks.

(c) Medium density residentialdevelopment is intended to becharacterised by ample areas ofattractive and useable private openspace so that the appearance is one ofdwellings units situated in a gardensetting. The most common form ofmedium density residentialdevelopment will include townhousesand apartments. A combination ofdetached dwellings on small lots,duplex dwellings and townhousesestablished in a garden setting mayalso be developed in areas designatedfor medium density residential living.

(d) Generally the built form in mediumdensity residential areas is to be lowrise with a maximum height of threestoreys plus residential roof style. Three storey development is notintended to be widely used. Wherethree storey development is proposedthe proponent must demonstrate toCouncil’s satisfaction that overlookingand overshadowing of adjacentdevelopment will not reduce itsresidential amenity.

Page 71: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 61

(e) Dwelling units are to be designed andsited so as to minimise energyrequirements and provide a highstandard of residential amenity.

(f) High density forms of urbandevelopment will not be approved inmedium density residential areasbecause of the divergent amenitystandards, lifestyle characteristics,development forms, residentaspirations and servicing implicationsdiscussed in section 6.2 of this DCP.

6.3.3.8 Other Residential

(a) Special forms of residentialaccommodation will be permitted, butonly in appropriate locations and whenshown on an approved sector plan.

(b) Other forms of residentialaccommodation, such as motels,retirement villages, communitydwellings, etc, are preferred to belocated in more central areas, offeringclose proximity to public transport andcommunity facilities.

6.4 Design and SitingMeasures

Design and siting measures will ensure acomprehensive and integrated approach todevelopment and so achieve the characterintention for the urban residential areas.

In general, the performance criteria specified forthe range of housing types in QueenslandResidential Design Guidelines and whereappropriate AMCORD provide the design and sitingprinciples and criteria to be addressed. While theacceptable solutions provided in these publicationsmay generally satisfy the performance criteria fordevelopment in urban residential areas they do notpreclude other solutions and may also be modifiedby an approved sector plan.

“Council will have regard to the outcomes achievedin the application of these design and sitingmeasures and sector plan development standardsand codes to determine the suitability for theircontinued application in subsequent Sector Plansfor achieving a high quality of amenity.”

Page 72: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

62 Mango Hill Infrastructure Development Control PlanImplementation Provisions

6.5 Supplementary Table of Development - Urban ResidentialAreas Element

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected premises may be premises may not beor used without the or used without the consent erected or used only erected or usedconsent of Council of Council subject to with the consent of (Prohibited(Permitted Development) conditions (Permitted Council (Permissible Development)

COLUMN A conditions) COLUMN CDevelopment subject to Development)

COLUMN B COLUMN D

Associated unit in association Any one or more of the For land in a sector Adult product shopwith lot types 1-3 (table 6.1) following purposes on land any purpose not AgricultureCaretaker’s residence nominated for that purpose listed in Column A, D Air stripDetached house or purposes on an approved or included in Amusement premisesDisplay home sector plan. Column B but not Animal husbandryDomestic storage and nominated for that Aquaculturerecreation structures where < Apartments land in an approved Bulk garden supplies8% of the site area Child care centre sector plan Camping grounds Family day care centre Community dwelling Car parkLocal utilities Duplex dwelling Car washPark Estate sales office Caravan park

Home occupation where located Casinoin a residential/business Catering premisestransitional area indicated on an Catteryapproved sector plan CemeteryRetirement village Commercial servicesSales and information centre Communication stationTownhouse units where part of any mast is

Any purpose in this column attached to a building andnot nominated for land by projects more than 3mthe sector plan becomes for from that buildingthat land a permissible Community premisesdevelopment Concrete batching plant

higher than 10m aboveground level, or is

Contractor’s depotConvention centreCorrectional institutionCrematoriumCultural facilityDairyEducational establishmentEntertainment libraryExtractive industryFuel depotFuneral parlourGeneral industryHardware centreHazardous industryHeavy vehicle parkingHeavy vehicle salesHelicopter landing siteHospitalHost farmHotel

Page 73: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected premises may be premises may not beor used without the or used without the consent erected or used only erected or usedconsent of Council of Council subject to with the consent of (Prohibited(Permitted Development) conditions (Permitted Council (Permissible Development)

COLUMN A conditions) COLUMN CDevelopment subject to Development)

COLUMN B COLUMN D

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 63

Indoor recreationInstitutionJunk yardKennelsLicenced clubLot feedingMini-breweryMotelMotor sport or shootingOccasional marketOfficeOutdoor recreationOutdoor salesPassenger terminalPiggeryPlace of worshipPoultry farm Re-cycling depotRestaurantRetail nurseryRetail showroomRural industryService industryService stationShop >200m² GFAShopping centreShowgroundSimulated conflictSpecial useStableStock sales yardTechnology industryTourist facilityTransport terminalTransportable home villageTurf farmingVehicle hire depotVehicle sales yardVeterinary clinicVeterinary hospitalWarehouse

The provisions of the Supplementary Table of Development are subject to section 2.4.9 of this DCP.

Page 74: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

64 Mango Hill Infrastructure Development Control PlanImplementation Provisions

7 MIXED INDUSTRY AND BUSINESS AREA (MIBA)

7.1 Desired EnvironmentalOutcomes

7.1.1 General

To promote the establishment of a mixed industryand business area (MIBA), as part of a MajorEmployment Centre in the northern part of PineRivers Shire, which:

(a) provides opportunities for sustainableand diverse employment for residentsof the Shire and surrounding areas;

(b) develops in step with the extension ofinfrastructure within the MIBA area;

(c) supports a strong town centre to beestablished progressively in the DCParea; and

(d) provides a high standard of visualpresentation in the form of landscapingand building design and siting to theBruce Highway.

7.1.2 Specific

(a) To encourage activities, appropriate ina Major Employment Centre, whichcan benefit from the high level ofaccessibility to the regional transportnetwork and the high level of exposureto the Bruce Highway.

(b) To provide opportunities for theestablishment of employment-intensiveland uses, such as technology- basedindustries, offices, educationalfacilities, service trades, low impactindustries, tourism and recreationalfacilities, in complementary land usegroups within the MIBA.

(c) To ensure that the range, level andintensity of activities in the MIBAcomplements the role, function andvitality of the town centre.

(d) To provide an effective land use bufferfrom the effects of the Bruce Highwayon the urban residential areas to theeast of the MIBA.

(e) To provide a high quality, landscaped,development frontage to the BruceHighway.

(f) To achieve comprehensive landscapingof development sites and open spaces,integrated with attractive buildings ofcomplementary design.

(g) To promote the extension of roads andthe open space network, including thepath system, to increase accessibilityfor residents to the MIBA and toachieve a high degree of connectivitywith other parts of the DCP area andthe region.

(h) To promote a predominately low tomedium intensity form of developmentwhich is compatible with adjacent landuses, including the nearby urbanresidential areas, in terms ofdevelopment character, trafficgeneration and environmental impacts.

(i) To ensure department store basedshopping, discount departmentshopping and large supermarkets arenot established in the MIBA.

7.2 Planning Intent

The strategic plan provides for the establishmentof Major Employment Centres in both the northernarea and the southern area of the Shire. Thenorthern employment centre consists of two partsboth focused upon the Bruce Highway in thevicinity of the Anzac Avenue interchange. Anextensive area of the northern major employmentcentre lies within the DCP area adjacent to theBruce Highway.

Together with the Mango Hill town centre, theMIBA will contribute strongly towards theimplementation of the strategic intentions of theCouncil as established in the strategic plan. Toensure the potential social and economic benefitsof the MIBA are realised in the Shire over andbeyond the life of the Mango Hill development, ahigh degree of flexibility in land use planning anddevelopment control is required.

The MIBA is intended to provide a diversity ofemployment opportunities in businesses andappropriate industries. These employmentopportunities are intended to include commercialand professional services, office services, service

Page 75: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 65

trades, technology development and of the MIBA and consequently road reserves mustmanufacturing, tourism, leisure, recreation andsome retail showrooms. Some small scaleretailing may be included, principally to service thedaily convenience needs of the MIBA workforce.

The MIBA is likely to be developed progressivelyover the life of the Mango Hill development project.A characteristic of that development is expected tobe the establishment of pioneer activities aroundwhich and from which a range of related, anddesirably interdependent activities will develop.Adequate provision for a range of suchemployment generating activities needs to bemade throughout the planning and development ofthe MIBA.

7.3 Development Intent

7.3.1 Infrastructure andTransport

The MIBA is to be serviced with adequateengineering and transport infrastructure to ensurethe strategic intentions can be achieved. Separateinfrastructure agreements will be entered into bythe Council and the principal developer for theprovision of engineering services. In the provisionof infrastructure, the principal developer mustconsult with relevant service providers to ensurethat appropriate infrastructure of sufficient capacityis made available to meet the demands of rapidtechnology development. In particular,telecommunications systems need to be adequatefor the high-speed transfer of large quantities ofelectronic data.

The MIBA is to be linked with the road networkand public transport system to be establishedwithin the DCP area. The proposed north-southarterial road indicated on the structure plan willprovide the principal road access to the MIBA. Nodirect road access from the Bruce Highway to theMIBA is intended.

To ensure the integration of the MIBA with theMango Hill town centre, the internal road systemmust accommodate a bus-based public transportsystem.

The internal road system also will be designed toaccommodate flows of heavy vehicles and servicevehicles generated by MIBA activities. Whileperforming traffic functions, the internal roadsystem is an important element in the landscape

be landscaped.

As part of the integrated transport systemproposed in the DCP area, safe and convenientconnections from the MIBA to the path systemwithin the open space network are intended.

7.3.2 Development Form

7.3.2.1 Character

Groupings of similar or related activities tomaximise the potential benefits of co-location areintended to be achieved in the MIBA. Forexample, corporate offices may be grouped into anoffice park, while technology industries generallyshould be grouped together in a clean and quietenvironment. A desirable planning outcome will bethe establishment of areas within the MIBA withdistinctive character in terms of activities, identityand built form.

Character areas within the MIBA might include:

(a) office parks;

(b) research and development;

(c) recreation, leisure and tourism;

(d) industry and service trades;

(e) education and health care; and

(f) other MIBA activities, including retailshowrooms and warehouses.

The location and extent of the MIBA characterareas, and the intensity and mix of developmentwithin those areas must take into considerationthe nature of, and relationship to, adjoining uses,as well as the relationship to major roads,topography, landscape, sight lines and noiselevels.

It is also intended to permit the co-location ofsome complementary development typical ofdifferent character areas, providing that potentialimpacts can be overcome to the satisfaction of theCouncil. Examples of possible co-location includeoffice parks and research and developmentfacilities, or education, and office premises, andresearch and development facilities. Anotherpossibility envisaged in the MIBA is the proximatelocation of activities which normally requireseparation, for example, some forms of residentialdevelopment and office parks, or recreation andtourism facilities and office parks.

Page 76: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

66 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The generally large development sites within the (d) generally low to medium rise buildingMIBA will offer opportunities for a high level of forms sympathetic to theirintegration between the built form and landscaping surroundings;both within a development site and with adjoiningsites. Where practicable, remnant vegetation is (e) comprehensively landscaped, park-liketo be retained and integrated in the overall surroundings featuring generouslandscaping of individual sites. landscaping; and

The physical form of development to be promoted (f) extension of the local path system forin the MIBA will vary depending on its proximity to pedestrians and cyclists, linkingthe town centre. Development closer to the town development sites with the open spacecentre may consist of low to medium rise buildings network and the DCP area pathwithin landscaped surroundings, while system. development close to urban residential areas willbe mostly low rise and set in generous landscapedsettings. All development will exhibit a high levelof urban amenity, achieved through sensitivedetailed planning, design and siting, and sitelandscaping. Buildings generally will have acommercial character rather than being overtlyindustrial in their appearance. It is intended thatthe MIBA offer the workforce a pleasant and safeenvironment in which to work and to recreate.

To ensure the appearance of buildings situated ina park-like setting, car parking, loading docks andother building services are to be landscaped andgenerally screened from adjacent roadways andopen space networks. Limited visitor car parking,emergency vehicle parking and security controlfacilities may be more visible but also situated inlandscaped surroundings. Car parking will belandscaped and screened from the roads withinthe MIBA. Shade trees are to be providedextensively within car parking areas to providerelief from the heat and glare of summer weatherconditions.

The over-riding character of the MIBA will be one oflow to moderate intensity development on largeallotments, exhibiting high standards in urbandesign integrated with landscaping complementaryto development in the MIBA.

The planning outcome sought in terms ofdevelopment character in the MIBA will be:

(a) a diversity of land use activities;

(b) generally complementary intensity andspacious forms of development;

(c) groupings of similar land uses, withsome areas of mixed use development;

7.3.2.2 Office Parks

The office and commercial activities intended inthe MIBA may be distinguished from thoseintended in the town centre core and frame, in thatthey do not require either a town centre core orframe location. They do require large parcels ofland to function, to project the requisite corporateimages, and to provide the level of amenity soughtby the workforce engaged in them.

Commercial and office activities which belongmore appropriately in the town centre core orframe will not be encouraged to establish in theMIBA.

Generally, office park development will be moreintense with low to medium rise buildings inproximity to the town centre, and less intense withlow rise buildings in proximity to urban residentialareas.

Some potential exists for a residential componentas a mixed use activity in the office park context.Preferred forms of residential development mayinclude accommodation units for visiting staff andcorporate guests, caretaker’s residences andmotels.

Generally, commercial and office activities willreflect the over-riding principles for achieving alandscaped, urban character in the MIBA.

7.3.2.3 Research and Development

The MIBA provides opportunities for theestablishment of research and developmentactivities such as technology industries becauseof:

(a) its accessibility to a range of marketsvia the available regional, national andinternational transport infrastructure(national highway, air port, sea port);

Page 77: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 67

(b) the availability of large allotments in a provided in the MIBA typically will require largeclean and electronically quiet sites and large areas for car parking. There willenvironment free from such external be a need to ensure that the built form andfactors as ground and air vibration, and landscaping of such development is in keepingchemical and thermal contamination with adjacent development and the overallfrom the atmosphere; character of the MIBA. Possible activities include

(c) the proximity to a large growing indoor recreation such as major indoor sportingworkforce and the opportunity to have facilities. Cinema complexes are not intendeda skilled workforce housed in the DCP within the MIBA as this type of entertainmentarea and elsewhere; and facility is more appropriately located in conjunction

(d) the potential flexibility for development specialist cinema as part of a major tourist facilityoffered by a “greenfield” site. may be appropriate in the MIBA.

Establishing technology industries and other The visual character, built form and landscaping fortechnology-based services in the MIBA will require entertainment and leisure facilities will be inco-ordinated planning to avoid potential adverse keeping with the overall character of the MIBA.impacts from nearby incompatible activities.

Within the research and development industry not necessarily be, related to the recreation andarea, the preferred land use is technology leisure facilities. Tourism accommodation requiresindustries and related activities such as a high level of visual exposure to traffic andtechnology services and convenience retailing accessibility. While permitting such exposure andprimarily to serve the needs of the local workforce. providing such accessibility, it is intended toOther more industrial activities such as light maintain the form and character of developmentindustry, or inappropriate higher intensity activities within the overall intentions for the MIBA. Theare not envisaged in this part of the MIBA. preferred built form is mostly low to medium rise,

Some potential exists for a residential component architectural design quality. The developmentas a mixed use activity in the research and intensity, proportion of site landscaping, and thedevelopment area context. Preferred forms of provision and location of car parking must beresidential development include accommodation complementary to adjacent development.units for visiting staff and corporate guests, andcaretaker’s residences. 7.3.2.5 Industry and Service Trades

In special circumstances appropriate to the The MIBA is the preferred location for anyintention of promoting a technology-based industry industrial activity that may be permitted in thepark, a departure from the general requirements of DCP area, providing that such industrial activity isthis section may be permitted to accommodate a of a light industry nature. General industry,particular corporate image which relies upon an hazardous and offensive industry, and extractivearchitectural style and the use of colours and industry are not intended, nor are similarly highmaterials outside the scope of this section, and impact uses examples of which might include thewhich will not be to the detriment of other manufacture of precast concrete products, heavydevelopment in the MIBA. metal fabrication or the processing of large

7.3.2.4 Recreation, Leisure and Tourism

Because of its central location in the region and trades activities apart from service tradesthe high level of accessibility and exposure to the establishments which meet the needs of activitiesregional transport network, there are opportunities in the town centre core and the town centre frame.for the development of a range of recreation and Generally, it is intended that the service tradesleisure activities in the MIBA. Opportunities also activities in the MIBA will meet the needs ofexist for tourism development, including residents of Mango Hill and surrounding urbanaccommodation which is typically linked to the areas with respect to the sales, repair andrecreation and leisure facilities. servicing of a broad range of domestic and

It is not intended to diminish the role and functionof the town centre by providing high orderentertainment facilities to the DCP population andthe regional population in the MIBA. The type oftourism, recreation and leisure facilities likely to be

integrated theme parks, and specialised forms of

with the major shopping centre. However a

Tourist accommodation is likely to be, but need

with a strong emphasis on landscaping and

quantities of organic materials.

The MIBA is the preferred location for service

commercial appliances and equipment.

Light industrial activities and service tradesactivities typically involve the use of buildings andland in ways which, if not controlled, are frequently

Page 78: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

68 Mango Hill Infrastructure Development Control PlanImplementation Provisions

unsightly and undesirable. Matters requiring 7.3.2.7 Other MIBA Activitiesdetailed control are:

(a) vehicle storage and maintenance; warehouses, institutional uses, community

(b) plant and equipment storage and which generally are not appropriate to either themaintenance; town centre core or frame.

(c) materials storage; Continuous development of retail showrooms along

(d) signage; Highway is not intended and is considered to be

(e) storage and disposal of waste Council. materials;

(f) architectural and landscape design; provided that the role and function of the bulky

(g) building materials and colours; diminished nor the achievement of that centre

(h) amenity; development.

(i) emissions; and For the avoidance of doubt, department store

(j) environmental protection. and supermarkets are not intended in the MIBA.

7.3.2.6 Education and Health Care MIBA to allow for other forms of retailing such as

Within the DCP area there is an opportunity to manufactured or assembled on-site, buildingestablish tertiary and vocational education and supplies, home furnishings, floor coverings,health care facilities. The health care facilities sporting goods, leisure goods, electronic goodsmay include a private hospital, 24 hour medical and the like. The nature and scale of retailcentres and emergency services, i.e ambulance. showroom development in the MIBA must not In conjunction with the education and health care conflict with the role and function of the bulkyfacilities, there is likely to be an ancillary need for goods centre.rental accommodation for staff, students, patientsand their families. Retail showrooms typically are large bulky

The preferred location for such facilities may be in impacts upon the urban environment. Retailproximity to the town centre. There are possible showroom development may permit a greateremployment and economic benefits of co-locating proportion of car parking between the building andeducation and health care facilities with research the road frontage, providing that car parking isand development activities in the MIBA. landscaped at the edges and with shade trees

As with other forms of development in the MIBA, relaxed for development on lots away from majorthe development of education and health care roads and other highly visible areas. Control overfacilities must respond to the overall open, signage is proposed to remain unchanged.landscaped character of the MIBA. Whilebuildings may be of low to medium rise, the It is also intended to allow for small scale retaildevelopment intensity, proportion of site uses principally to service the daily conveniencelandscaping, and the provision and location of car needs of the MIBA workforce.parking must be complementary to adjacentdevelopment.

Other MIBA activities include retail showrooms,

facilities, public utilities and other low impact uses

the frontages of major roads and the Bruce

an undesirable environmental outcome opposed by

Retail showrooms may be developed in the MIBA

goods retail centre in the town centre are not

delayed as a consequence of this form of

based shopping, discount department shopping

Rather, it is the intention of development in the

retail showrooms offering for sale goods

buildings with the potential for adverse visual

throughout. The control of building colours may be

7.3.3 Development Intensity

Page 79: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 69

7.3.3.1 General

Overall development intensity in the MIBA,expressed in terms of a plot ratio, will not exceed0.5:1 based on the gross site area. Within thecharacter areas of the MIBA and within individualdevelopment sites, it is envisaged that plot ratioswill vary both to a lesser and a greater extent thanthe overall development intensity of 0.5:1.

7.3.3.2 Office Parks

Generally office development within the office parkcharacter area will correspond to one of fourcategories of development intensity. Thosecategories are:

(a) Plot ratio less than 0.25:1

(1) Typically buildings will be lowrise, of a domestic scale andcharacter, and established inlandscaped garden settings;

(2) The minimum landscaped areawill be 40% of the site area;

(b) Plot ratio between 0.26:1 and 0.4:1

(1) Typically buildings will be low tomedium rise, of a domestic scaleand character, and established inlandscaped garden settings;

(2) The minimum landscaped areawill be 30% of the site area;

(3) For a single storey development,with a plot ratio greater than0.35:1, a minimum 25% of therequired car parking is to belocated under the building (atbasement or ground level);

(c) Plot ratio between 0.4:1 and 0.6:1

(1) Buildings may be low to mediumrise, of a commercial scale andcharacter, and established inlandscaped garden settings;

(2) The minimum landscaped areawill be 25% of the site area;

(3) For two storey development aminimum of 25% of the requiredcar parking will be located underbuildings;

(d) Plot ratio in excess of 0.6:1

(1) The development intensity is notlikely to exceed 1.0 except inoptimal circumstances describedin a precinct plan in respect ofsites nominated on an approvedsector plan;

(2) Typically buildings will bemedium rise with opportunities foroccasional high rise, of acommercial scale and character,and established in landscapedgarden settings;

(3) The minimum landscaped areawill be 25% of the site area.

The establishment of non-office uses within theoffice park character area, which provide for thedaily convenience needs of the MIBA work force isgenerally supported. The impact of such uses onthe criteria contained within the four categoriesreferred to above is to be assessed at the sectorplan stage where Council may agree to variationsproviding the overall office park character is notcompromised.

Non-office uses in the office park are to achievethe same character and outcomes which resultfrom the application of the categories listed in (a) -(d) above for offices development.

The precinct plan and the sector plans willestablish the landscape concept and moredetailed development form and character.Generally development in the MIBA will reflect anurban character.

7.4 Design and SitingMeasures

Design and siting measures will ensure acomprehensive and integrated approach todevelopment and so achieve the characterintention for the MIBA. Design and sitingmeasures will be provided in the sector plans.Design and siting issues to be addressed in thesector plans include:

(a) Building set backs

(1) All building set backs to roadsare to be landscaped in acomprehensive and integratedmanner. Maintenance of thebuilding set back spaces will bethe responsibility of the

Page 80: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

70 Mango Hill Infrastructure Development Control PlanImplementation Provisions

registered proprietors of each side of buildings align whereverallotment; possible on an east-west access;

(2) Allotments fronting the Bruce (6) Where practicable, shelteredHighway must have a minimum pedestrian connections between20 metre building setback to be buildings, including those onlandscaped in a co-ordinated adjoining allotments, aremanner. In some locations along encouraged.the Bruce Highway frontage, agreater building setback may be (c) Landscapingdetermined in a sector plan,having regard to local influences (1) Areas visible from roads andsuch as topography and noise open space, such as those inlevels. building set-back areas, are to be

landscaped in accordance with(b) Building design the landscape concept plan;

(1) Any development in the MIBA will (2) Landscaping for car parkingbe subject to the requirement areas is to include shade treesthat building site cover plus the planted at a rate not less than 1area of any car parking spaces tree per 6 vehicle spaces, andand driveways, will not exceed screening trees and shrubs75%; planted so as to screen car

(2) Preferred building forms include other areas readily accessible topitched roofs for front office at the the public.least, roof overhangs, recessedwindows in external walls, and (d) Car parking and loading docksarticulation in lengthy facades;

(3) Preferred building forms will are to be sited and screened socomplement those of adjacent as not to be highly visible frombuildings in terms of their the frontage of the site or fromarchitecture, height and bulk, and other areas readily accessible togenerally, will avoid the use of the public. In assessingindustrial building forms, compliance with this requirementparticularly on those allotments Council will take into accountfronting either the Bruce Highway local site considerations andor the north-south arterial road; other relevant site planning and

(4) Building heights generally will below rise on allotments where (2) Loading docks and serviceoverlooking of residential areas vehicle storage areas are to bewithin 100m is likely, and will be screened to ameliorate suchlow to medium rise on other impacts as noise, headlight glareallotments; and unpleasant odours.

Council will consider fully (e) Signage, colours and materialsdocumented alternative proposalsput forward by the principal (1) To avoid unsightly or excessivedeveloper at precinct or sector advertising, one major sign onlyplan stages which achieve, in is permitted per facade of aCouncil's opinion, the appropriate building, with the prior approval ofprotection of amenity for the Council and the principalresidential properties in the developer;general area.

(5) Orientation to reduce energyrequirements so that the long

parking areas from roads and

(1) Car parking and loading docks

development requirements;

Page 81: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 71

(2) Signage and entry details are tobe specified in each sector plan (g) Residential developmentfor development on allotmentwithin the MIBA; (1) Residential developments are to

(3) Proliferation of unco-ordinated level of residential amenity, insignage along the frontage of the terms of noise, vibration, fumes,Bruce Highway and major roads glare, privacy, security andwill not be permitted. Free- identity, by responding to non-standing signs, such as pylon residential developmentsigns, not related to a particular characteristics such as:activity within the MIBA, will notbe permitted along these C hours of operation;frontages unless for gateway ordirectional signage purposes; C location of loading bays, delivery

(4) The preferred major colours for storage and disposal facilities,external walls and surfaces of flues, air conditioners and thebuildings in the MIBA will be like; and specified in the sector plan;

(5) Highly reflective finishes are notencouraged in building materials (2) In general the performancefor development in the MIBA. criteria specified for the range of

(f) Environmental management Residential Design Guidelines

(1) Building services, plant rooms and siting principles and criteriaand equipment rooms located on to be addressed in mediumroofs or externally around density residential development.buildings are to be sited, While the acceptable solutionsdesigned and constructed in provided in these publicationsorder to: may generally satisfy the

C form an integral part of the overall residential development in thedevelopment on an allotment; MIBA they do not preclude other

C generally not be visible from modified by an approved sectorpedestrian thoroughfares, streets plan.or other areas readily accessibleto the public; and “Council will have regard to the outcomes achieved

C protect the amenity of the area measures and sector plan development standardsfrom noise, vibration, smells, and codes to determine the suitability for theirfumes, electrical interference or continued application in subsequent Sector Plansotherwise; for achieving a high quality of amenity.”

(2) Environmental managementstructures or control devices,such as gross pollutant traps,waste disposal bins, flues andthe like, are to be designed so asnot to detract from the overallvisual character of the MIBA orthe immediate locality.

be designed to offer a reasonable

docks, service areas, waste

C access arrangements;

housing types in Queensland

and AMCORD provide the design

performance criteria for

solutions and may also be

in the application of these design and siting

Page 82: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

72 Mango Hill Infrastructure Development Control PlanImplementation Provisions

7.5 Supplementary Table of Development - Mixed Industry andBusiness Area Element

Page 83: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 73

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be premises may be premises may be premises may not beerected or used erected or used without erected or used only erected or usedwithout the consent of the consent of Council with the consent of (ProhibitedCouncil (Permitted subject to conditions Council (Permissible Development)Development) (Permitted Development Development)

COLUMN A COLUMN D

subject to conditions)COLUMN B COLUMN C

Caretaker’s residence Any one or more of the For land in a sector Adult Product ShopPark following purposes on any purpose not AgricultureLocal utilities land nominated for that listed in Column A, D Air strip

purpose or purposes on or included in Column Animal husbandryan approved sector plan. B but not nominated Aquaculture

Accommodation units approved sector plan Camping groundsBulk garden supplies Caravan parkCar park CasinoCar wash CatteryCatering premises CemeteryChild care centre Community dwellingCommercial services Concrete batching plantCommunication station Correctional institutionContractor's depot CrematoriumConvention centre DairyEducational establishment Detached houseElectronic simulated conflict Display homeEntertainment library Domestic storage andEstate sales recreation structuresFuneral parlour Duplex dwellingHardware centre Extractive industryHeavy Vehicle sales Family day care centreHome Occupation Fuel depotHospital Hazardous industryHotel Heavy Vehicle parkingIndoor recreation Host farmInstitution KennelsMotel Lot feedingOffice Motor sport and shootingOutdoor recreation PiggeryOutdoor sales Poultry farmPassenger terminal Retirement villagePublic utilities Rural industryRe-cycling depot Shopping centre >1500m²Restaurant GLARetail nursery ShowgroundRetail showroom StablesSales and information Stock sales yardcentre Townhouse unitsService industry Transportable homeService station VillageShop <300m² GFA Turf farmingShopping centre <1500m²GLASpecial useTechnology industryTourist facilityTransport terminalVehicle hire depotVehicle sales yardVeterinary clinicVeterinary hospitalWarehouseAny purpose in thiscolumn not nominated

for that land in an Associated unit

Page 84: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

74 Mango Hill Infrastructure Development Control PlanImplementation Provisions

The provisions of the Supplementary Table of Development are subject to section 2.4.9 of this DCP.

Page 85: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 75

8 COMMUNITY FACILITIES

8.1 Desired Environmental 8.2 Planning IntentOutcomes

8.1.1 General

(a) To encourage the provision of anappropriate range of communityfacilities in convenient locations and instep with residents’ needs, integratedwith the overall development of theDCP area.

(b) To maximise the use and communitybenefits of community facilities throughthe provision of multi-purposepremises, the co-location of uses andestablishing high levels ofaccessibility.

(c) To achieve an integrated network ofpleasant, safe public places for culturaland social interaction.

8.1.2 Specific

(a) To integrate community facilities withthe public transport system, the roadnetwork and the open space network.

(b) To ensure, within the context of agrowing population and changingdemography, that an appropriate rangeof community facilities and servicesare provided within convenient reach of,and which remain highly accessible toresidents of, the DCP area and nearbyurban areas.

(c) To ensure that capital and physicalresources are utilised effectively andefficiently in meeting the needs forcommunity facilities.

(d) To co-ordinate the planning anddevelopment of integrated communityfacilities, drawing upon the benefits ofco-location and multiple use of sharedfacilities.

(e) To maximise the potential for socialinteraction within community facilitiesareas.

In providing a range of community services for thegrowing population of the DCP area, it is intendedthat community facilities be provided in:

(a) the town centre core and frame to fulfila high level function;

(b) the MIBA, including communityfacilities which are generally notappropriate in the Town Centre or assupporting community facilities for thelocal workforce (e.g child care centre);

(c) the designated major communityfacilities areas which will fulfil aregional function or serve a populationa part of which will reside beyond theDCP area; and

(d) the designated areas for localcommunity facilities which areprimarily intended for residents withinthe DCP area.

The community facilities functions within the towncentre core and frame are established in Sections4 and 5 of this DCP.

8.2.1 Major CommunityFacilities

Major community facilities are designated on thestructure plan for the land to the east of the towncentre, adjacent to a linear park and AnzacAvenue.

Educational facilities

One of the desired environmental outcomes forthis area is to provide an integrated sharedcampus secondary school complex to provide forthe Mango Hill population, with additionalenrolments coming from other adjacent residentialareas and potentially the wider region.

Alternative desirable environmental outcomes mayinclude a stand-alone secondary school togetherwith other appropriate major and local communityservices.

Page 86: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

76 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Other Uses (c) the south-eastern part of the DCP area,

If a secondary education establishment does not and the designated major communityeventuate an alternative acceptable outcome would facilities area.be the establishment of other major communityfacilities and compatible land uses catering for Local community facilities are intended to providesocial, educational, health or recreational needs of a wide range of community services meeting theresidents or visitors. For example a medical daily needs of small populations contained in onecentre, community building or various forms of or several villages. The range of communityoutdoor or indoor recreation may be established as services intended includes:services to residents of the DCP area and thewider community. (a) convenience retailing and commercial

In general retail, commercial, industrial orresidential uses are not considered appropriate in (b) community health and welfare services;the major community facilities area. Howeversome retail or residential uses, where provided as (c) primary education and child care services;a minor component of an approved community andfacility, may be appropriate.

It is intended that local community services be entertainment services.provided in both the town centre core and frameand the designated major community facilities One shopping centre or group of shops only is toarea in order to meet the needs of the town centre be established in each local community centre.residents and the workforces in the town centre,MIBA and major community facilities area. These services are intended to be provided in

Access shared resources such as meeting rooms and

The major community facilities area is intended to public transport. Furthermore, the opportunity willbe serviced by the major road network and have exist for integrated and comprehensive urbanaccess to a linear park on its northern side. It is design and landscaping to encourage a strongintended also that the district open space community identity, social interaction and highfacilities, such as playing fields and sporting levels of amenity and public safety.facilities, within the linear park will serve a multipleuse function being utilised by the secondary Cinema complexes are not intended within theschools, the public and possibly a shared campus local community facilities element as this type ofprimary school complex proposed to be entertainment facility is more appropriately locatedestablished to the north-west of the linear park. in conjunction with the major shopping centre.

By locating the major community facilities area Access to the local community facilities will beadjacent to Anzac Avenue it will buffer traffic noise from distributor roads, residential streets and theimpacts to on the urban residential areas further to path/cycleway system within the open spacethe north. network.

8.2.2 Local CommunityFacilities

As notionally indicated on the structure plan, localcommunity facilities are intended to be establishedin three locations in the DCP area including:

(a) the north-west part of the DCP area in thegeneral vicinity of the north-south arterialroad;

(b) the central part of the DCP area adjacentto the linear park; and

most likely to the north of the linear park

services;

(d) limited cultural, dining and other

integrated centres drawing upon the benefits of

display areas, recreation facilities, car parking and

It is intended to provide opportunities for limitedmixed use development where a residential unitmay be developed in association with a businessactivity. The mixed use development is seen asan opportunity to provide for new start upbusinesses and incubated home occupations.However independent residential development isnot intended in the local community facilitiesnodes. Further, residential development whichmay place unreasonable restriction on theactivities of the local community facilities node inproviding a wide range of community facilities areconsidered undesirable development.

Page 87: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 77

Residential components of mixed use contains an indicative timing for the provision ofdevelopments are to be designed to offer a certain community facilities which has beenreasonable level of residential amenity, in terms of determined on the basis of comprehensive needsnoise, vibration, fumes, glare, privacy, security assessments and linked to the establishment of aand identity, by responding to non-residential service once the population reaches adevelopment characteristics such as: predetermined level.

• hours of operation; While this strategy is sound in community

• location of loading bays, delivery docks, adequately provide for the immediate essentialservice areas, waste storage and disposal needs of the initial residents. It would be ideal tofacilities, flues, air conditioners and the provide all community facilities up front for the firstlike; and residents, however, government and community

• access arrangements. provision.

8.3 Development Intent

In establishing community facilities, whether at themajor or the local level, several importantdevelopment principles must be observed. Theseprinciples are:

(a) providing an appropriate range and mix ofcommunity services in time to meet theneeds of the catchment population;

(b) establishing and maintaining a high levelof accessibility to the communityfacilities; and

(c) ensuring that community facilities areintegrated with other development toachieve maximum community benefits.

8.3.1 Range and Mix ofServices

An important planning intention of this DCP is toensure the timely provision of an appropriate rangeof community facilities and services to meet thechanging needs of a growing population. Theprovision of certain forms of communityinfrastructure is to be the subject of infrastructureagreements between the principal developer, theCouncil and the State Government.

Principles for the provision of community facilitiesare contained in Section 12 regardinginfrastructure agreements.

The Mango Hill Infrastructure DCP Planning Studyin section 6.5 contains an assessment of theexisting community facilities and identifies theadditional facilities required to meet the needs ofthe DCP area population. The planning study also

planning and economical terms it may not

resources do not realistically enable such

Certain facilities such as a local convenienceshopping outlet and access to public transportideally need to be provided from the time newresidents locate in the DCP area and thereforemay need to be provided by the principal developeruntil a viable market base is established. Theissue of access to public transport is dealt with insection 10 of this DCP. The principal developerwill make provision for an elementary localconvenience outlet from the time of occupancy ofthe first dwelling established in the DCP area untilsuch time as a viable alternative is provided.

Precinct plan preparation must take into accountexisting and forecast needs for communityfacilities and community services.

8.3.2 Accessibility

In providing highly accessible community facilitiesand services the range and mix of facilities set outin the infrastructure agreements are to beconveniently located to potential user groups andphysically accessible to those groups.

Community facilities are intended to be located onthe public transport network and on major roadswithin the road network. These facilities are to beaccessible from the path and cycleway systemwithin the open space network.

Community facilities must be provided withconveniently located all-weather access forresidents.

Car parking areas must be:

(a) situated conveniently to the entrances ofcommunity facilities without visuallydominating local streetscapes;

Page 88: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

78 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(b) planted with sufficient shade trees to Sector plans must ensure appropriate integrationprovide shelter for cars; and of community services occurs in premises through

(c) well lit and safe in terms of design, must be considered:construction and landscaping.

8.3.3 Integration

An important intention is that efficiencies beachieved and effectiveness enhanced in theprovision of community facilities within the DCParea.

There must be a high level of physical integrationof community facilities through the co-location ofsimilar or related community services, sharing ofjoint physical resources, the provision of multi-purpose facilities, and the integration of the openspace system within community facilities whereappropriate.

Where necessary, sector plans will establish theadministrative means of achieving high levels ofintegration, for example, access easements andcommunity titles.

careful detailed design. The following principles

(a) the needs of user groups;

(b) possible difficulties in providing integratedservice facilities;

(c) safety, convenience and comfort for usergroups and service providers;

(d) the visual implications of different buildingscales and architectural styles;

(e) integration with the open space network;and

(f) the nature and amenity of adjacent uses.

Page 89: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 79

8.4 Supplementary Table of Development - Major CommunityFacilities Element

Page 90: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

80 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected or premises may be premises may not beor used without the used without the consent of erected or used only erected or usedconsent of Council Council subject to conditions with the consent of (Prohibited(Permitted Development) (Permitted Development Council (Permissible Development)

COLUMN A COLUMN B COLUMN C COLUMN Dsubject to conditions) Development)

Caretaker’s residence Any one or more of the For land in a sector any Accommodation unitsLocal utilities following purposes on land purpose not listed in Adult product shopPark nominated for that purpose Column A, D or Agriculture

or purposes on an approved included in Column B Air stripsector plan.. but not nominated for Amusement premises

Car park approved sector plan ApartmentsCar wash AquacultureCatering premises Associated unitChild care centre Bulk garden suppliesCommunity premises Camping groundsCultural facility Caravan parkEducational establishment CasinoEstate sales office CatteryHospital CemeteryIndoor recreation Concrete batching plantInstitution Contractor’s depotOutdoor recreation Correctional institutionPlace of worship CrematoriumPublic utilities DairyRecycling depot Detached houseRestaurant Display homeSales and information centre Domestic storage andShop < 300m GFA recreation structures2

Special use Duplex dwelling

Any purpose in this column Extractive industry not nominated for land by Family day care centre the sector plan becomes for Fuel depotthat land a permissible Funeral parlourdevelopment General industry

that land in an Animal husbandry

Entertainment library

Hardware centre Hazardous industryHeavy vehicle parkingHeavy vehicle salesHome occupationHost farmHotelJunk yardKennelsLot feedingMini breweryMotelMotor sport or shootingOutdoor salesPiggeryPoultry farmRetail nurseryRetail showroomRetirement villageRural industryService industryShopping centreSimulated conflictStableStock sales yard

Page 91: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected or premises may be premises may not beor used without the used without the consent of erected or used only erected or usedconsent of Council Council subject to conditions with the consent of (Prohibited(Permitted Development) (Permitted Development Council (Permissible Development)

COLUMN A COLUMN B COLUMN C COLUMN Dsubject to conditions) Development)

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 81

Technology industryTownhouse unitsTransport terminalTransportable homevillageTurf farmingVehicle hire depotVehicle sales yard Warehouse

The provisions of the Supplementary Table of Development are subject to Section 2.4.9 of this DCP.

Page 92: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

82 Mango Hill Infrastructure Development Control PlanImplementation Provisions

8.5 Supplementary Table of Development - Local Community Facilities

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected or premises may be premises may not beor used without the used without the consent of erected or used only erected or usedconsent of Council Council subject to conditions with the consent of (Prohibited(Permitted Development) (Permitted Development Council (Permissible Development)

COLUMN A COLUMN B COLUMN Csubject to conditions) Development)

COLUMN D

Caretaker’s residence Any one or more of the For land in a sector Accommodation unitsLocal utilities following purposes on land any purpose not Adult product shopPark nominated for that purpose listed in Column A, D Agriculture

or purposes on an approved or included in Air stripsector plan. Column B but not Amusement premises

Apartments as part of a mixed land in an approved Apartmentsuse development in association sector plan Aquaculturewith any other Column B use Associated unitCar park Bulk garden suppliesCatering premises Camping groundsChild care centre Caravan parkCommercial services CasinoCommunity premises CatteryEducational establishment CemeteryEntertainment library Communication stationEstate sales office Concrete batching plantIndoor recreation Contractor’s depotOffice Convention centreOutdoor recreation Correctional institutionPlace of worship CrematoriumPublic utilities DairyRecycling depot Detached houseRestaurant Display homeRetail nursery Domestic storage andSales and information centre recreation structuresService station Duplex dwelling Shop <300m² GFA Extractive industry Shopping centre <3,000m² GLA Family day care centre Special use Fuel depotVeterinary clinic Funeral parlour

Any purpose in this column Hazardous industrynot nominated for land by Heavy vehicle parkingthe sector plan becomes for Heavy vehicle salesthat land a permissible Home occupationdevelopment Host farm

nominated for that Animal husbandry

General industryHardware centre

HotelJunk yardKennelsLot feedingMini breweryMotelMotor sport or shootingOutdoor salesPiggeryPoultry farmRetail showroomRural industry

Page 93: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be erected premises may be erected or premises may be premises may not beor used without the used without the consent of erected or used only erected or usedconsent of Council Council subject to conditions with the consent of (Prohibited(Permitted Development) (Permitted Development Council (Permissible Development)

COLUMN A COLUMN B COLUMN Csubject to conditions) Development)

COLUMN D

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 83

Service industryShopping centre >3000m²GLAShowgroundSimulated conflictStableStock sales yardTechnology industryTourist facilityTownhouse unitsTransport terminalTransportable home villageTurf farmingVehicle hire depotVehicle sales yard Warehouse

The provisions of the Supplementary Table of Development are subject to Section 2.4.9 of this DCP.

Page 94: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

84 Mango Hill Infrastructure Development Control PlanImplementation Provisions

9 OPEN SPACE

9.1 Desired EnvironmentalOutcomes

9.1.1 General

To provide a comprehensive and integrated systemof open space fulfilling aesthetic, recreation,conservation, transportation and environmentalmanagement functions for the DCP area.

9.1.2 Specific

(a) To integrate the open space system,as a key structural element, with otherelements of the DCP area such as thetransport network and the communityfacilities network.

(b) To provide landscaped buffers betweenincompatible uses within and borderingthe DCP area.

(c) To provide visual relief and aestheticamenity to the urban landscape as partof the integrated approach to planning,design and development of the DCParea.

(d) To provide for a wide range ofsatisfying, structured and unstructuredrecreation opportunities for residents.

(e) To ensure that, through integratedplanning and good design, recreationopportunities offered in the open spacesystem will be rewarding and can bepursued safely by the public.

(f) To conserve and protect land of localand wider conservation value within theopen space system for the enjoymentof present and future generations.

(g) To integrate pedestrian and bicyclemodes of transport within the openspace system, linking urban residentialareas with local community facilities,major community facilities, the MIBAand the town centre.

(h) To use the open space system as aneffective means for maintaining high

levels of environmental quality throughwater management, habitat protection,wildlife corridors and acoustic buffering.

(i) To provide a village park as a focus foreach residential village.

9.2 Planning Intent

It is intended that a full range of open spaceopportunities will be conveniently available to thecommunity as it develops. Open spaces includeland designated for public park purposes,unallocated land held by the Council or the Crownas well as areas of private recreational openspace. Examples of open space are:

(a) enlarged areas of roadways used foropen space;

(b) golf course, including practice areasand buffer areas;

(c) landscaped areas, includinglandscaping for visual or acousticscreening or buffering;

(d) pedestrian and bicycle pathways;

(e) waterways;

(f) water bodies used for environmentalmanagement purposes; and

(g) other outdoor recreation areas.

Sufficient land is to be set aside at thedevelopment stage to provide for the diverserecreational needs of the community. The openspace needs of the community are to be providedthrough the provision of land and appropriatefacilities in accordance with the infrastructureagreements. The agreements will specify the areaof land and the range and timing of recreationinfrastructure capital works to be provided. Theprovision of open space is to be in step with theneeds of the growing community as stipulated inclause 12.6 and the infrastructure agreement.

To meet the open space desired environmentaloutcomes the following range of open spaces willbe required for the community:

(a) environmental park;

Page 95: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 85

(b) linear park system;

(c) town park;

(d) village and local parks;

(e) district and local playing fields; and

(f) open space buffers.

9.2.1 Environmental Park

The environmental park is an area of remnant the district level. It will achieve this through:bushland in the north-east corner of the DCP area,adjacent to Saltwater Creek and is shown in green (a) a network of cycleways, paths andon the structure plan. It has been identified as an trails allowing movement throughoutarea of environmental and cultural significance and the DCP area while remaining in ais intended to be conserved and protected. The natural or landscaped setting;environmental park encompasses an identifiedcultural heritage site located adjacent to Saltwater (b) retention where practicable ofCreek and the buffers recommended around that continuous corridors of trees, shrubssite. The environmental park is intended to link and grasslands which is subject towith a larger regional body of open space based on minimal maintenance regimes for theSaltwater Creek and the Hays Inlet estuarine purpose of permitting the movement ofsystem. Hays Inlet and Saltwater Creek are within fauna through the DCP area andthe ‘Conservation Zone’ under the Marine Parks providing natural outlooks for residents.(Moreton Bay) Zoning Plan 1997 and are covered Specifically the linear open spaceby the Habitat Conservation and Protection providing a link between the Brucemanagement strategies under the Moreton Bay Highway and the northern boundary ofStrategic Plan 1993. It is also a designated Fish the DCP area is to be specificallyHabitat Area under the Fisheries Act 1994. Any retained as a wildlife corridor;development within the environmental park is to beconsistent with and advance the planning (c) inclusion of artificial wetlands andobjectives of these regulatory mechanisms. It is water bodies for water managementintended to be used principally for nature prior to discharge into Saltwater Creek;conservation as well as to fulfil education,landscape and amenity roles. (d) direct connections from urban

It may be appropriate to provide a recreational trail, fields, the town centre and communityincluding a bridle path, along the perimeter of the facilities;environmental park possibly linking with the bufferpark along the western boundary of the Mango Hill (e) enhancement of open spaces by thevillage. The recreational trail, if established, will be provision of educational anddesigned and located to ensure the environmental interpretative facilities; values of the environmental park are notcompromised. (f) control over the design and siting of

The principal developer must submit a amenities, car parking areas,management plan for the environmental park prior furnishings and lighting; andto undertaking any development which may impacton the environmental park. (g) the provision of playing fields and multi-

The Departments of Environment and Heritage andPrimary Industries are to be consulted by theprincipal developer when preparing themanagement plan.

9.2.2 Linear Park System

The structure plan provides for a system of linearparks extending into the DCP area from theSaltwater Creek drainage system. Each of thelinear parks is linked directly or indirectly with theSaltwater Creek and Hays Inlet drainage system.The basic structure of the linear park system isshown in green on the Structure Plan.

The linear park system is intended to serve openspace, recreational and environmental needs at

residential areas to district playing

public facilities such as clubhouses,

purpose courts.

Page 96: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

86 Mango Hill Infrastructure Development Control PlanImplementation Provisions

9.2.3 Town Park

The town park is intended to provide a range ofstructured and unstructured recreation spacesrelated to adjoining town centre activities. Forexample, if located adjacent to the town centrecore, the town park may take on a formalarrangement of spaces, landscaping andfurnishing. By contrast adjacent to the towncentre frame, the town park typically will consist ofplaying fields and other structured recreationfacilities. The town park may include anornamental waterbody which performs aesthetic,landscaping, recreational and environmentalmanagement functions. It is desirable to provide The open space system also includes buffer areaspublic access around the entire perimeter of the which are intended principally to:water body which will facilitate jogging and walkingtrack circuits. The town park may consist of a (a) screen the effects of incompatible landseries of interconnected open spaces throughout uses from the DCP area; the town centre.

9.2.4 Village and Local Parks

Village and Local parks will take a variety of formsand are intended to provide for a range of functionsdetermined on a case by case basis duringprecinct planning. Some of the functions of theseparks include providing:

(a) the focal point for each residentialvillage;

(b) opportunities for unstructuredrecreation;

(c) aesthetic benefits and visual relief forurban residential development;

(d) environmental protection andmanagement functions; and

(e) connections with the path system(pedestrian and cycleways).

9.2.5 District and LocalPlaying Fields

Sporting fields generally are to be provided in anumber of major clusters, including one in thenorthern part of the DCP area and one in thesouthern part. The sporting fields are generallyintended to be linked with the community facilitiesin order to achieve the benefits of co-location andmultiple use. The linear park system will providepathways linking to the district playing fields.

Vehicle access to the district playing fields is tobe provided via roads specifically designed toaccommodate the anticipated traffic flows anddiscourage through traffic on the local roadsystem.

The amenity of the surrounding residential area isto be protected in the design and development ofthe district playing fields. Sporting fields may alsoprovide a hydraulic mitigation function for majorstorm events.

9.2.6 Buffers

(b) screen the development of the DCParea from existing land uses so as toprotect existing character values;

(c) provide opportunities for commercialrecreation, such as a golf course, forwhich there may be a demand duringthe life of the development;

(d) provide opportunities for recreationaltrails.

(e) provide for or protect existing areas orfeatures of local aesthetic or intrinsicvalue; and

(f) ameliorate environmental effects fromexisting or proposed infrastructure.

The open space buffers generally are to be linkedwith, and are intended to be landscaped to reflecttheir function and complement other elements ofthe open space system.

It may be appropriate to locate a recreational trail,including a bridle path within the open space bufferalong the western boundary of the Mango Hillvillage.

Council may not accept all or any land within openspace buffers as park. Although recognising thedual function which park and open space canperform land which specifically and primarilyfunctions as a buffer will generally not beconsidered as a park contribution for the purposesof calculating park contributions in accordance theinfrastructure agreement.

Page 97: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 87

9.2.7 Open SpaceComponents

The following components are importantconsiderations in establishing the role, functionand character of open spaces:

(a) the environmental managementsystem including sedimentation pondsor basins or lakes;

(b) pedestrian and bicycle transportsystem;

(c) landscape treatments; and

(d) a range of recreational opportunities.

The components of the open space system areintended to enhance the environmental quality,urban amenity and quality of life attainable in theDCP area.

The environmental management system isintended to mitigate and manage the potentialdownstream effects of urban development in theDCP area, principally through the management ofurban drainage and stormwater. The environmentalmanagement system is also important in providingopportunities for the movement of wildlife.Environmental performance objectives andindicators are intended to be established throughinfrastructure agreements.

The water management system, upon which muchof the linear park system is based, relies uponintegrated measures for pollution control. Bothnatural and constructed measures are intended,including gross pollutant traps, artificial wetlands,purifying waterbodies, detention basins andgrassed drainage swales. Water bodies formingpart of the water management system are adesired environmental outcome.

The path network to be provided within the openspace system is intended to provide an alternativemeans of transport in the DCP area. Connectionswith adjacent areas are intended to be provided,further integrating the development of the DCParea with its urban surrounds. Integration of therecreational path network with the transportnetwork is to be achieved through the preparationof precinct plans.

Important functions of the path network include:

Page 98: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

88 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(a) connecting the urban residential areas will be provided as park. An additional contributionwith local and major community will be provided in relationfacilities, and the major employmentareas of the town centre and the MIBA;

(b) providing opportunities for recreation innatural and landscaped settings; and

(c) connecting the DCP area with adjacentareas.

The path network is also intended to provide afocus for broad-scale community recreation,enhancing the quality of life for residents in theDCP area.

The landscape treatments of the open spacesystem are intended to recognise and enhance thedifferent roles and functions, locationalcharacteristics and natural qualities of openspace. Natural qualities will be maintainedthrough a practice of utilising native plants of localprovenance. Through a comprehensive approachto landscaping, the open space system shouldhave diversity and interest for a wider range ofusers while at the same time serving as amechanism for restoring the degraded naturalenvironment of the DCP area.

9.2.8 Landscape Plans

It is intended that an integrated andcomprehensive open space system will beprovided through the provisions of the approvedlandscape concept and design plans described insection 2 of this DCP. In preparing the landscapeconcept and design plans the development intentset out in the following section is to be met.

9.3 Development Intent

The creation of the open space system is to takeplace progressively with the subdivision anddevelopment of the DCP area. The contribution forthe open space system may consist of land andthe embellishment of that land in accordance withthe infrastructure agreement.

9.3.1 Extent of Open Space

Open space is to be provided in accordance withthe relevant infrastructure agreement. Principlesfor the provision of open space, including theamount and characteristics of land suitable fordedication as park, are contained in Section 12.6of this DCP. In principle, an equivalent of at least10% of the site comprising land and improvements

Page 99: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 89

to high density residential development. The extracontribution of park will be determined at theprecinct or sector plan stage in response to thenature and actual density of high densityresidential development proposed in accordancewith the Infrastructure Agreement.

Parks must be progressively provided assubdivision approvals are issued by Council. Forpractical reasons the principal developer andCouncil might agree to dedicate park ahead of thedevelopment program, subject to conditions. Inthe same manner park may not be transferred withevery development approval where not provided forin the relevant sector plan.

Generally and where practical park will bededicated in sequence with development approvalsor within a reasonable time of developmentapprovals. A balance sheet of park contributions,including land and park enhancementsinfrastructure, will be maintained by Council tomonitor progress of park contributions. Thebalance sheet will be updated in accordance withthe infrastructure agreements.

9.4 Design of Open Space

The development of the open space system isintended to reflect the characteristics set out inTable 9.1. Table 9.1 includes a general guide asto the characteristic of the various categories ofpark and open space while the infrastructureagreement will include details of such matters asthe items which will be allowed as parkenhancement works.

Page 100: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

90 Mango Hill Infrastructure Development Control PlanImplementation Provisions

OPEN SPACE CATEGORY CHARACTERISTICS

Environmental park (1) May be developed to retain its natural state and rehabilitated asappropriate to maintain water filtration functions, and protect itsenvironmental values and to provide for the retention of existingindigenous flora and fauna in accordance with the environmentalmanagement plan prepared in accordance with section 9.2.1 of theDCP.

(2) May be developed with low impact facilities such as paths,interpretive facilities, shelters and car parking in accordance withcarrying capacity.

(3) To provide environmental education value and to heighten publicawareness of why such areas are worthy of protection

Linear park (1) Makes up the largest portion of the open space system.

(2) A significant area of linear park lies below the Q2 floodline (ie.within waterway corridor.

(3) May be maintained in a natural condition or rehabilitated toreflect the natural condition of the bushland in the locality

(4) May include environmental management features such aswetlands and waterbodies where considered appropriate followingdetailed design.

(5) May include various forms of commercial recreation such as agolf course.

(6) Will be developed to replicate the natural landscape to the fullestextent possible while maintaining its recreational and engineeringfunctions.

(7) To be developed with a network of paths providing linkagesbetween residential areas and community facilities, town park.

(8) May be developed with shelters, play structures, gazebos andpark furniture.

(9) Playing fields, multipurpose courts, indoor facilities, amenities forcommunity use, car parking and terraced seating may also bedeveloped in certain locations in accordance with theinfrastructure agreement.

(10) Playing fields in linear parks will typically be 3-4 ha in area andcomprise of local playing fields, multi-purpose courts, indoorfacilities and other amenities.

Page 101: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

OPEN SPACE CATEGORY CHARACTERISTICS

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 91

Town Park (1) Adjacent to the town centre, more formal landscaping treatmentswill be adopted including formal arrangements of plazas, restparks and ornamental gardens. A recreational lake may also beincluded.

(2) May extend as a green spine or series of interconnected openspaces linking the town centre core with the linear park to thenorth.

(3) The formal areas are intended to provide recreation opportunitiesfor residents of the DCP area and other areas.

(4) The less formal areas adjacent to the town centre frame willinclude some playing fields, and possibly an amphitheatre foroutdoor performances.

(5) A jogging/walking circuit may be included preferably around theperimeter of any water feature.

Village parks (1) The form of village parks will vary according to their roles andfunctions but in most cases will provide the focal points forresidential villages. Village parks will provide gardens, picnicareas, half courts, other amenities. Village parks will serve acatchment of households within approximately 400m or 5 minutewalking distance

(2) The typical size of village parks will vary from to 0.5 -1.0 ha(larger village parks may be provided in certain circumstances).

(3) May be developed with park furniture, play structures, sheltersand seating.

Local parks (1) The form of local parks will be pocket parks scattered at regularintervals throughout the residential areas serving a catchment ofhouseholds within approximately 200m. Local parks will providechildren’s play areas, residential outlook, etc

(2) The minimum size of local parks will be approximately 0.2 ha.

(3) May be developed with limited play equipment

Page 102: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

OPEN SPACE CATEGORY CHARACTERISTICS

92 Mango Hill Infrastructure Development Control PlanImplementation Provisions

District and local playingfields (1) To be provided in a number of groupings in the northern and the

southern parts of the DCP area, linked with community facilitiessuch as schools.

(2) Will be developed to provide opportunities for active recreation forresidents and the wider regional community.

(3) Playing fields are to be either junior size or laid out in regulationsize and alignment, and may be supported with amenitiesbuildings, clubhouse facilities and car parking.

(4) May be developed with pavilions, seating, furniture, gazebos,fencing and pathways.

Buffers (1) Will generally be linear in form with the width and lengthdetermined by the specific purpose of the buffer.

(2) May provide a range of passive recreational activities includingfootpaths and bikeways and/or recreational trails.

(3) Commercial recreation uses which characteristically require largeareas of land, such as a golf course, may be established in thebuffer areas provided the purpose of the buffer is maintained.

Table 9.1 Open Space Characteristics

Page 103: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 93

9.5 Supplementary Table of Development - Open Space Element

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be premises may be erected premises may be premises may not beerected or used or used without the erected or used erected or usedwithout the consent consent of Council only with the (Prohibitedof Council (Permitted subject to conditions consent of Council Development)Development) (Permitted Development (PermissibleCOLUMN A subject to conditions) Development)

COLUMN B COLUMN C COLUMN D

Park Any one or more of the For land in a sector Accommodation unitsLocal utilities following purposes on any purpose not Adult product shop

land nominated for that listed in Column A, Air strippurpose or purposes on D or included in Amusement premises an approved sector plan. Column B but not Animal husbandry

Educational land in an approved Aquacultureestablishment sector plan Associated unitOccasional market (in Bulk garden suppliestown centre only) Car parkOutdoor recreation Car wash Public utilities Caravan parkRecycling depot Casino

Any purpose in this Commercial servicescolumn not nominated for Communication stationland by the sector plan Community dwellingbecomes for that land a Concrete batching plantpermissible development Contractor’s depot

nominated for that Apartments

CatteryCemetery

Convention centreCorrectional institutionCrematoriumDairyDetached house Display homeDomestic storage andrecreation structuresDuplex dwellingEntertainment libraryExtractive industry Family day care centre Fuel depotFuneral parlourGeneral industryHardware centreHazardous industryHeavy vehicle parkingHeavy vehicle salesHelicopter landing siteHome occupationHospitalHost farmHotelInstitutionJunk yardKennelsLicenced clubLot feeding

Page 104: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Purposes for which Purposes for which Purposes for which Purposes for whichpremises may be premises may be erected premises may be premises may not beerected or used or used without the erected or used erected or usedwithout the consent consent of Council only with the (Prohibitedof Council (Permitted subject to conditions consent of Council Development)Development) (Permitted Development (PermissibleCOLUMN A subject to conditions) Development)

COLUMN B COLUMN C COLUMN D

94 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Mini-BreweryMotelMotor sport or shootingOfficeOutdoor salesPassenger terminalPiggeryPlace of worshipPoultry farmRetail nurseryRetail showroomRetirement villageRural industryService industryService stationShopShopping centreSimulated conflictStableStock sales yardTechnology industryTownhouse units Transport terminalTransportable homevillageTurf farmingVehicle hire depotVehicle sales yardVeterinary clinicVeterinary hospitalWarehouse

The provisions of the Supplementary Table of Development are subject to section 2.4.9 of this DCP.

Page 105: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 95

10 TRANSPORT & CIRCULATION

10.1 Desired Environmental 10.2 Planning IntentOutcomes

10.1.1 General

To establish, through a comprehensive andintegrated approach to planning, an efficient,functional transport system within the DCP area,appropriately linked to the regional transportnetwork and the surrounding urban areas.

10.1.2 Specific

(a) To plan and appropriately integrate theDCP area progressively with theexisting and future regional and localtransport networks.

(b) To establish high levels of accessibilitywithin the DCP area through ahierarchy of major and local roadscatering for through traffic and localtraffic safely and efficiently.

(c) To keep through traffic off the localroad network in urban residentialareas.

(d) To establish a functionally efficientand safe network of vehicular, bicycleand pedestrian routes linkingdesignated activity nodes,employment centres and urbanresidential areas within the DCP areaand surrounding area.

(e) To integrate a public transport systemwith the internal road and recreationalpath network and activity nodes inorder to establish and maintain highlevels of mobility within the DCP area.

(f) To create an access system which isadaptable to future transportrequirements.

(g) To incorporate a high standard ofenvironmental protection in providing forthe transport needs within and externalto the DCP area.

10.2.1 Overall Intent

The Mango Hill development presents anopportunity, through the master planning process,to integrate the transport system for the DCP areawith the wider area. The development of the DCParea is intended to provide for a range oftransportation modes, including buses, motorvehicles, integration with rail services, pedestrianpaths, bikeways and possibly recreational bridletrails. The internal transport network, comprisingroads and paths, will extend these modes to thetown centre and the employment nodes of theDCP area, as well as establishing linkages withthe surrounding area and the region.

Integration with the regional transport network isdesirable in order to take advantage of thestrategic location and to implement thedevelopment intentions for the town centre andother elements within the DCP area, such as themajor employment centre and secondary andtertiary education facilities. Connections with theBruce Highway, Boundary Road, Anzac Avenueand the rail network are necessary to achieve thelevels of mobility and accessibility required. Thiswill include provision for a future north-southarterial road intended to relieve pressure fromtraffic movements on the Bruce Highway in themedium to long term. The north-south arterial andpossibly other major internal and bounding roadsmay need to be adaptable to future transportationrequirements, such as accommodating a possibleregional busway system.

The development of the transport network withinand external to the DCP area will be undertakenprogressively over a period of approximately 20years by the State Government, the Council andthe principal developer. Infrastructure agreementsbetween these parties are to determine the roles,responsibilities, cost-sharing arrangements andtiming for the provision of transport infrastructure.

It is intended that the principal developer inconjunction with the Department of Transport andCouncil prepare a Development Co-ordination Planfor public transport operating within the DCP areaand connecting to outside areas. ThisDevelopment Co-ordination Plan should include allforms of non-car based transport, including non-motorised transport such as major commuterpedestrian and cycle paths.

Page 106: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

96 Mango Hill Infrastructure Development Control PlanImplementation Provisions

10.2.2 External TransportNetwork Intent

The desired environmental outcomes sought interms of the external transport network are:

(a) integration with existing elements ofthe regional transport network;

(b) integration with future elements of theregional transport network;

(c) timely provision of an adequate rangeof transport services to the DCP area;and

(d) amelioration of any adverseenvironmental effects of increasingregional traffic volumes on externalelements of the transport network.

10.2.3 Internal TransportNetwork Intent

The internal transport network is to comprise acomprehensive hierarchy of roads, public transportroutes and pedestrian and bicycle paths providedprogressively and in step with the needs of thecommunity. An appropriate road hierarchy will beestablished in the urban residential areas tocontrol through traffic and to maximise residentialamenity and safety. It is intended that theinternal transport network provide a fully integratedcirculation system linking urban residential areaswith activity nodes such as open space, schoolsand other community facilities, employment nodesand the town centre.

It is intended that a community based publictransport service will be available to residents ofthe DCP area in the initial stages of development.

An important aspect of the transport networkwithin the DCP area is the landscaping of roadcorridors and the open space network throughwhich the path system will mostly pass. Theurban roads and streets of the DCP area areintended to be pleasant in their appearance, safe,and highly efficient in their function andperformance.

The desired environmental outcome sought interms of the internal transport network are:

(a) a high level of accessibility betweenthe urban residential areas and activityand employment nodes;

(b) a high level of safety and integrationwith all elements in the design anddevelopment of the network;

(c) pleasant landscaped bicycle,pedestrian and vehicular thoroughfaresthroughout the DCP area;

(d) reduced reliance upon the privatemotor vehicle for mobility andminimised adverse effects upon theenvironment in terms of physical andamenity impacts;

(e) segregation of local and non-localtraffic; and

(f) a high standard of safety and amenityachieved through road design ratherthan other traffic calming devices.

10.3 Development Intent

10.3.1 Public Transport

Extension of the public transport network into theDCP area is necessary to ensure the achievementof an acceptable level of service and amenity forresidents. Furthermore, public transport isnecessary to provide access to the high orderfacilities which provide services extending beyondthe DCP area. For example, the major shoppingcentre and the high order administrative,commercial, educational and entertainment andleisure facilities to be found in or adjacent to thetown centre will all require high quality publictransport services to achieve their functionalpotential.

Public transport is intended to include busservices within the DCP area, with linkages to theexternal network. The external public transportnetwork includes commuter bus services to othermetropolitan centres, and the commuter and inter-regional passenger rail services on the NorthCoast railway.

To facilitate connections with the public transportnetwork, it is intended that a public transporttransit centre be established within or adjacent tothe town centre core. This facility willaccommodate commuter and inter-regional busservices and taxi services. Desirably the transitcentre will be integrated with the major shopping

Page 107: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 97

centre, the transportation system links to theMIBA, urban residential areas and the widercommunity.

A community bus service will be provided to meetthe transport needs of residents in the initialstages of development until such time as thepublic bus services become operational in theDCP area.

The development of the road network is intended tomake appropriate provision for bus routes,including a requirement that the majority ofdwellings will be situated within 400 metres of abus route.

With the possible extension of a railway to theRedcliffe Peninsula, there may be a future need toplan for a rail corridor and station within the DCParea in the vicinity of the town centre. Furtherdetailed planning is required, in conjunction withQueensland Transport and Queensland Rail, todetermine the overall feasibility of this possible railline, as well as the location of the corridor andstation facilities to be provided.

At the time this DCP was formulated, the Councilcould not ascertain the likelihood and time framefor construction of the mooted Petrie to Kippa-Ringrailway line. Public transport planning in the DCParea retains an option for the extension of arailway from Petrie to Kippa-Ring together with arailway station until the State Governmentconcludes its feasibility studies. The structure planmakes provision for this possible rail connection tothe town centre on the understanding theTransport Department will undertake a detailed anddefinitive study to finally determine the publictransport requirements and programs for this partof the northern corridor. This is in keeping with therecommendations of the Integrated RegionalTransport Plan. The feasibility of this corridor andstation will be the subject of a State Governmentpublic transport study to commence in the1998/99 financial year. In the event the feasibilitystudy does not firmly endorse the Redcliffe railproposal, or some practical derivative of it, andlead to the adoption of an implementation programby 30 June 2000, then the provision for the railconnection to the town centre will no longer be arequirement of this DCP.

Desirably the possible railway station will be linkedwith, or in reasonable proximity to, the majorshopping centre within the town centre core.

10.3.2 External Roads

Bruce Highway

The Bruce Highway as part of the national highwaynetwork, provides the principal access route fromthe Brisbane metropolitan area to the northerngrowth corridor and the DCP area. Access to theBruce Highway from the DCP area is provided viaAnzac Avenue and Boundary Road. Regionalgrowth in traffic flows will require upgrading of thehighway, including interchanges, with developmentof the DCP area contributing to that growth.

Traffic flows on the Bruce Highway impact uponland along the western edge of the DCP areathrough exhaust emissions and noise. It isintended that building setbacks, configuration anddesign together with landscape requirementswithin development sites adjacent to the BruceHighway will mitigate these impacts. Furthermore,the structure plan designates the area fronting theBruce Highway for MIBA and town centredevelopment as a further means of buffering theimpact of the highway upon residentialdevelopment within the DCP area.

The three possible links indicated on the StructurePlan from the possible Bruce Highway service roadinto the town centre are subject to detailed studieswhich demonstrate normal safety and capacityrequirements to the satisfaction of the Departmentof Main Roads.

Anzac Avenue

Anzac Avenue provides the principal point ofaccess from the DCP area, and the town centre,to the regional road transport network. As with theBruce Highway, regional growth in traffic willrequire upgrading of Anzac Avenue and theinterchange with the Bruce Highway. Thedevelopment of the DCP area will contribute to theregional growth and the requirement for upgradeworks.

Contributions to upgrading works for AnzacAvenue are to be provided through the transportinfrastructure agreement between the StateGovernment, the Council and the principaldeveloper.

Traffic flows on Anzac Avenue impact upon landin the DCP area through exhaust emissions andnoise. However, the structure plan designates thearea adjacent to Anzac Avenue generally for non-residential land uses such as the town centreframe and community facilities as a means of

Page 108: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

98 Mango Hill Infrastructure Development Control PlanImplementation Provisions

buffering the impact of Anzac Avenue traffic upon These studies showed that Websterresidential development within the DCP area. Road/McGahey Street provided significant

Boundary Road and the DCP area.

The strategic plan indicates a possible future road It is Council’s intention that future planning withinlink connecting Boundary Road to Anzac Avenue the north-eastern part of the DCP area shall notin Rothwell basically along the line of a tributary of compromise the option of constructing a possibleSaltwater Creek at the northern extremity of the future local road connection from Rothwell acrossDCP area. The road link was included in the Saltwater Creek to link with the major roadstrategic plan at the request of Redcliffe City network depicted on DCP Map 3 provided thisCouncil which had expected higher population matter is determined, including cost andgrowth within its local authority area than has responsibility for the project, by approximatelyactually occurred over the past ten years. January 2003 in conjunction with the resolution of

Council, the Department of Main Roads and the Anzac Avenue at Rothwell.principal developer undertook traffic and transportstudies which, among other issues, investigated A possible future road connection betweenthe need for this road link. These studies involved Lipscombe Road and the DCP area road networkconsultation with Redcliffe City Council and is not supported or agreed to by Council on theCaboolture Shire Council. grounds that this connection is inconsistent with

Whilst the Department of Main Roads does not DCP area and will unduly impact on the intendedrequire this link to be preserved as a future State residential amenity and character of the DCP area.controlled road, it is Council’s intention that thismatter is determined by January 2003 in However, the provision of public transport, walkingconjunction with the resolution of the issue of and cycling facilities across the northern boundaryconstructing a possible future local road of the DCP, either on or in the vicinity ofconnection from Rothwell across Saltwater Creek, Lipscombe Road would be supported.to link with the major road network depicted onMap 3.

Possible Bruce Highway Overpass

A possible future Bruce Highway overpass may beconstructed generally in the vicinity of the commonboundary between the Dakabin Tip and privatelyowned land south of the Tip. Other alternativelocations in this general area include a possiblelocation at or near Kerr Road. This overpass will,if constructed, provide a new road connectionbetween the Dakabin/Kallangur district and theDCP area, as well as achieving an important publictransport link with the commuter railway station atDakabin. The overpass also connects with apossible future major road link (to Alma Road)identified in the North Pine Development ControlPlan.

Webster Road/McGahey Street andLipscombe Road Connections

The Departments of Transport and Main Roads,the principal developer and Pine Rivers Shire inconsultation with Caboolture Shire and RedcliffeCity Councils undertook traffic and transportstudies which, amongst other things, investigatedissues associated with possible road connectionsfrom McGahey Street/Webster Road andLipscombe Road.

transport benefits between Deception Bay Road

the need for a link connecting Boundary Road to

Council’s road hierarchy aspirations within the

10.3.3 Internal Roads

In developing a network of internal roads andstreets, the over-riding design principle adopted inthe master planning approach is to maximise thenumber of dwellings fronting low flow streets whileminimising the extent of non-frontage accessroads. The network of internal roads is intended toreflect a clear hierarchy comprising the followingelements:

(a) proposed north/south arterial road;

(b) major roads;

(c) local streets; and

(d) laneways.

Proposed North/South Arterial Road

The proposed north/south arterial designated onthe structure plan is intended to accommodate twolanes in each direction extending generally north-south through the DCP area. This road will caterfor high volumes of traffic as well as pedestriansand cyclists in separate carriageways andthoroughfares. It may also need to make provisionfor a possible separate busway. Direct

Page 109: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 99

access from development sites will not be provided local network will ensure that traffic speeds arefrom this road.

The south bound carriageway of the ultimate 4lane dual carriageway north/south arterial roadshall not be located closer than 20 m to the DCPboundary in the vicinity of the Mango Hill Village.A 20 m buffer is to be maintained along the DCPboundary adjoining Lots 1 and 2 RP 123625. This20 m buffer is to be landscaped, includingrevegetation, to Council’s satisfaction to provide aneffective visual screen and provide for themitigation of future traffic source effects on airquality and noise levels. Upon gazettal of thisDCP the principal developer is to prepare andsubmit for Council’s approval a landscape plan.Upon approval of this plan the principal developershall immediately undertake the works required bythe plan.

Noise attenuation devices which comply with Table11.1 regarding the mitigation of traffic noise effectsare to be provided when required and thelandscape plan is to have regard to the futurerequirement for such devices to minimise the needto remove established landscaping at a later date.

Major Roads

The notional major roads, also designated on thestructure plan, are intended to collect anddistribute traffic from the residential villages to thetown centre and the major employment nodes. The major roads generally adopt a modified gridpattern across the DCP area. Major roads willcarry traffic and local bus services on a singlecarriageway.

Local Streets

The arrangement of local streets within the overallroad pattern, including collector roads, accessstreets and access places is intended to generallyreflect a modified grid pattern. The final pattern oflocal streets, will be determined through detailedplanning at the sector plan level. A network ofcollector roads will extend throughout thecommunity to service the various developmentareas and to allow for local bus services. Localaccess streets and access places will thencomplete the street network to provide acomprehensive structural framework for the infillingof each of the residential villages.

Local streets are intended to accept circulatingtraffic and pedestrian traffic in safe conditions thatdiscourage through traffic. Careful design of this

maintained to safe, low levels to help create livableresidential streets.

Local streets will be constructed as singlecarriageway roads which permit on-street carparking, with street tree plantings in the grassverges.

Laneways

As part of the innovative approach to providing avariety of housing choices in the DCP area, thehierarchy of roads will include laneways. Thefunction of laneways will be to provide rear accessto some residential allotments.

Laneways are intended to be constructed with asingle carriageway of sufficient width to conveytwo-way traffic flows in most circumstances, allowa truck and a car to pass at very low speeds andaccommodate service vehicles for garbagecollection.

10.3.4 Path Network

Overall Approach

A key element of the transport and circulationstrategy for the DCP area is the provision of ahighly developed recreational path systemappropriately integrated with the road network,public transport service and the land use pattern ofopen space, activity nodes, for example,community facilities, schools, employmentcentres and urban residential areas. Therecreational path system is intended to cater forbicycle and pedestrian traffic so as to increasemobility, choice in mode of transport and reducethe reliance upon the private motor car as a meansof transport, especially within the DCP area.“Commuter” cycle routes are to be providedprimarily within road reserves. The design andlocation of these commuter cycle routes is tocomply with the Council's Bikeways Plan andintegrate with surrounding areas. “Recreational”and local bicycle traffic will generally beaccommodated on shared pedestrian/bicyclepaths within the open space network.

To achieve the objective of high levels of mobilitythroughout the DCP area, irrespective of its stageof development, it is intended to integrate pathslocated within road reserves with thoseconstructed within open space to progressivelyestablish the path system.

Page 110: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

100 Mango Hill Infrastructure Development Control PlanImplementation Provisions

For reasons of safety and utility, it is intended that necessary. The most logical locations would be inthe recreational path system make adequate the vicinity of Boundary Road, Anzac Avenue, andspace for pedestrians and cyclists where shared the proposed highway overpass.use is proposed, and in areas of high usage,separate paths for pedestrians and cyclists mayneed to be provided. Shared recreational paths,including pedestrian/bicycle paths, provided inareas of open space are to be designed inaccordance with the bikeways plan and located soas to maximise visibility, sight lines and publicscrutiny, and be developed with:

(a) adequate night lighting;

(b) safe horizontal and vertical gradients;

(c) safety rails and fencing where adjacentto waterbodies, steep cross-falls andat major road crossing points; and

(d) adequate drainage.

The potential for recreational trails, including bridlepaths, within the DCP area is to be investigated.While it is generally not appropriate to integratehorse riding with pedestrian and cycle networks itmay be possible to locate separate bridle pathsalong the edges of the DCP area, such as withinbuffer parks and along the perimeter of theenvironmental park adjacent to the Mango Hillvillage.

Town Centre Path System

An important element in achieving a high level ofaccessibility to and within the town centre will bethe extension of the community recreational pathsystem to and throughout the town centre.Pedestrians and cyclists must be able to movefreely and safely to and within the town centrewithout having to compete for space with vehiculartraffic. The town centre pathway system is likely tobe comprised of dedicated pathways, roadsidepaths, and public plazas and pedestrianised openspaces.

It is intended that safe and secure bicycle storagefacilities be provided adjacent to the majorshopping centre, community facilities and thetransit centre, as well as other major activity andemployment centres.

Connections Across Bruce Highway

To effectively link the DCP area with existing andfuture urban development west of the BruceHighway, a minimum of three access points are

10.4 Permeability

An underlying principle for the development of theDCP area is that of maximising the permeability ofthe urban area to a range of transport modes whilemaintaining a clear and legible hierarchy. Thisprinciple will be best implemented through thecomplete integration of the road network withpublic open space, the recreational path system,open spaces within road reserves and developmentsites.

A desirable planning outcome will entail anintegrated system of streets, paths and openspaces which permit the safe and easy movementof pedestrians and cyclists between activity areasand the residential villages. Preferably thissystem will be designed, constructed andlandscaped in a way which ensures a high level oflegibility to create a mix of formal and informalthoroughfares throughout the DCP area.

Page 111: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 101

11 ENVIRONMENTAL PROTECTION11.1 Desired Environmental

Outcomes

11.1.1 General

To establish a sustainable community thatbalances and integrates:

(a) protection of ecological processes andnatural systems;

(b) economic development; and

(c) maintenance of the cultural, economic,physical and social well being ofpeople and communities.

11.1.2 Specific

(a) To facilitate the building of asustainable community living andworking in a safe and pleasant urbanenvironment.

(b) To identify, protect and manageecological, cultural heritage resourcesor social attributes of local, regional,state or national significance within theDCP area and recognise the potentialimpacts of development upon similarattributes in adjacent areas.

(c) To adopt appropriate environmentalmanagement practices to avoid, ormitigate and manage the potentialadverse effects of development andenvironmental harm as required by theEnvironmental Protection Act 1994(EPA).

(d) To reduce resource and energyrequirements for the Mango Hilldevelopment through providingopportunities for walking and cyclingand the establishment of a viablepublic transport system, innovativebuilding designs, shared use of publicfacilities and spaces, and theextensive use of low maintenancelandscapes in open spaces.

(e) To recognise and mitigate adverseeffects such as noise, diminished air

quality, transmitted heat, light andglare from adjacent land uses,transport systems and other urban andrural activity in the planning, designand siting of development.

(f) To provide the means for theestablishment or enhancement ofhabitat areas and wildlife corridorsprimarily along the linear parks throughthe DCP area connecting with theregional open space network.

(g) To minimise the loss of remainingstands of native vegetation whenundertaking development whereverpracticable.

11.2 Planning Intent

This DCP recognises that the physical processesto achieve protection of the environment aregoverned by the provisions of the (EPA). Planningis intended to co-ordinate, integrate and managethe process by which development occurs andimpacts on the environment. In the planning of theDCP area it is necessary to consider andaccommodate the inter-relationships betweenland, water and climate. These variables and theway in which they combine, directly influence thecharacter of the natural environment within theDCP area and beyond in terms of drainagesystems, flora and fauna, energy cycles andlandscapes.

The existing state of the DCP area is far frompristine as it has been severely disturbed byprevious activities conducted upon the land,particularly the most recent forestry activities, theharvesting of that forest and the removal ofstumps. Forestry activities have left the DCP areadevoid of many of the natural elements of theenvironment which might typically be present inother undisturbed parts of the locality, althoughsome remnants of that environment have survived.

Development proposed for the DCP area must, ofnecessity, recognise the existing environment andseeking to achieve in an integrated mannerreduction of potentially adverse effects ofdevelopment on the existing environment while atthe same time seeking to achieve rehabilitationand restoration of areas disturbed by previous landusers. Development within and adjacent to the

Page 112: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

102 Mango Hill Infrastructure Development Control PlanImplementation Provisions

linear park, the environmental park and open space areas, is to be consistent with the planningobjectives of relevant state regulatory mechanismsestablished to protect Hays Inlet and SaltwaterCreek. These include the Marine Parks (MoretonBay) Zoning Plan 1997, the Moreton Bay StrategicPlan 1993, the Environmental Protection Act andthe Fisheries Act 1994. The rehabilitation of areaspreviously disturbed must consider in a sensitiveway the restoration of flora and fauna native to theDCP area.

The single ownership of the DCP area has theadvantage of allowing for integrated managementof the environment. This factor alone should beinstrumental in achieving a level of integratedenvironment protection superior to what might beachieved if the land were developed in a piecemealway by a series of separate owners.

The planning intent for the DCP area inenvironmental terms is to:

(a) protect waterways from the potentialimpact of more intensive land useactivities within the DCP area;

(b) prevent encroachment of developmentinto flood plains;

(c) provide opportunities for wildlifemovement through the DCP area;

(d) retain and rehabilitate areas of remnantvegetation;

(e) create buffers between areas ofincompatible land uses;

(f) preserve the environmentally sensitivearea in the north-east of the DCP area;and

(g) provide additional areas of open space.

Planning for land in the DCP area must, whererelevant, take into account the planning intentcontained in this section.

11.3 Development Intent

In order to achieve the desired environmentaloutcomes and intent of this section developmentmust seek to generally satisfy the performancecriteria for each issue listed in Table 11.1.

Page 113: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 103

Table 11.1 Environmental Performance Criteria

ISSUE PERFORMANCE CRITERIA DESIRED OUTCOMES

Water cycle C Attainment of acceptable C Surface water flows are to meet standardsmanagement surface water quality established by EPP (Water - Protection of

Aquatic Ecosystems) (sub 24 Iss 8.2 (e))

C For standing water in a constructed waterfeature, water quality suitable for theproposed use (eg contact quality, non-contact quality).

C Maintenance of flow C Stream flows downstream of DCP area areregimes at the pre- to meet the requirements of the Pine Riversdevelopment level Shire Council’s Design Manual.

Drainage corridors C Protection and C Retain remnant vegetation within openenhancement of space to the greatest extent practicable.vegetation cover along C Enhance and supplement with landscapingdrainage corridors to provide corridor opportunities.

C Maintenance of flow path C Adequate buffers to minimise vegetationstability loss and uncontrolled access to flow paths.

C Provide controlled access points to openspace in the vicinity of flow paths.

Receiving C Protection of Hays Inlet C Discharges to receiving environments are toenvironments and Saltwater Creek meet the requirements of EPP (Water) and

the Infrastructure Agreements.

Habitat protection C Retention of remnant C Retention of significant stands of remnantvegetation vegetation in areas of open space to the

greatest extent practicable.C Enhancement with supplementary plantings

of similar indigenous species.C Provision of protective buffers to formal

landscaped areas and to development.

C Establishment of potential C Supplementary plantings to formwildlife corridors continuous links of sufficient sustainable

width at all forest levels (eg understorey,mid-storey, canopy).

C Creation of networks of open space toaccommodate and buffer corridorvegetation.

Soil erosion and C Minimisation of soil C Mitigation works in drainage lines and forsedimentation erosion sheet flows on development sites.

C Progressive rehabilitation of constructionsites (planting, surfacing, drainage).

C Stabilise, rehabilitated surfaces soon afterconstruction.

C Implement appropriate soil erosionprotection measures.

Page 114: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

ISSUE PERFORMANCE CRITERIA DESIRED OUTCOMES

104 Mango Hill Infrastructure Development Control PlanImplementation Provisions

C Minimisation of C Minimal soil loss from construction sites.sedimentation C Provide appropriate gross pollutant traps.

Stormwater C Maintenance of C Drainage waters are to meet thedrainage acceptable water quality requirements of EPP (Water) and the

in drainage corridors Infrastructure Agreements.

C Accommodation of flood C Flows within overland flow paths are to beevents in drainage managed in accordance with the Pinecorridors Rivers Shire Council’s Design Manual.

Acoustic conditions C Mitigation of traffic noise C Effective noise mitigation measures whicheffects meet EPP standards for residential areas or

in accordance with Council's policy.C Landscaping of buffer areas where

appropriate.

C Mitigation of commercial C During construction, effective noiseand industrial noise mitigation measures which meet EPPeffects standards for residential areas.

C Segregation of incompatible land uses.C Landscaped buffers between commercial or

industrial sites and residential areas.C Post-construction, effective noise mitigation

measures which meet EPP standards forresidential areas.

Air quality C Mitigation of traffic C Landscaped buffers between major roadssources effects on air and residential areas.quality C EPP standards for residential areas.

C Mitigation of construction C Mitigation measures (dust suppression,works effects on air methods of operation).quality C EPP standards for residential areas.

Liquid and solid C Management and disposal C Comprehensive sewerage system adequatewaste management of liquid waste for the community’s needs.

C Extension of trade waste services to DCParea.

C Management and disposal C Municipal collection services.of solid waste C Convenient access to waste transfer

station. C Extension of trade waste services to DCP

area.

Page 115: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

ISSUE PERFORMANCE CRITERIA DESIRED OUTCOMES

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 105

Acid Sulfate So i l sC P r o t e c t i o n o f C Acid Sulfate Soils (ASS) investigationsenvironmental values are undertaken for all works below 5and attainment of metres AHD, in accordance withacceptable surface QASSIT draft “Sampling & Analysiswater quality of the procedure for Lowland ASS inreceiving environment. Queensland (not including engineering

& shrinkage tests)” 15 October 1997Revision 3.47 or later versions thereofas such become available.

C If ASS is identified, an ASSmanagement plan is developed prior toany works being undertaken. Themanagement plan describes themeasures to be taken to prevent orminimise, to the greatest extentpracticable, the threat of environmentalharm to the receiving environment.

C Water quality of receiving environmentsare to meet standards established bythe EPP (Water) 1997 and theAustralian Water Quality Guidelines forthe Protection of Aquatic Ecosystems.

Cultural Heritage C Sites, items and C Cultural heritage values within the areaplaces with cultural will be identified in a culturallyheritage value will be appropriate manner.identified andprotected

EPP = Environmental Protection PolicyASS = Acid Sulfate SoilsAHD = Australian Height DatumQASSIT = Queensland Acid Sulfate Soil Investigation Team

Page 116: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

106 Mango Hill Infrastructure Development Control PlanImplementation Provisions

12 INFRASTRUCTURE AGREEMENTS

12.1 Introduction

An essential element of the development of amaster planned community is the appropriate andtimely provision of infrastructure for:

(a) water supply and sewerage;(b) stormwater;(c) roads and transport;(d) open space; and(e) community facilities

12.2 General

In order to ensure the appropriate and timelyprovision of these items of infrastructure and,before development is approved under this DCP,the principal developer will enter into thenecessary infrastructure agreements with theCouncil and the relevant government or governmentagencies. This DCP will not commence to operateuntil legally binding agreements for the provision ofinfrastructure have been entered into. In the caseof the Department of Main Roads and QueenslandTransport, this DCP will not commence until aMemorandum of Understanding or Heads ofAgreement on the basic principles for the provisionof infrastructure have been legally entered into onthe understanding that legally binding and moredetailed agreements will be entered into at a laterstage.

Council will require any infrastructure agreementsto, among other things, satisfy the Basic Criteria -water and sewerage, stormwater, roadworks andtransport, community facilities and open space.

12.3 Water and Sewerage

The DCP area is presently not included in Councilheadworks area for the provision of water andsewerage and the principal developer will need tomake agreements with Council to bring forwardthese essential services.

Basic Criteria

(a) To ensure that existing and futureusers within Council’s existingheadworks area as depicted inCouncil’s headworks documents as ofMarch 1998 are not disadvantaged.

(b) To ensure that the strategy adopted forproviding water and sewerage services

for the DCP area will result in nofinancial disadvantage to Council.

(c) To ensure Council is immune from riskassociated with expenditure to beincurred by Council to match theprojected rate of development within theDCP area.

(d) The water and sewerage services to theDCP area will form part of the subregional scheme for the northern part ofthe Shire.

(e) The principal developer will beresponsible for the design andconstruction for parts of the systems toservice the DCP area in accordancewith a strategy approved from time totime by Council.

(f) The Council will require a headworkscontribution towards the provision ofwater and sewerage services asfollows:

Water

The principal developer will pay a waterheadworks charge of $1,993 perEquivalent Tenement (ET), which willbe varied on the same basis asheadwork charges for water are variedacross the Shire.

The principal developer shall pay a bulkwater supply adjustment charge of$460 per Equivalent Tenement (ET),this amount to be increased inaccordance with the percentageincrease for Indexation in 12.7.

(Equivalent Tenement means a demandequal to 1350 litres per day)

Note: The water headworks chargeconverts to a rate of $18,954 perhectare.

Sewerage

The principal developer will pay asewerage headworks charge of $731per Equivalent Person (EP) which willbe varied on the same basis asheadwork charges for sewerage arevaried across the Shire.

Page 117: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure
Page 118: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

108 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(Equivalent Person means a loading of the management of stormwater250 litres per day). drainage discharge in accordance with:

Note: The sewerage headworks charge (1) Council’s Local Laws and Designconverts to a rate of $22,928 per Manual and policies, excepthectare. where varied by a precinct or

(g) The principal developer will, from timeto time, be required to make a capital (2) Environment Protection Policycontribution for water supply headworks (Water); andto Council to ensure no financialdisadvantage to Council as a result of (3) Relevant Catchment Managementthe development. The method of Plans including the Saltwaterdetermining the capital contribution Creek Catchment Managementshall be specified in the Infrastructure Plan and Freshwater CreekAgreement. Catchment Management Plan.

The capital contribution is to be (c) The principal developer will not bereduced by: responsible for treating stormwater

(1) the amount of any water supply originates from outside the DCP area.headworks credit available to theprincipal developer at the time; (d) The entire stormwater managementand system will be maintained and proven

(2) the amount of the bulk supply at accepted design standard prior toadjustment charge already paid to the system being transferred tothe Council. Council.

(h) The definition of water and sewerage (e) The proposed strategy identified inheadworks contained in section 2 of Council Minute Pages 97/1313-21 forLocal Planning Policy LP 10 - Water management of stormwater drainage forand Sewerage Contributions applies. tributary C in the DCP area is to be

12.4 Stormwater

Land use planning needs to be cognisant of theimpact and treatment of stormwater generated bydevelopment. This DCP therefore recognises theimportance of managing stormwater discharges ina planning sense, however the management ofstormwater, including flows and quality ofstormwater, is governed by the provisions of theEnvironmental Protection Act 1994 and it is notnecessary for this DCP to make provision formatters governed by that Act.

Basic Criteria

(a) The provision of stormwater drainageinfrastructure for the DCP area will notcause a nuisance or annoyance to anyperson.

(b) Any strategy for stormwater drainageinfrastructure within the DCP area willbe approved by Council and will include

sector plan;

quality for stormwater run off which

to be operating to Council’s satisfaction

used as the model for management ofstormwater drainage in the DCP area.

(f) Following construction of thestormwater drainage infrastructure intributary C in accordance with themodel and after appropriate monitoringof stormwater quality, Council maymodify the target concentrationstandards for total Nitrogen, totalPhosphorous and suspended solids forfuture stormwater drainageinfrastructure.

In future strategies, the pre-development catchment characteristicsto be assumed will be:

(1) areas west of the Bruce Highway- existing conditions (open forest,grassland and urbandevelopment);

Page 119: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 109

(2) DCP area - open grassland andsemi-vegetated depressions.

(g) The principal developer will, at no cost network for the DCP area will result into Council, design and construct the no financial disadvantage to Council.stormwater drainage infrastructure toservice the DCP area in accordance (d) The principal developer will bewith the strategy approved from time to responsible for designing andtime by Council. constructing at no cost to Council the

(h) The principal developer will prepare for accordance with Council approvals andCouncil approval a Stormwater in particular will design and constructManagement Plan for each major sub at no cost to Council the roadscatchment in the DCP area complying depicted on Map. 4 in accordance within particular with the requirements of Council’s Design Manual current at thesection 4.5.0 of Volume 1 of the Design time of commencement of engineeringManual. design for the relevant section of road.

(i) If, after the principal developer has (e) Should Council adopt a roadexercised its best endeavours, development contribution scheme forincluding the exercise of its statutory the Shire at some future time, nothingrights, to acquire downstream drainage in this DCP or the infrastructurerights Council recognises it has a agreements shall be construed tostatutory discretion it may exercise to exempt the DCP area from theacquire land or interests in land. operation of the scheme. Such a

(j) The principal developer may, from time credit system whereby works by anyto time, be required to make a capital developer are credited against thecontribution for implementing mitigation developer’s contribution required underof stormwater quality and quantity. The the scheme.Catchment Management Plan willdetermine the capital contribution and Relevant works by the principalthe method of payment shall be developer pursuant to an infrastructurespecified in the Infrastructure agreement shall be given properAgreement. recognition and credit (if considered

appropriate by Council) in accordance

12.5 Roads and Transport

Access to the DCP area is from roads under thecontrol of both the State and Council.Development will necessitate the provision of anappropriate road network within the DCP areawhich must take into account not only trafficgenerated by the development but make provisionfor the integration within that network of regionallygenerated traffic. The impact on the existing roadnetwork external to the DCP area must also beassessed.

Basic Criteria

(a) To provide an effective and efficient roadnetwork in the DCP area to Council’s Open space provision is an important andsatisfaction. desirable feature of the Mango Hill development

(b) To provide adequate road and a wide range of open space areas to cater for therecreational path network connections varying needs of the community. In addition,to land outside the area. environmentally sensitive areas should be set

(c) To ensure construction of the road enhancement. The broad nature of the open

road network in the DCP area in

scheme shall, in principle, include a

with the terms of the scheme.

(f) The principal developer must satisfy theMain Roads Department requirementsin regard to the State road networkwithin the DCP area and adjacent to orin the vicinity of the DCP area.

(g) The principal developer must satisfy theTransport Department requirements inregard to the public transport networkwithin the DCP area and adjacent to orin the vicinity of the DCP area.

12.6 Open Space

and must recognise Council standards and provide

aside for preservation, restoration and

Page 120: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

110 Mango Hill Infrastructure Development Control PlanImplementation Provisions

space system is contained in Section 9.

Unless the framework of land use set out in thisDCP intensifies, a park contribution which satisfiesthe Basic Criteria will be sufficient parkcontribution for the DCP area.

Basic Criteria

(a) 10% of the DCP area will be transferredto the Crown as park except as may beotherwise provided herein.

(b) The area of park in (a) can be reducedby an agreed value of works whichenhance the recreational value of thepark.

(c) The monetary value of any agreedworks will be determined in accordancewith Council’s Policy LP22.

(d) Council, having regard to the integratednature of the development of the DCParea and its overall scale, is preparedto accept from the principal developerworks which may reduce the landcontribution to approximately 8%.

(e) Agreed works are limited to certainforms of park enhancement works. Thegeneral categories of agreed works willbe stated in the infrastructureagreement. The works and values willbe determined as the relevant times forpark contributions arise. Whereagreement cannot be reached, thedecision by Council will be final andbinding.

(f) The area of the town centre lake abovethe pre-development Q20 lines will beaccepted as park.

(g) The following land will not be acceptedas park:

(1) land below the post developmentQ20 flood line;

(2) the area of any water bodiesoutside the town centre wheretheir primary function is tomanage water quality and controlstormwater;

(3) the area of any school playingfield or any playing field being

Page 121: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 111

relied upon to provide the school's progressively required by the community asrequirements for active recreation; development occurs. Some services will need to

(4) land required for the attenuation of from the start of any major ‘new front’ oftransportation noise under development. Other components may beCouncil's policies; developed incrementally.

(5) land required for stormwater Basic Criteriadrainage purposes;

(6) land which contains an easement appropriate range of communityfor power lines, stormwater facilities and services to meet thedrainage purposes or any other changing needs of a growingpurpose which may impact on the population.suitability of the land for use aspark and open space. (b) Community facilities and services will

(h) In total, the area of the open space step with the needs of residents. Theysystem (comprising 8% park, and will be integrated into the DCP area inadditional public and private open a sensitive manner responding tospace), will be approximately 190ha or surrounding land uses, takingabout 18% of the DCP area. opportunities for co-location and

12.7 Community Facilities

A development of the size proposed must makeproper allowance for provision of communityfacilities such as a library, a community recreationand leisure centre, community centres andprovision for community services which will be

be provided from the start of the development or

(a) To ensure the timely provision of an

be provided in convenient locations in

sharing of resources and having a highlevel of accessibility.

(c) Major community facilities will beprovided to serve the residents and thework force of the DCP area as well asthe wider community.

(d) Infrastructure Arrangements as required alternative proposals from the principalbetween State Government Agencies developer regarding the constructionand the principal developer will and operation of the facility.determine the type and level ofcommunity facilities to be provided by Community CentreState Government Agencies.

(e) The principal developer shall be transfer to the Council by 1stresponsible for the following June 2003, at no cost to theobligations: Council, 5,000m² of land in the

Community Recreation and Leisure Facility satisfactory to the Council.

The principal developer will, no later (2) The principal developer will, withinthan 1st September 2001, transfer at twelve (12) months of Councilno cost to the Council, a 2 ha site sealing the plan which includeswithin the town centre frame area, in a the 1,760th residential lot in thelocation satisfactory to the Council. DCP area, be responsible for the

Council, in its absolute discretion, may to in (1) of building works forbuild and operate a community community purposes up to arecreation and leisure facility on the value of $500,000.00.land and the principal developer willcontribute $3.8 million towards the (3) Until such time as the communityfacility as Council’s obligations for centre referred to in (2) isprogress payments relating to the completed, the principal developerconstruction arise. will provide for community use

Council will be prepared to consider

(1) The principal developer will

town centre frame in a location

construction on the land referred

Page 122: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

112 Mango Hill Infrastructure Development Control PlanImplementation Provisions

purposes on terms satisfactory to urban residential area in athe Council no less than 150m² of location satisfactory to thesuitable space in an agreed Council for the purpose of a locallocation which could be in its community centre.Sales and Information Centre.

Local Community Centre No. 1 twelve months of Council sealing

(1) The principal developer will, at no 7,160th residential lot in the DCPcost to the Council, transfer by lst area, be responsible for theJune 2007, 2,000m² of land in the construction on the land referredurban residential area in a to in (1) of building works to thelocation satisfactory to the value of $200,000 for localCouncil for the purpose of a local community purposes.community centre.

(2) The principal developer will, within Contributiontwelve months of Council sealingthe plan which includes the The principal developer will,4,460th residential lot in the DCP commencing on lst July 2000 and eacharea, be responsible for the year thereafter until 1st July, 2014,construction on the land referred contribute to the Council the sum ofto in (1) of building works to the $30,000 to be used by Council in thevalue of $200,000 for local manner agreed from time to time withcommunity purposes. the principal developer for community

Local Community Centre No. 2 contribution shall be paid annually no

(1) The principal developer will, at no the last payment to be made by 1stcost to the Council, transfer by lst July, 2014.June 2011, 2,000m² of land in the

(2) The principal developer will, within

the plan which includes the

Community Services and Facilities

services and facilities. This

later than the lst July each year with

Library

Provided Council has opened for use apermanent library in the town centrecore or town centre frame on or beforethe sealing of the plan which includesthe 7,160th residential lot, the principaldeveloper will pay to the Council anamount equal to eighty percent (80%)of the value of the library at the time ofthe sealing of the plan which includesthe 7,160th residential lot. Theprincipal developer’s contribution willnot exceed $800,000.

Indexation

The monetary amounts referred to in (e)will be increased in accordance withthe percentage increase in the PriceIndex for materials used in building,other than house building (All GroupsIndex for Brisbane) ABS Publication6407 from the date of the gazettal ofthis DCP.

Page 123: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 113

13 MISCELLANEOUS PROVISIONS

13.1 Existing and InterimUses

13.1.1 Existing Uses

In accordance with the provisions of the PEA, theexisting lawful use of the DCP area for agriculture,animal husbandry and park purposes maycontinue.

13.1.2 Interim Uses

Given the large size of the DCP area and the longtime frame (approximately 20 years) to completethe ultimate development of the DCP area it isdesirable to provide for the establishment ofappropriate interim uses. Interim uses are not thefinal development form and will be superseded byfinal development approved in accordance with theprocess established in section 2 of this DCP.

This provision is not intended to circumvent thestandard development approval processescontained in section 2 of this DCP but rather toprovide for the establishment of certain forms ofinterim development which are appropriatelylocated, designed, constructed and operated priorto the land being developed for its final use.

Interim development may be for purposesassociated with the management, maintenance ordevelopment of the DCP area or other temporarypurposes which can be readily established andsuperseded without significant impact orinvestment in non-reusable resources.

13.1.2.1 Management and DevelopmentInterim Uses

Despite any other provision of this DCP theprincipal developer may make application to theCouncil to use land or erect or use a building forthe purpose of maintenance, planningrehabilitation, construction or management of theDCP area including any of the purposes listedbelow in the manner specified for codeassessment development applications under IPA

(a) any part of the DCP area whether ornot a precinct or sector plan has beenapproved may be used for any of thefollowing purposes :

(1) agriculture (not being an existinguse);

(2) animal husbandry (not being anexisting use);

(3) contractor's depot (associatedwith the development of the DCParea);

(4) earthworks including creation ofwater bodies (where contained inan area the subject of anapproved precinct plan);

(5) excavation of material for use inconstruction within the DCP area;

(6) park and landscaping (wherecontained in an area the subjectof an approved precinct plan);

(7) local utilities;

(8) plant nursery (for plants used inthe development of the DCParea);

(9) public utilities;

(10) storage of construction materialsand equipment for use in thedevelopment of the DCP area;and

(11) turf farming (for turf used in thedevelopment of the DCP area);

(b) any part of the DCP area for which nosector plan has been approved andwhich is not within 500 metres of theDCP boundary (other than where theboundary abuts Boundary Road or theBruce Highway) or land included in asector plan and on which developmenthas commenced may be used for anyof the following purposes:

(1) concrete batching plant (forconstruction purposes in theDCP area);

Page 124: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

114 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(2) hazardous industry (storage ofdangerous goods for construction Mango Hill village is a relatively small communitypurposes in the DCP area); which lies immediately to the east of the DCP

(3) helicopter landing site; Mango Hill village because of its rural character,

(4) rural industry. traffic and generally more relaxed and safer

The principal developer may make application inthe manner specified for development permits Planning for the DCP area has taken these values,requiring impact assessment for any of the above aspirations and lifestyle choices into account inuses listed in (b) 1-4 above over land within 500m several ways:of the DCP boundary (other than where theboundary abuts Boundary Road or the Bruce (a) the creation of a landscaped openHighway) or a sector plan boundary containing space network located mainly alongland on which development has commenced. existing creeks and drainage paths

13.1.2.2 Other Interim Uses opportunities of existing Mango Hill

Despite any other provision of this DCP the provide a soft non-urban edge to theprincipal developer may make application in the DCP area;manner specified for development permits requiringimpact assessment to use land or erect or use a (b) the creation of a pedestrian andbuilding in any part of the DCP area for which no bicycle path system within the opensector plan has been approved and which is not space network, and on roads wherewithin 500 metres of land included in a sector plan necessary, extending from the DCPand on which development has commenced for the area to Mango Hill village;interim purposes listed below:

(a) bulk garden supplies; range of modern facilities and services(b) camping grounds; without any change to the semi-rural,(c) occasional market; low intensity character of Mango Hill(d) outdoor recreation; village;(e) retail nursery;(f) riding school; (d) the location of the activities of highest(g) showground; intensity in the DCP area on sites(h) tourist facility; remote from Mango Hill village;(i) turf farming;(j) any other interim purpose which is (e) retention of sensitive environments

considered appropriate by Council within and adjacent to the DCP area,

13.1.2.3 Conditions of Approval Mango Hill village and adjoining areas,

Council may impose reasonable or relevant around Mango Hill village;conditions on its approval of an interim use underthis clause including but not limited to a limitation (f) incorporation of a number ofon the period of the use, access, service provision, environmental safeguards, for example,environmental protection, residential amenity, in relation to water cycle managementfencing, car parking and rehabilitation. which will ameliorate potentially

Despite any limitation on the period of use and Hays Inlet ecosystems; andimposed by Council the use must cease withinthirty (30) days of the approval by Council of a (g) consideration of the need to providesector plan which includes the land for which an possible recreational trails for horseinterim use has been approved or which relates to riding in close proximity to the Mangoland within 500 metres of land used for a purpose Hill village.listed in sub-section 13.1.2.1(b) above.

13.2 Mango Hill Village

area. The residents have generally settled in

relatively isolated location, absence of through

lifestyle than in suburban communities.

which will increase the recreation

village residents substantially and

(c) improved access to a much broader

including Portion 388 to the north of

to create an environmental buffer

adverse impacts on Saltwater Creek

Page 125: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 115

These initiatives, when taken as part of the overall it is appropriate for car parking needsmaster planning approach to integrated to be assessed at the beginning of thedevelopment in the DCP area, will address the development of each sector or at leastprincipal concerns of residents as expressed each proposed development site;during consultations with them.

The principal developer and the Council will by a traffic engineer whoseestablish a consultation protocol for consulting qualifications and experience arewith the residents of Mango Hill village. acceptable to Council taking into

The consultation protocol should provide for various circumstances as appropriate:forms of consultation including the provision ofgeneral information about the progress, design and (1) the level of provision of, and thetiming of the development and interactive need to encourage the use of,consultation in regard to matters which may public transport facilities;directly affect the Mango Hill village such as thedesign of a sector adjacent to the village. (2) the likelihood of a generation of

13.3 Car Parking

If for land in a sector it is intended to modify thecar parking requirements of the planning scheme,then vehicle parking spaces must be provided foreach development in that sector in accordancewith the principles, guidelines and planningrequirements as follows:

(a) the integrated and overall planning ofthe development of the DCP area(which is possible due to the scale ofthe proposed development) means carparking can be provided in an overallorderly and planned basis which willprovide adequate car parking spaceswithin easy walking distance of eachdevelopment and avoid a proliferation ofunsightly car parking areas and ageneral wastage of land;

(b) the Council presently has requirementsfor car parking set out in Division 2Part 7 of the planning scheme and theDesign Manual, Book 1, Volume 1Road and Drainage Design GuidelineNo.4;

(c) the car parking space requirements inthe planning scheme were calculatedon the basis of stand-alonedevelopments of relatively small sizeand the tables represent only indicativelevels of car parking which are notnecessarily appropriate to thedevelopment of the DCP area becauseof the scale, complexity, mass andrelationship of the developmentsproposed;

(d) it is not possible to be specific aboutcar parking at the date of this DCP so

(e) this assessment must be carried out

account some or all of the following

greater or less than normal peakparking demand, includingrequirements for staff;

(3) the location of the sector or sitein relation to existing or proposedpublic car parking areas andother parking areas;

(4) the level of pedestrian/cycleaccessibility;

(5) the nature of the proposed use,including hours of operation,anticipated intensity and itsintegration with otherdevelopment;

(6) avoidance of proliferation ofunsightly car parks;

(7) avoidance of over-provision of carparking spaces;

(8) the amount of off-site parkingspaces including kerbsideparking space; and

(9) other relevant and reasonablefactors;

(f) the assessment must be given toCouncil with the sector plan and mustbe considered by Council indetermining the number of parkingspaces to be provided for developmentproposed in that sector;

(g) the Council, when approving a sectorplan, may either adopt the assessmentprovided by the traffic engineer ordetermine the level of car parkingprovision to be made.

Page 126: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

116 Mango Hill Infrastructure Development Control PlanImplementation Provisions

13.4 Definitions

13.4.1 Introduction

(a) Interpretation

The definitions are arranged in two groups. The first group, section 13.4.2, contains administrative definitionsand the second group, 13.4.3, contains purpose definitions.

Unless the context otherwise indicates or requires the terms in each group have the meaning respectivelyassigned to them. Where any term used in this DCP is not defined in this DCP but is defined in the LocalGovernment (Planning and Environment) Act, Integrated Planning Act or a Council local law, the term has, forthe purposes of this DCP and unless the context otherwise indicates or requires, the meaning assigned to itby the relevant Act or local law.

Any question as to whether a use is contained within a definition, or a class of uses, is to be determined bythe Council.

(b) Use of Limiting Criteria to More Specifically Define Particular Uses in Sector Plans

A use may be limited in extent by a sector plan by including in parentheses elements of the use, area of use,type of goods or services or hours of operation and in that event the meaning of the purpose is to be read downso as to be limited to the elements, area, type of goods or services or hours of operation stated in parentheses.

(c) Notwithstanding anything to the contrary in this DCP, no development shall be undertaken which,in the opinion of the Council would -

(1) by its design, orientation or construction materials, have or be likely to have a detrimentaleffect on the amenity of the area or adjoining development, or place undue restriction on thefuture development of land in the vicinity;

(2) cause or be likely to cause interference with the amenity of the area from the operation ofmachinery or electrical equipment, or from light, noise, shadow, vibration, smell, fumes,smoke, vapour, steam, soot, ash, grit, oil, dust, waste water, waste products, electricalinterference or otherwise.

13.4.2 Administrative Definitions

Ancillary Incidental to, subordinate to, and necessarily associated with. The term refers onlyto activities conducted on the same site.

Appointed day The day upon which the Order in Council notifying that the Governor in Council hasapproved this DCP is published in the Gazette, or where the context otherwiseindicates or requires, the day upon which any amendment is effective.

Building Any fixed structure which is wholly or in part enclosed by walls and which is roofed.The term includes any part of a building.

Building line Has the meaning assigned to it by the Building Act 1975.

Caravan Any motor vehicle or trailer designed or adapted for human habitation. The termincludes any annexe to a motor vehicle or trailer but does not include a transportablehome.

Page 127: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 117

Page 128: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

118 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Council The Council of the Shire of Pine Rivers.

Curtilage The area of land appurtenant to a building or other structure.

Developer A person or entity who proceeds with the development of all or part of the land within theDCP area in accordance with a development approval granted by the Council.

DCP The Mango Hill Infrastructure Development Control Plan and any plan made underit.

DCP Area The area shown on DCP Map 1.

Development The use of any land or the erection or use of any building or other structure, or thecarrying out of building, mining or engineering operations in, on or under land, or themaking of material change to the use of any premises.

Dwelling unit Any building or part of a building which comprises self-contained accommodation forthe exclusive use of a single family. The term includes outbuildings and recreationfacilities for the exclusive use of that family.

Erect Includes:

(a) erect or commence or continue to erect;

(b) do, or commence or continue to do, any work in the course of or for thepurpose of erecting; or

(c) perform any structural work or make any alteration, addition or rebuilding; or

(d) move from one position on a site to another position on the same site; or

(e) re-erect with or without alteration on or partly on the same site; or

(f) where a building is located on more than one allotment or lot -

(1) move to another position on the same site;

(2) re-erect with or without alteration on another position on the samesite;

and erection is to be likewise construed.

Family Any one person maintaining a household, or two or more persons living together andmaintaining a common household such that each person has access to all parts ofthe dwelling unit occupied by the household.

Gross floor area The sum of the areas (inclusive of all walls, columns and covered balconies) of all(GFA) storeys of a building or buildings as measured at the perimeter of the building

excluding any areas of the building used exclusively for car parking.

Gross Lettable Area The sum of the areas (exclusive of all walls and columns) of all storeys of a (GLA) building used as a shopping centre, including major tenant areas and specialty

shops, provided that the term does not include cinemas, common mall areas andother public areas, car parking and loading dock areas, plant rooms, equipmentrooms and public amenities such as toilets and change rooms.

Page 129: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 119

Heavy vehicle Means any of the following:

(a) any motor vehicle or trailer designed or adapted for the carriage of goods witha carrying capacity in excess of two tonnes;

(b) any motor vehicle equipped with a lifting or loading device capable of beingused for the towing of a motor vehicle, and so used or intended to be soused;

(c) any articulated vehicle;

(d) any prime mover, being a motor vehicle especially designed for hauling atrailer with a carrying capacity greater than two tonnes;

(e) any motor vehicle or trailer designed or adapted for earthmoving or roadmaking, including vehicles designed or adapted for excavating materials, theterm includes rollers, compressors and other equipment designed or adaptedto be drawn behind a vehicle;

(f) any motor vehicle or trailer designed or adapted for agricultural purposes,including the clearing of land. The term includes ploughs and otherequipment designed or adapted to be drawn behind a vehicle;

(g) any vessel whose length exceeds 9 metres;

(h) any crane;

(i) any omnibus (having a seating capacity in excess of 20 people); and

(j) any tracked vehicle or other tracked machine; whether or not the vehicle,vessel or equipment is in operating condition and complete.

Industry Includes:

(a) any of the following operations -

(1) any manufacturing process whether or not the process results in theproduction of a finished article;

(2) the breaking up or dismantling of goods or any articles for trade, saleor gain, or ancillary to any business;

(3) the extraction of sand, gravel, clay, turf, soil, rock, ore, stone, orsimilar substances from land including any treatment or processingof such substances;

(4) altering, repairing, servicing, ornamenting, finishing, cleaning,washing, freezing, canning, or adapting for sale of articles includingvehicles, machinery, buildings or other structures;

(5) any operation connected with the installation of equipment andservices and the extermination of pests but not including on-sitework on buildings or other structures or land;

(6) the dismantling of motor vehicles, whether the dismantling is carriedout by one operation or by a series of operations; and

Page 130: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

120 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(7) the carrying on of scientific research when carried on in the coursesof a trade or business;

(b) When conducted on land upon which any of the above operations are carriedon -

(1) the storage of articles used in connection with or resulting from anyof the above operations;

(2) the provision of amenities for persons engaged in such operations;

(3) the sale or display of goods, resulting from such operations; and anywork of administration or accounting in connection with suchoperations provided that the use does not exceed twenty percent ofthe total use area of any building or buildings so used;

(c) Without limiting the generality of the foregoing, any industry or class ofindustry particularly defined in this DCP, but does not include a homeoccupation.

Landscaping The treatment of land for the purpose of enhancing or protecting the amenity of a siteand the locality in which it is situated. Works may include any of the following:

(a) screening by fences, walls or other structures;

(b) planting of trees, hedges, shrubs or grass;

(c) formation of banks, terraces or other earthworks;

(d) laying out of gardens, courts or footways;

(e) construction of boardwalks;

(f) pathways and bikeways;

(g) irrigation and lighting; and

(h) other amenity features.

Land use and Elements designated on the structure plan depicting indicative land use structural elements categories and physical infrastructure.

Local government Premises used in the course of carrying out any function of Local Government. purposes

Local law A local law of the Council in force for the time being.

Lot Means a separate, distinct parcel of land created on registration of a plan ofsubdivision or the recording in the land registry of an instrument as that term isdefined in the Land Titles Act 1994.

Management lot A lot on a plan of subdivision not intended for final development or sale for finaldevelopment and identified as such by the principal developer when lodging a sectorplan or a plan of subdivision for approval with the Council. The term includes but isnot limited to a lot:

(a) intended for future road reserve;

(b) for later transfer to the Crown or the Council;

Page 131: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 121

(c) shown on a plan of a type accepted by the Registrar of Titles for registrationfor lease purposes only;

(d) to define a balance area; and(e) intended for further subdivision (other than a Community Titles Scheme).

Owner Mango Hill Development Pty Ltd (ACN 068 244 762) or its successors in title.

Planning scheme The town planning scheme for the Shire of Pine Rivers.

Plot ratio The ratio between the gross floor area of a building and the total area of the site onwhich the development is, or is proposed to be carried out.

Precinct plan A plan prepared in accordance with Section 2 of this DCP.

Premises Any site, building or structure or part of the site, building or structure.

Principal developer A reference in this DCP to the principal developer is a reference to the owner so faras the reference is about the preparation and gazettal of this DCP. Insofar as thereference is about development after the appointed day, the principal developermeans the developer or developers nominated by the owner presently being LendLease Development Projects (Mango Hill) Pty Ltd and Lensworth Pine Rivers PtyLtd. Rights granted to the principal developer are in favour of the owner and thenominated developers. A reference to the principal developer includes a referenceto the successors and assigns of the parties referred to in this paragraph.

Sale The term includes display, hire, exchange or offer to sell.

Sector plan A plan prepared in accordance with Section 2 of this DCP.

Shire The Shire of Pine Rivers as constituted at the appointed day.

Site Any land which is used as premises and which comprises the whole or part of oneor more contiguous lots.

Site coverage That portion of a site covered by a building, fixed structure, or outdoor storage area,but not including unroofed parking areas.

Storey That space within a building which is situated between one floor level and the floorlevel next above, or if there is no floor above, the ceiling or roof above.

Strategic plan The strategic plan in the planning scheme.

Structure Any wall, fence or unroofed building or anything affixed to or projecting from any wall,fence or unroofed building. The term includes any part of a structure.

Structure plan DCP Map No. 3

Total use area The sum of the areas (exclusive of all walls and columns) of all storeys of a buildingwhich is used or intended for use for a particular purpose plus any other area of asite which is also used or intended for use for the same purpose, provided that theterm does not include:

(a) the areas (inclusive of all walls and columns) of any liftwells, lift motor rooms,air conditioning, and associated mechanical or electrical plant and equipmentrooms;

(b) the areas of any staircase;

Page 132: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

122 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(c) the areas of any common foyer where not being used for commercial or retailpurposes;

(d) the area of any public toilets;(e) the areas of any staff toilets, washrooms, recreation areas and lunchrooms

provided that these areas are not open to persons other than staff; and

(f) the area used for the access, parking and associating manoeuvring of motorvehicles.

Transportable home A building that complies in all respects with the Building Act 1975 for a Class I or ClassIII building, factory assembled or built in components and assembled on site, capable ofbeing transported readily by trailer or other vehicle, for which building approval has beengranted on an approved site. Buildings may be fitted with wheels at the point ofmanufacture but not for the purpose of road transport. The wheels may be retained on thebuilding after location on site.

Use The term includes:

(a) in relation to land, the carrying out of excavation work in or under land andthe placing on land of any material or thing that is not a building or structure;and

(b) any use which is ancillary to the lawful use of the premises in question; and

(c) an intended use of premises.

Zones The divisions respectively into which the planning scheme area is divided by theplanning scheme for its purposes.

Zoning maps The planning scheme maps designating the division of the planning scheme areainto zones.

Page 133: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 123

13.4.3 Purpose Definitions

Accommodation units Any premises used as a boarding house, guest house, hostel, unlicensed hotel,unlicensed residential club, serviced apartment, serviced room and any other formof residential accommodation not being dwelling units. This term does not includea hotel, motel or community dwelling.

Adult product shop Any premises used for the sale or distribution of any article, device, publication, film,audiotape, videotape or any other information storage system which is concernedwith or intended to be used in connection with sexual behaviour and which in theopinion of Council, is objectionable.

The term does not include premises where the sale of those goods is ancillary to alawful use.

Agriculture Any premises used for the commercial growing, harvesting and storage of crops,pastures, flowers, fruit, vegetables, plants or trees other than in association with adetached house.

Air strip Any premises used for the arrival or departure of aircraft. The term includes anyfacilities provided on the site for:

(a) the housing, servicing, maintenance, or repair of aircraft; or

(b) the assembly of passengers or goods prior or subsequent to theirtransportation by air.

The term does not include a helicopter landing site or public utilities.

Amusement premises Any premises which contain six or more amusement machines for the enjoymentof the public, other than on premises used for hotel, indoor recreation, or outdoorrecreation.

Animal husbandry Any premises used for the breeding, care, feeding, keeping, or pasturing of anyanimal for business or commercial purposes. The term includes the keeping ofbees, but does not include a cattery, dairy, kennels, lot feeding, piggery or poultryfarm.

Apartments Premises consisting of more than two dwelling units for use by separate familieswhether or not the use is combined with other uses on the site. The term includes,where carried out on the same site, the conduct of a trade, business or profession,not being a home occupation, which:

(a) only employs persons resident on the site;

(b) does not involve display of articles likely to be seen from beyond the site;

(c) has only one sign no greater than 0.3m ;2

(d) the gross floor area so used does not exceed 30m ;2

(e) does not involve the parking or storage on or in the vicinity of the site of anyheavy vehicle or more than one vehicle which is not a heavy vehicle; and

(f) does not, in the opinion of the Council, detrimentally affect the amenity of thelocality due to factors including but not limited to noise, dust, vibration,lighting, fumes, odours, appearance, traffic generation and/or hours ofoperation.

The term does not include townhouse units or duplex dwellings.

Page 134: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

124 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Aquaculture Any premises used for the breeding or keeping of any fish or crustacean whether insalt or fresh water business or commercial purposes. The term does not include ashop.

Associated unit Any premises integrated with a detached house and which:

(a) are used or intended for use as a dwelling unit; and

(b) do not exceed 60m in gross floor area.2

Bulk garden supplies Any premises used for the sale or distribution of sand, soil, screenings, garden andlandscaping materials where material is received on the site in quantities greaterthan one cubic metre. The term does not include a retail nursery, a hardware centre,or an extractive industry.

Bulky Goods Centre A collection of retail showrooms selling predominantly household goods from onepurpose built location with integrated shared parking and access arrangements anda gross leasable area of 10,000m² or greater.

Camping grounds Any premises used for temporary accommodation primarily in tents. The termincludes the land together with any amenity building which is used in conjunctionwith the land. The term does not include a caravan park.

Car park Any premises used for the temporary parking of motor vehicles where the parkingis not ancillary to a purpose elsewhere defined in this DCP. The term does notinclude heavy vehicle parking or a vehicle hire depot.

Car wash Any premises used for the mechanical washing of motor vehicles.

Caravan park Any premises used to park caravans for the purpose of providing accommodation forthe public. The term includes the erection and use within the caravan park of akiosk and/or amenity buildings for the exclusive use of occupants of the caravanpark. The term also includes the erection of cabins and the pitching of tents toprovide overnight and short term holiday accommodation within the caravan park.The maximum number of cabins will be determined by Council. The term does notinclude a motel or a transportable home village.

Caretaker’s residence Any dwelling unit used for accommodation of a caretaker and family in connectionwith an industry or other non-residential use.

Casino Any premises used for the purpose of gambling and where the use is conducted inaccordance with the provisions of any Act concerning casino premises. The termdoes not include an indoor recreation, licenced club or hotel.

Catering premises Any premises with seating for less than 40 people used for the preparation of mealsfor sale to the public whether or not other refreshments are also sold. The term doesnot include an indoor recreation, licenced club or hotel.

Cattery Any premises used for the boarding, breeding or keeping of more than three (3) cats.

Cemetery Any premises used for the interment of the deceased. The term includes agraveyard, a burial ground, columbarium, funeral chapel or parlour erected on theland and used in connection with it. The term does not include a crematorium.

Child care centre Any premises used for the minding or care, but not accommodation, of children forfee or reward. The term includes a kindergarten, day care centre or creche. Theterm does not include a family day care centre, an educational establishment, or a

Page 135: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 125

special use, or the care of a child where a parent of the child is engaged in anactivity on the site.

Commercial services Any premises used for any of the purposes included in but not limited to Table 13.1,being a process carried on in the course of a trade or business, where not a homeoccupation.

The term includes the sale of any articles resulting from the use.

Page 136: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

126 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Barber shopComputer servicesCostume hireDocument copyingDomestic appliance hireDressmakingDry cleaning or dyeingEngravingHairdressingLaundering including a coin-operated laundryThe making of -

Bread, cakes, and/or pastryClothingConfectioneryCurtainsDental goodsJewelleryKeysLeather goodsMedical and therapeutic equipment (not involving poisons or hazardous materials)MillineryNovelty goodsOptical goodsTrophies, Pennants, Badges and the likeVinyl goods

Photographic film developing and printingPlan printingPrintingThe repair or servicing of -

CamerasClocks and watchesClothingComputer equipmentElectrical goodsFootwearFurnitureJewelleryLocksMusical instrumentsOffice machinesPedal cyclesPrecision or scientific instrumentsSewing machinesSporting goodsToys

Sale of second-hand goodsThe small-scale specialist wholesaling of

-Foods and drinks-Carpet and floor coverings-Paper products-Textiles and clothing-Health products

Screen printingTailoringUpholstering furniture.

Page 137: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 127

Communication station Any premises used for the transmission of signals unless the transmission isancillary to some other use of the premises. The term does not include publicutilities.

Community dwelling Any residential premises used by a group of persons not being a family, but maintaininga household by a common discipline where one or more members of the group retains thepower and dominion over the whole of the premises occupied by the group.

Community premises Any premises used for any of the following purposes:

(a) the delivery of community and welfare services whether or not those servicesare a function of a government program;

(b) the holding of meetings by social or other groups;

(c) community-based cultural or recreational activities;

(d) libraries, but not entertainment libraries; or

(e) any other community-based activity.

The term does not include educational establishment, indoor recreation or outdoorrecreation.

Concrete batching plant Any premises used for mixing concrete for use elsewhere. The term does notinclude the manufacture, storage and sale of precast concrete products on the sitenor the storage and sale of sand and gravel not required for the purpose.

Contractor's depot Any premises used for the purpose of storage of goods, including vehicles andequipment, pending their use elsewhere as part of a trade or contracting businessincluded in but not limited to Table 13.2. The term includes the servicing of theequipment or vehicles, and the carrying out of preparation work incidental to theconduct of business. The term does not include a home occupation, local utilities,or office.

Page 138: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

128 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Table 13.2

ConcretingDomestic cleaning serviceDrainage work and sewerageEarthmovingElectrical workFencingFurniture removalGardeningHouse-building or installation of fittingsHouse removalsInstallation and maintenance of air conditioningLandscapingLawnmowingLaying of bricks, tiles, paving or carpetsMilk deliveryOffice cleaning servicesPaintingPaperhangingPest controlPlasteringPlumbingRoad buildingRubbish removalSwimming pool constructionTree lopping and felling.

Convention centre Premises used in a co-ordinational and integrated manner as a place for:

(a) the assembly of people with a common object;

(b) trade fairs, exhibitions and concerts whether or not they include some formof entertainment; or

(c) including but not limited to:- conferences;- dances;- functions;- receptions;

together with ancillary facilities as may be required from time to time for the health,comfort and enjoyment of patrons. The term includes premises licensed under theLiquor Act 1992 when conducted in conjunction with the use. The term does notinclude a place of worship.

Correctional institution Any premises used for the reform, incarceration or training of persons committed bya court.

Crematorium Any premises used for the reduction of the human body to ashes after deathtogether with any columbarium, funeral chapel, or funeral parlour erected on the landand used in connection with it. The term does not include a cemetery.

Page 139: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 129

Cultural facility Any premises used for the purpose of a museum, theatre, concert hall or art gallery.The term does not include a special use.

Dairy Any premises used primarily for milking animals.

Detached house Any premises consisting of one dwelling on a single allotment used for theaccommodation of a single family. The term includes where carried out on the samesite:

(a) the keeping of animals for the enjoyment of the occupants other than asdefined in this DCP;

(b) the growing of crops, fruit, vegetables or other plants for sale, domestic useor enjoyment where:

(1) the area of land so used does not exceed 200m²;

(2) the gross floor area of any associated building or structure does notexceed 50m²;

(3) has only one sign no greater than 0.3m ;2

(4) no produce is publicly displayed;

(5) only employs persons resident on the site;

(6) the carrying out of the activity does not involve powered machinery orotherwise prejudice the amenity of the locality.

(c) the conduct of a trade, business or profession, not being a home occupation,which:

(1) only employs persons resident on the site;

(2) does not involve display of articles likely to be seen from beyond thesite;

(3) has only one sign no greater than 0.3m ;2

(4) the gross floor area so used does not exceed 30m ;2

(5) does not involve the parking or storage on or in the vicinity of the siteof any heavy vehicle or more than one vehicle which is not a heavyvehicle;

(6) does not in the opinion of the Council detrimentally affect the amenityof the locality due to factors including but not limited to noise, dust,vibration, lighting, fumes, odours, appearance, traffic generation and/orhours of operation.

Display home Any premises used to display a type of dwelling unit or accommodation unit to thepublic to show the type of construction or design offered by the builder. The termincludes ancillary car parking and the making of a sale arising from an inspection.The term does not include an estate sales office, a sales and information centre oroffice.

Page 140: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

130 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Domestic storage and Any premises having an aggregate floor area greater than 9m used for non-2

recreation structures habitable purposes either in association with, but not forming part of a detachedhouse or for the maintenance of vacant land.

The term does not include shade houses, gazebos, pergolas and patios.

Duplex dwelling Any premises consisting of two dwelling units within one building used foraccommodation by families. The term includes where carried out on the same site:

(a) the keeping of animals for the enjoyment of the occupants other than asdefined in this DCP;

(b) the growing of crops, fruit, vegetables or other plants for sale, domestic useor enjoyment where:

(1) the area of land so used does not exceed 200m²;

(2) the gross floor area of any associated building or structure does notexceed 50m²;

(3) has only one sign no greater than 0.3m ;2

(4) no produce is publicly displayed;

(5) only employs persons resident on the site;

(6) the carrying out of the activity does not involve powered machinery orotherwise prejudice the amenity of the locality.

(c) the conduct of a trade, business or profession, not being a home occupation,which:

(1) only employs persons resident on the site;

(2) does not involve display of articles likely to be seen from beyond thesite;

(3) has only one sign no greater than 0.3 m²

(4) the gross floor area so used does not exceed thirty (30) squaremetres;

(5) does not involve the parking or storage on or in the vicinity of the siteof any heavy vehicle or more than one vehicle which is not a heavyvehicle;

(6) does not in the opinion of the Council detrimentally affect the amenityof the locality due to factors including but not limited to noise, dust,vibration, lighting, fumes, odours, appearance, traffic generation and/orhours of operation.

Educational Any premises used for the purpose of a school, college, university, technicalinstitute, academy, pre school or educational centre. The term includes theresidential accommodation of staff and students and the provision of recreational andother support facilities. The term does not include a child care centre or institution.

Page 141: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 131

Entertainment library Any premises used for the display, storage and hire of video and electronicentertainment materials and equipment. The term includes the occasional andancillary sale of second-hand materials and equipment used previously on thepremises, and the ancillary sale of confectionery and other light refreshments.

Page 142: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

132 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Estate sales office Any premises including a caravan, erected on land subdivided and released as oneestate and used or intended for use for the purpose of promoting and selling that andonly. The term does not include a display home, or an office as herein defined.

Extractive industry Any premises used for extraction of sand, gravel, soil, rock, stone or similarsubstances from land. The term includes ancillary storage, loading or cartage, andany crushing, screening, washing or other treatment processes, or manufacture ofproducts from the material extracted. The term does not include a mine as definedin "The Mineral Resources Act 1989" turf farm or bulk earth works associated withapproved development of land.

Family day care centre Premises used for the home-based daily reception, minding or care of children in adetached house or dwelling unit in a duplex dwelling registered under the provisionsof a relevant government programme. The term does not include a “child carecentre”, “community dwelling” or “institution”.

Fuel depot Premises used for the bulk storage of petroleum products or other flammable fuelsfor wholesale distribution. The term does not include hazardous industry or aservice station.

Funeral parlour Any premises used by an undertaker for the storage or preparation of bodies forburial or cremation. The term includes a mortuary and a funeral chapel.

General industry Any premises used for industry not otherwise defined in this DCP.

Hardware centre Premises exceeding 300m total use area, used for the sale of domestic:2

(a) hardware;

(b) gardening equipment and materials;

(c) electrical and plumbing fittings and materials;

(d) light building materials; and

(e) small machinery and appliances.

The term does not include a retail showroom.

Hazardous industry Any premises used for the conduct of any noxious, hazardous or offensive industry orstorage activity which:

(a) is noxious or offensive because of the gaseous, liquid or solid discharges orwastes produced by the manufacturing or processing of materials, or becauseof the nature of the materials handled;

(b) is dangerous because of the nature of the materials manufactured, processedor stored;

(c) is hazardous because the materials manufactured, processed or storedrequire a licence pursuant to the Flammable and Combustible LiquidsRegulations when not conducted in conjunction with any other use;

(d) involves handling, treatment, storage or disposal of radio-active material; or

(e) has the potential for adverse environmental impacts on or unacceptablehazards or risks to other properties.

Heavy vehicle parking Any premises used for the storage or parking of heavy vehicles in association witha detached house.

Page 143: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 133

Heavy vehicle sales Any premises used for the sale of heavy vehicles, and where conducted inconjunction with the use it includes:

(a) the sale of tools, spare parts, and accessories; and

(b) servicing, cleaning, customising, panel beating and spray painting.

Helicopter landing site Any premises used as an aerodrome for the landing and taking off of helicopters.

Home occupation The use of a detached house or dwelling unit for any business, profession or tradeby one or more persons residing permanently in the detached house provided:

(a) the area used for the purposes does not exceed one-third of the gross floorarea of the detached house;

(b) merchandise is not displayed;

(c) has only one sign no greater than 0.3m ;2

(d) the amenity of the locality is not diminished as a consequence of the use;

(e) traffic flows generated by the use are not excessive in the street; and

(f) not more than one employee not residing on the premises is engaged in theuse, unless otherwise provided for on an approved sector plan.

The term includes:

(a) one tennis court available for hire whether or not floodlit; and

(b) the giving of lessons in swimming or a sporting activity.

Hospital Any premises used for the care, treatment, surgery and accommodation of thesick, injured and infirm. The term includes accommodation for staff, a home forinfirm, incurable or convalescent persons, a nursing home, a sanatorium, or adispensary and includes buildings and other structures associated with those uses,but does not include an institution.

Host farm Any residential premises used as short-term tourist accommodation in conjunctionwith animal husbandry, agriculture or dairy purposes. The term does not includeaccommodation units, apartments, community dwelling, hotel, motel or townhouses.

Hotel Any premises licensed under the Liquor Act 1992 whether or not accommodationis provided and includes drive through sales, bulk liquor sales up to 1,000m floor2

area, dining, entertainment and gambling facilities. The term includes associatedfacilities and structures not the subject of the licence. The term does not includea shop selling liquor.

Indoor recreation Any premises used primarily for live, recorded, sports-based, static or technology-based entertainment purposes where such entertainment is provided principallyindoors. The term includes activities such as auditoria, gymnasia, indoor sportshalls, interactive and technology-based entertainment, theatres, cinemas,unlicensed clubs and the like, and the sale of associated merchandise and lightrefreshments. The term does not include amusement premises.

Institution Any premises not elsewhere defined used for the care of people with disabilities orwho are poor or disadvantaged. The term does not include a hospital, or aretirement village.

Page 144: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

134 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Junk yard Any premises used for the collection, storage, dismantling, salvaging, or sale ofgoods or materials which are scrap or have been discarded or abandoned. The termdoes not include a recycling depot.

Kennels Any premises used for the keeping, boarding, breeding or training of more than two(2) dogs.

Licenced club Any premises used for a purpose specified in a club licence of one of the prescribedtypes under the Liquor Act 1992. The term includes the ancillary provision of musicand band facilities or gambling machines, reception facilities and the preparation,supply and consumption of food to persons attending the licenced club. The termdoes not include the residential use of the premises or a hotel.

Local utilities Any premises used in the course of a public utility undertaking for the supply ofwater or electricity, or the provision of telephone, sewerage or drainage serviceswhere these activities do not involve:

(a) the use of electricity power lines, transformers or switching stations operatingat or in excess of 60 000 volts; or

(b) the use of any building or other structure having a gross floor area greaterthan 50m or a height greater than five metres.2

Lot feeding Any premises used for feeding stock in stalls, compounds or stock yards, as distinctfrom range feeding. The term does not include a piggery.

Mini brewery Any premises used for brewing and selling alcoholic liquor where the total use areaof the brewing facilities does not exceed 200m or where the volume of alcoholic2

liquor produced does not exceed 300,000 litres per day.

Motel Any premises used for overnight accommodation of travellers and the vehicles usedby them. The term includes the provision of meals and ancillary entertainmentprincipally for the enjoyment of guests accommodated in the premises.

Motor sport or shooting Any premises used for driving or racing motor vehicles including models ordischarging firearms.

Occasional market Any premises used for the sale of goods, light refreshments, prepared food, andproduce from temporary stalls on weekends and public holidays unless otherwiseapproved by Council. The term also includes the ancillary provision of entertainmentwhether indoors or not, for the enjoyment of patrons of the market.

Office Any premises used for the provision of professional services, or advice, for thecarrying on of administrative work whether or not in the course of a business.

Without limiting the generality of the foregoing, the term includes any of thefollowing:

(a) the consulting rooms of any professional person including medicalpractitioners, dentists, and paramedical practitioners,

(b) a local surgery and an incidental dispensary;

(c) a photographic studio, an artist's studio, but not a dance studio;

(d) a bank or other financial institution;

(e) a betting shop;

(f) a post office;

Page 145: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 135

(g) a real estate agent's office;

(h) administrative functions of Commonwealth, State, Local or semi GovernmentDepartments, statutory authorities or Government owned corporations.

The term includes ancillary storage of articles where:

(a) except for vehicles other than heavy vehicles, all the articles are stored fullyenclosed within a building;

(b) the total area used for storage of heavy vehicles, and storage of articles otherthan vehicles, is less than one-third of the gross floor area; and

(c) the total number of vehicles stored on the site does not exceed three per 100square metres of gross floor area.

The term does not include use for administrative purposes of premises which useis ancillary to another use of that site, a veterinary clinic, veterinary hospital, orhome occupation.

Outdoor recreation Any premises used primarily for viewing or participating in entertainment, structuredrecreation, or sports principally conducted outdoors, together with any buildings,grandstands and other structures necessary for the comfort, enjoyment and healthof patrons and participants. The term includes a riding school and the sale ofassociated merchandise and light refreshments. The term does not includeconvention centre, indoor recreation, motor sport or shooting ,or simulated conflict.

Outdoor sales Any premises used for the purpose of sale of goods wholly or partly outdoors nototherwise defined in this DCP.

Park Any premises not elsewhere defined in this DCP to which the public has rights ofaccess, which:

(a) has been ornamentally laid out or prepared;

(b) is maintained so as to preserve or enhance its natural qualities, including thequality of its flora, fauna and geological or physiographical features;

(c) has been prepared or is maintained as a grassed area either with or withouttrees or shrubbery; or

(d) has been prepared or is maintained other than according to (a) or (c), but insuch a way as to be in the opinion of the Council suitable for informal open-airrecreation;

and which is used for open-air recreation.

The term includes any of the following facilities, provided for the enjoyment orconvenience of the public at those premises:-

(a) kiosks for the supply of light refreshments to patrons of the premises;

(b) band stands;

(c) outdoor amphitheatre;

(d) picnic places, places for enjoying views, routes for nature study, car parkingareas, cycleways, footways and bridle paths;

(e) information and display areas for the promotion of such land;

Page 146: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

136 Mango Hill Infrastructure Development Control PlanImplementation Provisions

(f) shelters and other public conveniences;

(g) children's play areas;

(h) structures, surfaces, or equipment for informal sport or physical exercise;

(i) sculptures, fountains, ponds, waterbodies, or other decorative devices;

and also includes the occasional use of the premises for fairs, exhibitions andsimilar activities where that use is approved by Council.

In this definition, the term "open air recreation" includes, among other things, theorganised sporting activities of an educational establishment and any form ofathletics where the activity is not organised or controlled by any club ororganisation, nor as a business undertaking, nor for fee or reward.

Passenger terminal Any premises used for the assembly and dispersal of passengers prior to orsubsequent to their transportation irrespective of the mode of transport.

Piggery Any premises used for the keeping, depasturing, feeding, watering or breeding ofpigs.

Place of worship Any premises used primarily for the public religious activity of a religiousorganisation, community or association. The term includes the ancillary use of partof the premises for a columbarium. The term does not include an educationalestablishment or institution.

Poultry farm Any premises used for the keeping of poultry where the number of birds keptexceeds six (6).

Public utilities Any premises used for major facilities relating to the provision of services such aswater supply, electricity, gas, telephone, sewerage, drainage, waste and refusedisposal or transmission of signals. The term does not include local utilities orcommunication station.

Re-cycling depot Any premises used for the purpose of storage pending collection for re-cycling ofany of the following:-

(a) articles made of glass, including bottles;

(b) articles made of metal;

(c) articles made of synthetic material;

(d) rags and clothes;

(e) paper and cardboard;

where the total area used for those purposes, not including areas reserved forparking, loading and unloading, is less than 25 square metres.

Restaurant Any premises with seating for more than 40 people used for the preparation of meals forsale to the public whether or not other refreshments are also sold. The term does notinclude indoor recreation or hotel.

Retail nursery Any premises used for the sale of plants. The term includes where carried out onthe same site:

Page 147: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 137

(a) the propagation of plants for sale, from the premises or elsewhere; and/or

(b) the sale of landscaping and gardening supplies, provided the area so useddoes not exceed the total area used for the propagation of plants for sale;

where the area used for the display or storage of articles for sale is not fullyenclosed within a building.

Retail showroom Any premises in excess of 300m total use area used for the display and sale of2

large or bulky goods, large stocks of similar goods or related goods excluding foodand groceries except fruit and vegetables .

The term does not include entertainment library, shop or shopping centre.

Retirement village Any premises used as permanent residential accommodation for persons aged fiftyyears or over and which consists of a grouping of self-contained dwelling units and/orserviced hostel units and/or nursing home accommodation together with ancillaryfacilities provided for use by residents or staff of the community and which mayinclude staff accommodation, chapel, medical consulting rooms, meeting rooms,recreational facilities, therapy rooms, and kiosk facilities.

Rural industry Any premises used for the purpose of:

(a) a blacksmith;

(b) boring contractors;

(c) fencing contractors; or

(d) light engineering fabrication for farming needs;

and which is in the opinion of the Council consistent with rural pursuits.

Sales and information Any premises used by the principal developer for the purpose of planning, centre constructing, managing, displaying of information about and marketing the DCP

area. The term includes the use of part of the premises for a shop and communityuse purposes.

Service industry Any premises used to conduct an industry included in but not limited to:

(a) Table 13.1, which does not conform with the provisions of the definition ofcommercial services;

(b) Table 13.3 where:-

(1) the use of the premises does not detrimentally affect the existing orprospective amenity of the area; and

(2) the activity is carried out in the course of a trade or business.

Page 148: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

138 Mango Hill Infrastructure Development Control PlanImplementation Provisions

Table 13.3

Cabinet making or shopfittingCutting and finishing glassEngraving, not being commercial services as defined hereinFibre-glass repairsFrench polishingOutdoor Storage of -

Building supplies, hardware, fence posts, fence palings, plumbingsupplies, sawn timber, new (unused) tyres, boats, caravans,trailers and other goods which Council may approve from time totime, and where the storage area exceeds 50m in area.2

Picture framingRepairing, servicing or modifying -

BoatsFurnitureGas appliancesMotor mowersMotor vehiclesOutboard motorsTrailersSaw sharpeningSign writingSelf storage facility.

The term does not include bulk garden supplies, car depot, car park, hardwarecentre, heavy vehicle parking, heavy vehicle sales, home occupation, service stationor vehicle sales yard.

Service station Premises used for the fuelling of motor vehicles involving the sale by retail of petrolor automotive distillate or any other fuel capable of use in internal combustionengines whether or not the premises are also used for one or more of the followingpurposes:-

(a) The sale by retail of

- lubricating oils and greases;

- batteries and tyres;

- accessories and other products associated with motor vehicles;

- power and lighting kerosene;

- mower fuel; and

- goods for the comfort and convenience of travellers by motor vehicleincluding food and beverages;

(b) The carrying out of -

- the fitting, removal, and exchange of tyres;

- the repairing of tubes;

- the supply of air;

Page 149: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 139

- the charging or replacement of batteries;

- the lubrication and greasing of motor vehicles;

- the cleaning, adjustment and replacement of spark plugs;

- the adjustment, cleaning or replacement of filters or carburettors or fuelinjection systems;

- the reception and return of tyres deposited for repair on otherpremises;

- running repairs of a minor nature and of a type which do not normallyimmobilise a vehicle for a period longer than four hours;

- the hiring of trailers not exceeding one tonne capacity. The number oftrailers for hire on site must be limited to five (5); and

- the hiring of motor vehicles. The number of vehicles for hire on sitemust be limited to three (3).

(c) The rendering of minor services incidental to any of the above.

The term does not include an industry, or a shop.

Shop Any separate area of occupation, not elsewhere defined in this DCP used for thesale of articles, including food, by retail.

Shopping centre Any premises which -

(a) function as an integrated unit;

(b) are used principally for retailing;

(c) contain one or more buildings-

(1) having a total floor area of not less than 300m² GLA;

(2) erected-

(i) at the one time as one complete entity or in stages where eachsucceeding stage forms one complete entity with any earlierstage or stages; and

(ii) to a coordinated layout; and

(3) comprising separate areas of occupation-

(i) which may be used for purposes such as:

- shop;- office;- commercial services;- indoor recreation;- restaurant;- catering premises;- amusement premises;

Page 150: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

140 Mango Hill Infrastructure Development Control PlanImplementation Provisions

- entertainment library;- community premises and

(ii) where a majority of those separate areas of occupation are usedfor shop purposes; and

(d) contain at least one shop of the kind normally described as a supermarket(with a minimum floor area of 1000m²), discount department store or adepartment store, or a similar major anchor tenant.

The term does not include retail nursery or retail showroom.

Showground Any premises used for the exhibition of primary produce, trade and manufacturedmerchandise on an annual basis. The term includes forms of entertainment andamusement during the time of the exhibition.

The term does not include outdoor recreation, indoor recreation, motor sport orshooting, or a place of worship.

Simulated conflict Any activity, whether for fee or reward or otherwise, conducted outdoors which isbased on simulated warfare or criminal action, armed combat, or similar or relatedactivities in which a mechanical or electronic device is used to register contact withan person by means of a paint pellet or electronic or light sensitive beam or otherremote energy source.

The term does not include the sport of fencing, indoor recreation or amusementpremises.

Special use Any premises used for Commonwealth, State, Local Government, semi-government, statutory authority or Government owned corporation purposes, exceptfor a child care centre, dwelling units, educational establishment, hospital,institution, local utilities, office, community premises or public utilities.

Stable Any structure not elsewhere defined used for the stabling, boarding or breeding ofanimal/s; the terms includes a roofed or partly roofed yard, training track orveterinary facilities associated therewith. The term does not include animalhusbandry, kennels, cattery, lot feeding, aquaculture, piggery, any structure for thekeeping of birds, insects, fish or crustaceans, reptiles or bees or stables associatedwith a riding school.

Stock sales yard Any premises used for the purpose of offering animals for sale.

Technology Any premises used for any of the following: industry

(a) the research and development of medical and scientific technologies;

(b) the development of, and any support services related to, computer softwareand other technology-based services or equipment;

(c) the manufacture, storage and distribution of goods and materials forcommunications, electronic and other technology-based or specialisedcomponents or parts;

(d) the assembly, packaging, storage and distribution of technology-basedequipment and machinery of a small and specialised nature;

provided that the use will not:

Page 151: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

Mango Hill Infrastructure Development Control Plan

Implementation Provisions 141

(a) impose adverse environmental impacts on or present unacceptable hazardsor risks to other properties;

(b) cause the intense emission of noise, light, heat, gases, waste material orhazardous, noxious or offensive by-products of any kind;

(c) involve the manufacture, processing, handling or storage of hazardous,noxious or offensive materials;

(d) generate high traffic flows, or high flows of heavy vehicles, in the context ofthe locality or the road network;

(e) cause an increased demand for services such as treated water, sewage andsolid waste disposal, electricity, roads, stormwater drainage and the like.

The term does not include any other industry.

Tourist facility Any premises used primarily for the purpose of providing recreation, entertainmentor attractions for the general touring public. The term includes accommodation oreating facilities for tourists as an ancillary use.

Townhouse units Any premises consisting of more than two (2) dwelling units for use by separatehouseholds where at least one habitable room in each dwelling unit and a privatecourt yard directly accessible to each dwelling unit is situated at ground level. Theterm includes, where carried out on the same site, the conduct of a trade, businessor profession, not being a home occupation, which:

(a) only employs persons resident on the site;

(b) does not involve display of articles likely to be seen from beyond the site;

(c) has only one sign no greater than 0.3m ;2

(d) the gross floor area so used does not exceed 30m ;2

(e) does not involve the parking or storage on or in the vicinity of the site of anyheavy vehicle or more than one vehicle which is not a heavy vehicle;

(f) does not in the opinion of the Council detrimentally affect the amenity of thelocality due to factors including but not limited to noise, dust, vibration,lighting, fumes, odours, appearance, traffic generation and/or hours ofoperation.

Transportable Any premises used for the parking or location of two or more transportable homeshome village for the purpose of providing residential accommodation. The term includes ancillary

amenities buildings, a kiosk and recreational facilities for the use of patrons of thetransportable home village. The term does not include a caravan park or motel.

Transport terminal Any premises used for the purpose of an airline goods terminal, bus depot, roadtransport goods terminal, rail goods terminal, or a terminal for water-borne goods.The term does not include a passenger terminal, but includes a repository fortemporary storage of goods before re-shipment, and includes a terminal used solelyfor the garaging and basic maintenance of fleet vehicles engaged in the transport ofgoods.

Turf farming Any premises used for the growing, harvesting and removal of turf. The termincludes ancillary buildings, structures and uses necessary for and usually

Page 152: Mango Hill Infrastructure - Moreton Bay Regional Council · 2.4.3 Approval of Sector Plan Prior to Development ... 3 Mango Hill Development Strategy ... Mango Hill Infrastructure

142 Mango Hill Infrastructure Development Control PlanImplementation Provisions

incidental to the operation of a turf farm. The term does not include agriculture orretail nursery.

Vehicle hire depot Any premises used for the hire, storage or parking of vehicles other than heavyvehicles. The term includes the servicing of those vehicles and any administrativework carried out in connection with the activity but does not include an office.

Vehicle sales yard Any premises used for the sale of vehicles (other than heavy vehicles), or vesselsless than nine metres in length and where conducted in conjunction with the useand includes the sale of tools, spare parts, and accessories, and cleaning,customising, panel beating and spray painting.

Veterinary clinic Any premises used in which a veterinarian or veterinary surgeon treats the minorailments of domestic animals and no animal remains on the premises aftertreatment overnight, except in emergencies.

Veterinary hospital Any premises used for the treatment of sick or injured animals where those animalsare accommodated overnight after treatment in premises. The term does not includeanimal husbandry or kennels.

Warehouse Any premises used for the storage of goods in large quantities pending their sale,or distribution, to persons who purchase only for the purpose of resale or for use inthe course of an industry. The term does not include a shop, hardware centre orretail showroom.