Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility
2
![Page 3: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/3.jpg)
Clean Water Act Goals By 1985…
3
![Page 4: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/4.jpg)
Clean Water Act Goals Cntd.
4
![Page 5: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/5.jpg)
TBELs and WQBELs CWA Section 301 (b)(2)(A)
“Elimination of pollutant discharges to waters of the U.S.” … “if such elimination is technologically and economically achievable”
CWA Section 302(a) Whenever discharges of pollutants…with the application of effluent limitations required under section 301(b)(2) interfere with the attainment of maintenance of water quality, that water quality effluent limits shall be established to attain or maintain the water quality
5
![Page 6: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/6.jpg)
NPDES Program Section 402 of the CWA authorizes EPA to issue an National Pollutant Discharge Elimination System (NPDES) permit to any person discharging any pollutant or combination of pollutants from a point source into waters of the United States
NPDES Permits Restrict the types and amounts of pollutants
Accomplished by requiring dischargers to meet Technology Based Effluent Limitations; or
Water Quality Based Effluent Limitations
6
![Page 7: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/7.jpg)
Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility
7
![Page 8: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/8.jpg)
Public Health and Water Resource Impacts “A Waterborne outbreak of Norwalk‐Like Virus among Snowmobilers” Published in Journal of Infectious Diseases, volume 187, 2003
Undersized onsite septic system contaminated the water supply
Highlights the importance of proper design and maintenance for onsite wastewater treatment systems
8
![Page 9: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/9.jpg)
Installation Statistics
0%
10%
20%
30%
40%
50%
60%
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
1996
1998
2000
2002
2004
2006
2008
2010
Total Systems Installed
Surface DischargingSystemsPercentage of Total
9
![Page 10: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/10.jpg)
Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility
10
![Page 11: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/11.jpg)
ILG62‐What is it? NPDES General Permit that covers new and replacement surface discharging systems
Eligibility requirements: Receive and process domestic sewage only, Flow through the system is 1500 gallons per day or less, Connection to sewer is 200 feet from the property or greater, and
All alternatives to a surface discharging system are technically or economically infeasible.
11
![Page 12: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/12.jpg)
You’re Not Eligible If… Lots created 6‐months after the effective date of the permit
Already covered by a different NPDES permit Discharges to 303(d) listed waters Discharges mixed with material other than domestic sewage
Discharges from more than one home, or other structure
A sewer connection is within 200 feet of your property
12
![Page 13: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/13.jpg)
Effluent LimitsDischarges to WOUS Discharges to Lakes, Ponds,
or Impoundments Max. Daily Limits in mg/L
BOD5 or COD (45 or 55) TSS or Turbidity (45 or 15
NTU) Dissolved Oxygen (4.0
minimum) Fecal Coliform (400
CFU/100 mL) Total Resid. Chlorine (0.038) pH (6.0‐9.0 Std. Units) Oil, Odor, Color, Floating
Debris (None Detectable)
Max. Daily Limits in mg/L BOD5 (20) TSS (24)
Fecal Coliform (400 CFR/100 mL)
Total Resid. Chlorine (0.038) pH (6.0‐9.0 Std. Units) Oil, Odor, Color, Floating
Debris (None Detectable)
13
![Page 14: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/14.jpg)
Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility
14
![Page 15: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/15.jpg)
Permit Mechanics‐HomeownerTech. Feasibility
AnalysisCan your site support a zero discharge system?
Economic AnalysisEvaluate least expensive zero
discharge system.
Install the least expensive zero
discharge system or;
Apply for an individual NPDES permit from the state of Illinois
Submit an NOI
15
Yes No
Eligible
Not Eligible Not Eligible
![Page 16: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/16.jpg)
Permit Mechanics‐Business or Government
16
Tech. Feasibility Analysis
Can your site support a zero discharge system?
Install the least expensive zero
discharge system or;
Apply for an individual NPDES permit from the
state of IllinoisSubmit an NOI
NoYes
![Page 17: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/17.jpg)
Overview Overview of the CWA and the NPDES Program Need for General Permit and Beneficial Impact General Permit ILG62‐What is it? Permit Mechanics Technical and Economic Feasibility
17
![Page 18: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/18.jpg)
Technical Feasibility
Soil Investigation
Site Evaluation
Technical Feasibility Analysis
18
![Page 19: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/19.jpg)
Economic Feasibility• $ Least expensive zero discharge system
• Corresponding O&M $
Annualized Cost over 30
years
• AGI year 1• AGI year 2• AGI year 3
Average AGI
19
![Page 20: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/20.jpg)
Economic Eligibility Criteria IF annualized cost over 30 years > 2% of average AGI
Eligible for coverage Submit an NOI
IF annualized cost over 30 years < 2% of average AGI Not eligible for coverage Install zero discharge system; or Apply for an individual NPDES permit
20
![Page 21: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/21.jpg)
Example‐Economic Feasibility Given:
Total system cost (purchase & installation) $7,500 Corresponding annual O&M cost = $350‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
The annualized cost over 30 years = $895/yr ($75/month) Find corresponding AGI such that:
Annualized cost = 2% * AGI $895 = 2% * AGI AGI = $44,750/year
21
![Page 22: Mark Ackerman U.S. EPA, Region 5 April 5, 2013](https://reader033.vdocument.in/reader033/viewer/2022051521/585c56321a28abed218cc69a/html5/thumbnails/22.jpg)
Photo References http://www.militarymentalhe
alth.org/blog/2012/03/fishing‐is‐more‐than‐just‐a‐relaxing‐pastime‐it‐can‐help‐with‐ptsd‐symptoms/
http://rowerunning.co.uk/2008/04/why‐some‐dont‐like‐open‐water‐swimming/
http://chenected.aiche.org/plant‐operations/water‐industrial‐discharge‐permits/
22