master plan study on - jica · 2004-05-06 · result of site survey for micro-hydropower potential...

16
JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) MINISTRY OF NATURAL RESOURCES AND ENVIRONMENTAL AFFAIRS (MONREA) DEPARTMENT OF ENERGY AFFAIRS (DOE) REPUBLIC OF MALAWI MASTER PLAN STUDY ON RURAL ELECTRIFICATION IN MALAWI FINAL REPORT TECHNICAL BACKGROUND REPORT MPN JR 03-025 No MARCH 2003 TOKYO ELECTRIC POWER SERVICES CO., LTD. NOMURA RESERARCH INSTITUTE, LTD.

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

JAPAN INTERNATIONAL COOPERATION AGENCY (JICA)

MINISTRY OF NATURAL RESOURCES AND ENVIRONMENTAL AFFAIRS (MONREA) DEPARTMENT OF ENERGY AFFAIRS (DOE) REPUBLIC OF MALAWI

MASTER PLAN STUDY ON

RURAL ELECTRIFICATION IN

MALAWI

FINAL REPORT TECHNICAL BACKGROUND REPORT

MPN

JR

03-025

No

MARCH 2003

TOKYO ELECTRIC POWER SERVICES CO., LTD. NOMURA RESERARCH INSTITUTE, LTD.

Page 2: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower
Page 3: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower
Page 4: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

MASTER PLAN STUDY ON RURAL ELECTRIFICATION

IN MALAWI Final Report Technical Background Report

Contents

Page

Malawi Map Acronyms/Abbreviations and Unit 1/3 – 1/1 Chapter 1 Introduction

1.1 Background 1-1 ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

1.2 Objectives and Geographical Scope of the Master Plan Study 1-2 Chapter 2 Outline of the Master Plan Study

2.1 Preparation Work in Japan 2-1 2.2 First Field Survey 2-2 2.3 Second Field Survey 2-2 2.4 First Domestic Activities 2-2 2.5 Third Field Survey 2-3 2.6 Second Domestic Activities 2-3 2.7 Fourth Field Survey 2-3 2.8 Third Domestic Activities 2-4 2.9 Fifth Field Survey 2-4 2.10 Fourth Domestic Activities 2-4 2.11 Sixth Field Survey 2-4 2.12 Member of the M/P Study Team 2-5

Chapter 3 General Situations of Malawi 3.1 Population 3-1 3.2 Race, Language and Religion 3-1 3.3 Fertility and Mortality 3-2 3.4 Education and Literacy 3-7 3.5 Poverty and Living Standards 3-10 3.6 Administrative Organization and Local Social Structure 3-10 3.7 Economic Activity 3-13 3.8 Current Situation of the Power Sector 3-15 3.9 Development Plan 3-26

-i-

Page 5: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Chapter 4 Demand Forecast 4.1 Demand Supply Balance of Malawi 4-1 ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

4.2 Forecast of potential demand in unelectrified TCs 4-5 4.3 Power Development in Malawi Related to the Rural Electrification mplementation 4-6

Chapter 5 Distribution System

5.1 Current Situation of Distribution System 5-1 5.2 Distribution System Planning 5-6 5.3 Study of System Location 5-9 5.4 Preliminary Design 5-11 5.5 Construction Cost 5-13 5.6 Case Studies on Distribution Systems 5-17 5.7 House Wiring 5-22

Chapter 6 Micro-Hydropower Generation Planning 6.1 Purpose 6-1 6.2 Data Collection 6-1 6.3 Review of Existing Hydropower Development Plans 6-3 6.4 Micro-hydropower Potential Survey 6-5 6.5 Impact of Micro-hydropower Development on Social and Natural Environment 6-28 6.6 Preliminary Cost Estimate for Micro-hydropower Potential Sites 6-29 6.7 Project Evaluation for Micro-hydropower Development 6-38 6.8 Implementation of a Case Study for Micro-hydropower Development 6-43 6.9 Case Study Result Consideration 6-50

Chapter 7 Solar Power Generation Planning 7.1 The state of Solar Power in Malawi 7-1 7.2 Field Surveys and evaluation of existing PV systems 7-3 7.3 Design and Specification of PV systems in Malawi 7-5 7.4 Procedure for the Cost Estimation of Photovoltaic Power System 7-7 7.5 State of PV Projects implemented with foreign funds 7-9 7.6 Photovoltaic Power Generation and Environmental Issues 7-10 7.7 Model for the promotion of PV projects supported by foreign countries 7-10

Chapter 8 Rural Society 8.1 Functions of Trading Centers and Local Communities 8-1 8.2 Economic Activity in Rural Areas and Expected Effects after Electrification 8-2 8.3 Rural Electrification and Energy Consumption 8-3 8.4 Rural Development Plan 8-6 8.5 Selection of Electrification Target 8-6

-ii-

Page 6: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

8.6 Socio-economic Survey 8-12 ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

8.7 Technical Aspects Evaluation: Demand Forecast for Unelectrified Trading Centers 8-22 8.8 Social Aspects Evaluation: Ability and Willingness to Pay 8-54 8.9 Summary of Analysis Results 8-69

Chapter 9 Rural Electrification Database 9.1 Data Contents 9-1 9.2 Process of Database Elaboration 9-1 9.3 Database Components 9-2 9.4 Data Items 9-10

Chapter 10 Economic and Financial Analysis 10.1 Current State of the Malawi Economy 10-1 10.2 Economic and Financial Analysis of the Rural Electrification Master Plan 10-8 10.3 Conclusions 10-9 10.4 Funding 10-16

Chapter 11 Institutions and Organizations 11.1 RE Program Implemented by ESCOM Thus Far 11-1 11.2 Promotion of Further RE by the DOE 11-2 11.3 The Movement for Power Sector Reform 11-7 11.4 Rural Electrification Bill 11-17 11.5 Advisable Setup for RE Promotion 11-20 11.6 Institutional conditioning required for promotion of RE 11-30 11.7 Further Tasks 11-35

Appendix Chapter 3 A3-1~A3-2 Chapter 5 A5-1~A5-15 Chapter 6 A6-1-1~A6-3-10 Chapter10 A10-1~A10-3

-iii-

Page 7: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

List of Tables

Page Table 3-1-1 Population Distribution and Annual Growth Rate by Region/District 3-4 ・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・

・・・・・・・・

Table 3-1-2 Population Density by Region/District 3-5 Table 3-1-3 Population Distribution by Age Group 3-5 Table 3-2-1 Utilizing Language by Population Ratio in Each Region 3-6 Table 3-2-2 Population by Religion in Each Region 3-6 Table 3-4-1 Population Aged 5 Years and Over by Highest Education Attended 3-8 Table 3-4-2 Population Aged 5 Years and Over by Literacy Status 3-9 Table 3-5-1 Number of Households and Average Number of Persons per Household 3-11 Table 3-5-2 Poverty and Ultra-Poverty Lines 3-11 Table 3-7-1 Population Aged 10 Years and Over by Economic Activity Status 3-14 Table 3-8-1 Power Plant in Malawi 3-5 Table 3-8-2 Breakdown of Transmission Substations in 1998/99 3-5 Table 3-8-3 Gross Generation in Malawi 3-6 Table 3-8-4 Regional Energy Sales 3-6 Table 3-8-5 Category-wise Energy Sales 3-7 Table 3-8-6 Energy Sales Summaries by Category and Region in 1998/99 3-7 Table 3-8-7 Peak Demand 3-7 Table 3-8-8 Number of Customers 3-8 Table 3-8-9 Number of Customers by Category and Region in 1998/99 3-8 Table 3-8-10 Energy Sales per Customer in 1998/99 3-8 Table 3-9-1 Proposed Plan for Generation Expansion 3-14 Table 3-9-2 Plan of HV Transmission System 3-14 Table 4-1-1 Demand Forecast in Malawi (Generated) 4-3 Table 4-1-2 Assumptions by ESCOM 4-4 Table 4-1-3 Difference items of World Bank and ESCOM (Base Scenario) 4-4 Table 4-2-1 Forecasted Electric Energy Consumption [kWh/day] 4-7 in year of 2021 for Prioritized TCs Table 4-2-2 Basic Data and Forecasted Power Demand for Unelectrified TCs 4-9 Table 5-1-1 Total Lengths of Transmission and Distribution Lines 5-26 Table 5-1-2 Acts and Manuals 5-26 Table 5-4-1 Voltage Classes 5-32 Table 5-4-2 Facilities 5-32 Table 5-5-1 Calculation of Cost and Benefit 5-33 Table 6-4-1 Micro-Hydropower Potential Site Investigation Record 6-56 Table 6-4-2 (1)~(7) Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower Potential Survey for unelectrified TCs listed up 6-75 in Socio-economic Survey and located more than 20km far from existing grid

-iv-

Page 8: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Table 7-3-1 The company name of SHS equipment 7-6 ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・

・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・

・・・・・

・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・

・・・・・・

・・

・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・

Table 7-3-2 The company name of SHS equipment 7-6 Table 7-3-3 SHS price list 7-7 Table 7-3-4 Usage hour per day 7-7 Table 8-3-1 Number of Dwelling Units by Main Source of Energy for Lighting 8-4 Table 8-3-2 Number of Dwelling Units by Main Source of Energy for Cooking 8-5 Table 8-5-1 Data Collection Sheet for Unelectrified Trading Centers 8-8 Table 8-5-2 Unelectrified Trading Centers with Annual Market Fee in Each District 8-9 Table 8-6-1 Main Survey Items in Socio-economic Survey 8-16 Table 8-6-2 Electrified Trading Centers Investigated in Socioeconomic Survey 8-17 Table 8-6-3 Unelectrified Trading Centers Investigated in Socioeconomic Survey 8-18 Table 8-6-4 Estimated Populations of Households and Business Entities 8-20 in Socio-economic Survey Table 8-6-5 Necessary Sample Sizes and Selected Sample Sizes in Socio-economic Survey 8-20 Table 8-6-6 Detail Sample Sizes for Socio-economic Survey 8-21 Table 8-6-7 Collected Sample Sizes in Socio-economic Survey 8-21 Table 8-7-2-1 Summaries of Surveyed Electrified Trading Centers 8-25 Table 8-7-2-2 Summary Table of Surveyed Public Facilities 8-25 Table 8-7-2-3 Numbers of Existing and Electrified Public Facilities 8-26 in Each Electrified Trading Center Table 8-7-2-4 Numbers of Existing and Electrified Business Entities 8-26 in Each Electrified Trading Center Table 8-7-2-5 Numbers of Existing and Electrified Maize Mills 8-29 in Each Electrified Trading Center Table 8-7-2-6 Numbers of Existing and Electrified Households 8-31 in Each Electrified Trading Center Table 8-7-2-7 Time Table of Daily Demand in Surveyed Electrified Trading Centers 8-34 Table 8-7-3-1 Peak demand except Maize Mills and Number of Households in Electrified TCs 8-39 Table 8-7-3-2 Numbers of Households in Unelectrified TCs from 2001 to 2021 8-42 Table 8-7-3-3 Numbers of Maize Mills in Electrified TCs 8-44 Table 8-7-3-4 Numbers of Maize Mills in Unelectrified TCs 8-45 Table 8-7-3-5 Forecasted Numbers of Maize Mills in Unelectrified TCs from 2001 to 2021 8-46 Table 8-7-4-1 Forecasted Peak Demand for Prioritized Unelectrified TCs from 2001 to 2021 8-48 Table 8-7-4-2 Forecasted Electric Energy Consumption [kWh/day] for Unelectrified TCs in 2021 8-52 Table 8-8-1-1 Highly correlated variables among data collected in the survey 8-56 Table 8-8-2-1 Summaries of Basic Statistics for Monthly Incomes in Four Categories 8-57 Table 8-8-2-2 Summaries of Null Hypotheses Tests’ Results regarding 8-58 Monthly Incomes in Four Categories Table 8-8-3-1 Summaries of Basic Statistics for ESCOM Connection 8-59 Fee and In-house Wiring Costs Paid by each of Households and Business Entities Table 8-8-3-2 Summary of Null Hypotheses Test’s Result regarding ESCOM Connection fee 8-59 and In-house Wiring Costs Paid by each of Households and Business Entities

-v-

Page 9: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Table 8-8-3-3 Summaries of Basic Statistics for ESCOM Connection Fee and 8-59 ・・・・・・・・・・・・・・・・・・

・・・・

・・・・・・・・・・・・・

・・・・

・・・・・・・・・・・・

・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・

・・・・・・・・・・

・・・・・・・・・・・・・・・・・

・・・・・・・

・・・・・・・・・・・・・

・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・

・・・・・・・・・・・・

・・・・・・

・・・・・・・

・・・・

・・・

・・・

In-house Wiring Costs Paid by both Households and Business Entities Table 8-8-3-4 Summaries of Basic Statistics for Willingness to Pay for ESCOM Connection fee 8-60 and In-house Wiring Cost by each of Households and Business Entities Table 8-8-3-5 Summary of Null Hypotheses Test’s Result regarding Willingness to 8-60 Pay for ESCOM Connection fee and In-house Wiring Cost by each of Households and Business Entities Table 8-8-3-6 Summaries of Basic Statistics for Willingness to Pay for ESCOM Connection fee 8-60 and In-house Wiring Cost by both Households and Business Entities Table 8.8.3.7 Summaries of Basic Statistics for Actually Paid Connection Costs and 8-61 Willingness to Pay for Connection Costs Table 8-8-3-8 Summary of Null Hypotheses Test’s Result regarding Actually Paid 8-61 Connection Costs and Willingness to Pay for Connection Costs Table 8-8-4-1 Summaries of Basic Statistics for Monthly Electricity Tariff Paid 8-62 by each of Households and Business Entities Table 8-8-4-2 Summary of Null Hypotheses Test’s Result regarding Monthly Electricity 8-62 Tariff Paid by each of Households and Business Entities Table 8-8-4-3 Summaries of Basic Statistics for Monthly Electricity Tariff Paid 8-62 by both Households and Business Entities Table 8-8-4-4 Summaries of Basic Statistics for Willingness to Pay for Monthly Electricity 8-63 Tariff by each of Households and Business Entities Table 8-8-4-5 Summary of Null Hypotheses Test’s Result regarding Willingness to 8-63 Pay for Monthly Electricity Tariff by each of Households and Business Entities Table 8-8-4-6 Summaries of Basic Statistics for Actually Paid Monthly Tariff and 8-65 Willingness to Pay for Monthly Tariff Table 8-8-4-7 Summary of Null Hypotheses Test’s Result regarding Actually 8-65 Paid Monthly Tariff and Willingness to Pay for Monthly Tariff by Households Table 8-8-4-8 Summary of Null Hypotheses Test’s Result regarding Actually Paid 8-65 Monthly Tariff and Willingness to Pay for Monthly Tariff by Business Entities Table 8-8-5-1 Summaries of Basic Statistics for Ratio of Monthly Tariff to Monthly 8-66

Income for each of Households and Business Entities Table 8-8-5-2 Summary of Null Hypotheses Test’s Result regarding Ratio of Monthly Tariff 8-66 to Monthly Income for each of Households and Business Entities Table 8-8-5-3 Summaries of Basic Statistics for Ratio of Monthly Tariff to Monthly Income 8-66 for both Households and Business Entities Table 8-8-5-4 Summaries of Basic Statistics for Ratio of Willingness to Pay for Monthly Tariff 8-67 to Monthly Income for each of Households and Business Entities Table 8-8-5-5 Summary of Null Hypotheses Test’s Result regarding Ratio of Willingness to Pay 8-67 for Monthly Tariff to Monthly Income for each of Households and Business Entities Table 8-8-5-6 Summaries of Basic Statistics for Ratio of Willingness to Pay for Monthly Tariff 8-67 to Monthly Income for both Households and Business Entities

-vi-

Page 10: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Table 8-8-5-7 Summaries of Basic Statistics for Ratio of Actually Paid Monthly Tariff 8-68 ・・・・・・・・・・

・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

and Willingness to Pay for Monthly Tariff to each Monthly Income Table 8-8-5-8 Summary of Null Hypotheses Test’s Result regarding Ratio of Actually 8-68 Paid Monthly Tariff and Willingness to Pay for Monthly Tariff to each Monthly Income Table 9-1-1 Number of Data Items Collected by Each Type of Interviewees 9-1 Table 10-1 Foreign Exchange Rate for Malawian Kwacha 10-1 Table 10-2-1 Likoma Island Cost Analysis 10-10 Table 10-2-2 Likoma Island Electrification Cash Flow Estimate 10-11 Table 10-2-3 Electrification Tariff Analysis of Mkaika 10-13 Table 10-2-4 Electrification Tariff Analysis Chitimba 10-13 Table 11-1 Subjects of the Phase-4 RE program 11-4 Table 11-2 Tariff table(as of August 1,2001) 11-10 Table 11-3 Schedule for the power Sector Reform 11-17 Table 11-4 Possibilities of operation of RE projects 11-30

List of Figure

Fig. 3-1-1 Population and Annual Growth Rate: 1901 - 1998 Census 3-3 ・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

Fig. 3-6-1 Malawi District/Region Map 3-12 Fig. 3-8-1 Liwonde Barrage 3-10 Fig. 3-8-2 Transmission lines in Malawi 3-9 Fig. 3-8-3 66kV Transmission Line 3-10 Fig. 3-8-4 Category-wise Energy Sales 3-11 Fig. 3-8-5 Typical Load Curve 3-11 Fig. 3-9-1 Development Plan 3-15 Fig. 4-1-1 Demand Supply Balance of Malawi 4-4 Fig. 4-2-1 Planning Process of Rural Electrification 4-5 Fig. 5-1-1 SCADA system of NCC (Sample) 5-26 Fig. 5-1-2 Typical configuration of Distribution System 5-27 Fig. 5-1-3 Disconnecting Switch 5-27 Fig. 5-1-4 Recloser 5-27 Fig. 5-1-5 Number of Faults 5-27 Fig. 5-1-6 Reconstructed pole 5-28 Fig. 5-1-7 Transformer (50kVA) 5-28 Fig. 5-1-8 Transformer (100kVA) 5-28 Fig. 5-1-9 Safety Guard 5-28 Fig. 5-3-1 Existing and Planning Distribution Lines 5-29 Fig. 5-4-1 System Configuration 5-32 Fig. 5-5-1 Extended Situation of Distribution Lines after PhaseIV 5-37 Fig. 5-5-2 Expected Distribution Lines after PhaseV 5-38 Fig. 5-5-3 Expected Distribution Lines after PhaseVI 5-39

-vii-

Page 11: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Fig. 5-5-4 Expected Distribution Lines after PhaseXV (1) 5-40 ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

Fig. 5-5-5 Expected Distribution Lines after PhaseXV (2) 5-41 Fig. 5-7-1 Prepaid Meter and Sample Receipt 5-42 Fig. 5-7-2 Ready Board 5-43 Fig. 5-7-3 Cooker 5-43 Fig. 5-7-4 Electrical Fan 5-43 Fig. 5-7-5 Bracket (outside) 5-43 Fig. 5-7-6 Bracket (inside) 5-43 Fig. 5-7.7 Ready Board and Wiring 5-43 Fig. 6-2-1 Mean Annual Rainfall Map 6-54 Fig. 6-4-1 Location if the micro-hydropower potential sites 6-55 Fig. 6-4-2 General Plan of Chisenga Site 6-65 Fig. 6-4-3 General Plan of Kakasu Site 6-66 Fig. 6-4-4 General Plan of Choyoti Site 6-67 Fig. 6-4-5 General Plan of Hewe Site 6-68 Fig. 6-4-6 General Plan of Nchenachena Site 6-69 Fig. 6-4-7 General Plan of Murwezi, Lizunkhuni Site 6-70 Fig. 6-4-8 General Plan of Sasasa Site 6-71 Fig. 6-4-9 General Plan of Ngapani Site 6-72 Fig. 6-4-10 General Plan of Mtemankhokwe Site 6-73 Fig. 6-4-11 General Plan of Nswadzi Site 6-74 Fig. 6-6-1 SMALL-SIZE HYDRO TURBINE APPLICATION CHART 6-76 Fig. 7-1 SHS system equipment 7-1 Fig. 7-1-1 monthly solar irradiation 7-2 Fig. 7-1-2 each geographical region’s solar irradiation 7-2 Fig. 7-2-1 Field surveys 7-3 Fig. 7-2-2 Stuff House 7-3 Fig. 7-2-3 (Left)Wireless Communication in Health Centre (Middle, Right)Radio, 7-4 TV, and Electric bulb in Stuff House Fig. 7-2-4 (Top) Electric Bulb (Under) Battery 7-4 Fig. 7-2-5 (Left) Refrigerator,(Middle)Battery,(Right)Solar Panel 7-5 Fig. 7-3-1 (Right)PV Company (Middle, Left) inside the company 7-5 Fig. 7-3-2 (Left) Battery (Right) Battery’s tools and parts 7-5 Fig. 7-7-1 DANIDA’s Legal Framework Model of PV System 7-12 Fig. 8-1-1 Summary of Trading Center’s Functions 8-1 Fig. 8-6-1 Process of Target TCs Selection for Electrification and 8-14 Technical/Social Aspects Evaluation Fig. 8-7-1 Flow Chart of Data Analysis for Technical Aspects Evaluation 8-22 Fig. 8-7-2-1 Average Daily Load Curve per Unit for Each Public Facility 8-25 Fig. 8-7-2-2 Public Facilities’ Daily Load Curves for Electrified Trading Centers 8-26 Fig. 8-7-2-3 Business Entity’s Unit Average Daily Load Curve 8-23 for Each Electrified Trading Center

-viii-

Page 12: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

Fig. 8-7-2-4 Business Entities’ Daily Load Curves for Electrified Trading Centers 8-28 ・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・

・・・・

・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・・・・・・・・

・・・・・・・・・・・・・・・・・・・

Fig. 8-7-2-5 Maize Mills’ Daily Load Curves for Electrified Trading Centers 8-30 Fig. 8-7-2-6 Household’s Unit Average Daily Load Curve for Each Electrified Trading Center 8-32 Fig. 8-7-2-7 Households’ Daily Load Curves for Electrified Trading Centers 8-32 Fig. 8-7-2-8 Daily Load Curves for Electrified Trading Centers 8-32 Fig. 8-7-3-1 Linear Regression Model for Peak Demand except Maize Mills in Electrified TCs 8-39 Fig. 8-7-4-1 Potential Daily Peak Demand in Unelectrified TCs in 2001 8-49 Fig. 8-7-4-2 Potential Daily Peak Demand in Unelectrified TCs in 2006 8-49 Fig. 8-7-4-3 Potential Daily Peak Demand in Unelectrified TCs in 2011 8-50 Fig. 8-7-4-4 Potential Daily Peak Demand in Unelectrified TCs in 2016 8-50 Fig. 8-7-4-5 Potential Daily Peak Demand in Unelectrified TCs in 2021 8-51 Fig. 9-3-1 Database’s Menu Screen 9-3 Fig. 9-3-2 TC’s Data Screen 9-3 Fig. 9-3-3 The screen for inputting the parameter 9-6 Fig. 9-3-4 Each TC’s Electrified Cost Data 9-6 Fig. 9-3-5 Each TC’s Basic Data 9-7 Fig. 9-3-6 Each District’s Priority Data 9-7 Fig. 9-3-7 Each Phase’s TC Data 9-8 Fig. 9-3-8 Each TC’s Basic Data Print 9-8 Fig. 9-3-9 Fundamental TC Table 9-9 Fig. 9-3-10 First Data Table 9-9 Fig. 11-1 Trend of ESCOM’s overall unit tariff rate 11-10 Fig. 11-2 institutional framework for promotion of RE projects 11-21 Fig. 11-3 Mechanism of subsidization for the operation of RE programs 11-33

-ix-

Page 13: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

ACRONYMS / ABBREVIATIONS

AC : Alternating CurrentACC : Area Control CenterAFD : African Development FundBOO : Build, Own and OperateBOT : Build, Operate and TransferCB : Circuit BreakerCDM : Clean Development MechanismCHAM : Christian Health Association of MalawiCIF : Cost, Insurance and FreightCO2 : Carbon DioxideCOD : Cash on DeliveryCP, C/P : CounterpartCRCD : Community Resource Conservation and DevelopmentDANIDA : Danish International Development AgencyDB : Dry BatteryDC : Direct CurrentDEA/DOE : Department of Energy AffairsDL, D/L : Distribution LineDSM : Demand Side ManagementEC : Electric CooperativeEIA : Environmental Impact AssessmentEIRR : Economic Internal Rate of ReturnEIS : Environmental Impact StatementEL : ElevationESCOM : Electricity Supply Corporation of Malawi LimitedEU : European UnionF/S : Feasibility StudyFC : Foreign CurrencyFIRR : Financial Internal Rate of ReturnFOB : Free On BoardFOR : Forced Outage RateFOREX : Foreign Exchange Rate Adjustment ClausesGDP : Gross Domestic ProductGEF : Global Environmental FacilityGNP : Gross National ProductGRDP : Gross Regional Domestic ProductGTZ : Gesellschaft fur Technishe ZusammenarbeitIBRD : International Bank for Reconstruction and DevelopmentIPP : Independent Power ProducerISO : International Standardization Organization

- 1/3 -

Page 14: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

ACRONYMS / ABBREVIATIONS

JICA : Japan International Cooperation AgencyKfW : Kreditanstadt fur WiederanfbauLRMC : Long Run Marginal CostM/P, MP : Master PlanMAI : Ministry of Aguricalture and IrrigationMASAF : Malawi Social Action FundMHP : Mini- Hydropower or Micro-Hydropowermil : MillionMLG : Ministry of Local GovernmentMNREA/MONREA : Ministry of Natural Resources and Environmental AffairsMOE : Ministry of Education and Science TechnologyMOF : Ministry of Finance and Economic PlanningMOHP : Ministry of Health and PopulationNCC : National Control CenterNECO : National Electricity CouncilNGO(s) : Non-Government Organization(s)NNW : North-northwestNPV : Net Present ValueNRI : Nomura Research Institute Co., Ltd.

NSREP : National Sustainable Renewable Energy Program

NW : NorthwestO&M : Operation and MaintenanceODA : Official Development AssistanceOECF : Overseas Economic Cooperation FundOJT : On the Job TrainingP/S, PS : Power StationPF : Power FactorPPA : Power Purchase AgreementPV : Solar PhotovoltaicRE : Rural ElectrificationREP : Rural Electrification ProgramREU : Rural Electrification UnitROR : Run of RiverRTC : Rural Training CenterSS, S/S : SubstationSAPP : South Africa Power PoolSCADA : Supervisory Control and Data AcquisitionSCF : Standard Conversion FactorSE : SoutheastSEO : Senior Environment Officer

- 2/3 -

Page 15: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

ACRONYMS / ABBREVIATIONS

SHS : Solar Home SystemSSE : South-southeastSW : SouthwestT&D : Transmission and Distribution LineTL, T/L : Transmission LineTC T/C : Trading CenterTEPSCO : Tokyo Electric Power Services Co., Ltd.Tr. : TransformerUNDP : United Nations Development ProgrammeUNICEF : the United Nations Children's Fund UNIDO : United Nations Industrial Development OrganizationVAT : Value-Added TaxWB : The World BankWHO : World Health OrganizationWWF : World Widelife Fund

- 3/3 -

Page 16: MASTER PLAN STUDY ON - JICA · 2004-05-06 · Result of Site Survey for Micro-hydropower Potential in Northern 6-58 and Southern Area of Malawi Table 6-4-3 Result of Micro-hydropower

UNITS

Prefixesμ : micro- = 10 -6

m : milli- = 10 -3

c : centi- = 10 2

d : deci- = 10 9

da : deca- = 10h : hecto- = 10 2

k : kilo- = 10 3

M : mega- = 10 6

G : giga- = 10 9

Units of Length m : meterkm : kilometer

Units of Aream2 : square meterkm2 : square kilometer

Units of Volumem3 : cubic meterl : literkl : kiloliter

Units of Masskg : kilogramt : ton (metric)oz : ounce

Units of DensityUnits of Energy

kWh : kilowatt-hourMWh : megawatt-hourMj : megajoule

Units of Temperature℃ : degree Celsius or Centigrade

Units of ElectricityW : wattkW : kilowattMW : megawattAh : ampere hourV : voltkV : kilovoltkVA : kilovolt ampere

Units of Times : secondmin : minuteh : hourd : daym : monthy : year

Units of Flow Ratel/s : liter per secondm3/s : cubic meter per second

Units of CurrencyMK : Malawi KwachaUS$ : US Dollar¥ : Japanese Yen

Exchange Rate1 US$ = MK 64.40 As of September 20011 US$ = MK 74.43 As of March 20021 US$ = MK 76.60 As of June 2002

- 1/1 -